2 Seaport Lane, 9th Floor, Boston, MA 02210
Request for Proposals For Branded Hotel Operator
Georgia World Congress Center Hotel
March 30, 2018
I. INTRODUCTION
Drew Company, Inc. (“Drew”) has been selected by the Georgia World Congress Center Authority (the “GWCCA”) to be the developer of a proposed 1,000 key headquarters hotel adjacent to the Georgia World Congress Center (the “GWCC”) and Mercedes Benz Stadium in downtown Atlanta, Georgia (the “Hotel”). Since originally soliciting potential operators for the Hotel in 2015, the scope and terms of the project have changed. The Hotel will now be owned by the GWCCA and will be publicly financed through the issuance of tax-exempt bonds secured by the Hotel revenues ("Bonds"). As such, Drew is undertaking this RFP process to select an operator (the “Operator”) for the Hotel.
The primary objective of this RFP process is to identify an Upper Upscale/Luxury Operator that will:
• Provide Management Services on terms and conditions that are most favorable to theGWCCA.
• Relate well to the quality and overall positioning of the GWCC.• Understand the vision for the Hotel and align its objectives with the objectives of the GWCCA.• Offer a strong brand, generating immediate and long-term positive consumer recognition.• Deliver a significant market premium in terms of RevPAR index.• Provide a consistently high-quality level of service as demonstrated by measurable guest
satisfaction.• Aggressively market and promote the Hotel through national and international marketing
programs.• Demonstrate exceptional revenue management and brand promotional tools, maximizing
RevPAR.• Expertly and efficiently operate the Hotel to maximize net operating income.• Provide and demonstrate experience providing tailored, innovative approaches to hotel
operations.• Maintain the Hotel in keeping with the highest standards for a top-tier headquarters hotel.
II. RFP SCHEDULE DETAILS
A. RFP Schedule
RFP Release Date: March 30, 2018 RFP Questions Due: April 13, 2018 at 5:00 pm EST Proposal Submission: May 15, 2018 at 5:00 pm EST Interviews/presentations: Currently contemplated June 7-8, 2018 Selection: End of June, 2018
B. RFP Questions. Inquiries may be submitted by 5:00 pm on April 13, 2018 [email protected]. Questions submitted by the specified deadline will be addressed and sent to all Respondents.
1
C. Intent to Submit. If your firm is interested in submitting a proposal, please notify us viaemail to [email protected] by 5:00 pm EST on April 27, 2018.
D. Format. Respondents shall submit three (3) hard copies of the proposal marked“Response to RFP for Branded Hotel Management Services” together with an electronic version of the submittal on one (1) USB flash drive in PDF format.
E. Time and Place for Submission of Proposals. Proposals must be received by 5:00 pm ESTon May 15, 2018. Proposals must be hand-delivered by the Respondent or a courier/overnight delivery services to the following:
Drew Company, Inc. Attention: Theonie Alicandro 2 Seaport Lane, 9th Floor Boston, MA 02210
Late proposals will not be considered for selection.
III. PROJECT OVERVIEW
The Hotel has the unique ability to be a prominent, iconic landmark on the City of Atlanta skyline, attracting guests attending the many activities and events at the GWCC, Mercedes-Benz Stadium, Philips Arena and Centennial Olympic Park. This Hotel will include approximately 1,000 rooms and will support and function in harmony with the many convention-related activities, sports and entertainment events and other events in the area and will have a direct connection into Hall C at the GWCC. The Hotel site is shown on Exhibit A attached hereto. The Hotel is projected to open during the fourth quarter of 2021.
The proposed program for the Hotel is set forth on Exhibit B, attached hereto (the “Hotel Program”). Floor plan diagrams based on the contemplated Hotel Program are attached hereto as Exhibit C.
As a publicly financed facility, the Hotel will be required to provide budgets that include reserves for working capital and capital improvements and FF&E replacements, as well as funds for debt service and other expenses. The Operator will be required to enter into a Qualified Management Agreement (“QMA”) with the GWCCA which complies with the federal income tax requirements applicable to tax-exempt obligations, including IRS Revenue Procedure 2017-13 and other rulings and guidelines that interpret the provisions of Section 141 of the Internal Revenue Code.
IV. SUBMISSION REQUIREMENTS
A. General Company Information and Experience:
Please provide the following:
• Listing of other large hotels in development or developed and operated by the same hotel brandfamily with more than 500 rooms attached to convention centers in the United States and
2
globally, to include the following: Location, opening date, room count, food and beverage outlets, function space, room block arrangement, owner name, public or private ownership and QMA (yes or no). Please include central reservations contribution.
• Listing of other existing and proposed hotels within the brand family in the Atlanta area. Describethe relationship of the proposed subject hotel to these other properties.
• Experience working with Convention & Visitors Bureaus (CVB) and convention centermanagement firms, including detail as to programs, goals and results for selected projects thatdistinguish your ability to work in conjunction with CVBs and convention center managers.
• Description of your experience with the planning, design and construction of large, convention-oriented hotels, and experience in assisting or working with other entities or organizations in thedevelopment, design, and construction of hotels.
• Description of the Brand/Large Hotel Network Program—does one exist? Discuss cross referralsand marketing of 500+ room hotels in your portfolio.
• Description of the brand contribution through Rewards Program — What is the percentage ofoverall occupancy/business mix/revenue annually?
• Establishing facility access and booking policy agreements that align the interests of the publicsector owner and the private manager is critical to the ultimate success of the project. Pleaseprovide examples where you have done this.
• Provide examples of restaurant/F&B concepts from recent openings and best in class/portfolio.• Provide other relevant information not specified above.
B. Hotel Market and Project Understanding
• Describe your overall understanding of the Atlanta market and the subject Hotel project in thissection.
• Describe your anticipated positioning of this property within the downtown Atlanta lodgingmarket, with particular attention to your other hotels within your brand family located therein, ifapplicable.
• Who would be your primary competitors?• Please describe your strategy to fill this Hotel, including an explanation of how the centralized
sales process will be managed to ensure that the Hotel receives its fair share of leads andbookings.
• Please provide a description of your ability to attract group and transient business frominternational markets.
• Latest Brand Experiential Initiatives—how are you different and creating moments for the guest?• Given your understanding of the Atlanta market and the product as described herein, what are
the factors that are likely to impact operational performance, guest satisfaction and employeesatisfaction at this site?
• What concerns you about this opportunity?
C. Operations Plan
Please provide a thorough outline of your scope of management services. The Operations plan shall include the following:
3
• Discussion of the local hotel market and your ability to penetrate the business, transient, meetings and group, and leisure segments of the market. Please address the role that Global Sales will play in this process and specific goals for this Hotel to ensure a successful opening;
• Description of your approach to sales and marketing; • Description of your approach to food and beverage operations, including how this approach
applies to the convention market; • Sample staffing plan, including an organizational chart of hotel staff; and • Description of your approach to FF&E purchasing/installation and general estimates of FF&E and
OS&E costs per key.
Submit key elements of a pre-opening and other technical services plan. Such plan should include, without limitation, the following services:
• General estimate of Pre-Opening Budget (including Grand Opening activities); • Monitoring and guiding the design team to ensure the Hotel is consistent with brand standards; • Pre-opening sales and marketing, including collaboration with the GWCCA; • Planning for and hiring the staff to operate the Hotel; and • Establishing policies and procedures with respect to operation of the Hotel.
D. Hotel Product and Program Section III above and Exhibit B contain the current proposed Hotel Program. Based on these parameters, please describe the proposed brand and its positioning in the regional, national and international group meetings and convention/trade show markets. If a dual branded facility is proposed, please describe both proposed brands and why they are appropriate for this project. Based on the parameters set forth in Section III, please also submit a detailed description of your proposed program for the Hotel, including size and type of meeting facilities, recreational amenities, proposed innovative food and beverage outlets, parking requirements, Club level/VIP experience and offerings, basic module dimensions, brand-specific space considerations/requirements (if any), and other program information that the Respondent believes is important to the success of the Hotel.
In addition, please describe any changes to the Hotel Program set forth in Section III you propose and what the impact to development costs and/or profitability may be.
E. Operating Projections Please provide a proforma ten (10)-year projection of departmental revenues and expenses as well as undistributed operating expenses, and net operating income from operation of the Hotel, together with all material assumptions used to prepare the projections using the Hotel Program assumptions set forth in Section III above. Please provide as much detail as possible. Specific areas of concern include the following:
• The impact to occupancy from the demand generated by the GWCC and the Mercedes Benz Stadium.
• Assumptions regarding utilization of meeting space and GWCC space and the impact on banquet and catering revenue.
4
• Assumptions regarding property utilization/performance during periods when there are notevents at the GWCC.
• Since the Hotel will be owned by the GWCCA, the operating projections should not includeestimates for property taxes.
• Proposed group of competitive hotels (“Comp Set”) and top-line projections for Comp Set.
If you proposed any changes to the Hotel Program set forth in Section III above, please provide a separate proforma for your revised program.
F. Financial Proposal
Please address all proposed fees and reimbursements, including, without limitation, with respect to its pre-opening and technical services and management services, as set forth in Exhibit D. The objective is to identify all major deal points, including, but not limited to, all fees, costs and financial incentives.
G. Proposed Key Business Terms:This section should address the proposed key business terms that you offer for your managementservices. Exhibit E includes the contract clauses that the GWCCA is seeking to obtain. Please indicate onExhibit E your acknowledgement of each provision, or any proposed changes.
V. SELECTION PROCESS
Questions and Answers – All questions shall be submitted in writing to [email protected] prior to 5:00 pm on April 13, 2018. All responses shall be provided to all Respondents.
Selection Criteria – The criteria used to evaluate the RFP responses will include, without limitation, the following (the criteria are not listed in any order of importance):
1. Related project experience of the Respondent and the individuals assigned to the project;2. Hotel market and project understanding;3. Operations plan, including corporate support, sales and marketing approach, including
composition, experience, and past performance;4. Hotel product and program, including food and beverage offerings;5. Operating projections;6. Financial proposal; and7. Proposed key business terms
The above criteria are provided as a guide and are not necessarily intended to be comprehensive.
Interviews - Respondents may be interviewed by Drew and representatives of the GWCCA, currently contemplated to occur June 7-8, 2018. The purpose of the interview will be to meet the proposed project team, become familiar with key personnel, and understand the Respondent’s project approach and ability to meet the objectives of Drew and the GWCCA.
Negotiation and Award. Based on proposals received to this RFP, it is the intent of Drew and the GWCCA to select the most responsive Respondent for management services contract negotiations. This RFP does
5
not in any way limit the right of Drew and the GWCCA to solicit contracts for similar or identical services, in Drew and the GWCCA’s sole and absolute discretion. Drew and the GWCCA have sole and absolute discretion over whether or not to select Respondents for management services negotiations. The selection of any proposal shall not imply acceptance by Drew and the GWCCA of all terms of the proposal, which may be subject to further negotiation and approvals before Drew, or the GWCCA, may be legally bound thereby. If a satisfactory QMA cannot be negotiated in a reasonable time, Drew and the GWCCA, in their sole discretion, may terminate negotiations and begin negotiations with another Respondent. The QMA is not considered to be awarded until the negotiations are successfully concluded and the QMA is approved by the GWCCA Board of Directors.
6
Exhibit A
Site Plan
7
Exhibit B
Proposed Hotel Program
See Attached.
8
3/27/18
SUMMARY PROJECT DESCRIPTION
Acres Area Summary % GSF sf/key Remarks
Spaces 61.9% 550,484
Guestroom Count 1000 Keys 22.7% 201,785
1 Level(s) 15.4% 137,260
2 Level(s)
30 Floors 889,529 890
GUESTROOM AREAS
Remarks
Room Type & Mix: gsf #Suites #Bays TTLbay Keys
Standard Rooms 390 1 0 0 NSF NSF NSF 400 NSF 54.1%
Std King Typical 390 530 1 530 530 206,700 NSF NSF NSF 400 NSF 39.2%
Std Double/Queen 390 384 1 384 384 149,760 NSF NSF NSF 400 NSF 4.9%
2 bay Suites (Executive) 780 48 2 96 48 37,440 NSF NSF NSF 675 NSF 1.6%
3 bay Suites (grand/Hospitality) 1170 16 3 48 32 18,720 NSF NSF NSF 900 NSF 0.1%
Entertainment Suites 3000 1 6 6 3 3,000 NSF NSF NSF 1800 NSF 0.1%
Presidential Suites 5000 1 8 8 3 5,000 NSF NSF NSF 2500 NSF 100.0%
Total # Suites/Bays/Keys: 980 1072 1000
TOTAL GUESTROOMS 420,620 NSF 0 NSF 0 NSF
Remarks:
28,800 GSF GSF GSF
12,960 GSF GSF GSF
Stairs 17,280 GSF GSF GSF
Ice Machine/Vending/IT-Elec Rooms 17,280 GSF GSF GSF
Guestroom club and pantry 3,500 GSF GSF GSF
79,820 NSF NSF 0 NSF
Total Guestrooms + support areas 500,440 GSF GSF 0 GSF
10% 50,044 GSF GSF 0 GSF
550,484 TGSF TGSF TGSF
421 NSF/k 550 GSF/k 0 GSF/k 0 GSF/k includes circulation & building skin
PUBLIC AREAS
Remarks:
3,000 GSF GSF GSF
8,000 GSF GSF GSF
525 GSF GSF GSF
GSF GSF GSF included in circulation SF
GSF GSF GSF included in circulation SF
480 GSF GSF GSF
Gross / Circulation Factor 12% included above included above included above
12,005 GSF 0 GSF 0 GSF over program
Remarks:
1,300 GSF GSF GSF
150 GSF GSF GSF
120 GSF GSF GSF
100 GSF GSF GSF
750 GSF GSF GSF
200 GSF GSF GSF
1,000 GSF GSF GSF
200 GSF GSF GSF included in lobby space
Gross / Circulation Factor 12% included above included above included above
3,820 GSF 0 GSF 0 GSF
Remarks:
sf/Unit qty subdiv
Grand Ballroom 1 10 40,000 NSF NSF NSF
Maln Ballroom 1 10 20,000 NSF NSF NSF
Hotel Meeting Rooms 1,500 10 15,000 NSF NSF NSF
Hotel Meeting Rooms 750 28 21,000 NSF NSF NSF
Hotel Boardrooms 500 8 4,000 NSF NSF
Subtotal function rooms - SF/GR = 100 100,000 NSF 0 0 NSF
Prefunction Spaces:
Prefunction - Ballrooms %PF to funct = 35% 21,000 GSF GSF GSF
Prefunction - Hotel Meeting Rooms %PF to funct = 28% 10,080 GSF GSF GSF
Prefunction - Hotel Boardrooms %PF to funct = 20% 800 GSF GSF GSF
Subtotal prefunction spaces - %PF to funct = 32% 31,880 GSF 0 GSF 0 GSF
Air Wall Closets / Entry Vestibules % to ballrooms 14% 8,400 GSF GSF GSF
Gross / Circulation Factor included in PF included in PF included in PF
TOTAL CONVENTION CENTER & BALLROOMS 140,280 GSF 0 GSF 0 GSF
Remarks:
sf/per seats
Hotel Restaurant (3 meal) 20 200 4,000 GSF GSF GSF kitchen noted in BOH below
Signature Restaurant 24 150 3,600 GSF GSF GSF kitchen noted in BOH below
Lounge (lobby) 20 150 3,000 GSF GSF GSF bar storage included
Deli/Coffee 400 GSF GSF GSF
Pool Bar and Grill 0 GSF GSF GSF
Roof Level Bar and Club 0 GSF GSF GSF
15% included above included above included above
500 11,000 GSF 0 GSF 0 GSF
Remarks:
1,200 GSF GSF GSF
2,000 GSF GSF GSF
10% included above included above included above
3,200 GSF 0 0 GSF
Proposed Program
Cart Storage
TOTAL GUESTROOM SUPPORT
Schematic DesignConceptual DesignProposed Program
Proposed Program Conceptual Design
Conceptual Design
FOOD & BEVERAGE
Gross / Circulation Factor
Main Lobby Luggage Storage
Total GSF & SF/key =
TOTAL FOOD & BEVERAGE
Business Center
PUBLIC LOBBY
Main Lobby / Seating Area
Function Rooms:
TOTAL PUBLIC LOBBY SUPPORT AREAS
RETAIL / COMMERCIAL
Schematic Design
Guestrooms
Public Spaces
BOH Areas
Avg SF per Key (Guestroom area only)
Guestroom Gross Circulation Factor
ATM
Service Elevators/Service Core
Conceptual Design
Conceptual Design
GUESTROOMS
GUESTROOM SUPPORT AREAS
Site
Parking
Guestrooms
Public Space
GWCC CC Hotel - 1,000 Key / 100,000 NSF Ballroom/Meeting
Proposed Program
Main Lobby / Circulation
Proposed Program Schematic Design
LOCATION: Atlanta, GA TYPE: Convention Hotel
Schematic Design
Basement
Retail - Gift Shop/Sundries
Proposed Program
Passenger Elevator Core
Safety Deposit Room
Gross / Circulation Factor
TOTAL RETAIL / COMMERCIAL
Public Restrooms
PUBLIC LOBBY SUPPORT AREAS
Conceptual Design Schematic Design
Front Desk / Registration
Front Desk Queuing Area
Express Check Out Area (kiosks)
Concierge
TOTAL PUBLIC LOBBY & CIRCULATION
Proposed Program
Front Office
Valet Cashier
Schematic DesignConceptual Design
FUNCTION SPACES - CONVENTION CENTER & BALLROOMS
Bell Desk
Schematic Design
180327 GWCC Hotel 1000 Key 100K Mtg Program - vers 6 3/27/2018
9
3/27/18
GWCC CC Hotel - 1,000 Key / 100,000 NSF Ballroom/MeetingLOCATION: Atlanta, GA TYPE: Convention Hotel
Remarks:
0 GSF GSF GSF
Support Spaces 0 GSF GSF GSF
Fitness Center 5,000 GSF GSF GSF
160 GSF GSF GSF
10% included above included above included above
5,160 GSF 0 0 GSF
175,465 GSF 0 GSF 0 GSF
15% 26,320 GSF 0 GSF 0 GSF
GRAND TOTAL PUBLIC AREAS 201,785 GSF 0 GSF 0 GSF
202 GSF/k 0 GSF/k 0 GSF/k
SERVICE / BOH AREAS
Remarks:
General Support:
Main Vertical Circulation (non-hotel room elevators) 2,200 GSF GSF GSF
Exit Stairs 4,500 GSF GSF GSF all non-guestroom related stairs
Dedicated Exit Corridors (used for egress only) 4,000 GSF GSF GSF
Subtotal general support - 10,700 GSF 0 GSF 0 GSF
Ballroom / Meeting Support Areas:
Public Restrooms (ballroom level) 4,000 GSF GSF GSF
Coat Room (s) 350 GSF GSF GSF
Registration Area (s) Grand BR 250 GSF GSF GSF
Main BR 200 GSF GSF GSF
Recording Room 0 GSF GSF GSF
AV Control Room both BR 400 GSF GSF GSF 200 SF each BR
AV Equipment Storage 600 GSF GSF GSF 300 SF each BR
Table Storage 4,500 GSF GSF GSF
Chair Storage 3,300 GSF GSF GSF
Container Storage 500 GSF GSF GSF 200 SF MBR, 300 SF GBR
Linen Storage both BR 500 GSF GSF GSF 200 SF MBR, 300 SF GBR
Dry Storage both BR 600 GSF GSF GSF 300 SF each BR
Banquet Set up Storage (BSU) both BR 1,800 GSF GSF GSF 600SF MBR + 1200SF GBR
Beverage Room 550 GSF GSF GSF 250 SF MBR, 300 SF GBR
Silverware Dish Storage 550 GSF GSF GSF 250 SF MBR, 300 SF GBR
Patch Bay Storage 320 GSF GSF GSF 160SF each BR
IDF Rooms 400 GSF GSF GSF 200SF each BR
BOH Ballroom Service Corridor 6,300 GSF GSF GSF 2900 SF MBR, 3400 SF GBR
Other BOH Service Corridors 2,500 GSF GSF GSF
Subtotal ballroom support - 27,620 GSF 0 GSF 0 GSF
Ballroom Mechanical & Gallery Support Areas:
Ballroom Catwalk 600 GSF GSF GSF GBR
Vertical access to catwalk/mezzanine (elevator/stairs) 300 GSF GSF GSF GBR
Ballroom spot Lighting 300 GSF GSF GSF GBR
Ballroom dimmer room (s) 500 GSF GSF GSF 250 SF MBR, 300 SF GBR
Ballroom/Meeting Room Mechanical/Electrical 6,000 GSF GSF GSF
Subtotal ballroom mech & gallery support - 7,700 GSF 0 GSF 0 GSF
Boardroom Support:
Boardroom Restroom 350 GSF GSF GSF
Boardroom Pantry 275 GSF GSF GSF
Boardroom AV 120 GSF GSF GSF
Subtotal hotel meeting support - 745 GSF 0 GSF 0 GSF
Gross / Circulation Factor 15% 7,015 GSF 0 GSF 0 GSF
TOTAL FUNCTION SPACE SUPPORT AREAS 53,780 GSF 0 GSF 0 GSF
Remarks:
3,800 GSF GSF GSF
F&B Admin Offices 750 GSF GSF GSF
200 GSF GSF GSF
1,200 GSF GSF GSF
140 GSF GSF GSF
GSF GSF GSF included in exec office SF
GSF GSF GSF included in exec office SF
GSF GSF GSF included in F&B offices SF
250 GSF GSF GSF
1,300 GSF GSF GSF
400 GSF GSF GSF
10% 804 GSF included above included above
8,844 GSF 0 GSF 0 GSF
Remarks:
2,500 GSF GSF GSF
500 GSF GSF GSF
800 GSF GSF GSF
3,800 GSF GSF GSF
10% 760 GSF included above included above
8,360 GSF 0 GSF 0 GSF
Remarks:
13,500 GSF GSF GSF
GSF GSF GSF included in main kitchen SF
GSF GSF GSF included in main kitchen SF
1,400 GSF GSF GSF
GSF GSF GSF included in main kitchen SF
GSF GSF GSF included in main kitchen SF
1,200 GSF GSF GSF
1,188 GSF GSF GSF
20% included above included above included above
17,288 GSF 0 GSF 0 GSF
TOTAL HEALTH SPA / FITNESS CENTER
Total Public Area
Gross / Circulation Factor
Gross / Circulation Factor
3 Meal Restaurant Kitchen
Room Service
Pool Equipment
Gross / Circulation Factor
Gross / Circulation Factor
HEALTH SPA / FITNESS CENTER (INDOOR RECREATION)
Proposed Program
TOTAL FOOD SERVICES / KITCHENS
Signature Restaurant Kitchen
Banquet Set UP (BSU)
Banquet Services
Employee Servery
TOTAL ADMIN. OFFICES
Sales
Gross / Circulation Factor
FUNCTION SPACE BOH SUPPORT AREAS
Conceptual Design Schematic Design
TOTAL EMPLOYEE AREAS
Employee Cafeteria
Uniform Issue
Proposed Program
Marketing
FOOD SERVICES / KITCHENS
Employee Locker Rooms & Restrooms
Main Kitchen
Health Spa
Executive Offices
Per Key
IT / Telecommunications
Proposed Program
Proposed Program
Catering
EMPLOYEE AREAS
Proposed Program
Main Kitchen Offices
Human Resources / Personnel
Conceptual Design
Conceptual Design
Conceptual Design
Training
Rooms Administration
Accounting
Reservations
Main Kitchen Refrigerated & Dry Storage
ADMINISTRATIVE OFFICES
Schematic Design
Conceptual Design
Schematic Design
Schematic Design
Schematic Design
180327 GWCC Hotel 1000 Key 100K Mtg Program - vers 6 3/27/2018
10
3/27/18
GWCC CC Hotel - 1,000 Key / 100,000 NSF Ballroom/MeetingLOCATION: Atlanta, GA TYPE: Convention Hotel
Remarks:
5,600 GSF GSF GSF
320 GSF GSF GSF
700 GSF GSF GSF
240 GSF GSF GSF
400 GSF GSF GSF
250 GSF GSF GSF
120 GSF GSF GSF
15% 1,145 GSF included above included above
8,775 GSF 0 GSF 0 GSF
Current Scheme:
750 GSF GSF GSF
2,000 GSF GSF GSF
300 GSF GSF GSF
200 GSF GSF GSF new hotel equipment located in GWCC central plant
200 GSF GSF GSF new hotel equipment located in GWCC central plant
800 GSF GSF GSF
400 GSF GSF GSF
1,400 GSF GSF GSF
400 GSF GSF GSF
150 GSF GSF GSF
200 GSF GSF GSF
15% 1,020 GSF included above included above
7,820 GSF 0 GSF 0 GSF
Remarks:
800 GSF GSF GSF
160 GSF GSF GSF
400 GSF GSF GSF
240 GSF GSF GSF
0 GSF GSF GSF Using existing space in CC lower evels - 4 truck bays
1,960 GSF GSF GSF 2 trash compactors
15% 534 GSF included above included above
4,094 GSF 0 0 GSF
Remarks:
4% 24,000 SF SF SF
SF SF SF
SF SF SF
Distributed electrical 4,000 SF SF SF
Utilities entrances 300 SF SF SF
SF SF SF
General Circulation SF SF SF
0% SF SF SF
New areas (see heading below)
28,300 GSF 0 GSF 0 GSF
137,260 GSF 0 0 GSF
137 GSF/k 0 0 GSF/k
889,529 GSF 0 GSF 0 GSF
890 GSF/k 0 GSF/k 0 GSF/k
OPEN COVERED AREAS
Remarks
SF SF SFSF SF SF 4 truck bays
SF SF SF
SF SF SF
SF SF SF
SF SF SF
SF SF SF
PARKING
Remarks
Cars
SF SF SF 350 sf/space (9 X 19 space + 9 X 12 driveway * 1.25)
SF SF SF
SF SF SF
SF SF SF
SF SF SF
SF SF SF on grade & off site
0 0 SF 0 SF 0 SF
DEVELOPED SITE
Remarks
SF SF SF
Building Coverage SF SF SF
0 SF SF SF
0 SF SF SF
0 SF SF SF
0 SF SF SF
SUBTOTAL 0 SF SF SF
0 SF SF SF
0 SF SF SF
Parking & Drives
TOTAL PARKING
Overall Site Area
Proposed Program
Outdoor Pool and Deck
Landscaped Area
Structured: Grade & Above
BOH circulation
Employee Parking
Note: provided to hotel by adjacent convention center
Proposed Program
HK - Lost & Found
Unassigned spaces
Hotel Loading Docks
Soiled Linen Sorting & Chute Room
Grade (Including Drives)
Proposed Program
Gross / Circulation Factor
Per Key
Mail Room
Hotel Porte Cochere
Proposed Program
TOTAL SITE
Covered Areas & Walks
Covered Areas & Walks
Undeveloped Site
Hotel Loading Dock
Spaces per Key
Guest Parking
Structured: Underground
Patios with Furniture
Ramps: Underground / Above
TOTAL OPEN COVERED AREAS
MISCELLANEOUS
GRAND TOTAL BUILDING AREA
Per Key
TOTAL MISCELLANEOUS
GRAND TOTAL SERVICE / BOH AREAS
Building envelope that appears in gross area calculations
Purchasing
HK - Cleaning Supplies Storage
General Storage
Distributed mechanical
Dock - Refrig. Trash/Recycle/Can Wash
Receiving / Security
Fire Pump Room
TOTAL LOADING DOCK / RECEIVING
Electrical Switchgear Room
Engineering Storage
Engineering Offices
HK - Supply & Chemical Issue
HK - Amenity & Supply Room
TOTAL LAUNDRY / HOUSEKEEPING
ENGINEERING / MAINTENANCE
Gross / Circulation Factor
Engineering Shop
Parcel Receipt
Fire Control Center
Proposed Program
TOTAL ENGINEERING / MAINTENANCE
LOADING DOCK / RECEIVING
Proposed Program
Plumbing Equipment Room
Main Telephone Equipment Room
Conceptual Design
Boiler Central Plant
Proposed Program
Laundry
Conceptual Design
LAUNDRY / HOUSEKEEPING
Gross / Circulation Factor
Chiller Central Plant
Emergency Generator
Housekeeping (HK)
Conceptual Design
Conceptual Design
Conceptual Design
Conceptual Design
Conceptual Design
Schematic Design
Schematic Design
Schematic Design
Schematic Design
Schematic Design
Schematic Design
Schematic Design
180327 GWCC Hotel 1000 Key 100K Mtg Program - vers 6 3/27/2018
11
Exhibit C
Floor Plan Diagrams
See Attached.
12
R35'-0"
x;ENTRANCE
FD FD
FDFD
24105 SFMAIN BALLROOM
3 MEAL
RESTAURANT
FRONT OFFICE
PREFUNCTION
TABLE AND
CHAIR STORAGE
DELIRETAIL
RESTROOM
BEV.
VALET
BANQUET SET UP
CONTNRDRY STOR.
BAR
RESTROOM
LINENSILVER
PATCH BAYAV IDF
RESTROOM
MECH
EMPLOYEE
RESTROOMS
ELEC
KITCHEN
ADMIN
LOBBY
LIVING
LOBBY
PORCH
TERRACE
1600 PERSON194'
- 0"
38' -
10"
SIGNATURE
RESTAURANT
KITCHEN
POOL
BALLROOM
MOTOR
COURT
HOTEL
MOTOR
COURT
HOTEL DRIVE
ENTRANCE
TVS PROPOSED HOME
DEPOT FIELD ENTRANCE
OUTDOOR
TRELLIS
EL. 1004' - 0"
EL. 1002' - 6" EL. 988' - 6"
EL. 992' - 2"
EL. 1004' - 0"
RESTROOM
MEETING
1242 SFSTORAGE
ELEC
REG.
533 SFCOAT
ADMIN
158 SFSTORAGE
2331 SFSTORAGE
BUSINESS
CENTER
BOH
© GenslerGensler 2017
01/18/18GWCC HOTEL & 100,000 SF CONFERENCE CENTER
LEVEL 1 - 1004'
GWCCA / DREW *FOR INTERNAL REVIEW ONLY
DIAGRAMATIC - FOR PROGRAM INFORMATION ONLYMARCH 27, 2018
GWCC - HALL C
13
PREFUNCTION
RESTROOM
BOH
20621 SFMAIN KITCHEN
BD ROOMS
BD ROOMS
EXEC OFFICES
MEETING
MEETING MEETING
BA
LL
RO
OM
ME
CH
MEETING
F&B OFFICES
RESTROOM
MEETING
RESTROOM
ELEC
STORAGE
AV
BOH
© GenslerGensler 2017
01/18/18GWCC HOTEL & 100,000 SF CONFERENCE CENTER
LEVEL 2 - 1022'
GWCCA / DREW *FOR INTERNAL REVIEW ONLY
DIAGRAMATIC - FOR PROGRAM INFORMATION ONLYMARCH 27, 2018
GWCC - HALL C
14
SERVICE
6 LR PASS
6 HR PASS
FITNESS
FITNESS STUDIO
40800 SFMAIN BALLROOM
BOH
RESTROOM
RESTROOM
32' -
0"
PREFUNCTION
MEETING MEETING
MEETING
BD ROOMS
BOH
RESTROOM
ROOF
28' - 0"
22' - 0"
184'
- 0"
26' -
0"
25' - 0"
STORAGE REG. COAT
BOH
CIRCULATION
BANQUET SET UP
BEVERAGE
DRY STOR.LINEN
CONTAINER
SILVER
PATCH BAY
EMPLOYEE
RESTROOMS
AV EQUIP
AV CONTROL
TABLE AND
CHAIR STORAGE
IDF
© GenslerGensler 2017
01/18/18GWCC HOTEL & 100,000 SF CONFERENCE CENTER
LEVEL 3 - 1042'
GWCCA / DREW *FOR INTERNAL REVIEW ONLY
DIAGRAMATIC - FOR PROGRAM INFORMATION ONLYMARCH 27, 2018
GWCC - HALL C
15
SE
RV
ICE
6 L
R P
AS
S
6 H
R P
AS
S
Q Q Q Q Q Q Q Q
Q Q Q Q
KKKK
KKO/S K
K
K
K
K
CORNER KKK
KKKK
CORNER KCORNER K
CORNER K
SE
RV
ICE
6 H
R P
AS
S
2 BAY
2 BAY
2 BAY
2 BAY
Q Q Q Q Q Q Q Q
Q Q Q Q
KKKK
KKO/S K KK
KKKK
Q Q
Q QK K
Q Q Q QKKO/S K KKQ Q
SE
RV
ICE
6 H
R P
AS
S
3BAY 3BAY
3BAY3BAY ENTERTAINMENT
CORNER K CORNER K
Q Q
Q Q Q Q
K
KKO/S K KK
K
Q Q
SE
RV
ICE
6 H
R P
AS
S
3BAY 3BAY
3BAY3BAY
CORNER K CORNER K
3BAY 3BAY
SE
RV
ICE
6 H
R P
AS
S
3BAY
PRESIDENTIAL
SUITE
CORNER K
3BAY
CORNER KQ Q Q Q Q Q
K
KKO/S K KK
K
3BAY3BAY
© GenslerGensler 2017
01/18/18GWCC HOTEL & 100,000 SF CONFERENCE CENTER
TYP. GUESTROOM LEVELS
GWCCA / DREW
TYPICAL LOW RISE LEVEL - 1060'
FIRST FULL LEVEL @ LEVEL 4
TYPICAL HIGH RISE LEVEL
*FOR INTERNAL REVIEW ONLY
SUITE LEVEL
PRESIDENTIAL SUITE LEVEL
ENTERTAINMENT SUITE LEVEL
560,974.12 SFGUESTROOM TOWER TGSF:
DIAGRAMATIC - FOR PROGRAM INFORMATION ONLYMARCH 27, 201816
977
978977978 979
979
RECEIVING
RECYLCLE / CAN
WASH / TRASH
NEW GOLD DECK
PARKING
HR
HOUSEKEEPING
EMPLOYEE
CAFETERIA
LAUNDRY
LINEN HOLDING
UNIFORM
ADMIN
HOTEL DOCK
TRASH
EMPLOYEE
SERVERY
EMPLOYEE
LOCKERS
EMPLOYEE
LOCKERS
AVAILABLE
ENGINEERING
OFFICES
PLUMBING
EQUIP.
CHILLER
BOILER
ENGINEERING
SHOP
SWITCHGEAR EMERGENCY
GENERATOR
ENGINEERING
STOR. FIRE PUMP FIRE CONTROL
TRAINING
AVAILABLE
GWCC DOCK
© GenslerGensler 2017
01/18/18GWCC HOTEL & 100,000 SF CONFERENCE CENTER
LOWER LEVEL - 980'
GWCCA / DREW *FOR INTERNAL REVIEW ONLY
DIAGRAMATIC - FOR PROGRAM INFORMATION ONLYMARCH 27, 201817
Exhibit D
Proposed Fees and Financial Incentives
Contract Clause Comments Proposal Base Management Fee Subject to review and approval
by GWCCA bond counsel and terms of Rev. Proc. 2017-13, provide proposed base management fee and the basis for computation. The base management fee may vary depending on the applicable year of the term. The GWCCA desires the base management fee prior to stabilization be minimized in order to maximize revenues available for debt service.
Subordinated Management Fee Subject to review and approval by GWCCA bond counsel and terms of Rev. Proc. 2017-13, Respondents are requested to offer a proposal for subordination/deferral of a portion of their management fee, including the amount of fixed management fee to be subordinated and the terms of the subordination/deferral.
Operator System-Reimbursable Expenses
Provide the proposed reimbursements for the cost of all centralized chain services, including, but not limited to, national advertising, national sales, central reservations, technology, payroll, accounting, training and loyalty rewards programs.
Technical Services Fee Provide the proposed fee, reimbursements and duration for Technical Services related to the Hotel’s development (including all costs associated with personnel, administrative and travel).
Purchasing and Installation of OS&E Services Fees
Provide the proposed fees and duration for purchasing and
18
installation of OS&E required to fully furnish/equip the Hotel.
Pre-Opening Services Fee Provide the Pre-Opening Services fee, reimbursements and duration (including all costs associated with personnel, administrative and travel).
Other Fees Provide all other fees and reimbursable expenses payable by GWCCA not otherwise addressed above.
Key Money Contribution Subject to review and approval of GWCCA’s bond counsel, indicate amount and term of the financial contribution the Respondent is willing to make.
Revenue Shortfall Guarantee Subject to review and approval of GWCCA’s bond counsel, indicate the terms of a revenue shortfall guarantee the Respondent is willing to make.
19
Exhibit E
Proposed Key Business Terms
Contract Clause Business Term Offered by Respondent Qualified Management Agreement (“QMA”)
Confirm that the Hotel will be managed by Operator under a QMA with the GWCCA that complies with Operating Guidelines for Management Contracts as set forth in the IRS Rev. Proc. 2017-13 and the Internal Revenue Code of 1986, as amended, and as interpreted by Drew and GWCCA counsel.
Term of QMA Proposed term shall be no longer than 30 years.
FF&E Replacement Reserves FF&E reserves up to 5% of gross revenues will be included as an expense of the Hotel after payment of base management fees and before the payment of debt service. The GWCCA desires the FF&E reserves to ramp-up in the startup years in order to maximize revenues available for debt service.
Capital Replacement Reserves Capital replacement reserves (subject to GWCCA’s sole discretion) up to 2% of gross revenues will be included as an expense of the Hotel after the payment of debt service.
Working Capital Requirement Indicate amount of working capital reserves that should be retained for operations.
Termination - Owners Right of Termination Prior to Hotel Opening:
Confirm and describe GWCCA’s rights to terminate the QMA without penalty prior to Hotel Opening if (a) GWCCA is unable to complete bond financing by a specified deadline; or (b) Bond Holders do not agree to the terms of the QMA; or (c) prior to commencement of construction, GWCCA determines Hotel is no
20
longer economically viable based on changes in the market or changes in financing, construction or operating cost of Hotel. GWCCA requests free termination for the specified events.
Termination for Performance Respondent agrees that beginning at the start of the fourth operating year, the GWCCA can terminate QMA if: (a) Net Cash Flow in any givenyear does not exceed DebtService; or (b) RevPARpenetration level compared tocompetitive set is not achieved,provided such event is notcaused by an extraordinaryevent, major renovation (ineither such case, equitableadjustments shall be made tothe relevant performancemetrics) or default by theGWCCA.
Termination for Other Causes Confirm GWCCA’s right to terminate QMA upon any of the following events: (a) sale or change of control of the Operator; (b) material adverse change in Operator’s financial condition; and (c) any other event provided for in the bond documents.
Area of Protection Describe any proposed non-competition protection for the Hotel including geographic area(s), brands covered and length of the term(s).
No violation of geographic restriction
Confirm that the Respondent is not subject to any noncompetition restriction with another hotel from locating the proposed brand on the Site.
Approval of Operating and Capital Budgets
Confirm that GWCCA shall have approval rights over each annual
21
marketing plan, operating budget (including rates charged) and capital expenditure budget prepared by Respondent.
Employer of Hotel Employees Confirm that Respondent or Respondent’s Affiliate will be the legal employer of all Hotel employees.
Approval over Department Leaders
Confirm that GWCCA shall have right to approve the General Manager of the Hotel, the Director of Finance, Director of Food & Beverage, Director of Sales and Director of Engineering.
No Inconsistent Tax Position Confirm that the QMA will not entitle the Operator to, and the Operator does not intend to, take any tax position inconsistent with its role as a service provider with respect to the Hotel.
Room Block Agreement Confirm that Respondent agrees to enter into a Room Block Agreement on terms to be negotiated between the Respondent and GWCCA.