REPUBLIC OF TUNISIAMINISTRY OF EQUIPMENT,HOUSING AND LAND PLANNING
GENERAL DIRECTION OF BRIDGES AND ROADS
GABES – MEDENINE HIGHWAY
RADES - LA GOULETTE BRIDGE
December 2010
The 2nd
JAEF
2010
Table of contents
Road Infrastructure
Evolution of the Traffic on roads
Highways network
Presentation of the Highway Gabès-Médenine
Economic study
Designs progress status
Works Cost Estimate
Rades-La Goulette Bridge The
2nd JA
EF 2010
Road Infrastructure
19371 Km Classified Road Network:
%(75)covered of which 14564 Km
2%
24%
34%
30%
10%1
2
3
4
5
Highways Km 360
National Roads Km4738
Regional Roads Km 6498
Local Roads Km 5888
in the course of classification
Km1886
78%
22%
Rural runways : 64 800 Kmof which 14 400 Km covered
The 2nd
JAEF
2010
Evolution and distribution of the traffic
2007 2002 1997 Year 5446
88,9 %
3940
86,8%
2919
86,5 %
Light
vehicles
678
11,1 %
588
13,2 %
458
13,5 %
Heavy
vehicles
6124 4539 3377 Total
Evolution of the daily average traffic on all the roads of the Republic Veh/day/Km
The 2nd
JAEF
2010
Year of Exploitation
Length
(Km)Highway
1997141.5
In exploitation
Tunis-M’saken
200253Tunis-Bizerte
200567Tunis-Oued Zarga
200897.5M’saken –Sfaxcontribution JBIC :El Jem-Sfax
155 under construction
Sfax-Gabès
018
Works scheduled
Gabès-Médenine-Ras Jédir
70Oued Zarga-Bousalem
80Bousalem-Algerian Frontier
348Enfidha-Kairouan-Sidi
Bouzid-Kasserine-Gafsa
HIGHWAYS NETWORK
objectif : 1500 Km in 2020
The 2nd
JAEF
2010
PRESENTATION OF THE PROJECT OF GABES-MEDENINE HIGHWAY
The Project of construction of Gabès-Médenine Highway is a part of trans-Maghrebin Corridor constructionProgram
It is a presidential project and it’srecommended to begin the civil worksat the end of 2011 for a duration of 3years. The
2nd JA
EF 2010
GABES - MEDENINE
Length: 90 km
a part of 3d section
Maghrebi Highway
M’Saken – Gabès - Ras Jédir
•1st section “M’Saken-
Sfax” 97.5Km
in exploitation
•2nd section “Sfax-
Gabès” 155 Km
under construction
•3d section “Gabès-Ras
Jédir” 180 km
construction scheduled
The 2nd
JAEF
2010
Components of the project
Length=90 km
4 interchanges of type exit trumpet(System of closed toll)
36 structures (29 overpasses+5 underpasses+
2 railway underpasses)
100 hydraulic structures of which 12 large hydraulic structures to cross the
flows designed for 1 century return period.
2 rest areas
The 2nd
JAEF
2010
GABES-MEDENINE HIGHWAY
The 2nd
JAEF
2010
CROSS-SECTION OF THE HIGHWAY(2X2 lanes)
The 2nd
JAEF
2010
ECONOMIC STUDY
The 2nd
JAEF
2010
ANALYSIS OF THE TRAFFIC
The 2nd
JAEF
2010
ANNUAL AVERAGE DAILY TRAFFIC IN THE ZONE OF THE PROJECT
Trafic TJMA par poste d'enquête
9589
7628
84723492
7008
The 2nd
JAEF
2010
TRAFFIC IN THE ZONE OF THE PROJECT
Growth rate of the traffic:
Period 2006 -2010
2010 -2015
2015 -2020
2020 -2025
2025 -2030
2030 -2035
light vehicles 5,8% 6,1% 6,0% 5,7% 5,1% 4,7%
heavy vehicles 4,4% 4,5% 4,4% 4,0% 3,8% 3,4%
The 2nd
JAEF
2010
RESULTS OF THE AFFECTATION OF THE TRAFFIC
AFFECTATION OF THE TRAFFIC ON ROAD NETWORK
The 2nd
JAEF
2010
RESULTS OF AFFECTATION OF TRAFFIC
Evaluation of the traffic on the RN1 and on the highway for the period 2016 - 2035
Results of affectation of traffic:
Traffic on the highway : 59% ;
Traffic on the RN1 : 41% ;
Traffic heavy vehicles on the highway : 10% ;
Traffic heavy vehicles on the RN1 : 7% ;
Traffic on the highway and on the RN1 will remain fluid until 2035 ;
The 2nd
JAEF
2010
Distribution of the traffic between the toll highway and the national road RN1
Jorf
Ras Jédir
6 421
10 197 10 112
4 149
5 170
4 5924 650
7 894
10 875
8 947
RN1
RR116
RR108
RR118
RR109
Mareth
Zarzis
Gabès
Médenine
Origine du
projet
Rocade
Ben Guerdane
RN16
RR107
6 915
4 932
9 209
12 055
2 636
Vers El
Hamma
Vers
Matmata
6 059
3 088
Horizon 2013
The 2nd
JAEF
2010
Distribution of the traffic between the toll highway and the national road RN1
Horizon 2016
Jorf
Ras Jédir
7 299
4 251 8 113
4 977
6 635
5 4205 082
9 418
13 056
10 695
7 9573 456
RN1
RR116
RR108
RR118
RR109
Mareth
Zarzis
Gabès
Medenine
Origine du
projet
Rocade
Ben Guerdane
RN16
RR107
8 047
5 482
11 353
6 692
11 569
3 216
5 287
Vers El
Hamma
Vers
Matmata
7 278
3 738
The 2nd
JAEF
2010
Distribution of the traffic between the toll highway and the national road RN1
Horizon 2020
Jorf
Ras Jédir
8 630
4 847 9 449
6 400
8 537
6 8366 432
11 988
16 774
13 579
10 0004 197
RN1
RR116
RR108
RR118
RR109
Mareth
Zarzis
Gabès
Médenine
Origine du
projet
Rocade
Ben Guerdane
RN16
RR107
9 918
6 327
14 512
8 327
13 646
4 321
6 869
Vers El
Hamma
Vers
Matmata
9 457
4 796
The 2nd
JAEF
2010
Distribution of the traffic between the toll highway Gabès-Médenine and the national road RN1
Horizon 2025
Jorf
Ras Jédir
10 126
5 558 11 159
8 560
11 390
8 9588 496
16 020
22 882
18 167
13 2025 544
RN1
RR116
RR108
RR118
RR109
Mareth
Zarzis
Gabès
Médenine
Origine du
projet
Rocade
Ben Guerdane
RN16
RR107
12 501
7 328
19 410
10 625
16 703
6 324
9 484
Vers El
Hamma
Vers
Matmata
13 091
6 399
The 2nd
JAEF
2010
Distribution of the traffic between the toll highway and the national road RN1
Horizon 2035
Jorf
Ras Jédir
11 468
6 168 12 415
11 204
14 742
11 54411 092
20 793
30 554
23 555
16 8977 117
RN1
RR116
RR108
RR118
RR109
Mareth
Zarzis
Gabès
Médenine
Origine du
projet
Rocade
Ben Guerdane
RN16
RR107
15 601
8 475
25 191
13 200
19 532
9 183
12 854
Vers El
Hamma
Vers
Matmata
17 890
8 361
The 2nd
JAEF
2010
RESULTS OF THE AFFECTATION OF TRAFFIC
The 2nd
JAEF
2010
ECONOMIC RETURNOF THE PROJECT
Indicators of economic return: Economic internal Rate of return : EIRR = 27,7%
Economic immediate rate of return : EImRI = 12,8%
Net profits ( 12%) : VAN = 1728 M TD
very satisfactory return
The 2nd
JAEF
2010
DESIGNS PROGRESS STATUS
Detailed Designs submitted to and
approved by the Administration,
The 2nd
JAEF
2010
WORKS COST ESTIMATE (M TD)
Highway works : 415
Price fluctuations : 29
Variation in the total quantity of work : 29
Amount to be claimed : 7
Clearing of right-of-way : 30
Control : 8
Toll Equipment : 32
Total : 550
The 2nd
JAEF
2010
PRESENTATION OF RADES-LA GOULETTE BRIDGE
The 2nd
JAEF
2010