Requirements for the Interlock System of the Phase1 beam line
Janet Schmidt on behalf of CP3
2
Functional scheme of main laser lines
2
LSSP1, LSSP2, LSSE1, LSSE2 – Laser Safety Shutters for proton and electron beam linesLBDP1, LBDP2, LBDP3 – Laser Beam Dumps for proton beam lineMP1- MP5 – Mirrors for proton beam lines (IN VACUUM)ME1- ME4 – Mirrors for electron beam lineVP1 – VP5, VE1 – Vacuum vessels for proton and electron lines
Photoinjector
LSSE2 VE1
LSSE1
ME1 ME2
ME3ME4
THG
Delay line
CERN Naming of shutters and dumps
LSSP1 = TOSWB – in airLSSP2 = TOSWA in vacLSSE1 = TOSWB – in airLSSE2 = TOSWB – in air
LBDP1 = TODWA in vacLBDP2 = TODWB in vacLBDP3 = TODWC in vac
BTVs
F
LSSP2
LBDP1
LBDP2
B2B1B4
B3
F = Movable Filter with end switch
Laser dumps
LBDP3
Layout of Beam Lines
TRUTH Table For LASER
LASER TO LINE LSSP2 OUT V OUT
LOW POWER (default) F IN Diagnostics LBDP1 IN OUT IN OUT LBDP2 OUT OUT IN IN B1 IN/OUT IN/OUT IN/OUT IN/OUT B2 IN/OUT IN/OUT IN/OUT IN/OUT
B3 IN/OUT IN/OUT IN/OUT IN/OUTB4 IN/OUT IN/OUT IN/OUT IN/OUT
FULL POWER (by request) F OUT Diagnostics LBDP1 IN OUT IN OUT
LBDP2 OUT OUT IN IN B1 IN/OUT OUT IN/OUT OUT B2 IN/OUT OUT IN/OUT IN/OUT
B3 IN/OUT OUT IN/OUT IN/OUTB4 IN/OUT OUT IN/OUT IN/OUT
Type Name
F Filter / Indicator for Laser Power (tbd) To be defined
LSSP2 Laser Shutter TOSWA.420255LBDP1 Laser Dump upstream plasma TODWA.412322LBDP2 Laser Dump downstream plasma TODWB.412424LBDP3 Laser Dump downstream plasma TODWC.412443
V Valves (CERN + MPP)VVGS.420306, VVGS.412354, VVGS.412424,6x MPP
B1 2 Screens upstream plasma BTV.412350, BTV.412353B2 1 Screen downstream plasma BTV.412426B3 Diagnostic MPPB4 1 Screen (SMI diagnostic CERN) BTV.412442
Local System
B2
LBDP2
B4Plasma
LBDP1LSSP2
LBDP3
Commissioning and Operational Modes For LASER
Mode Laser Power Laser Shutter Laser Dump Screens
Set up only laser Low/High LSSP2 IN LBDP1, LBDP2,LBDP3 IN/OUT B1, B2, B3, B4 IN/OUT
Set up laser beam in TT41
Low LSSP2 OUT LBDP1, LBDP2 LBDP3
IN/OUTIN B1, B2, B3, B4 IN/OUT
High LSSP2 OUT LBDP1 LBDP2,LBDP3
ININ/OUT B1, B2, B3, B4 IN/OUT
Set up protons and laser Low LSSP2 OUT
LBDP1 LBDP2 LBDP3
OUTIN/OUTIN
B1, B2 B3, B4
ININ/OUT
Operation Phase 1 High LSSP2 OUTLBDP1LBDP2 LBDP3
OUTINOUT
B1, B2B3, B4
OUTIN/OUTIN
Operation Phase 2 High LSSP2 OUTLBDP1LBDP2 LBDP3
OUTOUTIN
B1, B2 B3, B4Electron spectrometer
OUTOUTIN
Local System
B2
LBDP2
B4Plasma
LBDP1LSSP2
LBDP3
TRUTH Table For Protons
Permit this SPS extraction
status nameValves (8) out CERN: VVGS.412354, VVGS.412424
out MPP valves/plunger: 6Laser dump LBDP1 (1) out TOSWA.420255
SPS BIC
Permit next SPS extraction
status nameBPMs around laser merging OK BPM.412311, BPM.412319BPMs before plasma cell OK BPM.412339, BPM.412352BLM at laser merging OK BLM.412356 BLM around plasma cell OK BLM.412356, BLM.412424
4x valve 4x valve
Summary
• The laser interlock system should be a local system, checking the status of screens and valves according to the laser power and shutter status.
• The required interlocks for the proton line are defined, including BMPs, BLMs and valves.
• For the electron transfer line, only the valve needs to be interlocked. Requirements of the source will be defined on a later stage.