1

REQUIREMENT-SUPPLIED QUANTITY OF MATERIALS

TUMKUR CIRLCE

FOR THE YEAR 2011-12

( Upto 09.03.2012)

Page 2: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 2/27

 

1039

1081

1100

0

200

400

600

800

1000

1200

        1  .

        4  .        2

        0

        1        1

        8  .        4  .        2

        0

        1        1

        1       5  .

        4  .

        2        0

        1        1

        2        2  .

        4  .

        2        0

        1        1

        2        9  .

        4  .

        2        0

        1        1

        6  .       5  .        2

        0

        1        1

        1        3  .

       5  .

        2        0

        1        1

        2        0  .

       5  .

        2        0

        1        1

        2       7  .

       5  .

        2        0

        1        1

        3  .        6  .        2

        0

        1        1

        1        0  .

        6  .

        2        0

        1        1

        1       7  .

        6  .

        2        0

        1        1

        2        4  .

        6  .

        2        0

        1        1

        1  .       7  .        2

        0

        1        1

        8  .       7  .        2

        0

        1        1

        1       5  .

       7  .

        2        0

        1        1

        2        2  .

       7  .        2

        0

        1        1

        2        9  .

       7  .

        2        0

        1        1

       5  .        8  .        2

        0

        1        1

        1        2  .

        8  .

        2        0

        1        1

        1        9  .

        8  .

        2        0

        1        1

        2        6  .

        8  .

        2        0

        1        1

        2  .        9  .        2

        0

        1        1

        9  .        9  .        2

        0

        1        1

        1        6  .

        9  .

        2        0

        1        1

        2        3  .

        9  .

        2        0

        1        1

        3        0  .

        9  .

        2        0

        1        1

       7  .

        1        0  .

        2        0

        1        1

        1        4  .

        1        0  .

        2        0

        1        1

        2        1  .

        1        0  .

        2        0

        1        1

        2        8  .

        1        0  .

        2        0

        1        1

        4  .

        1        1  .

        2        0

        1        1

        1        1  .

        1        1  .

        2        0

        1        1

        1        8  .

        1        1  .

        2        0

        1        1

        2       5  .

        1        1  .

        2        0

        1        1

        2  .

        1        2  .

        2        0

        1        1

        9  .

        1        2  .

        2        0

        1        1

        1        6  .

        1        2  .

        2        0

        1        1

        2        3  .

        1        2  .

        2        0

        1        1

        3        1  .

        1        2  .

        2        0

        1        1

        6  .

        0        1  .

        2        0

        1        2

        1        3  .

        0        1  .

        2        0

        1        2

        2        0  .

        0        1  .

        2        0

        1        2

        2       7  .

        0        1  .

        2        0

        1        2

        0        3  .

        0        2  .

        2        0

        1        2

        1        0  .

        0        2  .

        2        0

        1        2

        1       7  .

        0        2  .

        2        0

        1        2

        2        4  .

        0        2  .

        2        0

        1        2

        0        2  .

        0        3  .

        2        0

        1        2

        0        9  .

        0        3  .

        2        0

        1        2

        1        6  .

        0        3  .

        2        0

        1        2

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

week

Requirement-Supplied Quantity of 25KVA Distribution Transformers to TUMKUR CIRCLE

for FY 2011-12

Requirement

Supplied

Page 3: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 3/27

 

176

183

380

0

50

100

150

200

250

300

350

400

        1  .

        4  .

        2        0        1        1

        8  .

        4  .

        2        0        1        1

        1       5  .        4  .

        2        0        1        1

        2        2  .        4  .

        2        0        1        1

        2        9  .        4  .

        2        0        1        1

        6  .

       5  .

        2        0        1        1

        1        3  .       5  .

        2        0        1        1

        2        0  .       5  .

        2        0        1        1

        2       7  .       5  .

        2        0        1        1

        3  .

        6  .

        2        0        1        1

        1        0  .        6  .

        2        0        1        1

        1       7  .        6  .

        2        0        1        1

        2        4  .        6  .

        2        0        1        1

        1  .

       7  .

        2        0        1        1

        8  .

       7  .

        2        0        1        1

        1       5  .       7  .

        2        0        1        1

        2        2  .       7  .

        2        0        1        1

        2        9  .       7  .

        2        0        1        1

       5  .

        8  .

        2        0        1        1

        1        2  .        8  .

        2        0        1        1

        1        9  .        8  .

        2        0        1        1

        2        6  .        8  .

        2        0        1        1

        2  .

        9  .

        2        0        1        1

        9  .

        9  .

        2        0        1        1

        1        6  .        9  .

        2        0        1        1

        2        3  .        9  .

        2        0        1        1

        3        0  .        9  .

        2        0        1        1

       7  .

        1        0  .

        2        0        1        1

        1        4  .

        1        0  .

        2        0        1        1

        2        1  .

        1        0  .

        2        0        1        1

        2        8  .

        1        0  .

        2        0        1        1

        4  .

        1        1  .

        2        0        1        1

        1        1  .

        1        1  .

        2        0        1        1

        1        8  .

        1        1  .

        2        0        1        1

        2       5  .

        1        1  .

        2        0        1        1

        2  .

        1        2  .

        2        0        1        1

        9  .

        1        2  .

        2        0        1        1

        1        6  .

        1        2  .

        2        0        1        1

        2        3  .

        1        2  .

        2        0        1        1

        3        1  .

        1        2  .

        2        0        1        1

        6  .

        0        1  .

        2        0        1        2

        1        3  .

        0        1  .

        2        0        1        2

        2        0  .

        0        1  .

        2        0        1        2

        2       7  .

        0        1  .

        2        0        1        2

        0        3  .

        0        2  .

        2        0        1        2

        1        0  .

        0        2  .

        2        0        1        2

        1       7  .

        0        2  .

        2        0        1        2

        2        4  .

        0        2  .

        2        0        1        2

        0        2  .

        0        3  .

        2        0        1        2

        0        9  .

        0        3  .

        2        0        1        2

        1        6  .

        0        3  .

        2        0        1        2

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

week

Requirement-Supplied Quantity of 63KVA Distribution Transformers to TUMKUR CIRCLE

For FY 2011-12

Requirement

Supplied

Page 4: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 4/27

 

3435

293

0

50

100

150

200

250

300

350

        1  .

        4  .

        2        0

        1        1

        8  .

        4  .

        2        0

        1        1

        1       5  .

        4  .

        2        0

        1        1

        2        2  .

        4  .

        2        0

        1        1

        2        9  .

        4  .

        2        0

        1        1

        6  .

       5  .

        2        0

        1        1

        1        3  .

       5  .

        2        0

        1        1

        2        0  .

       5  .

        2        0

        1        1

        2       7  .

       5  .

        2        0

        1        1

        3  .

        6  .

        2        0

        1        1

        1        0  .

        6  .

        2        0

        1        1

        1       7  .

        6  .

        2        0

        1        1

        2        4  .

        6  .

        2        0

        1        1

        1  .

       7  .

        2        0

        1        1

        8  .

       7  .

        2        0

        1        1

        1       5  .

       7  .

        2        0

        1        1

        2        2  .

       7  .

        2        0

        1        1

        2        9  .

       7  .

        2        0

        1        1

       5  .

        8  .

        2        0

        1        1

        1        2  .

        8  .

        2        0

        1        1

        1        9  .

        8  .

        2        0

        1        1

        2        6  .

        8  .

        2        0

        1        1

        2  .

        9  .

        2        0

        1        1

        9  .

        9  .

        2        0

        1        1

        1        6  .

        9  .

        2        0

        1        1

        2        3  .

        9  .

        2        0

        1        1

        3        0  .

        9  .

        2        0

        1        1

       7  .        1

        0  .

        2        0

        1        1

        1        4  .

        1        0  .

        2        0

        1        1

        2        1  .

        1        0  .

        2        0

        1        1

        2        8  .

        1        0  .

        2        0

        1        1

        4  .        1

        1  .

        2        0

        1        1

        1        1  .

        1        1  .

        2        0

        1        1

        1        8  .

        1        1  .

        2        0

        1        1

        2       5  .

        1        1  .

        2        0

        1        1

        2  .        1

        2  .

        2        0

        1        1

        9  .        1

        2  .

        2        0

        1        1

        1        6  .

        1        2  .

        2        0

        1        1

        2        3  .

        1        2  .

        2        0

        1        1

        3        1  .

        1        2  .

        2        0

        1        1

        6  .        0

        1  .

        2        0

        1        2

        1        3  .

        0        1  .

        2        0

        1        2

        2        0  .

        0        1  .

        2        0

        1        2

        2       7  .

        0        1  .

        2        0

        1        2

        0        3  .

        0        2  .

        2        0

        1        2

        1        0  .

        0        2  .

        2        0

        1        2

        1       7  .

        0        2  .

        2        0

        1        2

        2        4  .

        0        2  .

        2        0

        1        2

        0        2  .

        0        3  .

        2        0

        1        2

        0        9  .

        0        3  .

        2        0

        1        2

        1        6  .

        0        3  .

        2        0

        1        2

   Q   u   a   n   t   i   t   y   i   n   N

   o    '   s

week

Requirement-Supplied Quantity of 100 KVA Distribution Transformers to TUMKUR CIRCLE

for FY 2011-12

Requirement

Supplied

Page 5: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 5/27

 

0

0

6

0

1

2

3

4

5

6

7

   Q   u   a   n   t   i   t   y   i   n   N

   o    '   s

week

Requirement-Supplied Quantity of 250 KVA Distribution Transformers toTUMKUR CIRCLE for FY 2011-12

Requirement

Supplied

Page 6: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 6/27

 

4425.40

4609.66

4500.00

0.00

500.00

1000.00

1500.00

2000.00

2500.00

3000.00

3500.00

4000.00

4500.00

5000.00

   Q   u   a   n   t   i   t   y   i   n   K

   m   s

week

Requirement-Supplied Quantity of Rabbit ACSR Conductor to Tumkur Circle for FY

2011-12

Requirement

Supplied

Page 7: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 7/27

 

11616

2013417500

0

5000

1000015000

20000

25000

        1        6  .

        9  .

        2        0        1        1

        2        3  .

        9  .

        2        0        1        1

        3        0  .

        9  .

        2        0        1        1

       7  .

        1        0  .

        2        0        1        1

        1        4  .        1

        0  .        2

        0        1        1

        2        1  .        1

        0  .        2

        0        1        1

        2        8  .        1

        0  .        2

        0        1        1

        4  .

        1        1  .

        2        0        1        1

        1        1  .

        1        1  .        2

        0        1        1

        1        8  .        1

        1  .        2

        0        1        1

        2       5  .

        1        1  .        2

        0        1        1

        2  .

        1        2  .

        2        0        1        1

        9  .

        1        2  .

        2        0        1        1

        1        6  .        1

        2  .        2

        0        1        1

        2        3  .        1

        2  .        2

        0        1        1

        3        1  .        1

        2  .        2

        0        1        1

        6  .

        0        1  .

        2        0        1        2

        1        3  .        0

        1  .        2

        0        1        2

        2        0  .        0

        1  .        2

        0        1        2

        2       7  .        0

        1  .        2

        0        1        2

        0        3  .        0

        2  .        2

        0        1        2

        1        0  .        0

        2  .        2

        0        1        2

        1       7  .        0

        2  .        2

        0        1        2

        2        4  .        0

        2  .        2

        0        1        2

        0        2  .        0

        3  .        2

        0        1        2

        0        9  .        0

        3  .        2

        0        1        2

        1        6  .        0

        3  .        2

        0        1        2

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

Months

Requirement-Supplied Quantity of 45 KN Disc Insulator to

Tumkur Circle for FY 2011-12

Requirement

Supplied

Page 8: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 8/27

 

13365

2316615000

20500

0

5000

10000

15000

20000

25000

        1        6  .

        9  .        2

        0        1        1

        2        3  .

        9  .        2

        0        1        1

        3        0  .

        9  .        2

        0        1        1

       7  .

        1        0  .

        2        0        1        1

        1        4  .        1

        0  .        2

        0        1        1

        2        1  .        1

        0  .        2

        0        1        1

        2        8  .        1

        0  .        2

        0        1        1

        4  .

        1        1  .        2

        0        1        1

        1        1  .        1

        1  .        2

        0        1        1

        1        8  .        1

        1  .        2

        0        1        1

        2       5  .        1

        1  .        2

        0        1        1

        2  .

        1        2  .        2

        0        1        1

        9  .

        1        2  .

        2        0        1        1

        1        6  .        1

        2  .        2

        0        1        1

        2        3  .        1

        2  .        2

        0        1        1

        3        1  .        1

        2  .        2

        0        1        1

        6  .

        0        1  .        2

        0        1        2

        1        3  .        0

        1  .        2

        0        1        2

        2        0  .        0

        1  .        2

        0        1        2

        2       7  .        0

        1  .        2

        0        1        2

        0        3  .        0

        2  .        2

        0        1        2

        1        0  .        0

        2  .        2

        0        1        2

        1       7  .        0

        2  .        2

        0        1        2

        2        4  .        0

        2  .        2

        0        1        2

        0        2  .        0

        3  .        2

        0        1        2

        0        9  .        0

        3  .        2

        0        1        2

        1        6  .        0

        3  .        2

        0        1        2

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

Months

Requirement-Supplied Quantity of Pin Insulator Shells

1.1 KV to Tumkur Circle for FY 2011-12

Requirem

entSupplied

Page 9: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 9/27

 

30940

27400

0

5000

10000

15000

20000

25000

30000

35000

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

Months

Requirement-Supplied Quantity of Pin Insulator Shells 11 KV to

Tumkur Circle for FY 2011-12

Requirement

Supplied

Page 10: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 10/27

 

177.66

188.78

189.00

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

160.00

180.00

200.00

   Q   u   a   n   t   i   t   y   i   n   K   L

Months

Requirement-Supplied Quantity of Fresh Transformer Oil Good to

Tumkur Circle for FY 2011-12

Requirement

Supplied

Page 11: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 11/27

 

14175

16026

16026

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

   Q   u   a   n   t   i   t   y   i   n

   N   o    '   s

Months

Requirement-Supplied Quantity of No.8 insulator to Tumkur Circle

for FY 2011-12

Requirement

Supplied

Page 12: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 12/27

 

1277

14441300

0

200

400

600

800

1000

1200

1400

1600

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

Months

Requirement-Supplied Quantity of SPMT for 25 / 63 KVA to Tumkur

Circle for FY 2011-12

Requirement

Supplied

Page 13: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 13/27

 

912

1032

1150

0

200

400

600

800

1000

1200

1400

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

Months

Requirement-Supplied Quantity of L.T.Protection Kit to Tumkur Circlefor FY 2011-12

Requirement

Supplied

Page 14: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 14/27

 

10095

9000

0

2000

4000

6000

8000

10000

12000

        1        6  .

        9  .        2

        0        1        1

        2        3  .

        9  .        2

        0        1        1

        3        0  .

        9  .        2

        0        1        1

       7  .

        1        0  .        2

        0        1        1

        1        4  .        1

        0  .        2

        0        1        1

        2        1  .        1

        0  .        2

        0        1        1

        2        8  .        1

        0  .        2

        0        1        1

        4  .

        1        1  .        2

        0        1        1

        1        1  .        1

        1  .        2

        0        1        1

        1        8  .        1

        1  .        2

        0        1        1

        2       5  .        1

        1  .        2

        0        1        1

        2  .

        1        2  .        2

        0        1        1

        9  .

        1        2  .

        2        0        1        1

        1        6  .        1

        2  .        2

        0        1        1

        2        3  .        1

        2  .        2

        0        1        1

        3        1  .        1

        2  .        2

        0        1        1

        6  .

        0        1  .        2

        0        1        2

        1        3  .        0

        1  .        2

        0        1        2

        2        0  .        0

        1  .        2

        0        1        2

        2       7  .        0

        1  .        2

        0        1        2

        0        3  .        0

        2  .        2

        0        1        2

        1        0  .        0

        2  .        2

        0        1        2

        1       7  .        0

        2  .        2

        0        1        2

        2        4  .        0

        2  .        2

        0        1        2

        0        2  .        0

        3  .        2

        0        1        2

        0        9  .        0

        3  .        2

        0        1        2

        1        6  .        0

        3  .        2

        0        1        2

   Q   u   a   n   t   i   t   y   i   n   N

   o    '   s

Months

Requirement-Supplied Quantity of No.15 insulator to Tumkur

Circle for FY 2011-12

Requirement

Supplied

Page 15: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 15/27

 

52791

47000

0

10000

20000

30000

40000

50000

60000

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

Months

Requirement-Supplied Quantity of Guy wire 7/10 to Tumkur Circlefor FY 2011-12

Requirement

Supplied

Page 16: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 16/27

 

528

600

0

100

200

300

400

500

600

700

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

Months

Requirement-Supplied Quantity of 2 Pin cross arms to Tumkur Circle

for FY 2011-12

Requirement

Supplied

Page 17: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 17/27

 

10318

1166310500

0

2000

4000

6000

8000

10000

12000

14000

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

Months

Requirement-Supplied Quantity of Horizontal cross arms to Tumkur

Circle for FY 2011-12

Requirement

Supplied

Page 18: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 18/27

 

3952

3500

0

500

1000

1500

2000

2500

3000

3500

4000

4500

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

Months

Requirement-Supplied Quantity of GI Ground pipe to Tumkur Circle for

FY 2011-12

Requirement

Supplied

Page 19: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 19/27

 

1923

21732173

-500

0

500

1000

1500

2000

2500

3000

3500

   Q   u   a   n   t   i   t   y   i   n   N

   o    '   s

Months

Requirement-Supplied Quantity of 4 Pin cross arms to Tumkur Circle

for FY 2011-12

Requirement

Supplied

Linear (Supplied)

Page 20: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 20/27

 

2379725000

0

5000

10000

15000

20000

25000

30000

   Q   u   a   n   t   i   t   y   i   n   N   o    '   s

Months

Requirement-Supplied Quantity of GI pin 1.1KV to Tumkur Circle for

FY 2011-12

Requirement

Supplied

Page 21: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 21/27

 

28621

3235432654

0

5000

10000

15000

20000

25000

30000

35000

   Q   u   a   n   t   i   t   y   i   n   N

   o    '   s

Months

Requirement-Supplied Quantity of GI pin 11KV to Tumkur Circle forFY 2011-12

Requirement

Supplied

Page 22: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 22/27

 

1366

1543

0

200

400

600

800

1000

1200

1400

1600

1800

   Q   u   a   n   t   i   t   y   i   n   N   o

    '   s

Months

Requirement-Supplied Quantity of H.G. Fuse Unit to Tumkur Circle

for Fy 2011-12

Requirement

Supplied

Page 23: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 23/27

 

6608

7470

6700

0

1000

2000

3000

4000

5000

6000

7000

8000

   Q   u   a   n   t   i   t   y   i   n   N

   o    '   s

Months

Requirement-Supplied Quantity of Guy Rods to Tumkur Circle for Fy

2011-12

Requirement

Supplied

Page 24: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 24/27

 

2222519800

0

5000

10000

15000

20000

25000

   Q   u   a   n   t   i   t   y   i   n

   N   o    '   s

Months

Requirement-Supplied Quantity of PCC/PSC/RCC pole clamps to

Tumkur Circle for Fy 2011-12

Requirement

Supplied

Page 25: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 25/27

 

46075207

16000

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

   Q   u   a   n   t   i   t   y   i   n   N

   o    '   s

Months

Requirement-Supplied Quantity of G.I. Wire to Tumkur Circle for FY

2011-12

Requirement

Supplied

Page 26: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 26/27

 

147

166

0

150

0

20

40

60

80

100

120

140

160

180

   Q   u   a   n   t   i   t   y   i   n   N

   o    '   s

Months

Requirement-Supplied Quantity of G.O.S 11kV 200A, S/B to Tumkur

Circle for FY 2011-12

Requirement

Supplied

Page 27: Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

8/2/2019 Requirement-Supply of Line Materials toTUMKUR Circle for FY 11-12 till 24.02.2012

http://slidepdf.com/reader/full/requirement-supply-of-line-materials-totumkur-circle-for-fy-11-12-till-24022012 27/27