SERC APDRP Upto January 2013

Embed Size (px)

Citation preview

  • 7/28/2019 SERC APDRP Upto January 2013

    1/76

    S.No MonthEnergy Input

    Billed and lossesHawal Rainawari K.K.Moulla Khanyar Zakura

    Total for

    the Division

    Input (LU's) 129.51 129.51

    Billed (LU's) 38.99 38.99

    Losses % 69.89 69.89

    Input (LU's) 121.43 121.43

    Billed (LU's) 38.28 38.28

    Losses % 68.48 68.48Input (LU's) 110.79 110.79

    Billed (LU's) 35.70 35.70

    Losses % 67.78 67.78

    Input (LU's) 94.25 94.25

    Billed (LU's) 36.02 36.02

    Losses % 61.78 61.78

    Input (LU's) 81.35 81.35

    Billed (LU's) 29.51 29.51

    Losses % 63.72 63.72

    Input (LU's) 81.65 81.65

    Billed (LU's) 29.73 29.73

    Losses % 63.59 63.59

    Input (LU's) 89.14 89.14Billed (LU's) 29.39 29.39

    Losses % 67.03 67.03

    Input (LU's) 119.25 119.25

    Billed (LU's) 36.21 36.21

    Losses % 69.64 69.64

    Input (LU's) 149.59 149.59

    Billed (LU's) 52.21 52.21

    Losses % 65.10 65.10

    Input (LU's) 161.01 161.01

    Billed (LU's) 54.22 54.22

    Losses % 66.33 66.33

    Input (LU's) 0.00 0.00

    Billed (LU's) 0.00 0.00Losses % #DIV/0! #DIV/0!

    Jul-12

    3

    4

    7

    9 Dec-12

    Sep-126

    Feb-13

    8

    Oct-12

    Nov-12

    10 Jan-13

    11

    5 Aug-12

    Form # 1: Monthly Energy-Kashmir

    MONTHLY ENERGY INPUT, ENERGY BILLED & LOSSES FOR THE YEAR 2012-113(For Achievement under Triparitite MoU and for progress to SERC)

    Apr-121

    Jun-12

    2 May-12

  • 7/28/2019 SERC APDRP Upto January 2013

    2/76

    Input (LU's) 0.00 0.00

    Billed (LU's) 0.00 0.00

    Losses % #DIV/0! #DIV/0!

    *

    12 Mar-13

  • 7/28/2019 SERC APDRP Upto January 2013

    3/76

    Form # 2: Monthly Meters-Kashmir

    S.No Month

    Total consumers

    electronic metering level

    and % metering at end of

    month

    Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal for

    the Divisio

    Total Consumers 11000 11000.0

    Meters Installed 9921 9921.00

    % Metering 90.19 90.19

    Total Consumers 11082 11082.0

    Meters Installed 10333 10333.0% Metering 93.24 93.24

    Total Consumers 11137 11137.0

    Meters Installed 10821 10821.0

    % Metering 97.16 97.16

    Total Consumers 11199 11199.0

    Meters Installed 10971 10971.0

    % Metering 97.96 97.96

    Total Consumers 11198 11198.0

    Meters Installed 10970 10970.0

    % Metering 97.96 97.96

    Total Consumers 11191 11191.0

    Meters Installed 10963 10963.0

    % Metering 97.96 97.96Total Consumers 11203 11203.0

    Meters Installed 10963 10963.0

    % Metering 97.86 97.86

    Total Consumers 11261 11261.0

    Meters Installed 10971 10971.0

    % Metering 97.42 97.42

    Total Consumers 11279 11279.0

    Meters Installed 10985 10985.0

    % Metering 97.39 97.39

    Total Consumers 10651 10651.0

    Meters Installed 10357 10357.0

    % Metering 97.24 97.24

    Total Consumers 0 0.00Meters Installed 0.00

    4 Jul-12

    MONTHLY TOTAL CONSUMERS, ELECTRONIC METERS INSTALLED AND %age ELECTRONIC FOR THE YEAR 2012-13(For Achievement under Triparitite MoU and for progress reporting to SERC)

    1 Apr-12

    5 Aug-12

    2 May-12

    3 Jun-12

    9 Dec-12

    6 Sep-12

    7 Oct-12

    8 Nov-12

    10 Jan-13

    Feb-1311

  • 7/28/2019 SERC APDRP Upto January 2013

    4/76

    % Metering #DIV/0! #DIV/0!

    Total Consumers 0 0.00

    Meters Installed 0.00

    % Metering #DIV/0! #DIV/0!

    Mar-1312

  • 7/28/2019 SERC APDRP Upto January 2013

    5/76

    Form # 3: Monthly Revenue-Kashmir

    S.No Month

    Monthly Revenue

    Realised, Pure & ED

    (Rs. In lacs)

    Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal for

    the Division

    Revenue Pure 26.51 26.51

    ED 5.82 5.82

    Total (Rs. In lacs) 32.33 32.33

    Revenue Pure 86.34 86.34

    ED 18.9518.95Total 105.29 105.29

    Revenue Pure 13.77 13.77

    ED 3.02 3.02

    Total 16.79 16.79

    Revenue Pure 152.36 152.36

    ED 33.44 33.44

    Total 185.80 185.80

    Revenue Pure 81.25 81.25

    ED 17.83 17.83

    Total 99.08 99.08

    Revenue Pure 59.88 59.88

    ED 13.14 13.14

    Total 73.02 73.02Revenue Pure 111.97 111.97

    ED 24.58 24.58

    Total 136.55 136.55

    Revenue Pure 76.19 76.19

    ED 16.72 16.72

    Total 92.91 92.91

    Revenue Pure 177.23 177.23

    ED 38.90 38.90

    Total 216.13 216.13

    Revenue Pure 99.08 99.08

    ED 21.75 21.75

    Total 120.83 120.83

    Revenue Pure 0.00 0.00ED 0.00 0.00

    4 Jul-12

    MONTHLY REVENUE REALISED (PURE AND ED) FOR THE YEAR 2012-13(For Achievement under Triparitite MoU and for progress reporting to SERC)

    1 Apr-12

    5 Aug-12

    2 May-12

    3 Jun-12

    9 Dec-12

    6 Sep-12

    7 Oct-12

    8 Nov-12

    10

    11

    Jan-13

    Feb-13

  • 7/28/2019 SERC APDRP Upto January 2013

    6/76

    Total 0.00 0.00

    Revenue Pure 0.00 0.00

    ED 0.00 0.00

    Total 0.00 0.00

    12 Mar-13

  • 7/28/2019 SERC APDRP Upto January 2013

    7/76

    S.No Month

    Monthly

    Connections added

    metered and flat rate

    (No's)

    Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal for

    the Division

    Metered 40 40

    Flat Rate 0 0

    Total 40 40

    Metered 30 30

    Flat Rate 0 0Total 30 30

    Metered 25 25

    Flat Rate 0 0

    Total 25 25

    Metered 20 20

    Flat Rate 0 0

    Total 20 20

    Metered 6 6

    Flat Rate 0 0

    Total 6 6

    Metered 31 31

    Flat Rate 0 0

    Total 31 31Metered 0 0

    Flat Rate 0 0

    Total 0 0

    Metered 3 3

    Flat Rate 0 0

    Total 3 3

    Metered 14 14

    Flat Rate 0 0

    Total 14 14

    Metered 13 13

    Flat Rate 0 0

    Total 13 13

    Metered 0

    Form # 4: Monthly Connection-Kashmir

    2 May-12

    3 Jun-12

    MONTHLY CONNECTIONS ADDED (METERED AND FLAT RATE) FOR THE YEAR 2012-13(For Achievement under Triparitite MoU and for progress reporting to SERC)

    1 Apr-12

    6 Sep-12

    7

    4 Jul-12

    5 Aug-12

    Oct-12

    8 Nov-12

    10 Jan-13

    9 Dec-12

  • 7/28/2019 SERC APDRP Upto January 2013

    8/76

    Flat Rate 0

    Total 0

    Metered 0

    Flat Rate 0

    Total 0

    Metered 182

    Flat Rate 0

    Total 182

    Total

    12 Mar-13

    11 Feb-13

  • 7/28/2019 SERC APDRP Upto January 2013

    9/76

  • 7/28/2019 SERC APDRP Upto January 2013

    10/76

    April May June July Aug Sept. O

    Domestic 9188 9254 9317 9359 9359 9352 93

    N.Dom/Commercial 1667 1683 1675 1695 1695 1695 16

    Irrigation/Aggri. 16 16 16 16 16 16 1

    State / Central 45 45 45 45 45 45 4

    Public Lighting 0 0 0 0 0 0 0

    LT Industries 80 80 80 80 79 79 7

    HT Industries 0 0 0 0 0 0 0

    HT P. Inten. 0 0 0 0 0 0 0

    LT Pub. WW 0 0 0 0 0 0 0

    HT Pub. WW 4 4 4 4 4 4 4

    Gen. Bulk 0 0 0 0 0 0 0

    Temporary 0 0 0 0 0 0 0

    Total 11000 11082 11137 11199 11198 11191 112

    April May June July Aug Sept. O

    Domestic 916548.66 1139548.28 501446.74 1681785.06 1134482.76 1194252.874 12768

    N.Dom/Commercial 306691.11 350608.15 80592.96 429895.19 353333.33 470740.7407 54365

    Irrigation/Aggri. 875.00 0.00 0.00 4901.00 3000.00 2800 15

    State / Central 0.00 1062386.29 24193.55 1959298.23 609032.26 331451.6129 12865

    Public Lighting 0.00 0.00 0.00 0.00 0.00 0 0

    LT Industries 5265.71 10238.10 1223.81 13519.05 10476.19 11904.7619 223

    HT Industries 0.00 0.00 0.00 0.00 0.00 0 0

    HT P. Inten. 0.00 0.00 0.00 0.00 0.00 0 0

    LT Pub. WW 0.00 0.00 0.00 0.00 0.00 0 0HT Pub. WW 0.00 0.00 0.00 205886.34 533902.44 202030.7317 20203

    Gen. Bulk 0.00 0.00 0.00 0.00 0.00 0 0

    Temporary 0.00 0.00 0.00 0.00 0.00 0 0

    Total 1229380 2562781 607457 4295285 2644227 2213181 3333

    Metered

    Flat Rate

    Total

    April May June July Aug Sept. O

    Domestic 2392192 2974221 1308776 4389459 2961000 3117000 3332

    N.Dom/Commercial 828066 946642 217601 1160717 954000 1271000 1467

    Irrigation/Aggri. 1750 0 0 9802 6000 5600 31

    State / Central 0 6586795 150000 12147649 3776000 2055000 7976

    Public Lighting 0 0 0 0 0 0 0

    LT Industries 11058 21500 2570 28390 22000 25000 469

    HT Industries 0 0 0 0 0 0 0

    HT P. Inten. 0 0 0 0 0 0 0

    LT Pub. WW 0 0 0 0 0 0 0

    HT Pub. WW 0 0 0 844134 2189000 828326 828

    Gen. Bulk 0 0 0 0 0 0 0

    Temporary 0 0 0 0 0 0 0

    Total 3233066 10529158 1678947 18580151 9908000 7301926 1365

    Metered

    Flat RateTotal

    Revenue

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Description CategoryYear 2012

    Category

    EnergyBilled

    Circle-Ist, Srinagar Division:- Electric D

    CATEGORIES CONNECTIONS ENERGY SALES AND REVENUE FO

    Connections

    Description Category

    DescriptionYear 2012

    Year 2012

  • 7/28/2019 SERC APDRP Upto January 2013

    11/76

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (L

    1 Feeder-2 Habak 10.90 2.87 7.23 8.03 73.68 1.87 4.89

    2 Feeder-3 Habak 9.47 2.46 6.20 7.01 74.02 1.71 4.46

    3 Feeder-5 Habak 17.00 2.83 7.12 14.17 83.38 1.41 3.69

    4 Feeder-1 Hazratbal 4.60 4.24 32.73 0.36 7.83 0.07 0.46

    5 Feeder-2 Hazratbal 10.31 10.00 25.98 0.31 3.01 2.63 6.87

    6 Feeder-3 Hazratbal 9.90 2.14 5.40 7.76 78.35 1.23 3.21

    7 Feeder-1 Kathidarwaza 11.80 0.85 2.13 10.95 92.84 0.44 1.14

    8 Feeder-2 Kathidarwaza 13.97 1.36 3.43 12.61 90.26 0.70 1.83

    9 Feeder-3 Kathidarwaza 1.03 1.02 22.41 0.01 0.97 0.01 0.09

    10 Feeder-5 Kathidarwaz 10.77 1.57 3.95 9.20 85.45 0.44 1.15

    11 Feeder-1 Rainawari 2.43 2.19 10.05 0.24 9.88 0.08 0.21

    12 Feeder-2 Rainawari 2.80 0.49 1.02 2.31 82.50 0.18 0.48

    13 Feeder-3 Rainawari 8.75 2.56 6.40 6.19 70.74 0.65 1.69

    14 Feeder-4 Rainawari 14.94 3.58 9.03 11.36 76.02 0.83 2.16

    15 PHE Pokhribal 0.84 0.84 6.45 0.00 0.00 0.00 0.00

    129.51 38.99 149.53 90.52 69.89 12.25 32.3

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (L

    1 Feeder-2 Habak 9.75 2.88 7.52 6.87 70.46 2.18 5.70

    2 Feeder-3 Habak 9.43 2.61 6.81 6.82 72.32 0.95 2.47

    3 Feeder-5 Habak 15.53 2.81 7.34 12.72 81.91 2.12 5.53

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF APRIL, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF MAY, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

  • 7/28/2019 SERC APDRP Upto January 2013

    12/76

    4 Feeder-1 Hazratbal 3.49 3.34 30.00 0.15 4.30 3.17 25.36

    5 Feeder-2 Hazratbal 10.40 9.95 25.98 0.45 4.33 14.54 37.94

    6 Feeder-3 Hazratbal 9.28 2.20 5.75 7.08 76.29 1.67 4.35

    7 Feeder-1 Kathidarwaza 8.30 0.89 2.32 7.41 89.28 1.02 2.67

    8 Feeder-2 Kathidarwaza 12.73 1.31 3.43 11.42 89.71 1.05 2.74

    9 Feeder-3 Kathidarwaza 0.94 0.84 12.94 0.10 10.64 1.30 9.31

    10 Feeder-5 Kathidarwaz 10.53 1.54 4.03 8.99 85.38 0.67 1.74

    11 Feeder-1 Rainawari 2.64 2.27 10.23 0.37 14.02 0.21 1.28

    12 Feeder-2 Rainawari 3.99 0.39 1.02 3.60 90.23 0.18 0.47

    13 Feeder-3 Rainawari 8.87 2.51 6.55 6.36 71.70 0.96 2.51

    14 Feeder-4 Rainawari 14.38 3.57 9.32 10.81 75.17 1.23 3.22

    15 PHE Pokhribal 1.17 1.17 9.39 0.00 0.00 0.00 0.00

    121.43 38.28 142.63 83.15 68.48 31.26 105.2

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (La

    1 Feeder-2 Habak 8.61 3.10 8.10 5.51 64.00 1.13 2.94

    2 Feeder-3 Habak 9.09 1.53 3.99 7.56 83.17 0.64 1.67

    3 Feeder-5 Habak 14.14 2.85 7.44 11.29 79.84 1.27 3.32

    4 Feeder-1 Hazratbal 3.49 3.48 27.80 0.01 0.29 0.03 0.23

    5 Feeder-2 Hazratbal 10.64 9.77 25.49 0.87 8.18 0.89 2.31

    6 Feeder-3 Hazratbal 9.22 1.96 5.12 7.26 78.74 0.80 2.09

    7 Feeder-1 Kathidarwaza 6.50 1.00 2.60 5.50 84.62 1.05 2.74

    8 Feeder-2 Kathidarwaza 11.90 1.35 3.35 10.55 88.66 0.28 0.74

    9 Feeder-3 Kathidarwaza 0.86 0.84 6.00 0.02 2.33 0.00 0.00

    10 Feeder-5 Kathidarwaz 10.31 3.45 9.00 6.86 66.54 0.04 0.10

    11 Feeder-1 Rainawari 2.44 1.83 11.00 0.61 25.00 0.00 0.00

    12 Feeder-2 Rainawari 1.92 0.21 0.55 1.71 89.06 0.01 0.03

    13 Feeder-3 Rainawari 7.91 1.07 2.80 6.84 86.47 0.07 0.17

    14 Feeder-4 Rainawari 12.22 1.72 4.50 10.50 85.92 0.17 0.45

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JUNE, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

  • 7/28/2019 SERC APDRP Upto January 2013

    13/76

    15 PHE Pokhribal 1.54 1.54 12.31 0.00 0.00 1.05 0.00

    110.79 35.70 130.05 75.09 67.78 7.42 16.79

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Rea

    in Rs (La

    1 Feeder-2 Habak 8.36 2.89 7.54 5.47 65.44 2.68 7.00

    2 Feeder-3 Habak 7.38 1.60 4.17 5.78 78.35 1.51 3.94

    3 Feeder-5 Habak 13.73 3.59 9.38 10.14 73.82 3.26 8.50

    4 Feeder-1 Hazratbal 2.67 2.52 20.10 0.15 5.66 7.76 50.45

    5 Feeder-2 Hazratbal 8.75 8.39 21.90 0.36 4.11 8.85 23.10

    6 Feeder-3 Hazratbal 7.40 1.82 4.75 5.58 75.41 2.07 5.39

    7 Feeder-1 Kathidarwaza 5.14 1.99 5.20 3.15 61.24 1.91 4.98

    8 Feeder-2 Kathidarwaza 10.24 2.25 5.88 7.99 78.00 1.86 4.86

    9 Feeder-3 Kathidarwaza 0.79 0.76 5.45 0.03 3.51 0.70 12.31

    10 Feeder-5 Kathidarwaz 8.14 2.74 7.15 5.40 66.35 1.10 2.88

    11 Feeder-1 Rainawari 2.31 1.69 12.10 0.62 26.74 17.15 44.75

    12 Feeder-2 Rainawari 1.48 0.31 0.81 1.17 79.03 0.22 0.58

    13 Feeder-3 Rainawari 6.20 1.62 4.23 4.58 73.86 1.21 3.16

    14 Feeder-4 Rainawari 10.24 2.42 6.32 7.82 76.35 2.09 5.46

    15 PHE Pokhribal 1.42 1.42 11.37 0.00 0.00 0.00 8.44

    94.25 36.02 126.35 58.23 61.78 52.37 185.80

    Total

    Total

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF AUGUST, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JULY, 2012

  • 7/28/2019 SERC APDRP Upto January 2013

    14/76

  • 7/28/2019 SERC APDRP Upto January 2013

    15/76

    9 Feeder-3 Kathidarwaza 0.77 0.75 1.96 0.02 2.60 0.65 11.44

    10 Feeder-5 Kathidarwaz 6.90 1.54 4.02 5.36 77.68 0.52 1.37

    11 Feeder-1 Rainawari 2.87 2.35 6.13 0.52 18.12 0.25 0.64

    12 Feeder-2 Rainawari 1.56 0.27 0.70 1.29 82.69 0.17 0.45

    13 Feeder-3 Rainawari 6.01 1.33 3.47 4.68 77.87 0.92 2.4

    14 Feeder-4 Rainawari 10.23 2.08 5.43 8.15 79.67 1.19 3.1

    15 PHE Pokhribal 1.03 1.03 8.28 0.00 0.00 3.17 8.28

    82.68 30.76 85.88 51.92 62.80 24.07 72.85

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (La

    1 Feeder-2 Habak 8.39 3.02 7.88 5.37 64.00 6.25 16.3

    2 Feeder-3 Habak 7.81 1.93 5.04 5.88 75.29 2.40 6.27

    3 Feeder-5 Habak 11.40 3.51 9.16 7.89 69.21 3.07 8.01

    4 Feeder-1 Hazratbal 2.50 2.21 18.17 0.29 11.60 8.18 53.2

    5 Feeder-2 Hazratbal 8.10 4.23 23.27 3.87 47.78 7.58 19.78

    6 Feeder-3 Hazratbal 6.44 2.21 5.77 4.23 65.68 1.51 3.95

    7 Feeder-1 Kathidarwaza 5.21 1.48 3.86 3.73 71.59 1.10 2.87

    8 Feeder-2 Kathidarwaza 9.10 1.94 5.06 7.16 78.68 2.25 5.86

    9 Feeder-3 Kathidarwaza 0.90 0.88 7.23 0.02 2.22 0.01 0.12

    10 Feeder-5 Kathidarwaz 7.40 1.55 4.05 5.85 79.05 0.85 2.23

    11 Feeder-1 Rainawari 2.76 2.31 6.03 0.45 16.30 0.00 0.01

    12 Feeder-2 Rainawari 1.55 0.27 0.70 1.28 82.58 0.16 0.41

    13 Feeder-3 Rainawari 6.31 1.37 3.58 4.94 78.29 1.90 4.96

    14 Feeder-4 Rainawari 11.27 2.48 6.47 8.79 77.99 1.06 2.76

    15 PHE Pokhribal 1.03 1.03 8.28 0.00 0.00 3.17 8.28

    90.17 30.42 114.55 59.75 66.26 39.49 135.0

    Total

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF OCTOBER, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

  • 7/28/2019 SERC APDRP Upto January 2013

    16/76

  • 7/28/2019 SERC APDRP Upto January 2013

    17/76

    5 Feeder-2 Hazratbal 13.52 7.50 19.58 6.02 44.53 23.02 60.08

    6 Feeder-3 Hazratbal 8.36 2.75 7.18 5.61 67.11 3.16 8.26

    7 Feeder-1 Kathidarwaza 9.02 2.17 5.66 6.85 75.94 1.67 4.36

    8 Feeder-2 Kathidarwaza 15.48 2.90 7.57 12.58 81.27 2.26 5.9

    9 Feeder-3 Kathidarwaza 0.90 0.88 2.30 0.02 2.22 0.17 2.99

    10 Feeder-5 Kathidarwaz 12.56 2.30 6.00 10.26 81.69 1.71 4.47

    11 Feeder-1 Rainawari 2.67 2.27 5.92 0.40 14.98 1.70 4.45

    12 Feeder-2 Rainawari 1.96 0.36 0.94 1.60 81.63 0.21 0.54

    13 Feeder-3 Rainawari 10.56 1.91 4.99 8.65 81.91 1.15 3.01

    14 Feeder-4 Rainawari 18.12 2.60 6.79 15.52 85.65 1.99 5.2

    15 PHE Pokhribal 11.50 11.50 9.23 0.00 0.00 0.00 17.54

    149.59 52.21 134.92 97.38 65.10 57.71 216.1

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (La

    1 Feeder-2 Habak 13.23 4.36 11.39 8.87 67.01 3.41 8.89

    2 Feeder-3 Habak 13.04 3.45 6.25 9.59 73.54 1.70 4.43

    3 Feeder-5 Habak 16.00 3.56 9.29 12.44 77.75 3.55 9.26

    4 Feeder-1 Hazratbal 5.60 5.35 49.01 0.25 4.46 0.02 0.1183

    5 Feeder-2 Hazratbal 13.66 6.89 34.47 6.77 49.53 11.66 30.43

    6 Feeder-3 Hazratbal 9.18 3.11 10.29 6.07 66.12 2.35 6.13

    7 Feeder-1 Kathidarwaza 11.57 2.23 4.30 9.34 80.73 1.51 3.93

    8 Feeder-2 Kathidarwaza 16.94 3.01 4.85 13.93 82.23 2.43 6.35

    9 Feeder-3 Kathidarwaza 1.20 1.17 11.23 0.03 2.50 0.34 5.96

    10 Feeder-5 Kathidarwaz 13.37 2.31 3.65 11.06 82.72 1.59 4.15

    11 Feeder-1 Rainawari 2.59 2.15 10.44 0.44 16.99 9.02 23.53

    12 Feeder-2 Rainawari 3.10 0.55 0.73 2.55 82.26 0.31 0.81

    13 Feeder-3 Rainawari 11.22 1.95 3.57 9.27 82.62 1.06 2.76

    14 Feeder-4 Rainawari 18.81 2.62 6.70 16.19 86.07 1.75 4.56

    15 PHE Pokhribal 11.50 11.50 9.25 0.00 0.00 0.00 9.25

    Total

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JANUARY, 2013

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

  • 7/28/2019 SERC APDRP Upto January 2013

    18/76

    161.01 54.22 175.42 106.79 66.33 40.67 120.

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (L

    1 Feeder-2 Habak 0.00 #DIV/0! 0.00

    2 Feeder-3 Habak 0.00 #DIV/0! 0.00

    3 Feeder-5 Habak 0.00 #DIV/0! 0.00

    4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00

    5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00

    6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00

    7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00

    8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00

    9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00

    10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00

    11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00

    12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00

    13 Feeder-3 Rainawari 0.00 #DIV/0! 0.0014 Feeder-4 Rainawari 0.00 #DIV/0! 0.00

    15 PHE Pokhribal 0.00 #DIV/0! 0.00

    0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.0

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (L

    Total

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF FEBRUARY, 2013

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF MARCH, 2013

  • 7/28/2019 SERC APDRP Upto January 2013

    19/76

    1 Feeder-2 Habak 0.00 #DIV/0! 0.00

    2 Feeder-3 Habak 0.00 #DIV/0! 0.00

    3 Feeder-5 Habak 0.00 #DIV/0! 0.00

    4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00

    5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00

    6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00

    7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00

    8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00

    9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00

    10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00

    11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00

    12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00

    13 Feeder-3 Rainawari 0.00 #DIV/0! 0.00

    14 Feeder-4 Rainawari 0.00 #DIV/0! 0.00

    15 PHE Pokhribal 0.00 #DIV/0! 0.00

    0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00Total

  • 7/28/2019 SERC APDRP Upto January 2013

    20/76

  • 7/28/2019 SERC APDRP Upto January 2013

    21/76

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 SERC APDRP Upto January 2013

    22/76

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

    0.00

    Form # 6: En. Aud. Ind.

  • 7/28/2019 SERC APDRP Upto January 2013

    23/76

    Whether KVAH

    Based tariff

    implemented

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 SERC APDRP Upto January 2013

    24/76

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

    0.00

    Form # 6: En. Aud. Ind.

  • 7/28/2019 SERC APDRP Upto January 2013

    25/76

    Whether KVAH

    Based tariff

    implemented

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 SERC APDRP Upto January 2013

    26/76

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 SERC APDRP Upto January 2013

    27/76

  • 7/28/2019 SERC APDRP Upto January 2013

    28/76

    0.00

    Form # 6: En. Aud. Ind.

  • 7/28/2019 SERC APDRP Upto January 2013

    29/76

    Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal for

    the Division

    16 16

    Energy Supplied (LU's) 11.18 11

    Energy Billed (LU's) 11.18 11

    Amount Billed (Lacs) 84.10 84

    Revenue Collected (Lacs) 0.00 0

    % of Revenue Collection 0.00 016 16

    Energy Supplied (LU's) 11.31 11

    Energy Billed (LU's) 11.31 11

    Amount Billed (Lacs) 85.93 86

    Revenue Collected (Lacs) 65.87 66

    % of Revenue Collection 76.66 77

    16 16

    Energy Supplied (LU's) 9.19 9

    Energy Billed (LU's) 9.19 9

    Amount Billed (Lacs) 68.01 68

    Revenue Collected (Lacs) 53.48 53

    % of Revenue Collection 78.64 79

    16 16

    Energy Supplied (LU's) 9.87 10Energy Billed (LU's) 9.87 10

    Amount Billed (Lacs) 73.67 74

    Revenue Collected (Lacs) 65.00 65

    % of Revenue Collection 88.23 88

    16 16

    Energy Supplied (LU's) 8.99 9

    Energy Billed (LU's) 8.99 9

    Amount Billed (Lacs) 67.13 67

    Revenue Collected (Lacs) 44.60 45

    % of Revenue Collection 66.44 66

    16 16

    Energy Supplied (LU's) 8.97 9

    Energy Billed (LU's) 8.97 9Amount Billed (Lacs) 67.01 67

    Energy Account

    for the Month of

    April, 2012

    Energy Account

    for the Month of

    May, 2012

    No. of Consumers

    No. of Consumers

    Energy Account

    for the Month of

    August, 2012

    No. of Consumers

    No. of Consumers

    No. of Consumers

    Energy Account

    for the Month of

    MONTHLY ENERGY ACCOUNT & REVENUE REALISATION FOR INSTALLATIONS HAVING LOAD 25 KVA & ABOVE FROM APRIL,

    2012 TO JANUARY, 2013

    Form # 7

    Energy Account

    for the Month of

    June, 2012

    Energy Account

    for the Month of

    July, 2012

    No. of Consumers

    Energy/Revenue

    Details

  • 7/28/2019 SERC APDRP Upto January 2013

    30/76

    Revenue Collected (Lacs) 95.36 95

    % of Revenue Collection 142.31 142

    16 16

    Energy Supplied (LU's) 10.69 11

    Energy Billed (LU's) 10.69 11

    Amount Billed (Lacs) 77.22 77

    Revenue Collected (Lacs) 8.31 8

    % of Revenue Collection 10.76 11

    16 16

    Energy Supplied (LU's) 13.25 13

    Energy Billed (LU's) 13.25 13

    Amount Billed (Lacs) 95.90 96Revenue Collected (Lacs) 149.57 150

    % of Revenue Collection 155.97 156

    16 16

    Energy Supplied (LU's) 14.00 14

    Energy Billed (LU's) 14.00 14

    Amount Billed (Lacs) 99.68 100

    Revenue Collected (Lacs) 159.78 160

    % of Revenue Collection 160.29 160

    0

    Energy Supplied (LU's) 0

    Energy Billed (LU's) 0

    Amount Billed (Lacs) 0

    Revenue Collected (Lacs) 0

    % of Revenue Collection 0

    0

    Energy Supplied (LU's) 0

    Energy Billed (LU's) 0

    Amount Billed (Lacs) 0

    Revenue Collected (Lacs) 0

    % of Revenue Collection 0

    0

    Energy Supplied (LU's) 0

    Energy Billed (LU's) 0

    Amount Billed (Lacs) 0

    Revenue Collected (Lacs) 0% of Revenue Collection 0

    No. of Consumers

    Energy Account

    for the Month of

    March, 2013

    Energy Account

    for the Month of

    Octuber, 2012

    No. of Consumers

    Energy Account

    for the Month ofNovember, 2012

    No. of Consumers

    Energy Account

    for the Month of

    December, 2012

    No. of Consumers

    Energy Account

    for the Month of

    January, 2013

    No. of Consumers

    Energy Account

    for the Month of

    February, 2013

    ,

    2012

    No. of Consumers

  • 7/28/2019 SERC APDRP Upto January 2013

    31/76

    Hawal Rainawari K.K.Moulla Khanyar Zakura

    No

    KVA

    Required

    (KVAR)

    Installed

    (KVAR)

    Deficiency

    (KVAR)

    %

    Deficiency

    Executive Engine

    Status of KVAR Compensation for Installations having Load 25 KVA & Above as on 30-06-2012(For achievement under Tripartite MoU and for progress reporting to SERC)

    Format # 8

    Electric Division-IV, Kh

    KVAR Compensation DetailsElectric Division-IV, Khanyar. Tota

    Di

    Connections with load 25KVA & Above

    KVAR

    Compensation through

    Shunt Capacitor

  • 7/28/2019 SERC APDRP Upto January 2013

    32/76

    S.No MonthComputerized

    BillingHawal Rainawari K.K.Moulla Khanyar Zakura

    th

    Total Energy Biled (LU's) 38.99

    Energy Billed through computer(LU's) 38.99

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 38.28

    Energy Billed through computer(LU's) 38.28%age computerised Billing 100.00

    Total Energy Biled (LU's) 35.70

    Energy Billed through computer(LU's) 35.70

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 36.02

    Energy Billed through computer(LU's) 36.02

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 29.51

    Energy Billed through computer(LU's) 29.51

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 30.76

    Energy Billed through computer(LU's) 30.76

    %age computerised Billing 100.00Total Energy Biled (LU's) 30.42

    Energy Billed through computer(LU's) 30.42

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 36.21

    Energy Billed through computer(LU's) 36.21

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 52.21

    Energy Billed through computer(LU's) 52.21

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 54.22

    Energy Billed through computer(LU's) 54.22

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 0.00

    Energy Billed through computer(LU's) 0.00

    %age computerised Billing #DIV/0!

    Total Energy Biled (LU's) 0.00

    Energy Billed through computer(LU's) 0.00

    %age computerised Billing #DIV/0!

    Jan-13

    Feb-13

    7 Oct-12

    11

    8 Nov-12

    12 Mar-13

    9 Dec-12

    10

    5 Aug-12

    Jul-12

    6

    1

    2

    3

    4

    Sep-12

    Form # 9

    Apr-12

    May-12

    Jun-12

    Monthly detail of Computerised Billed Energy From April 2012 to March 2013

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

  • 7/28/2019 SERC APDRP Upto January 2013

    33/76

    DiVision:

    N.A

    17510 N.A

    Computer Code: 9386 N

    Sanctioned Load: 30 HP

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 N.A 0 N.A 0.00 N.A N.A 273158.28 0.00

    2 May-12 N.A 0 N.A 0.00 N.A N.A 278259.49 0.00

    3 Jun-12 N.A 0 N.A 0.00 N.A N.A 283437.22 0.00

    4 Jul-12 N.A 0 N.A 0.00 N.A N.A 284426.22 0.00

    5 Aug-12 N.A 0 N.A 0.00 N.A N.A 289696.45 0.00

    6 Sep-12 N.A 0 N.A 0.00 N.A N.A 295045.73 0.00

    7 Oct-12 N.A 0 N.A 0.00 N.A N.A 300475.25 0.00

    8 Nov-12 N.A 0 N.A 0.00 N.A N.A 305986.21 0.00

    9 Dec-12 N.A 0 N.A 0.00 N.A N.A 311579.84 0.00

    10 Jan-13 317257.37

    11 Feb-13 0.00

    12 Mar-13 0.00

    0

    1

    2

    3

    4

    5

    1

    DiVision: Electric Divisi

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Circle: EM & RE Circle-Ist, Srinagar

    Circle:

    Meter Type:

    Note:

    Capacitor Installed: Y/ Rating of Capacitor:

    CT Ratio:

    Installation No: Meter Rated Current:

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    EM & RE Circle-Ist, Srinagar Electric Divisi

    Category: LT Indust. Supply Type:

    recorded KWH units with power factor = 0.85

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Name of Installation:- Nazir Ah. Zargar

    Asstt. Exe. Engineer

    KVAH and demand readings will be required for load more than 100KW only.

    Rainawari

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

  • 7/28/2019 SERC APDRP Upto January 2013

    34/76

    N.A

    18334 N.A

    Computer Code: 10074 N

    Sanctioned Load: 70 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    computed

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 29411.76 25000.00 29411.7647 25000.00 0.85 N.A 1326242.25 104775.00

    2 May-12 28235.29 24000.00 28235.2941 24000.00 0.85 N.A 1471497.75 100584.00

    3 Jun-12 25882.35 22000.00 25882.3529 22000.00 0.85 N.A 1611640.23 92202.00

    4 Jul-12 27058.82 23000.00 27058.8235 23000.00 0.85 N.A 1741556.67 96393.00

    5 Aug-12 28235.29 24000.00 28235.2941 24000.00 0.85 N.A 1876586.13 100584.006 Sep-12 28235.29 24000.00 28235.2941 24000.00 0.85 N.A 2046979.54 100584.00

    7 Oct-12 28235.29 24000.00 28235.2941 24000.00 0.85 N.A 2219928.85 100584.00

    8 Nov-12 28235.29 24000.00 28235.2941 24000.00 0.85 N.A 2395472.40 100584.00

    9 Dec-12 28235.29 24000.00 28235.2941 24000.00 0.85 N.A 2535615.00 100584.00

    10 Jan-13

    11 Feb-13

    12 Mar-13

    214000

    1

    23

    4

    5

    1

    DiVision:

    N.A

    46785 N.A

    Computer Code: 9943 N

    Sanctioned Load: 1200 KW

    KVAH and demand readings will be required for load more than 100KW only.

    Installation No: Meter Rated Current:

    Rating of Capacitor:

    EM & RE Circle-Ist, Srinagar

    Supply Type:

    Capacitor Installed: Y/

    Meter Type:

    Name of Installation:- Executive Engineer, UEED

    CT Ratio:Category: LT Water Works Supply Type:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Electric DivisiCircle:

    Meter Type:

    Rating of Capacitor:

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    recorded KWH units with power factor = 0.85

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    RainawariAsstt. Exe. Engineer

    Capacitor Installed: Y/

    Installation No: Meter Rated Current:

    Category: Central CT Ratio:

    Name of Installation:- Director National Institute of Technology

  • 7/28/2019 SERC APDRP Upto January 2013

    35/76

    S.No

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 295294.12 251000.00 295294.118 251000 0.85 N.A 1639500.0 1517295

    2 May-12 275294.12 234000.00 275294.118 234000 0.85 N.A 3186795.0 1414530

    3 Jun-12 223529.41 190000.00 223529.412 190000 0.85 N.A 1444530 1148550

    4 Jul-12 187058.82 159000.00 187058.824 159000 0.85 N.A 2623080 961155

    5 Aug-12 180000.00 153000.00 180000 153000 0.85 N.A 2169705 924885

    6 Sep-12 157647.06 134000.00 157647.059 134000 0.85 N.A 954885 810030

    7 Oct-12 355294.12 302000.00 355294.118 302000 0.85 N.A 840030 1825590

    8 Nov-12 429411.76 365000.00 429411.76 365000.00 0.85 N.A 0 2206425

    9 Dec-12 434117.65 369000.00 434117.65 369,000.00 0.85 N.A 0 2230605

    10 Jan-13

    11 Feb-13

    12 Mar-13

    2157000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    75858A N.A

    Computer Code: 10039 N

    Sanctioned Load: 53 KW

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Name of Installation:-

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    recorded KWH units with power factor = 0.85

    Note:

    Capacitor Installed: Y/ Rating of Capacitor:

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    Rainawari

    CT Ratio: Supply Type:

    Joint Director Poultary

    Meter Rated Current: Meter Type:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    KVAH and demand readings will be required for load more than 100KW only.

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Installation No:

    Asstt. Exe. Engineer

    Category: State

  • 7/28/2019 SERC APDRP Upto January 2013

    36/76

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 4096144.25 59845.5

    2 May-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 4170480.8 73144.5

    3 Jun-12 7058.82 6000.00 7058.82353 6000 0.85 N.A 4261042.1 39897

    4 Jul-12 5882.35 5000.00 5882.35294 5000 0.85 N.A 4311041.4 33,247.50

    5 Aug-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 4352928.3 46,546.50

    6 Sep-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 4311040.1 59,845.50

    7 Oct-12 3529.41 3000.00 3529.41176 3000 0.85 N.A 3285376.6 19,948.50

    8 Nov-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 3311038.8 73,144.50

    9 Dec-12 11764.71 10000.00 11764.7059 10000 0.85 N.A 3401600.0 66,495.00

    10 Jan-13

    11 Feb-13

    12 Mar-13

    71000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    14260A N.A

    Computer Code: 10043 N

    Sanctioned Load: 300 KW

    Rainawari

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Name of Installation:- Supdtt. JLNM Hospital

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    Capacitor Installed: Y/ Rating of Capacitor:

    Supply Type:

    Installation No: Meter Rated Current: Meter Type:

    Category: State CT Ratio:

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Note:

    Asstt. Exe. Engineer

  • 7/28/2019 SERC APDRP Upto January 2013

    37/76

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 114003.98 96903.39 114003.985 96903.387 0.85 N.A 806473.5 600801.00

    2 May-12 115280.00 97988.00 115280 97988 0.85 N.A 1552958.7 607525.60

    3 Jun-12 150535.29 127955.00 150535.294 127955 0.85 N.A 2307715.2 793321.00

    4 Jul-12 127058.82 108000.00 127058.824 108000 0.85 N.A 0.0 669600.00

    5 Aug-12 130588.24 111000.00 130588.235 111000 0.85 N.A 831108.0 688200.00

    6 Sep-12 132352.94 112500.00 132352.941 112500 0.85 N.A 1685094.0 697500.00

    7 Oct-12 129411.76 110000.00 129411.765 110000 0.85 N.A 2550519.0 682000.00

    8 Nov-12 152941.18 130000.00 152941.176 130000 0.85 N.A 3396879.0 806000.00

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    894346.39

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    6162SD N.A

    Computer Code: 10049 N

    Sanctioned Load: 32 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    Asstt. Exe. Engineer

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Supply Type:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Name of Installation:- Joint Director Floriculture, Hazratbal

    Category: State CT Ratio:

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Rainawari

    Installation No: Meter Rated Current: Meter Type:

    Capacitor Installed: Y/ Rating of Capacitor:

  • 7/28/2019 SERC APDRP Upto January 2013

    38/76

    A B C D E=D/C F G H

    1 Apr-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1395814.38 51068.16

    2 May-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1458917.54 51068.16

    3 Jun-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1522020.69 51068.16

    4 Jul-12

    9035.29 7680.00 9035.29412 7680 0.85 N.A 1585123.85 51068.16

    5 Aug-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1672950.41 51068.16

    6 Sep-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1762094.36 51068.16

    7 Oct-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1852575.48 51068.16

    8 Nov-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1944413.82 51068.16

    9 Dec-12 9035.29 7680 9035.294118 7680 0.85 N.A 2007517.00 51068.16

    10 Jan-13

    11 Feb-13

    12 Mar-13

    69120

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    90SD N.A

    Computer Code: 10040 N

    Sanctioned Load: 53 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    COMPUTE

    D

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 1,908,727.50 46546.5

    2 May-12 11764.71 10000.00 11764.7059 10000 0.85 N.A 1966839.23 66495

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Name of Installation:- Joint Director Poultary Briolers

    Rainawari

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    recorded KWH units with power factor = 0.85

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

    Category: State CT Ratio: Supply Type:

    Electric Divisi

    Installation No:

    Circle: EM & RE Circle-Ist, Srinagar

    Meter Rated Current: Meter Type:

    Capacitor Installed: Y/ Rating of Capacitor:

  • 7/28/2019 SERC APDRP Upto January 2013

    39/76

    3 Jun-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 2049288.13 46546.5

    4 Jul-12 7058.82 6000.00 7058.82353 6000 0.85 N.A 2107399.86 39897

    5 Aug-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 2107399.20 46546.5

    6 Sep-12 16470.59 14000.00 16470.5882 14000 0.85 N.A 2165510.93 93093

    7 Oct-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 2280409.39 46546.5

    8 Nov-12 32941.18 28000.00 32941.1765 28000 0.85 N.A 2373598.94 186186

    9 Dec-12 34117.65 29000.00 34117.6471 29000 0.85 N.A 2314771.00 192835

    10 Jan-13

    11 Feb-13

    12 Mar-13

    115000

    1

    2

    3

    45

    1

    DiVision:

    N.A

    LAWDA2 N.A

    Computer Code: 10085 N

    Sanctioned Load: 200 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 30588.24 26000.00 30588.2353 26000 0.85 N.A 5665832.5 108966

    2 May-12 27058.82 23000.00 27058.8235 23000 0.85 N.A 5848331.0 96393

    3 Jun-12 31764.71 27000.00 31764.7059 27000 0.85 N.A 6105722.8 113157

    4 Jul-12 32941.18 28000.00 32941.1765 28000 0.85 N.A 6293334.4 117348

    5 Aug-12 30588.24 26000.00 30588.2353 26000 0.85 N.A 6583349.8 108966

    6 Sep-12 31764.71 27000.00 31764.7059 27000 0.85 N.A 6867336.1 113157

    Note:

    recorded KWH units with power factor = 0.85

    Asstt. Exe. Engineer

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    EM & RE Circle-Ist, Srinagar Electric Divisi

    Name of Installation:- Ex. Engineer LAWDA, Habak

    Supply Type:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Circle:

    Rainawari

    Installation No: Meter Rated Current: Meter Type:

    Category: State

    Capacitor Installed: Y/ Rating of Capacitor:

    CT Ratio:200/5A

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

  • 7/28/2019 SERC APDRP Upto January 2013

    40/76

    7 Oct-12 36470.59 31000.00 36470.5882 31000 0.85 N.A 6049359.0 129921

    8 Nov-12 36470.59 31000.00 36470.5882 31000 0.85 N.A 6351284.0 129921

    9 Dec-12 36470.59 31000.00 36470.5882 31000 0.85 N.A 6449675.0 129921

    10 Jan-13

    11 Feb-13

    12 Mar-13

    250000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    LAWDA1 N.A

    Computer Code: 10084 N

    Sanctioned Load: 200 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 9411.76 8000.00 9411.76471 8000 0.85 N.A 840,711.94 33528

    2 May-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 931176.10 46101

    3 Jun-12 11764.71 10000.00 11764.7059 10000 0.85 N.A 1036979.32 41910

    4 Jul-12 9411.76 8000.00 9411.76471 8000 0.85 N.A 1137669.52 33528

    5 Aug-12 7058.82 6000.00 7058.82353 6000 0.85 N.A 1246555.69 25146

    6 Sep-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 1346695.71 29337

    7 Oct-12 1176.47 1000.00 1176.47059 1000 0.85 N.A 887032.71 4191

    8 Nov-12 4705.88 4000.00 4705.88235 4000 0.85 N.A 955831.32 16764

    9 Dec-12 5882.35 5000.00 5882.35294 5000 0.85 N.A 986557.00 20955

    10 Jan-13

    recorded KWH units with power factor = 0.85

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Note:

    EM & RE Circle-Ist, Srinagar Electric Divisi

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    KVAH and demand readings will be required for load more than 100KW only.

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    CT Ratio:200/5A Supply Type:

    Name of Installation:- Ex. Engineer LAWDA, Hazratbal

    Circle:

    Capacitor Installed: Y/ Rating of Capacitor:

    Category: State

    Installation No: Meter Rated Current: Meter Type:

    Asstt. Exe. EngineerRainawari

  • 7/28/2019 SERC APDRP Upto January 2013

    41/76

    11 Feb-13

    12 Mar-13

    60000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    222M N.A

    Computer Code: 10060 N

    Sanctioned Load: 2017 KW

    S.No Month

    KVAH

    Unitssupplied

    KWH Units

    supplied

    KVAH Units

    recorded /computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Chargesbilled

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12474117.65 403000.00 474117.647 403000 0.85 N.A 7383068 2436135

    2 May-12450588.24 383000.00 450588.235 383000 0.85 N.A 10405578 2315235

    3 Jun-12348235.29 296000.00 348235.294 296000 0.85 N.A 13280589 1789320

    4 Jul-12421176.47 358000.00 421176.471 358000 0.85 N.A 15513985 2164110

    5 Aug-12368235.29 313000.00 368235.294 313000 0.85 N.A 13204624 1892085

    6 Sep-12420000.00 357000.00 420000 357000 0.85 N.A 15563393 2158065

    7 Oct-12469411.76 399000.00 469411.765 399000 0.85 N.A 13246657 2411955

    8 Nov-12564705.88 480000.00 564705.882 480000 0.85 N.A 16239667 2901600

    9 Dec-12761176.47 647000.00 761176.471 647000 0.85 N.A 12330040 3911115

    10 Jan-13

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Rainawari

    Note:

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Installation No: Meter Rated Current: Meter Type:

    Name of Installation:- Registrar Kashmir University

    Capacitor Installed: Y/

    State CT Ratio:60/5A Supply Type:

    Rating of Capacitor:

    Category:

  • 7/28/2019 SERC APDRP Upto January 2013

    42/76

    11 Feb-13

    12 Mar-13

    3636000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    14260 N.A

    Computer Code: 10042 N

    Sanctioned Load: 90 KW

    S.No Month

    KVAH

    Unitssupplied

    KWH Unitssupplied

    KVAH Units

    recorded /computed

    KWH Unitsrecorded

    AV-PowerFactor

    Max.

    DemandRecorded

    KVA

    OpeningBalance

    Energy

    Charges / F.R

    Chargesbilled

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 31830.55 27055.97 31830.5503 27055.968 0.85 N.A 431705 167747

    2 May-12 32418.79 27555.97 32418.7856 27555.968 0.85 N.A 640283.81 170847

    3 Jun-12 31242.31 26555.97 31242.315 26555.968 0.85 N.A 852676 164647

    4 Jul-12 63529.41 54000.00 63529.4118 54000 0.85 N.A 0 334800

    5 Aug-12 61176.47 52000.00 61176.4706 52000 0.85 N.A 414054 322400

    6 Sep-12 61176.47 52000.00 61176.4706 52000 0.85 N.A 812856 322400

    7 Oct-12 61176.47 52000.00 61176.4706 52000 0.85 N.A 1211658 322400

    8 Nov-12 61176.47 52000.00 61176.4706 52000 0.85 N.A 1610460 322400

    9 Dec-12 61176.47 52000.00 61176.4706 52000 0.85 N.A 1874530 322400

    10 Jan-13

    11 Feb-13

    Name of Installation:- Supdtt. JLNM Hospital

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    State

    Capacitor Installed: Y/ Rating of Capacitor:

    Category: CT Ratio: Supply Type:

    Installation No: Meter Rated Current: Meter Type:

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. EngineerRainawari

  • 7/28/2019 SERC APDRP Upto January 2013

    43/76

    12 Mar-13

    395167.9

    1

    2

    34

    5

    1

    DiVision:

    N.A

    46827 N.A

    Computer Code: 10045 N

    Sanctioned Load: 51 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed(In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 20000.00 17000.00 20000 17000 0.85 N.A 14,361,727.00 113041.5

    2 May-12 22352.94 19000.00 22352.9412 19000 0.85 N.A 13600912.63 126340.5

    3 Jun-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 13962668 73144.5

    4 Jul-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 14053179 59845.5

    5 Aug-12 14117.65 12000.00 14117.6471 12000 0.85 N.A 14339378 79794

    6 Sep-12 18823.53 16000.00 18823.5294 16000 0.85 N.A 14654571 106392

    7 Oct-12 11764.71 10000.00 11764.7059 10000 0.85 N.A 15007429 66495

    8 Nov-12 21176.47 18000.00 21176.4706 18000 0.85 N.A 15316176 119691

    9 Dec-1240000.00 34000.00 40000 34000 0.85

    N.A 15466999 226083

    10 Jan-13

    11 Feb-13

    12 Mar-13

    146000

    Electric Divisi

    Category:

    Circle: EM & RE Circle-Ist, Srinagar

    State CT Ratio: Supply Type:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Installation No: Meter Rated Current: Meter Type:

    Capacitor Installed: Y/ Rating of Capacitor:

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    recorded KWH units with power factor = 0.85

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Name of Installation:- Supdtt. Mental Hospital

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. EngineerRainawari

    Note:

  • 7/28/2019 SERC APDRP Upto January 2013

    44/76

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    5531M N.A

    Computer Code: 10030 N

    Sanctioned Load: 360 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 129411.76 110000.00 129411.765 110000 0.85 N.A 33148432 731445

    2 May-12 137647.06 117000.00 137647.059 117000 0.85 N.A 34560542 777991.5

    3 Jun-12 95294.12 81000.00 95294.1176 81000 0.85 N.A 35518691 538609.5

    4 Jul-12 92941.18 79000.00 92941.1765 79000 0.85 N.A 35384795 525310.5

    5 Aug-12 90588.24 77000.00 90588.2353 77000 0.85 N.A 36034674 512011.5

    6 Sep-12 40000.00 34000.00 40000 34000 0.85 N.A 36668328 226083

    7 Oct-12 30588.24 26000.00 30588.2353 26000 0.85 N.A 36953149 172887

    8 Nov-12 69411.76 59000.00 69411.7647 59000 0.85 N.A 35934004 392320.5

    9 12-Dec 70588.235 60000 70588.2353 60000 0.85 N.A 35921636 398970

    10 Jan-13

    11 Feb-13

    12 Mar-13

    643000

    1

    recorded KWH units with power factor = 0.85

    Asstt. Exe. Engineer

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Category: State CT Ratio:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    Name of Installation:- Supdtt. Central Jail, Kathi Darwaza

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    KVAH and demand readings will be required for load more than 100KW only.

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Installation No:

    Capacitor Installed: Y/

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Rainawari

    Meter Rated Current: Meter Type:

    Rating of Capacitor:

    Supply Type:

    Note:

  • 7/28/2019 SERC APDRP Upto January 2013

    45/76

    2

    3

    4

    5

    1

    DiVision:

    N.A

    5531A

    N.AComputer Code: 10031 N

    Sanctioned Load: 47.25 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 1200510 73144.5

    2 May-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 1290946 59845.5

    3 Jun-12 0.00 0.00 0 0 0.85 N.A 1365158 0

    4 Jul-12 0.00 0.00 0 0 0.85 N.A 1166358 0

    5 Aug-12 0.00 0.00 0 0 0.85 N.A 1167558 0

    6 Sep-12 0.00 0.00 0 0 0.85 N.A 1168758 0

    7 Oct-12 0.00 0.00 0 0 0.85 N.A 1169958 0

    8 Nov-12 0.00 0.00 0 0 0.85 N.A1167220.9

    0

    9 Dec-120.00 0.00 0 0

    0.85 N.A1,068,420.88 0.00

    10 Jan-13

    11 Feb-13

    12 Mar-13

    20000

    1

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Installation No: Meter Rated Current: Meter Type:

    Circle:

    Rating of Capacitor:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    recorded KWH units with power factor = 0.85

    Asstt. Exe. Engineer

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    EM & RE Circle-Ist, Srinagar Electric Divisi

    Name of Installation:- Supdtt. Central Jail

    Note:

    Supply Type:

    Capacitor Installed: Y/

    Category: State CT Ratio:

    KVAH and demand readings will be required for load more than 100KW only.

    Rainawari

  • 7/28/2019 SERC APDRP Upto January 2013

    46/76

    2

    3

    4

    5

    1

    DiVision:

    N.A

    420SM N.A

    Computer Code: 8482 N

    Sanctioned Load: 26 HP

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 3170.59 2695.00 3170.58824 2695 0.85 N.A 214162.188 7855.925

    2 May-12 3170.59 2695.00 3170.58824 2695 0.85 N.A 227976 7855.925

    3 Jun-12 2652.94 2255.00 2652.94118 2255 0.85 N.A 241996 6573.325

    4 Jul-12 871.76 741.00 871.764706 741 0.85 N.A 1898 2160.01

    5 Aug-12 128.24 109.00 128.235294 109 0.85 N.A 0 317.73

    6 Sep-12 280.00 238.00 280 238 0.85 N.A 1 693.77

    7 Oct-12 98.82 84.00 98.8235294 84 0.85 N.A 1733 244.86

    8 Nov-12190.59 162.00 190.5882353 162 0.85

    N.A 2 472.23

    9 Dec-12315.29 268.00 315.2941176 268 0.85

    N.A0.00 781.20

    10 Jan-13

    11 Feb-13

    12 Mar-13

    9247

    1

    2

    Asstt. Exe. Engineer

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    KVAH and demand readings will be required for load more than 100KW only.

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    EM & RE Circle-Ist, Srinagar Electric Divisi

    Rainawari

    recorded KWH units with power factor = 0.85

    Capacitor Installed: Y/ Rating of Capacitor:

    Category: LT Indust.

    Installation No: Meter Rated Current: Meter Type:

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Circle:

    CT Ratio: Supply Type:

    Name of Installation:- Ghulam Mohd. Zaroo

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

  • 7/28/2019 SERC APDRP Upto January 2013

    47/76

    3

    4

    5

    1

    DiVision:

    N.A

    100-SD N.A

    Computer Code: 10021 N

    Sanctioned Load: 760 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 137647.06 117000.00 137647.059 117000 0.85 NA 9060675 758043

    2 May-12 181176.47 154000.00 181176.471 154000 0.85 NA 9999662 997766

    3 Jun-12 123529.41 105000.00 123529.412 105000 0.85 NA 11399579 680295

    4 Jul-12 167058.82 142000.00 167058.824 142000 0.85 NA 12243714 920018

    5 Aug-12 121176.47 103000.00 121176.471 103000 0.85 NA 13380311 667337

    6 Sep-12 121176.47 103000.00 121176.471 103000 0.85 NA 12200045 667337

    7 Oct-12 112941.18 96000.00 112941.176 96000 0.85 NA 12383046 621984

    8 Nov-12 135294.12 115000.00 135294.118 115000 0.85 NA 12327715 745085

    9 Dec-12 154117.65 131000.00 154117.647 131000 0.85 NA 11496956 745085

    10 Jan-13

    11 Feb-13

    12 Mar-13

    1066000

    1

    2

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Installation No: Meter Rated Current: Meter Type:

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    Ex. Engineer PHE, Pokhribal

    Category: State CT Ratio: Supply Type:

    Capacitor Installed: Y/ Rating of Capacitor:

    Note:

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Name of Installation:-

    Asstt. Exe. EngineerRainawari

  • 7/28/2019 SERC APDRP Upto January 2013

    48/76

    3

    4

    5

    1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Asstt. Exe. EngineerRainawari

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

  • 7/28/2019 SERC APDRP Upto January 2013

    49/76

    LT3Ph

    N.A Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    989.00 0.00 0.00 0.00 0.00 989.00 274147.28 0.00 274147.28

    989.00 0.00 0.00 0.00 0.00 989.00 279248.49 0.00 279248.49

    989.00 0.00 0.00 0.00 0.00 989.00 284426.22 0.00 284426.22

    989.00 0.00 0.00 0.00 0.00 989.00 285415.22 0.00 285415.22

    989.00 0.00 0.00 0.00 0.00 989.00 290685.45 0.00 290685.45

    989.00 0.00 0.00 0.00 0.00 989.00 296034.73 0.00 296034.73

    989.00 0.00 0.00 0.00 0.00 989.00 301464.25 0.00 301464.25

    989.00 0.00 0.00 0.00 0.00 989.00 306975.21 0.00 306975.21

    989.00 0.00 0.00 0.00 0.00 989.00 312568.84 0.00 312568.84

    8901 0

    1

    2

    3

    on-IV, Khanyar Sub-Division:- Rainawari

    Sub-Division:-

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Rainawari

    Type: Metered / Flat Rate:

    on-IV, Khanyar

    Surcharge on HT consumers for having metering on LT.

    Rainawari

    Flat Rate

    Executive EngineerElectric Division-IV, khanyar

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

  • 7/28/2019 SERC APDRP Upto January 2013

    50/76

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    17430.00 23050.5 9525.00 0.00 0.00 145255.50 1471497.8 0.00 1471497.8

    17430.00 22128.48 9144.00 0.00 0.00 140142.48 1611640.2 0.00 1611640.2

    17430.00 20284.44 8382.00 0.00 0.00 129916.44 1741556.7 0.00 1741556.7

    17430.00 21206.46 8763.00 0.00 0.00 135029.46 1876586.1 0.00 1876586.1

    17430.00 22128.48 9144.00 0.00 0.00 140142.48 2016728.6 0.00 2016728.6

    17430.00 22128.48 9144.00 0.00 0.00 140142.48 2187122.0 0.00 2187122.0

    17430.00 22128.48 9144.00 0.00 0.00 140142.48 2360071.3 0.00 2360071.3

    17430.00 22128.48 9144.00 0.00 0.00 140142.48 2535614.9 0.00 2535614.9

    17430.00 22128.48 107442.00 0.00 0.00 140142.48 2675757.5 0.00 2675757.5

    1251056.28 0

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-2

    Metered

    Rainawari

    Sub-Division:-

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge on HT consumers for having metering on LT.

    Hazratabal

    Metered

    Surcharge shall include following:

    Type: Metered / Flat Rate:

    Type: Metered / Flat Rate:

    Rainawarion-IV, Khanyar

    Executive EngineerElectric Division-IV, khanyar

  • 7/28/2019 SERC APDRP Upto January 2013

    51/76

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    30000 0 0 0 0 1547295 3186795 0 3186795.0

    30000 0 0 0 0 1444530 4631325 3186795 1444530.0

    30000 0 0 0 0 1178550 2623080 0 2623080.0

    30000 0 0 0 0 991155 3614235 1,444,530.00 2169705.0

    30000 0 0 0 0 954885 3124590 2,169,705.00 954885.0

    30000 0 0 0 0 840030 1794915 954,885.00 840030.0

    30000 0 0 0 0 1855590 2695620 2695620 0.0

    30000 0 0 0 0 2236425 2236425 2236425 0

    30000 0.00 0.00 0.00 0.00 2260605.00 2260605 2260605

    13309065 12687960

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Sub-Division:-

    Surcharge on HT consumers for having metering on LT.

    Surcharge shall include following:

    Type: Metered / Flat Rate:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    on-IV, Khanyar

    Executive EngineerElectric Division-IV, khanyar

    Rainawari

    Metered

    Kathi Darwaza

  • 7/28/2019 SERC APDRP Upto January 2013

    52/76

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P1325 13166.01 5440.5 0.00 0.00 74336.51 4170480.8 0.0 4170480.8

    1325 16091.79 6649.5 0.00 0.00 90561.29 4261042.1 0.0 4261042.1

    1325 8777.34 3627 0.00 0.00 49999.34 4311041.4 0.0 4311041.4

    1325 7314.45 33,247.50 0.00 0.00 41886.95 4352928.3 0.0 4352928.3

    1325 10240.23 4,231.50 0.00 0.00 58111.73 4411040.1 100000.0 4311040.1

    1325 13166.01 5,440.50 0.00 0.00 74336.51 4385376.6 1100000.0 3285376.6

    1325 4388.67 1,813.50 0.00 0.00 25662.17 3311038.8 0.0 3311038.8

    1325 16091.79 6,649.50 0.00 0.00 90561.29 3401600.0 0.0 3401600.0

    1500 14628.9 6,045.00 0.00 0.00 82623.90 3484223.9 0.0 3484223.9

    588079.69 1200000

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-1

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Surcharge shall include following:

    Electric Division-IV, khanyar

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge on HT consumers for having metering on LT.

    Rainawarion-IV, Khanyar Sub-Division:-

    Type: Metered / Flat Rate: Metered

    Rainawari

    Executive Engineer

  • 7/28/2019 SERC APDRP Upto January 2013

    53/76

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    7500.00 132176.22 6008.01 0.00 0.00 746485.23 1552958.7 0.0 1552958.7

    7500.00 133655.63 6075.26 0.00 0.00 754756.49 2307715.2 0.0 2307715.2

    7500.00 174530.62 7933.21 0.00 0.00 983284.83 3291000.0 3291000.0 0.0

    7500.00 147312 6696.00 0.00 0.00 831108.00 831108.0 0.0 831108.0

    7500.00 151404 6882.00 0.00 0.00 853986.00 1685094.0 0.0 1685094.0

    7500.00 153450 6975.00 0.00 0.00 865425.00 2550519.0 0.0 2550519.0

    7500.00 150040 6820.00 0.00 0.00 846360.00 3396879.0 0.0 3396879.0

    7500.00 177320 8060.00 0.00 0.00 998880.00 4395759.0 2780626.0 1615133.0

    6880285.548 6071626

    1

    2

    3

    LT3Ph

    N.A Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-5

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    Surcharge on HT consumers for having metering on LT.

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    on-IV, Khanyar

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Sub-Division:-

    Habak

    Rainawari

    Type: Metered / Flat Rate: Metered

    Executive EngineerElectric Division-IV, khanyar

  • 7/28/2019 SERC APDRP Upto January 2013

    54/76

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    800 11234.995 4642.56 0.00 0.00 63103.16 1458917.5 0.0 1458917.54

    800 11234.995 4642.56 0.00 0.00 63103.16 1522020.7 0.0 1522020.69

    800 11234.995 4642.56 0.00 0.00 63103.16 1585123.8 0.0 1585123.85

    800 11234.995 4642.56 0.00 0.00 63103.16 1648227.0 0.0 1648227.00

    800 11234.995 4642.56 0.00 0.00 63103.16 1736053.6 0.0 1736053.56

    800 11234.995 4642.56 0.00 0.00 63103.16 1825197.5 0.0 1825197.52

    800 11234.995 4642.56 0.00 0.00 63103.16 1915678.6 0.0 1915678.64

    800 11234.995 4642.56 0.00 0.00 63103.16 2007517.0 0.0 2007516.97

    800 11234.995 4642.56 0.00 0.00 63103.16 2070620.2 0.0 2070620.16

    567928.3968 0

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    1325 10240.23 4231.5 0.00 0.00 58111.73 1966839.23 0.00 1966839.23

    1325 14628.9 6045 0.00 0.00 82448.90 2049288.13 0.00 2049288.13

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Surcharge shall include following:

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Kathi Darwaza

    Rainawari

    Electric Division-IV, khanyar

    MAR 2013.

    Surcharge on HT consumers for having metering on LT.

    Executive Engineer

    Sub-Division:-on-IV, Khanyar

    Type: Metered / Flat Rate: Metered

  • 7/28/2019 SERC APDRP Upto January 2013

    55/76

    1325 10240.23 4231.5 0.00 0.00 58111.73 2107399.86 0.00 2107399.86

    1325 8777.34 3627 0.00 0.00 49999.34 2157399.20 50000.00 2107399.20

    1325 10240.23 4231.5 0.00 0.00 58111.73 2165510.93 0.00 2165510.93

    1325 20480.46 8463 0.00 0.00 114898.46 2280409.39 0.00 2280409.39

    1325 10240.23 4231.5 0.00 0.00 58111.73 2338521.12 0.00 2338521.12

    1325 40960.92 16926 0.00 0.00 228471.92 2602070.86 287300.00 2314770.86

    1325 42423.7 16926 0.00 0.00 236583.70 2551354.70 0.00 2551354.70

    944849.24 337300

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-2

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    49560 23972.52 9906 0.00 0.00 182498.52 5848331.0 0.0 5848331.0

    49560 21206.46 8763 0.00 0.00 167159.46 6015490.5 0.0 6015490.5

    49560 24894.54 10287 0.00 0.00 187611.54 6293334.4 0.0 6293334.4

    49560 25816.56 10668 0.00 0.00 192724.56 6486058.9 0.0 6486058.9

    49560 23972.52 9906 0.00 0.00 182498.52 6765848.3 0.0 6765848.3

    49560 24894.54 10287 0.00 0.00 187611.54 7054947.6 1094988.0 5959959.6

    Surcharge on HT consumers for having metering on LT.

    Executive Engineer

    Sub-Division:-

    Electric Division-IV, khanyar

    Rainawari

    MAR 2013.

    on-IV, Khanyar

    Metered

    Hazratbal

    Type: Metered / Flat Rate:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge shall include following:

  • 7/28/2019 SERC APDRP Upto January 2013

    56/76

    49560 28582.62 11811 0.00 0.00 208063.62 6257422.6 0.0 6257422.6

    49560 28582.62 11811 0.00 0.00 208063.62 6559347.6 208063.0 6351284.6

    37058.82 28582.62 11811 0.00 0.00 195562.44 6645237.4 0.0 6645237.4

    1711793.82 1303051

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-2

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    49560 7376.16 3,048.00 0.00 0.00 90464.16 931176.10 0.0 931176.10

    49560 10142.22 4,191.00 0.00 0.00 105803.22 1036979.32 0.00 1036979.32

    49560 9220.2 3,810.00 0.00 0.00 100690.20 1137669.52 0.00 1137669.52

    49560 7376.16 3,048.00 0.00 0.00 90464.16 1228133.68 0.00 1228133.68

    49560 5532.12 2,286.00 0.00 0.00 80238.12 1326793.81 0.00 1326793.81

    49560 6454.14 2,667.00 0.00 0.00 85351.14 1432046.85 558123.00 873923.85

    49560 922.02 381.00 0.00 0.00 54673.02 941705.73 0.00 941705.73

    49560 3688.08 1,524.00 0.00 0.00 70012.08 1025843.40 54673.00 971170.40

    37058.85 4610.1 1,904.00 0.00 0.00 62623.95 1049180.95 0.00 1049180.95

    Surcharge on HT consumers for having metering on LT.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    on-IV, Khanyar Sub-Division:-

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    MAR 2013.

    Rainawari

    Hazratbal

    MeteredType: Metered / Flat Rate:

    Executive EngineerElectric Division-IV, khanyar

  • 7/28/2019 SERC APDRP Upto January 2013

    57/76

    740320.05 612796

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-1

    Demandcharges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    CapacitorSurcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Latepayment

    surchar

    ge biled

    TotalAmount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    50425 535949.7 0.00 0.00 0.00 3022509.7 10405578 0.0 10405578

    50425 509351.7 0.00 0.00 0.00 2875011.7 13280589 0.0 13280589

    50425 393650.4 0.00 0.00 0.00 2233395.4 15513985 0.0 15513985

    50425 476104.2 0.00 0.00 0.00 2690639.2 18204624 5000000.0 13204624

    50425 416258.7 0.00 0.00 0.00 2358768.7 15563393 0.0 15563393

    50425 474774.3 0.00 0.00 0.00 2683264.3 18246657 5000000.0 13246657

    50425 530630.1 0.00 0.00 0.00 2993010.1 16239667 0.0 16239667

    50425 638352 0.00 0.00 0.00 3590377.0 19830044 7500000.0 12330044

    50425 860445.3 0.00 0.00 0.00 4821985.3 17152025 0.0 17152025

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge on HT consumers for having metering on LT.

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HPexcept for domestic, street lighting and loads where KVAH billing done.

    Executive Engineer

    Rainawarion-IV, Khanyar Sub-Division:-

    Type: Metered / Flat Rate: Metered

    Hazratbal

    Electric Division-IV, khanyar

  • 7/28/2019 SERC APDRP Upto January 2013

    58/76

    27268961.4 17500000

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-1

    Demandcharges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    CapacitorSurcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Latepayment

    surchar

    ge biled

    TotalAmount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    2250 36904.34 1677.47 0.00 0.00 208578.8 640284 0.0 640284

    2250 37586.34 1708.47 0.00 0.00 212391.8 852676 0.0 852676

    2250 36222.34 1646.47 0.00 0.00 204765.8 1057441 1057441.0 0

    2250 73656 3348.00 0.00 0.00 414054.0 414054 0.0 414054

    2250 70928 3224.00 0.00 0.00 398802.0 812856 0.0 812856

    2250 70928 3224.00 0.00 0.00 398802.0 1211658 0.0 1211658

    2250 70928 3224.00 0.00 0.00 398802.0 1610460 0.0 1610460

    2250 70928 3224.00 0.00 0.00 398802.0 2009262 134732.0 1874530

    2250 70928 3224.00 0.00 0.00 398802.0 2273332 2290968.0 -17636

    Sub-Division:-

    Type: Metered / Flat Rate: Metered

    Rainawari

    on-IV, Khanyar

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge on HT consumers for having metering on LT.

    Executive EngineerElectric Division-IV, khanyar

    Rainawari

  • 7/28/2019 SERC APDRP Upto January 2013

    59/76

    3033800.43 3483141

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for meteringon LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due(in Rs.)

    Amount

    received (InRs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    1275 24869.13 10276.50 0.00 0.00 139185.6 14500913 900000.0 13600913

    1275 27794.91 11485.50 0.00 0.00 155410.4 13756323 0.0 13756323

    1275 16091.79 6649.50 0.00 0.00 90511.3 14053179 0.0 14053179

    1275 13166.01 5440.50 0.00 0.00 74286.5 14127466 0.0 14127466

    1275 17554.68 7254.00 0.00 0.00 98623.7 14438001 0.0 14438001

    1275 23406.24 9672.00 0.00 0.00 131073.2 14785645 0.0 14785645

    1275 14628.9 6045.00 0.00 0.00 82398.9 15089828 0.0 15089828

    4800 26332.02 10881.00 0.00 0.00 150823.0 15466999 0.0 15466999

    6000 49738.26 10881.000.00

    0.00 281821.3 15748820 0.0 15748820

    1204133.94 900000

    on-IV, Khanyar Sub-Division:-

    Type: Metered / Flat Rate: Metered

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Kathi Darwaza

    Rainawari

    Surcharge on HT consumers for having metering on LT.

    Executive EngineerElectric Division-IV, khanyar

  • 7/28/2019 SERC APDRP Upto January 2013

    60/76

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    9000 160917.9 66495.00 0.00 0.00 901362.9 34049795 0.0 34049795

    9000 171158.13 70726.50 0.00 0.00 958149.6 35518691 0.0 35518691

    9000 118494.09 48964.50 0.00 0.00 666103.6 36184795 800000.0 35384795

    9000 115568.31 47755.50 0.00 0.00 649878.8 36034674 0.0 36034674

    9000 112642.53 46546.50 0.00 0.00 633654.0 36668328 0.0 36668328

    9000 49738.26 20553.00 0.00 0.00 284821.3 36953149 0.0 36953149

    9000 38035.14 15717.00 0.00 0.00 219922.1 37173071 0.0 37173071

    9000 86310.51 35665.00 0.00 0.00 487631.0 36421635 0.0 36421635

    9000 87773.4 35665 0 0 495743.4 36417379.4 0 36417379.4

    5297266.77 800000

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Type: Metered / Flat Rate: Metered

    O MAR 2013.

    Rainawarion-IV, Khanyar Sub-Division:-

    Surcharge shall include following:

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge on HT consumers for having metering on LT.

    Executive EngineerElectric Division-IV, khanyar

    Kathi Darwaza

  • 7/28/2019 SERC APDRP Upto January 2013

    61/76

  • 7/28/2019 SERC APDRP Upto January 2013

    62/76

    1

    2

    3

    LT3Ph

    N.A Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-2

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    860 1728.3035 416.24 0.00 0.00 10444.2 224606 0.0 224606

    860 1728.3035 399.69 0.00 0.00 10444.2 238420 0.0 238420

    860 1446.1315 657.33 0.00 0.00 8879.5 250875 0.0 250875

    860 475.2022 196.37 0.00 0.00 3495.2 5393 5393.0 0

    860 69.9006 28.89 0.00 0.00 1247.6 1248 1247.0 1

    860 152.6294 63.07 0.00 0.00 1706.4 1707 0.0 1707

    860 53.8692 22.26 0.00 0.00 1158.7 2892 2890.0 2

    860.00 103.8906 22.26 0.00 0.00 1436.1 1438 1438.0 0

    860.00 171.8671.06 0.00 0.00 1813.1 1813

    0.001813

    40625.0695 10968

    1

    Executive Engineer

    Surcharge on HT consumers for having metering on LT.

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Rainawarion-IV, Khanyar Sub-Division:-

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Electric Division-IV, khanyar

    Type: Metered / Flat Rate:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Rainawari

    Metered

    Surcharge shall include following:

  • 7/28/2019 SERC APDRP Upto January 2013

    63/76

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)