Scope of Part - B : Strengthening of Distribution System. Fund Allocation of Part - B: Proposed fund allocation Rs 40,000 Cr. RESTRUCTURED APDRP-II IN XI PLAN. Collection of data Physical, Loading, Losses, Voltages Computerise Data Validate Data Benchmark Performance Parameters - PowerPoint PPT Presentation
Citation preview
1
RESTRUCTURED APDRP-II IN XI PLAN RESTRUCTURED APDRP-II IN XI PLAN
Scope of Part - B :
Strengthening of Distribution System.
Fund Allocation of Part - B:
Proposed fund allocation Rs 40,000 Cr.
2
Steps for Preparation of DPRSteps for Preparation of DPR Collection of data
Physical, Loading, Losses, Voltages
Computerise Data
Validate Data
Benchmark Performance Parameters
Prioritise feeders/DTs Group feeders for Optimisation
Contd…
3
Evaluate options R&M, Augmentation,New Work
Cost benefit analysis
Prioritise & Shortlist
Finalisation of DPR & submission to nodal agencies
Steps for Preparation of DPRSteps for Preparation of DPR
4
Contents of DPRContents of DPR
1. Executive Summary Introduction Objective Scope & Cost Estimate Benefits Implementation Schedule Payback Period
5
Contents of DPRContents of DPR2. Town/circle profile & organization setup
Consumers profile
Existing distribution system with sources of supply
Details of sub stations, feeders, DTs with electrical and physical boundaries etc.
History of Load growth & Consumer growth
Power and energy flow details
Metering details at all voltage levels
HT/LT Ratio
Organisation Setup
6
Contents of DPRContents of DPR3. Commercial performance
Billing details Input Energy Billed Energy Revenue Billed Revenue Realised
T&D and AT&C losses
Feeder outage and reliability index
Power & Distribution transformer failure rate
7
Contents of DPRContents of DPR
4. Constraints & Difficulties in the existing system Adequacy of EHV transformation capacity for
supply of power Adequacy of Sub Transmission capacity at 66kV
or 33 kV level sub stations Overloading of 66kV or 33 kV, 11 kV and 440
volts feeder Overloading of distribution transformers
8
Contents of DPRContents of DPR
5. Scope of R&M works for Existing Sub station
Feeders (including reconductoring, Bifurcation, Segregation, Conversion to under ground cable, Conversion to Arial Bunch Cable (ABC) etc.
Distribution Transformers
Service connection
9
Contents of DPRContents of DPR
6. Scope of New Works for New Sub station
New Feeders
High Voltage Distribution System (HVDS)
New DTs
Capacitor bank - HT & LT
New Service connection
10
7. Project Implementation schedule
Schedule for NIT,OBD & LOA.
Schedule for Project Execution
Contents of DPRContents of DPR
11
COST BENEFIT ANALYSIS
Estimated cost of the scheme
Increase in annual revenue due to o Increased energy consumption (Load growth)o Reduction in technical losses o Reduction of commercial losses
Total annual benefit
Payback period
Contents of DPRContents of DPR
12
Bench marks of performance (Yearly)
Sl Benchmark Parameter Present Level
Level to be achieved
Date by which parameter would be achieved
a) Metering efficiency (Input Vs. metered energy)
b) Collection efficiency (amount collected to amount billed)
c) Transmission & Distribution losses
d) DT Failure rate
e) Number of feeder outages
f) Period of feeder outages
g) Reliability Index
h) Number of consumer complaints
i) Consumer complaint disposal time
k) AT&C Loss
Contents of DPRContents of DPR