Page 1: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve 1

FY2012 Draft Annual Basin Plan

CPRA

January 26, 2011

Page 2: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

Atchafalaya Basin • The Atchafalaya Basin Floodway System

(ABFS) encompasses 838,000 acres, and extends south from the Old River Control Structure to Morgan City

• The ABFS is bound on the east and west by the Atchafalaya Basin Floodway Levee Protection System

• Land Ownership– approximately 400,000 acres of

publicly owned lands, which include state and federal fee title lands, federal easement lands and state water bottoms.

– approximately 438,000 acres of privately owned lands which include upland forested habitats as well as deep-water swamps

• Flood control efforts and other changes to the system have modified historical flow patterns and impacted the hydrology and habitat of the Basin

2

Page 3: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

A Place Worth Restoring• Largest contiguous bottomland

hardwood forest and alluvial swamp remaining in the United States

• Habitat for endangered and threatened species

• Significant fisheries

• Vast recreational opportunities

• Preservation of culture and heritage

• Tourism

• Coastal Restoration Resource

• Economic impact

3

Page 4: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve 4

Challenges In The Basin

1. Ever-Changing Hydrology

2. Sedimentation

3. Hypoxic Conditions

4. Invasive Exotic Plant Species

5. Land Use/Resource Issues

6. Basin Management

Page 5: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve 5

Game Changer HB1135 (Act 606 - 2008)

•Established the Atchafalaya Basin Annual Plan Process– shall be approved by the Research & Promotion Board, Coastal Protection

and Restoration Authority and the Louisiana Legislature

•Created the Technical Advisory Group (TAG) to bring science into proposed solutions

•Created a focus on water management and water quality to accelerate restoration of the Atchafalaya Basin

•Created a focus on access to enhance public use of the recreational opportunities in the Atchafalaya Basin

•Created the Atchafalaya Basin Conservation Fund– 75% shall be used for water management, water quality, or access projects

– 25% may be used to complete ongoing projects, and for projects in accordance with the mission statement of the Atchafalaya Basin Master Plan.

Page 6: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve 6

FY2012 Annual Basin Plan Development

Page 7: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve 7

FY2011/12 ABP Timeline

– July 22, 2010 – Research & Promotion Board Meeting to discuss FY 2010 Annual Plan Status and FY 2011 Schedule

– August 5, 2010– Technical Advisory Group Meeting to discuss FY2010 Annual Plan status and FY 2011 Schedule

– 2011 proposed schedule– August 16, 2010 – Public Meeting – Morgan City– August 18, 2010 – Public Meeting – Henderson– August 19, 2010 – Public Meeting – Plaquemine– September 9, 2010 – TAG meeting to review proposed projects– September 27, 2010 – TAG meeting to discuss proposed

projects– October 4, 2010 – TAG meeting to approve projects– October 8, 2010 – TAG forwards approved projects to ABP– Week of October 26, 2009 – Draft Annual Plan Completed

Page 8: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve 8

FY2011/12 ABP Timeline (continued)

– November 4th, 2010 – R&P Meeting to approve draft annual plan for public comment

– November 8, 2010 – R & P Public Meeting -Morgan City– November 9, 2010 – R & P Public Meeting - Henderson– November 10, 2010 – R & P Public Meeting – Plaquemine– December 9, 2010 – R & P Meeting to consider Public Comment– January 26, 2011 – Present draft annual Plan to CPRA– February 2011 – CPRA Approval of Annual Plan– March 1-4, 2011 – R & P Approval Of Annual Plan– March 21-25 – Submit FY 2012 Annual Plan to Legislature– April 25, 2011 – Legislative Session Begins

Page 9: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

Atchafalaya BasinResearch & Promotion Board

1. Louis Buatt – Chair - Dept. of Natural Resources

2. Gerald Alexander –Vice Chair - Atchafalaya Levee Board

3. Brad Spicer - Dept. of Agriculture & Forestry

4. Stuart Johnson - Dept. of Culture, Recreation & Tourism

5. Alex Appeaning - Dept. of Environmental Quality

6. David Guilbeau - Dept. of Health and Hospitals

7. Shawn Wilson, Dept. of Transportation & Development

8. Mike Wood- Dept. of Wildlife & Fisheries

9. Chip Kline- Office of the Governor (Coastal Activities)

10. Charles St. Romain - State Land Office

11. Marty Triche - Assumption Parish (non-voting)

12. Mitchell Ourso - Iberville Parish (non-voting)

13. Guy Cormier - St. Martin Parish (non-voting)

14. Paul Naquin - St. Mary Parish (non-voting)

9

Page 10: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

1. Bobby Reed, Chair - Louisiana Department of Wildlife and Fisheries

2. Mike Walker - Louisiana Department of Wildlife and Fisheries

3. Keith Lovell - Louisiana Department of Natural Resources

4. Chris Piehler - Louisiana Department of Environmental Quality

5. Mike Thomas - Louisiana Department of Ag & Forestry

6. Charlie Demas - U.S. Geological Survey

7. Glenn Constant - U.S. Fish & Wildlife

8. Lamar Hale - U.S. Army Corps of Engineers

9. Dr. William Kelso - LSU School of Renewable Natural Resources

Technical Advisory Group (TAG)

10

Page 11: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

FY2012 Draft Annual Basin Plan1. Lists of Projects Proposed for Funding

2. Descriptions of Proposed Projects

3. Descriptions and Status of Projects Funded for FY2010

4. Description and Status of Ongoing Water Management and Access Projects

5. SONRIS Information

6. TAG Referral Letter

7. List of Proposed Water Management Projects

11

Page 12: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

Project Funding & PrioritizationPage 18

1. Capital Outlay request submitted October 2010

2. Funding level provided could not be determined at the time plan developed

3. Unknowns related to cost of some projects

4. In accordance with Act 606 75% of funds provided on water management & access and 25% on ongoing projects and other projects consistent with the Master Plan

5. Flexibility for unforeseen circumstances and level of funding provided

6. Provisions for Research and Promotion Board approval when funding is determined or significant changes made

7. If funding remains deferred projects may be brought forward if process is followed

12

Page 13: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

FY 2012 Water Management New Projects

Proposed for Funding

• Upper Grand River Flats

• East Grand Lake

13

Page 14: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

UGRF

Page 15: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

EGL

Page 16: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

FY 2012 Water Management ProjectsProposed for Funding (From 2011 Plan)

• Brown Bayou to I-10 Canal (construction)

• Big Bayou Pigeon (construction)

• Little Bayou Pigeon (construction)

• 16” & 21” Pipeline Canals (construction)

16

Page 17: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

FY 2012 Access Projects Proposed for Funding (Page 24)

1. Butte LaRose at Atchafalaya River

2. Wilson’s Landing

3. Sandy Cove Landing

4. Ramah Landing

5. Catahoula Landing

17

Page 18: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

Other Projects Proposed for Funding (Page 39-40)

1. Basin Master Plan Update

2. Belle River Park

3. Biking/Hiking/Paddling Trails

4. Camp Atchafalaya

5. Eagle Point Park

7. Lake End Park Cabins

8. Morgan City Interpretive Plaza

9. Primitive Campground

10. Stephensville Park

11. Veterans Park

18

Page 19: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve

Big Alabama

Pigeon Bay

Flat Lake/East Grand Lake

Henderson Lake

13 Water Management Units

Buffalo Cove

Beau Bayou Swamp

Upper Belle River

Cocodrie Swamp

Bayou Des Glaises

Grand Lake

Cow Island Lake

Lost Lake

Warner’s Lake

= WMU level effort ongoing or planned by State/Parish

=WMU level effort ongoing or planned by Corps

19

Page 20: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve 20

Atchafalaya Basin Natural Resource Inventory and Assessment System

Page 21: RestoreEnhancePreserve 1 FY2012 Draft Annual Basin Plan CPRA January 26, 2011

Restore Enhance Preserve 21

FY2011/12 PlanPath Forward

January 26, 2011 – Present draft annual Plan to CPRA

February 2011 – CPRA Approval of Annual Plan

March 1-4, 2011 – R & P Approval Of Annual Plan

March 21-25 – Submit FY 2012 Annual Plan to Legislature

April 25, 2011 – Legislative Session Begins