ABOUT THE SITE Osterley Station car park is located adjacent to Osterley underground station. The station is in zone 4, on the Piccadilly line, off the Great West Road. The Grade II listed station was opened in 1934 and its design includes a concrete obelisk at the top of the station tower which is regarded as an important local historic landmark. OUR RELATIONSHIP WITH TfL The site has been identified by TfL as an opportunity to deliver a high quality residential development with much needed affordable housing above the car park. AfL is working in partnership with TfL to deliver this. AfL’s development model enables this development opportunity to be unlocked, enabling new homes to be provided above a fully operational station car park. WE VALUE YOUR FEEDBACK Members of the project team are available to answer any questions you may have. A feedback form is available for you to complete and we would welcome your comments on our current proposals. All feedback will be reviewed and taken into consideration and addressed at a further public exhibition in the new year. AfL is committed to working with the local community throughout the development of our design proposals and will be holding further consultation and engagement with the community as our proposals develop. Residential Development, Osterley Station // 01 welcome ABOUT THE EXHIBITION Welcome to our public exhibition which sets out Apartments for London (AfL)’s plans for the redevelopment of Osterley Station car park. AfL is working with Transport for London (TfL), the owner of the site, to bring forward a residential development above the car park that will deliver much needed new affordable rental homes for the local area. 01 02 03 04 N O R T H E R N L I N E 1 2 5 THORNBURY PARK (1.1 MILES) 3 4 OSTERLEY PARK (0.6 MILES) 135 spaces 6 T O H E A T H R O W A I R P O R T G R E A T W E S T R O A D 1 3 5 2 4 6 N O S T E R L Y A V E N U E B A S S E T T G D N S. B A S S E T T G D N S. T H O R N B U R Y R O A D T H O R N B U R Y A V E. C R A N M O R E A V E. P E N W E R R I S A V E N U E P E V E N S E Y C L. S T U C L E Y R O A D J E R S E Y R O A D View of Osterley Station from across Great West Road View along Great West Road looking east View of Osterley Station entrance View along Great West Road looking west View across the existing station car park View looking towards the site from Osterley Park with the station Obelisk visible between the houses

Residential Development, Osterley Station // 01 welcome · 2019-01-30 · Residential Development, Osterley Station // 01 welcome ABOUT THE EXHIBITION Welcome to our public exhibition

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Residential Development, Osterley Station // 01 welcome · 2019-01-30 · Residential Development, Osterley Station // 01 welcome ABOUT THE EXHIBITION Welcome to our public exhibition

ABOUT THE SITE

Osterley Station car park is located adjacent to Osterley

underground station. The station is in zone 4, on the

Piccadilly line, off the Great West Road.

The Grade II listed station was opened in 1934 and its design

includes a concrete obelisk at the top of the station tower

which is regarded as an important local historic landmark.

OUR RELATIONSHIP WITH TfL

The site has been identified by TfL as an opportunity to

deliver a high quality residential development with much

needed affordable housing above the car park.

AfL is working in partnership with TfL to deliver this. AfL’s

development model enables this development opportunity

to be unlocked, enabling new homes to be provided above

a fully operational station car park.

WE VALUE YOUR FEEDBACK

Members of the project team are available to answer any

questions you may have. A feedback form is available for

you to complete and we would welcome your comments

on our current proposals. All feedback will be reviewed

and taken into consideration and addressed at a further

public exhibition in the new year.

AfL is committed to working with the local community

throughout the development of our design proposals and

will be holding further consultation and engagement with

the community as our proposals develop.

Residential Development, Osterley Station // 01 welcome

ABOUT THE EXHIBITION

Welcome to our public exhibition which sets

out Apartments for London (AfL)’s plans for the

redevelopment of Osterley Station car park.

AfL is working with Transport for London (TfL), the owner of

the site, to bring forward a residential development above

the car park that will deliver much needed new affordable

rental homes for the local area.

01 02 03 04

N

O

R

T H

E R

N

L I

N E

1

2

5

THORNBURY PARK

(1.1 MILES)

3

4

OSTERLEY PARK (0.6 MILES)

135 spaces

6

T O H E A T H R O W A I R P O R T

G R E A T W E S T R O A D

1

3

5

2

4

6

N

O S T E R L Y A V E N U E

B A

S S

E T

T

G D

N S.

B

A

S

S

E T

T

G

D

N

S.

T H

O

R

N

B

U

R

Y

R

O

A

D

T H O R N B U R Y A V E.

C R A N

M

O

R E

A V E.

P

E N

W

E

R

R

I S

A

V

E N

U

E

P

E V

E N

S

E Y

C

L.

S

T U

C

L E

Y

R

O

A

D

J E

R S

E Y

R

O A

D

View of Osterley Station from across Great West Road

View along Great West Road looking east

View of Osterley Station entrance

View along Great West Road looking west

View across the existing station car park

View looking towards the site from Osterley Park with the station Obelisk visible between the houses

Page 2: Residential Development, Osterley Station // 01 welcome · 2019-01-30 · Residential Development, Osterley Station // 01 welcome ABOUT THE EXHIBITION Welcome to our public exhibition

AfL DEVELOPMENT MODEL

AfL’s development model and construction methods,

enables us to work with TfL to bring forward development

on more challenging sites, such as those above active

and operational sites like Osterley Station Car Park.

AfL use modular construction, which means factory-

produced pre-engineered building units that are delivered

to site and then assembled, enabling high quality

development with more efficient timescales.

PROJECT TEAM

AfL is working with high quality, experienced design

teams on all of our projects in order to deliver outstanding

developments.

We have been working with our design team on the

proposals for Osterley Station over several months and

have met regularly with the London Borough of Hounslow

Planning and Housing Officers to get their comments on

the proposals.

KKA ARCHITECTURE

KKA is an award-winning architectural and interior

design practice based in their purpose-designed offices

at Highpoint in Liverpool City Centre.

KKA undertake projects nationwide and across a wide

spectrum of sectors on projects which range in size

and complexity. KKA is a young, vibrant practice, yet it

is backed by over 60 years of experience and has an

enviable reputation for the delivery of buildings of the

highest quality of design.

02 product & team

05 06 07

facade contextual skin relative to site

car parkexisting surface car park

modules typical 1-bed 1-person

apartments

amenitytraditionally built deck

provides communal space for residents

amenitygreen roof terraces with PVs for clean energy

traditionally built core

circulation core at ground level

naturally lit communal circulation

visit: www.apartmentsforlondon.org/osterleypublicexhibition to give us your feedback

AfL development concept

example of a previous residential scheme designed by KKA Architecture

modular construction process

Page 3: Residential Development, Osterley Station // 01 welcome · 2019-01-30 · Residential Development, Osterley Station // 01 welcome ABOUT THE EXHIBITION Welcome to our public exhibition

OPPORTUNITIES

• Maximise affordable housing delivery

• Deliver a building of outstanding design quality that makes

a positive contribution to the area

• Improve security for station and car park users with

enhanced lighting and security measures, as well as

increased natural surveillance from new residents

AfF is committed to delivering an outstanding new

development that contributes to solving the London

housing crisis, providing affordable homes.

CONSTRAINTS

• Impact on station car park during construction works

• Local views from the Osterley House and Park

• Relationship with the listed Osterley Station buildings and

obelisk

• Use of materials sympathetic to the local area

• Design and scale of surrounding residential properties

• Impact of development on local roads including Great

West Road

• Neighbourly relations and potential impact on those

residents who live closest to the site

03 site opportunities & considerations

AMBITION

TfL’s ambition is to progress development across London

on suitable sites to deliver more affordable housing.

TfL have partnered with AfL to progress the redevelopment

of Osterley Station, which presents the opportunity to

deliver much needed new affordable homes in a highly

accessible location, and to provide benefits for the local

community and commuters.

08 09 10

“U” Configuration follows traditional street elevation of Great West Rd. whilst providing continuous enclosure from road and railway. Foliage buffer used to screen from rail line.

4Original residential block rotated along Great West Road, similar to local flat types. Inefficient as more than 50% of the site is unoccupied.

2Residential block duplicated to maximise the footprint. Views, daylighting and ventilation are maintained. However still exposed to the rail network to the north of the site,

3To ensure north aspect apartments have dual aspect, a step in elevation is introduced.

5

rail network interfacethe site sits against the London tube network to its north. Opportunity to provide a large foliage buffer off TfL boundary to screen site

neighbouring interfaceneighbouring property and associated outbuildings have habitable rooms with dormers facing the site which requires a zone between the existing development and new development to ensure suitable levels of privacy are retained.

local style and characterneighbouring existing buildings to which the development must respond

green embankment bufferalong the Great West Road boundary a large green area screens the car park from view. The majority of plants are small, however two mature trees are located on the corner of the site

difference in levelNCP car park level has roughly a 2.5m level difference parallel to Great West Road

aspect & orientationissues of single aspect and overshadowing will influence the form of the development

Great West Roadthe site is located on a busy thoroughfare — the A4 dual carriageway connecting the city with Heathrow airport and the suburbs

grade ii listed stationOsterley tube station is a grade ii listed building meaning it is of special historic importance—key views must be maintained

KEY

New Block

Street Interface

Sun Path

High Massing

Low Massing

Amenity Area

Aspect

Push/ Pull

Interface Distance

Noise

Buffer

Foliage Screen

N

Typical East/West Residential Block along the site is inefficient because more than 50% of the site is unoccupied.

1

It was paramount to align the block’s front elevation with the station. This helped maintain the existing street edge definition

The southern block is reduced to four storeys to blend with the street edge and align in height with the Osterley station obelisk. At the north of the site, the storey height is increased maintaining critical mass

The storey height to Great West Road elevation is maintained to align with the Grade II Osterley Station tower, with density added to the north. South facing roofs are utilised as communal terraces.

After all constraints and opportunities had been considered the optimal form of the building was arrived at. This was then subject to a number of revisions from a planning perspective.

6 7 8 9

ALIGNMENT WITH STATION

ALIGNMENT WITH STATION

RE-WORK BLOCK HEIGHTS

RE-WORK BLOCK HEIGHTS CONTEXTUAL LINK

LAYOUT EXTRUDED CONCLUSION OF MASSING EXERCISE

visit: www.apartmentsforlondon.org/osterleypublicexhibition to give us your feedback

Page 4: Residential Development, Osterley Station // 01 welcome · 2019-01-30 · Residential Development, Osterley Station // 01 welcome ABOUT THE EXHIBITION Welcome to our public exhibition

DESIGN APPROACH

The design approach for the site is based on:

• Utilising materials that are in keeping with the station

buildings and surrounding area

• Height located to the rear of the site and stepping down

towards the station and concrete obelisk – respecting the

setting of the station and views of the obelisk

• Respecting key local views from Osterley House and Park

• Providing high quality living accommodation in line with

the London Plan living space guidelines

• AfL and the design team are committed to building a high

quality development that has a positive impact on the local

area.

LB HOUNSLOW & THE GLA

KKA Architecture has undertaken significant research

into the local area and has been in regular contact with

LB Hounslow Planning Officers and the GLA to ensure

our proposals are of the highest design quality.

SCALE & MASSING

The proposal is to build above the car park and we will

consider appropriate bulk, scale and massing during

design development.

We are currently looking at a proposal that reaches a

maximum height of 10 storeys stepping down to 5 storeys

to the front of the site along the Great Western Road to

respect the setting of the station and obelisk.

04 design approach

11 12 13

Street/ Interface

Body - Residential

CommunalTerrace

Street Interface

Street Interface

Street Interface

Street Interface

Body

Body

Body

Cornice

Roof

Roof

Roof Lights

Analysis of building composition

TfL Station Design Flash cards

Masonry Render

Accent colour Glazing

COLOUR

STATIONS

MATERIALITY SPECIAL FEATURES

EXAMPLE STATIONS

BRONZE UPLIGHTER

ESCALATOR UPLIGHTER (SOUTH GATE)

BRONZEIn o boar - rame (MANOR HOUSE) / Uplighter

VARNISHED TIMBER(ARNOS GROVE)

PAINTED CRITTALL WINDOWS (SUDBURY TOWN)

10.11 HOLDEN (PICCADILLY STYLE)

CERAMICCream

STRUCUTURE EXPRESSED INTERIOR & WHITE PAINTED CEILING (SUDBURY HILL)

INTERIOR STAIN CEILING (BLUE + ORANGE??? (ALPERTON)

OAKWOOD TICKET HALL INTERIOR ARNOS GROVE INTERIORSUDBURY TOWN EXTERIOR

SOUTHGATE EXTERIORCOCKFOSTERS PLATFORM INTERIOR

BRICKRe / Glaze blac (OAKWOOD)

POLISHED CONCRETE FLOOR TILES / PAVERSTravertine (int)St ame tyle tile (int)Concrete ag tone (ext)

PENDANT LIGHT

CONCRETE EXTERNAL LAMP POST (SOUTH GATE & RAYNERS LANE PLATFORM)

HOLDEN (PICCADILLY) TYPE – Designed by Charles Holden for the 1932/33 Piccadilly line extensions. These stations mark a milestone in world station architecture with groundbreaking use of brick, concrete and spatial layouts marking a new era in Underground stations.

TRIM COLOURBronze ni he br he tainle teel

COCKFOSTERSOAKWOODSOUTHGATEARNOS GROVE

BOUNDS GREENWOOD GREENTURNPIKE LANEMANOR HOUSE

PICCADILLY CIRCUSCHISWICK PARKACTON TOWNNORTHFIELDS

BOSTON MANOROSTERLEYHOUNSLOW WESTEALING COMMON

PARK ROYALALPERTONSUDBURY TOWNSUDBURY HILL

SOUTH HARROWRAYNERS LANEEASTCOTERUISLIP MANOR

UXBRIDGEHARROW ON THE HILLQUEENSBURY

BLACKNCS-S 9000-N

WHITENCS-S 0500-N

COLOUR

STATIONS

MATERIALITYSPECIAL FEATURES

EXAMPLE STATIONS

BRONZE UPLIGHTER

ESCALATOR UPLIGHTER (SOUTH GATE)

BRONZEIno boar-rame (MANOR HOUSE) / Uplighter

VARNISHED TIMBER(ARNOS GROVE)

PAINTED CRITTALL WINDOWS (SUDBURY TOWN)

10.11 HOLDEN (PICCADILLY STYLE)

CERAMICCream

STRUCUTURE EXPRESSED INTERIOR & WHITE PAINTED CEILING (SUDBURY HILL)

INTERIOR STAIN CEILING (BLUE + ORANGE??? (ALPERTON)

OAKWOOD TICKET HALL INTERIORARNOS GROVE INTERIOR SUDBURY TOWN EXTERIOR

SOUTHGATE EXTERIOR COCKFOSTERS PLATFORM INTERIOR

BRICKRe / Glaze blac (OAKWOOD)

POLISHED CONCRETEFLOOR TILES / PAVERSTravertine (int)St ame tyle tile (int)Concrete agtone (ext)

PENDANT LIGHT

CONCRETE EXTERNAL LAMP POST (SOUTH GATE & RAYNERS LANE PLATFORM)

HOLDEN (PICCADILLY) TYPE – Designed by Charles Holden for the 1932/33 Piccadilly line extensions. These stations mark a milestone in world station architecture with groundbreaking use of brick, concrete and spatial layouts marking a new era in Underground stations.

TRIM COLOURBronze nihe brhe

tainle teel

COCKFOSTERSOAKWOODSOUTHGATEARNOS GROVE

BOUNDS GREENWOOD GREENTURNPIKE LANEMANOR HOUSE

PICCADILLY CIRCUSCHISWICK PARKACTON TOWNNORTHFIELDS

BOSTON MANOROSTERLEYHOUNSLOW WESTEALING COMMON

PARK ROYALALPERTONSUDBURY TOWNSUDBURY HILL

SOUTH HARROWRAYNERS LANEEASTCOTERUISLIP MANOR

UXBRIDGEHARROW ON THE HILLQUEENSBURY

BLACKNCS-S 9000-N

WHITENCS-S 0500-N

COLOUR

STATIONS

MATERIALITYSPECIAL FEATURES

EXAMPLE STATIONS

BRONZE UPLIGHTER

ESCALATOR UPLIGHTER (SOUTH GATE)

BRONZEIno boar-rame (MANOR HOUSE) / Uplighter

VARNISHED TIMBER(ARNOS GROVE)

PAINTED CRITTALL WINDOWS (SUDBURY TOWN)

10.11 HOLDEN (PICCADILLY STYLE)

CERAMICCream

STRUCUTURE EXPRESSED INTERIOR & WHITE PAINTED CEILING (SUDBURY HILL)

INTERIOR STAIN CEILING (BLUE + ORANGE??? (ALPERTON)

OAKWOOD TICKET HALL INTERIORARNOS GROVE INTERIOR SUDBURY TOWN EXTERIOR

SOUTHGATE EXTERIOR COCKFOSTERS PLATFORM INTERIOR

BRICKRe / Glaze blac (OAKWOOD)

POLISHED CONCRETEFLOOR TILES / PAVERSTravertine (int)St ame tyle tile (int)Concrete agtone (ext)

PENDANT LIGHT

CONCRETE EXTERNAL LAMP POST (SOUTH GATE & RAYNERS LANE PLATFORM)

HOLDEN (PICCADILLY) TYPE – Designed by Charles Holden for the 1932/33 Piccadilly line extensions. These stations mark a milestone in world station architecture with groundbreaking use of brick, concrete and spatial layouts marking a new era in Underground stations.

TRIM COLOURBronze nihe brhe

tainle teel

COCKFOSTERSOAKWOODSOUTHGATEARNOS GROVE

BOUNDS GREENWOOD GREENTURNPIKE LANEMANOR HOUSE

PICCADILLY CIRCUSCHISWICK PARKACTON TOWNNORTHFIELDS

BOSTON MANOROSTERLEYHOUNSLOW WESTEALING COMMON

PARK ROYALALPERTONSUDBURY TOWNSUDBURY HILL

SOUTH HARROWRAYNERS LANEEASTCOTERUISLIP MANOR

UXBRIDGEHARROW ON THE HILLQUEENSBURY

BLACKNCS-S 9000-N

WHITENCS-S 0500-N

COLOUR

STATIONS

MATERIALITYSPECIAL FEATURES

EXAMPLE STATIONS

BRONZE UPLIGHTER

ESCALATOR UPLIGHTER (SOUTH GATE)

BRONZEIno boar-rame (MANOR HOUSE) / Uplighter

VARNISHED TIMBER(ARNOS GROVE)

PAINTED CRITTALL WINDOWS (SUDBURY TOWN)

10.11 HOLDEN (PICCADILLY STYLE)

CERAMICCream

STRUCUTURE EXPRESSED INTERIOR & WHITE PAINTED CEILING (SUDBURY HILL)

INTERIOR STAIN CEILING (BLUE + ORANGE??? (ALPERTON)

OAKWOOD TICKET HALL INTERIORARNOS GROVE INTERIOR SUDBURY TOWN EXTERIOR

SOUTHGATE EXTERIOR COCKFOSTERS PLATFORM INTERIOR

BRICKRe / Glaze blac (OAKWOOD)

POLISHED CONCRETEFLOOR TILES / PAVERSTravertine (int)St ame tyle tile (int)Concrete agtone (ext)

PENDANT LIGHT

CONCRETE EXTERNAL LAMP POST (SOUTH GATE & RAYNERS LANE PLATFORM)

HOLDEN (PICCADILLY) TYPE – Designed by Charles Holden for the 1932/33 Piccadilly line extensions. These stations mark a milestone in world station architecture with groundbreaking use of brick, concrete and spatial layouts marking a new era in Underground stations.

TRIM COLOURBronze nihe brhe

tainle teel

COCKFOSTERSOAKWOODSOUTHGATEARNOS GROVE

BOUNDS GREENWOOD GREENTURNPIKE LANEMANOR HOUSE

PICCADILLY CIRCUSCHISWICK PARKACTON TOWNNORTHFIELDS

BOSTON MANOROSTERLEYHOUNSLOW WESTEALING COMMON

PARK ROYALALPERTONSUDBURY TOWNSUDBURY HILL

SOUTH HARROWRAYNERS LANEEASTCOTERUISLIP MANOR

UXBRIDGEHARROW ON THE HILLQUEENSBURY

BLACKNCS-S 9000-N

WHITENCS-S 0500-N

South Block- South Elevation4-6 Storeys

Facade Composition - Station

Facade Composition - Great West Road

Facade Composition - Great West Road, Flats

Facade Composition - Osterley House

visit: www.apartmentsforlondon.org/osterleypublicexhibition to give us your feedback

1. Front elevation reduced by 1 storey to enable closer correspondence with street scene and allow vista of landmark obelisk

2. Lost accommodation replaced at northern block

3. Western block reduced and opened

4. Southern block moved to increase courtyard to 18m

1

3

4

2

Above the ground floor plinth the fenestration is vertically accentuated referencing the station obelisk

• Overall public amenity increased from 686sqm to 945sqm

• Additional roof terraces provided on the northern block to upscale overall communal amenity

Private amenity space increased from 0% to 58%. The remaining 42% have Juliet balconies

Dual aspect units increased from 0% to 48% through the introduction of gable windows

The front and rear of the building dropped in height to increase the vista angle of the Grade II listed station

Entrance precedent - Royal Court Theatre extension, Liverpool. AHMM Architects

The station entrance expresses horizontality and curvilinear forms common in the London Underground art deco stations. This motif has been referenced in the design of the main entrance.

The ground floor’s plinth is horizontally accentuated to promote the station’s and development’s shared urban realm

design moves made following consultation with LB Hounslow and GLA

facade composition and material study in relation to local context facade treatment study -typical western elevation typical southern elevation

KEY

Page 5: Residential Development, Osterley Station // 01 welcome · 2019-01-30 · Residential Development, Osterley Station // 01 welcome ABOUT THE EXHIBITION Welcome to our public exhibition

NUMBER OF UNITS & MIX

The proposals are for:

• Up to 118 new apartments in a mix of units

• Communal facilities and shared spaces within the

development for residents

• High quality landscaping and connection with Osterley

landscaping

• Enhance and improve hard landscaping to station frontage

TARGET MARKET

The homes will be designed to the highest standard.

AfL is targeting key workers, young professionals and

young families for the new homes.

OPPORTUNITY

This is an exciting development opportunity to provide

much needed affordable housing at this accessible site

in Osterley.

Once completed AfL will retain control of the residential

building working with a housing provider to ensure the

development contributes positively to the community and

the local area.

05 our proposals: new homes

AFFORDABLE HOUSING MODEL

The proposals are for a build to rent residential

development above Osterley Station Car Park. The

development will deliver as many affordable homes as

possible.

AfL is in discussions with LB Hounslow and the GLA about

the level of affordable housing within the scheme.

14 15 16 17

typical floor plan

studio apartment

example of a kitchen/ lounge in a 1-bed apartment

example of a bedrrom in a 2-bed apartment

example of a lounge in a 2-bed apartment

typical 2-bed 4-person apartment type

typical studio

typical 1-bed 2-person apartment type

WM

FF

WM

FF

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

WM

FF

WM

FF

WM

F.F.STAIR 01

E2Apartment

E2Apartment

B1Apartment

B1Apartment

VENTED CORRIDOR CORE 01

A2Apartment

A2Apartment

A2Apartment

B1Apartment

B1Apartment

VENTED CORRIDOR

Balcony 5.2sqm Balcony 5.2sqm

CORE 02

MaintenanceAccess

A2Apartment

Balcony13.6sqm

Balcony5.4sqm

Balcony5.4sqm

Externalwalkway82sqm

Balcony 6.4sqmBalcony 8.4sqm

Balcony 8.4sqm

BikeStoreRoof

120sqm

EntranceRoof

59sqm

A2Apartment

C4Apartment

C4Apartment

C3Apartment

B1Apartment

B1Apartment

B1Apartment

B1Apartment

rwp

rwp

606

878

3000

LEGEND

SCHEDULE

TYPES NO.

A2 - 1B 1P 39 SQM 38B1 - 1B 1P 41 SQM 52C3 - 1B 2P 53 SQM 06C4 - 1B 1P ACC 59 SQM 12E2 - 2B 4P 71 SQM 10

SUBTOTAL 118

NCP BAYS 65RESIDENT AC. BAYS 12LOADING BAYS 00SUBTOTAL 78

OTHER NO.BIKE SPACES (REQUIRED) 136BIKE SPACES (SHORT STAY)06BIN STORAGE (1100L) 14COM. AMENITY SPACE 1136PRIV. AMENITY SPACE 344

N

50

4471

S C A L E

SK121:250@A3

OSTERLEY STATION CAR PARKAFL APARTMENTS FOR LONDON

L E V E L 0 2 - 0 4 P L A N

This drawing must be read in conjunction with allarchitects, consultants, subcontractors andspecialists drawings. Do not scale from thisdrawing.

Rev. Date Description Sig.

PROPOSED LV02-04 FLOOR PLANSCALE 1:250

C O N S U L T A T I O N I S S U E

P10 26.11.18 Revised Schedule,Core, Car Park & Access

visit: www.apartmentsforlondon.org/osterleypublicexhibition to give us your feedback

Page 6: Residential Development, Osterley Station // 01 welcome · 2019-01-30 · Residential Development, Osterley Station // 01 welcome ABOUT THE EXHIBITION Welcome to our public exhibition

06 our proposals: landscaping

OVERVIEW

The proposals include high quality landscaping within

the development for new residents to enjoy as part of

their communal amenity space.

AfL is also in discussions with LB Hounslow about the

landscaping at ground floor level and the potential to

make improvements to the public realm and appearance

of the station entrance. The development presents the

opportunity to improve the appearance of the site through

outstanding landscaping, planting and greening.

18

visit: www.apartmentsforlondon.org/osterleypublicexhibition to give us your feedback

SETTING & CONTEXT

4 SEPT 20186468_AFL OSTERLEY

Other key elements of the landscape strategy include:

• Additional off-site vegetation comprises a wildlife buffer on the railway land of small trees and vegetation that will be retained, enhanced and managed.

• Podium terrace planting including new and appropriate street trees, mixed understorey planting and native plants of greater value to wildlife to connect with the large street trees and gardens forming valuable wildlife connectivity.

• a resident’s amenity south-east facing courtyard with further shared residents’ amenity terraces.

• Plant species will include native and flowering plants attractive to pollinators, edible plants, sensory planting for touch, smell, sight and sound with integrated watering reservoirs and rainwater harvesting devices used where possible

• Fixed planters incorporating seating and lighting will be orientated to the south and east maximising views. Pedestal paving and/or composite decking will be selected to achieve a high quality external finish flush with door thresholds.

• Growing planters, a lawn area and shared dining space with integrated planters

• Door stop play space and playable landscape features for pre-school age children

4 SEPT 20186468_AFL OSTERLEY

Other key elements of the landscape strategy include:

• Additional off-site vegetation comprises a wildlife buffer on the railway land of small trees and vegetation that will be retained, enhanced and managed.

• Podium terrace planting including new and appropriate street trees, mixed understorey planting and native plants of greater value to wildlife to connect with the large street trees and gardens forming valuable wildlife connectivity.

• a resident’s amenity south-east facing courtyard with further shared residents’ amenity terraces.

• Plant species will include native and flowering plants attractive to pollinators, edible plants, sensory planting for touch, smell, sight and sound with integrated watering reservoirs and rainwater harvesting devices used where possible

• Fixed planters incorporating seating and lighting will be orientated to the south and east maximising views. Pedestal paving and/or composite decking will be selected to achieve a high quality external finish flush with door thresholds.

• Growing planters, a lawn area and shared dining space with integrated planters

• Door stop play space and playable landscape features for pre-school age children

5SEPT 20186468_AFL OSTERLEY

Summary

The landscape strategy will seek to meet the requirements defined by the ecologists to promote biodiversity. Bird and bat boxes will be incorporated to the west and south facades, insect hotels to attract birds and pollinators, providing new habitat opportunities that currently are not possible with the site laid out as a surface car park. A landscape management and maintenance regime will be provided at planning application stage for adoption to achieve a robust and maintainable landscape

5SEPT 20186468_AFL OSTERLEY

Summary

The landscape strategy will seek to meet the requirements defined by the ecologists to promote biodiversity. Bird and bat boxes will be incorporated to the west and south facades, insect hotels to attract birds and pollinators, providing new habitat opportunities that currently are not possible with the site laid out as a surface car park. A landscape management and maintenance regime will be provided at planning application stage for adoption to achieve a robust and maintainable landscape

2 SEPT 20186468_AFL OSTERLEY

Page 7: Residential Development, Osterley Station // 01 welcome · 2019-01-30 · Residential Development, Osterley Station // 01 welcome ABOUT THE EXHIBITION Welcome to our public exhibition

SUSTAINABILITY

The proposals have been designed to comply with

current building regulations.

The development will be environmentally friendly and

incorporate renewable energy sources the use of modular

building techniques will significantly reduce disruption and

waste during the build process.

CONSTRUCTION MANAGEMENT

AfL is committed to being a responsible developer

during construction.

The site will be registered with the Considerate Constructors

Scheme and we will continue to engage with the local

community during construction to keep residents up to

date on the latest works and progress.

TRANSPORT & PARKING

The development will provide 136 long stay cycle parking

spaces at the site and 6 short stay spaces. This is in line

with the current London Plan.

The long stay parking spaces will be accessible for residents

to use and will also be secure. The short stay spaces will

be provided in the public realm. Given that the site is in

an accessible location, resident’s car parking will only be

available to Blue Badge holders. There will be an increase

in Blue Badge spaces at the site, rising from 3 to 12 spaces.

07 key considerations

OSTERLEY STATION CAR PARK

During construction the car park will be closed and

alternative car parking will be available for commuters

at nearby stations Hounslow East and Hounslow West.

The new car park will open upon completion of the

development. Further information will be provided by TfL

as the proposals progress.

19 20 2221

ServicingDeliveries and servicing will take place onsite. The majority of delivery/servicing vehicle movements will be made by vehicles such as transit/sprinter vans. Larger vehicles can also be accommodated onsite, but their movements will be much less frequent than smaller vehicles.

A delivery bay will be provided adjacent to the building to accommodate these delivery/servicing trips.

proposed car parking plan

existing car parking plan

Osterley Sustainability Approach

The Osterley development is aiming to achieve HQM 2-stars with a stretchtarget of 3-stars. As the generic pre-assessment has yet to be updated for theOsterley site, AfL cannot commit to the challenging 3-star standard at thisstage.

EnergyInitial analysis has demonstrated that Passivhaus is achievable on theOsterley site, and will reduce energy demand against Part L byapproximately 20%. The residual 15% on-site improvements requiredto meet the London Plan’s minimum on-site carbon improvements willbe delivered through 180m2 of roof mounted PV units.

The building configuration and orientation maximise roof top solarirradiation and minimises the risk of overshadowing of the PVs,thereby optimising the potential PV output.

DaylightingThe building orientation and the stepped building height from southto north maximises daylight in to apartments, communal roof terracesand the courtyard.

OverheatingAll units will have openable windows with south-facing units beingdual aspect to further minimise the risk of overheating. The need foradditional shading devices will be evaluated at the next design stageand implemented as necessary to reduce overheating risk.

The lightweight steel frame lacks thermal mass, however the highlyinsulated building envelope and continuous mechanical ventilationsystem with heat recovery should moderate internal temperatureswithin an acceptable range, subject to detailed calculations.

TransportThe site is located 50m from Osterley tube station and is accessedfrom safe and accessible pedestrian walkways. There is direct accessfrom the TfL cycle superhighway on Great West Road to the secure on-site cycle storage.

Comfort (Noise & Vibration)The building orientation and configuration creates an acoustic bufferbetween the surrounding highways and trains and the communalexterior amenity space. To ensure appropriate internal acousticconditions, the junction details around windows and the use ofacoustic insulation will be considered. Base isolation pads will be usedto minimise vibration transfer.

EnergyInitial analysis has demonstrated that Passivhaus is achievable on the Osterley site, and will reduce energy demand against Part L by approximately 20%. The residual 15% on-site improvements required to meet the London Plan’s minimum on-site carbon improvements will be delivered through 180m 2 of roof mounted PV units. The building configuration and orientation maximise roof top solar irradiation and minimises the risk of overshadowing of the PVs, thereby optimising the potential PV output.

Osterley Sustainability Approach

The Osterley development is aiming to achieve HQM 2-stars with a stretchtarget of 3-stars. As the generic pre-assessment has yet to be updated for theOsterley site, AfL cannot commit to the challenging 3-star standard at thisstage.

EnergyInitial analysis has demonstrated that Passivhaus is achievable on theOsterley site, and will reduce energy demand against Part L byapproximately 20%. The residual 15% on-site improvements requiredto meet the London Plan’s minimum on-site carbon improvements willbe delivered through 180m2 of roof mounted PV units.

The building configuration and orientation maximise roof top solarirradiation and minimises the risk of overshadowing of the PVs,thereby optimising the potential PV output.

DaylightingThe building orientation and the stepped building height from southto north maximises daylight in to apartments, communal roof terracesand the courtyard.

OverheatingAll units will have openable windows with south-facing units beingdual aspect to further minimise the risk of overheating. The need foradditional shading devices will be evaluated at the next design stageand implemented as necessary to reduce overheating risk.

The lightweight steel frame lacks thermal mass, however the highlyinsulated building envelope and continuous mechanical ventilationsystem with heat recovery should moderate internal temperatureswithin an acceptable range, subject to detailed calculations.

TransportThe site is located 50m from Osterley tube station and is accessedfrom safe and accessible pedestrian walkways. There is direct accessfrom the TfL cycle superhighway on Great West Road to the secure on-site cycle storage.

Comfort (Noise & Vibration)The building orientation and configuration creates an acoustic bufferbetween the surrounding highways and trains and the communalexterior amenity space. To ensure appropriate internal acousticconditions, the junction details around windows and the use ofacoustic insulation will be considered. Base isolation pads will be usedto minimise vibration transfer.

DaylightingThe building orientation and the stepped building height from south to north maximises daylight in to apartments, communal roof terraces and the courtyard.

Osterley Sustainability Approach

The Osterley development is aiming to achieve HQM 2-stars with a stretchtarget of 3-stars. As the generic pre-assessment has yet to be updated for theOsterley site, AfL cannot commit to the challenging 3-star standard at thisstage.

EnergyInitial analysis has demonstrated that Passivhaus is achievable on theOsterley site, and will reduce energy demand against Part L byapproximately 20%. The residual 15% on-site improvements requiredto meet the London Plan’s minimum on-site carbon improvements willbe delivered through 180m2 of roof mounted PV units.

The building configuration and orientation maximise roof top solarirradiation and minimises the risk of overshadowing of the PVs,thereby optimising the potential PV output.

DaylightingThe building orientation and the stepped building height from southto north maximises daylight in to apartments, communal roof terracesand the courtyard.

OverheatingAll units will have openable windows with south-facing units beingdual aspect to further minimise the risk of overheating. The need foradditional shading devices will be evaluated at the next design stageand implemented as necessary to reduce overheating risk.

The lightweight steel frame lacks thermal mass, however the highlyinsulated building envelope and continuous mechanical ventilationsystem with heat recovery should moderate internal temperatureswithin an acceptable range, subject to detailed calculations.

TransportThe site is located 50m from Osterley tube station and is accessedfrom safe and accessible pedestrian walkways. There is direct accessfrom the TfL cycle superhighway on Great West Road to the secure on-site cycle storage.

Comfort (Noise & Vibration)The building orientation and configuration creates an acoustic bufferbetween the surrounding highways and trains and the communalexterior amenity space. To ensure appropriate internal acousticconditions, the junction details around windows and the use ofacoustic insulation will be considered. Base isolation pads will be usedto minimise vibration transfer.

OverheatingAll units will have open-able windows with south-facing units being dual aspect to further minimise the risk of overheating. The need for additional shading devices will be evaluated at the next design stage and implemented as necessary to reduce overheating risk. The lightweight steel frame lacks thermal mass, however the highly insulated building envelope and continuous mechanical ventilation system with heat recovery should moderate internal temperatures within an acceptable range, subject to detailed calculations.

Osterley Sustainability Approach

The Osterley development is aiming to achieve HQM 2-stars with a stretchtarget of 3-stars. As the generic pre-assessment has yet to be updated for theOsterley site, AfL cannot commit to the challenging 3-star standard at thisstage.

EnergyInitial analysis has demonstrated that Passivhaus is achievable on theOsterley site, and will reduce energy demand against Part L byapproximately 20%. The residual 15% on-site improvements requiredto meet the London Plan’s minimum on-site carbon improvements willbe delivered through 180m2 of roof mounted PV units.

The building configuration and orientation maximise roof top solarirradiation and minimises the risk of overshadowing of the PVs,thereby optimising the potential PV output.

DaylightingThe building orientation and the stepped building height from southto north maximises daylight in to apartments, communal roof terracesand the courtyard.

OverheatingAll units will have openable windows with south-facing units beingdual aspect to further minimise the risk of overheating. The need foradditional shading devices will be evaluated at the next design stageand implemented as necessary to reduce overheating risk.

The lightweight steel frame lacks thermal mass, however the highlyinsulated building envelope and continuous mechanical ventilationsystem with heat recovery should moderate internal temperatureswithin an acceptable range, subject to detailed calculations.

TransportThe site is located 50m from Osterley tube station and is accessedfrom safe and accessible pedestrian walkways. There is direct accessfrom the TfL cycle superhighway on Great West Road to the secure on-site cycle storage.

Comfort (Noise & Vibration)The building orientation and configuration creates an acoustic bufferbetween the surrounding highways and trains and the communalexterior amenity space. To ensure appropriate internal acousticconditions, the junction details around windows and the use ofacoustic insulation will be considered. Base isolation pads will be usedto minimise vibration transfer.

TransportThe site is located 50m from Osterley tube station and is accessed from safe and accessible pedestrian walkways. There is direct access from the TfL cycle superhighway on Great West Road to the secure on-site cycle storage.

Osterley Sustainability Approach

The Osterley development is aiming to achieve HQM 2-stars with a stretchtarget of 3-stars. As the generic pre-assessment has yet to be updated for theOsterley site, AfL cannot commit to the challenging 3-star standard at thisstage.

EnergyInitial analysis has demonstrated that Passivhaus is achievable on theOsterley site, and will reduce energy demand against Part L byapproximately 20%. The residual 15% on-site improvements requiredto meet the London Plan’s minimum on-site carbon improvements willbe delivered through 180m2 of roof mounted PV units.

The building configuration and orientation maximise roof top solarirradiation and minimises the risk of overshadowing of the PVs,thereby optimising the potential PV output.

DaylightingThe building orientation and the stepped building height from southto north maximises daylight in to apartments, communal roof terracesand the courtyard.

OverheatingAll units will have openable windows with south-facing units beingdual aspect to further minimise the risk of overheating. The need foradditional shading devices will be evaluated at the next design stageand implemented as necessary to reduce overheating risk.

The lightweight steel frame lacks thermal mass, however the highlyinsulated building envelope and continuous mechanical ventilationsystem with heat recovery should moderate internal temperatureswithin an acceptable range, subject to detailed calculations.

TransportThe site is located 50m from Osterley tube station and is accessedfrom safe and accessible pedestrian walkways. There is direct accessfrom the TfL cycle superhighway on Great West Road to the secure on-site cycle storage.

Comfort (Noise & Vibration)The building orientation and configuration creates an acoustic bufferbetween the surrounding highways and trains and the communalexterior amenity space. To ensure appropriate internal acousticconditions, the junction details around windows and the use ofacoustic insulation will be considered. Base isolation pads will be usedto minimise vibration transfer.

Comfort (Noise & Vibration)The building orientation and configuration creates an acoustic buffer between the surrounding highways and trains and the communal exterior amenity space. To ensure appropriate internal acoustic conditions, the junction details around windows and the use of acoustic insulation will be considered. Base isolation pads will be used to minimise vibration transfer.

Air QualityThe majority of interior finishing materials will comply with the stringentHQM formaldehyde and VOC limits. Post construction testing will ensuresafe and healthy interior air quality levels are achieved.

Efficient Mechanical Ventilation Heat Recovery (MVHR) systems will deliverfresh air to the apartment during occupancy. Stringent checks on air filterswill ensure the quality of the incoming air is maintained throughout theoperational life.

In addition, the use of green infrastructure and buffer screens will beconsidered alongside the railway and highway to help improve local outdoorair quality.

Flood RiskThe landscape design integrates a variety of SuDS including a planted roofterraces and courtyard rain gardens to reduce existing run-off rates.

EcologyThe landscape design will consider habitat creation opportunities, throughthe use of a diverse number of native species and the introduction ofhibernacula such as insect hotels. Both to encourage biodiversity andprovide explorative play opportunities for local children.

MaterialsAs far as reasonably practical, key materials will be certified responsiblysourced to ISO14001 or BES6001 standard, and FSC/PEFC timber usedthroughout. High recycled content materials such as plasterboard, andcement replacements will also be pursued to reduce the embodied carbonof construction.

WasteSignificant reduction is construction waste is realised through the use ofmodular construction technology. Further opportunities to reduce in-situwaste will be explored with the principal contractor and associated supplychain. Dedicated space within homes for storing recycling and food wasteare designed into floorplans to maximise recycling among residents.

WaterThe London Plan maximum water usage rate of 105 litres per person per daywill be achieved through the installation of low flow appliances and fittingsin the modular units.

Sustainable ConstructionOff-site prefabrication and modular construction minimise on-site wasteand reduces impacts of construction activities such as noise, disturbanceand vehicle movements. Haul routes will be designated to minimisedisruption to local residents.

The principle contractor will be required to submit an EnvironmentalManagement Plan prior to starting on-site, detailing best practiceenvironmental management measures and pollution prevention strategies.All deliveries vehicles and Non-Road Mobile Machinery will comply withLondon Low Emission Zone requirements. Site generators will be avoided asfar as reasonably practical through early electrical connection to the grid.

Air QualityThe majority of interior finishing materials will comply with the stringent HQM formaldehyde and VOC limits. Post construction testing will ensure safe interior air quality levels are achieved. Efficient Mechanical Ventilation Heat Recovery (MVHR) systems will deliver fresh air to the apartments during occupancy. Checks on air filters will ensure the quality of the incoming air is maintained throughout the operational life. In addition, the use of green infrastructure and buffer screens will be considered alongside the railway and highway to help improve local outdoor air quality.

Air QualityThe majority of interior finishing materials will comply with the stringentHQM formaldehyde and VOC limits. Post construction testing will ensuresafe and healthy interior air quality levels are achieved.

Efficient Mechanical Ventilation Heat Recovery (MVHR) systems will deliverfresh air to the apartment during occupancy. Stringent checks on air filterswill ensure the quality of the incoming air is maintained throughout theoperational life.

In addition, the use of green infrastructure and buffer screens will beconsidered alongside the railway and highway to help improve local outdoorair quality.

Flood RiskThe landscape design integrates a variety of SuDS including a planted roofterraces and courtyard rain gardens to reduce existing run-off rates.

EcologyThe landscape design will consider habitat creation opportunities, throughthe use of a diverse number of native species and the introduction ofhibernacula such as insect hotels. Both to encourage biodiversity andprovide explorative play opportunities for local children.

MaterialsAs far as reasonably practical, key materials will be certified responsiblysourced to ISO14001 or BES6001 standard, and FSC/PEFC timber usedthroughout. High recycled content materials such as plasterboard, andcement replacements will also be pursued to reduce the embodied carbonof construction.

WasteSignificant reduction is construction waste is realised through the use ofmodular construction technology. Further opportunities to reduce in-situwaste will be explored with the principal contractor and associated supplychain. Dedicated space within homes for storing recycling and food wasteare designed into floorplans to maximise recycling among residents.

WaterThe London Plan maximum water usage rate of 105 litres per person per daywill be achieved through the installation of low flow appliances and fittingsin the modular units.

Sustainable ConstructionOff-site prefabrication and modular construction minimise on-site wasteand reduces impacts of construction activities such as noise, disturbanceand vehicle movements. Haul routes will be designated to minimisedisruption to local residents.

The principle contractor will be required to submit an EnvironmentalManagement Plan prior to starting on-site, detailing best practiceenvironmental management measures and pollution prevention strategies.All deliveries vehicles and Non-Road Mobile Machinery will comply withLondon Low Emission Zone requirements. Site generators will be avoided asfar as reasonably practical through early electrical connection to the grid.

Flood RiskThe landscape design integrates a variety of SuDS including a planted roof terraces and courtyard rain gardens to reduce existing run-off rates.

Air QualityThe majority of interior finishing materials will comply with the stringentHQM formaldehyde and VOC limits. Post construction testing will ensuresafe and healthy interior air quality levels are achieved.

Efficient Mechanical Ventilation Heat Recovery (MVHR) systems will deliverfresh air to the apartment during occupancy. Stringent checks on air filterswill ensure the quality of the incoming air is maintained throughout theoperational life.

In addition, the use of green infrastructure and buffer screens will beconsidered alongside the railway and highway to help improve local outdoorair quality.

Flood RiskThe landscape design integrates a variety of SuDS including a planted roofterraces and courtyard rain gardens to reduce existing run-off rates.

EcologyThe landscape design will consider habitat creation opportunities, throughthe use of a diverse number of native species and the introduction ofhibernacula such as insect hotels. Both to encourage biodiversity andprovide explorative play opportunities for local children.

MaterialsAs far as reasonably practical, key materials will be certified responsiblysourced to ISO14001 or BES6001 standard, and FSC/PEFC timber usedthroughout. High recycled content materials such as plasterboard, andcement replacements will also be pursued to reduce the embodied carbonof construction.

WasteSignificant reduction is construction waste is realised through the use ofmodular construction technology. Further opportunities to reduce in-situwaste will be explored with the principal contractor and associated supplychain. Dedicated space within homes for storing recycling and food wasteare designed into floorplans to maximise recycling among residents.

WaterThe London Plan maximum water usage rate of 105 litres per person per daywill be achieved through the installation of low flow appliances and fittingsin the modular units.

Sustainable ConstructionOff-site prefabrication and modular construction minimise on-site wasteand reduces impacts of construction activities such as noise, disturbanceand vehicle movements. Haul routes will be designated to minimisedisruption to local residents.

The principle contractor will be required to submit an EnvironmentalManagement Plan prior to starting on-site, detailing best practiceenvironmental management measures and pollution prevention strategies.All deliveries vehicles and Non-Road Mobile Machinery will comply withLondon Low Emission Zone requirements. Site generators will be avoided asfar as reasonably practical through early electrical connection to the grid.

EcologyThe landscape design will consider habitat creation opportunities, through the use of a diverse number of native species and the introduction of hibernacula such as insect hotels. Both to encourage biodiversity andprovide explorative play opportunities for local children.

Air QualityThe majority of interior finishing materials will comply with the stringentHQM formaldehyde and VOC limits. Post construction testing will ensuresafe and healthy interior air quality levels are achieved.

Efficient Mechanical Ventilation Heat Recovery (MVHR) systems will deliverfresh air to the apartment during occupancy. Stringent checks on air filterswill ensure the quality of the incoming air is maintained throughout theoperational life.

In addition, the use of green infrastructure and buffer screens will beconsidered alongside the railway and highway to help improve local outdoorair quality.

Flood RiskThe landscape design integrates a variety of SuDS including a planted roofterraces and courtyard rain gardens to reduce existing run-off rates.

EcologyThe landscape design will consider habitat creation opportunities, throughthe use of a diverse number of native species and the introduction ofhibernacula such as insect hotels. Both to encourage biodiversity andprovide explorative play opportunities for local children.

MaterialsAs far as reasonably practical, key materials will be certified responsiblysourced to ISO14001 or BES6001 standard, and FSC/PEFC timber usedthroughout. High recycled content materials such as plasterboard, andcement replacements will also be pursued to reduce the embodied carbonof construction.

WasteSignificant reduction is construction waste is realised through the use ofmodular construction technology. Further opportunities to reduce in-situwaste will be explored with the principal contractor and associated supplychain. Dedicated space within homes for storing recycling and food wasteare designed into floorplans to maximise recycling among residents.

WaterThe London Plan maximum water usage rate of 105 litres per person per daywill be achieved through the installation of low flow appliances and fittingsin the modular units.

Sustainable ConstructionOff-site prefabrication and modular construction minimise on-site wasteand reduces impacts of construction activities such as noise, disturbanceand vehicle movements. Haul routes will be designated to minimisedisruption to local residents.

The principle contractor will be required to submit an EnvironmentalManagement Plan prior to starting on-site, detailing best practiceenvironmental management measures and pollution prevention strategies.All deliveries vehicles and Non-Road Mobile Machinery will comply withLondon Low Emission Zone requirements. Site generators will be avoided asfar as reasonably practical through early electrical connection to the grid.

MaterialsAs far as reasonably practical, key materials will be certified responsibly sourced to ISO14001 or BES6001 standard, and FSC/PEFC timber used throughout. High recycled content materials such as plasterboard, and cement replacements will also be pursued to reduce the embodied carbon of construction.

Air QualityThe majority of interior finishing materials will comply with the stringentHQM formaldehyde and VOC limits. Post construction testing will ensuresafe and healthy interior air quality levels are achieved.

Efficient Mechanical Ventilation Heat Recovery (MVHR) systems will deliverfresh air to the apartment during occupancy. Stringent checks on air filterswill ensure the quality of the incoming air is maintained throughout theoperational life.

In addition, the use of green infrastructure and buffer screens will beconsidered alongside the railway and highway to help improve local outdoorair quality.

Flood RiskThe landscape design integrates a variety of SuDS including a planted roofterraces and courtyard rain gardens to reduce existing run-off rates.

EcologyThe landscape design will consider habitat creation opportunities, throughthe use of a diverse number of native species and the introduction ofhibernacula such as insect hotels. Both to encourage biodiversity andprovide explorative play opportunities for local children.

MaterialsAs far as reasonably practical, key materials will be certified responsiblysourced to ISO14001 or BES6001 standard, and FSC/PEFC timber usedthroughout. High recycled content materials such as plasterboard, andcement replacements will also be pursued to reduce the embodied carbonof construction.

WasteSignificant reduction is construction waste is realised through the use ofmodular construction technology. Further opportunities to reduce in-situwaste will be explored with the principal contractor and associated supplychain. Dedicated space within homes for storing recycling and food wasteare designed into floorplans to maximise recycling among residents.

WaterThe London Plan maximum water usage rate of 105 litres per person per daywill be achieved through the installation of low flow appliances and fittingsin the modular units.

Sustainable ConstructionOff-site prefabrication and modular construction minimise on-site wasteand reduces impacts of construction activities such as noise, disturbanceand vehicle movements. Haul routes will be designated to minimisedisruption to local residents.

The principle contractor will be required to submit an EnvironmentalManagement Plan prior to starting on-site, detailing best practiceenvironmental management measures and pollution prevention strategies.All deliveries vehicles and Non-Road Mobile Machinery will comply withLondon Low Emission Zone requirements. Site generators will be avoided asfar as reasonably practical through early electrical connection to the grid.

WasteSignificant reduction in construction waste is realised through the use of modular construction technology. Further opportunities to reduce in-situ waste will be explored with the principal contractor and associated supply chain. Dedicated space within homes for storing recycling and food waste are designed into floorplans to maximise recycling among residents.

Air QualityThe majority of interior finishing materials will comply with the stringentHQM formaldehyde and VOC limits. Post construction testing will ensuresafe and healthy interior air quality levels are achieved.

Efficient Mechanical Ventilation Heat Recovery (MVHR) systems will deliverfresh air to the apartment during occupancy. Stringent checks on air filterswill ensure the quality of the incoming air is maintained throughout theoperational life.

In addition, the use of green infrastructure and buffer screens will beconsidered alongside the railway and highway to help improve local outdoorair quality.

Flood RiskThe landscape design integrates a variety of SuDS including a planted roofterraces and courtyard rain gardens to reduce existing run-off rates.

EcologyThe landscape design will consider habitat creation opportunities, throughthe use of a diverse number of native species and the introduction ofhibernacula such as insect hotels. Both to encourage biodiversity andprovide explorative play opportunities for local children.

MaterialsAs far as reasonably practical, key materials will be certified responsiblysourced to ISO14001 or BES6001 standard, and FSC/PEFC timber usedthroughout. High recycled content materials such as plasterboard, andcement replacements will also be pursued to reduce the embodied carbonof construction.

WasteSignificant reduction is construction waste is realised through the use ofmodular construction technology. Further opportunities to reduce in-situwaste will be explored with the principal contractor and associated supplychain. Dedicated space within homes for storing recycling and food wasteare designed into floorplans to maximise recycling among residents.

WaterThe London Plan maximum water usage rate of 105 litres per person per daywill be achieved through the installation of low flow appliances and fittingsin the modular units.

Sustainable ConstructionOff-site prefabrication and modular construction minimise on-site wasteand reduces impacts of construction activities such as noise, disturbanceand vehicle movements. Haul routes will be designated to minimisedisruption to local residents.

The principle contractor will be required to submit an EnvironmentalManagement Plan prior to starting on-site, detailing best practiceenvironmental management measures and pollution prevention strategies.All deliveries vehicles and Non-Road Mobile Machinery will comply withLondon Low Emission Zone requirements. Site generators will be avoided asfar as reasonably practical through early electrical connection to the grid.

WaterThe London Plan maximum water usage rate of 105 litres per person per day will be achieved through the installation of low flow appliances and fittings in the modular units.

Air QualityThe majority of interior finishing materials will comply with the stringentHQM formaldehyde and VOC limits. Post construction testing will ensuresafe and healthy interior air quality levels are achieved.

Efficient Mechanical Ventilation Heat Recovery (MVHR) systems will deliverfresh air to the apartment during occupancy. Stringent checks on air filterswill ensure the quality of the incoming air is maintained throughout theoperational life.

In addition, the use of green infrastructure and buffer screens will beconsidered alongside the railway and highway to help improve local outdoorair quality.

Flood RiskThe landscape design integrates a variety of SuDS including a planted roofterraces and courtyard rain gardens to reduce existing run-off rates.

EcologyThe landscape design will consider habitat creation opportunities, throughthe use of a diverse number of native species and the introduction ofhibernacula such as insect hotels. Both to encourage biodiversity andprovide explorative play opportunities for local children.

MaterialsAs far as reasonably practical, key materials will be certified responsiblysourced to ISO14001 or BES6001 standard, and FSC/PEFC timber usedthroughout. High recycled content materials such as plasterboard, andcement replacements will also be pursued to reduce the embodied carbonof construction.

WasteSignificant reduction is construction waste is realised through the use ofmodular construction technology. Further opportunities to reduce in-situwaste will be explored with the principal contractor and associated supplychain. Dedicated space within homes for storing recycling and food wasteare designed into floorplans to maximise recycling among residents.

WaterThe London Plan maximum water usage rate of 105 litres per person per daywill be achieved through the installation of low flow appliances and fittingsin the modular units.

Sustainable ConstructionOff-site prefabrication and modular construction minimise on-site wasteand reduces impacts of construction activities such as noise, disturbanceand vehicle movements. Haul routes will be designated to minimisedisruption to local residents.

The principle contractor will be required to submit an EnvironmentalManagement Plan prior to starting on-site, detailing best practiceenvironmental management measures and pollution prevention strategies.All deliveries vehicles and Non-Road Mobile Machinery will comply withLondon Low Emission Zone requirements. Site generators will be avoided asfar as reasonably practical through early electrical connection to the grid.

Sustainable ConstructionOff-site prefabrication minimises on-site waste and reduces the impact of noise and vehicle movement. Haul routes will be designated to minimise disruption to local residents. The principal contractor is required to submit an Environmental Management Plan prior to starting on-site, detailing environmental management and pollution prevention strategies. All delivery vehicles and Non-Road Mobile Machinery will comply with London Low Emission Zone requirements. Site generators will be avoided as far as reasonably practical through early electrical connection to the grid.

Osterley sustainability approachservicing strategy

PARKING PROVISION

TOTAL DEVELOPMENT

CAR SPACES71 ( EXISTING NCP SPACES)

12 ACCESSIBLE RESIDENT BAYS

CYCLE SPACES

136 (+6 SHORT-STAY)

visit: www.apartmentsforlondon.org/osterleypublicexhibition to give us your feedback

Page 8: Residential Development, Osterley Station // 01 welcome · 2019-01-30 · Residential Development, Osterley Station // 01 welcome ABOUT THE EXHIBITION Welcome to our public exhibition

08 scheme benefits & next steps

• Developed Station car park with improved access,

enhanced security and lighting.

• Modular construction reducing disruption for local

residents and delivering the development within much

shorter timescales

NEXT STEPS

We will continue to work closely with LB Hounslow and

local stakeholders as our proposals progress. We will

be holding further public consultation and engagement

with the local community in the new year ahead of

submitting a planning application to LB Hounslow.

Thank you for attending our public exhibition. Please

remember to fill out a feedback form and let us know your

thoughts. All of the exhibition boards are available to view

on the project website (details below).

CONTACT US

T: 020 7871 3565

E:[email protected]

W: www.apartmentsforlondon.org/osterleypublicexhibition

Freepost: RTUA-THGR-LUYK

Public Consultation Cascade

26 Noel Street

London

W1F 8GY

SCHEME BENEFITS

The benefits of the scheme are:

• Delivery of much needed new affordable housing

• High quality residential development above Osterley

Station Car Park

• Sensitively designed proposals respecting the setting of

the station buildings

• Enhanced landscaping at ground floor level connecting

with Osterley Station.

23 24 25

visit: www.apartmentsforlondon.org/osterleypublicexhibition to give us your feedback