REPUBLIC OF INDONESIA
LLiisstt ooff PPllaannnneedd MMeeddiiuumm--TTeerrmm FFoorreeiiggnn
LLooaannss ((DDRRPPHHLLNN--JJMM)) 22001111--22001144
-- 22nndd BBooookk --
Ministry of National Development Planning/
National Development Planning Agency
- i -
List of Project and Technical Assistance
National Coordinating Agency for Surveys and Mapping
1. Land System Map Provision ....................................................................................................... 3
2. National Geospatial Data Infrastructure Development - Phase II ......................................... 5
3. Production of Geospatial Data Scale of 1:50,000 in Papua ...................................................... 7
Meteorology, Climatology, and Geophysics Agency
4. Strengthening BMKG’s Climate and Weather Services ......................................................... 11
National Disaster Management Agency
5. Procurement of Equipment for Emergency and Post Disaster Phase .................................. 15
National Agency of Drug and Food Control
6. Strengthening Drug and Food Control System in Indonesia ................................................ 19
Government Internal Control Agency
7. Capacity Building within the Government Internal Control System (GICS) to
Achieve Good Governance and Clean Government .............................................................. 25
Agency for the Assessment and Application of Technology
8. Revitalization of Baruna Jaya Research Vessels and Equipments Including On-
Shore Supporting Facility .......................................................................................................... 29
9. The Development of Industrial Laboratories to Support National Industry's
Competitiveness and Self Reliance ........................................................................................... 31
Batam Indonesian Free Zone Authority
10. Batu Ampar Transshipment Port Development Project ........................................................ 35
11. The Development of Sewerage System in Batam Island ....................................................... 37
National Land Agency
12. Improving Land Tenure and Land Service Performance ...................................................... 41
13. Institutional Partnership for Strengthening Land Administration in Indonesia
(IPSLA Phase II) .......................................................................................................................... 43
14. The Development of National Land Management Information System ............................. 45
Statistics Indonesia Agency
15. Statistical Capacity Building - Change and Reform for the Development of
Statistics ....................................................................................................................................... 49
2nd Book - List of Project and Technical Assistance
- ii -
National Search and Rescue Agency
16. Procurement of 80 M Type Search and Rescue Vessel Project ............................................. 53
17. Procurement of Search and Rescue Equipment for Medium Type Helicopter .................. 54
18. Procurement of Search and Rescue Helicopter Medium Range Project - Phase I ............. 55
Ministry of Religious Affair
19. Development of Teaching Hospital Faculty of Medicine and Health Science of
Islamic State University (UIN) Syarif Hidayatullah Jakarta ................................................. 59
20. The Development of the State Institute of Islamic Studies (IAIN) Mataram, West
Nusa Tenggara ........................................................................................................................... 61
21. The Development of the State Institute of Islamic Studies (IAIN) Raden Fatah
Project .......................................................................................................................................... 63
22. The Development of the State Institute of Islamic Studies (IAIN) Sulthan Thaha
Saifuddin Jambi .......................................................................................................................... 65
23. The Development of the State Institute of Islamic Studies (IAIN) Sumatera Utara
Project .......................................................................................................................................... 66
24. The Development of the State Institute of Islamic Studies (IAIN) Sunan Ampel
Surabaya Project ......................................................................................................................... 68
25. The Development of Walisongo State Institute of Islamic Studies ...................................... 70
Ministry of Home Affairs
26. National Program for Self-Reliant Rural Community Empowerment ............................... 75
27. Simeuleu Physical Infrastructure - Phase II ............................................................................ 77
Ministry of Laws and Human Rights
28. Development of Automation System of Intellectual Property Rights ................................ 81
Ministry of Marine Affairs and Fisheries
29. Coastal Community Development .......................................................................................... 85
30. Infrastructure Development of Space Oceanography (INDESO Project) ........................... 87
31. Outer Ring Fishing Ports Development - Stage I ................................................................... 89
32. Participatory Technology Development and Transfer for Sustainable Fisheries
Project .......................................................................................................................................... 91
Ministry of Health
33. Improvement of Laboratory Services in 4 Central Health Laboratories ............................. 95
34. Improvement of Medical Care in Central Government Hospitals ...................................... 97
35. Strengthening of Core Capacity at Points of Entry in the Implementation of
International Health Regulation .............................................................................................. 99
36. Strengthening of Teaching Hospitals in Indonesia .............................................................. 101
2nd Book - List of Project and Technical Assistance
- iii -
Ministry of Communication and Information Technology
37. The Improvement on Television Transmitting Stations (ITTS) - Phase II ......................... 105
Ministry of Environment
38. Financing Scheme for Emission Reduction Investment ...................................................... 109
Ministry of Public Works
Directorate General of Highways
39. Additional Loan of Tanjung Priok Access ............................................................................. 113
40. Asset Management for National Road and Bridge in Urban Area .................................... 114
41. Bandung Intra Urban Toll Road (BIUTR) Development Project - Phase I ........................ 115
42. Bridge Material Supply for Bridge Replacement Program - Phase II ................................ 117
43. Construction of Arterial Road to Support Belang-Belang International Port ................... 118
44. Construction of Galala - Poka Bridge..................................................................................... 119
45. Construction of Kendari Bridge .............................................................................................. 120
46. Construction of Panajam Bridge (Pulau Balang) .................................................................. 121
47. Development of Cileunyi-Sumedang-Dawuan Toll Road - Phase I .................................. 122
48. Gorontalo - Djalaludin Airport Road Construction Project ................................................ 123
49. Musi Bridge III Construction - Phase I................................................................................... 124
50. Padang By Pass Capacity Expansion ..................................................................................... 125
51. Regional Road Development Project – Phase I ..................................................................... 126
52. Road Development in Mamminasata Project ....................................................................... 127
53. Tayan Bridge Construction ..................................................................................................... 128
54. Toll Road Development of Medan-Kualanamu Project ...................................................... 129
55. Toll Road Development of Solo - Kertosono ......................................................................... 130
56. Western Indonesia National Road Improvement Project (WINRIP) ................................. 132
Directorate General of Human Settlements
57. Community Based Water Supply and Sanitation Project - Phase I .................................... 135
58. Development of Jatiluhur Water Supply Project - Stage I ................................................... 137
59. Drainage Improvement Support Project for Metropolitan Cities ...................................... 138
60. Emission Reduction in Cities - Solid Waste Management .................................................. 139
61. Greater Bandung Water Supply and Sanitation Project - Phase I ...................................... 140
62. Greater Surabaya - Umbulan Water Supply Project - Stage I ............................................. 141
63. IKK Water Supply Program and Small Water Treatment Plant for Water Scarcity
Area ............................................................................................................................................ 142
64. Makassar Water Supply Development Project - Stage II ..................................................... 143
65. Metropolitan Sanitation Management and Health Project ................................................. 144
66. National Community Empowerment Program - Urban Areas in Middle and
Eastern Indonesia ..................................................................................................................... 146
2nd Book - List of Project and Technical Assistance
- iv -
67. National Community Empowerment Program - Urban Areas in Western
Indonesia ................................................................................................................................... 148
68. National Community Empowerment Program - Urban Areas Nationwide .................... 150
69. Neighborhood Upgrading and Shelter Sector Project - Phase II ........................................ 152
70. Regional Infrastructure for Social and Economic Development Project - Phase II
(RISE II) ..................................................................................................................................... 153
71. Rural Infrastructure Support - National Community Empowerment Program -
Phase III ..................................................................................................................................... 155
72. Small Scale Water Treatment Plants for Emergency Relief ................................................ 157
73. Solid Waste Management Improvement Support Project for Regional and
Metropolitan Cities .................................................................................................................. 158
74. Water Supply System Development for Banten - Jakarta from Karian Dam ................... 159
Directorate General of Water Resources
75. Construction of Dams in East Nusa Tenggara: Including Raknamo Dam, Kolhua
Dam, and Mbay Dam .............................................................................................................. 163
76. Construction of Karian Multipurpose Dam ......................................................................... 165
77. Construction of Kelara - Karalloe Dam ................................................................................. 166
78. Construction of Pandanduri Dam.......................................................................................... 168
79. Flood Management in Selected River Basins ........................................................................ 169
80. Integrated Participatory Development and Management of Irrigation Project for
Eastern Region of Indonesia - Phase I ................................................................................... 171
81. Integrated Participatory Development and Management of Irrigation Project for
Western Region of Indonesia - Phase I .................................................................................. 173
82. Integrated Participatory Development and Management of Irrigation Small Scale
Project for Eastern Region of Indonesia - Phase I ................................................................ 175
83. Jakarta Urgent Flood Mitigation Project (JUFMP) ............................................................... 177
84. Jambo Aye Multi - Purpose Reservoir Project ...................................................................... 179
85. Rehabilitation of Upper Citarum .......................................................................................... 180
86. Rentang Modernization Strategic Irrigation - Phase I ......................................................... 181
87. The Construction of Transfer Water Interbasin Cibutarua-Cilaki Project-West Java ..... 183
88. Urgent Disaster Reduction Project for Mount Merapi and Lower Progo River Area
- Phase II .................................................................................................................................... 185
89. Urgent Rehabilitation of Strategic Irrigation Project for Eastern Region of
Indonesia ................................................................................................................................... 187
90. Urgent Rehabilitation of Strategic Irrigation Project for Western Region of
Indonesia ................................................................................................................................... 189
91. Water Resources and Irrigation Sector Management Program - APL 2 ........................... 191
2nd Book - List of Project and Technical Assistance
- v -
Ministry for Development of Disadvantaged Regions
92. National Strategic Centers of Activities Development in Border Regions ........................ 195
93. Program for Development of Integrated Transportation Infrastructure in
Disadvantaged Areas ............................................................................................................... 197
94. Solar Energy Utilization for Basic Infrastructure Improvement in Disadvantaged
Areas .......................................................................................................................................... 199
95. Support for Poor and Disadvantaged Areas (SPADA-2) .................................................... 201
96. Wind Power Electricity (WINDPED) for Border Areas and Outer Islands in
Indonesia ................................................................................................................................... 203
Ministry of National Education
97. Life Skills Education for Employment and Entrepreneurship (LSE3) ............................... 207
98. Modernization of Tanjungpura University ........................................................................... 209
99. Polytechnics Development Project ......................................................................................... 211
100. Revitalizing Education System in Pre-Service Teacher Organization Nationally
(RESPON) .................................................................................................................................. 213
101. Strengthening Sustainable Development of Jenderal Soedirman University Project ...... 215
102. Sustainable Economic Development through Technical and Vocational Education
and Training (SED-TVET) ....................................................................................................... 217
103. The Development and Improvement of Bogor Agricultural University (IPB):
Towards Research Based University ...................................................................................... 218
104. The Development and Upgrading of Padang State University .......................................... 221
105. The Development and Upgrading of Semarang State University ...................................... 223
106. The Development and Upgrading of the State University of Surabaya (UNESA)
Project, Indonesia...................................................................................................................... 225
107. The Development and Upgrading of Yogyakarta State University Project ...................... 227
108. The Development of Department of Forest Resources Conservation and
Ecotourism (DForCE), Bogor Agricultural University ........................................................ 229
109. The Development of Gorontalo State University ................................................................. 231
110. The Development of Hasanuddin University Hospital....................................................... 233
111. The Development of ITS Surabaya: A Strategic Empowerment of Being Research
University .................................................................................................................................. 235
112. The Development of Lambung Mangkurat University ....................................................... 237
113. The Development of Sam Ratulangi University ................................................................... 239
114. The Development of Syiah Kuala University Project .......................................................... 241
115. The Development of University of Brawijaya Towards Entrepreneurial University ...... 243
116. The Quality Improvement of Padjadjaran University (UNPAD) Bandung Project ......... 245
117. World Class Research University of Gadjah Mada .............................................................. 247
2nd Book - List of Project and Technical Assistance
- vi -
Ministry of Transportation
Directorate General of Land Transportation
118. Intelligent Transport System for Jabodetabek Area - Phase I............................................. 251
Directorate of Sea Transportation
119. Improvement and Development of Indonesian Aids to Navigation ................................ 255
120. Indonesia Ship Reporting System .......................................................................................... 256
121. Procurement of Fast Boat for Maritime Safety Law Enforcement ..................................... 258
122. Procurement of New Generation Passenger Vessel ............................................................ 259
123. Vessel Traffic Service (VTS) System for Northern Part of Malacca Strait ......................... 261
124. Vessel Traffic Service (VTS) System for Southern Part of Malacca Strait ......................... 263
Directorate General of Civil Aviation
125. Airport Development for Disaster Measure and Border Region Development .............. 267
126. Enhancement of Safety for Air Link to Eastern Indonesia.................................................. 268
127. New Communication, Navigation, Surveillance, and Air Traffic Management
(CNS/ATM) System Development in Indonesia .................................................................. 270
128. Procurement of Fire Fighting Equipment and Airport Rescue .......................................... 271
129. The Development of Airport in Papua .................................................................................. 272
Directorate General of Railways
130. Bandung Urban Railway Transport Development, Electrification Padalarang-
Cicalengka Line ........................................................................................................................ 275
131. Construction of Railway Double Track Kroya-Kutoarjo - Phase II ................................... 277
132. Procurement of Diesel Electric Locomotive .......................................................................... 279
133. Procurement of Electric Rail Cars for Jabodetabek .............................................................. 280
134. Procurement of Track Material and Turnouts ...................................................................... 281
135. Railway Double Tracking Cirebon-Kroya - Segment I & III............................................... 282
136. Surabaya Regional Railway Line - Phase I ........................................................................... 283
137. Mass Rapid Transit (MRT) East-West and Extension North-South Engineering
Services ...................................................................................................................................... 285
Ministry of Defense
138. Improvement of Aeromedical Hospital - Phase II ............................................................... 289
139. Procurement of Maritime Medical Facilities Program ........................................................ 290
140. Procurement of Medical Equipment for Army Hospital .................................................... 291
141. Provision of Mobile Clean and Drinking Water Treatment System for Emergency ....... 293
2nd Book - List of Project and Technical Assistance
- vii -
Ministry of Agriculture
142. Smallholder Livelihood Development Programmes in Eastern Indonesia (SOLID) ....... 297
143. Sustainable Management of Agricultural Research and Technology Dissemination
(SMART-D) ................................................................................................................................ 299
144. The Post Tsunami Rehabilitation of Agricultural Infrastructure in Nanggroe Aceh
Darussalam Province - Phase II .............................................................................................. 301
Ministry of Public Housing
145. Infrastructure Development for Large Scale Housing ......................................................... 305
146. Infrastructure Development for Slum Area Upgrading ...................................................... 307
147. New Town Development Policy for Low Income People ................................................... 309
Ministry of National Development Planning/National Development Planning
Agency
148. Institutional Capacity Building for Bureaucracy Reform .................................................... 313
149. Public Procurement and State Audit Reform (Pro STAR) ................................................... 315
Ministry of Research and Technology
150. Research and Innovation in Science and Technology (RISET) ........................................... 319
Ministry of Manpower and Transmigration
151. Revitalization of Vocational Training Centers (VTCs) ........................................................ 323
Indonesian National Police
152. Development of Communication Systems in the Border Area at Polda Kepulauan
Riau, East Nusa Tenggara, North Sulawesi, and Papua ...................................................... 327
153. Development of Indonesia Automatic Fingerprint Identification System (INAFIS) ....... 329
154. Development of Police Technology Innovation Equipment ............................................... 331
155. Fast Patrol Boat for the Indonesian National Police............................................................. 333
156. Integrated Trunking Radio Communication for Indonesian National Police - Phase
I ................................................................................................................................................... 334
157. Integrated Trunking Radio Communication for Indonesian National Police - Phase
II .................................................................................................................................................. 335
158. National Criminal Information Center for Indonesian National Police - Phase II ........... 336
159. Strengthening of Police Research and Development Institution ........................................ 337
160. Upgrading of Regional Police Hospital and Equipment ..................................................... 339
Indonesian Institute of Sciences
161. Animal Husbandry Technology and Practices Improvement to Accelerate Meat
and Milk Production (MEAT-MILK PRO) ............................................................................ 343
2nd Book - List of Project and Technical Assistance
- viii -
National Resilience Institute
162. Strengthening the Capacity Building of the National Resilience Institute ....................... 347
National Institute of Aeronautic and Space Agency
163. Upgrading LAPAN's Remote Sensing Ground-station to Support Climate Change
Mitigation .................................................................................................................................. 351
Local Government of Makassar City
164. Regional Information and Communication Technology Center for Human
Resources Development and Public Administration Services (RICT Makassar) ............ 355
Local Government of DKI Jakarta Province
165. Construction of Jakarta Mass Rapid Transit Project ............................................................ 359
Local Government of Kepulauan Riau Province
166. Kepulauan Riau Sea Transportation Project ......................................................................... 365
Local Government of Nanggroe Aceh Darussalam Province
167. Development of Seulawah Agam Geothermal Becoming Geothermal Power Plant
(GeoPP) 40 MW in NAD Province ......................................................................................... 369
Local Government of Riau Province
168. Southern Pekanbaru Water Supply Project .......................................................................... 373
Local Government of North Sulawesi Province
169. North Sulawesi e-Government Implementation Project ..................................................... 377
Indonesia Infrastructure Guarantee Fund
170. Indonesia Infrastructure Guarantee Fund ............................................................................ 381
PT Pertamina
171. Geothermal Total Project Development in Karaha, Unit 1 (30 MW) ................................. 385
172. Geothermal Total Project Development in Lahendong, Unit 5&6 (2x20 MW). ............... 386
173. Geothermal Total Project Development in Lumut Balai, Unit 1&2 (2x55 MW) ............... 387
174. Geothermal Total Project Development in Lumut Balai, Unit 3&4 (2x55 MW) ............... 388
175. Geothermal Total Project Development in Ulu Belu, Unit 3&4 (2x55 MW). .................... 389
176. Geothermal Upstream Project Development in Hululais, Unit 1&2 (2x55 MW). ............ 390
177. Geothermal Upstream Project Development in Kotamobagu, Unit 1,2,3,4 (4x20
MW). .......................................................................................................................................... 391
178. Geothermal Upstream Project Development in Sungai Penuh, Unit 1&2 (2x55
MW). .......................................................................................................................................... 392
2nd Book - List of Project and Technical Assistance
- ix -
State Electricity Company
179. 500 kV Java - Bali Crossing ...................................................................................................... 395
180. Bakaru II Hydro Electrical Power Plant (2x63 MW) ............................................................ 396
181. Containerized Diesel Power Plant .......................................................................................... 397
182. Hululais 1&2 Geothermal Power Plant (2x55 MW) ............................................................. 398
183. Improvement of Java-Bali Electricity Distribution Performance ........................................ 400
184. Java-Bali Submarine Cable 150 kV Circuit 3&4 .................................................................... 401
185. Kotamobagu Geothermal Power Plant (4x20 MW) .............................................................. 402
186. Lombok Steam Coal Power Plant (2x25 MW) ....................................................................... 404
187. Merangin Hydro Electrical Power Plant (2 x 175 MW) ....................................................... 405
188. Muara Tawar Add-on Block 2 Combined-Cycle Power Plant (500 MW) .......................... 406
189. Outside Java Bali Enterprise Resource Planning (ERP) ....................................................... 408
190. Pangkalan Susu Steam Coal Power Plant (SCPP) 2x200 MW ............................................ 410
191. Parit Baru Steam Power Plant (2x50 MW) ............................................................................. 411
192. Scattered Transmission and Substation in Indonesia .......................................................... 412
193. Scattered Transmission Line and Substation in Indonesia - Phase II ................................ 413
194. Strengthening West Kalimantan Power Grid ....................................................................... 414
195. Sungai Penuh 1&2 Geothermal Power Plant (2x55 MW) .................................................... 415
196. Takalar Steam Coal Power Plant (2x100 MW) in South Sulawesi ...................................... 416
197. Tulehu 1&2 Geothermal Power Plant (2x10 MW) ................................................................ 417
198. Upper Cisokan Pumped Storage Hydro Electrical Power Plant (1,000 MW) ................... 418
199. Indramayu Steam Coal Power Plant 2x1,000 MW - Phase I : Engineering Services ........ 420
PT. Semen Baturaja (Persero)
200. Baturaja II Project ...................................................................................................................... 423
1
National Coordinating Agency for
Surveys and Mapping (Badan Koordinasi Survei dan Pemetaan Nasional / Bakosurtanal)
3
BB-ID: BBP1-08301-08-063604-1070010
1. Project Title : Land System Map Provision
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : National Coordinating Agency for Surveys and Mapping
5. Implementing Agency : National Coordinating Agency for Surveys and Mapping
6. Background and Justification
Law Number 25/2004 concerning National Development Planning System/Sistem Perencanaan
Pembangunan Nasional (SPPN) states that all development activities should be planned based
on the accurate data and information. It is also mentioned that SPPN has aims to: support the
coordination between development actors; ensure the integration, synchronization, and
synergy both inter-regional, inter-space, between-time, inter-government functions, and
between central and local government; ensure the relevance and consistency between
planning, budgeting, implementation, and supervision; optimize the participation of the
community; and ensure that the use of resources in an efficient, effective, fair, and sustainable
way. The National Long-Term Development Plan 2005-2025 emphasizes that spatial aspect
must be integrated into and become a part of the framework of development planning at all
levels of government. There are 33 provinces and 456 districts/cities which must integrate their
regional spatial planning into their development planning.
A system that is capable to support the planning actors in a variety of planning issues relating
to the national spatial aspects is needed. The problem that arises and becomes a major concern
is the data/spatial information that is actually available, but seemingly not yet available. In line
with the efforts to meet the needs is the provision of advanced spatial data. Spatial information
that was systematically held in 1980s is lands system information on the scale of 1:250,000 and
1:1,000,000. This spatial information needs to be updated. Subsequently, in line with
development needs, the information also necessary to be developed on a larger scale (1:50,000)
and provided with other additional spatial information.
Further, the information will be provided with additional spatial information in order to
support the analysis and synthesis for the purposes of providing spatial information to
support regional planning, increase food security and disaster mitigation.
7. Scope of Work
a. Assessment of need analysis and synthesis of spatial information, which in further will
become the basis for database development and planning for surveys and mapping;
b. Development of thematic spatial database system;
c. Provision of thematic maps, Land System on scale of 1:250,000 and overview map of
National Land System on scale of 1:1,000,000 through a revision and updating, Land
System Maps on scale of 1:50,000 for several selected locations, and additional thematic
information for a particular purpose;
d. Dissemination of results and development of human resources capabilities
4
BB-ID: BBP1-08301-08-063604-1070010
8. Priority
Regional and Spatial Planning
9. Output and Outcome
a. Output
1) Thematic map of land systems, scale of 1:250,000;
2) Overview map of National Land System, scale 1: 1,000,000;
3) Land System Map Scale of 1:50,000 for some selected locations and additional
thematic information for a particular purpose.
b. Outcome
1) Implementing the sustainable development process through comprehensive and
standardized spatial information;
2) Supporting the development process that must be carried out simultaneously in
various regions and oriented to each region's potential.
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 0
Sub Total : US$ 35,000,000
Counterpart Funding
- Central Government : US$ 5,250,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 5,250,000
TOTAL : US$ 40,250,000
5
BB-ID: BBP1-08301-08-063610-1070011
1. Project Title : National Geospatial Data Infrastructure Development - Phase II
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : National Coordinating Agency for Surveys and Mapping
5. Implementing Agency : National Coordinating Agency for Surveys and Mapping
6. Background and Justification
National Geo-Spatial Data Infrastructure (NSDI) - Phase I is implemented simultaneously by
inter-sector and inter-central government and regional government. It covers 3 (three) major
activities, i.e.: national spatial data development, networking development and data utilization
development. NSDI - Phase I was started in 2007 and will be completed by the year of 2013.
In National Mid-Term Development 2010-2014, spatial planning has been clearly stated as a
national priority. The role of both geospatial and thematic data become more dominant. In the
NSDI, the most likely objectives of the project have been involved, nevertheless to achieve an
ideal NSDI in Indonesia as well as to maintain the sustainability of the NSDI project.
Therefore, the NSDI - Phase II is needed. The main reasons upon the proposals are as follow:
a. The need to anticipate a new regulation concerning Geo-Spatial Information, focusing on
geo-spatial and information custodianship among the nodes
b. The need to operate a sustainable NSDI development both in central and provincial or
regional government using their resources
c. The need to implement geo-spatial data and information to all regional governments in a
standardized format, including for regional spatial planning
d. The need to improve national capacity in local government to implement the NSDI project
7. Scope of Work
a. Enhancing networking to be operated in regional governments;
b. Enhancing and providing data utilization of the provincial/district/city levels to support
the Regional Development Planning;
c. Capacity building.
8. Priority
Regional and Spatial Planning
9. Output and Outcome
a. Output
1) Increased number of central province, district, and municipal governments involved
as nodes of NSDI network;
2) Increased number of province and district/city in data spatial utilization to support
the Regional Development Planning;
3) Increased number of skilled and trained personnel in implementing NSDI.
6
BB-ID: BBP1-08301-08-063610-1070011
b. Outcome
1) Creating an environment in which all stakeholders use technology and standards and
share geo-spatial information;
2) Operating the Geographic Information System (GIS) as an important tool for decision-
makers in the formulation, implementation, and monitoring and evaluation of
national and regional development plans,
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 7,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,500,000
TOTAL : US$ 57,500,000
7
BB-ID: BBP1-08301-08-063609-1070012
1. Project Title : Production of Geospatial Data Scale of 1:50,000 in Papua
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : National Coordinating Agency for Surveys and Mapping
5. Implementing Agency : National Coordinating Agency for Surveys and Mapping
6. Background and Justification
In the National Mid-Term Development Plan (NMTDP: 2010-2014), it is stated that
development of Indonesia is islands base. Consequently a complete set of data and
information related to each island should be available. In the other hand, one of National
Coordinating Agency for Surveys and Mapping / Badan Koordinasi Survei dan Pemetaan Nasional
(Bakosurtanal) functions is to provide geospatial data all over Indonesia in appropriate scale
according to the use of its data. Recently, Bakosurtanal has produced geospatial data around
80% of Indonesian territory including the most outer small island in various scales. The
remaining unmapped area is Papua, due to the obstacle of data acquisition (yearly cloud
cover). Therefore, to fulfill that purpose, non-optical technique (such as Interferometric
Synthetic Aperture Radar/IFSAR) is very important to be adopted.
The selected area covered in the provision of geo-spatial data in this project is Papua, based on
the following consideration:
a. Fulfillment of the gap
The activity of this project will be as follows:
1) Data acquisition
2) Map production
b. Providing geo-spatial data for various usages i.e.:
1) Developing urban area
2) Economic reason. The high economic value in these islands as having high potential
resources should be empowered to attract investors.
3) Potential disaster area, like Nabire is potential for earthquake.
c. Border coverage. Papua has three borders to the other countries, with Australia, Papua
New Guinea, and Palau. Providing geo-spatial data in Papua will support the social
development in boundary areas and also minimize the conflict with other countries
around boundaries.
7. Scope of Work
a. Densification of National Geodetic framework (Ground Control Points).
National geodetic framework is a network from ground control points. These control
points serve to connect the measurement results to be integrated into a particular
coordinated system. Densification of national geodetic framework will be distributed in
the region of the Republic of Indonesia. Ground control points in Indonesia are referenced
to National Geodetic Datum 1995 (ellipsoid WGS 1984). Densification of national geodetic
framework uses a GPS technology.
8
BB-ID: BBP1-08301-08-063609-1070012
b. Data acquisition in Papua area.
The activity of geospatial data acquisition uses technology IFSAR. It is an aircraft-
mounted sensor designed to measure surface elevation which is used to produce
topographic imagery. Radar pulses are aimed at targets on the earth and the return
ground signals are received by two antennas that record elevations (z) at specific ground
coordinates (x, y). The ground coordinates are determined by Global Positioning System
and Inertial Measurement Unit (IMU) technology. Post-processing of these data produces
topographic information in the form of Orthorectified Radar Imagery (ORRI).
c. Map productions scale of 1:50,000 in Papua area.
Geospatial data for 413,909 sq. km in Papua will be produced following the production of
ORRI and data compilation at scale 1:50,000. The ORRI are black-and-white (grayscale) in
8 or 16-bit with a pixel resolution ranging from 1.25 meters to 2.50 meters. The projection
for ORRI products is a Universal Transverse Mercator (UTM) projection and WGS84
ellipsoid datum.
8. Priority
Regional and Spatial Planning
9. Output and Outcome
a. Output
1) Increased number of data acquisition in Papua area for 413,909 sq. km;
2) Increased number of basic geospatial data in Papua area scale of 1:50,000.
b. Outcome
Providing high benefits by the existence of basic geospatial data.
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 0
Sub Total : US$ 35,000,000
Counterpart Funding
- Central Government : US$ 5,250,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 5,250,000
TOTAL : US$ 40,250,000
9
Meteorology, Climatology, and
Geophysics Agency (Badan Meteorologi, Klimatologi, dan Geofisika / BMKG)
11
BB-ID: BBP1-07501-09-063402-1050014
1. Project Title : Strengthening BMKG’s Climate and Weather Services
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Meteorology, Climatology, and Geophysics Agency
5. Implementing Agency : Deputy Ministry of Meteorology Affairs - Meteorology,
Climatology, and Geophysics Agency
6. Background and Justification
Global warming has caused more frequent severe disasters caused by the extreme weather and
climate in tropical countries such as Indonesia. The natural condition of Indonesia has also
triggered a gigantic tsunami like that occurred in December 2004 which has dramatically
shown the lack of warning system. It has also proven an evidence for the need of
strengthening and upgrading of the infrastructures of the Meteorology, Climatology, and
Geophysics Agency/Badan Meteorologi, Klimatologi, dan Geofisika (BMKG) in the meteorology,
climatology, as well as geophysics.
The proposed project aims at the strengthening of the whole BMKG's meteorological
infrastructure and related information system in order to develop extensively the early
warning and information services provided by BMKG to the community.
The main objective of BMKG is to improve the quality of its services to the Indonesian
community, from general public to all major economic sectors of the country, from marine to
aviation and agronomy.
7. Scope of Work
a. Technical support;
b. Capacity building/human resource development program;
c. Development of meteorology, climatology, and geophysics infrastructure and related
infrastructure system.
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
1) Availability of a set of reliable and modern observation equipment, communications,
analysis, and forecasting of weather and climate;
2) Availability of supporting equipment for the production and dissemination system of
weather and climate information;
3) Availability of fast, precise, and accurate weather and climate information services;
4) Availability of early warning system for both national and regional scope;
5) Knowledge and technological transfer on metrology and climate.
b. Outcome
1) Improving the quality of meteorological and climatological early warning systems
services;
2) Reducing the impact of severe disaster caused by extreme weather and climate
changes.
12
BB-ID: BBP1-07501-09-063402-1050014
10. Project Cost
Foreign Funding
- Loan : US$ 39,200,000
- Grant : US$ 2,000,000
Sub Total : US$ 41,200,000
Counterpart Funding
- Central Government : US$ 4,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,000,000
TOTAL : US$ 45,200,000
13
National Disaster Management
Agency (Badan Nasional Penanggulangan Bencana / BNPB)
15
BB-ID: BBP1-10301-04-063908-1070018
1. Project Title : Procurement of Equipment for Emergency and Post Disaster Phase
2. Duration : 48 months
3. Location : DKI Jakarta
4. Executing Agency : National Disaster Management Agency
5. Implementing Agency : National Disaster Management Agency
6. Background and Justification
Located at the conjunction of three tectonic plates (Eurasian, Pacific, and Australian),
Indonesia becomes one of the most highly exposed to volcanic eruptions and earthquakes in
the world. Not only earthquakes and volcanic eruptions are posing a considerable threat to the
country and its people, they are often triggering other natural disasters like landslides, lava,
floods, and tsunamis.
Many disasters struck Indonesia in these past four years had made lots of victims, damages
(environmental, wealth, and infrastructure), and economic instability. One of the damage that
has big influence in people's life is the infrastructure damage, e.g. clean water supplies.
In emergency of rehabilitation and reconstruction phase, clean water supplies are critically
needed. The damages critically influence the human lives and activities. According to the
standard, clean water consumption in emergency phases is minimum 15 liter per person per
day.
The Government of Indonesia through the National Disaster Management Agency/Badan
Nasional Penanggulangan Bencana (BNPB) as the leading sector in disaster management in
Indonesia has to take serious steps to solve clean water insufficiency in emergency phase and
in rehabilitation and reconstruction phase.
7. Scope of Work
Procurement of equipment for emergency and post disaster phase in the form of mobile water
purification unit, car handling, and mobile command center.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of equipments for emergency and post disaster phase in the form of mobile
water purification unit, car handling, and mobile command center.
b. Outcome
Improving the clean water supplies for communities in regions affected by disasters.
16
BB-ID: BBP1-10301-04-063908-1070018
10. Project Cost
Foreign Funding
- Loan : US$ 10,000,000
- Grant : US$ 0
Sub Total : US$ 10,000,000
Counterpart Funding
- Central Government : US$ 1,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,000,000
TOTAL : US$ 11,000,000
17
National Agency of Drug and
Food Control (Badan Pengawas Obat dan Makanan)
19
BB-ID: BBP1-06301-11-063224-1010020
1. Project Title : Strengthening Drug and Food Control System in Indonesia
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : National Agency of Drug and Food Control
5. Implementing Agency : National Agency of Drug and Food Control
6. Background and Justification
National Agency of Drug and Food Control (NADFC) is a competent authority to perform
drug and food control in Indonesia. The most important responsibilities of NADFC is to assure
the safety, quality, and benefit of drug and food products marketed throughout Indonesia and
in international trade. To carry out its main responsibilities, NADFC conducts full spectrum of
regulatory activities including the following functions: (i) legislation, registration, and
standardization; (ii) pre-audit of licensing and certification of pharmaceutical industries based
on Good Manufacturing Practices/GMP; (iii) pre-marketing evaluation of products including
imports and exports; (iv) post-marketing vigilance, including product sampling and laboratory
testing, inspection of production and distribution facilities, investigation, and law
enforcement; (v) pre-review and post-audit of label, product advertisement, and promotion;
and (vi) public communication, information, and education including public warning.
While facing the ASEAN Free Trade Area (AFTA), the forum of ASEAN Consultative
committee on Standard and Quality of Pharmaceuticals, Food, Cosmetics, Traditional
Medicine, and Health Supplement Product Working Groups is developed to set up drug, food,
traditional medicine, cosmetics, and health supplement harmonization in the field within
ASEAN countries, in particular with the requirement of registration aspects, Quality (Q),
Safety (S), Efficacy (E), and Administrative. The national criteria have served as the basis for
setting up national requirements for evaluation and licensing of drug, food, traditional
medicine, cosmetics, and health supplement products in line with ASEAN requirements and
international standards. Supports from infrastructure and system are essential to achieve the
implementation of these requirements. Therefore, Information Technology (IT)-based system
consisting of several sub-systems is required for the success and fulfillment of the
implementation of those requirements. Establishment of such system could become a sufficient
procedure to evaluate dossier properly. This is intended to speed up the registration process,
therefore to achieve the stakeholder satisfaction at the end. This system is not only for
qualified and safe dossier but also particularly covering all administrative data.
As part of this integrated IT-based system, NADFC will also implement the developing
standards using this IT-based system. Standard is not static, it is dynamic so the IT-based
system is playing important role in communicating the development of standard and review
the standard itself.
Another main task of NADFC is to perform post marketing vigilance that covers operational
investigation to eliminate the violation in drug and food. As law enforcement agency, NADFC
has to provide evidence based, mainly from laboratory testing in order to perform law
enforcement such as in judicial trial. The main challenges for NADFC is to ensure the capacity
of the laboratories, at National and regional level, to carry out routine measurements and to
keep up with the changing in strategic environments such as technology advancement in
production, distribution and transportation; new emerging pathogens; decreasing the quality
and nutrition of the food resources; borderless entry barrier in global trade, life style and
consumption pattern.
20
BB-ID: BBP1-06301-11-063224-1010020
To create a good quality of public service system, NADFC must establish a system that can
maintain and assure the compliance of process. One of the main purposes of implementing
Quality Management System (QMS) within NADFC is to strengthen the organization in doing
its responsibilities according to the predetermined quality standards in order to achieve the
goals and objectives set out in its policy and strategy. Quality system should cover among
organizational structure, responsibilities, procedures and processes within NADFC. The
implementation of QMS in the NADFC is the only way to support and put bureaucracy reform
into realization, increasing transparency and accountability in order to perform good
governance and clean government.
7. Scope of Work
a. Strengthening Pre-Market Control System:
1) Developing an IT-based system for screening of drug, food, traditional medicine,
cosmetics, and health supplement application dossier continuous improvement in the
time line of the drug and food registration process;
2) Developing IT-based system for food product standardization.
b. Strengthening Laboratory Capacity to Support the Control Systems:
1) Establishing national laboratory system;
2) Developing laboratory center of excellences;
3) Developing specific laboratory (vaccine, food additives, pesticides, and heavy metals);
4) Improving laboratory networking;
5) Developing supporting laboratory facilities (maintenance and repair workshop, glass
blowing facilities, animal husbandry, waste treatment facilities, and others);
6) Developing national laboratory for preparation of reference substances;
7) Procurement of laboratory equipments.
c. Developing Quality Management System for NADFC:
1) Initial review for development of QMS;
2) Development of QMS;
3) Training and dissemination of QMS;
4) Implementation of QMS (pilot project);
5) Establishment of QMS;
6) Implementation of QMS (full project);
7) ISO 9001 Certification;
8) Procurement of equipment to support implementation of QMS.
d. Strengthening Human Resource Capacity:
1) Developing human resource standards and conducting gap analysis;
2) Developing job and workload analysis;
3) Assessing organizational structure and staff adjustment needs;
4) Developing training needs assessment;
5) Overseas course and fellowship;
6) Domestic course and degree.
21
BB-ID: BBP1-06301-11-063224-1010020
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Development of IT-based system for screening of drug and food, within the
registration process and IT-based system for development of food product
standardization;
2) Increased safety and quality of food and drug by strengthening the national
laboratory management system;
3) Implementation of Quality Management System for NADFC;
4) Improved capacity of NADFC human resources.
b. Outcome
Improving the drug and food control system in Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 24,311,798
- Grant : US$ 0
Sub Total : US$ 24,311,798
Counterpart Funding
- Central Government : US$ 3,600,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,600,000
TOTAL : US$ 27,911,798
23
Government Internal Control
Agency (Badan Pengawas Keuangan dan Pembangunan / BPKP)
25
BB-ID: BBP1-08901-07-063752-1020022
1. Project Title : Capacity Building within the Government Internal Control System
(GICS) to Achieve Good Governance and Clean Government
2. Duration : 30 months
3. Location : Nationwide
4. Executing Agency : Government Internal Control Agency
5. Implementing Agency : Government Internal Control Agency
6. Background and Justification
With the approval of Government Regulation Number 60/2008 concerning Government
Internal Control System which is intended to support the implementation of Good Governance
and Clean Government, the Government Internal Control Agency/Badan Pengawas Keuangan
dan Pembangunan (BPKP) is positioned as the government institution responsible to report
directly to the President regarding the supervision function of the implementation of
government internal control. At this moment, the Government Internal Control System is not
supported by the availability of an integrated and reliable performance system accountable for
public finance, so the President has not have optimal access to the updated information on the
progress of the government institutions' performance accountability. In this scenario, BPKP
has taken an initiative to strongly support the development of President Accountability System
(PAS). The system is the President's control tool in the implementation of the President's
accountability in the management of public finance. In order to attain this objective, the
Government of Indonesia needs to prepare integrated information systems in all levels of
government agencies, together with the required infrastructure means.
Within this context, BPKP has refined its grand strategy for an integrated information system
and prepared the "Capacity Building within the Government Internal Control System (GICS)
to Achieve Good Governance and Clean Government”.
7. Scope of Work
Procurement of equipment and services for the development of system with the major
activities as following:
a. Detailed project planning;
b. Need analysis;
c. Design and implementation of network infrastructure (Wide Area Network/WAN and
Local Area Networks/LAN);
d. Supply, installation, and configuration of all hardware, software, and peripherals;
e. Analysis, design, development, trial, and installation of the required software application;
f. System initialization;
g. Education and training program;
h. Project management;
i. Program socialization;
j. Technical assistance, maintenance, and warranty program.
8. Priority
Law and State Apparatus
26
BB-ID: BBP1-08901-07-063752-1020022
9. Output and Outcome
a. Output
1) Support for the development of a comprehensive, accurate, updated, and secured
national database on government internal control information;
2) Availability of software and hardware infrastructures for supporting GICS Project
operations;
3) Enhanced network system to facilitate information management and integrate every
working unit within BPKP;
4) Development of customized software applications to provide a complete and accurate
platform for information management in accordance with BPKP business processes;
5) Development of secured and timely exchange of data and information with related
institutions as well as the related stakeholders linked to the BPKP network;
6) Design and implementation of flexible and expandable system to foresee the
increasing workload in line with technology development;
7) A comprehensive transfer of technology and knowledge towards BPKP in order to
support the project sustainability.
b. Outcome
Supporting the attainment of BPKP's strategic objectives.
10. Project Cost
Foreign Funding
- Loan : US$ 34,791,000
- Grant : US$ 0
Sub Total : US$ 34,791,000
Counterpart Funding
- Central Government : US$ 5,219,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 5,219,000
TOTAL : US$ 40,010,000
27
Agency for the Assessment and
Application of Technology (Badan Pengkajian dan Penerapan Teknologi / BPPT)
29
BB-ID: BBP1-08101-03-023521-1040024
1. Project Title : Revitalization of Baruna Jaya Research Vessels and Equipments
Including On-Shore Supporting Facility
2. Duration : 48 months
3. Location : Serang District
4. Executing Agency : Agency for the Assessment and Application of Technology
5. Implementing Agency : Agency for the Assessment and Application of Technology
6. Background and Justification
Based on objectives of the maritime development through science and technology approach,
the existing Research Vessel (RVs) Baruna Jaya 1,2,3, and 4 which have already been dedicated
for marine survey for 20 years need to be supported with an on-shore supporting facility
named as Technology Center for Marine Survey/Pusat Teknologi Survei Kelautan (Pusteksurla).
This center is an infrastructure comprise of jetty, laboratory, warehouse, workshop, office, and
information center of marine data and technology. It also accommodates survey activity, sea
research, and technology assessment to improve the efficiency of survey operation, center of
marine data management, and other function related to the sea research and development.
On the other hand, it also needs to revitalize RVs Baruna Jaya 1,2,3, and 4 as they have already
been 20 years on duty. In addition, in order to run after the advancement of marine survey
equipment, it needs to up-grade the survey equipments.
7. Scope of Work
a. Revitalization of Baruna Jaya vessels;
b. Procurement of goods and equipment and upgrading the existing survey equipment;
c. Design of jetty and laboratory, sample and data processing centers, data centers and
information on marine, warehousing, workshop, office, guest house;
d. Land acquisition for Technology Center for Marine Survey;
e. Construction of Technology Center for Marine Survey;
f. Structuring a management concept of Technology Center for Marine Survey.
8. Priority
Science and Technology
9. Output and Outcome
a. Output
1) Upgraded capabilities of Baruna Jaya research vessels and equipment;
2) Availability of Technology Center for Marine Survey as supporting facility for the
research vessels;
3) Availability of more coordinated marine data management;
4) Availability of sustainable infrastructure and physical facilities in marine research
development.
30
BB-ID: BBP1-08101-03-023521-1040024
b. Outcome
1) Providing scientific-based studies for marine development;
2) Increasing the cooperation and balanced participation of all stakeholders in marine
development;
3) Implementing long-term, systematic, and coordinated ocean observations programs;
4) Developing marine science and technology competence through involvement in
programs in regional and international marine science and technology;
5) Promoting the importance of marine science and technology for sustainable economic
development and improved quality of life;
10. Project Cost
Foreign Funding
- Loan : US$ 10,000,000
- Grant : US$ 0
Sub Total : US$ 10,000,000
Counterpart Funding
- Central Government : US$ 1,597,938
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,597,938
TOTAL : US$ 11,597,938
31
BB-ID: BBP1-08101-03-023521-1040025
1. Project Title : The Development of Industrial Laboratories to Support National
Industry's Competitiveness and Self Reliance
2. Duration : 60 months
3. Location : Tangerang District
4. Executing Agency : Agency for the Assessment and Application of Technology
5. Implementing Agency : Agency for the Assessment and Application of Technology
6. Background and Justification
The objectives of this activity are the construction of new industry oriented laboratories in the
Agency for the Assessment and Application of Technology / Badan Pengkajian dan Penerapan
Teknologi (BPPT) and procurement of laboratories equipments to support the main tasks and
functions of BPPT in technological development field. In line with BPPT's main tasks and
engineering activities, BPPT's laboratories are designed to support industries which can
conduct R-D-E-O activities (research, development, engineering, and operation). The scope of
work of the laboratories is to conduct observation, survey, component testing, simulation,
design & prototyping, performance test, and certification.
In addition to 16 Technology Centers, BPPT has 17 laboratories as working units located in
several areas such as Serpong, Lampung, Yogyakarta, Surabaya, and Bali. However, facilities
within these working units are still insufficient to support the BPPT's main tasks, though
several technology centers have developed their small labs with insufficient facilities and low
safety standards.
The development of new laboratories will be based on the following clusters:
- Cluster I : Transportation and Production Laboratories
- Cluster II : Material and Process Laboratories
- Cluster III : Defense & Security and Information & Communication Technology
Laboratories
- Cluster IV : Geo-technology Laboratories
- Cluster V : New and Renewable Energy Laboratories
- Cluster VI : Other facilities including the Education and Training Center
7. Scope of Work
a. Preparing design/master plan (Detailed Engineering Design);
b. Construction of new industrial oriented laboratories;
c. Procurement of lab equipment for the new labs and the existing labs (upgrading);
d. Operation, test, and evaluation;
e. Laboratories certification.
8. Priority
Science and Technology
32
BB-ID: BBP1-08101-03-023521-1040025
9. Output and Outcome
a. Output
1) Availability of industrial oriented laboratories;
2) Availability of laboratories equipment for the new and upgraded laboratories.
b. Outcome
1) Improving the engineering facilities with international standard to support industry's
competitiveness and self-reliance;
2) Maintaining the equipments to catch up with the development of industry's needs.
10. Project Cost
Foreign Funding
- Loan : US$ 40,000,000
- Grant : US$ 0
Sub Total : US$ 40,000,000
Counterpart Funding
- Central Government : US$ 20,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 20,000,000
TOTAL : US$ 60,000,000
33
Batam Indonesian Free Zone
Authority (Badan Pengusahaan Kawasan Perdagangan Bebas dan Pelabuhan Bebas Batam)
35
BB-ID: BBP1-11201-04-081999-1070027
1. Project Title : Batu Ampar Transshipment Port Development Project
2. Duration : 24 months
3. Location : Batam
4. Executing Agency : Batam Indonesian Free Zone Authority
5. Implementing Agency : Batam Indonesian Free Zone Authority
6. Background and Justification
Rapid industrial growth in Batam has been significantly increasing the number of cargo
containers to enter and exit from Batam. To serve the increasing number of cargo, Batu Ampar
port as one of the main ports in Batam, has reached its maximum capacity of service. As the
consequence, the ships have to wait long enough for docking due to the limited number of
dockyard and loading equipment.
To anticipate this situation, in early 2000 the Batam Authority decided to develop and expand
Batu Ampar port for a container port but remain serving a non-container cargo. In addition,
the strategic position of Batam island in the Malacca strait shipping lane has given the
opportunity to take a business advantage of 55 million TEUs per year of container traffic.
Similarly, 4million TEUs per year container from Indonesia, which currently utilizes Singapore
port for transshipment, is expected to be utilized to conduct transshipment in Batam.
Development plan of Batu Ampar transshipment seaport is a manifestation of one of the
functions of Batam island as a transshipment port, as indicated in article 4 (1) of the
Presidential Regulation Number 41/1973 regarding the industrial area of Batam island.
7. Scope of Work
a. Renovation of the existing berth;
b. Construction of new berth;
c. Dredging of shipping lane and turning basin;
d. Reclamation for a backyard;
e. Construction of North Breakwater;
f. Procurement of equipment.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of new container loading dock with a capacity of 900,000 TEUs per year
2) Improvement of infrastructure and facilities of the port of Batu Ampar.
b. Outcome
1) Increasing the efficiency ratio of loading/unloading of containers to and return from
Batam;
2) Supporting the status of Batam island as a Free Trade Zone.
36
BB-ID: BBP1-11201-04-081999-1070027
10. Project Cost
Foreign Funding
- Loan : US$ 110,000,000
- Grant : US$ 0
Sub Total : US$ 110,000,000
Counterpart Funding
- Central Government : US$ 16,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 16,500,000
TOTAL : US$ 126,500,000
37
BB-ID: BBP1-11201-04-072446-1070028
1. Project Title : The Development of Sewerage System in Batam Island
2. Duration : 60 months
3. Location : Batam
4. Executing Agency : Batam Indonesian Free Zone Authority
5. Implementing Agency : Batam Indonesian Free Zone Authority
6. Background and Justification
In Batam, there has not been established any sewerage services yet. Batam Indonesian Free
Zone Authority considers that this position is not suitable and it poses a threat to public health,
environment, water resources, and to Batam attractiveness as a foreign direct investment
location.
Besides that, now Batam has portable water supplies throughout the island which is developed
and operated by a private sector under concession agreement with Batam Indonesian Free
Zone Authority. However, there is an increasing concern over the rising pollution levels
resulted from disposal of untreated domestic sewage and to a lesser extent industrial effluent.
In recent years, Batam Indonesian Free Zone Authority has prepared plans for financing and
constructing a sewage system for Batam. Technical solutions have been identified for
constructing a collector sewerage system and central treatment facilities to service the
established urban areas of Nagoya and Jodoh as well as the most recent rapidly developing
urban areas of Batam Centre. This project is aimed to reduce reservoir and coastal water
pollution levels and to identify the need of working capital to collect and treat the effluent
from the above target urban centers.
7. Scope of Work
a. Updating the existing plan;
b. Land site preparation and office building construction;
c. Installation of piping network and pumping stations;
d. Establishment of centralized sewage treatment plant;
e. Procurement of sludge collector vehicles;
f. Procurement of sludge treatment facility for receiving septic sludge located in centralized
sewage treatment plant;
g. Provision of sludge disposal facilities (landfill site or other method);
h. Operations and management of the facilities;
i. Public education program.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of adequate infrastructure of sewerage system;
2) Reduced reservoir and coastal water pollution levels.
38
BB-ID: BBP1-11201-04-072446-1070028
b. Outcome
1) Increasing foreign investment by providing a better sewerage service;
2) Developing a healthy and hygienic environment.
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 5,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 5,000,000
TOTAL : US$ 55,000,000
39
National Land Agency (Badan Pertanahan Nasional / BPN)
41
BB-ID: BBP1-05601-08-013023-1070029
1. Project Title : Improving Land Tenure and Land Service Performance
2. Duration : 48 months
3. Location : DKI Jakarta
4. Executing Agency : National Land Agency
5. Implementing Agency : National Land Agency
6. Background and Justification
Land is a major asset for economic and social development of a nation. In a household scale,
control and ownership of land are key elements of family economic support. Legal guarantee
of land rights is an important determinant in the context of the use and utilization of land for
various purposes. Currently the number of land fields that have been enrolled in a formal
system of land registration in Indonesia only reached about 40% of the estimated 89 million
fields (National Medium-Term Development Plan/NMTDP: 2010-2014). To improve the
performance of land registration requires various improvements and acceleration in the land
services framework.
The project is expected to produce a feasibility study in order to improve the performance of
land services and land ownership. It is expected to be a strengthening of land administration
system that has been achieved after the implementation of Land Administration Project and
Land Management and Policy Development Project.
In addition, this project will be the acceleration factor to achieve the NMTDP targets in land
sector especially in the acceleration of assets legalization.
7. Scope of Work
a. Improving land tenure security;
b. Improving land service performance;
c. Capacity and institutional building;
d. Project management.
8. Priority
Regional and Spatial Planning
9. Output and Outcome
a. Output
Availability of land information system.
b. Outcome
1) Providing a complete, centralized, and comprehensive electronic Land Register;
2) Enabling flow of property ownership information required for property taxation;
3) Enabling revenue-generating Land Register services;
4) Improving customer service, including more efficient and effective property transfers
and title searches, transparent and accountable system that meets the operational
needs of all stakeholders.
42
BB-ID: BBP1-05601-08-013023-1070029
10. Project Cost
Foreign Funding
- Loan : US$ 46,305,000
- Grant : US$ 1,890,000
Sub Total : US$ 48,195,000
Counterpart Funding
- Central Government : US$ 7,229,250
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,229,250
TOTAL : US$ 55,424,250
43
BB-ID: BBP1-05601-08-063044-1070030
1. Project Title : Institutional Partnership for Strengthening Land Administration
in Indonesia (IPSLA Phase II)
2. Duration : 36 months
3. Location : DKI Jakarta
4. Executing Agency : National Land Agency
5. Implementing Agency : National Land Agency
6. Background and Justification
Land development program has been considered as a peripheral sector within the national
development programs since several decades ago, nevertheless the land management and
service are ironically urged to be perfect, but it is demanded without any support of adequate
infrastructures. Land administration is the process of determining, recording, and
disseminating information about ownership, value, and use of land by implementing land
policies (United Nation Economic Commission for Europe, 1996).
The overlapping of land ownerships, the unbalanced and speculation of land ownerships, the
reality of uncontrolled land value and market, the poor of public land services, and the
weakness of land resource use monitoring are only parts of problems on the lack of cadastral
and land resource infrastructures in Indonesia. A good land administration management is
believed, and has been proven by developed countries, to be able to contribute to economic
development, to reduce poverty, to improve the quality of environment, and to give certainty
and security of land ownership and land use. Institutional Partnership for Strengthening Land
Administration in Indonesia (IPSLA Phase I) has been started in 2005 and has been
successfully implemented. IPSLA Phase II is the continuation of IPSLA Phase I in order to
achieve those development goals.
7. Scope of Work
a. Bureaucratic reform and good governance;
b. Sustainable environmental development;
c. Poverty reduction and food security through improving land tenure security.
8. Priority
Regional and Spatial Planning
9. Output and Outcome
a. Output
1) Improved land service performance and land office infrastructures;
2) Land law reform focusing on land use and spatial planning policy development;
3) Accelerated land registration and informal settlement regularization.
b. Outcome
Increasing the efficient methodology for the implementation of land administration
reform so as to accelerate economic development and poverty reduction.
44
BB-ID: BBP1-05601-08-063044-1070030
10. Project Cost
Foreign Funding
- Loan : US$ 49,398,548
- Grant : US$ 2,338,102
Sub Total : US$ 51,736,650
Counterpart Funding
- Central Government : US$ 7,760,498
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,760,498
TOTAL : US$ 59,497,148
45
BB-ID: BBP1-05601-08-013023-1070031
1. Project Title : The Development of National Land Management Information System
2. Duration : 36 months
3. Location : DKI Jakarta
4. Executing Agency : National Land Agency
5. Implementing Agency : National Land Agency
6. Background and Justification
The availability of complete, updated, and accurate information of land has become an urgent
need for the development. Many development activities cannot be accomplished on schedule
or even cancelled due to be hampered by the lack of accurate information about land.
By this consideration and in line with the strategic plan of National Land Agency (NLA)/Badan
Pertanahan Nasional in order to implement the National Medium-Term Development Plan, the
development of infrastructure and information system of land has been a priority.
The application of information technology in NLA is a part of the main strategies in directing
the performance of NLA functions in order to achieve the following objectives:
a. Supporting the national program of poverty alleviation, economic growth, and sustainable
development through the implementation of reliable land administration systems in
Indonesia;
b. Shortening the time of service to the community;
c. Storing information related to land in form of digital media that will enable NLA to
process the completed database and structured data including the position and
identification of soil geography, land use, and land ownership;
d. Validation and improvement of the quality of information;
e. Standardization of data and information in the NLA system that allows the tracking and
maintenance of an efficient data;
f. Access of NLA in the data and information available at the offices of NLA current level of
flexibility and high accuracy;
g. Efficiency in the implementation of policy changes in land area;
h. Enabling NLA to exchange information between the offices of different levels with various
kinds of flexibility and accuracy;
i. Improving skills in the field of NLA range of information technology.
7. Scope of Work
Providing management information system on national land in Indonesia including hardware,
data and information center, training center, network infrastructure and application system
development.
8. Priority
Regional and Spatial Planning
46
BB-ID: BBP1-05601-08-013023-1070031
9. Output and Outcome
a. Output
1) Availability of complete, updated, and accurate data and information of land:
migration, collection, entry, process, and storage as well as cadastral, land rights, land
use, and land value;
2) Availability of hardware, software, network, system application, and installation;
3) Well trained human resources in using the system.
b. Outcome
1) Supporting the National Program of Poverty Reduction, Economic Growth, and
Sustainable Development through the implementation of land administration system
in Indonesia;
2) Accelerating of public services;
3) Storing of information related to land in form of digital media, so that making it easy
for NLA to manage completed and structured database including, the land
geographical position and identification, land right, and land ownership;
4) Validation and improvement of the quality of information;
5) Standardization of data and information systems in NLA, so it is easy to navigate and
manage;
6) Access of NLA to the data and information in the offices, with a level of flexibility and
high accuracy;
7) An efficient implementation of changes policies related to land and especially in
recent modifications produced by the new regulations concerning Land Registration
set by the Government of Indonesia;
8) Facilitating the NLA to exchange information between different levels of office in a
flexible and accurate way;
9) Increasing the capacity of NLA staff in the field of information technology.
10. Project Cost
Foreign Funding
- Loan : US$ 42,895,796
- Grant : US$ 0
Sub Total : US$ 42,895,796
Counterpart Funding
- Central Government : US$ 6,434,365
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,434,365
TOTAL : US$ 49,330,161
47
Statistics Indonesia Agency (Badan Pusat Statistik / BPS)
49
BB-ID: BBP1-05401-02-062952-1040032
1. Project Title : Statistical Capacity Building - Change and Reform for the
Development of Statistics
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : Statistics Indonesia Agency
5. Implementing Agency : Statistics Indonesia Agency
6. Background and Justification
High quality and reliable statistics resulted in a timely manner is an essential part in the
process of formulating a policy. The Statistical Capacity Building-Change and Reform in
Development of Statistics (STATCAP-CERDAS) is a program culminated in the achievement of
high quality and reliable statistical data. This is a change and reform program on statistics
development as a part of strengthening the National Statistics System of Indonesia,
particularly in providing qualified statistical products in a systematic working system without
any distortion as well as being supported by professional human resources and modern
communication information technology.
The improvement of statistical activities capacity in Statistic Indonesia Agency/Badan Pusat
Statistik (BPS) is done to answer the increase of demand on statistics information to support the
process of decentralization of governance administration. BPS is a competent institution in
producing and disseminating basic statistics based on international standard. BPS needs to
create strategic options due to its duties in collecting and disseminating statistics data.
7. Scope of Work
a. Improving the quality of statistics data
1) Improving the quality of statistic data on National Balance System/Sistem Neraca
Nasional (SNN), large and medium industries, price index (manufacturers and
wholesales), export-import, National Socio-economic Survey/Survei Sosial-Ekonomi
Nasional (SUSENAS), National Work Force Survey/Survei Angkatan Kerja Nasional
(SAKERNAS)
2) Improving the quality of survey management, survey methodology, statistics
analysis, relationship with data users, and the efficiency of data dissemination
b. Developing Information and Communication Technology (ICT) platform and Information
Management
1) Developing online services for internal or external data users;
2) Establishing ICT Standardization (architecture, procedure, hardware, and software);
3) Developing ICT infrastructure generally;
4) Developing ICT and human resource control.
c. Improving Human Resource Capacity
1) Improving policy and procedure of human resource development in BPS;
2) Improving learning, training, and the effectiveness of education center;
3) Establishing system related to the development of human resource.
50
BB-ID: BBP1-05401-02-062952-1040032
d. Institutional Arrangement and Management
1) Improving the effectiveness and efficiency of BPS arrangement and organization;
2) Improving the role of major inspectorate.
8. Priority
National Development Management Support System
9. Output and Outcome
a. Output
1) Improved quality of statistics data provided by BPS;
2) Improved capacity of ICT;
3) Improved capability and professionalism of human resource in BPS;
4) Improved effectiveness and efficiency of institutional management.
b. Outcome
Improving capacity, capability, and credibility of BPS to provide qualified statistical
products in a systematic working system without any distortion as well as being
supported by professional human resources and modern information technology.
10. Project Cost
Foreign Funding
- Loan : US$ 65,000,000
- Grant : US$ 0
Sub Total : US$ 65,000,000
Counterpart Funding
- Central Government : US$ 18,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 18,000,000
TOTAL : US$ 83,000,000
51
National Search and
Rescue Agency (Badan SAR Nasional / Basarnas)
53
BB-ID: BBP1-10701-04-063959-1060033
1. Project Title : Procurement of 80 M Type Search and Rescue Vessel Project
2. Duration : 36 months
3. Location : DKI Jakarta
4. Executing Agency : National Search and Rescue Agency
5. Implementing Agency : National Search and Rescue Agency
6. Background and Justification
At present the need for search and rescue vessel to conduct Search and Rescue (SAR) mission
is considerably an urgent one, especially to conduct SAR mission at the sea that is respectively
increasing in the time to come. The need for SAR vessel is considerably important especially to
carry a helicopter with appropriate size.
7. Scope of Work
a. Consultancy;
b. Procurement of 3 (three) units of SAR vessels;
c. Procurement of vessel’s spare part and SAR equipment;
d. Training and familiarization for vessel crew.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of 80 m type SAR vessels to support successful SAR mission.
b. Outcome
1) Increasing the capability of National Search and Rescue Agency to deliver fast
response time to any maritime accident by the availability of appropriate facility;
2) Minimizing the number of casualty in any maritime accident by delivering fast
response.
10. Project Cost
Foreign Funding
- Loan : US$ 76,500,000
- Grant : US$ 0
Sub Total : US$ 76,500,000
Counterpart Funding
- Central Government : US$ 13,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 13,500,000
TOTAL : US$ 90,000,000
54
BB-ID: BBP1-10701-04-063959-1060034
1. Project Title : Procurement of Search and Rescue Equipment for Medium Type
Helicopter
2. Duration : 12 months
3. Location : DKI Jakarta
4. Executing Agency : National Search and Rescue Agency
5. Implementing Agency : National Search and Rescue Agency
6. Background and Justification
In accordance with the Search and Rescue (SAR) helicopter procurement project year 2010,
National Search and Rescue Agency/Badan SAR Nasional (Basarnas) is lack of supporting
equipment in the SAR aircraft, so it needs for additional rescue equipment in the SAR
operations. The aircrafts are still in the standard type. Therefore, the planes are needed to be
modified by the addition of Search and Rescue equipment system appropriate for the ability to
conduct SAR operations.
7. Scope of Work
a. Procurement of SAR helicopter equipment system in the form of:
1) Infrared camera;
2) Radar weather;
3) Radio system;
4) Moving map system;
b. Procurement of system rescue helicopter:
1) Hoist;
2) Emergency floating;
3) Inflatable life raft.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of helicopter rescue equipment for SAR missions in Indonesia.
b. Outcome
Increasing the capacity of National Search and Rescue Agency to deliver fast response.
10. Project Cost
Foreign Funding
- Loan : US$ 8,500,000
- Grant : US$ 0
Sub Total : US$ 8,500,000
Counterpart Funding
- Central Government : US$ 1,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,500,000
TOTAL : US$ 10,000,000
55
BB-ID: BBP1-10701-04-063959-1060035
1. Project Title : Procurement of Search and Rescue Helicopter Medium Range
Project - Phase I
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : National Search and Rescue Agency
5. Implementing Agency : National Search and Rescue Agency
6. Background and Justification
Helicopter is the most efficient major device in the Search and Rescue (SAR) effort because it is
faster and covers a wider search area within the specified time. Helicopter is particularly
needed for distributing materials, such as survival equipment, and delivering SAR and
medical personnel. It is an important facility to evacuate victims from the location. In addition,
it can provide direction to other SAR units to get to the location and also provide
communication aid to the main unit of SAR. Considering the importance of this device, the
National Search and Rescue Agency considers to add more units of helicopters in order to
improve its performance in providing SAR services, particularly to respond flight and
shipping accident as well as other disaster.
7. Scope of Work
a. Procurement of 4 (four) units of SAR medium range helicopter;
b. Training for technician and crew;
c. Procurement of helicopter spare parts.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of 4 (four) units of SAR medium range helicopters.
b. Outcome
1) Improving National Search and Rescue Agency/Badan SAR Nasional (Basarnas)
capability to respond flight and shipping accident as well as other disaster;
2) Strengthening the skill and capability of rescue team in operating SAR helicopter for
Search and Rescue operation.
10. Project Cost
Foreign Funding
- Loan : US$ 42,500,000
- Grant : US$ 0
Sub Total : US$ 42,500,000
Counterpart Funding
- Central Government : US$ 7,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,500,000
TOTAL : US$ 50,000,000
57
Ministry of Religious Affair (Kementerian Agama)
59
BB-ID: BBP1-02504-04-072167-1010046
1. Project Title : Development of Teaching Hospital Faculty of Medicine and Health
Science of Islamic State University (UIN) Syarif Hidayatullah
Jakarta
2. Duration : 60 months
3. Location : Tangerang City
4. Executing Agency : Ministry of Religious Affairs
5. Implementing Agency : Syarif Hidayatullah State Islamic University (UIN) of Jakarta
6. Background and Justification
Syarif Hidayatullah State Islamic University/Universitas Islam Negeri (UIN) of Jakarta is a
university under the umbrella of the Ministry of Religious Affairs. UIN is one of the twelve
best universities in this country.
In 2004 UIN opened Faculty of Medicine and Health Sciences (FMHS). At the same time, this
faculty admitted new medical students and other health students in the following year. This
faculty is opened with the aim to be an institution of medical education that is able to integrate
the scientific aspect of medical field with Islam and Indonesian spirit. This faculty is expected
to be able to produce sufficient medical doctors and other health experts in meeting the
shortage of human resources.
A good medical higher education should be carried out not only in a good classroom but also
in a good hospital as a place for applying the theory into practice. This hospital is well known
as a teaching hospital. Therefore, for the purpose of maintaining and improving the quality of
medical education in UIN, FMHS has provided its own teaching hospital. In Indonesia, this
proposed hospital will be a model of teaching hospital possessed by a university or University
Hospital.
The establishment of the teaching hospital is also intended to fulfill the increasing demands for
medical services which are still considered insufficient for the people of Tangerang district and
city in particular and Jakarta as well as Banten province in general.
7. Scope of Work
a. Construction of hospital building;
b. Procurement of medical equipment and other supporting facilities;
c. Consulting services (project management and engineering services).
8. Priority
Social, Cultural, and Religious Affair
9. Output and Outcome
a. Output
Availability of teaching hospital in Syarif Hidayatullah Islamic State University of Jakarta.
b. Outcome
Improving the medical education and services.
60
BB-ID: BBP1-02504-04-072167-1010046
10. Project Cost
Foreign Funding
- Loan : US$ 60,000,000
- Grant : US$ 0
Sub Total : US$ 60,000,000
Counterpart Funding
- Central Government : US$ 6,750,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,750,000
TOTAL : US$ 66,750,000
61
BB-ID: BBP1-02504-01-072167-1010047
1. Project Title : The Development of the State Institute of Islamic Studies (IAIN)
Mataram, West Nusa Tenggara
2. Duration : 48 months
3. Location : Mataram
4. Executing Agency : Ministry of Religious Affairs
5. Implementing Agency : The State Institute of Islamic Studies (IAIN) Mataram
6. Background and Justification
The State Institute of Islamic Studies/Institut Agama Islam Negeri (IAIN) Mataram was
established in 1966. IAIN Mataram has three faculties of Tarbiyah, Shariah, and Dakwah
supervising 12 study departments. The strategic point of the only State Islamic higher
education in Southern East Indonesia makes IAIN Mataram is highly targeted by prospective
students-especially those who live in West Nusa Tenggara, Bali, and East Nusa Tenggara.
The statistics shows that IAIN Mataram has got increasing numbers of students for years.
Recently, it has more than 4,000 students. Therefore, the facilities of campus available in
campus I are considered inadequate to accommodate conducive academic standards. Hence,
IAIN Mataram has been already doing a gradual action of newly campus site building in
campus II in the 14 hectare land.
This good action however is hindered by the limited funding of the Ministry of Religious
Affairs and student’s contribution. To accelerate the program, IAIN stakeholders are now
thinking of proposing the invested fund from the foreign financial support. The foreign
financial support will be allocated for the building of facilities, and the capacity building for
the teaching staffs. Shortly it will contribute to the adequate availability of facilities and
enhancing the capacity of human resources. This will lead to the improvement of West Nusa
Tenggara development and Indonesia in general.
7. Scope of Work
a. Restructuring and modernization of the IAIN curriculum with relevant modern
disciplines;
b. Upgrading and developing selected existing departments;
c. Establishing the post-graduate and other programs in Islamic Studies matching with
community development in East Indonesia;
d. Capacity building for staffs through training and assistance;
e. Adding and strengthening learning facilities such as laboratories, libraries, and centers;
f. Enlarging university network with other institutions, industries, government, donors and
NGO's;
g. Assisting other selected private Islamic higher education and Islamic Boarding School
(pesantren) in engaging the restructured curricula;
h. Supporting IAIN to get International Organization for Standardization (ISO) certification
in academic services.
8. Priority
Social, Cultural, and Religious Affair
62
BB-ID: P BBP1-02504-01-072167-1010047
9. Output and Outcome
a. Output
1) Availability of new building;
2) Restructured IAIN curriculum which is compatible with modern disciplines;
3) Established post-graduate and other programs in Islamic Education Program and
Low Program matched with community development in East Indonesia;
4) Availability of skillful and well trained staffs;
5) Enlarged university networking with other institutions, industries, government,
donors and NGO's;
6) Achievement of ISO Certification in academic services is obtained by IAIN Mataram.
b. Outcome
Improving the educational services of IAIN Mataram.
10. Project Cost
Foreign Funding
- Loan : US$ 30,000,000
- Grant : US$ 0
Sub Total : US$ 30,000,000
Counterpart Funding
- Central Government : US$ 4,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,500,000
TOTAL : US$ 34,500,000
63
BB-ID: BBP1-02504-01-072167-1010441
1. Project Title : The Development of the State Institute of Islamic Studies (IAIN)
Raden Fatah Project
2. Duration : 48 months
3. Location : Mataram
4. Executing Agency : Ministry of Religious Affairs
5. Implementing Agency : The State Institute of Islamic Studies (IAIN) Raden Fatah
6. Background and Justification
The State Institute of Islamic Studies/Institut Agama Islam Negeri (IAIN) Raden Fatah was
established on October 22nd, 1964 in South Sumatera. It has 5 (five) faculties of Syari’ah,
Tarbiyah, Ushuluddin, Adap, and Dakwah, and Post Graduate Program.
Some efforts have been conducted by IAIN Raden Fatah in order to achieve its vision to be the
center of excellence of Islamic higher education. However, the support of modern facilities and
infrastructure, including the use of up-to-date technology, is deemed necessary. Education
facilities and infrastructure in IAIN Raden Fatah will be developed comprehensively either for
direct learning center or for overall IAIN activities.
By improving the quality of its learning process, research, and public services, it is expected to
produce qualified graduates which meet the market demand, workforce with high qualified
knowledge and skills. The facilities and infrastructure of IAIN Raden Fatah campus is also
expected to become the pride of South Sumatera community and become one of the tourist
destination and reference for city development in the future with its modern architecture
founded on Islamic and local culture.
7. Scope of Work
a. Development of infrastructure and facilities;
b. Consulting services;
c. Capacity building for IAIN Raden Fatah’s lecturers and staffs;
d. Development of curriculum.
8. Priority
Social, Cultural, and Religious Affair
9. Output and Outcome
a. Output
1) Availability of Islamic higher education which has capability to develop numerous
sciences and technology sector relevant to community requirement and in conformity
to Islamic basic value;
2) Generated scientists and scholars who posses balanced intellectual, emotional, and
spiritual maturity and capable to perform professionally with high community
service spirit;
3) Generated academic publication and relevant qualified vision in numerous science
sectors to improve the quality of community life.
64
BB-ID: P BBP1-02504-01-072167-1010441
b. Outcome
1) Becoming a center of excellence of Islamic higher education;
2) Developing a scientific paradigm which integrates Islamic basic sciences with modern
science and technology;
3) Developing education, research activities, and public services relevant to potencies,
requirement and problems of the community life;
4) Developing academic infrastructure to support numerous scientific activities for
lecturer, students, and society in general;
5) Developing academic culture to support and encourage study awareness and propel
academic activities.
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 0
Sub Total : US$ 35,000,000
Counterpart Funding
- Central Government : US$ 6,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,000,000
TOTAL : US$ 41,000,000
65
BB-ID: BBP1-02504-01-072167-1010048
1. Project Title : The Development of the State Institute of Islamic Studies (IAIN)
Sulthan Thaha Saifuddin Jambi
2. Duration : 36 months
3. Location : Jambi
4. Executing Agency : Ministry of Religious Affairs
5. Implementing Agency : The State Institute of Islamic Studies (IAIN) Sulthan Thaha
Saifuddin Jambi
6. Background and Justification
The State Institute of Islamic Studies (IAIN) Sulthan Thaha Saifuddin in Jambi requires
development efforts in order to improve the quality of graduates produced. In addition, there
are several other reasons as background, i.e.:
a. Globalization issues and the rapid changes of structure affect the need of skilled labors to
enter the competitive market opportunity;
b. Tendency of the thought mainstream changes which consider education should be holistic
and responsible to prepare the students with knowledge, attitude, determination, and
functional skills;
c. It is a great need of the availability of sufficient infrastructure and equipment in an effort
to support the improvement of the human resources quality;
d. A great demand of Moslems, as they are majority in Jambi, for competent graduates in the
field of law, especially Islamic law, as stipulated in their adage “the customs are based on
syara (religious teaching), and syara is based on the Holy Book (Qur’an)”;
7. Scope of Work
a. Developing faculties and study programs;
b. Establishing sufficient means and appliances;
c. Reinforcement and empowering human resources quality.
8. Priority
Social, Cultural, and Religious Affair
9. Output and Outcome
a. Output
Availability of education buildings for four faculties and one post graduate program and
any other supporting facilities of IAIN Sulthan Thaha Saifuddin.
b. Outcome
Improving the educational services of IAIN Sulthan Thaha Saifuddin Jambi.
10. Project Cost
Foreign Funding
- Loan : US$ 30,000,000
- Grant : US$ 0
Sub Total : US$ 30,000,000
Counterpart Funding
- Central Government : US$ 4,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,500,000
TOTAL : US$ 34,500,0000
66
BB-ID: BBP1-02504-01-072167-1010049
1. Project Title : The Development of the State Institute of Islamic Studies (IAIN)
Sumatera Utara Project
2. Duration : 36 months
3. Location : Medan
4. Executing Agency : Ministry of Religious Affairs
5. Implementing Agency : The State Institute of Islamic Studies (IAIN) Sumatera Utara
6. Background and Justification
Established in 1973, IAIN Sumatera Utara consists of four faculties (Tarbiyah, Syari'ah, Dakwah
and Ushuluddin) and one Graduate Program (Masters and Doctorate Programs). Located in the
city of Medan, the capital of the province of North Sumatra, IAIN Sumatera Utara has a
strategic educational destination not only for the Moslems in the province but also for those
Moslems from other provinces in the island of Sumatera as well as from abroad like Malaysia
and Thailand.
Nowadays IAIN Sumatera Utara has 8,000 students distributed in various faculties and
Graduate Programs. However, this rise has thus far not been followed by the improvement of
the supporting academic facilities, the standardized one. By this consideration, the
development of IAIN Sumatera Utara is a necessity. However, due to limitation of budget
support allocated by the government and students fees, these could not solve the problem of
the lack of infrastructure in IAIN Sumatera Utara, and hence alternative effort is required. In
order to fulfill this need, foreign financial support is needed.
On the whole, such financial support will be used for building construction, facilities, human
resource development of academic staffs. To put it differently, the availability of sufficient
supporting facilities, the improvement of the quality of human power and academic
productivity would contribute to the social development in North Sumatra in particular and
Indonesian community in general.
7. Scope of Work
a. Restructuring and modernizing IAIN Sumatera Utara curriculum with relevant modern
disciplines;
b. Upgrading and developing selected existing departments;
c. Upgrading the post graduate and other programs in Islamic Studies matching with
community development in North Sumatera Province;
d. Capacity building for staffs through training and assistance;
e. Increasing and strengthening learning facilities such as laboratories, libraries, and study
centers;
f. Enlarging the university network with other institution industries, government, donors,
and Non Government Organizations (NGOs);
g. Supporting IAIN Sumatera Utara to get International Organization for Standardization
(ISO) certification in academic services.
8. Priority
Social, Cultural, and Religious Affair
67
BB-ID: BBP1-02504-01-072167-1010049
9. Output and Outcome
a. Output
1) Availability of new buildings and other infrastructures in IAIN Sumatera Utara;
2) Restructured IAIN Sumatera Utara curriculum compatible with modern disciplines;
3) Establishment of post graduate and other programs in Islamic Education programs
and other low programs matching with community development in North Sumatera
Province;
4) Availability of skillful and well-trained staff;
5) Enlarged university networking with other institutions such as industries,
government, donors, and NGOs;
6) Achievement of ISO Certification in academic services.
b. Outcome
Improving the education services of IAIN Sumatera Utara.
10. Project Cost
Foreign Funding
- Loan : US$ 30,000,000
- Grant : US$ 0
Sub Total : US$ 30,000,000
Counterpart Funding
- Central Government : US$ 4,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,500,000
TOTAL : US$ 34,500,000
68
BB-ID: BBP1-02504-01-072167-1010050
1. Project Title : The Development of the State Institute of Islamic Studies (IAIN)
Sunan Ampel Surabaya Project
2. Duration : 36 months
3. Location : Surabaya
4. Executing Agency : Ministry of Religious Affairs
5. Implementing Agency : The State Institute of Islamic Studies (IAIN) Sunan Ampel
Surabaya
6. Background and Justification
IAIN Sunan Ampel was established in 1961. It has five (5) faculties, with 21 departments,
including Master and Doctoral program. The number of IAIN's students has been reasonably
increased. In 2008-2009, IAIN Sunan Ampel had 6,717 students and 365 lecturers. The
development of this institution is related to its strategic position where IAIN is located in
Surabaya, known as INDARMADI (industry, trading, maritime, and education), and is
accessible from many regions. Its contribution toward the high qualified educational outputs
and academic thoughts is unquestionable. However, from infrastructure perspective, the 9
hectare campus is lack of building or classes, and the existed building is not appropriate to
support high qualified educational process.
The efforts to develop infrastructure have been done by the IAIN, however, due to the
limitation of budget, to fulfill the ideal needs cannot be realized. So, it is a big concern for the
IAIN to realize high qualified education by proposing the greater amount of funding from the
foreign financial support. The foreign sources financial support will be supported by the
funding from the government of Indonesia. The government of Indonesia (GoI')s budget will
be used to develop human resources development, curriculum development, and feasibility
study, while the foreign source budget is mainly allocated for building infrastructure. The
development of IAIN Sunan Ampel is expected to give a great contribution to society of East
Java and Indonesia in general.
IAIN Sunan Ampel tries to become the center of excellence of developing Islamic studies.
There are, at least, 4 (four) major programs to reach IAIN's vision:
a. Institutional development;
b. Academic development;
c. Capacity building; and
d. Community empowerment.
Institutional development has been done by the IAIN by means of opening new departments
which can fulfill the demand of society. To fulfill this development, IAIN needs good
infrastructures. Academic development is related to improve the quality assurance in
education, and finally to reach International Organization for Standardization (ISO)
accreditation in educational matters. Capacity building is addressed to support high qualified
lecturers, administrative staffs, and students through pursuing their study and trainings.
Finally, the first three efforts will give a great impact to empower society both through
education in classes and direct service to society by means of programs of community service.
69
BB-ID: BBP1-02504-01-072167-1010050
7. Scope of Work
a. Construction of class romms, office, and other supporting buildings;
b. Procurement of laboratorium equipment;
c. Development of information and communication technology network and facilities;
d. Development of modern curriculum;
e. Technical assistance in effort to obtain ISO accreditation in academic services.
8. Priority
Social, Cultural, and Religious Affair
9. Output and Outcome
a. Output
1) Availability of high qualified learning infrastructure;
2) Availability of high qualified human resources;
3) Availability of modern curriculum to support high quality of learning process;
4) Availability of better networking among institutions particularly between higher
institutions;
5) Achievement of ISO certification in academic services.
b. Outcome
Increasing the capacity of qualified higher education of IAIN Sunan Ampel for the
community in East Java and Eastern Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 0
Sub Total : US$ 35,000,000
Counterpart Funding
- Central Government : US$ 6,204,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,204,000
TOTAL : US$ 41,204,000
70
BB-ID: BBP1-02504-01-072167-1010051
1. Project Title : The Development of Walisongo State Institute of Islamic Studies
2. Duration : 36 months
3. Location : Semarang
4. Executing Agency : Ministry of Religious Affairs
5. Implementing Agency : The State Institute of Islamic Studies (IAIN) Walisongo
6. Background and Justification
Anticipating the global competitiveness, these recent years IAIN Walisongo has prepared its
position in the Indonesian higher education. Some analysis has been prepared in responding to
(1) the need and perception of communities regarding the contribution of IAIN Walisongo in
the community and its graduates in labour market; (2) the restructuring of IAIN Walisongo in
terms of Government of Indonesia policy on higher education autonomy, which result in the
organizational change of IAIN to be Public Service Organization/Badan Layanan Umum (BLU)
typed organization; (3) internal IAIN's request to extend and increase its capacity building.
This awareness has made IAIN Walisongo preparing its Business Strategic Plan. One of the
evaluation of this analysis shows that IAIN Walisongo currently is in the position of growing.
It means that IAIN Walisongo has to utilize optimally all external opportunities to develop the
organization. Some cases of external opportunities are (1) wider mandate policy, (2) tendency
of education budget increase, (3) large coverage area of education or students.
For the next five years, IAIN Walisongo Semarang has four strategic goals based on four
perspectives, namely (1) stakeholders, (2) administrative and finance, (3) teaching and learning
process, and (4) ethic and culture of working perspective. The strategic goal based on
stakeholder perspective is the increase of quality of education, research, and the participation
of IAIN Walisongo in social empowerment. The strategic goal based on administrative and
finance perspective is the increase of transparency, accountability, efficiency, and effectiveness
of financial management. The strategic goal based on teaching and learning process is the
increase of teaching learning process and continually service. Then the strategic goal based on
ethic and culture of working perspective is the increase of professionalism and productivity of
officials.
7. Scope of Work
a. Construction of new buildings for postgraduate offices and classes, Policlinic, Training
Center, Small Medium Enterprises offices, classes, laboratories, offices and administration,
lecturer's room, library, dormitory for men and women, and medical center;
b. Development of infrastructure to support the need of academic activities, including (1)
electricity and mechanical installation, (2) generator set for several rooms, (3) fire
protection system, (4) fiber optic between buildings, (5) hot spot (wi-fi facility) for certain
rooms, and (6) road, paving and drainage;
c. Procurement of equipment, including (1) multi media, (2) computing lab, (3)
medical/polyclinic equipment, (4) industrial based Math, Chemistry, Physic, and Biology,
(5) Falaq lab, (6) physiology and psychology, (7) language center, and (8) university
management automation system.
8. Priority
Social, Cultural, and Religious Affair
71
BB-ID: BBP1-02504-01-072167-1010051
9. Output and Outcome
a. Output
Availability of infrastructure and facilities for better education services in IAIN Walisongo.
b. Outcome
Improving the capacity of IAIN Walisongo to be research and development agent,
lecturing university, and dakwah (missionary activity) university integrally.
10. Project Cost
Foreign Funding
- Loan : US$ 28,750,000
- Grant : US$ 0
Sub Total : US$ 28,750,000
Counterpart Funding
- Central Government : US$ 5,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 5,000,000
TOTAL : US$ 33,750,000
73
Ministry of Home Affairs (Kementerian Dalam Negeri)
75
BB-ID: BBP1-01005-10-131285-1030052
1. Project Title : National Program for Self-Reliant Rural Community
Empowerment
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Home Affairs
5. Implementing Agency : Ministry of Home Affairs
6. Background and Justification
The Government of Indonesia supports the National Program for Community Empowerment
which was started in 2007 initially noted by scaling up the Sub-district/Kecamatan
Development Program (KDP) and Urban Poverty Program (UPP) as the lead of the program.
National Program on Community Empowerment through KDP provides a new "approach" in
fighting against poverty. The community-based planning process provides a powerful and
efficient way to build large amounts of simple productive infrastructure using mechanisms
that mobilize and develop the capacities of rural communities themselves. In addition to
community capacities development, they can also take a more active role in improving the
quality of other social services.
KDP and its urban counterpart UPP now form a main pillar of the government's national
poverty reduction strategy and both projects will eventually cover all of the rural and urban
villages in Indonesia. KDP's scaling-up takes place in the context of institutional collapse,
major economic crisis, and one of the world's largest decentralization programs.
7. Scope of Work
a. Providing grants for sub-district community;
b. Technical assistance/community facilitators in provinces, districts, and villages target;
c. Providing revolving funds and credit for economic activities;
d. Providing basic productive infrastructure and social infrastructure;
e. Strengthening the capacity of community and local government in participatory
development;
f. Strengthening the participatory development and women participation on planning and
development decision making.
8. Priority
Mainstreaming and cross-sector
9. Output and Outcome
a. Output
1) Availability of goods and services attainable by the community employment
opportunities development through neighborhood infrastructure development
(community procurement or self-managing), local economic development, human
resource development, internalizing of pro-poor development program;
2) Improved community participation as a foundation of rural-based democratic
process;
76
BB-ID: BBP1-01005-10-131285-1030052
3) Building community's self-belonging of asset and the product development output;
4) Improved capacity of communities local government officials and government
officials;
5) Increased pro-poor planning and budgeting effectiveness;
6) Improved employment opportunity.
b. Outcome
1) Improving the services for the rural poor through democratic and participatory
processes;
2) Providing funds transparently to community based organization and local
government to provide services to the rural poor;
3) Reducing the poverty.
10. Project Cost
Foreign Funding
- Loan : US$ 946,300,000
- Grant : US$ 0
Sub Total : US$ 946,300,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 946,300,000
77
BB-ID: BBP1-01006-04-061242-1060053
1. Project Title : Simeuleu Physical Infrastructure - Phase II
2. Duration : 36 months
3. Location : Simeulue District
4. Executing Agency : Ministry of Home Affairs
5. Implementing Agency : Directorate General of Regional Planning, Ministry of Home
Affairs
6. Background and Justification
Poverty is overwhelmingly a problem in Indonesia. The causes of rural poverty include the
lack of access to health, education, safe water, sanitation services, and an absence of economic
opportunities compounded by the poor rural connectivity - lack of infrastructure in isolated
areas with difficult geography and inadequate market linkages. The government has issued a
poverty reduction action plan around the theme of “increasing employment opportunities and
accelerating poverty reduction”. During the development implementation, it is also learned
that capacity of the poor people and community itself to engage on poverty reduction program
is key to ensure sustainability of poverty alleviation efforts.
This poverty alleviation program has been conducted in all provinces in Indonesia, including
in Nanggroe Aceh Darussalam (NAD). Simeulue District is one of districts in NAD which has
been undertaking several programs in order to combat the poverty. In line with this program,
Simeulue District has been implementing Integrated Regional Development Project,
comprising 2 phases, phase I: post tsunami reconstruction of facilities and infrastructure and
phase II: Improvement of community and regional community capacity of Simeuleu District.
Phase II is a project in order to contribute to poverty alleviation for the rural population and
farmers through the creation of employment opportunities and the increase of households'
income.
Referring to the Integrated Regional Development Program implementation in Simeulue
District which covers several sector activities, thus the program will be implemented in 2 (two)
phases:
a. Phase I consists of construction and reconstruction of facilities and infrastructure.
b. Phase II consists of activities program, in the framework of community and regional
economic capacity of the Simeulue District.
7. Scope of Work
a. Establishment of infrastructure for Palm Plantation and Palm Oil Factory;
b. Procurement of equipment for palm oil factory;
c. Providing consultancy services.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Rehabilitation and reconstruction of facilities and infrastructure in the structure of
improving regional capacity particularly in regional economic sector;
78
BB-ID: BBP1-01006-04-061242-1060053
2) Improved capability of human resources, particularly in technology for plantation
farmer community.
b. Outcome
1) Strengthening the structure of plantation/agriculture and trading sector in order to
boost the economic growth;
2) Creating a conducive business atmosphere in the development of plantation/
agriculture and trading sector.
10. Project Cost
Foreign Funding
- Loan : US$ 20,000,000
- Grant : US$ 0
Sub Total : US$ 20,000,000
Counterpart Funding
- Central Government : US$ 3,070,970
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,070,970
TOTAL : US$ 23,070,970
79
Ministry of Laws and Human
Rights (Kementerian Hukum dan Hak Asasi Manusia)
81
BB-ID: BBP1-01307-07-091612-1020056
1. Project Title : Development of Automation System of Intellectual Property Rights
2. Duration : 36 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Laws and Human Rights
5. Implementing Agency : Directorate General of Intellectual Property Rights, Ministry of
Laws and Human Rights
6. Background and Justification
Intellectual Property Rights (IPR) is one of the most important rights of the economy. The
value of intellectual property has become very significant since it is closely related to economic
interest and national competitiveness in today’s knowledge-based society. Specially, secured
intellectual property right means that inventions of people and company are guaranteed by
legal. It indirectly enables economic growth of the country.
Indonesia has improved the Intellectual Property (IP) administration, however it is not enough
as they still have long process up to present time. Over the years, there has been a growing
concern and dissatisfaction on how Directorate General of Intellectual Property Rights
(DGIPR) of the Ministry of Laws and Human Rights (MOLH)/Kementerian Hukum dan Hak
Asasi Manusia manage and strengthen its IP administration. Therefore, there is an urgent need
to device a cost-effective scheme to facilitate IP automation of the DGIPR in Indonesia.
7. Scope of Work
a. Integration of administration system;
b. Enhancement of network and IT equipment;
c. Establishment of disaster recovery center;
d. Standardization of IT management operation;
e. Development of advanced searching system.
8. Priority
Law and State Apparatus
9. Output and Outcome
a. Output
Compliance with the facilities, infrastructure, and system application in the development
of intellectual property rights.
b. Outcome
Enforcing information technology services to improve the automation system of
intellectual property rights through the development process and system improvements,
such as digitizing, inspection, registration, and publishing systems, system integration
disbursement of Intellectual Property Rights and the regional network system.
82
BB-ID: BBP1-01307-07-091612-1020056
10. Project Cost
Foreign Funding
- Loan : US$ 33,000,000
- Grant : US$ 0
Sub Total : US$ 33,000,000
Counterpart Funding
- Central Government : US$ 6,088,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,088,000
TOTAL : US$ 39,088,000
83
Ministry of Marine Affairs and
Fisheries (Kementerian Kelautan dan Perikanan)
85
BB-ID: BBP1-03207-09-092400-1050065
1. Project Title : Coastal Community Development
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Marine Affairs and Fisheries
5. Implementing Agency : Ministry of Marine Affairs and Fisheries
6. Background and Justification
One form of strategic activities of the domestic market access expansion of micro-business
activities of marine and fishery support "Minapolitan", in the form of the establishment of
Solar Packed Dealer untuk Nelayan (SPDN), Coastal Store, Microfinance Institutions, Salt-
Business People , and their diversification. These activities have been initiated by the Ministry
of Marine Affairs and Fisheries (MMAF) since 2001 through the Coastal Community
Economic Empowerment/Pemberdayaan Ekonomi Masyarakat Pesisir (PEMP) Program. Many
positive lessons have been obtained. The program has been shifted to the National Program of
Self-Reliant Community Empowerment for Marine and Fisheries.
For the activity of coastal community empowerment then, MMAF is trying to find sources of
other funding for the development of micro businesses that already exist. The project is
intended to continue the positive outcomes of the PEMP program, Marine and Coastal
Resources Management Project (MCRMP), Coral Reef Rehabilitation and Management
Program (COREMAP), Community-based Environmental Empowerment Program,
Empowerment of Small islands, and National Program of Self-Reliant Community
Empowerment/Program Nasional Pemberdayaan Masyarakat Mandiri (PNPM Mandiri) on
Marine and Fisheries (MF) focusing to support the development of Minapolitan in achieving
the strategic goals of MMAF. Thus, it is a combination of the implementation of the PNPM-
MF plus the positive success of PEMP programs and other projects in the scope of Directorate
General of Marine, Coasts, and Small Islands Affairs.
In this project MMAF proposes 27 districts/cities scattered throughout 22 provinces of the
Republic of Indonesia, but the number of districts/cities that will receive the project may be
reduced depending on the (i) seriousness, (ii) ability, and (iii) readiness of each district / city.
Site selection is based on the potential of marine and fisheries appropriate to support the
concept Minapolitan, review the results of the coastal community empowerment activities in
previous years, the possibility of supporting the PNPM-MF, and the support of the relevant
office.
7. Scope of Work
a. Institutional strengthening capacity;
b. Community based coastal resource management;
c. Small scale infrastructure and facilities for minapolitan;
d. Capacity building and community facilitation.
8. Priority
Natural Resources and Environment
86
BB-ID: BBP1-03207-09-092400-1050065
9. Output and Outcome
a. Output
Increased standard of living of coastal communities, institutions management of coastal
resources and small islands, and the existence of small-scale infrastructure that can be
used by coastal communities.
b. Outcome
Increasing the prosperity of coastal communities and strengthening the institutional
capacity in managing coastal resources and small islands.
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 4,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,000,000
TOTAL : US$ 54,000,000
87
BB-ID: BBP1-03211-09-042408-1050066
1. Project Title : Infrastructure Development of Space Oceanography (INDESO
Project)
2. Duration : 36 months
3. Location : DKI Jakarta, Bali
4. Executing Agency : Ministry of Marine Affairs and Fisheries
5. Implementing Agency : Ministry of Marine Affairs and Fisheries
6. Background and Justification
Marine resources are a key factor for state's economy so they need to be managed wisely to
avoid being endangered progressively by intensive fishing or by the impact of climate change.
To enable a sustainable management of resources that respect both economic constraints and
ecological imperatives, it is necessary to identify the evolution and trends in marine
ecosystems as well as the migration of fish and fluctuation of their stocks. It is also necessary
to control and assess observation technology to monitor coral reef as ocean natural ecosystem.
Integrated solutions based on observation networks, scientific modeling techniques and
decision support systems are emerging to support governmental decision making, fisheries
and environmental planning, and associated control policies.
Oceanographic marine resources management needs to be supported by three (3) essential
components; space based observation, in-situ observation, and ocean biochemical and
physical modeling. Those three elements are needed to understand the ocean dynamic and
then use it to forecast natural phenomenon. By understanding the ocean dynamic and being
able to forecast future event, the Government will be able to manage marine resources in a
wise and sustainable way.
The importance of space oceanography data for the government in supporting the marine and
fisheries programs make it vital to develop a ground receiving station which will enhance
collaboration and international partnership in the future.
7. Scope of Work
a. Development of oceanic and biologic monitoring infrastructure and services;
b. Analysis on coral reefs condition, thus planning of conservation and protection of coral
reef area could be done properly;
c. Developing surveillance system of illegal fishing activities;
d. Integrated management of coastal zones in the marine conservation area;
e. Development of satellite reception infrastructure and data processing facilities;
f. Development of a special physics and biochemistry sea model configuration;
g. Capacity building;
h. Dissemination.
8. Priority
Natural Resources and Environment
88
BB-ID: BBP1-03211-09-042408-1050066
9. Output and Outcome
a. Output
1) Availability of satellite data receiver station, database systems, applications and
hardware/software, data backup systems, and data communications system;
2) Availability of satellite imagery in accordance with the needs of the application of
Infrastructure Development of Space Oceanography (INDESO);
3) Availability of integrated satellite image and in-situ data for the following
applications;
4) Integrated coastal zone management for marine conservation area;
5) Availability of illegal fisheries monitoring system;
6) Availability of satellite radar to develop oil spill monitoring model;
7) Availability of model development of coastal discharge monitoring (Total Suspended
Matters);
8) Improved quality of human resources.
b. Outcome
1) Enhancing the development of science and technology, increasing the rehabilitation,
conservation, control, and monitoring of marine resources exploitation and
utilization and governance of marine resources;
2) Improving the management of marine resources.
10. Project Cost
Foreign Funding
- Loan : US$ 30,000,000
- Grant : US$ 0
Sub Total : US$ 30,000,000
Counterpart Funding
- Central Government : US$ 1,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,500,000
TOTAL : US$ 31,500,000
89
BB-ID: BBP1-03203-09-062374-1050067
1. Project Title : Outer Ring Fishing Ports Development - Stage I
2. Duration : 60 months
3. Location : Bitung City, Kupang City, Nunukan District, Ternate City, Central
Lombok District, Tual City, Merauke District
4. Executing Agency : Ministry of Marine Affairs and Fisheries
5. Implementing Agency : Directorate General of Capture Fisheries, Ministry of Marine
Affairs and Fisheries
6. Background and Justification
Indonesia is a marine country in which three-fourths of its area (5.8 million km) consists of
islands and territorial waters covering 3.1 million km2. The Exclusive Economic Zone of
Indonesia covers 2.7 million km2 and more than 17,500 islands are strewn on it bound together
by coast line of 95,181 km long. It is the second longest coast line in the world after Canada
sea territory. Coastal region of the archipelago surrounding Indonesia are abundant and have
diverse economic potential. People all over the world know Indonesia as the largest marine
and archipelagic country in the world.
Ministry of Marine Affairs and Fisheries (MMAF), has already set a strategic plan that
emphasis on developing marine affairs and fisheries with management of sustainable natural
resources and simultaneously keeping up its sustainability with the operational policy on the
development of marine affairs and fisheries, inter alia, as follows:
a. Strengthening and developing national efficient and sustainable capture fishery effort;
b. Developing or solidifying the handling and processing industries and marketing of
products;
c. Keeping up the sustainability of marine and fishery resources and the ecosystem of
coastal zone and sea;
d. Strengthening the supervision and control of the exploitation of marine and fishery
resources.
Up to now, the government of Indonesia has built 968 fishing Ports comprising 6 Ocean
Fishing Ports, 13 Archipelago Fishing Ports, 45 Coastal Fishing Ports, 902 Fish Landing Bases,
and 2 Private Fishing Ports. For this, the role of fishing ports as infrastructures that can
accommodate activities in fishing business, i.e. as the centre for fishery community
development, a place to anchor, a fish landing place, a centre for marketing fish products and
fishery products quality control, a centre for fishery instruction and data collection, a centre
for implementation of supervising fish resources, and a centre for fishery information, has to
be optimized. One of the exertions is to perform the activities in The Outer Ring Fishing Ports
Development.
7. Scope of Work
a. Consultation works which consist of development studies and detailed design and
supervision;
b. Construction works which consist of basic facilities, functional facilities, and supporting
facilities development;
c. Supply of goods and equipment;
d. Training and education include fishing port overseas training and human resource
capacity development.
90
BB-ID: BBP1-03203-09-062374-1050067
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
Availability of fishing ports facilities in 8 (eight) locations with international service
standard.
b. Outcome
1) Creating job opportunities;
2) Improving economy growth;
3) Minimizing the potential economic losses caused by illegal, unreported, and
unregulated (IUU) fishing and using foreign fishing ports;
4) Improving the security for fishermen in running their business.
10. Project Cost
Foreign Funding
- Loan : US$ 107,000,000
- Grant : US$ 2,160,000
Sub Total : US$ 109,160,000
Counterpart Funding
- Central Government : US$ 4,261,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,261,000
TOTAL : US$ 113,421,000
91
BB-ID: BBP1-03211-09-042407-1050068
1. Project Title : Participatory Technology Development and Transfer for
Sustainable Fisheries Project
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Marine Affairs and Fisheries
5. Implementing Agency : Agency for Marine and Fisheries Research, Ministry of Marine
Affairs and Fisheries
6. Background and Justification
Marine and fisheries research faces enormous challenges, among others, such as the following
factors:
a. In utilizing huge opportunity of the marine and fisheries resources, there is a need for
intensive and proper researches to provide scientific data and information for policy
makers and regulators in formulating appropriate and sustainable management strategy
supported by the implementation of better monitoring, control and surveillance on
capture fisheries to protect the environmental and sustainable resources;
b. In developing aquaculture technology that increases productivity, it needs also to ensure
the environmental sustainability, establish community-based development, ensure food
safety and minimal impact on biodiversity;
c. Doubled or increased production of fish of Indonesia and processed fish product from 8.7
million tons (2008);
d. Development of technology suitable to small fishers, fish farmers, and fish product
processors to increase their income by 25% in 2015;
e. Increasing the consumption of fish of Indonesian people from 28.57 kg per capita (2008) to
38.67 kg per capita in 2014.
The strengthening capacity of Agency for Marine and Fisheries Research (AMFR) research
institutions through the project is an answer for the challenge and to satisfy the needs of
scientific data and information for policy makers and regulators, nationally and
internationally, as well as appropriate technologies for marine and fisheries development
planners, fishers, fish farmers, fish product processors, and other stakeholders.
7. Scope of Work
a. Strengthening competences of researchers, field and laboratory technicians, and research
managers;
b. Improvement and provision of research facilities comprising of the following activities;
c. Advocacy activities in utilizing research based information for decision making to policy
makers.
8. Priority
Natural Resources and Environment
92
BB-ID: BBP1-03211-09-042407-1050068
9. Output and Outcome
a. Output
1) Improvement of human resource quality;
2) Availability of research facilities, including the necessary research equipments;
3) Availability of participatory technology dissemination model.
b. Outcome
1) Providing policy and regulations supported by scientific data and information from
research undertaking to sustain marine and fisheries resources and environment;
2) Improving income of fishing farmers;
3) Improvement of fish product processors by 25% due to the adoption of appropriate
local specific technologies.
10. Project Cost
Foreign Funding
- Loan : US$ 79,900,000
- Grant : US$ 0
Sub Total : US$ 79,900,000
Counterpart Funding
- Central Government : US$ 20,100,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 20,100,000
TOTAL : US$ 100,000,000
93
Ministry of Health (Kementerian Kesehatan)
95
BB-ID: BBP1-02411-01-042114-1010080
1. Project Title : Improvement of Laboratory Services in 4 Central Health
Laboratories
2. Duration : 36 months
3. Location : DKI Jakarta, Makassar, Palembang, Surabaya
4. Executing Agency : Ministry of Health
5. Implementing Agency : Directorate General of Medical Care, Ministry of Health
6. Background and Justification
As the implementation of development, the Ministry of Health, that responsible to raise health
status of the country, has worked hard to realize health development goals. One point of
health development goals is by facilitating the Center of Health Laboratories/Balai Besar
Laboratorium Kesehatan (BBLK).
The function of BBLK is as a clinical laboratory and public laboratory inspection. The
inspection includes microbiology, health chemistry, pathology, immunology testing, and
specimen inspection sent by hospital, health laboratory and Public Health Center (Puskesmas).
BBLK also functions in providing technical assistance to public hospitals and Puskesmas.
Ministry of Health has optimized all of its manpower to raise the health in 4 (four) BBLKs, but
unfortunately they still face manpower and medical equipment problem that make their
services are not going optimally. In this case, the strengthening of faculty in raising manpower
capacity of BBLK is needed. Ministry of Health has targeted to solve this problem with long
investment financing.
7. Scope of Work
a. Building construction or renovation;
b. Training for health personnel in medical sciences and improving the capability in
operating the equipment;
c. Providing maintenance for the equipment after warranty.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Availability of health/medical facility;
2) Availability of health/medical equipment;
3) Availability of qualified medical manpower.
b. Outcome
Improving the capacity of central health laboratories in providing services.
96
BB-ID: BBP1-02411-01-042114-1010080
10. Project Cost
Foreign Funding
- Loan : US$ 24,000,000
- Grant : US$ 600,000
Sub Total : US$ 24,600,000
Counterpart Funding
- Central Government : US$ 3,600,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,600,000
TOTAL : US$ 28,200,000
97
BB-ID: BBP1-02401-01-022092-1010081
1. Project Title : Improvement of Medical Care in Central Government Hospitals
2. Duration : 60 months
3. Location : DKI Jakarta, Yogyakarta, Denpasar, Makassar, Medan
4. Executing Agency : Ministry of Health
5. Implementing Agency : a. RS. Cipto Mangunkusumo, Jakarta
b. RSUP. Dr. Sardjito, Yogyakarta
c. RSUP. Sanglah, Denpasar
d. RSUP. Wahidin Sudiro Husodo, Makassar
e. RSUP. H. Adam Malik, Medan
6. Background and Justification
The Government of Indonesia has set the aim for health development that will provide the
Indonesian people with a qualified, effective, efficient, and equal/affordable health services.
The direction of the health development according to the national development consists of:
a. Health development is an integral part of the national development;
b. Health services, run by either government or society, should be implemented with quality,
equality, and justice by giving special emphasize to the poor people;
c. Health development is executed according to the national development strategies that take
into account health concerns, professionalism, decentralization, and community health
maintenance assurance;
d. The public health maintenance and promotion efforts are done through healthy living
behaviors;
e. The supply and improvement of health facilities and infrastructure are to be continued.
Supplies of medicine and health instruments that are safe and accessible to the society
have to be prioritized;
f. In order to support all the health development efforts, manpower with national, ethical,
and professional attitude is required.
One way in attaining these objectives is that the Ministry of Health is optimizing its resources
in order to improve the health/medical care in the central state-owned hospitals. Ministry of
Health believes that one area that needs to be enhanced in meeting the above objectives is in
the intensive services as these services will be able to strengthen the effort in reducing
mortality rate in post surgery patients, maternal mortality rate, and others disease, which are
the main causes of death in Indonesia.
In addition, the second point of the national health development, which states that health
services are run by either government or society should be implemented with quality, equality,
and justice by giving special emphasize to the poor people; so that this portion of the
population that was previously only able to afford unsophisticated service, which is highly
subsidized and mostly under qualified, may now be able to benefit from normally high-cost
services. Consequently, Ministry of Health has the obligation to prioritize the development or
improvement of health/medical facilities under its jurisdiction. This is why Ministry of Health
will solely focus the project on upgrading its central state-owned hospitals.
98
BB-ID: BBP1-02401-01-022092-1010081
7. Scope of Work
a. Building construction or renovation;
b. Training for health personnel in medical sciences and improving the capability in
operating the equipment;
c. Providing maintenance for the equipment after warranty.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Availability of health/medical facility;
2) Availability of health/medical equipment;
3) Availability of qualified medical manpower;
b. Outcome
Improving the capacity of central government hospitals in providing services.
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 2,600,000
Sub Total : US$ 102,600,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 117,600,000
99
BB-ID: BBP1-02403-01-000000-1010082
1. Project Title : Strengthening of Core Capacity at Points of Entry in the
Implementation of International Health Regulation
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Health
5. Implementing Agency : Directorate General of Disease Control and Environmental Health,
Ministry of Health
6. Background and Justification
In the acceleration of the implementation of International Health Regulation (IHR: 2005), the
World Health Organization (WHO) members have the obligations to meet the core capacity
requirements, both core capacities for surveillance and response as well as for designated
airports, ports, and ground crossings. The core capacity to be strengthened includes the
provision of trained and competent personnel, medical facilities, and equipment as well as
referring system. The Directorate General of Disease Control and Environmental Health
supervises 48 Port Health Offices and 294 stations which are spread around Indonesia. Up to
present time, the availability of those capacities has not been met. The detection and response
equipments are required to support the implementation of preventing and controlling the
communicable diseases through points of entry.
7. Scope of Work
a. Capacity building of human resource through structured training of Health Quarantine
for port health officers;
b. Developing training module;
c. Provision of vector control and sanitation equipments for points of entry consisting of
equipments for sanitation inspection of conveyances, equipments for vector control at
points of entry, and vector control vehicles for 48 Port Health Offices;
d. Provision of medical service facilities and equipments consisting of medical equipments
for Port Health Clinics, evacuation ambulances for 48 Port Health Offices, and isolation
shelters for 33 provinces;
e. Building construction for 100 Port Health Office Stations due to the unavailability of office
buildings;
f. Provision of communication devices consisting of communication network system at all
Port Health Office stations;
g. Provision of consultants to assist the acceleration of IHR implementation.
8. Priority
Social, Cultural, and Religious Affair.
100
BB-ID: BBP1-02403-01-000000-1010082
9. Output and Outcome
a. Output
1) Improved human resources in the implementation of preventing and controlling the
communicable diseases;
2) Improved capability in detecting potential case of Public Health Emergency of
International Concern (PHEIC) at points of entry;
3) Improved capacity in controlling communicable diseases at perimeter and buffer area;
4) Implementation of standard procedures of health quarantine at ports.
b. Outcome
Improving the capability for early detection and quick response to PHEIC at points of
entry as well as mitigating and preventing the spread of the PHEIC within a region with
PHEIC pandemic epicenter.
10. Project Cost
Foreign Funding
- Loan : US$ 18,632,000
- Grant : US$ 149,000
Sub Total : US$ 18,781,000
Counterpart Funding
- Central Government : US$ 2,790,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 2,790,000
TOTAL : US$ 21,571,000
101
BB-ID: BBP1-02404-01-000000-1010083
1. Project Title : Strengthening of Teaching Hospitals in Indonesia
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Ministry of Health
5. Implementing Agency : Directorate General of Medical Care, Ministry of Health
6. Background and Justification
The government of Indonesia continues to make improvements, development, and innovation
in order to improve the quality of education for doctors and specialists. This effort is expected,
in the long term, can improve health service quality in health care institutions. Accelerated
graduation programs of specialist doctor have been developed in competence based to meet
the lack of the need of specialist doctors. Due to this reason, several hospitals have been
established as affiliates to accommodate the process of education and apprenticeship in order
to have a network expansion and equalization, in cooperation with the Faculty of Medicine at
several universities.
In order to develop the quality of graduates of the specialist doctors, infrastructure is required
in health institutions to support the improvement of competence in terms of diagnostic
procedures, treatment, and rehabilitation with adequate medical equipment and good hospital
management system.
In order to achieve this goal, an effort has been undertaken to improve and develop service
systems in each hospital, especially central and local government hospital as the affiliation.
The hospital is not only being a health care center but also functioning as an educational center
for doctor/dentist and specialists.
Central government hospital currently consists of 13 General Hospitals and 17 Special
Hospitals, scattered in 13 provinces in Indonesia. Current conditions indicates that the quality
of health infrastructure and equipment in central government hospital is not optimal.
Moreover, the service development and utilization of health technologies are not fully
developed yet. Therefore, it is deemed necessary to improve health services through the
fulfillment of health infrastructure, modern equipment, and management services in order to
support the hospital as a referral of safe community.
In addition to the above, in general, the central government hospitals have a vission as the
service, education, and research center in their respective territories. This is in line with health
development programs especially in health and education.
7. Scope of Work
a. Improving the emergency services;
b. Improving the facilities of Intensive Care Unit (ICU), Intensive Cardiology Care Unit
(ICCU), Neonatal Intensive Care Unit (NICU), and Pediatric Intensive Care Unit (PICU);
c. Improving the capacity of Central Operating Theatre (COT);
d. Improving the cardiology services;
e. Building construction or renovation;
f. Training for health workforce and improving the capacity of medical equipment operation;
g. Maintenance of the equipment.
102
BB-ID: BBP1-02404-01-000000-1010083
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Availability of better health/medical facility;
2) Availability of better health/medical equipment;
3) Availability of qualified medical manpower.
b. Outcome
Strengthening the central government hospitals as the teaching hospitals.
10. Project Cost
Foreign Funding
- Loan : US$ 14,000,000
- Grant : US$ 0
Sub Total : US$ 14,000,000
Counterpart Funding
- Central Government : US$ 3,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,500,000
TOTAL : US$ 17,500,000
103
Ministry of Communication and
Information Technology (Kementerian Komunikasi dan Informatika)
105
BB-ID: BBP1-05903-04-000000-1060094
1. Project Title : The Improvement on Television Transmitting Stations (ITTS) -
Phase II
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Ministry of Communication and Information Technology
5. Implementing Agency : Ministry of Communication and Information Technology
6. Background and Justification
In the globalization era, whereby State boundaries have become irrelevant, information
becomes a powerful weapon in influencing public and electronic media to be a vehicle to
disseminate information. It means that the enhancement of quality and equipment in
disseminating information becomes very important and needs to be intensified in order to
balance the utilization of delivering appropriate information to the public. Lembaga Penyiaran
Publik (LPP)-TVRI as a government broadcast media, is now facing a dilemma, due to the
limited infrastructure availability resulting in dilemma on the capacity of disseminating
information to support national development planning. The coverage is still under 42.5% of
state area at present, eventhough population coverage is almost 80%. Based on this, the
availability of infrastructure (TV transmitters system) is absolutely requiring rehabilitation,
upgrading, and in some areas even needs new installation. The implementation of the phase I,
now under finishing process, would provide improvement on additional coverage 27% of the
region and this is around 50% of the population. Further implementation of the phase II will
cover additional 42% of the region and 88% of the population. Therefore, the success of the
implementation of the phase I and approval of the financing and implementation for phase II
would be a mean for Ministry of Communication and Information Technology to broadcast
throughout the nation in achieving TVRI’s vision and mission.
7. Scope of Work
a. Designing, Procurement, and Installation of Television Transmitting Station (ITTS) - Phase
II in the following locations: Telanaipura, Mt. Betung, Mt. Gompong, Pekan Baru,
Prabumulih, Mt. Depok, Cemorosewu, Pontianak, Palangkaraya , Mt. Gantungan, Oben,
Wungurejo, Tuban, Mt. Banon, Mt. Doek, Seganteng, Mataram, Bukit Greser, Palu,
Kendari, Gorontalo, Cikurai, Sorong, Biak, Bukit Nyampai, Bayah, Baribis, Wonogondo,
Poso, Majene, Sibolga, Mt. Sitoli, Kijang, Natuna, Ipuh, Tungkal Ilir, Tahuna, Mt. Mangkol,
Dabo Singkep, Tarempa, Kuala Tungkal, Soe, Painan, Liwa, Kota Bumi, Pager Gedog,
Semanggi, Garung, Eromoko, Parang Tritis, Mt. Gending, Mt. Brengos, Pujut, KotaBaru,
Donggala, Adonara, Riung, Namlea, Morotai, Sanana;
b. Procurement and installation of equipment and remote supervision;
c. Procurement of 5 sets of van for Digital Satellite News Gathering (DSNG);
d. Procurement of digital studio equipment and supporting services;
e. Conducting trainings and implementation services;
f. Improvement of project management;
g. Provision of technical support and maintenance.
8. Priority
Infrastructure
6
106
BB-ID: BBP1-05903-04-000000-1060094
9. Output and Outcome
a. Output
1) Improvement of infrastructure of TV transmission;
2) Improvement of reception (signal) quality, coverage area, and broadcast program
system of LPP-TVRI;
3) Increased coverage area of information dissemination on national development
program and policy.
b. Outcome
1) Educating people by dissemination of educative information;
2) Encouraging the involvement of community on development by close relationship
with the government;
3) Achieving social, cultural, economic, and political stability in Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 74,865,000
- Grant : US$ 0
Sub Total : US$ 74,865,000
Counterpart Funding
- Central Government : US$ 7,486,500
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,486,500
TOTAL : US$ 82,351,500
107
Ministry of Environment (Kementerian Lingkungan Hidup)
109
BB-ID: BBP1-04301-09-062735-1050101
1. Project Title : Financing Scheme for Emission Reduction Investment
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Environment
5. Implementing Agency : Ministry of Environment
6. Background and Justification
The Government of Indonesia (GoI) has committed to reduce green house gases by 26% in
2025 compared to business as usual. It has been demonstrated by some programs in reducing
emission significantly i.e. Blue Sky Program, Energy efficiency, Energy Audit, Integrated
Crops and Resource Management, Program for Pollution Control Evaluation and Rating
(PROPER), Cleaner Production Programs, Ozone Depletion Program, and Waste to Energy
Program. Those programs have showed their contribution in the achievement of emission
reduction by producing numbers of good practices. It is important to bring the pilot project
scale of impact into the full scale projects with a greater positive impact to the environment.
Moreover, the current climate change conference has raised the awareness of entrepreneurs
and industries to environment, generating the demand of environmental friendly investment.
Thus, Emission Reduction Investment (ERI) program is a timely program to replicate the
above mentioned successful program and pilot projects to the full scale project that produce
more significant emission reduction. In addition, the ERI program is intended to meet demand
of industries for having environmental friendly investment.
7. Scope of Work
a. Feasibility study on funding need, institutional, and distribution mechanism;
b. Establishing legal framework for institutional and mechanism;
c. Establishing standard operating procedure;
d. Project implementation: financing to business player, environmental technology provider,
and local government.
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
Availability of legal framework for financing scheme for reduction emission investment.
b. Outcome
1) Reducing emission and improving environmental quality;
2) Encouraging the growth of environmental measures in reaching a minimum critical
mass.
110
BB-ID: BBP1-04301-09-062735-1050101
10. Project Cost
Foreign Funding
- Loan : US$ 30,600,000
- Grant : US$ 4,600,000
Sub Total : US$ 35,200,000
Counterpart Funding
- Central Government : US$ 270,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 270,000
TOTAL : US$ 35,470,000
111
Ministry of Public Works (Kementerian Pekerjaan Umum)
Directorate General of Highways
(Direktorat Jenderal Bina Marga)
113
BB-ID: BBP1-03304-04-082443-1060105
1. Project Title : Additional Loan of Tanjung Priok Access
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
The terrible traffic congestion in Jabotabek area is a significant issue on major arterial roads as
well as on toll roads resulting from rapid expansion of social and economic activities which
stimulates motorization in urban area. Currently, there is no direct toll roads access to the port
of Tanjung Priok, despite the fact that the port, which is ranked 24th among the world
container ports, is the most multifunctional primary port in Indonesia. Therefore, a high
standard road access is required in order to cater to these needs.
Thus, the Government of Indonesia has developed Tanjung Priok Access Road Construction
Project (TgPA) which is part of Jakarta Outer Ring Road (JORR) and is connected to Jakarta
Inter Urban Toll Road (JIUT) and JORR 2. Considering the raising price and additional scope
of works which results in the increase of project cost, in order to complete the current TgPA
section, the government is proposing new loan resources.
Based on 2004 Feasibility Study, volume of traffic was assumed to be 72,900 vehicles/day in
the early 2011 and the Economic Internal Rate of Return (EIRR) indicates that the project was
economically feasible, with a value of 47.5%.
7. Scope of Work
a. Construction of Tanjung Priok access toll road;
b. Construction supervision.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Development of Tanjung Priok access toll road.
b. Outcome
1) Avoiding serious traffic congestion, thereby contributing to sustainable urban
activities;
2) Supplementing the function of radial toll roads and Cengkareng access;
3) Enhancing the physical distribution originally from Tanjung Priok international port.
10. Project Cost
Foreign Funding
- Loan : US$ 120,000,000
- Grant : US$ 0
Sub Total : US$ 120,000,000
Counterpart Funding
- Central Government : US$ 18,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 18,000,000
TOTAL : US$ 138,000,000
6
114
BB-ID: BBP1-03304-04-082436-1060106
1. Project Title : Asset Management for National Road and Bridge in Urban Area
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
Indonesia has a very large asset of road and bridge network. In order to keep these networks
in good condition, these assets need to be maintained. Directorate General of Highways,
Ministry of Public Works in accordance with its main mission and functions to execute the
planning and management of the assets requires a comprehensive and sustainable system.
One of the solutions is to use better asset management for national road and bridge.
Improvement of this asset management system is very important to build more effective and
efficient road and bridge system as well as to optimize output and outcome in constrained
budget. As a policy supporting tool, all asset managements ideally have the ability to provide
more accurate information of existing asset conditions and also its future condition prediction.
7. Scope of Work
a. Development of asset management system;
b. Road and bridge rehabilitation;
c. Capacity building.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of asset management system;
2) Rehabilitation of roads and bridges;
3) Improved capacity of human resource.
b. Outcome
1) Establishing a strategy of asset management system;
2) Rehabilitating the current assets;
3) Improving the economic activities in urban area.
10. Project Cost
Foreign Funding
- Loan : US$ 86,000,000
- Grant : US$ 0
Sub Total : US$ 86,000,000
Counterpart Funding
- Central Government : US$ 12,900,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 12,900,000
TOTAL : US$ 98,900,000
6
115
BB-ID: BBP1-03304-04-082443-1060107
1. Project Title : Bandung Intra Urban Toll Road (BIUTR) Development Project -
Phase I
2. Duration : 48 months
3. Location : West Java
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
Most of metropolitan cities in Indonesia have been suffering from a terrible congestion
leading to decrease mobility and economic efficiency. The movement of people and goods
from suburb areas, settlements, and centers of production of goods toward city increases the
traffic volume as well as decreases the road capacity that the congestion has occurred.
Bandung, one of the metropolitan cities located in West Java province, experiences severe
traffic congestion as a result of economic and social activities within the city and its
surrounding areas.
Many various activities are served by the existing road network without any intra-city toll
road and appropriate public transport system. The road network is mostly radial with narrow
lane width, one way direction, short distance intersection, and highly side friction.
Meanwhile, the increasing of economic capacity has led to the number of movement that is
mostly served by private transport/car. In addition, the generated traffic from Jakarta and
other cities surrounding the Metropolitan Bandung increases the number of traffic on the
roads. Nowadays, the average travel speed on roads within the city is less than 20 km per
hour. Without any additional capacity extension, in the future, Bandung would become more
crowded and traffic congestion occurs anywhere. Toll road is an alternative solution to cope
with the problem since the government budget for road development and its maintenance is
limited.
7. Scope of Work
a. Project pre-development (detailed engineering design, tender assistance);
b. Construction of toll road from Pasteur (city) to Cileunyi; Corridor: Pasteur-Pasupati-
Surapati-Cicaheum-Ujung Berung-Gedebage-Cileunyi;
c. Construction supervision.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of toll road from Pasteur (city) to Cileunyi.
b. Outcome
1) Improving access and capacity of road networks and good distribution leading to
improve the link of Bandung Metropolitan Area to Jakarta and its surrounding cities
as well as other cities in Southern East part of West Java.
6
116
BB-ID: BBP1-03304-04-082443-1060107
2) Enhancing the city development and its suburb areas in order to enhance the
economic development and alleviate the poverty especially along the corridor.
3) Accelerating the development of Eastern Bandung area to include its surrounding
within Bandung metropolitan area through the accessibility improvement directly
toward the city by developing toll road network.
10. Project Cost
Foreign Funding
- Loan : US$ 150,000,000
- Grant : US$ 0
Sub Total : US$ 150,000,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 165,000,000
6
117
BB-ID: BBP1-03304-04-082436-1060108
1. Project Title : Bridge Material Supply for Bridge Replacement Program - Phase II
2. Duration : 60 months
3. Location : Sumatera
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
There are more than 300,000 bridges listed in database in the entire Indonesia. Bridge
construction was commenced in Netherland colonial eras. There are few very old bridges but
majorities are quite new before the termination of their life span.
It is certain that the bridges will gradually get old and deteriorated by year. Age is highly
related to its deterioration degree and if deterioration degree proceeds, it will produce
damages. The Government of Indonesia has set "degree of damage" from 0 to 5 and evaluated
the current condition of the bridges and their elements. The degree of damages will increase
from 0 to 5 gradually with progress of deterioration.
Based on the recent survey, almost 6,750 m long of bridges in Java and Sumatera need to be
replaced due to the condition of the bridges (degree of damage more than 4).
7. Scope of Work
Construction and rehabilitation of bridges in Sumatera island.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of new and rehabilitated bridges in Sumatera.
b. Outcome
Providing the basic transport facilities to support the regional development and social
economic activity.
10. Project Cost
Foreign Funding
- Loan : US$ 45,000,000
- Grant : US$ 0
Sub Total : US$ 45,000,000
Counterpart Funding
- Central Government : US$ 4,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,500,000
TOTAL : US$ 49,500,000
6
118
BB-ID: BBP1-03304-04-082437-1060109
1. Project Title : Construction of Arterial Road to Support Belang-Belang
International Port
2. Duration : 60 months
3. Location : West Sulawesi
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
West Sulawesi Province was established under the Law Number 25/2004 as a fractional area
of South Sulawesi Province and the youngest province in Indonesia. The implication of such
expansion is the need to improve basic infrastructure in order to keep the pace with other
areas, especially in road and bridge transportation infrastructure. Construction of arterial road
access to support Belang-Belang international port is a systematic effort to achieve it.
7. Scope of Work
Construction of arterial road access to and from Belang-Belang port - Tampa Padang airport -
Mamuju city – Tappalang of approximately 100km.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of arterial road access to and from Belang-Belang port - Tampa Padang
airport - Mamuju city - Tapalang of approximately 100 km.
b. Outcome
Establishing national road network to an acceptable standard of services and accessibility
and capable in supporting local and regional economy.
10. Project Cost
Foreign Funding
- Loan : US$ 60,000,000
- Grant : US$ 0
Sub Total : US$ 60,000,000
Counterpart Funding
- Central Government : US$ 9,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 9,000,000
TOTAL : US$ 69,000,000
6
119
BB-ID: BBP1-03304-04-082436-1060110
1. Project Title : Construction of Galala - Poka Bridge
2. Duration : 20 months
3. Location : Ambon
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
In order to develop better transportation infrastructure in Maluku and to improve access from
Ambon city to Pattimura airport, construction of Galala-Poka bridge is an alternative solution.
With the existence of the bridge, it will shorten the distance between Ambon city and
Pattimura airport along 13 km. In addition, the construction of this bridge is intended to
anticipate traffic congestion which is estimated to occur in Paso area on rush hours.
7. Scope of Work
a. Construction of a bridge from Galala area to Poka area across Ambon bay;
b. Construction of access roads with length of 60 m (south side) and 390 m (north side).
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of Galala Poka bridge from Galala area to Poka area across Ambon bay;
2) Availability of access roads with length of 60 m (south side) and 390 m (north side).
b. Outcome
1) Improving transportation system in Maluku province;
2) Accelerating community economic growth.
10. Project Cost
Foreign Funding
- Loan : US$ 50,032,000
- Grant : US$ 0
Sub Total : US$ 50,032,000
Counterpart Funding
- Central Government : US$ 7,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,500,000
TOTAL : US$ 57,532,000
6
120
BB-ID: BBP1-03304-04-082436-1060111
1. Project Title : Construction of Kendari Bridge
2. Duration : 36 months
3. Location : Kendari
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
Kendari, the provincial capital of Southeast Sulawesi, Indonesia, is the center of service, trade,
tourism, and regional transport for the province. To increase the function of Kendari as the
center of service needs to increase the accessibility to Kendari port. Construction of Kendari
bridge will enable convenient access from the old city of Kendari sub-district to Poasia. This
Kendari Bridge will across Kendari bay.
7. Scope of Work
a. Construction of bridge across Kendari bay.
b. Construction of access roads with the length of approximately 1.46 km.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of bridge across Kendari bay;
2) Availability of access roads in the length of approximately 1.46 km.
b. Outcome
1) Improving transportation system in Southeast Sulawesi province;
2) Accelerating community economic growth.
10. Project Cost
Foreign Funding
- Loan : US$ 60,000,000
- Grant : US$ 0
Sub Total : US$ 60,000,000
Counterpart Funding
- Central Government : US$ 6,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,000,000
TOTAL : US$ 66,000,000
6
121
BB-ID: BBP1-03304-04-082436-1060112
1. Project Title : Construction of Panajam Bridge (Pulau Balang)
2. Duration : 45 months
3. Location : East Kalimantan
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
Balikpapan is the second largest city in East Kalimantan and holds important role in economy
due to its position in national oil and gas industry. In order to develop transportation
infrastructure in East Kalimantan, especially to improve accessibility from Panajam to
Balikpapan which is a part of Southern Trans Kalimantan highway, it is needed to construct a
bridge crossing Balikpapan bay to shorten travel time and anticipate traffic congestion due to
poor ferry service.
7. Scope of Work
a. Construction of a bridge from Panajam to Balikpapan across Balikpapan bay;
b. Construction of access roads.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of Pasir Panajam Bridge from Panajam to Balikpapan across Balikpapan
bay;
2) Availability of road access in the length of 15 km.
b. Outcome
1) Improving transportation system in East Kalimantan province;
2) Accelerating community economic growth.
10. Project Cost
Foreign Funding
- Loan : US$ 150,433,000
- Grant : US$ 0
Sub Total : US$ 150,433,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 165,433,000
6 6
122
BB-ID: BBP1-03304-04-082436-1060113
1. Project Title : Development of Cileunyi-Sumedang-Dawuan Toll Road - Phase I
2. Duration : 36 months
3. Location : West Java
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
Bandung, the capital city of West Java province, is one of the biggest emerging metropolitan
cities which attracts and generates socio-economic activities. The Government of Indonesia
(GoI) intends to build a new international airport in Majalengka and new port in Cirebon as
main inlet/outlet for West Java and secondary inlet/outlet of Jakarta which need a high
standard road access. Accordingly the GoI will develop Cileunyi‐Sumedang‐Dawuan toll
road along ± 58.5 km connecting trans-Java toll road, new airport, and other cities such as
Bandung and Cirebon.
7. Scope of Work
a. Civil works for 58.5 km toll road;
b. Consulting services for Detailed Engineering Design and construction supervision.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Detailed Engineering Design;
2) Development of Cileunyi‐Sumedang‐Dawuan toll road.
b. Outcome
1) Improving the accessibility and capacity of road network connecting Bandung and
Cirebon and the proposed new airport and seaport;
2) Promoting national and regional development in corridor impacted area and cities
along the road in the eastern part of West Java;
3) Increasing the productivity of the area and improving access to regional and
international market.
10. Project Cost
Foreign Funding
- Loan : US$ 200,000,000
- Grant : US$ 0
Sub Total : US$ 200,000,000
Counterpart Funding
- Central Government : US$ 34,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 34,000,000
TOTAL : US$ 234,000,000
6
123
BB-ID: BBP1-03304-04-082436-1060114
1. Project Title : Gorontalo - Djalaludin Airport Road Construction Project
2. Duration : 24 months
3. Location : Gorontalo
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
Gorontalo is one of the new provinces in Sulawesi island established in 2001 when policies for
regional autonomy were implemented. As a new province, Gorontalo has developed its
potential resources in agricultural and tourism. The Government of Gorontalo Province is in
the process of improving Djalaludin airport. However the existing road connecting Gorontalo
and Djalaludin airport is not sufficient to attract investors and tourism to come to Gorontalo.
Accordingly, it is necessarily to improve that road in order to attract people from outside of
the province.
7. Scope of Work
Development (Detailed Engineering Design, construction, and supervision) of new road.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Detailed Engineering Design;
2) Development of road from Gorontalo to Djalaludin airport of approximately 34 km.
b. Outcome
1) Alleviating the traffic congestion between Gorontalo City urban areas and Djalaludin
Airport;
2) Accelerating the regional development of Gorontalo Province and stimulating local
economic activity;
3) Strengthening the transportation network of Sulawesi Island and Eastern Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 17,900,000
- Grant : US$ 0
Sub Total : US$ 17,900,000
Counterpart Funding
- Central Government : US$ 1,790,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,790,000
TOTAL : US$ 19,690,000
6
124
BB-ID: BBP1-03304-04-082436-1060115
1. Project Title : Musi Bridge III Construction - Phase I
2. Duration : 48 months
3. Location : South Sumatera
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
Palembang, the provincial capital of South Sumatera, Indonesia, is cut through by Musi River
running form the west to the east. The only connections between the south and north sides of
the city are Ampera Bridge (Musi I) and Musi II Bridge. Being located on the outer ring road
of the city and far from the center, Musi II bridge in the southwest of Palembang is mainly
undertaking the transit traffic.
Ampera Bridge which was built in Central Palembang and joints the two parts of Jenderal
Sudirman road (central corridor) has been the main corridor for road traffic from the two
sides. Since Ampera Bridge can no longer satisfy the needs of Palembang transport, Musi III
bridge has been planned to be built at 3.5 km away downstream from Ampera Bridge.
7. Scope of Work
Development (detailed engineering design, construction, and supervision) of bridge designed
to a dual 2-Lane carriageway structure with a motorcycle lane on each side of the roadway.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Development of Musi Bridge III with dual 2-Lane carriageway structure and a motorcycle
lane on each side of the roadway.
b. Outcome
Providing an efficient road transport network in Sumatera island as well as Palembang
Metropolitan City and promoting its rapid socio-economic and industrial area
development.
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 5,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 5,000,000
TOTAL : US$ 55,000,000
6
125
BB-ID: BBP1-03304-04-082436-1060116
1. Project Title : Padang By Pass Capacity Expansion
2. Duration : 24 months
3. Location : Padang
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
One of Padang By Pass road functions is to provide transport facility from and to
International Airport Ketaping and Teluk Bayur port. The traffic growth for this link has been
increased by year. Referring to Padang By Pass project study in 1987, it had been estimated
that in 1994 the Annual Average Daily Traffic (AADT) would be 6,988. Padang By Pass road is
needed to anticipate regional development due to the operation of Minangkabau airport and
Bingkuang Regional Terminal, as well as Teluk Bayur Port development plan.
7. Scope of Work
Improvement of roads capacity from 2-lanes two ways to 2-lanes four-ways.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Padang By Pass road capacity expansion from 2-lanes two ways to 2-lanes four-ways.
b. Outcome
1) Accommodating the traffic growth in Padang;
2) Accelerating the social and economic activity.
10. Project Cost
Foreign Funding
- Loan : US$ 58,000,000
- Grant : US$ 0
Sub Total : US$ 58,000,000
Counterpart Funding
- Central Government : US$ 6,800,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,800,000
TOTAL : US$ 64,800,000
6
126
BB-ID: BBP1-03304-04-082436-1060117
1. Project Title : Regional Road Development Project – Phase I
2. Duration : 60 months
3. Location : Kalimantan and Southern Corridor of Java
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
The regional development needs sufficient road infrastructure network, especially in
disadvantaged regions and border areas. Directorate General of Highways has been
prioritizing the northern corridor of Kalimantan island as a strategic option of development.
Besides that, south corridor of Java Island also needs equal attention. Therefore, it needs a
comprehensive measure in those areas in the form of Regional Road Development Project
(RRDP).
7. Scope of Work
Development and improvement of road in Northern corridor of Kalimantan island and
Southern corridor of Java.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of adequate roads in Northern corridor of Kalimantan and Southern corridor
of Java.
b. Outcome
Accelerating social and economic activity in Northern corridor of Kalimantan island and
Southern corridor of Java.
10. Project Cost
Foreign Funding
- Loan : US$ 250,000,000
- Grant : US$ 0
Sub Total : US$ 250,000,000
Counterpart Funding
- Central Government : US$ 50,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 50,000,000
TOTAL : US$ 300,000,000
6
127
BB-ID: BBP1-03304-04-082436-1060118
1. Project Title : Road Development in Mamminasata Project
2. Duration : 48 months
3. Location : South Sulawesi
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
South Sulawesi Province is the most developed province in Sulawesi island even in Eastern
Indonesia regions. The growing economic activities in the province, mostly in Makassar
Metropolitan and its surrounding area, needs a sufficient support of road infrastructure. The
development road infrastructure in this area is expected to be a strong impetus for economy
growth in this region, will even spread to other provinces in Eastern Indonesia.
7. Scope of Work
a. Construction of Arterial Roads
1) Construction of 16 km of urban roads;
2) Construction of 820 m of bridges, including Tallo River Bridge (136 m in length) and
Jeneberang River Bridge;
3) Construction of one fly over bridge of 50 m in length.
b. Implementation Support
1) Environmental management, project performance monitoring, and financial
management;
2) Detailed engineering design work, assisting in pre-construction activities and
construction supervision.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of urban roads of 16 km in length;
2) Availability of bridges of 820 m in length;
3) Availability of fly over bridge of 50 m in length.
b. Outcome
1) Providing basic infrastructure to support various regional development plans in
Maminasata Metropolitan Area;
2) Supporting the logistic flow and environment for inducing industrial and
commercial service sector on development investments.
10. Project Cost
Foreign Funding
- Loan : US$ 85,400,000
- Grant : US$ 0
Sub Total : US$ 85,400,000
Counterpart Funding
- Central Government : US$ 12,800,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 12,800,000
TOTAL : US$ 98,200,000
128
BB-ID: BBP1-03304-04-082436-1060119
1. Project Title : Tayan Bridge Construction
2. Duration : 24 months
3. Location : West Kalimantan
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
The development of Kalimantan island is greatly influenced by the function of the Southern
corridor which is part of ASEAN (Association of Southeast Asian Nations) Highway. South
corridor of Kalimantan is a primary arterial road as well as main road of economic sector in
Kalimantan. The existing transportation mode crossing Kapuas River is by Ferry boat which
will no more satisfy the future traffic demand.
The improvement of the South corridor in West Kalimantan including construction of Tayan
Bridge will enable convenient access from the island to the core business center. Specifically,
numerous resources provided from hinterland can be transported not only to Pontianak but
also to Malaysia and Brunei which induce the activation of regional economy.
7. Scope of Work
Construction and supervision of Tayan bridges at 112 km away from Pontianak in the South
corridor of Kalimantan which connects West Kalimantan and Central Kalimantan. The bridge
is designed to a single 2-landed carriageway structure with description as follows: toll bridge,
main bridge, approach road, and access road.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of Tayan bridge with its approach road and access road in West Kalimantan.
b. Outcome
1) Improving the accessibility and connectivity from Pontianak to Palangkaraya;
2) Promoting the regional development along South corridor of Kalimantan island.
10. Project Cost
Foreign Funding
- Loan : US$ 87,000,000
- Grant : US$ 0
Sub Total : US$ 87,000,000
Counterpart Funding
- Central Government : US$ 8,700,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 8,700,000
TOTAL : US$ 95,700,000
129
BB-ID: BBP1-03304-04-082443-1060120
1. Project Title : Toll Road Development of Medan-Kualanamu Project
2. Duration : 36 months
3. Location : North Sumatera
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
The economic growth of Nothern part of Sumatera has led Medan city become important
inlet/outlet for socio-economic activities resulting in the airport overcapacity. The
Government of Indonesia (GoI) intends to build a new international airport in Kualanamu
which needs a high standard road access from surrounding cities to the planned air port, i.e
toll road. Therefore, the GoI will develop Medan - Kualanamu - Tebingtinggi toll road along
+/- 60 km connecting Medan, the new airport, and the other cities such as Tebing Tinggi,
Lubuk Pakan, and Tanjung Morawa. However, due to its marginal financial viability, the GoI
intends to construct part of the corridor and the rest will be offered to the private sector.
7. Scope of Work
Development (detailed engineering design, tender, contruction, and supervision) of toll road
section that is estimated to become Government undertaking (44.5 km instead of 60 km).
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Development of toll road section of 44.5 km in Medan - Kualanamu.
b. Outcome
1) Improving accessibility and capacity of road network for the movement of people and
freight to/from Medan/Tebing Tinggi as well as to/from the new airport;
2) Promoting national and regional socio-economic development in corridor-impact
areas and cities along the road in northern part of Sumatera;
3) Increasing the productivity with repression of distributional cost and giving access to
regional and international market.
10. Project Cost
Foreign Funding
- Loan : US$ 137,000,000
- Grant : US$ 0
Sub Total : US$ 137,000,000
Counterpart Funding
- Central Government : US$ 37,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 37,000,000
TOTAL : US$ 174,000,000
6
130
BB-ID: BBP1-03304-04-082443-1060121
1. Project Title : Toll Road Development of Solo - Kertosono
2. Duration : 36 months
3. Location : Central Java
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
The flourish economic and regional growth in the southern part of Java island has increased
the demand for better trasportation facility, including road infrastructure, as it is known that
the southern part of Java varies in term of regional capacity and potency. Yogyakarta is
known as tourism area and center of education as well as Solo. Meanwhile, the other cities
along the corridor have potencies as centers of agriculture and some tourism projects. The
corridor is known also as part of Trans-Java main trunk, connecting East Java and Central
Java heading to Jakarta. The distribution of goods and the movement of people need higher
travel speed and less travel time without any ignorance to the safety and comfort factors. The
government is now undertaking the capacity extension by widening the existing roads, since
some sections are not adequate anymore to hedge the traffic problem. The development of
freeway/toll road will overcome the existing, as well as to cope with the future, problem in
regard to the traffic growth resulted from regional and economic development growth. This
project has been cited as a 'model project' at Indonesia Infrastructure Conference and
Exhibition (IIEC: 2006), thus it must be supported and implemented soon. This section has
been included in the Ministry Regulation Number 369/Kms/M/2005 jo Number
280/KPTS/M/2006 on Master Plan of National Road Network.
7. Scope of Work
a. Project of pre-development (detailed engineering design, tender assistance);
b. Construction of toll road at Solo – Ketosono at approximately 218 km;
c. Construction supervision.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of toll road at Solo – Ketosono.
b. Outcome
1) Improving the access and capacity of road networks and good distribution leading to
improve the link of Jogja-Surabaya and surrounding cities as well as to other cities in
eastern part of Java in complience with economic and regional development;
2) Enhancing the development of the city and its suburb areas in order to enhance the
economic development and poverty alleviation especially along the corridor;
3) Increasing the efficiency of production with repression of distributional cost and
giving access to national and international market.
6
131
BB-ID: BBP1-03304-04-082443-1060121
10. Project Cost
Foreign Funding
- Loan : US$ 300,000,000
- Grant : US$ 0
Sub Total : US$ 300,000,000
Counterpart Funding
- Central Government : US$ 30,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 30,000,000
TOTAL : US$ 330,000,000
132
BB-ID: BBP1-03304-04-082440-1060122
1. Project Title : Western Indonesia National Road Improvement Project (WINRIP)
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Highways, Ministry of Public Works
6. Background and Justification
The Government of Indonesia wishes to continue the strengthening of the national road
system in Indonesia. To realize it, a new Ministerial Regulation added approximately 8,000
km to the national road network, increasing its length by 30%.
7. Scope of Work
a. Improvement of road;
b. Improvement of bridge.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Improvement of national road network of approximately 8,000 km long in Western
Indonesia.
b. Outcome
1) Improving national road network to an acceptable standard of service;
2) Supporting local and regional economic development.
10. Project Cost
Foreign Funding
- Loan : US$ 250,000,000
- Grant : US$ 0
Sub Total : US$ 250,000,000
Counterpart Funding
- Central Government : US$ 50,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 50,000,000
TOTAL : US$ 300,000,000
6 6
133
Directorate General of Human Settlements
(Direktorat Jenderal Cipta Karya)
135
BB-ID: BBP1-03305-04-072446-1060126
1. Project Title : Community Based Water Supply and Sanitation Project - Phase I
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Based on Data of Indonesian Statistics (2007), community access into basic sanitation facilities
in Indonesia has reached 77.15%, passed over the Millennium Development Goals (MDGs)
2015 target. On the other hand, there is only about 49.13% of household using proper on-site
system (septic tank).
Community access into domestic wastewater infrastructure is closely related to health,
environment, education, socio-culture, and wealth aspects. Many researches have proven that
higher community access into domestic wastewater infrastructure (including people
knowledge about hygiene) could decrease the level of waterborne diseases. Community Based
Sanitation or known as SANIMAS (sanitasi masyarakat) in Indonesia is one of the solutions to
provide domestic wastewater infrastructure for the poor community living in slum area.
SANIMAS is a program that promotes the provision of community based sanitation
infrastructure by demand responsive approach. Its focus is on handling domestic wastewater
treatment, especially for human feces, and also home industrial wastewater that can be
degraded naturally. In SANIMAS process, community is fully involved in selecting
appropriate technology to local conditions and actively participating to develop action plan,
forming communities, building sanitation facilities, and also managing the operation and
maintenance.
7. Scope of Work
a. Development of SANIMAS ;
b. Capacity building;
c. Community empowerment.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of SANIMAS in 2,232 urban villages in East Indonesia, 2,591 urban villages in
Kalimantan and Sulawesi, 3,188 urban villages in Java, and 2,989 urban villages in
Sumatera.
b. Outcome
Decreasing the waterborne diseases in Indonesia.
6
136
BB-ID: BBP1-03305-04-072446-1060126
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 0
Sub Total : US$ 100,000,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 115,000,000
137
BB-ID: BBP1-03305-04-072450-1060127
1. Project Title : Development of Jatiluhur Water Supply Project - Stage I
2. Duration : 60 months
3. Location : DKI Jakarta, Bekasi, Karawang District
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
The increasing population and economic activities increase water demand, especially in the
areas of Jakarta, Bekasi, and Karawang. Meanwhile, water supply infrastructure, especially in
Jakarta is incapable to provide and cover current and future demand. To meet this
requirement is necessary to construct water supply system from the reservoir of Jatiluhur.
Development of Jatiluhur Water Supply System is an advantage for regional development for
the area of Jakarta, Karawang, and Bekasi. Water supply system in terms of regional
development with a more economical scale will make system management more efficient and
environmentally friendly. Development of Jatiluhur water supply system can also support the
availability of drinking water for a long time and assured of quality, quantity, and continuity.
7. Scope of Work
a. Preparation of detailed engineering design and feasibility study;
b. Construction of water pump 5,000 lps;
c. Construction of transmission pipe;
d. Construction of booster pump and reservoir.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Improved water supply service coverage for 400,000 house connections or 2 million
people in DKI Jakarta, Bekasi, and Karawang.
b. Outcome
Improving the productivity and quality of community life through the adoption of
healthy behavior in DKI Jakarta, Bekasi, and Karawang.
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 7,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,500,000
TOTAL : US$ 57,500,000
6
138
BB-ID: BBP1-03305-04-072444-1060128
1. Project Title : Drainage Improvement Support Project for Metropolitan Cities
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Along with the rapid population growth, especially in urban area, drainage is becoming
challenging also. Most of metropolitan cities in Indonesia do not have proper drainage
system, hence most of them are inundated with floodwater during rainy season. The flood
causes massive outbreaks of dengue fever and diarrhea. Thus, immediate action to solve
complete drainage problem in these cities should be done.
7. Scope of Work
a. Review on the existing engineering design and field survey for internal and external
drainage system including micro and macro drainage condition;
b. Preparing physical construction steps;
c. Socialization to the affected population and preparation construction action plan;
d. Construction of drainage system infrastructure along with other supporting facilities.
e. Supervision of the infrastructure construction;
f. Preparing operation and maintenance manual.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Improvement of infrastructure for drainage system in metropolitan cities.
b. Outcome
Solving flood and inundation problems that appear in prioritized areas around Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 30,000,000
- Grant : US$ 0
Sub Total : US$ 30,000,000
Counterpart Funding
- Central Government : US$ 4,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,500,000
TOTAL : US$ 34,500,000
6
139
BB-ID: BBP1-03305-04-072446-1060129
1. Project Title : Emission Reduction in Cities - Solid Waste Management
2. Duration : 48 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Final Disposal Sites (FDS) in Indonesia still uses old system, which is open dumping. The
consequence of the application of open dumping is that this type of solid waste management
emits methane gas that creates environmental problems such as local air pollution and
increases the risk of fires and explosions at the landfill site. Landfill gas contributes to global
warming as it emits methane gas that is one of green house gases. Its global warming
potential that is twenty one times larger than that of carbon dioxide leads to the importance of
this gas to be mitigated in such a way that could give not only environmental benefit but also
economic as well as social benefit.
7. Scope of Work
a. Rehabilitation of the existing FDS and development of new FDS according to feasibility
study and detailed engineering design;
b. Improvement of urban solid management.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of new Final Disposal Site and improvement of the existing ones;
2) Improved urban solid management.
b. Outcome
Optimizing the performance of final disposal site for achieving clean development
management.
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 0
Sub Total : US$ 35,000,000
Counterpart Funding
- Central Government : US$ 20,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 20,000,000
TOTAL : US$ 55,000,000
6
140
BB-ID: BBP1-03305-04-072450-1060130
1. Project Title : Greater Bandung Water Supply and Sanitation Project - Phase I
2. Duration : 60 months
3. Location : Bandung District
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Greater Bandung Area is a center of national activities. It becomes the center of national
strategic locations with the rapid population growth. Total population in 2010 is 42 million
people with the growth rate of 1.7% per year. The estimation for the population is 52 million
people in 2025. The increasing population growth is parallels with the increasing
environmental problem as an effect of infrastructures quality instability in that area. Hence,
the integrated planning system between areas and sectors become an urgent issue to be done
in Greater Bandung area.
7. Scope of Work
a. Construction of water supply system with the water resources alternatives as follows:
1) Saguling Dam (4,000 lps) in West - East Bandung district;
2) Cisangkuy/Cikalong River (1,400 lps) in South Bandung district.
b. Construction of regional final disposal site of solid waste:
1) Leuwi Gajah regional final disposal site of solid waste (2,328 ton/day);
2) Legok Nagka regional final disposal site of solid waste (1,909 ton/day).
c. Master plan review and development of sewerage system to optimize Bojongsoang waste
water treatment plant management as the priority.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Development of multi-sector infrastructures in Greater Bandung;
2) Fulfillment of the need for water supply.
b. Outcome
Increasing the productivity and community lives by the construction of sanitation
infrastructure.
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 7,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,500,000
TOTAL : US$ 57,500,000
6
141
BB-ID: BBP1-03305-04-072450-1060131
1. Project Title : Greater Surabaya - Umbulan Water Supply Project - Stage I
2. Duration : 60 months
3. Location : Surabaya
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Umbulan spring is located between Kedungrejo and Umbulan, Pasuruan, East Java
Province. It has a capacity of 4,000 liters per second (lps) but only 10% of water can be used by
the community, which is to supply Pasuruan only with approximately 170 lps and the rest is
just wasted into the sea. On the other hand, the areas around the district of Pasuruan, Gresik,
and Surabaya for example, have difficulties in obtaining high quality raw water sources. Raw
water sources in Gresik and Surabaya during this time rely on water from Surabaya, which is
no longer feasible to be used as raw drinking water materials. Umbulan Water Supply Project
aims to accelerate the fulfillment of drinking water services in Surabaya and surrounding
areas (Gresik, Sidoarjo, Pasuruan District, and Pasuruan City). This project is a government
investment to support the Public Private Partnership schemes in water supply infrastructure
with good quality and quantity for communities.
7. Scope of Work
a. Preparation of detailed engineering design and feasibility study;
b. Constructions of Broncaptering intake with 4,000 lps capacity;
c. Construction of pump shelter;
d. Development of water transmission pipe network with total pipe length of 92 km.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Improvement of water supply service coverage for 320,000 house connections or 1.6
million people in Surabaya city, Gresik district, Sidoarjo district, Pasuruan district, and
Pasuruan city.
b. Outcome
Improving the productivity and quality of community life through the adoption of
healthy behavior in Surabaya city, Gresik district, Sidoarjo district, Pasuruan district, and
Pasuruan city
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 7,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,500,000
TOTAL : US$ 57,500,000
6
142
BB-ID: BBP1-03305-04-072450-1060132
1. Project Title : IKK Water Supply Program and Small Water Treatment Plant for
Water Scarcity Area
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Government of Indonesia is committed to achieve the target of water supply and sanitation of
Millennium Development Goals - to halve the number of population without access to water
supply sanitation in year 2015. However, 2008 data shows that service coverage in urban areas
only reach 47% and 12% in rural areas. Therefore, Ibukota Kecamatan (IKK) Water Supply
Program and Small Treatment Plant for water scarcity area are expected to be able to provide
access to water supply to communities living in water scarcity area.
7. Scope of Work
a. Construction of water treatment plant;
b. Construction of raw water transmission pipeline;
c. Construction of distribution pipeline.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of water treatment plants in 350 sub-district capital locations;
2) Improved access to water supply in 350 sub-district capital locations.
b. Outcome
Increasing the access to water supply for communities in water scarcity area.
10. Project Cost
Foreign Funding
- Loan : US$ 80,000,000
- Grant : US$ 0
Sub Total : US$ 80,000,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 95,000,000
143
BB-ID: BBP1-03305-04-072447-1060133
1. Project Title : Makassar Water Supply Development Project - Stage II
2. Duration : 60 months
3. Location : Makassar
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Somba Opu Water Treatment Plant (WTP) has been facing an unexpected turbidity problem
of raw water from Bili-Bili dam caused by the collapse of Bawakaraeng mountain. This
problem will reduce the service period of Bili-Bili dam and the production capacity of WTPs,
increase the production cost, and disturb the reliability of raw water resource. Therefore, an
emergency project is necessary. In addition, an extension of water supply service is necessary
to satisfy the Millennium Development Goals.
7. Scope of Work
a. Construction of Somba Opu WTP - stage II, with the capacity of 1,000 lps;
b. Extension of distribution pipeline with diameter of 50 mm to 1,100 mm, 272.5 km;
c. Installing additional house connection.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of water supply system that is able to serve the community of Makassar city
with water that fulfills the standard.
b. Outcome
Improving the community well-being in Makassar city.
10. Project Cost
Foreign Funding
- Loan : US$ 20,000,000
- Grant : US$ 0
Sub Total : US$ 20,000,000
Counterpart Funding
- Central Government : US$ 3,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,0000,000
TOTAL : US$ 23,000,000
6
144
BB-ID: BBP1-03305-04-072446-1060134
1. Project Title : Metropolitan Sanitation Management and Health Project
2. Duration : 60 months
3. Location : Medan, Yogyakarta
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Indonesia is urbanizing rapidly, with the urban population projected to increase from the
current 45% of total population to 60% by 2025 or reaching 160 million people by then. Basic
urban services, including water supply and sanitation, are in crisis. Poor sanitation services
are the cause of severe urban pollution, with impact on public health and well-being of the
population. The condition of water supply services in Yogyakarta city and Medan city are
better than their sanitation. Almost all of Medan communities get their clean water from
unprotected wells (no wall nor waterproof floor), whereas water closets or septic tanks are
placed about 10 m from them. Therefore, the wells often got polluted by seepage from septic
tanks nearby. Meanwhile, the result of water analysis from wells in Yogyakarta city shows
that 50% from all wells have high pollution level.
7. Scope of Work
a. Rehabilitation of the system that currently serves the city, involving:
1) Pipe replacement;
2) Upgrading of pumping stations;
3) Replacement of pumps;
4) Installation of new sewer connections.
b. Expansion of the sewerage system, involving:
1) Construction of pipe;
2) Construction pumping stations;
3) Installation of new sewer connections;
4) Rehabilitation of wastewater treatment plant.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Improvement of sewerage system services for 13,250 SR in Medan city and 14,640 SR in
Yogyakarta.
b. Outcome
1) Decreasing the number of diseases caused by wastewater;
2) Increasing the health level of the communities.
6
145
BB-ID: BBP1-03305-04-072446-1060134
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 1,500,000
Sub Total : US$ 36,500,000
Counterpart Funding
- Central Government : US$ 20,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 20,000,000
TOTAL : US$ 56,500,000
6
146
BB-ID: BBP1-03305-04-072450-1030135
1. Project Title : National Community Empowerment Program - Urban Areas in
Middle and Eastern Indonesia
2. Duration : 60 months
3. Location : Central Java, DI Yogyakarta, East Java, Sulawesi, West Nusa
Tenggara, Bali, East Nusa Tenggara, East Kalimantan, South
Kalimantan, Central Kalimantan, Maluku, Papua, and West Papua
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
The Government of Indonesia (GoI) is committed to achieve the Millennium Development
Goals (MDGs). One such target within the MDGs is to reduce the poverty level by 50% in
2015. As a mean of achieving this, the GoI has established the National Program of
Community Empowerment/Program Nasional Pemberdayaan Masyarakat (PNPM) as an
'umbrella policy' to create synergy amongst the various community empowerment programs.
PNPM has been implemented by expanding the coverage area of various on-going
community empowerment programs, so by the end of 2009, PNPM covers a total of more than
6,000 sub-districts of which about 1,144 will be urban.
The expansion of coverage area is urgent and relevant considering the financial assistance to
the beneficiary communities from current programs is relatively small (at $2/person)
compared to the desired minimum ($5/person). In addition, the availability of assistance to
the community can only cover 10-15% of the needs. Therefore, the GoI plans to implement
PNPM at least until 2015 in two phases. The current phase, 2007-2009, is increasing entire
national coverage of more than 70,000 villages. PNPM is now shifting into a more sustainable
mode in the second phase, 2010-2014, whereby the local governments and sectoral programs
will take on greater responsibility for financing. Over time, other Community Driven
Development (CDD) - poverty reduction initiatives (e.g. housing improvement project) will be
folded into the PNPM umbrella in order to make programming at community level in more
streamlined, coordinated, and responsive to beneficiaries needs.
President Regulation Number 13/2009 was issued to underline the important of PNPM to
coordinate, consolidate, and integrate the poverty reduction agenda of the government. The
Ministry of Finance Regulation Number 168/2009 gives the local government higher
contribution. Subsequently in 2010, the GoI will establish a policy for implementation of
PNPM in the entire sub-districts through PNPM-Urban and in rural sub-districts through sub-
district development program, Support for Poor and Disadvantaged Areas (SPADA),
Regional Infrastructure for Sosial Economic Development (RISE)/(PNPM-Rural), and other
programs. In this context, the PNPM-Urban covers 1,094 urban sub-districts in 265 cities and
9,556 urban villages/villages in 2010. In addition to the expansion of the PNPM-Urban in 2010,
the implementation mechanism will incorporate the improved concepts from evaluations of
the ongoing PNPM. This project will support PNPM-Urban of Fiscal Year 2010 in Central
Java, DI Yogyakarta, East Java, All Sulawesi Areas, West Nusa Tenggara, Bali, East Nusa
Tenggara, East Kalimantan, South Kalimantan, Central Kalimantan, Maluku, Papua, and West
Irian.
147
BB-ID: BBP1-03305-04-072450-1030135
7. Scope of Work
a. Providing supplemental block grants to the existing PNPM-Urban wards in 19 provinces;
b. Financing a channeling program by community organization in about 1,402 villages;
c. Institutional enhancements to the more sustainable revolving funds component.
8. Priority
Mainstreaming and cross-sector
9. Output and Outcome
a. Output
1) Achievement of an “Empowered and Independent” community that is capable in
overcoming local poverty problems;
2) Increased capacity of local governments to incorporate the participative development
model as a basis of partnership with the community and local interest groups;
3) Harmonization and synergy amongst the various community empowerment
programs;
4) Increased benefits towards the poverty affected communities.
b. Outcome
1) Strengthening the community leadership through community self-reliant
organization that is inspirational, representative, and accountable;
2) Preparing and integrating a medium-term plan for comprehensive poverty
alleviation by creating synergy between the various poverty alleviation initiatives in
accordance with the aspirations as well as the needs of the community in the context
of improving their living environment in a sustainable way;
3) Improving the access of the poor to basic services within the community as part of
the objective of increasing Human Development Index and achieving the MDGs.
10. Project Cost
Foreign Funding
- Loan : US$ 150,000,000
- Grant : US$ 0
Sub Total : US$ 150,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 150,000,000
6
148
BB-ID: BBP1-03305-04-072450-1030136
1. Project Title : National Community Empowerment Program - Urban Areas in
Western Indonesia
2. Duration : 60 months
3. Location : Sumatera, West Java, Banten, DKI Jakarta, and West Kalimantan
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
The Government of Indonesia (GoI) is committed to achieve the Millennium Development
Goals (MDGs). One such target within the MDGs is to reduce the poverty level by 50% in the
year 2015. As a mean of achieving this, the GoI has established the National Community
Empowerment Program/Program Nasional Pemberdayaan Masyarakat (PNPM) as an 'umbrella
policy' to create synergy amongst the various community empowerment programs. PNPM
has been implemented by expanding the coverage area of various on-going community
empowerment programs so in the end of 2009, PNPM covers a total of more than 6,000 sub-
districts of which about 1,144 will be urban.
The expansion of coverage area is urgent and relevant considering the financial assistance to
the beneficiary communities from current programs is relatively small (at $2/person)
compared to the desired minimum ($5/person). In addition, the availability of assistance to
the community can only cover 10-15% of the needs. Therefore, the GoI plans to implement
PNPM at least until 2015 in two phases. The current phase, 2007-2009, is increasing entire
national coverage of more than 70,000 villages. PNPM is now shifting into a more sustainable
mode in the second phase, 2010-2014, whereby the local governments and sectoral programs
will take on greater responsibility for financing. Over time, other Community Driven
Development (CDD) - poverty reduction initiatives (e.g. housing improvement project) will be
folded into the PNPM umbrella in order to make programming at community level in more
streamlined, coordinated, and responsive to beneficiaries needs.
President Regulation Number 13/2009 was issued to underline the important of PNPM to
coordinate, consolidate, and integrate the poverty reduction agenda of the government. The
Ministry of Finance Regulation Number 168/2009 gives the local government higher
contribution. Subsequently in 2010, the GoI will establish a policy for implementation of
PNPM in the entire sub-districts through PNPM-Urban and in rural sub-districts through sub-
district development program, Support for Poor and Disadvantaged Areas (SPADA),
Regional Infrastructure for Sosial Economic Development (RISE)/(PNPM-Rural), and other
programs. In this context, the PNPM-Urban covers 1.094 urban sub-districts in 265 cities and
9,556 urban villages/villages in 2010. In addition to the expansion of the urban PNPM in 2010,
the implementation mechanism will incorporate the improved concepts from evaluations of
the ongoing PNPM. This project will support PNPM-Urban of Fiscal Year 2010 in Sumatera
areas, West Java, Banten, DKI Jakarta, and West Kalimantan.
149
BB-ID: BBP1-03305-04-072450-1030136
7. Scope of Work
a. Providing supplemental block grants to the existing PNPM-Urban wards in 14 provinces;
b. Financing a channeling program by community self-reliant organization in about 1,402
villages;
c. Institutional enhancements to the more sustainable revolving funds component.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Achievement of an “Empowered and Independent” community that is capable in
overcoming local poverty problems;
2) Increased capacity of local governments to incorporate the participative development
model as a basis of partnership with the community and local interest groups;
3) Harmonization and synergy amongst the various community empowerment
programs;
4) Increased benefits towards the poverty affected communities.
b. Outcome
1) Strengthening the community leadership through Community Self-Reliant
Organization that is inspirational, representative, and accountable;
2) Preparing and integrating a medium-term plan for comprehensive poverty
alleviation by creating synergy between the various poverty alleviation initiatives in
accordance with the aspirations as well as the needs of the community in the context
of improving their living environment in a sustainable way;
3) Improving the access of the poor to basic services within the community as part of
the objective of increasing Human Development Index and achieving the MDGs.
10. Project Cost
Foreign Funding
- Loan : US$ 77,603,697
- Grant : US$ 0
Sub Total : US$ 77,603,697
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 77,603,697
6
150
BB-ID: BBP1-03305-04-072450-1030137
1. Project Title : National Community Empowerment Program - Urban Areas
Nationwide
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
The Government of Indonesia (GoI) is committed to achieve the Millennium Development
Goals (MDGs). One such target within the MDGs is to reduce the poverty level by 50% in the
year 2015. As a mean of achieving this, the GoI has established the National Community
Empowerment Program/Program Nasional Pemberdayaan Masyarakat (PNPM) as an 'umbrella
policy' to create synergy amongst the various community empowerment programs. PNPM
has been implemented by expanding the coverage area of various on-going community
empowerment programs so in the end of 2009, PNPM covers a total of more than 6,000 sub-
districts of which about 1,144 will be urban.
The expansion of coverage area is urgent and relevant considering the financial assistance to
the beneficiary communities from current programs is relatively small (at $2/person)
compared to the desired minimum ($5/person). In addition, the availability of assistance to
the community can only cover 10-15% of the needs. Therefore, the GoI plans to implement
PNPM at least until 2015 in two phases. The current phase, 2007-2009, is increasing entire
national coverage of more than 70,000 villages. PNPM is now shifting into a more sustainable
mode in the second phase, 2010-2014, whereby the local governments and sectoral programs
will take on greater responsibility for financing. Over time, other Community Driven
Development (CDD) - poverty reduction initiatives (e.g. housing improvement project) will be
folded into the PNPM umbrella in order to make programming at community level in more
streamlined, coordinated, and responsive to beneficiaries needs.
President Regulation Number 13/2009 was issued to underline the important of PNPM to
coordinate, consolidate, and integrate the poverty reduction agenda of the government. The
Ministry of Finance Regulation Number 168/2009 gives the local government higher
contribution. Subsequently in 2010, the GoI will establish a policy for implementation of
PNPM in the entire sub-districts through PNPM-Urban and in rural sub-districts through sub-
district development program, Support for Poor and Disadvantaged Areas (SPADA),
Regional Infrastructure for Sosial Economic Development (RISE)/(PNPM-Rural), and other
programs. In this context, the PNPM-Urban covers 1,094 urban sub-districts in 265 cities and
9,556 urban villages/villages in 2010. In addition to the expansion of the urban PNPM in 2010,
the implementation mechanism will incorporate the improved concepts from evaluations of
the ongoing PNPM. This project will support PNPM-Urban of Fiscal Year 2010 in all
provinces in Indonesia.
151
BB-ID: BBP1-03305-04-072450-1030137
7. Scope of Work
a. Providing supplemental block grants to the existing PNPM-Urban wards;
b. Financing a channeling program by community self-reliant organization in about 1,402
villages;
c. Institutional enhancements to the more sustainable revolving funds component.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Achievement of an “Empowered and Independent” community that is capable in
overcoming local poverty problems;
2) Increased capacity of local governments to incorporate the participative development
model as a basis of partnership with the community and local interest groups;
3) Harmonization and synergy amongst the various community empowerment
programs;
4) Increased benefits towards the poverty affected communities.
b. Outcome
1) Strengthening the community leadership through Community Self-Reliant
Organization that is inspirational, representative, and accountable;
2) Preparing and integrating a medium-term plan for comprehensive poverty
alleviation by creating synergy between the various poverty alleviation initiatives in
accordance with the aspirations as well as the needs of the community in the context
of improving their living environment in a sustainable way;
3) Improving the access of the poor to basic services within the community as part of
the objective of increasing Human Development Index and achieving the MDGs.
10. Project Cost
Foreign Funding
- Loan : US$ 409,603,490
- Grant : US$ 0
Sub Total : US$ 409,603,490
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 409,603,490
6
152
BB-ID: BBP1-03305-04-072444-1060138
1. Project Title : Neighborhood Upgrading and Shelter Sector Project - Phase II
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
The slum settlement environment growth is quite significant, i.e. 1.37% per year (Indonesia
Statistics Agency). It is estimated that the total area of slum settlement will reach 71,860 ha in
2025. The spread of slums in cities has led to various impacts such as the increased frequency
of floods and fires, the increased social conflicts and vulnerability, and the declining public
health, basic facilities, and housing services. This project is intended to improve planning and
management of urban slum settlement through the preparation of area development strategy.
In addition, this project is necessary to satisfy the Millennium Development Goals.
7. Scope of Work
a. Preparation of area development strategy;
b. Development of cities scale slum area settlement facilities;
c. Development of new settlement area for low-income communities in the cities;
d. Strengthening institutional capacity of local government and community.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Improvement on planning and management of urban region slum settlement;
2) Improvement of cities scale slum area settlement facilities;
3) Improvement of institutional capacity of local government and community.
b. Outcome
Establishing the sustainable human settlements through a synergy planning and handling
between the central government, local government, community, and other related
stakeholders.
10. Project Cost
Foreign Funding
- Loan : US$ 40,000,000
- Grant : US$ 0
Sub Total : US$ 40,000,000
Counterpart Funding
- Central Government : US$ 4,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,000,000
TOTAL : US$ 44,000,000
6
153
BB-ID: BBP1-03305-04-072444-1070139
1. Project Title : Regional Infrastructure for Social and Economic Development
Project - Phase II (RISE II)
2. Duration : 48 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : a. Directorate General of Human Settlements, Ministry of Public
Works
b. Directorate General of Community and Village Empowerment,
Ministry of Home Affairs
c. Directorate General of Regional Development, Ministry of Home
Affairs
6. Background and Justification
To support the Poverty Reduction Strategic Papers (PRSPs) and National Community
Empowerment Program/Program Nasional Pemberdayaan Masyarakat (PNPM), the Government
of Indonesia has implemented the Regional Infrastructure for Social and Economic
Development Project (RISE) which was initiated in 2008 and scheduled to be completed by the
end of 2011 fiscal year. The RISE project supports the infrastructure development in 237 sub-
districts in 34 districts and in 9 provinces. In addition, 34 strategic areas of District for Social
Economic Development/Kawasan Strategis Kabupaten (KSK) have been defined and supported
by infrastructure development based on integrated medium-term social economic
development plan prepared by the project together with local government authorities.
As the recent Five Year Medium-Term Development Plan/Rencana Pembangunan Jangka
Menengah Nasional (RPJMN 2010-2014) has decided to extend the PNPM program until 2014, all
the RISE project locations shall be covered by additional three years PNPM program from 2012
till 2014.
So the proposed Phase II project is an extension of apparent success of the on-going Phase I
project and will cover approximately 250 sub-districts in 40 districts located outside of Java and
Bali, which will include the same project locations of Phase I and some additional where other
PNPM project cannot cover, for the period of 2012 - 2014 fiscal year. The project will provide
basic infrastructures by 2014 whose target is to reduce the number of population living below
the poverty line from 14.1% (2009) to 8-10% by 2014.
7. Scope of Work
a. Construction/improvement of transportation infrastructure;
b. Construction/improvement of supporting facilities for production;
c. Construction/improvement of marketing support facilities;
d. Construction/improvement of village water supply and sanitation facilities;
e. Construction/improvement of primary health care facilities ;
f. Construction/improvement of primary and junior high school buildings;
g. Preparing Mid-term Social Economic Development Plan of Areas Strategic Development of
District;
h. Adoptation of appropriate technology for supporting agribusiness sector of Strategic
Development Areas of District;
i. Consulting services.
154
BB-ID: BBP1-03305-04-072444-1070139
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Improvement of rural socio-economic infrastructure;
2) Structured dissemination and training programs for district and sub-district
administrations;
3) Availability of development planning documents:
Medium-term Strategic Plan of Sub-district Development (Renstra Kecamantan);
Annual Investment Program for sub-district (Program Investasi Kecamatan/PIK);
Medium-term Social Economic Development Plan of KSK;
Annual Memorandum of Coordinated Development Plan.
b. Outcome
1) Supporting the poverty alleviation by the provision of basic social and economic
infrastructure services and increasing economic opportunities in rural areas;
2) Supporting the decentralization and Local Governance;
3) Supporting social development, strengthening of capacities, and institutionalizing
community empowerment and self-reliance through participatory approach.
10. Project Cost
Foreign Funding
- Loan : US$ 40,000,000
- Grant : US$ 0
Sub Total : US$ 40,000,000
Counterpart Funding
- Central Government : US$ 6,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,000,000
TOTAL : US$ 46,000,000
6
155
BB-ID: BBP1-03305-10-072444-1030140
1. Project Title : Rural Infrastructure Support - National Community
Empowerment Program - Phase III
2. Duration : 24 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Rural Infrastructure Support was conducted by Directorate General of Human Settlements
(DGHS) to support the Self-Reliant National Community Empowerment Program/Program
Nasional Pemberdayaan Masyarakat (PNPM) Mandiri in 2009. The program covers Riau, South
Sumatra, Jambi, and Lampung provinces.
This project is aimed for strengthening capacity of community development which seeks to
empower communities and strengthen their capacity to prioritize, design, implement, and
monitor community interventions. Consistent with the PNPM-mandiri guidelines, investment
opportunities for communities will be open, except a short negative list of activities prohibited
by the Government of Indonesia’s policies. Experience from PNPM-mandiri shows that the
most common community investments include rural roads, water supply and sanitation,
irrigation, schools, health centers, community centers, and electricity. The design and
implementation of community-selected investments will be supported by social and technical
facilitators and consistent with the detailed guidelines prepared for the PNPM-mandiri.
Throughout the implementation period, technical, management, and capacity development
support will be provided to the central Project Coordination and Monitoring Unit (PCMU)
and provincial and district Project Implementation Units (PIUs) in areas such as (i) project
planning, management, and coordination; (ii) preparation of feasibility studies and
procurement packages; (iii) design and construction supervision; (iv) contract management;
(v) financial management and accounting; and (vi) institutional and human resource
development. Monitoring and evaluation support will include the design and implementation
of a high-quality impact evaluation, possibly implemented in collaboration with the
multilateral-funded PNPM in rural areas and/or other development partners involved in the
PNPM support facility.
7. Scope of Work
a. Capacity building for community development;
b. Development of rural infrastructure;
c. Supporting the implementation of project management.
8. Priority
Mainstreaming and cross-sector
156
BB-ID: BBP1-03305-10-072444-1030140
9. Output and Outcome
a. Output
1) Availability of rural infrastructure in accordance with the needs and affordability of
the community; qualified, sustainable, and environmentally friendly;
2) Increased capacity of rural communities in the implementation of rural
infrastructure;
3) Increased capacity of local government officials as facilitators of development in
rural areas;
4) Implementation of participatory, transparent, accountable, and sustainable rural
infrastructure development.
b. Outcome
1) Improving under-developed rural community welfare;
2) Creating employment opportunities;
3) Improving the community participatory for more sustainable local community
welfare program.
10. Project Cost
Foreign Funding
- Loan : US$ 180,000,000
- Grant : US$ 0
Sub Total : US$ 180,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 180,000,000
6
157
BB-ID: BBP1-03305-04-072446-1060141
1. Project Title : Small Scale Water Treatment Plants for Emergency Relief
2. Duration : 24 months
3. Location : Bekasi, Makassar, Medan, Surabaya Cities
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Several large cities and areas in Indonesia have suffered from various types of disaster
including drought, floods, earth quakes, landslides, volcanic eruptions, and whirl winds with
varying frequencies, damages, and loss of life. Due to its geographical conditions, some areas
frequently suffer from drought which in turn will cause water shortage. Ministry of Public
Works takes initiation to prepare this project as emergency relief in order to be able to assist
the victims of tragedies through providing and distributing drinking water as well as to
provide small water treatment plant for disaster victims.
7. Scope of Work
a. Providing small scale water treatment plants, along with their supporting equipments,
truck, and communication system for emergency relief (including operational vehicle) in
four locations (Medan, Bekasi, Makassar, and Surabaya)
b. Construction of Location Open Storage in four locations (Medan, Bekasi, Makassar, and
Surabaya)
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of small scale water treatment plants in Medan, Bekasi, Makassar, and
Surabaya that can be used effectively in case of emergency.
b. Outcome
Overcoming the difficulties to get safe drinking water in emergency situation.
10. Project Cost
Foreign Funding
- Loan : US$ 25,000,000
- Grant : US$ 0
Sub Total : US$ 25,000,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 40,000,000
6
158
BB-ID: BBP1-03305-04-072446-1060142
1. Project Title : Solid Waste Management Improvement Support Project for
Regional and Metropolitan Cities
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Metropolitan cities with population of more than a million inhabitants are facing massive
solid waste problems including final disposal site. Currently, these cities operate landfills,
which most of them are about to finish their operating time in the near future. The need of
opening new landfills in these cities is very critical, thus studies regarding opening new
landfills, preferably regional landfill is needed to be done as soon as possible.
7. Scope of Work
a. Construction of sorting plant and composting plant;
b. Construction of landfill site;
c. Preparation of heavy equipment;
d. Construction of transfer station and transportation vehicles;
e. Supervision;
f. Preparation of landfill operation manual and training.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of sanitary landfill;
2) Availability of supporting facilities;
3) Availability of capable human resources involved in managing and operating the
facility.
b. Outcome
Improving the infrastructure and services of solid waste.
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 0
Sub Total : US$ 100,000,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 115,000,000
6
159
BB-ID: BBP1-03305-04-072447-1060143
1. Project Title : Water Supply System Development for Banten - Jakarta from
Karian Dam
2. Duration : 60 months
3. Location : Banten
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works
6. Background and Justification
Construction of Karian Dam is for water supply and irrigation. For water supply, it needs a
construction of water conveyance from Karian to Serpong to deliver water to the locations
that need water. For stage I, water demand is about 518,000 m3/day and for the stage II is
about 346,000 m3/day. This is a government investment to support the Public Private
Partnership (PPP) scheme in the provision of water supply infrastructure.
7. Scope of Work
a. Construction of Water Treatment Plant (WTP);
b. Construction of transmission pipe;
c. Construction of distribution pipe from Serpong to Serang.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Increase of water supply service in Banten and Jakarta.
b. Outcome
1) Improving the coverage of water supply service;
2) Improving the productivity and quality of communities life through the adoption of
healthy behavior.
10. Project Cost
Foreign Funding
- Loan : US$ 40,000,000
- Grant : US$ 0
Sub Total : US$ 40,000,000
Counterpart Funding
- Central Government : US$ 6,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,000,000
TOTAL : US$ 46,000,000
6 6
161
Directorate General of Water Resources
(Direktorat Jenderal Sumber Daya Air)
163
BB-ID: BBP1-03306-04-102459-1060164
1. Project Title : Construction of Dams in East Nusa Tenggara: Including Raknamo
Dam, Kolhua Dam, and Mbay Dam
2. Duration : 60 months
3. Location : Kupang District, Nagekeo District, Kupang City
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
East Nusa Tenggara province is one of the poorest provinces in Indonesia with approximately
28% of its population living below the poverty line, far above national average of 16.66%.
Moreover, Gross Regional Domestic Product per capita is Rp3.1 million which is one third of
the national average. One of the causes of underdeveloped economy in this area is lack of basic
infrastructure such as irrigation system, flood control, and water conservation facilities to meet
the needs for economic activities. The shortage of irrigation water in West Timor, especially in
the long dry season, limits the agricultural production resulting in poor nourished status and
low income of residents. It is projected that irrigation water supply during dry season will
dramatically improve the crop productivity of the area. Insufficient safe water supply is a
cause of waterborne diseases. Recurrent flood damages are critical roadblock for sustainable
development and discourage people's motivation for steady progress.
Main sources of water supply in Kupang district/city are spring water and ground water.
However, they are not reliable water source throughout the year. Especially, spring water
supply in dry season is reduced by more than a half of the capacity that of in the rainy season.
To address the problem, Kolhua Dam is currently under feasibility study by local consultant.
Also, "The Bananain River Basin Water Resources Development and Management Study in
West Timor Island, in East Nusa Tenggara Province" was completed in 2002 to prioritize dam
projects from 21 potential dams including Temef Dam, Kinumina Dam, and Halikatuas Dam
which were proposed as priority projects in the basin.
7. Scope of Work
a. Integrated Water Development Plan for West Timor
1) Review on the existing development projects and project identification in West Timor;
2) Prioritization of the projects;
3) Establishment of implementing plan of water development plan in West Timor;
b. Kupang District Water Resource Development (Construction of Raknamo Dam)
1) Review of the detailed design;
2) Review and support of the environmental impact analysis (EIA);
3) Support of land acquisition and resettlement action plan (LARAP);
4) Construction of Raknamo Dam;
5) Development of irrigation system;
6) Development of water supply system.
c. Kupang City Water Supply
1) Review of feasibility studies;
2) Detailed design of Kolhua Dam and Mbay Dam;
3) Construction of Kolhua Dam and Mbay Dam;
6
164
BB-ID: BBP1-03306-04-102459-1060164
4) Development of water supply system;
5) Water resources development and flood control of the East of West Timor;
6) Review of the existing studies and survey on current condition;
7) Preparation of water resources development plan;
8) Preparation of flood control plan;
9) Selection of priority project.
d. Community Capacity Development Program
1) Development/empowerment of water users' associations for effective Operation and
Maintenance (O&M) of the facilities and water, which could lead to productivity
improvement in agricultural sector, and for creation of new employment such as
freshwater fishery industries;
2) Capacity development of dam operators on O&M.
3) Capacity development of local authorities on dam operation, maintenance and
management;
4) Capacity development of the communities on effective use of water.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Development of water resources and disaster management (Raknamo dam, Mbay
dam, and Kolhua dam);
2) Availability of irrigation water to irrigate Nageko district;
3) Availability of raw water in Nageko district;
4) Availability of raw water in Kupang.
b. Outcome
1) Promoting the business opportunities in East Nusatenggara;
2) Reducing the negative impacts of flash floods and draughts.
10. Project Cost
Foreign Funding
- Loan : US$ 125,900,000
- Grant : US$ 0
Sub Total : US$ 125,900,000
Counterpart Funding
- Central Government : US$ 12,900,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 12,900,000
TOTAL : US$ 138,800,000
165
BB-ID: BBP1-03306-04-102459-1060165
1. Project Title : Construction of Karian Multipurpose Dam
2. Duration : 48 months
3. Location : Lebak District
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
The probable drought discharges with a return period of ten years of Ciujung river and
Cidurian river of 3.6 m3/s and the major water sources of the project area are 1.1 m3/s. They
cannot meet the projected water demands in 2012 in the project area (5.8 m3/s in Serang,
12.7m3/s in Tangerang, and 36 m3/s in DKI Jakarta). Furthermore, it is anticipated that the
availability of private wells as an alternative water resources will be decreased due to the
exhaustion of groundwater. Considering these conditions, it is urgent to implement the first
step of development consisting of Karian dam schemes and Karian-Serpong Conveyance
System (KSCS) with a length of 36.5 km from Ciuyah tunnel to envisaged Parung Panjang
water treatment plant.
7. Scope of Work
a. Construction of dam and the entire appurtenant structure;
b. Construction of waterways.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of dam with 207.5 million cubics storage;
2) Availability of raw water supply to Serang and Cilegon city and to Tangerang district;
3) Availability of irrigation water supply to Ciujung irrigation area.
b. Outcome
1) Reducing the flood discharge in Rangkasbitung city;
2) Improving Baduy ecotourism.
10. Project Cost
Foreign Funding
- Loan : US$ 99,000,000
- Grant : US$ 0
Sub Total : US$ 99,000,000
Counterpart Funding
- Central Government : US$ 9,900,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 9,900,000
TOTAL : US$ 108,900,000
6
166
BB-ID: BBP1-03306-04-102459-1060166
1. Project Title : Construction of Kelara - Karalloe Dam
2. Duration : 50 months
3. Location : Jeneponto District
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
The Kelara-Karalloe weir irrigation system of 7,004 ha had been completed in 1974 located in
the center of Jeneponto which is the poorest and driest district of South Sulawesi province.
Agriculture dominates the economy of the area. The scheme is very significant and valuable to
the local economy. However the function of the scheme has steadily deteriorated over the past
30 years. A dramatic improvement in crop production is resulted from Small Scale Irrigation
Management Project (SSIMP)-III being implemented from 1998 to 2003. This was achieved
through simultaneous improvement by: (i) rehabilitation of deteriorated infrastructure, (ii)
strengthening of Water User Associations and farmer groups for participation in water
management, and (iii) guidance on agricultural techniques by demonstrations and training.
However, the lack of water limits the extent of this improvement, being only sufficient for
irrigation of around 45% of the area in dry season. Further improvement of the scheme can
only be effected by creation of a storage dam on Kelara-Karalloe river system.
The project area is located at about 105 km of southeast of Makassar, the capital city of South
Sulawesi, and intended to create a total irrigation potential of 9,700 ha of land which includes
the area of irrigation in the existing Kelara-Karalloe irrigation system and increase the
cropping intensity to 250% with a cropping pattern meeting the real site conditions and
aspirations of the farmers.
In order to enhance agricultural production, improvement of main canal and secondary
system for 7,004 ha and construction of new secondary and tertiary system of 2,700 ha
including farm and inspection roads and drainage system will be provided with Kelara-
Karalloe dam project.
7. Scope of Work
a. Construction of Kelara-Karalloe dam and reservoir (Concrete Faced Rockfill dam);
b. Rehabilitation of irrigation facilities (7,000 ha);
c. Construction of new irrigation facilities (2,700 ha).
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of a new dam (29 mcm storage capacities to serve 9,700 ha) with an
irrigation-based rural development approach emphasizing on empowerment of
beneficiary farmers;
2) Establishment of profitable and sustainable irrigated agriculture.
6
167
BB-ID: BBP1-03306-04-102459-1060166
b. Outcome
1) Increasing rice production, income, living standard, and national food security;
2) Supporting the poverty alleviation in South Sulawesi.
10. Project Cost
Foreign Funding
- Loan : US$ 53,261,000
- Grant : US$ 0
Sub Total : US$ 53,261,000
Counterpart Funding
- Central Government : US$ 27,174,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 27,174,000
TOTAL : US$ 80,435,000
168
BB-ID: BBP1-03306-04-102459-1060167
1. Project Title : Construction of Pandanduri Dam
2. Duration : 60 months
3. Location : East Lombok District
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : a. Directorate General of Water Resources, Ministry of Public
Works
b. Balai Wilayah Sungai/River Basin Organization Nusa Tenggara I
6. Background and Justification
South Lombok region covering the southern part of Central Lombok and southern part of East
Lombok is a critical water area with 1,065,379 populations. It requires an integrated
development to overcome the problem through High Level Diversion suplesi system that has
50,564 ha potential area with semi-technical conditions of irrigation and rain-fed land.
7. Scope of Work
a. Construction work includes:
1) Construction and development of dam;
2) Rehabilitation and improvement of irrigation network;
3) Relocation of road.
b. Provision of consultant services
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of Pandanduri dam.
b. Outcome
1) Providing water for sustainable irrigation for 5,168 ha of rice cultivation in Trench
river systems.
2) Enabling the availability of watershed flood control in trench river;
3) Supporting the development of tourism sector;
10. Project Cost
Foreign Funding
- Loan : US$ 52,740,000
- Grant : US$ 0
Sub Total : US$ 52,740,000
Counterpart Funding
- Central Government : US$ 7,800,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,800,000
TOTAL : US$ 60,540,000
6
169
BB-ID: BBP1-03306-04-102462-1060168
1. Project Title : Flood Management in Selected River Basins
2. Duration : 60 months
3. Location : Banten, DI Yogyakarta, Central Java, East Java
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
Frequent flooding is a major constraint to socio-economic development in the four basin units,
while the river regime with erratic scouring and sedimentation is a major hazard for stability
of structures in Ciujung Ciliman, Jratun Seluna, Sampean, and Progo Opak Oyo rivers. Past
measures to overcome floods, emphasizing structural approaches, had limited success and the
proposals were frequently not feasible. Lesson learned from the international experience
suggests that floods are more effectively addressed through an optimal combination of
structural and non-structural measures, addressing both causes and impacts of flooding, and
based on agreements with all stakeholders for comprehensive basin management.
Surface flow which tends to getting bigger at shorter duration and larger amount of sediment
flows into the river caused by higher and higher ground erosion is dominating the flood
problems these day. Flood problems will affect life quality degradation, poverty damage,
economic activity, and soil and environment balance. In reducing these effects, flood
management approach is proposed in selected river basins.
7. Scope of Work
Improvement of flood management in Ciujung Ciliman, Jratun Seluna, Sampean, and Progo
Opak Oyo rivers, covering:
a. River capacity enhancement;
b. River normalization;
c. Drainage improvement;
d. River barrier improvement.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Improved flood management of Ciujung Ciliman, Jratun Seluna, Sampean, and Progo
Opak Oyo rivers.
b. Outcome
Reducing the effect of flood in Ciujung Ciliman, Jratun Seluna, Sampean, and Progo Opak
Oyo rivers.
6
170
BB-ID: BBP1-03306-04-102462-1060168
10. Project Cost
Foreign Funding
- Loan : US$ 108,700,000
- Grant : US$ 0
Sub Total : US$ 108,700,000
Counterpart Funding
- Central Government : US$ 27,170,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 27,170,000
TOTAL : US$ 135,870,000
171
BB-ID: BBP1-03306-04-102460-1060169
1. Project Title : Integrated Participatory Development and Management of Irrigation
Project for Eastern Region of Indonesia - Phase I
2. Duration : 60 months
3. Location : Gorontalo, South Kalimantan, East Kalimantan, East Nusa Tenggara,
Papua, South Sulawesi,, North Sulawesi
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : a. Directorate General of Water Resources, Ministry of Public Works
b. Directorate General of Land and Water Management, Ministry of
Agriculture,
c. Directorate General of Land Rehabilitation and Social Forestry,
Ministry of Forestry
d. Directorate General of Regional Development, Ministry of Home
Affairs
6. Background and Justification
The Government of Indonesia (GoI) has indicated the revitalization of agriculture is one of the
national priorities to sustain national economic growth and to achieve food self-sufficiency in
terms of food security. The expected target of agricultural revitalization during the period of
2010-2014 is to attain growth rate in average of 3.22% in agriculture sector and to increase
income and welfare of farmers.
As one of the measures to revitalize agriculture sector, diminishing water–resources, and
reduction of rice field due to the land conversion on the over populated island of Java, the GoI
has a strategy to implement a program for developing and managing irrigation system
through (i) new development and upgrading, (ii) rehabilitation, (iii) empowerment of Water
User Associations (WUAs), (iv) implementation of irrigation asset management and
strengthening the Operation & Maintenance (O&M), (v) improvement of farming irrigation,
(vi) conservation improvement and (vii) enhancing the participation of farmers.
According to the Strategic Planning 2010-2014 of the Directorate of Irrigation, Directorate
General of Water Resources, the program consists of new development of irrigation about
500,000 ha, rehabilitation and upgrading of about 1,342,870 ha and operation and maintenance
of about 2,341,363 ha. Thus, it is urgently required to increase rice production in Indonesia for
sustainable food security. The target is the new development, upgrading, and rehabilitation of
irrigation scheme in eastern region of Indonesia which is one of the major rice producing
region and this would significantly contribute to increase rice production. The eastern region
consists of many irrigation schemes that cover more than 3,000 ha per irrigation scheme in
Kalimantan, Sulawesi, Bali, Nusa Tenggara, Maluku, and Papua.
7. Scope of Work
a. Sustainable and integrated development of irrigation infrastructure with participatory
approach of Survey Investigation and Design (SID), construction, and O&M;
b. Planning and implementation of participatory rehabilitation of irrigation system;
c. Establishment and empowerment of WUAs;
d. Capacity building of operation and maintenance office and staffs;
e. Implementation of irrigation asset management;
6
172
BB-ID: BBP1-03306-04-102460-1060169
f. Improvement of on-farm irrigation;
g. Improvement of water catchment area for conservation through public consultation,
socialization, and dissemination.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Participatory development of about 106,765 ha irrigation project for eastern Indonesia.
b. Outcome
1) Increasing the rice production;
2) Accelerating the poverty alleviation in eastern region of Indonesia;
3) Establishing a sustainable irrigated agriculture development in participatory manner
emphasizing the empowerment of the beneficiary farmers and water user's
organization.
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 0
Sub Total : US$ 100,000,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 115,000,000
173
BB-ID: BBP1-03306-04-102460-1060170
1. Project Title : Integrated Participatory Development and Management of
Irrigation Project for Western Region of Indonesia - Phase I
2. Duration : 60 months
3. Location : Bengkulu, Jambi, Nanggroe Aceh Darussalam, West Sumatera,
South Sumatera, North Sumatera
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : a. Directorate General of Water Resources, Ministry of Public
Works
b. Directorate General of Land and Water Management, Ministry
of Agriculture
c. Directorate General of Land Rehabilitation and Social Forestry,
Ministry of Forestry
d. Directorate General of Regional Development, Ministry of
Home Affairs
6. Background and Justification
The Government of Indonesia (GoI) has indicated the revitalization of agriculture is one of the
national priorities to sustain national economic growth and to achieve food self-sufficiency in
terms of food security. The expected target of agricultural revitalization during the period of
2010–2014 is to attain growth rate in average of 3.22 % in agriculture sector and to increase
income and welfare of farmers.
As one of the measures to revitalize agriculture sector, diminishing water – resources, and
reduction of rice field due to the land conversion on the over populated island of Java, the GoI
has a strategy to implement a program for developing and managing irrigation system
through (i) new development and upgrading, (ii) rehabilitation, (iii) empowerment of Water
User Associations (WUAs), (iv) implementation of irrigation asset management and
strengthening the Operation & Maintenance (O&M), (v) improvement of farming irrigation,
(vi) conservation improvement, and (vii) enhancing the participation of farmers.
According to the Strategic Planning 2010-2014 of the Directorate of Irrigation, Directorate
General of Water Resources, the program consists of new development of irrigation about
500,000 ha, rehabilitation and upgrading of about 1,342,870 ha and operation and maintenance
of about 2,341,363 ha. Thus, it is urgently required to increase rice production in Indonesia for
sustainable food security. The target is the new development, upgrading, and rehabilitation of
irrigation scheme in eastern region of Indonesia which is one of the major rice producing
region and this would significantly contribute to increase rice production. The western region
consists of many irrigation schemes that cover more than 3,000 ha per irrigation scheme in Java
Island and Sumatera
7. Scope of Work
a. Sustainable and integrated development of irrigation infrastructure with participatory
approach of Survey Investigation and Design (SID), construction, and O&M;
b. Planning and implementation of participatory rehabilitation of irrigation system;
c. Establishment and empowerment of WUAs;
6
174
BB-ID: BBP1-03306-04-102460-1060170
d. Capacity building of operation and maintenance office and staffs;
e. Implementation of irrigation asset management;
f. Improvement of on-farm irrigation;
g. Improvement of water catchment area for conservation through public consultation,
socialization, and dissemination.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Development of irrigation of more than 3,000 ha in Java and Sumatra.
b. Outcome
1) Increasing the rice production;
2) Accelerating the poverty alleviation in western region of Indonesia;
3) Establishing a sustainable irrigated agriculture development in participatory manner
emphasizing the empowerment of the beneficiary farmers and water user's
organization.
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 0
Sub Total : US$ 100,000,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 115,000,000
175
BB-ID: BBP1-03306-04-102460-1060171
1. Project Title : Integrated Participatory Development and Management of
Irrigation Small Scale Project for Eastern Region of Indonesia -
Phase I
2. Duration : 60 months
3. Location : Gorontalo, Central Kalimantan, East Kalimantan, Maluku, North
Maluku, West Nusa Tenggara, East Nusa Tenggara, Central
Sulawesi, South East Sulawesi, North Sulawesi
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
The Government of Indonesia (GoI) has indicated the revitalization of agriculture is one of the
national priorities to sustain national economic growth and to achieve food self-sufficiency in
terms of food security. The expected target of agricultural revitalization during the period of
2010-2014 is to attain growth rate in average of 3.22 % in agriculture sector and to increase
income and welfare of farmers.
As one of the measures to revitalize agriculture sector, diminishing water – resources, and
reduction of rice field due to the land conversion on the over populated island of Java, the GoI
has a strategy to implement a program for developing and managing irrigation system
through (i) new development and up grading, (ii) rehabilitation, (iii) empowerment of Water
User Associations (WUAs), (iv) implementation of irrigation asset management and
strengthening the Operation & Maintenance (O&M), (v) improvement of farming irrigation,
(vi) conservation improvement, and (vii) enhancing the participation of farmers.
According to the Strategic Planning 2010-2014 of the Directorate of Irrigation, Directorate
General of Water Resources, the program consists of new development of irrigation about
500,000 ha, rehabilitation and upgrading of about 1,342,870 ha and operation and maintenance
of about 2,341,363 ha. Out of 500,000 ha, 60% is categorized as large scale irrigation and the rest
should be contributed by small scale irrigation. Thus, it is urgently required to develop and to
upgrade small scale irrigation to enhance rice production and this would significantly
contribute to maintain food security.
7. Scope of Work
a. Sustainable and integrated development of irrigation infrastructure with participatory
approach of Survey Investigation and Design (SID), construction, and O&M;
b. Planning and implementation of participatory rehabilitation of irrigation system;
c. Establishment and empowerment of WUAs;
d. Capacity building of operation and maintenance office and staffs;
e. Implementation of irrigation asset management;
f. Improvement of on-farm irrigation;
g. Improvement of water catchment area for conservation through public consultation,
socialization, and dissemination.
8. Priority
Infrastructure
6
176
BB-ID: BBP1-03306-04-102460-1060171
9. Output and Outcome
a. Output
Rehabilitated and upgraded small-scale irrigation infrastructure, system, and
management.
b. Outcome
1) Increasing rice production and maintaining food security;
2) Accelerating the poverty alleviation in eastern region of Indonesia;
3) Establishing a sustainable irrigated agriculture development in participatory manner
emphasizing the empowerment of the beneficiary farmers and water user's
organization.
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 1,000,000
Sub Total : US$ 101,000,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 116,000,000
6
177
BB-ID: BBP1-03306-04-102462-1060172
1. Project Title : Jakarta Urgent Flood Mitigation Project (JUFMP)
2. Duration : 36 months
3. Location : North Jakarta
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
Storm drainage of central Jakarta whose basin is approximately 42.1 km is carried out by three
jump stations placed in the basin, namely Pluit, Cideng, Melati pump stations. Of those, Pluit
pump station is located at the most downstream in the basin and is the essential facility for
drainage. Facilities of Pluit pump station comprises three pump houses, East, Central and
West, which total drainage capacity is 48.4m3/s. The drainage capacity of East Pump Station is
13.6m3/s, Central pump Station is 16.8m3/s, and West Pump Station is 18.0m3/s. East Pump
Station started operating in 1963 and has passed more than 45 years from construction.
So far, maintenance works such as replacement of the pump units have been carried out,
however the aging of the facilities has seriously been making progress. On the other hand,
Central and West Pump Stations are relatively new due to their operation from 1986 and 2002
respectively. A large scale of the piping collapse occurred in the East Pump Station and bulk of
sea water intruded in Pluit Reservoir through the East Pump House. It becomes a worry if
there is no countermeasure undertaken, reservoir of Pluit will be soon full, resulting in ceasing
to function of the whole Pluit Pump Station.
As the result of the emergency investigation, it was found that piping collapse was not
generated from the sea but mainly caused by the cracks appeared on the wall and base plate of
the discharge sump. At present, as an emergency countermeasure, clogging the outlet of the
discharge sump by putting the sand bag was taken to cut off sea water into the sump and
empty of it to prevent progress of piping collapse. At present, East Pump House is ceased its
operation.
7. Scope of Work
a. Re-construction of East Pump Station;
b. Re-furnishing of pump units;
c. Construction of high tide dike;
d. Consulting services: (including technical transfer of operation and maintenance of the
pump stations).
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Improved pump units and East Pump Station of Pluit.
6
178
BB-ID: BBP1-03306-04-102462-1060172
b. Outcome
Mitigating and avoiding flood damage in Central Jakarta in order to maintain its function
as a capital city and improvement of public welfare, including poverty reduction.
10. Project Cost
Foreign Funding
- Loan : US$ 150,500,000
- Grant : US$ 6,000,000
Sub Total : US$ 156,500,000
Counterpart Funding
- Central Government : US$ 12,600,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 12,600,000
TOTAL : US$ 169,100,000
179
BB-ID: BBP1-03306-04-102459-1060173
1. Project Title : Jambo Aye Multi - Purpose Reservoir Project
2. Duration : 72 months
3. Location : Nanggroe Aceh Darussalam
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : a. Directorate General of Water Resources, Ministry of Public Works
b. River Basin Organization Sumatera I Nanggroe Aceh Darussalam
Province
6. Background and Justification
Jambo Aye Multi-Purpose Reservoir is located in the upstream of Krueng Jambo Aye which is
proposed to supply water for Pase, Arakundo, and Jambo Aye irrigation scheme and also for
flood control in Lhokseumawe city and North Aceh region and to generate electric hydro
power. The topography is dominated by central mountain range dropping down through an
undulating zone. Social activities are agriculture as yet mainly rain-fed and small irrigation
scheme and sugar estate. Today, energy supply in Nanggroe Aceh Darussalam (NAD)
province is supplied from Diesel Electrical Power Station of other province. As the increase of
water demand for people and industry activities in project area, the implementation of this
project will also provide raw water.
7. Scope of Work
a. Construction of dams and spillway;
b. Embankment of dams;
c. Construction of spillway and intake dams;
d. Construction of diversion canal;
e. Construction of power station (civil works);
f. Procurement of equipments for power station (turbines and generators).
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of Jambo Aye dam and spillway;
2) Availability of irrigation water supply management;
3) Availability of hydro electric power plant.
b. Outcome
1) Supporting national food security;
2) Providing electricity supply to NAD province;
3) Fulfilling the needs of raw/clean water to the public.
10. Project Cost
Foreign Funding
- Loan : US$ 36,000,000
- Grant : US$ 0
Sub Total : US$ 36,000,000
Counterpart Funding
- Central Government : US$ 8,600,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 8,600,000
TOTAL : US$ 44,600,000
6
180
BB-ID: BBP1-03306-04-102459-1060174
1. Project Title : Rehabilitation of Upper Citarum
2. Duration : 12 months
3. Location : West Java
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
A serious flooding had occurred in the Upper Citarum Basin, inundating an area of 4,500 ha
with flood depths of 0.5 to 2.0 m. It caused the extensive damages to many houses as well as
large areas of rice fields, along the stretches of Citarum main river and its tributaries. About
14,000 people were forced to be evacuated.
The most serious flood damage was reported along the major tributaries of the Citarum river
(such as Cikeruh, Cimande, Citarik upstream, Citarum upstream, Cirasea, Cisangkuy
upstream rivers, etc.) which has recently been suffering from recurrent seasonal floods.
Therefore, it is desirable to extend flood control works to such tributaries urgently, so they can
be free from inundation damages.
7. Scope of Work
a. Land acquisition;
b. Rehabilitation of 9 (nine) Citarum tributaries.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Rehabilitated upper citarum basin area.
b. Outcome
Controlling of flooding caused by overflow of Citarum river.
10. Project Cost
Foreign Funding
- Loan : US$ 40,000,000
- Grant : US$ 0
Sub Total : US$ 40,000,000
Counterpart Funding
- Central Government : US$ 25,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 25,000,000
TOTAL : US$ 65,000,000
6 6
181
BB-ID: BBP1-03306-04-102460-1060175
1. Project Title : Rentang Modernization Strategic Irrigation - Phase I
2. Duration : 96 months
3. Location : West Java
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
The governement of Indonesia has emphasized on irrigation development in rice fields to
achieve the self-sufficiency in rice and to secure the food security of the country since 1960's.
Although the government realized the irrigation area of 7.2 million ha in 2009, continuous
efforts to increase rice production are prerequisite to meet the increasing demand. The
government sets the target to realize the extension of irrigation for 0.5 million ha and
rehabilitation of the existing irrigation facilities for 1.34 million ha under Medium-Term
Development Plan 2010-2014.
However, the main beneficial area, namely Rentang irrigation area, is not ready to receive the
main supplemental water from the newly created reservoir. At present, irrigated wet season
paddy in Rentang irrigation area is 87,800 ha, but one of dry season paddy is 39,800 ha only.
Modernization work of the Rentang irrigation area is urgently needed to increase the irrigated
dry season paddy area of about 47,000 ha through the effective and efficient use of the valuable
and expensive water resulted by Jatigede dam. The Jatigede dam with effective reservoir
volume of 877 million cubic meters (MCM) and investment cost of US$ 240 million has been
started in 2008 and scheduled to be completed in 2013.
Comprehensive study on irrigated agricultural development with Jatigede reservoir is
required based on the above conditions assumed for dam planning and proposed cropping
pattern of Paddy-Paddy-Palawija (Cl=277%). Present irrigation efficiency is estimated at lower
than 50% considering canal lining, condition of gated structures and water management
activities. To meet the planned irrigation efficiency of 65%, it is needed to formulate the
required modernization works for.
7. Scope of Work
a. Rehabilitation of Rentang irrigation area;
b. Strengthening of operation and maintenance;
c. Empowerment of Water User Associations (WUAs);
d. Implementation of irrigation asset management;
e. Review of system planning;
f. Improvement of irrigated farming;
g. Conservation improvement.
8. Priority
Infrastructure
6
182
BB-ID: BBP1-03306-04-102460-1060175
9. Output and Outcome
a. Output
1) Modernized irrigation system of about 87,400 ha;
2) Strengthened operational and maintenance office as well as empowered WUAs and
realization of asset management procedure.
b. Outcome
1) Increasing rice production, especially during dry season by utilizing supplemental
water resulted by Jatigede reservoir;
2) Increasing the income level of farmers.
10. Project Cost
Foreign Funding
- Loan : US$ 200,000,000
- Grant : US$ 1,000,000
Sub Total : US$ 201,000,000
Counterpart Funding
- Central Government : US$ 20,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 20,000,000
TOTAL : US$ 221,000,000
183
BB-ID: BBP1-03306-04-102459-1060176
1. Project Title : The Construction of Transfer Water Interbasin Cibutarua-Cilaki
Project-West Java
2. Duration : 48 months
3. Location : West Java
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General Water Resources, Ministry of Public Works
6. Background and Justification
The population and industrial growth in Bandung has caused the shortage of clean water
supply. One way of gratifying the clean water supply is by enhancing clean water potential
resources in and around Bandung city/regency.
The decree of West Java Governor Number 610/Kep.305-Bapedda/2002 dated 1 April, 2002 is
regarding clean water resources management in 3 (three) watersheds/Daerah Aliran Sungai
(DAS), namely DAS Cibutarua, DAS Cilaki, and DAS Cisangkuy. It is recited there that in
endeavor of fulfilling clean water demand in Bandung city, particularly clean water supply for
Bandung city/regency. One of the alternative is by obtaining water from Cisangkuy river.
Several studies have been conducted to increase dominant debit of Cisangkuy river by
rerouting flow from DAS Cibutarua to DAS Cilaki through a ± 4,000 m tunnel and then to
Cisangkuy river utilizing the existing waterway, and will produce a gush of 800 lps.
There is a possibility that a dam will be constructed in DAS Cilaki (Santoso dam). Water from
Cibutarua and Cilaki rivers will be preserved in the Santoso dam before being routed to
Cisangkuy river. The utilization of this system will result the gush of 1,400 lps.
In filtering water from Cibutarua river needs a dam construction in the upstream of Cibutarua
river which flows to Garut with a dimension of 65.9 km2 and rainfall of 250 mm/year. One of
the dams will be capable to preserve 990,000 m3 of water and is expected to secure clean water
supply for Garut district.
7. Scope of Work
a. Phase 1, construction of Cibutarua dam and tunnel of transfer inter basin;
b. Phase 2, construction of Santosa dam.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of Cibutarua dam and tunnel of transfer inter basin;
2) Availability of Santosa dam.
b. Outcome
Utilizing water resources in DAS Cibutarua to increase raw water supply for Bandung city
and guarantee the irrigation water supply in Garut district.
6
184
BB-ID: BBP1-03306-04-102459-1060176
10. Project Cost
Foreign Funding
- Loan : US$ 63,750,000
- Grant : US$ 0
Sub Total : US$ 63,750,000
Counterpart Funding
- Central Government : US$ 11,250,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 11,250,000
TOTAL : US$ 75,000,000
185
BB-ID: BBP1-03306-04-102462-1060177
1. Project Title : Urgent Disaster Reduction Project for Mount Merapi and Lower
Progo River Area - Phase II
2. Duration : 72 months
3. Location : Bantul District, Boyolali District, Klaten District, Sleman District,
Magelang City
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
Indonesia is characterized as a volcanic country, having 129 volcanoes equivalent to sixteen
percent of the world total. Among them, Mount Merapi is one of the most active volcanoes.
Frequent eruptions have induced pyroclastic flows resulting in tremendous amount of
volcanic loose deposit on the slope, and concequently the debris flows occur with the intensive
rainfall.
The project is intended to protect the assets and people living in the downstream region of
Mount Merapi, with a population of approximately three milion from the threat of natural
disasters due to flood lava eruption of Mount Merapi with Progo degradation of the
downstream. In general, the project is aimed to increase security level of regional and national
againts natural disaster of debris flow due to Mt. Merapi eruptions and degradation in
downstream of Kali Progo. Therefore, social activity and regional/national economic growth
can be sustained.
The Government of Indonesia (GoI) has made efforts to mitigate sediment disasters in Mt.
Merapi area since 1980s. Considering the regional development in Mt. Merapi area and high
frequency of recent eruption of Mt. Merapi, the Urgent Disaster Reduction Project for Mt.
Merapi and Progo River Basin has been implemented since 2006 and projected to be finished in
2011. To achieve the overall targets, further implementation is necessary, so that the regional
development through volcanic disaster mitigation can be achieved.
7. Scope of Work
a. Consulting services include: (a) review on the current conditions, (b) public consultation
meetings, (c) detailed design studies, (d) procurement of goods/services, and (e)
construction supervision;
b. Civil works and equipment including:
1) implementation of construction and;
2) procurement of heavy equipment.
c. Empowerment of the institutional strengthening of Public Services Agency/Badan Layanan
Umum (BLU) of Central River Basin of Serayu Opak.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of Sabo facilities on slope of Mount Merapi;
6
186
BB-ID: BBP1-03306-04-102462-1060177
2) Availability of primary irrigation canal with inspection road on the slope area of
Mount Merapi;
3) Availability of groundsill in Progo River at Kamijoro irrigation intake in downstream
area of Mount Merapi;
4) Strengthened capacity of BLU concerning sand mining management related to
sediment control, avoiding debris flows disaster caused by Mount Merapi.
b. Outcome
Reducing the damage caused by disasters of Mount Merapi eruption.
10. Project Cost
Foreign Funding
- Loan : US$ 53,160,000
- Grant : US$ 0
Sub Total : US$ 53,160,000
Counterpart Funding
- Central Government : US$ 7,900,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,900,000
TOTAL : US$ 61,060,000
187
BB-ID: BBP1-03306-04-102460-1060178
1. Project Title : Urgent Rehabilitation of Strategic Irrigation Project for Eastern
Region of Indonesia
2. Duration : 72 months
3. Location : Bali, West Nusa Tenggara
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
During the past years, Indonesia has made remarkable progress in improving food security in
which the increasing food production during the last five years development plan was
dominated by the effort of achieving self-sufficiency of rice. The successful achievement of rice
self-sufficiency in 2008 has improved the status of food availability. The domination of rice in
agricultural development was quite understandable, since rice contributed about eighteen
percent to Indonesia's GDP in 2008 and spent more than thirty percent of consumer budget in
urban area. Rice became a dominant factor in influencing the inflation and became prime
attention in maintaining economic stability. Rice also played a strategic role in employment
generation for rural sector.
Moreover, the Government of Indonesia declared to increase the amount of domestic rice
production from the current 55,000,000 tons up to 73.64 million tons by 2014. However, those
are less likely to be achieved in a sustainable manner without adequate rehabilitation and
improvement of the irrigation systems. Thus, it is urgent to rehabilitate and improve the
existing irrigation scheme to support the sustainability of food security in Indonesia.
7. Scope of Work
a. Reviewing and updating the existing plan and design with participation of beneficiaries;
b. Preparation of tender documents and assistance;
c. Execution of construction work;
d. Strengthening of operational and maintenance office and staff for formulating the
implementation of irrigation asset management;
e. Empowerment of Water User Associations (WUAs) and introduction of asset management
through water management activities;
f. Improvement of water supply and distribution at farm level (Jaringan Irigasi Tingkat Usaha
Tani/JITUT and Jaringan Irigasi Desa/JIDES) and Tertiary Development Unit;
g. Improvement of conservation through dissemination of reforestation in catchment area.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Rehabilitated urgent irrigation in eastern region of Indonesia.
188
BB-ID: BBP1-03306-04-102460-1060178
b. Outcome
1) Increasing the rice production;
2) Alleviating regional disparity between rural and urban areas;
3) Improving the income level of the community by the irrigation development.
10. Project Cost
Foreign Funding
- Loan : US$ 39,076,000
- Grant : US$ 1,000,000
Sub Total : US$ 40,076,000
Counterpart Funding
- Central Government : US$ 5,749,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 5,749,000
TOTAL : US$ 45,825,000
189
BB-ID: BBP1-03306-04-102460-1060179
1. Project Title : Urgent Rehabilitation of Strategic Irrigation Project for Western
Region of Indonesia
2. Duration : 72 months
3. Location : Lampung, Riau, West Sumatera, North Sumatera
4. Executing Agency : Ministry of Public Works
5. Implementing Agency : Directorate General of Water Resources, Ministry of Public Works
6. Background and Justification
During the past years, Indonesia has made remarkable progress in improving food security in
which the increasing food production during the last five years development plan was
dominated by the effort of achieving self-sufficiency of rice. The successful achievement of rice
self-sufficiency in 2008 has improved the status of food availability. The domination of rice in
agricultural development was quite understood, since rice was contributed about eighteen
percent to Indonesia's Gross Domestic Product in 2008 and shared more than thirty percent of
consumer budget in urban area. Rice became a dominant factor to the formation of inflation
and placed the prime attention in the maintenance of economic stability. Rice was also poses a
strategic role in employment generation for the rural sector.
Moreover, Government of Indonesia declared to increase the amount of domestic rice
production from the current 55,000,000 tons up to 73,64 million tons by 2014. However, those
are less likely to be achieved in a sustainable manner without adequate rehabilitation and
improvement of the existing irrigation systems. Thus, it is urgent to rehabilitate and improve
the existing irrigation scheme to support the sustainability of food security in Indonesia.
7. Scope of Work
a. Reviewing and updating the existing plan and design with participation of beneficiaries;
b. Preparation of tender documents and assistance;
c. Execution of construction work;
d. Strengthening of operational and maintenance office and staff for formulating the
implementation of Irrigation Asset Management;
e. Empowerment of Water User Associations (WUAs) and introduction of asset management
through water management activities;
f. Improvement of water supply and distribution at farm level (Jaringan Irigasi Tingkat Usaha
Tani/JITUT and Jaringan Irigasi Desa/ JIDES) and Tertiary Development Unit;
g. Improvement of conservation through dissemination of reforestation in catchment areas.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Rehabilitated urgent irrigation in western region of Indonesia.
6
190
BB-ID: BBP1-03306-04-102460-1060179
b. Outcome
1) Increasing rice production;
2) Alleviating regional disparity between rural and urban areas;
3) Improving the income level of the community by the irrigation development.
10. Project Cost
Foreign Funding
- Loan : US$ 73,975,000
- Grant : US$ 1,000,000
Sub Total : US$ 74,975,000
Counterpart Funding
- Central Government : US$ 9,781,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 9,781,000
TOTAL : US$ 84,756,000
6
191
BB-ID: BBP1-03306-04-102460-1060180
1. Project Title : Water Resources and Irrigation Sector Management Program - APL 2
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Public Works
5. Implementing
Agencies
: a. Directorate General of Water Resources, Ministry of Public Works;
b. Directorate General of Land and Water Management, Ministry of
Agriculture;
c. Directorate of Regional Development, Ministry of Home Affairs;
d. Ministry of National Development Planning Agency/National
Development Planning Agency
6. Background and Justification
Water Resources and Irrigation Sector Management Program (WISMP) APL 1 will end in
December 2010 with good progress in improving the capacity building Institutions in the
management sector and the river region participatory irrigation management, especially in
formation/development of water user association/Gabungan Persatuan Petani Pemakai Air,
rehabilitation of irrigation networks. However, there are still some unresolved aspects in the
settlement process, such as the formation of provincial water resources and Water
Resources Management Coordination Team/Tim Koordinasi Pengelolaan Sumber Daya Air, the
absence of memorandum of understanding for role sharing, the absence of legal protection
such as river regulation, and decree of the Minister of Public Works related to the authority of
central and provincial institutions.
Therefore, WISMP APL 2 is designed and implemented within an overall framework, with a
balance between capacity building and rehabilitation of irrigation networks and infrastructure
with respect to river lesson learned from the implementation of WISMP APL 1.
7. Scope of Work
a. Improving Basin Water Resources Management and Participatory Irrigation Management:
1) Basin Water Resources Management:
(a) Improving river basin institutional and river infrastructure;
(b) Developing Public Services Agency/Badan Layanan Umum (BLU) for River Basin
Organization;
(c) Improving national hidrology system management and information program.
2) Participatory Irrigation Management:
(a) Increasing institutional and capacity building for participatory irrigation
management;
(b) Improving participatory irrigation network in several levels;
(c) Supporting irrigated agriculture in order to support adaptation to climate
change.
b. Rehabilitation and improvement of Jatiluhur Irrigation Network:
1) Improving institutional for irrigation network management;
2) Rehabilitation of infrastructure for the investigation, design, flood, and sedimentation
management;
3) Supporting irrigated agriculture in order to support adaptation to climate change.
6
192
BB-ID: BBP1-03306-04-102460-1060180
c. Project Management and Technical Assistance.
Supporting the project management activities and technical assistance.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Improvement of irrigation infrastructure, management, networks, and services.
b. Outcome
Increasing the productivity of irrigated agriculture within the river area and selected
provinces.
10. Project Cost
Foreign Funding
- Loan : US$ 150,000,000
- Grant : US$ 0
Sub Total : US$ 150,000,000
Counterpart Funding
- Central Government : US$ 50,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 50,000,000
TOTAL : US$ 200,000,000
6
193
Ministry for Development of
Disadvantaged Regions (Kementerian Pembangunan Daerah Tertinggal)
195
BB-ID: BBP1-06706-02-000000-1070195
1. Project Title : National Strategic Centers of Activities Development in Border
Regions
2. Duration : 60 months
3. Location : West Kalimantan Province, East Kalimantan Province
4. Executing Agency : Ministry for Development of Disadvantaged Regions
5. Implementing Agency : a. Ministry for Development of Disadvantaged Regions
b. Ministry of National Development Planning / National
Development Planning Agency
6. Background and Justification
The government has announced the policies for the development of boarder areas as national
priority which has been formulated in the last Medium-Term Development Plan (2004-2009).
Most of the border regions are categorized as disadvantaged regions in which they have
problems of isolation, poverty, security hardship, territorial acquisition, illegal trading, human
trafficking, and moving border line by neighbor country.
The government has decided to give a high priority to conduct the implementation of
increasing the people welfare and security in balanced manner. In the West and East
Kalimantan provinces, there are 5 (five) districts which should be developed as National
Strategic Activities Centre; Sambas, Bengkayang, Sanggau, Kapuas Hulu, and Nunukan.
7. Scope of Work
a. Development of regional economic focusing on the development of prime product, the
development of production areas to stimulate the economics of activities in surrounding
areas, and the development of integrated industrial estates;
b. Economic empowerment for community in boarder regions;
c. Strengthening the sub-regional economic cooperation with neighbor counties;
d. Development of inter-regional infrastructure for supporting the economic movement
between the regional growth centers and its surrounding regions, and sub-regional areas;
e. Development of local infrastructure for supporting the local economic development and
social services;
f. Provision of custom-immigration-quarantine-security facilities with completed standard
for supporting the in-out flow of human and goods.
8. Priority
Economy
9. Output and Outcome
a. Output
1) Increase of production of prime commodities;
2) Increase of employment opportunity and community income;
3) Availability of inter-regional and local infrastructure;
4) Availability of custom-immigration-quarantine-security facilities;
5) Improvement of the flow of human and goods;
6) Availability of working facilities for apparatus in boarder areas.
196
BB-ID: BBP1-06706-02-000000-1070195
b. Outcome
1) Increasing the economic activities and people welfare in boarder regions;
2) Increasing the boarder area security and sovereignty of the state;
3) Increasing the border areas as a front gates function.
10. Project Cost
Foreign Funding
- Loan : US$ 30,181,819
- Grant : US$ 0
Sub Total : US$ 30,181,819
Counterpart Funding
- Central Government : US$ 3,018,182
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,018,182
TOTAL : US$ 33,200,001
197
BB-ID: BBP1-06703-04-000000-1070196
1. Project Title : Program for Development of Integrated Transportation
Infrastructure in Disadvantaged Areas
2. Duration : 48 months
3. Location : Nationwide
4. Executing Agency : Ministry for Development of Disadvantaged Regions
5. Implementing Agency : Ministry for Development of Disadvantaged Regions
6. Background and Justification
The issue of rural development is ultimately rooted in the disparities and linkages between
urban and rural areas. As rural areas are positioned as sources of cheap labor and suppliers of
raw materials for productive activities, typically, citizens in these areas are poor and having no
access to public services. The lack of accessibility is caused by the scarcity of infrastructure.
The availability and improvement of transportation infrastructure is the most important
factors in order to encourage and speed up economic development in rural areas. It is
imperative that transportation policy prioritize improving citizens' access to markets and
production centers as well as social services. The development of transportation infrastructure
can facilitate and guarantee the availability and supply of agricultural commodities, the
stability of input and output prices, a fall in costs which will strengthen competitiveness, a rise
in production value, the development of advantageous links between large and Small and
Medium Enterprises and specialization among different areas, enterprises, and workers.
Development of integrated sea, river, and lake-based water transportation infrastructure in
both near and remote disadvantaged regions consists of:
a. Pioneer transportation, that is, transportation which serves localities or areas which have
not yet been served by water transportation because they have not yet been commercially
viable;
b. Marine transportation, which would be operated by businesses owned people and would
support pioneer transportation;
c. Crossing transport or transport which functions as a bridge, linking networks between
ports and/or terminals, and also supports optimization and integration among different
modes of transportation.
7. Scope of Work
a. Procurement of water transportation infrastructure (sea, river, and lake-based);
b. Assistance in operational management and utilization of transportation infrastructure; and
c. Strengthening of institutions and human resources for management of water
transportation infrastructure.
8. Priority
Regional and Spatial Planning
198
BB-ID: BBP1-06703-04-000000-1070196
9. Output and Outcome
a. Output
1) Availability of sea, river, and lake-based water transportation infrastructure and
supporting of pioneering, community, and ferry services in disadvantaged regions in
75 districts;
2) Establishment of institutional management of water transportation infrastructure at
each target disadvantaged area in an inclusive manner, with reference to relevant
rules and provisions in 75 districts;
3) Strengthened capacity of institutional and human resources for management of water
transportation infrastructure.
b. Outcome
1) Improving the flow of goods and people among residents of rural disadvantaged
regions to and from centers of economic activity in other areas;
2) Increasing the public services and economic activity among different areas, resulting
in increased investment activity, production, and direct and indirect job creation.
10. Project Cost
Foreign Funding
- Loan : US$ 58,000,000
- Grant : US$ 0
Sub Total : US$ 58,000,000
Counterpart Funding
- Central Government : US$ 5,800,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 5,800,000
TOTAL : US$ 63,800,000
199
BB-ID: BBP1-06703-08-000000-1070197
1. Project Title : Solar Energy Utilization for Basic Infrastructure Improvement in
Disadvantaged Areas
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Ministry for Development of Disadvantaged Regions
5. Implementing Agency : a. Ministry for Development of Disadvantaged Regions
b. Ministry of National Development Planning / National
Development Planning Agency
6. Background and Justification
Ministry for Development of Disadvantaged Regions of the Republic of Indonesia in 2005
revealed that 199 districts were categorized as less-developed regions. The criteria for less
developed regions are: local economic level, financial capacity, local characteristic, human
resources, accessibility, and infrastructure. The provision of basic electricity needs can be
independently conducted by utilizing local energy source, that is solar energy which can
improve the development of human resources, accessibility, and infrastructure. The electricity
will be used for rural home lighting and public facility, including rural school to support
education, improvement of rural healthcare centre, improvement of rural clean/drinking water
supply, and rural information centre. For the last 5 years, the ministry has initiated
improvement of less developed regions by providing solar cell system for rural home lighting.
Nevertheless, the improvement needs to be accelerated to shorten the development gap with
developed regions.
7. Scope of Work
a. Improving the electricity infrastructure for disadvantaged area by considering the local
energy potential: 100 Wp Photovoltaic (PV/Solar Home) system combined with Rural
Telecommunication PV, Wind Power Electricity, Solar Water Pumping, and also Hybrid
System in Indonesia.
b. Accelerating electricity program in disadvantaged area, including: i) defining the problem
in application of PV system, regarding the disadvantaged area, ii) setting up the system
design and evaluation of the appropriate technology, iii) procurement of hardware for
various Photovoltaic or Hybrid systems applications, iv) system transportation installation,
testing & commissioning, v) monitoring and evaluation of system performance, financial,
social, and economical aspects on PV technology and applications, vi) dissemination of
project results to other parties or areas;
c. Reducing the gap between the disadvantaged areas and the developed areas with regard
to some aspects below: i) improvement of people income level in the disadvantaged area,
ii) human resources development through non-degree education and training, iii)
establishment of the rural institutional management, iv) society transformation through
training or exchange experience for certain people between the less-developed area and/or
developed area.
8. Priority
Regional and Spatial Planning
7
200
BB-ID: BBP1-06703-08-000000-1070197
9. Output and Outcome
a. Output
1) Availability of solar energy in Indonesia;
2) Availability of human resource in the operation and maintenance of solar energy;
3) Implementation of institutional strengthening for rural organization for program
sustainability and developing self-help ability.
b. Outcome
1) Decreasing the gap between developed area and disadvantaged area by providing
electricity infrastructures;
2) Improving national capacity building through additional various accesses, such as
solar PV electrification, wind power rural electrification, and hybrid system
electrification;
3) Reducing the oil consumptions in the disadvantaged area;
4) Developing national human resources through various technical trainings both
degree and non-degree training, such as Solar PV engineering design, Solar PV rural
electrification operation and maintenance.
5) Improving local technical capability in order to provide long-term support for the
Solar PV user.
10. Project Cost
Foreign Funding
- Loan : US$ 30,000,000
- Grant : US$ 0
Sub Total : US$ 30,000,000
Counterpart Funding
- Central Government : US$ 3,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,000,000
TOTAL : US$ 33,000,000
201
BB-ID: BBP1-06706-08-000000-1070198
1. Project Title : Support for Poor and Disadvantaged Areas (SPADA-2)
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry for Development of Disadvantaged Regions
5. Implementing Agency : a. Ministry for Development of Disadvantaged Regions
b. National Development Planning Agency
c. Local Governments
6. Background and Justification
The Government of Indonesia has implemented the Support for Poor and Disadvantaged
Areas (SPADA) since 2005, by using a loan with the total amount of $135 million. This fund
has been distributed to 51 districts (35 districts in various provinces and 16 districts in NAD
province). The SPADA is a part of the National Community Empowerment.
Today, there are 183 districts categorized as disadvantaged regions (149 as previous districts
and 34 as expansion districts). Consequently, to speed up the development of disadvantaged
regions, the SPADA should be continued and expanded covering the target location in 75
districts, particularly the isolated areas, outer island, and boarder areas.
7. Scope of Work
a. Provision of block grant to be allocated to the 75 districts categorized as very poor regions,
including the isolated areas, outer islands, and boarder areas;
b. Provision of local infrastructure and community based utilities;
c. Land development for agriculture uses and fishery pond;
d. Supporting fund for community empowerment program;
e. Supporting fund for integrated rural area development program;
f. Provision of management assistance consultants and community facilitators;
g. Dissemination and training;
h. Controlling, monitoring, and evaluation.
8. Priority
Regional and Spatial Planning
9. Output and Outcome
a. Output
1) Availability of local infrastructure such as road, small harbor, terminal, air strip,
market, small dam, irrigation, and transportation facilities;
2) Availability of community based utilities, including electricity, water supply,
telecommunication;
3) Land development for agriculture and fishery pond uses;
4) Funding allocation for community empowerment program;
5) Implementation of integrated rural area development program;
6) Implementation of management assistance and community facilitation;
7
202
BB-ID: BBP1-06706-08-000000-1070198
b. Outcome
1) Increasing the local economic growth in the disadvantaged regions;
2) Decreasing the inter-regional disparity and poverty in the disadvantaged regions;
3) Decreasing the number of disadvantaged regions.
10. Project Cost
Foreign Funding
- Loan : US$ 80,000,000
- Grant : US$ 0
Sub Total : US$ 80,000,000
Counterpart Funding
- Central Government : US$ 8,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 8,000,000
TOTAL : US$ 88,000,000
203
BB-ID: BBP1-06703-04-000000-1070199
1. Project Title : Wind Power Electricity (WINDPED) for Border Areas and Outer
Islands in Indonesia
2. Duration : 36 months
3. Location : Alor District, Kepulauan Aru District, Kepulauan Mentawai
District, Kepulauan Talaud District, West Maluku Tenggara
District, Sangihe District, East Sumba District
4. Executing Agency : Ministry for Development of Disadvantaged Regions
5. Implementing Agency : a. Ministry for Development of Disadvantaged Regions
b. Agency for the Assessment and Application of Technology
6. Background and Justification
Indonesia is the largest archipelagic nation in the world, consisting of ± 18,110 islands with
coastline length of 108,000 km. According to the 1982 Naval Law Convention (UNCLOS),
Indonesia owns 3.2 millions km2 water areas (2.9 million km2 of around archipelagic sea and
0.3 million km2 of territorial sea). Moreover, Indonesia also has exclusive rights to explore sea
resources on 2.7 km2 Economic Exclusive Zone (up to 200 miles from baseline). Borderline:
East Timor 228 km, Malaysia 1,782 km, Papua New Guinea 820 km.
The border area is an important area for interconnection between countries. It has a role to
represent the national image to other countries. Thus, the development of community’s life in
border area will strengthen the national security, political and social aspects, as well as
economic and cultural.
There are several problems regarding the gap of development between the greater islands and
the small islands at the border area such as :
1) Low accessibility connecting the border areas and the governmental hubs and/or more
developed areas;
2) Limited infrastructure on governmental, transportation, education, health, economic,
communication, clean water, irrigation, electricity, security, and defense;
3) Low population density according to the geographical characteristics;
4) The development in these areas is not optimal because of both central and local
government perception that these areas could not generate economic benefits.
In order to provide electricity in border areas and outer islands, the Government of Indonesia
proposes the Wind Power Electricity (WINDPED) project.
7. Scope of Work
a. Promoting the wind turbine generator technology in Indonesia and speeding up the
achievement of Village Electrification Program in border areas and outer islands, which
cover the following activities:
1) Defining the various Wind Turbine generator systems application;
2) Setting up criteria and mapping potential locations;
3) Setting up system design and evaluation;
4) Hardware procurement for Wind Turbine generator systems applications;
5) Analyzing fund and return of investment for sustainability of the program;
6) System transportation, installation, testing, and commissioning;
204
BB-ID: BBP1-06703-04-000000-1070199
7) Monitoring and evaluation of system performance, financial, social and economical
aspects of the project to increase the knowledge base and understanding on Wind
Turbine generator systems technology and applications;
8) Dissemination of project results to other parties.
b. Establishing community based organization as well as the capacity building:
1) Preparing the organization management;
2) Operation and maintenance capacity;
3) Human resource development.
c. Setting up wind turbine generator systems support such as strengthening local human
resources capability and improving component test capacity, which cover the activities as
follow:
1) Detailed technical specification of the equipment and materials;
2) Design and preparation of the test facilities;
3) Installation and acceptance test of equipment at site;
4) Onsite training of related personnel for certain equipment;
d. Training for engineers and technicians abroad on the operation and maintenance of the
equipment.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Utilization of wind energy in border areas especially in small and outer islands in
Indonesia.
b. Outcome
1) Meeting the basic energy demand for the people in border areas especially in small
and outer islands in Indonesia by implementing wind energy as an alternative
solution in energy crisis.
2) Increasing the low-income people's welfare in border areas especially in small and
outer islands in Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 19,500,000
- Grant : US$ 0
Sub Total : US$ 19,500,000
Counterpart Funding
- Central Government : US$ 1,950,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,950,000
TOTAL : US$ 21,450,000
7
205
Ministry of National Education
(Kementerian Pendidikan Nasional)
207
BB-ID: BBP1-02305-01-092061-1010202
1. Project Title : Life Skills Education for Employment and Entrepreneurship (LSE3)
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Non-Formal and Informal Education,
Ministry of National Education
6. Background and Justification
The government has set up a high priority as outlined in the 2010-2014 Medium-Term
Development Plan on pro-poor (welfare promotion), pro-job (unemployment reduction), and
pro-growth (economic growth) activities of development. However, some challenges are still
faced today, including: (a) on demand-side: employers do not only require highly qualified
(well-trained) workers but also tend to have workers on contract basis (outsourcing), (b) on
supply-side: more than 71% of the unemployment are young people (15-34 years old), more
than 82% of them never have university level of education, and they have unmatched or low
working competence, (c) on institution-side: public institutions of training and education
generally have low capacity in producing qualified outcomes, but, on other hand, some private
training providers show their capability in it.
The first agenda of national development of 2010-2014 is the development of economy and the
improvement of public welfare which can be realized through action programs of poverty
alleviation, job creation, life skill education, etc., corresponding to the government's first
agenda. One of the Ministry of National Education's policies is to increase the access, quality,
and relevance of education as well as the harmonization of school to work. Furthermore, in
making significant contribution to the public welfare promotion, Directorate General of Non-
Formal and Informal Education is going to provide the unemployment with Life Skill
Education for Employment and Entrepreneurship (LSE3) program.
7. Scope of Work
a. Broadening the access of people to demand-driven and quality life skills education so that
beneficiaries can get a job or to be entrepreneur easily by (a) providing beneficiaries with
block grants (scholarships) so that they can go to an appropriate training provider to get
"LSE3 specific education service" (a package of life skills training plus certification and
apprenticeship as well as job placement or small enterprise), b) dissemination, and (c)
trainings;
b. Strengthening the institutions and developing competence standards to improve the
quality assurance system by (a) developing education outcome competence standards that
fit to Indonesia National Working Competence Standard/Standar Kompetensi Kerja Nasional
Indonesia (SKKNI), b) increasing instructor's competence, (c) strengthening the certification
system, (d) strengthening the institution accreditation system, and (e) broadening the
networking and partnership;
c. Improving program management to ensure the integration process of LSE3 into regular
and sustainable activity.
208
BB-ID: BBP1-02305-01-092061-1010202
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Increased number of training providers (TP) that aligning their course delivery to
reflect demand-driven and market oriented life skills education;
2) Improved quality and relevance of education in providing skills to meet the
requirement of job market or small enterprise;
3) Increased capability of human resources in job market and entrepreneurship in
micro/small scale business.
b. Outcome
1) Increasing the workforces skill in order to meet the market need for trained and
educated workforces;
2) Producing young entrepreneurs for small and medium enterprises;
3) Reducing unemployment.
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 0
Sub Total : US$ 35,000,000
Counterpart Funding
- Central Government : US$ 1,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,500,000
TOTAL : US$ 36,500,000
1
209
BB-ID: BBP1-02304-01-082056-1010203
1. Project Title : Modernization of Tanjungpura University
2. Duration : 36 months
3. Location : West Kalimantan (Pontianak)
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
According to its existence as a higher education institution, Tanjungpura
University/Universitas Tanjungpura (Untan) is the biggest university in West Kalimantan. It has
performed various kinds of higher education programs in science, art, and technology both
academically and professionally.
Geographically, Untan is located in the province that is becoming a trade between overseas
cities and other cities in other provinces in Indonesia. To the north is the city of Kuching of
East Malaysia, to the east is the province of East Kalimantan, to the south is the province of
South Kalimantan and Indo China Sea, and to the west is the coasts of Karimata and Indo
China Sea. This strategic position has always influenced the social, cultural, political, and
economic point of view both in negative and positive. Untan is also becoming the model for
the educational standard in Indonesia for the people in Malaysia and other foreign countries.
Consequently, Untan is forced to be more professional and in the same time performing
excellent capacity. Therefore, the modernization proposal for Untan is becoming a demand and
priority in order to be one of the best universities in Indonesia and in Southeast Asia that has
great competence in global competition.
Moreover, Untan is located in a growing province of West Kalimantan. Currently, there are 2
(two) urban cities and 11 (eleven) rural districts. The unique development of West Kalimantan
implies for specific analysis through many intensive researches. In this matter, Untan should
preserve the rigorous research in accordance to the need for the growing and development of
new regions. Besides that, Untan should also prepare the incoming demand fix new qualified
human resources. Moreover, the national policy concerning the program of decentralization
and regional autonomy, especially in West Kalimantan area, forces Untan to be more actively
involved in the future.
There are 8 (eight) faculties with 6 (six) study programs in diploma degree, 38 (thirty eight)
study programs from undergraduate degree and 10 (ten) study programs for postgraduate
degree in Untan. In the academic year of 2008/2009, the total number of students in Untan was
15,712 students. By the year 2020, Untan has predicted an increasing number of the total
students due to the increasing number of 36 (thirty six) new program studies majoring in
diploma, undergraduate, and post graduate degrees.
7. Scope of Work
a. Restructuring land use and building support;
b. Building of integrated lecturer room, integrated administration, integrated laboratory, and
integrated library;
c. Building of management and incubator center;
210
BB-ID: BBP1-02304-01-082056-1010203
d. Building of student centre;
e. Building of integrated training center;
f. Building of Islamic center;
g. Technical assistance, project management, and supervisory consultant.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Development and improvement of physical facilities and infrastructures relevant to
academic activities in providing qualified higher education service to communities,
either local, regional, or nationally, such as the sufficient lecture room and integrated
sophisticated laboratory;
2) Development and implementation of integrated courses and training center,
management and incubator center.
b. Outcome
Improving the graduate's quality through modernization facilities, better services on
public demand, developing science and high technologies.
10. Project Cost
Foreign Funding
- Loan : US$ 24,896,000
- Grant : US$ 0
Sub Total : US$ 0
Counterpart Funding
- Central Government : US$ 4,979,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,979,000
TOTAL : US$ 29,875,000
1
211
BB-ID: BBP1-02304-03-082053-1010204
1. Project Title : Polytechnics Development Project
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
The main economic policy of the government of Indonesia is to increase domestic production
of goods and services, leaving from the lowest level of production of goods. This will require
power supply, skilled manpower, and larger technicians. To maintain the current level of
economic growth into the future, productivity must be increased based on the improvement of
labor’s skill. As the government expanded the training system to produce skilled manpower,
then it also needs to expand opportunities to the next level, especially at the technician level.
7. Scope of Work
a. Development of courses in specialized fields of science corresponding with local or
regional potential;
b. Increasing the levels of education up to diploma 4 (D4) and the pilot implementation of the
program of master of applied science;
c. Capacity building of teachers and educational staff, including technicians;
d. Development and assessment of curriculum, study and training programs;
e. Providing qualified and relevant workshop equipment, including accessories and lab
building;
f. Improvement of generic skills, including communication, basic sciences, creativity and
problem solving, information and communication technology and its applications;
g. Supporting the achievement of accreditation from National Accreditation Agency for
Higher Education/Badan Akreditasi Nasional - Perguruan Tinggi (BAN PT);
h. Implementation of Quality Assurance System/Sistem Penjaminan Mutu on Polytechnics to
improve the management capability programs of international cooperation or the
implementation of programs that encourage an international character.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
Availability of qualified and applicable programs, infrastructure, and potential in
polytechnics.
b. Outcome
1) Producing higher skilled work forces that are competitive and ready to increase
national production;
2) Increasing the admissions in the scheme of equality and the program for improving
employability as well as career guidance of students and graduates.
212
BB-ID: BBP1-02304-03-082053-1010204
10. Project Cost
Foreign Funding
- Loan : US$ 75,000,000
- Grant : US$ 0
Sub Total : US$ 75,000,000
Counterpart Funding
- Central Government : US$ 11,250,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 11,250,000
TOTAL : US$ 86,250,000
1
213
BB-ID: BBP1-02304-01-082053-1010205
1. Project Title : Revitalizing Education System in Pre-Service Teacher
Organization Nationally (RESPON)
2. Duration : 24 months
3. Location : Nationwide
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Within the education system, teachers play a central role in implementing and improving
education quality. In carrying out their professional assignment, teachers are supported legally
by the Law on Teachers and Lecturers (UU 14/2005) and the Government Regulation Number
78/2008, in which if certified, they deserve for professional allowance. Through the availability
of legal and financial supports to education sector, training and incentives are provided to
improve the quality of education.
Despite those efforts, Indonesian education is still facing various challenges. Among these,
Indonesian students are still ranked 36 out of 48 countries in the Third International
Mathematics and Science Study (TIMSS) of 2007. This situation is highly influenced by the
quality of Indonesian teachers in general. At present, the majority of teachers do not meet the
required academic qualification and national standard on teacher competencies as prescribed
in the Law Number 14/2005. Furthermore, teacher colleges are expected to produce an
increasing number of certified teachers to fulfill the emerging need for teachers due to a high
number of retiring teachers within the period of 2010-2014. Special effort must be taken,
focusing on the improvement of the teacher education system, particularly improvement of the
quality of teacher colleges in Indonesia.
The rapidly changing environment requires teacher colleges to carry out systematic and
comprehensive improvement of the educational services they are offering. The challenges for
teacher colleges are: (1) improving their institutions to be teacher education institution
producing high quality teachers; (2) improving the quality of educational services offered for
pre-service training, including the four year (S1) program as well as the graduate level
professional training program for teachers/Pendidikan Profesi Guru (PPG); and, (3) improving
the role of teacher colleges as important partners to stakeholders in provision as well as
maintenance of qualified teachers.
7. Scope of Work
Strengthening the institutional of training for primary and secondary teachers in the level of
Bachelor Degree (S1) in public and private Teacher Training Institute/lembaga Pendidikan
Tenaga Kependidikan (LPTK) through:
a. Improvement of quality and quantity of equipment and learning resources;
b. Curriculum reform;
c. Training of lecturers and administrators;
d. Development of information and communication technology-based system.
214
BB-ID: BBP1-02304-01-082053-1010205
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Improved capacity of teachers to meet the competency standard;
2) Increased ability of districts/cities to place teachers in remote and disadvantaged
areas in-line with established national standards;
3) Developed teacher colleges as partners to various stakeholders in responding to the
needs of quality teachers in the area.
b. Outcome
1) Increasing the educational outcomes of primary and secondary students by increasing
the knowledge of subject matter and the pedagogical skills of teachers;
2) Improving the quality of teachers through systemic and comprehensive development
effort of teachers colleges.
10. Project Cost
Foreign Funding
- Loan : US$ 75,000,000
- Grant : US$ 0
Sub Total : US$ 75,000,000
Counterpart Funding
- Central Government : US$ 10,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 10,000,000
TOTAL : US$ 85,000,000
1
215
BB-ID: BBP1-02304-01-082052-1010206
1. Project Title : Strengthening Sustainable Development of Jenderal Soedirman
University Project
2. Duration : 36 months
3. Location : Banyumas
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Jenderal Soedirman University (Unsoed) was founded in 1963 as a state university. Currently,
the university has occupied very fertile and productive soils, paddy fields, around which a
dense population and housing, and real estate development. As a consequence, this location
has now turned into a limiting factor resulted in another crucial problem that further
development become impossible.
However, Unsoed has already developed a new strategy for campus development, which
includes developing a multi-campus such as Department of Engineering campus in
Purbalingga and seven other study programs (Pharmacy, Medicine, Nurse, Public Health,
Letters, International Business, and Science) in the main campus. This new campus
development strategy is aimed not only to overcome the current problems, but also to
accelerate Banyumas regional development. In addition, for the later reason, Unsoed has signed
mutual agreements with the Governments of Purbalingga and Cilacap districts in developing
Department of Engineering and Marine and Fisheries Science in those two districts,
respectively.
The propose project includes the improvement of teaching and learning process, human
resource advancement, infrastructure and equipment development. This project also aimed to:
1) improve the quality and quantity of the graduates by modernizing the facilities; 2) promote
the advancement of science and technologies; 3) provide better service to students and
community; and 4) play more active role in nation development.
7. Scope of Work
a. Development of building as an addition to the existing faculties;
b. Establishment of teaching and research facilities and public service, infrastructure, and
supporting facilities.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Availability of additional building, infrastructures and supporting facilities;
2) Availability of facilities for teaching, research, and public service.
216
BB-ID: BBP1-02304-01-082052-1010206
b. Outcome
1) Improving the university reputation leading to the establishment of a world class
university;
2) Improving the competitiveness of the graduates in both national and global markets;
3) Increasing mutual collaboration between Unsoed and local government or industry;
4) Increasing Banyumas people’s welfare.
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 0
Sub Total : US$ 35,000,000
Counterpart Funding
- Central Government : US$ 7,252,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,252,000
TOTAL : US$ 42,252,000
1
217
BB-ID: BBP1-02303-03-072050-1010207
1. Project Title : Sustainable Economic Development through Technical and
Vocational Education and Training (SED-TVET)
2. Duration : 48 months
3. Location : Yogyakarta, Central Java, West Java, Bali, South Sulawesi, East
Kalimantan, West Nusa Tenggara, South Sumatera
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General for the Management of Primary and Secondary
Education, Ministry of National Education
6. Background and Justification
The vision of national industrial development is to set up Indonesia as new advanced country
in 2020. It requires a competency-based training and the importance of flexibility between
academic and professional education, especially the concept of skills by the year 2020 for the
global era. Indonesian labor market study stated that vocational graduates have a high labor
force participation rate compared to the equivalent high school graduates. Accordingly,
vocational school is able to respond to labor market needs and reduce the unemployment rate,
as well as strategic role in supporting efforts to achieve the vision of national industrial
development. Therefore, a new training program is needed in order to improve the Technical
and Vocational Education and Training (TVET) System.
7. Scope of Work
a. Developing coherent strategies to improve the quality of TVET;
b. Improving labor market information for TVET planning and implementation;
c. Broadening access to (self) employment in relevant competencies as part of lifelong
learning;
d. Enhancing and recognizing the standard based national assessment and certification
system.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
Skillful TVET graduates that are competitive to meet the labor market work in industry
sector.
b. Outcome
Responding to labor market needs and contributing to national economy to reduce
unemployment index.
10. Project Cost
Foreign Funding
- Loan : US$ 25,387,000
- Grant : US$ 12,960,000
Sub Total : US$ 38,347,000
Counterpart Funding
- Central Government : US$ 10,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 10,500,000
TOTAL : US$ 48,847,000
218
BB-ID: BBP1-02304-01-082055-1010208
1. Project Title : The Development and Improvement of Bogor Agricultural
University (IPB): Towards Research Based University
2. Duration : 36 months
3. Location : Bogor District
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
As a university with core of competence in tropical agriculture, Bogor Agricultural
University/Insitut Pertanian Bogor (IPB) will uphold its original commitment to contribute in
strengthening agriculture development. The idea of bringing IPB toward a research-based
university definitely needs a massive preparation in all aspects, such as human resource and
physical facilities with the high competence and capability to support activities of teaching,
research, and also community empowerment. Through continuous improvement on that, the
vision of IPB to be a world class research university with core competences in tropical
agriculture and biosciences with entrepreneur characters can be achieved soon.
The development of science and technology should give impacts to the society through
strengthening food security and sovereignty as well as improving community health and
prosperity. In this respect, IPB has chosen quality seed supply and biopharmaca research
programs based on the sustainable utilization of biodiversity and human capability resources.
Through these programs, a network will be developed in which IPB can build capacity and
forms alliances with partners from the public and private sectors nationally, regionally, and
globally which have complementary expertise and resources to enhance crop production in
Indonesia.
The implementation of these programs is expected also to contribute significantly in achieving
Millennium Development Goal (MDG).
7. Scope of Work
a. Development and improvement of infrastructures and facilities for high quality research
activities, capacity building, and human resource development.
b. Sustainable seed supply research and development for strengthening food security:
1) Enhancing biodiversity utilization through plant biotechnology and breeding;
2) Developing integrated research activities on agriculture production;
3) Developing seed system and technology;
4) Improving technology transfer;
5) Strengthening human resource capacity.
c. Biopharmaca research and development for community health improvement and poverty
reduction:
1) Biodiversity conservation and domestication of medicinal plant;
2) Study of ethno-botany and indigenous knowledge;
3) Development of biopharmaca standardization and product development;
4) Developing biopharmaca education and socio-economic impact;
219
BB-ID: BBP1-02304-01-082055-1010208
5) Utilization of biopharmaca product through herbal clinic;
6) Dissemination and strengthening networking of biopharmaca achievement to
stakeholders.
d. Strengthening networks of agricultural higher education on research to produce high
quality seed and to utilize biodiversity resource in a sustainable manner.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Increase of biodiversity resources utilization through biotechnology and breeding
techniques;
2) Integrated research activities and dissemination of its results for food security
development and environmental;
3) Establishment of seed systems and technology;
4) Increase of high skilled human resources for seed development in several universities
in the regions (IPB's partners) with respect to their indigenous biodiversity;
5) Establishment of a pilot plant for seed research and production;
6) Increasing biodiversity explored for raw material of drug/pharmaceutical products;
7) Establishment of GAP and Global Call to Action Against Poverty (GCAP) for herbal
plant and its standardization procedure;
8) Application of biopharmaca products for improving human and animal health;
9) Improved capacity and capability of laboratory for research on seed and
biopharmaca;
10) Increase of high skilled human resources for biopharmaca research and development
in several universities in the regions with respect to their indigenous biodiversity.
b. Outcome
1) Developing Bogor Agricultural University (IPB) as a Research Based University,
which significantly contributes to the strengthening of food security, community
health improvement, environmental conservation, and poverty reduction;
2) Developing the Seed Center to support research activities, dissemination, and
application of high quality seeds;
3) Developing the Biopharmaca Research Center to support research activities on
etnobotany and etnopharmacology, exploration, standardization, and efficacious test
of biopharmaca products and its application for drug/pharmaceutical production;
4) Strengthening university networks with IPB as a core/reference university for
research capacity building of universities in the regions;
5) Upgrading of IPB and university partners toward a world-class academic reputation.
220
BB-ID: BBP1-02304-01-082055-1010208
10. Project Cost
Foreign Funding
- Loan : US$ 35,830,000
- Grant : US$ 8,000,000
Sub Total : US$ 43,830,000
Counterpart Funding
- Central Government : US$ 7,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,500,000
TOTAL : US$ 51,330,000
221
BB-ID: BBP1-02304-04-082052-1010209
1. Project Title : The Development and Upgrading of Padang State University
2. Duration : 48 months
3. Location : Padang
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
State University of Padang/Universitas Negeri Padang (UNP) is located at Jalan Prof. Dr. Hamka,
Air Tawar, Padang Municipality. The UNP has 17,131 students offering various levels such as
diploma Engineering (D-III), Elementary School Teacher Education/Pendidikan Guru Sekolah
Dasar (D-II PGSD), and Preschool Teacher Education//Pendidikan Guru Taman Kanak-kanak ( D-
II PGTK), Scholar (S-1), Master (S-2), and PhD (S-3) with 916 academic staffs and 556
administrative staffs.
The UNP has 7 (seven) faculties and 9 (nine) graduate programs. The seven faculties are the
Faculty of Education/Fakultas Ilmu Pendidikan (FIP), Faculty of Social Sciences/Fakultas Ilmu
Sosial (FIS), the Faculty of Language Literature and Art/Fakultas Bahasa, Sastra, Seni (FBSS),
Faculty of Mathematics and Natural Sciences/Fakultas Matematik dan Ilmu Pengetahuan
(FMIPA), Faculty of Technology/Fakultas Teknologi (FT), Faculty of Sports/Fakultas Ilmu
Keolahragaan (FIK), and Faculty of Economics/Fakultas Ekonomi (FE). From the 7 (seven)
faculties, there are 48 (forty eight) departments, with 52 (fifty two) academic programs. UNP
has a research center and public services. During the last 52 years, UNP has as many as 36,080
graduates for the S-1 and 30,317 post-graduate students. In addition, the UNP also has given
awards to 52,145 diploma students in various fields.
As the oldest university, the UNP faces many new challenges. This development program will
be able to give UNP much needed strengthening to face these challenges. The UNP should also
train the students more professionally than teachers. In addition, it should be carried out both
basic and applied research in all fields, not limited to the field of education.
7. Scope of Work
a. Construction work;
b. Procurement of equipment and facilities;
c. Consulting engineering design and supervisory;
d. Training and workshop implementation;
e. Financial auditing;
8. Priority
Social, Cultural, and Religious Affair.
222
BB-ID: BBP1-02304-04-082052-1010209
9. Output and Outcome
a. Output
1) Availability of new learning classrooms, offices, and laboratories for the Faculty of
Educational Sciences (FIP), Faculty of Social Sciences (FIS), Faculty of Engineering
(FT), Faculty of Sports (FIK), Faculty of Economics (FE), Faculty of Languages,
Literature and Art (FBSS) and Postgraduate Studies (PPS);
2) Availability of new buildings and facilities for research centers and community
service;
3) Availability of new facilities for student center;
4) Availability of new health centers;
5) Availability of new student dormitory;
6) Availability of a center of Islamic tutorial;
7) Modernization of administration of academic facility, civil service, finance, and
planning section.
b. Outcome
Developing the academic status and role of the UNP as a modern and qualified university
to improve services to the students.
10. Project Cost
Foreign Funding
- Loan : US$ 31,608,000
- Grant : US$ 0
Sub Total : US$ 31,608,000
Counterpart Funding
- Central Government : US$ 8,024,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 8,024,000
TOTAL : US$ 39,632,000
1
223
BB-ID: BBP1-02304-04-082052-1010210
1. Project Title : The Development and Upgrading of Semarang State University
2. Duration : 36 months
3. Location : Semarang
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
The main objective of the second Long-Term Development Program of Higher Education is to
improve the quality and relevancy of higher education in order to produce graduates who
could fulfill the gap of the increased unemployment and low job market. It is also aimed at
anticipating the needs of the industrial growth which will be characterized by intensive
technology and information inputs. Therefore, it is concluded that the goal of the university
development is to prepare the tertiary education graduates with intellectual standard,
professional skills standard, and disciplinary varieties that fit all aspects of national
development needs.
Many universities have not fulfilled the targets of this mid-term development plan. While they
are busy achieving the targets of this mid-term plan, they also initiate further action program
and action plan to attain the second five-year development plan. The similar situation is also
faced by Semarang State University. The details of the situation faced by Semarang State
University are described below.
There are only 75.74% of full time teaching staffs possessing master and doctorate degrees,
though this condition is not much different from that of other universities in Indonesia.
Currently, this deficiency can be solved by hiring more qualified local experts on part-time
basis. Additional permanent staff is pre-requisite for institutional capability building and
qualified education. Substantial resources will be needed for the development of the existing
staff and hiring additional qualified staff on permanent basis.
Another problem is that the existing buildings can hardly accommodate the existing
departments and present student enrolment level. There is shortage of office space for
instructors and researchers, laboratories, libraries, and supporting services. Therefore,
additional construction work will be needed in the form of additional classrooms, computer
laboratories, department libraries, and seminar rooms.
7. Scope of Work
a. Training in the preparation process of the project implementation;
b. Project management and supervision consultant;
c. Detailed engineering design consultant;
d. Provision of consultant for equipment design, audit, and academic capacity building;
e. Civil works for training center, research center, integrated laboratory, integrated class
room, dean of several faculties, cultural village, sport area, landscaping, road, drainage,
utilities, renovation of Faculty of Social Science, renovation of lecturers’ office, renovation
of mosque, and renovation of auditorium;
f. Providing other supporting equipment.
224
BB-ID: BBP1-02304-04-082052-1010210
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Upgraded curriculum and syllabus in accordance with international standard;
2) Prepared academic community to manage the university not only as a higher
education institution but also as a business entity.
3) More qualified lecturers and administrative staff.
4) Availability of adequate facilities consisting of buildings, infrastructures, and other
equipment.
b. Outcome
1) Running various accredited study programs with good and best qualifications in all
levels of education programs, undergraduate, and postgraduate degrees;
2) Having organizational management using national and international organization
quality standard approach implemented in the university's organizational activity;
3) Having a comprehensive quality control system for higher education;
4) Possessing capability to develop partnership networking with government, private
sector and other local and foreign universities;
5) Producing constant excellent graduates, well-suited for community demand, from all
study programs.
10. Project Cost
Foreign Funding
- Loan : US$ 36,025,000
- Grant : US$ 0
Sub Total : US$ 36,025,000
Counterpart Funding
- Central Government : US$ 8,910,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 8,910,000
TOTAL : US$ 44,935,000
1
225
BB-ID: BBP1-02304-03-082052-1010211
1. Project Title : The Development and Upgrading of the State University of
Surabaya (UNESA) Project, Indonesia
2. Duration : 48 months
3. Location : Surabaya
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Based on Presidential Regulation Number 93/1999, Universitas Negeri Surabaya (UNESA)
formally replaced IKIP Surabaya. It is expected that UNESA would improve the performance
and image of higher education institutions in Indonesia. It is also to attain the government’s
estimation on the ratio between engineering versus social sciences of 70% : 30% which is
actualized by conferring greater mandate to UNESA to carry out non-educational studies
beside the existing educational studies. Thus, these two programs are expected to support each
other.
Quantitatively, progress of educational sector is encouraging, especially for learning
opportunity. But the qualitative outcome is still below community’s expectation. This is due to
the greater speed of technology advancement compared to educational progress.
Thus, human resource development has become global awareness in several countries,
especially Indonesia. Human resources quality improvement in the 21st century and in the
third millennium era is channeled into this main direction. This awareness is more evident by
the launching of a central theme ”Education for All and All for Education” in advanced and
developed countries. Currently, UNESA is a higher education institution with double
missions. In other words, UNESA still carries out its main task to conduct education program
simultaneously with non-education program. More implicitly, in line with Presidential
Regulation Number 93/1999, the responsibilities of UNESA are as follow:
a. Conducting academic education program and/or professional training in several science
disciplines, technology, and culture;
b. Developing sciences education, sciences learning, and academic professional training in
education sectors.
7. Scope of Work
a. Feasibility studies, topography study, and master plan;
b. Construction work;
c. Procurement of equipment and supporting facilities;
d. Consulting engineering studies, design, supervisory, and audit;
e. Training and workshop.
8. Priority
Social, Cultural, and Religious Affair.
226
BB-ID: BBP1-02304-03-082052-1010211
9. Output and Outcome
a. Output
1) Modern management in learning process and administration;
2) Conducive academic condition for education process;
3) Maximized education facilities and equipment support, such as labs, auditorium,
library, and other public facilities;
4) Optimum mechanism and performance to improve potentials of UNESA to become a
university with high level graduates;
5) Modern education model orienting to accountability, international scope, and field-
based demand.
b. Outcome
1) Improving the access and chance for the communities to get higher education;
2) Improving the modern management quality in higher education process;
3) Improving the human resources of Indonesia;
4) Improving the national development in Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 30,000,000
- Grant : US$ 0
Sub Total : US$ 30,000,000
Counterpart Funding
- Central Government : US$ 9,200,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 9,200,000
TOTAL : US$ 39,200,000
1
227
BB-ID: BBP1-02304-01-082052-1010212
1. Project Title : The Development and Upgrading of Yogyakarta State University
Project
2. Duration : 36 months
3. Location : Sleman District
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Teacher’s education is becoming a central issue in Indonesia. Improving the teacher’s quality is
seen as an immensely important and strategic policy to raise the quality the Indonesian
education as a whole. This policy invites the participation and contribution of a number of
institutions, especially those related to teacher education. As a university committed to
education Yogyakarta State University (YSU) is obliged to take responsibility and play role in
improving the teaching and learning quality to produce qualified and professional teachers to
succeed the national policy. YSU realizes that quality, relevance, and competence are
important issues in university graduates quality improvement in the global era. It is important
to equip students/graduates with skills needed in the global communication.
Ministry of National Education has stated the commitment to push Indonesian universities to
be the World Class Universities (WCU). YSU is one among 50 and even 20 Indonesian
universities that go into category of universities having prospect to be a WCU.
University is a thrust mechanism for a nation, at the same time the core of competition for its
individuals. The outcome of a university affects the capability of the nation community to
compete at national or international level. The key factor is imposing those qualities on human
resources. It is expected that all personnel possess adequate knowledge, capabilities, and skills
to make innovations and adjustments. Human resources only is not sufficient. It has to be
supported by adequate facilities, so the outcome will be optimal.
7. Scope of Work
Development and upgrading of Yogyakarta State University, including:
a. Curriculum, communication technology, research, consultant services/technical assistance,
and capacity building;
b. Education facilities and equipment such as library, laboratory, training center, health and
sport center, convention room, and other supporting facilities.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Availability of comfortable and modern classrooms;
2) Availability of laboratories with adequate equipments;
3) Availability of integrated training center to enhance language, culture, IT and ICT
skills;
228
BB-ID: BBP1-02304-01-082052-1010212
4) Comprehensive and modern library to ease learning and research;
5) Conducive studio, gallery, performance stage, and convention rooms;
6) Opportunity for faculty members to broaden their horizon, be knowledgeable, and be
updated with science and technology development.
b. Outcome
1) Creating condusive research and teaching learning activities;
2) Supporting the students and faculty members to express their creativity and
intellectual models;
3) Improving the ability of students and faculty members to produce qualified scientific
writings.
10. Project Cost
Foreign Funding
- Loan : US$ 25,000,000
- Grant : US$ 0
Sub Total : US$ 25,000,000
Counterpart Funding
- Central Government : US$ 9,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 9,000,000
TOTAL : US$ 34,000,000
229
BB-ID: BBP1-02304-09-082055-1010213
1. Project Title : The Development of Department of Forest Resources Conservation
and Ecotourism (DForCE), Bogor Agricultural University
2. Duration : 24 months
3. Location : Bogor District
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Forest degradation, biodiversity loses, rural poverty and public health are closely linked. The
situation of forest degradation and threatening of biodiversity loses must be controlled and
stopped. Traditional knowledge and local wisdom must be studied and developed to support
the conservation of forest ecosystem. Forest potential as some environmental services i.e.
ecotourism, clean water and air, and carbon absorption must be studied and developed to give
some sustainable benefits for human-being nationally, regionally, and globally. To realize
these objectives need strong capability and capacity of human resources in advanced forest
resources conservation science and technology. The Development of Department of Forest
Resource Conservation and Ecotourism (DFoRCE) as first and trendsetter of high education
institute of forest resource conservation in Indonesia with strong and excellent programs will
help the national, regional, and global government in formulating a forest resources and
biodiversity conservation strategy as well as preparing high quality of human resources and
enhancing science and technology in the field of conservation of forest resources, biodiversity,
and environment.
7. Scope of Work
a. Capacity building in the field of tropical biodiversity conservation, ecotourism, and
environmental services;
b. Conducting research to support biodiversity conservation, ecotourism, and environmental
services.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
Improved capacity and capability of human resources involved in the forest resources
conservation and ecotourism.
b. Outcome
1) Supporting link and cooperation of national and international institutions involved in
the development of forest resources conservation and environmental;
2) Establishing this program as a pilot project to motivate local governments (districts
and provinces) to apply local development based on conservation through this
"Conservation District Model";
230
BB-ID: BBP1-02304-09-082055-1010213
3) Providing recommendation in formulating policy and regulation in the conservation
of biodiversity and ecosystems.
10. Project Cost
Foreign Funding
- Loan : US$ 10,981,000
- Grant : US$ 0
Sub Total : US$ 10,981,000
Counterpart Funding
- Central Government : US$ 1,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,500,000
TOTAL : US$ 12,481,000
231
BB-ID: BBP1-02304-04-082052-1010214
1. Project Title : The Development of Gorontalo State University
2. Duration : 36 months
3. Location : Gorontalo
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Establishment of Gorontalo State University/Universitas Negeri Gorontalo (UNG) has a long
history. However, it was started when University of Education Gorontalo (IKIP) was
transformed into UNG. The early mission of academy is to give chance for the young people in
Gorontalo to obtain higher education without leaving Gorontalo. This change brings a new
phenomenon to the existence of the UNG.
This phenomenon can be seen from the change of public perception that assuming the UNG,
not only as an institution that produces teachers, but more broadly as an institution that
produces professional graduates who can compete in the labor market. This growth took very
little time, as it can be seen from the increasing number of students of the UNG. It is expected
to continue growing with the increase in the course of study in each faculty.
The increasing number of students causes problems in the context of the classroom and
student activity space that is now no longer feasible. This condition will get more difficult in
the future with the increasing number of students. The solution is to build facilities and
infrastructure that require large area. Meanwhile, the UNG is located in the center of town,
where to release the expansion of land will require a very high cost. Based on these
considerations, the new campus development should be outside the existing location.
7. Scope of Work
a. Construction of new building facilities for academic activities, such as class rooms, staff
rooms, seminar rooms, laboratories, and libraries;
b. Development of supporting facilities, such as parking area, interconnection roads,
drainage, water installation system, fire protection system, and landscaping;
c. Procurement of laboratory instruments, equipment for campus network wireless
connection, and other equipments for teaching and learning.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
Availability of new physical facilities and infrastructures relevant to academic activities.
b. Outcome
1) Improving the quality of teaching and learning process;
2) Improving the quality of staff and student research;
3) Improving access to higher education for those students who are of economically
disadvantaged;
232
BB-ID: BBP1-02304-04-082052-1010214
4) Improving the role of UNG in promoting local development and increasing
community welfare.
10. Project Cost
Foreign Funding
- Loan : US$ 30,000,000
- Grant : US$ 0
Sub Total : US$ 30,000,000
Counterpart Funding
- Central Government : US$ 6,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,000,000
TOTAL : US$ 36,000,000
233
BB-ID: BBP1-02304-01-082052-1010215
1. Project Title : The Development of Hasanuddin University Hospital
2. Duration : 60 months
3. Location : Makassar
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Universitas Hasanudin (UNHAS) is the best university in the east of Indonesia and boasting
the best medical school, residency, and post-graduate program. UNHAS has traditionally used
RS Wahidin Sudirohusodo as its hospital for both teachers and students.
Recently, Ministry of National Education (MONE) has issued a regulation encouraging big
universities with recognized medical schools to have their own university hospital. UNHAS
has used the opportunity to get funds from MONE to start the building of the hospital which
should be finished by December 2010 or early 2011.
Some justifications that reinforce the importance of the teaching hospital for UNHAS is:
a. There is no referral for trauma services in Makassar and east of Indonesia;
b. The need for specialized services in trauma, emergency, reproductive, tropical health
research, oncology/radiotherapy, advanced cardiac diagnosis, and treatment;
c. The utilization of RS Wahidin Sudirohusodo has reached its maximum capacity and
further development in space is not possible due to the limited land;
d. Improving the quality of education;
e. Improving the medical research capacity of UNHAS and RS Wahidin Sudirohusodo to
become the leading research facility in the east and one of the top three research center in
Indonesia;
f. Addressing equitable services such as advanced trauma/emergency care, specialized
cardiac/cancer therapy services, and reproductive health to the poor.
7. Scope of Work
a. Improving the referral capacity of UNHAS hospital in the specialized services, including:
1) Cancer Centre;
2) Eye Centre;
3) Trauma Centre;
4) Cardiac Centre;
5) FER (Fertility Endocrine Reproductive Centre);
6) Neurointervention Centre (Early Treatment of Brain Damage);
7) Centre for Promotion and Prevention.
b. Procurement of equipment (clinical and non-clinical);
c. Procurement of operational, ambulance, and service vehicles;
d. Research and development in tropical disease, trauma, oncology, reproductive health,
aesthetic care, and cardiology.
8. Priority
Social, Cultural, and Religious Affair.
234
BB-ID: BBP1-02304-01-082052-1010215
9. Output and Outcome
a. Output
Availability of facilities to support the development of Hasanuddin University Hospital as
the main referral hospital in the east of Indonesia and as a high-tech teaching hospitals.
b. Outcome
1) Providing best managed university hospital in the east of Indonesia;
2) Providing an environmental friendly hospital using green and energy saving
technology and safe health care waste management;
3) Providing appropriate, applicable, and affordable technology in the form of clinical
and supportive equipment;
4) Delivering the quality, safety, and customer satisfaction health care;
5) Achieving the cutting edge clinical and laboratory research in all departments
especially the centers of excellence;
10. Project Cost
Foreign Funding
- Loan : US$ 45,000,000
- Grant : US$ 0
Sub Total : US$ 45,000,000
Counterpart Funding
- Central Government : US$ 6,750,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,750,000
TOTAL : US$ 51,750,000
1
235
BB-ID: BBP1-02304-01-082055-1010216
1. Project Title : The Development of ITS Surabaya: A Strategic Empowerment of
Being Research University
2. Duration : 60 months
3. Location : Surabaya
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Institute Teknologi Sepuluh Nopember (ITS) Surabaya as one of the largest science and technology
(scintech) university in Indonesia has played significant roles as a backbone in the national
development. ITS has reputation for innovative and proactive relationship with the
government, industry, and public services. Since ITS was established in 1960, there have been
10,000 graduates pursueing their challenging career nationwide. Currently many ITS
graduates have also entered the job market overseas, especially in the Southeast Asia regions.
Cooperation between ITS and foreign industries as well as scintech institutions are also
blooming nowadays. This is to a certain degree encourages ITS to firm up and step ahead
aiming at an international recognition to be a world class university. As a center of excellence,
by the mid of 90s ITS was appointed by the Ministry of National Education as a resource
university in scintech. In this position, ITS has a specific responsibility to assist the
development of other universities and various institutions especially in the eastern part of
Indonesia. Such responsibilities direct ITS to always be keeping up with the latest
development in scintech, hence it would have a strong competence in supporting the national
development to be competitive in the global issues. At the same time, ITS should be able to
produce graduates with certain accepted international standards, hence they would be
acceptable and competitive in entering the global market of industry and institutions.
Therefore, ITS is obliged to extensively expand its current condition.
7. Scope of Work
a. Provision of technical experts in planning and management of the development of ITS;
b. Construction of buildings and infrastructures to support postgraduate programs and
research activities;
c. Procurement of laboratory equipment.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Attainment of a better ratio of the need of room according to strategic plan of ITS;
2) Enhanced quality of the laboratory equipment, especially those are related to the field
of marine technology and housing/human settlement/environment/disaster
management;
236
BB-ID: BBP1-02304-01-082055-1010216
3) Technology transfer in the field of marine technology and housing/human
settlement/environment/disaster management as well as the utilization of the
laboratory equipment procured from this project.
b. Outcome
1) Providing a better infrastructure of classes, laboratories, lecturer rooms, libraries, and
other supporting facilities, especially to support the postgraduate program in the field
of marine technology and housing/human settlement/environment/disaster
management, integrated research center building, techno-park as well as its drainage
system;
2) Improving the quality of research and enabling the implementation of lab-based
education as stipulated in the strategic plan of ITS.
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 3,840,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,840,000
TOTAL : US$ 53,840,000
1
237
BB-ID: BBP1-02304-01-082052-1010217
1. Project Title : The Development of Lambung Mangkurat University
2. Duration : 60 months
3. Location : Banjarmasin
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Effort of the Lambung Mangkurat University internally to advance its lecturing and laboratory
equipment is impossible considering that the university can not dependent on the income of
tuition fee as majority of students are from middle to low economic strata. Although large area
of land has been provided and university development plan has been approved by
stakeholders, but the comprehensive development of the university requires large fund which
may be difficult to be solely supported by the regional and provincial governments. Therefore,
it is required that the University of Lambung Mangkurat be assisted for its development
finance through foreign financing from government program.
This development institution will serve as a resource and research centers while providing
services to larger communities in the captioned fields as above. This design of the project for
the development of Lambung Mangkurat University will involve:
a. Restructuring and modernization of the existing curriculum to be integrated with
technological contents;
b. Strengthening the existing study programs and faculties;
c. Upgrading and development of Information and Communication Technology (ICT)
platform as a basis to daily academic activities and university management in the
preparation of state owned legal higher education entity;
d. Quality improvement of the existing staff;
e. Strengthening of library facilities in terms of ICT infrastructures development.
7. Scope of Work
a. Consulting Services
b. Construction works covering study programs and faculties of:
1) Teacher training and education science;
2) Law, economics and political and social science;
3) Agricultural;
4) Fishery science;
5) Forestry;
6) Engineering;
7) Medicine;
8) Basic science on the basis of computer base teaching and ICT, including their labs and
university support buildings.
c. Procurement of equipment to supply those developed faculties and university automation
and ICT infrastructures;
d. Development of curriculum;
e. Training program and scholarship.
238
BB-ID: BBP1-02304-01-082052-1010217
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Availability of new infrastructure and equipment;
2) Implementation of restructuring and modernization of the existing curriculum to be
integrated with new technology and relevant to academic activities.
b. Outcome
1) Strengthening, developing, and upgrading Lambung Mangkurat University in the
field of the existing study program and faculties;
2) Providing a qualified higher education service to communities, either local, regional,
or national.
10. Project Cost
Foreign Funding
- Loan : US$ 38,900,000
- Grant : US$ 0
Sub Total : US$ 38,900,000
Counterpart Funding
- Central Government : US$ 8,600,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 8,600,000
TOTAL : US$ 47,500,000
1
239
BB-ID: BBP1-02304-01-082052-1010218
1. Project Title : The Development of Sam Ratulangi University
2. Duration : 48 months
3. Location : Manado
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
In facing the current and future challenge, especially in increasing the competitiveness of the
nation, implementation of autonomy and decentralization, and enhancing the organizational
health, Sam Ratulangi University/Universitas Sam Ratulangi (UNSRAT) has to adjust its
paradigm to be able to run a qualified educational process, developing creativity, and
performing good university governance. These challenges become more important in
developing the national integration by strengthening the unity in the border area, including
improving the capacity of higher education institutions.
Environmental strategy analysis as stated at Strategic Plan of UNSRAT 2009-2013 indicates
that there are a set of opportunities of this institution to contribute to the nation's
competitiveness due to its location at the gate of eastern Indonesia, availability of natural
resources, and the national policy to develop the Manado-Bitung Integrated Economic
Development Zone and the opportunity of Bitung to become a free trade area.
Taking advantage of the challenges and opportunities described above, UNSRAT must
improve its capacity by handling the internal issues formulated by a self evaluation process
such as low capability of the teaching staff in supporting a high qualified teaching process,
lack of laboratory equipment, lack of class rooms, lack of laboratories space rooms, lack of
books and journals, and lack of supporting facilities and infrastructures such as information
system network, clean water, electricity, and access road.
7. Scope of Work
a. Development of academic staffs through postgraduate program;
b. Consulting engineering studies and design, supervision, and technical assistance;
c. Civil construction work;
d. Procurement of lab equipment, books and journals for the library, and other supporting
equipment;
e. Training for academic and administrative staff.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
Availability of resources and facilities in teaching and learning process to support
educational and training programs.
240
BB-ID: BBP1-02304-01-082052-1010218
b. Outcome
Serving as a centre of excellence in research and social services by developing institutional
management.
10. Project Cost
Foreign Funding
- Loan : US$ 25,280,000
- Grant : US$ 0
Sub Total : US$ 25,280,000
Counterpart Funding
- Central Government : US$ 6,320,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,320,000
TOTAL : US$ 31,600,000
1
241
BB-ID: BBP1-02304-01-082052-1010219
1. Project Title : The Development of Syiah Kuala University Project
2. Duration : 60 months
3. Location : Banda Aceh
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
In line with post-tsunami rehabilitation and reconstruction of Nanggroe Aceh Darussalam
(NAD), the University of Syiah Kuala with Three-Functional Pledge of Higher Education
realizes its important roles in the development of NAD after strong earthquake and tsunami
hit. The mission of University of Syiah Kuala reflects strong responsibility in strengthening
human resources both scientific knowledge and technology. Moreover, development of
research has been conducted towards exploration of the local natural resources that may
contribute to economic growth of the region.
These developments, however, are still insufficient to reach the expected outcomes due to the
lack of academic programs, staff competence, and facilities. Labor market oriented academic
programs are not well developed, while the existing academic resources are more designed to
meet the education purpose than research orientation. As a result, fundamental and frontier
researches cannot be performed to meet the above expectation. To solve the problem, the
University of Syiah Kuala has made strong efforts to participate in post-tsunami development
programs in Aceh, by contributing to the provision of resources and research outcomes for the
greater utilization of local natural resources and products that will benefit the community and
improve the economic development of Aceh.
7. Scope of Work
a. Construction of academic buildings for the Faculty of Natural Sciences and the Faculty of
Veterinary Medicine;
b. Procurement of supporting equipment;
c. Consulting engineering studies, design, and supervisory;
d. Consulting service for the technical assistance service.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Availability of academic building for the Faculty of Natural Sciences;
2) Extension of academic building for the Faculty of Veterinary Medicine;
3) Availability of laboratory, field test, and workshop equipment, as well as computer
facilities to serve the academic program.
242
BB-ID: BBP1-02304-01-082052-1010219
b. Outcome
1) Increasing the ability of University of Syiah Kuala in solving regional and national
problems in science and technology;
2) Supporting the development of University of Syiah Kuala into a high-rank regional
university in integrating rural agro-complex and industry;
3) Providing high-quality academic, research and training services for the general
public, government and private sectors.
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 0
Sub Total : US$ 35,000,000
Counterpart Funding
- Central Government : US$ 3,023,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,023,000
TOTAL : US$ 38,023,000
243
BB-ID: BBP1-02304-01-082052-1010220
1. Project Title : The Development of University of Brawijaya Towards
Entrepreneurial University
2. Duration : 60 months
3. Location : Malang
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Entrepreneurship education as an elected courses have no significant impact to
entrepreneurial way of life in campus and regional society. Graduated student majority is still
job seeker instead of job creator. University of Brawijaya (UB) has to shift from traditional roles
of education provider and knowledge creators to incorporate additional roles of
commercialization of knowledge and contribution to development of private enterprises and
regional economy. Commercialized UB research products are important to sustain university
but also for poverty alleviation and economic development.
There is particular concerns for the role of entrepreneurship in stimulating technology transfer
and commercialization of academic research. The UB in collaboration with Research and
Development Agency, Ministry of National Education, has developed business incubators'
guideline for higher education in Indonesia in which the UB is being the center for 22
university business incubators in network and conducting a Training of Trainer (TOT) for 18
universities across the nation.
The UB in collaboration with other universities in ASEAN and other Asia countries has
developed a new approach of teaching methods for entrepreneurship education using
"LEARNING FROM HELPING" concept. Therefore, the model of entrepreneurship education
would replace the classroom approach with a real business environment. Entrepreneurship
education is the first step and core instrument to change the mind sets of faculties toward an
entrepreneurial university. The related activities supporting this project are competitive grants.
7. Scope of Work
a. Improving entrepreneurship education methods;
b. Developing infrastructure and organizational unit to support UB entrepreneurial capacity;
c. Developing generic entrepreneurial and strengthening networking skill through business
incubator.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Improved infrastructure to support the UB towards entrepreneurial university;
2) Availability of affordable curriculum, learning model, and entrepreneurial network;
3) Establishment of UB Science and Technological park;
244
BB-ID: BBP1-02304-01-082052-1010220
4) Achievement of patent on UB product in science and technology;
5) Increased sources of revenues for the UB to support the future self-regulating
university model.
b. Outcome
1) Increasing the image, competitiveness, and national and international ranking
position of the UB;
2) Improving the capability of graduated students of the UB in job creation and
competition in employment;
3) Increasing the number of research products based on science and technology able to
be commercialized;
4) Increasing the role of the UB on regional business society development in providing
employment that end up with poverty reduction;
10. Project Cost
Foreign Funding
- Loan : US$ 40,000,000
- Grant : US$ 1,500,000
Sub Total : US$ 41,500,000
Counterpart Funding
- Central Government : US$ 4,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 4,000,000
TOTAL : US$ 45,500,000
245
BB-ID: BBP1-02304-03-082052-1010221
1. Project Title : The Quality Improvement of Padjadjaran University (UNPAD)
Bandung Project
2. Duration : 36 months
3. Location : Sumedang District
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
The new paradigm in higher education requires a totally new approach where the issues of
massive education, life-long learning, open learning, quality and relevance, accountability and
autonomy, and equity become so important. The impact of globalization causes a shift of the
role of higher education institutions from traditional learning institutions to knowledge
creators, a change from random planning to strategic planning and a movement from
comparative approach to competitive approach.
In meeting the challenges of the globalization, Indonesian higher education development is
implemented using the new paradigm where institutional autonomy and accountability
become the strategic issue. It is expected that by 2010 Indonesia will have a competitive
leverage due to the existence of highly reputable higher education institutions and a strong
higher education institution will lead to a nation's competitiveness.
Due to the tight national and international competition, particularly in human resources
development, Padjadjaran University is planning to be one of the ideal places to fulfill the
needs to prepare human resources in facing the global competition by increasing the quality of
graduates according to international standard.
7. Scope of Work
a. Upgrading the campus facilities and infrastructure to advance the learning process;
b. Improving the curriculum and organization study programs;
c. Improving the individual knowledge and skill of academic and administration staffs
through carrying out the development training program;
d. Improving the administration and management system using information technology;
e. Improving the institution managerial structures to be effective and efficient.
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
1) Availability of campus facilities and infrastructure to advance the learning process;
2) Availability of research facilities;
3) Availability of appropriate equipment and facilities;
4) Availability of information system networks;
5) Availability of competent academic and administration staffs.
246
BB-ID: BBP1-02304-03-082052-1010221
b. Outcome
1) Improving the university rank position among the higher institutions based on
accreditation status;
2) Achieving the top 50 universities in Asia;
3) Achieving the national participation rate for higher education in Indonesia;
4) Upgrading and improving product of the university;
5) Increasing the number of students.
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 0
Sub Total : US$ 35,000,000
Counterpart Funding
- Central Government : US$ 8,750,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 8,750,000
TOTAL : US$ 43,750,000
1
247
BB-ID: BBP1-02304-01-082055-1010222
1. Project Title : World Class Research University of Gadjah Mada
2. Duration : 48 months
3. Location : Sleman District
4. Executing Agency : Ministry of National Education
5. Implementing Agency : Directorate General of Higher Education, Ministry of National
Education
6. Background and Justification
Gadjah Mada University (GMU) is the oldest, biggest (50,000 students/year), and most
comprehensive state university as well as the most desired university to be enrolled by school
graduates in Indonesia, which ranks at 250th in the Times Higher Education - Quacquarelli
Symonds (THE-QS), world University Ranking 2009 with 103rd rank in life science and
biomedicine which is the highest in Indonesia. GMU has received grade A for National
Accreditation. Seven faculties and units were accredited by ISO 9001:2008 and the University
Integrated Research Laboratory was accredited by ISO 17025:2008. GMU maintains top
position of Webometrics among universities (1st nationally, 8th in Southeast Asia, 62nd in
Asia, 562nd in the World). The Faculty of Economic and Business is pursuing the Association
to Advance Collegiate School (AACSB) accreditation (USA), and the Department of Chemical
Engineering is pursuing Institution of Chemical Engineers / IchemE (Europe).
GMU is now improving its performance by the development of World Class Research
University (WCRU), through the implementation of research based education and community
services and the establishment of some system units to improve efficiency, effectiveness, and
accountability, as well as international acknowledgement. However, due to the management
transfer of the previous university hospital (Sardjito Hospital) from GMU to the Ministry of
Health in 1998, GMU is now lack of teaching hospital facilities for education, so that it must
have collaboration with 44 small hospitals surrounded Yogyakarta. In order to become WCRU,
an advanced and multidisciplinary-approached University's Academic Hospital must be
established in GMU. Due to very big earthquake in Yogyakarta (2006) many GMU buildings
and facilities are unsafe to be used and must be renovated.
7. Scope of Work
Renovation of University Convention Hall and some old classes and laboratory buildings
within Faculties of: Biology, Cultural Sciences, Dentistry, Engineering (Department of
Electrical Engineering), Geography, Law, Pharmacy, Philosophy, and Social & Political
Sciences (some damage due to the earthquake and crowded city).
8. Priority
Social, Cultural, and Religious Affair.
9. Output and Outcome
a. Output
Availability of facilities and classroom for Faculties of Biology, Pharmacy, Social Science
and Politics, Philosophy, Geography, Dentistry, Law, Cultural Sciences, and Department
of Electrical Engineering.
248
BB-ID: BBP1-02304-01-082055-1010222
b. Outcome
1) Meeting the qualification as World Class Research University along with improving
the quality of learning facilities and supporting facilities for student activities.
2) Improving the service on teaching and learning process and improving the
university's performance as a world class research university.
10. Project Cost
Foreign Funding
- Loan : US$ 75,000,000
- Grant : US$ 0
Sub Total : US$ 75,000,000
Counterpart Funding
- Central Government : US$ 11,250,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 11,250,000
TOTAL : US$ 86,250,000
1
249
Ministry of Transportation
(Kementerian Perhubungan)
Directorate General of Land Transportation (Direktorat Jenderal Perhubungan Darat)
251
BB-ID: BBP1-02203-04-061992-1060235
1. Project Title : Intelligent Transport System for Jabodetabek Area - Phase I
2. Duration : 48 months
3. Location : DKI Jakarta, Bogor (City and District), Tangerang (City and
District), Bekasi (City and District), and Depok
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Land Transportations, Ministry of
Transportation
6. Background and Justification
Jabodetabek, a large-scale metropolitan area with population of 21 millions, consists of DKI
Jakarta, the capital city of Indonesia and seven local governments (Bogor city and district,
Tangerang city and district, Depok city, and Bekasi city and district). Its gross regional
domestic product is estimated at Rp351,000 billion in 2002, or 22% of the national gross
domestic product, showing that Jabodetabek is strategically the most important region of the
nation.
At present, the annual economic loss caused by traffic congestion in the region could be as
much as Rp3,000 billion for vehicle operating costs and Rp2,500 billion for travel time.
Furthermore, if there is no improvement undertaken in the period up to the year 2020,
compared to the case of the proposed Master Plan of Transportation System Development, the
accumulation of economic loss would be up to Rp65,000 billion, consisting of Rp28,100 billion
for additional vehicle operating costs and Rp36,900 billion for longer travel time at present
value discounted by 12%.
The fundamental solution against these traffic problems is either to construct more roads to
absorb the increased number of vehicles or alternatively to develop different mode of transport
such as Light Rail Transit (LRT). These measures are, however, long-term policy and require
substantial investment in the construction of infrastructure, which is not possible under the
current economic condition of the country.
More practical countermeasure is to make efficient use of the existing facilities by
implementing various traffic engineering and management measures, which have been proven
effective in other cities and countries. One of measures is implementing Intelligent Transport
System (ITS). As currently old-fashioned inefficient signals are used, only several cities are
implementing Area Traffic Control System (ATCS), but this cannot cope with all countries
with traffic congestion problem. This system does not only control the ATCS but also real-time
Variable Message Signs (VMS) system, Public Transport Information System (PTIS), route
guidance, emergency assistance, traffic management, accident assistance and analysis.
7. Scope of Work
a. Technical Assistance
1) Developing the standardization of ITS in Indonesia;
2) Formulating the basic design of ITS Jabodetabek.
252
BB-ID: BBP1-02203-04-061992-1060235
b. Construction and Supervision
1) Building a new ATCS center in Indonesia, including:
Sub-systems;
Installation or changing of traffic signals, construction of related ITS;
Installation of variable message signs at major roads in golden triangle and toll
roads;
Installation of data acquisition systems at major roads in golden triangle and toll
roads;
Installation of lane change control systems at toll road gateways;
Installation of electric toll collection systems at toll road gateways;
2) Supporting the operation and maintenance system;
3) Supervision.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of economic evaluation and implementation of the project;
2) Availability of standardization of ITS Jabodetabek;
3) Availability of basic design of ITS Jabodetabek;
4) Availability of new ATCS center in Indonesia.
b. Outcome
1) Developing a comprehensive traffic management plan centered at ITS;
2) Transferring the technology and “know-how” in the traffic engineering and
management to the Government of Indonesia (central and local government).
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 5,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 5,000,000
TOTAL : US$ 55,000,000
253
Directorate of Sea Transportation (Direktorat Jenderal Perhubungan Laut)
255
BB-ID: BBP1-02204-04-081995-1060237
1. Project Title : Improvement and Development of Indonesian Aids to Navigation
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Sea Transportation, Ministry of
Transportation
6. Background and Justification
According to the monthly report of Navigation District on the availability and reliability of
Aids to Navigation (AtN), a great number of Indonesian AtN is in a poor technical condition
as the result of most AtN have surpassed the ideal lifetime. The low availability 58.60% and
reliability 92.96% of AtN have caused Indonesia cannot meet the minimum requirement of the
International Association of Lighthouse Authorities (IALA). The low contribution of
Indonesian AtN to the safety of navigation in Indonesian waters, in which today 230 AtNs are
damaged, 131 AtNs are missing.
The necessity to implement the policies in order to increase navigational services in Indonesia,
namely:
a. Replacement of the collapsed AtN to be able to be properly re-operated;
b. Replacement of damaged/old AtN equipment to increase its reliability;
c. Selectively establishing new AtN in order to increase its availability.
7. Scope of Work
a. Capacity building in technical AtN and management services;
b. Procurement of AtN equipment;
c. Construction of AtN towers.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of adequate AtN equipment;
2) Improvement of AtN services.
b. Outcome
1) Supporting the marine safety throughout Indonesian waters;
2) Increasing the regional access throughout the archipelago to support the regional
economic development of Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 78,000,000
- Grant : US$ 0
Sub Total : US$ 78,000,000
Counterpart Funding
- Central Government : US$ 7,800,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,800,000
TOTAL : US$ 85,800,000
256
BB-ID: BBP1-02204-06-081998-1060238
1. Project Title : Indonesia Ship Reporting System
2. Duration : 24 months
3. Location : Nationwide
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Sea Transportation, Ministry of
Transportation
6. Background and Justification
International Convention on Maritime Search and Rescue (SAR Convention) 1979, which has
become effective since 1985, stipulates the need of Ship Reporting Systems (SRS). Indonesia as
an archipelagic country is required to establish a SRS. Indonesia is responsible in providing a
safety and monitoring the shipping traffic within any search and rescue region under its
territory using Vessel Traffic Service (VTS). This is considered necessary to facilitate search and
rescue operations and is deemed practicable.
In consequence, a Ship Reporting System provides the up-to-date information on the
movements of vessels in order to give a quick and maximum assistance by participating
vessels to a vessel which may be in distress and in order to facilitate a quick SAR operation in
case of missing of a participating vessel.
7. Scope of Work
a. Establishing report receiving stations at the main coast stations (1st, 2nd, and 3rd);
b. Establishing report sub-centers at nine of first class and nine of second class coast stations;
c. Establishing a transmitting site of Jakarta coast station (Tanjung Priok) at the ship
reporting center;
d. Establishing data transmission lines by telecommunication line for reports transmission on
land as follows:
1) Center to Sub-Centers: internet/existing High Frequency (HF);
2) Sub-Center to 3rd class station: existing High Frequency (HF);
e. Establishing VTS station in Sunda and Lombok straits.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of SRS and its supporting devices (report receiving stations, report sub-
centers, ship reporting center, data transmission lines);
2) Availability of VTS station in Sunda and Lombok straits.
b. Outcome
1) Improving the service in SAR operation by providing up to date information on the
movement of vessels in order to give a quick and maximum aid in the event of
distress/accident;
257
BB-ID: BBP1-02204-06-081998-1060238
2) Facilitating the provision of vessels for medical service;
3) Securing the safety of the life and property at sea;
4) Improving the safety navigation and environmental protection from pollution.
10. Project Cost
Foreign Funding
- Loan : US$ 17,504,000
- Grant : US$ 0
Sub Total : US$ 17,504,000
Counterpart Funding
- Central Government : US$ 2,891,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 2,891,000
TOTAL : US$ 20,395,000
258
BB-ID: BBP1-02204-04-081996-1060239
1. Project Title : Procurement of Fast Boat for Maritime Safety Law Enforcement
2. Duration : 24 months
3. Location : Nationwide
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Sea Transportation, Ministry of
Transportation
6. Background and Justification
In order to improve the operational tasks in the enforcement of law in the sea, patrol ships are
needed as a supporting facility. One of the ship type to cover all Indonesian territorial waters
is class II patrol boat. All of the class II patrol boats are operated in the Navy and Coast Guard
Base/Pangkalan Penjagaan Laut dan Pantai (PLP). At present, the number of the boats is 9 (nine)
units, while the need is 21 (twenty one) units. Therefore, the procurement of new patrol boats
is necessary to support the Ministry of Transportation in implementing maritime safety law
enforcement.
7. Scope of Work
Procurement of 12 (twelve) units of class II patrol boats with the activities as follow:
a. Preparation of design and specification;
b. Implementation of construction work;
c. Supervision of the construction work;
d. Launching;
e. Dock and sea trial;
f. Delivery.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Fulfillment of the needs of class-II patrol boats;
2) Enforcement of maritime safety monitoring and control operation.
b. Outcome
1) Improving the surveillance of safety and security at sea;
2) Supporting the law enforcement at sea.
10. Project Cost
Foreign Funding
- Loan : US$ 60,000,000
- Grant : US$ 0
Sub Total : US$ 60,000,000
Counterpart Funding
- Central Government : US$ 9,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 9,000,000
TOTAL : US$ 69,000,000
259
BB-ID: BBP1-02204-04-081998-1060240
1. Project Title : Procurement of New Generation Passenger Vessel
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Sea Transportation, Ministry of
Transportation
6. Background and Justification
Indonesia is an archipelagic country with more than 18,000 islands and 80,000 km coastal lines.
The main national eccessibility problems such as inter-island, inter-region, and inter-zone
accessibilities are the very important and strategic needs which will influence the stability of
the nation.
PT PELNI as one of Indonesia’s leading public service provider which also serves passenger
and cargo transport in disadvanted and remote areas has played role in stimulating the local
economic growth (ship promote the trade). On the other hand, PT PELNl as commercial entity
attempts to continuesly gain profit for the company itself and for the state by means of
following the economic principles (ship follow the trade). In order to support its operation, such
accessibilities need to be reliable and sustainable particularly for inter-island and inter-zone
passenger and cargo movement.
The current emergence of some external factors – such as fluctuating of the current exchange,
increasing of fuel oil and maintenance cost as well as the introduction of Low Cost Carriers
(LCC) in air transport inflict farce competition among various modes of transport – has
challenged PT PELNl to properly manage its increasingly higher cost of operation. Such
situation has brought about some direct implications on the sustainability of sea passenger
transport as a whole.
Therefore, the procurement of a new generation passenger vessel is necessity to maintain sea
passenger transport capacity, considering some passenger vessels have reached the limit of
capacity operation, and to increase the profits of PT PELNl by changing it as business
transport becomes passenger-container transport. This is also by the consideration that the
situation of Indonesian sea transport shows decreasing in long distance passenger transport,
but over demand for container and car/truck transport instead, especially to the eastern of
Indonesia.
Based on the consideration of the above need, the design of the new generation passenger
vessel will be provided by changing the lay out of the vessels into the combination of
passenger-container-car/truck and, due to the global warming, it should be environmentally
friendly.
7. Scope of Work
a. Study on engineering estimation;
b. Supervision of vessels construction;
c. Procurement of 1 (one) unit of passenger-container type vessel;
d. Training and dissemination.
260
BB-ID: BBP1-02204-04-081998-1060240
8. Priority
Infrastructure
9. Output and Outcome
d. Output
Fulfillment of the need for adequate sea transportation of passenger vessels and cargo
transport, particularly in eastern Indonesia.
e. Outcome
1) Improving the sea transportation services to create traffic safety of sea transportation;
2) Maintaining the installed carrying capacity of national fleet to meet the needs of
transportation for passengers, goods, and vehicles, particularly in eastern Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 135,000,000
- Grant : US$ 0
Sub Total : US$ 135,000,000
Counterpart Funding
- Central Government : US$ 20,250,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 20,250,000
TOTAL : US$ 155,250,000
261
BB-ID: BBP1-02204-06-081998-1060241
1. Project Title : Vessel Traffic Service (VTS) System for Northern Part of Malacca
Strait
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Sea Transportation, Ministry of
Transportation
6. Background and Justification
Indonesia has been recognized as an archipelagic state by the United Nation Convention of the
Law of the Sea (UNCLOS). With thousands of islands under its territory, the recognition
means that Indonesia has been given the right and responsibility to monitor maritime traffic in
its territorial water. To support the above-mentioned objective, the Ministry of Transportation
proposes to establish Vessel Traffic Service (VTS) system in strategic and important areas in
the northern part of Malacca Strait. The majority of Malacca traffic is between coast and 20
Nautical Miles (NM) offshore and generally moves along the line of the International Maritime
Organization (IMO) that is designated as Traffic Separation Schemes (TSS) in the Malacca
Strait concerned.
A VTS system covering the Bangka Strait (northern part of Malacca Strait) should be
monitored due to a narrow lane and numerous sharp curves. The VTS will ensure that vessels
navigating in this channel and its vicinity are safe. Many passenger-ferries navigating in the
channel and entering the port of Palembang from other islands support the plan of the
Ministry of Transportation to minimize accidents in the areas.
7. Scope of Work
Establishment of VTS system in strategic and important areas in the northern part of Malacca
Strait (Ie Muelu, Weh island, Tg Tamiang, Sigli, Tg Nipah - Krueng Geukueh, Berhala, Tg
Jambuaye, Jemur island, Tg Peureulak) comprises radar system, Automatic Identification
System (AIS) base station, Closed-Circuit Television (CCTV), Very High Frequency (VHF)
radio system and meteorological sensor with the VTS center in Belawan and a sub-center in
Sabang.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of VTS system in northern part of Malacca strait;
2) Improvement of vessels services and operation.
b. Outcome
1) Providing surveillance, detection, and tracking of vessels;
2) Providing general and specific information to vessels in navigation;
3) Monitoring and analyzing the risks of collision and grounding;
262
BB-ID: BBP1-02204-06-081998-1060241
4) Improving the efficiency of vessel movements;
5) Improving the safety of navigation and environmental protection from pollution due
to accident.
10. Project Cost
Foreign Funding
- Loan : US$ 14,048,000
- Grant : US$ 0
Sub Total : US$ 14,048,000
Counterpart Funding
- Central Government : US$ 1,092,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,092,000
TOTAL : US$ 15,140,000
263
BB-ID: BBP1-02204-04-081998-1060242
1. Project Title : Vessel Traffic Service (VTS) System for Southern Part of Malacca
Strait
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Sea Transportation, Ministry of
Transportation
6. Background and Justification
Indonesia has been recognized as an archipelagic state by the United Nation Convention of the
Law of the Sea (UNCLOS). With thousands of islands under its territory, the recognition
means that Indonesia has been given the right and responsibility to monitor maritime traffic in
its territorial water. To support the above-mentioned objective, the Ministry of Transportation
proposes to establish Vessel Traffic Services (VTS) system in strategic and important areas in
the southern part of Malacca Strait as well as Port of Jakarta. The majority of Malacca traffic is
between coast and 20 Nautical Miles (NM) offshore and generally moves along the line of the
International Maritime Organization (IMO) that is designated as Traffic Separation Schemes
(TSS) in the Malacca Strait concerned. A VTS system covering the Bangka Strait (southern part
of Malacca Strait) should be monitored due to a narrow lane and numerous sharp curves. The
VTS will ensure that vessels navigating in this channel and its vicinity are safe. Many
passenger-ferries navigating in the channel and entering the Port of Palembang from other
islands support the plan of the Ministry of Transportation to minimize accidents in the areas.
Being an international port with high density of maritime traffic, the Port of Jakarta is
considerably urgent to be monitored. The statistic mentioned that the Port of Jakarta recorded
a traffic increase up to 18,110 vessels in 2008. A thorough monitoring should be available to
ensure that the coming in-and-out vessels are well-arranged.
7. Scope of Work
Establishment of Vessel Traffic Service (VTS) system in strategic and important areas in the
southern part of Malacca Strait comprises radar system, Automatic Identification System (AIS)
base station, Closed-Circuit Television (CCTV), Very High Frequency (VHF) radio system and
meteorological sensor.
The locations involved in this project are the port of Palembang (VTS centre), Muntok (VTS
sub-centre), Muci island (sensor site), Mendanao island (sensor site), Dapur island (sensor
site), Nangka island (sensor site), Tanjung Kelian (sensor site), Berhala island (sensor site),
Toboali (VTS sub-centre), Jakarta (VTS centre), Edam island (sensor site), Sunda Kelapa (sensor
site), Pohon Asem (sensor site).
8. Priority
Infrastructure
264
BB-ID: BBP1-02204-04-081998-1060242
9. Output and Outcome
a. Output
1) Availability of VTS system in southern part of Malacca strait and Port of Jakarta;
2) Improvement of vessels services and operation.
b. Outcome
1) Providing surveillance, detection, and tracking of vessels;
2) Providing general and specific information to vessels in navigation;
3) Monitoring and analyzing the risks of collision and grounding;
4) Improving the efficiency of vessel movements;
5) Improving the safety of navigation and environmental protection from pollution due
to accident.
10. Project Cost
Foreign Funding
- Loan : US$ 26,000,000
- Grant : US$ 0
Sub Total : US$ 26,000,000
Counterpart Funding
- Central Government : US$ 3,900,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,900,000
TOTAL : US$ 29,900,000
265
Directorate General of Civil Aviation (Direktorat Jenderal Perhubungan Udara)
267
BB-ID: BBP1-02205-04-092003-1060248
1. Project Title : Airport Development for Disaster Measure and Border Region
Development
2. Duration : 36 months
3. Location : Bengkulu, East Kalimantan, Maluku, East Nusa Tenggara, Papua,
West Papua, Riau, North Sulawesi, West Sumatera, North
Sumatera
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Civil Aviation, Ministry of Transportation
6. Background and Justification
Most areas of Indonesia are prone to natural disaster (earthquake, volcano eruption, lava
flood, and tsunami) caused by the fault and collision of lithosphere slab and active volcanoes.
Meanwhile, some areas in border region are sensitive, remote, and undeveloped, thus air
transportation infrastructure is necessary for improving the accessibility of people and goods
from and to the areas. On the contrary, the airport infrastructure in disaster prone area is, in
general, inadequate to support the evacuation process and aid distribution referring to disaster
accrued in recent times. Therefore, the development of airports infrastructure in disaster prone
areas and border regions is aimed to support the disaster measure and also the ability of
border regions to be equal with the neighboring countries.
7. Scope of Work
a. Consulting services;
b. Civil work and construction;
c. Procurement of goods and equipment.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Improvement and development of airport facilities and infrastructure in disaster prone
and border areas.
b. Outcome
1) Improving the air trasportation services, for disaster measure and commercial
purpose;
2) Improving the economy in disaster prone and border areas.
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 9,100,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 9,100,000
TOTAL : US$ 59,100,000
268
BB-ID: BBP1-02205-04-092005-1060249
1. Project Title : Enhancement of Safety for Air Link to Eastern Indonesia
2. Duration : 18 months
3. Location : Jayawijaya District, Southeast Maluku District, West Manggarai
District, Merauke District, Sikka District, Sorong District, Palu City,
Ternate City
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Civil Aviation, Ministry of Transportation
6. Background and Justification
The responsibility of Directorate General of Civil Aviation (DGCA) is to ensure the safety of
the entire Indonesian Airspace, thus contributing to economic development of the country by
allowing safe and reliable air link across the overall archipelago. Western (Sumatera) and
Central Indonesia (Java, South Sulawesi, South Kalimantan, and Bali) have beneficiated of
permanent investment in the fields of air transport means and infrastructure (airlines, Airport,
Air Traffic control, and surveillance facilities). The eastern part of our country has been left
aside as not economically attractive. Airports exist in most of eastern populated areas,
however the limitation of means of traffic control, surveillance and communications doesn't
allow the increase of the existing traffic, therefore slowing down dramatically the development
of these regions.
DGCA has performed several studies at identifying plans to develop gradually Eastern part of
Indonesia, based on which hubs have been identified as the most prioritized location
development. This project has been defined which objective is the opening up of these region
by enhancement of safety means of surveillance, communication, and navigation for the air
links.
7. Scope of Work
a. Specification and design:
1) Site survey, surveillance, and communication analysis coverage of very high
frequency (VHF)/high frequency (HF);
2) System specification;
3) Construction works design and specification.
b. Manufacturing and procurement
- System manufacturing
c. Construction works
- Site preparation at each site
d. Services
1) Factory site test and trainings;
2) Installation and configuration of the equipment;
3) Integration of national networks system;
4) Commissioning and certification.
8. Priority
Infrastructure
269
BB-ID: BBP1-02205-04-092005-1060249
9. Output and Outcome
a. Output
Procurement and installation on a turn-key of the following systems:
1) Enhanced mode of collocated Primary Surveillance Radar (PSR) and Monopulse
Secondary Surveillance Radar (MSSR);
2) Terminal Control Unit (TCU);
3) Voice Communication Switching System (VCSS);
4) UHF/VHF Communication System.
b. Outcome
Ensuring the safe and reliable air link.
10. Project Cost
Foreign Funding
- Loan : US$ 42,000,000
- Grant : US$ 0
Sub Total : US$ 42,000,000
Counterpart Funding
- Central Government : US$ 8,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 8,000,000
TOTAL : US$ 50,000,000
270
BB-ID: BBP1-02205-04-092004-1060250
1. Project Title : New Communication, Navigation, Surveillance, and Air Traffic
Management (CNS/ATM) System Development in Indonesia
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Civil Aviation, Ministry of Transportation
6. Background and Justification
In order to improve the situation, Directorate General of Civil Aviation (DGCA) established a
master plan for Communication, Navigation, Surveillance, and Air Traffic Management
(CNS/ATM) systems, which satisfies the standards and recommended practices of
International Civil Aviation Organization (ICAO). This project is justified since the
implementation of the new CNS/ATM systems in an international obligation of ICAO member
countries and it will have significant positive impact on aviation safety, flight efficiency,
natural environment, and national economy.
7. Scope of Work
a. Design, procurement, and construction of CNS/ATM systems,
b. Human resource development.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of new CNS/ATM systems;
2) Availability of competent human resource.
b. Outcome
1) Reducing the aircraft accidents and air traffic services (ATS) incidents;
2) Improving the air navigation services for the entire Indonesian air spaces.
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 0
Sub Total : US$ 100,000,000
Counterpart Funding
- Central Government : US$ 10,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 10,000,000
TOTAL : US$ 110,000,000
271
BB-ID: BBP1-02205-04-092005-1060251
1. Project Title : Procurement of Fire Fighting Equipment and Airport Rescue
2. Duration : 24 months
3. Location : Central Java, West Kalimantan, South Kalimantan, Central
Kalimantan, East Kalimantan, Lampung, West Nusa Tenggara, East
Nusa Tenggara, Papua, West Papua, Central Sulawesi, Southeast
Sulawesi, North Sumatera.
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Civil Aviation, Ministry of Transportation
6. Background and Justification
The project is aimed to complete the need of fire fighting vehicles at the airports and to replace
some of them which have already been over 10 years operation in accordance to International
Civil Aviation Organization (ICAO)’s operational standard. The success of aircraft evaluation
accident in the airport depends on the completeness of the facilities and the speed movement
of the fire fighting vehicles beside personnel support. Some vehicles are at the average of 10
years, so the equipment cannot dependable enough to prevent of emergency at airport areas.
7. Scope of Work
a. Procurement of new airport rescue and fire fighting vehicles, consisting of 15 units of
Medium Type II and 15 units of RIV-CA Type;
b. Replacement of the old fire fighting vehicles.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of adequate fire fighting vehicles with 30 units of new vehicles and
replacement of the old ones.
b. Outcome
Improving the aviation safety.
10. Project Cost
Foreign Funding
- Loan : US$ 31,700,000
- Grant : US$ 0
Sub Total : US$ 31,700,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 31,700,000
272
BB-ID: BBP1-02205-04-092003-1060252
1. Project Title : The Development of Airport in Papua
2. Duration : 36 months
3. Location : Jayapura District, Jayawijaya District, Merauke District,
Manokwari District, Sorong District
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Civil Aviation, Ministry of Transportation
6. Background and Justification
Papua topographical condition is mostly mountainous and hard to be reached by ground
transportation. The drawback in air transportation infrastructure in Papua and West Papua
provinces is a major nuisance for the development. The availability of transportation
infrastructure that covers all areas in Papua and West Papua provinces is needed. It is due to
the fact that those areas are essential in extending natural resources and tourism potencies in
both provinces, as they are strategic places in eastern part of Indonesia. Since Papua has a big
tourism potency, it is necessary to be supported by well transportation facilities.
7. Scope of Work
a. Consulting services;
b. Civil work and construction;
c. Procurement of goods and equipment.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Establishment/installation of air transport network and service system;
2) Utilization of the airport as the center of distribution control in Papua and West
Papua Provinces.
b. Outcome
1) Building an air transportation network and services system and also optimizing both
citizens and private companies potential role in opening the isolated areas;
2) Opening and tiding-up international aviation paths;
3) Supporting the development of tourism potency.
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 20,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 20,000,000
TOTAL : US$ 70,000,000
273
Directorate General of Railways (Direktorat Jenderal Perkeretaapian)
275
BB-ID: BBP1-02208-04-072009-1060257
1. Project Title : Bandung Urban Railway Transport Development, Electrification
Padalarang-Cicalengka Line
2. Duration : 36 months
3. Location : Bandung City
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Railways, Ministry of Transportation
6. Background and Justification
The partial double-track sections of Jakarta - Bandung railway corridor, i.e. Cikampek-
Purwakarta (19 km), Plered-Cisomang (6,2 km), and Ciganea-Sukatani (7,2 km) have been
operated since 2005. Nevertheless, the passenger transport volume in the corridor has been
decreased up to 40% until now due to the increasing competition against road transport since
the beginning operation of Cipularang toll-road in 2005.
To recover this declining trend, the railway needs to improve its product competitiveness in
the corridor, inter-alia, by improving the accessibility to its related services at both ends (origin
and destination) of its current route. This needs to be supported by a relevant study to provide
a justification for necessary improvement measures, which may include improvement of
transport connectivity or access from/to the station in Bandung city and the surrounding by
improving the track layout, adding new stopping points and line electrification of the trunk
line between Padalarang-Cicalengka. The commuter rail lines in Jabodetabek area has
practically been fully electrified, but in Bandung area-there has not been any electrified rail
line until now and, therefore, diesel rail cars are normally operated for commuter services and
sometimes train rakes are also used for the same, but mainly for local/regional train services.
7. Scope of Work
a. Procurement of materials, equipment, and installations facilities, including - but not
limited to those required for:
1) Improvements of track and re-layout of some railway stations;
2) Additional stopping points intermediate stations with the related signaling and
telecommunications systems;
3) Electrification of Padalarang-Cicalengka rail line, including sub-stations and
catenaries, and/or structures of electrical distribution system;
4) Improvement of signaling system;
5) Establishment of depot and workshop for maintenance facilities.
b. Construction
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of electrification on Padalarang - Cicalengka line;
2) Availability of equipment and installation facilities to support function of Padalarang-
Cicalengka line.
276
BB-ID: BBP1-02208-04-072009-1060257
b. Outcome
1) Enhancing the quality of urban/commuter railway services in Padalarang-Cicalengka
line, while improving the connectivity/accessibility of intercity train services from/to
Bandung;
2) Reducing the environmental impacts or pollution due to emissions from the roads as
well as current operation of rail-vehicles through electrification of Padalarang-
Cicalengka line;
3) Supporting the conservation/saving the use of non-renewable energy by the use of
electricity in Bandung urban/commuter railway operation;
4) Reducing the urban road traffic congestion in Bandung and those economic
inefficiencies and negative environmental impacts.
10. Project Cost
Foreign Funding
- Loan : US$ 157,000,000
- Grant : US$ 0
Sub Total : US$ 157,000,000
Counterpart Funding
- Central Government : US$ 18,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 18,000,000
TOTAL : US$ 175,000,000
277
BB-ID: BBP1-02208-04-072009-1060258
1. Project Title : Construction of Railway Double Track Kroya-Kutoarjo - Phase II
2. Duration : 84 months
3. Location : Central Java
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Railways, Ministry of Transportation
6. Background and Justification
Railway network in Java is approximately 4,700 km of route length forming main line for
intercity passenger and freight transport. Among others, Java South Line connects Jakarta and
Surabaya through Cirebon, Kroya, Yoygakarta, Solo for major intercity passengers transport.
To cope with the transport demand, double tracking for line capacity increase is implemented
by staging execution for total route on South Line and railway Double Tracking for
Yogyakarta-Kroya that is scheduled by two phases of implementation, consisting of
Yogyakarta -Kutoarjo (Phase I) and Kroya-Kutoarjo (Phase II).
While Yogyakarta-Kutoarjo (Phase I) has already been completed by double tracking
construction as the half part of Yogyakarta-Kroya section, this project is implemented to
extend Kutoarjo-Kroya (Phase II). On completion of full section double track between
Yogyakarta and Kroya by the projects (Phase I and II), intercity train traffic for passenger and
freight transport will increase along Java South Line.
7. Scope of Work
a. Construction of double track infrastructure on Kroya-Kutoarjo;
b. Construction of double track facility on Kroya-Kutoarjo;
c. Construction of double track station on Kroya-Kutoarjo;
d. Installation of double track electrical system on Kroya-Kutoarjo.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of double track infrastructure on Kroya-Kutoarjo;
2) Availability of double track facility on Kroya-Kutoarjo;
3) Availability of double track station on Kroya-Kutoarjo;
4) Availability of electrical system on double track of Kroya-Kutoarjo.
b. Outcome
1) Expanding the transport capacity fully for South Line;
2) Increasing the operation of intercity railway on Java South Line;
3) Increasing the contribution for public transport services and social economic
development enhancement to the regional cities and areas along Java South Line.
278
BB-ID: BBP1-02208-04-072009-1060258
10. Project Cost
Foreign Funding
- Loan : US$ 226,000,000
- Grant : US$ 0
Sub Total : US$ 226,000,000
Counterpart Funding
- Central Government : US$ 40,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 40,000,000
TOTAL : US$ 266,000,000
279
BB-ID: BBP1-02208-04-072009-1060259
1. Project Title : Procurement of Diesel Electric Locomotive
2. Duration : 48 months
3. Location : Banten, DKI Jakarta, West Java, Central Java, DI Yogyakarta, East
Java (Java Island)
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Railways, Ministry of Transportation
6. Background and Justification
Indonesia Railway Company/PT Kereta Api Indonesia (PT KAI) has four railway networks
separated in Java, North Sumatera, West Sumatera, and South Sumatera. The network on Java
island has total route length of 4,726 km, out of which 3,672 km is in operational condition by
1,067 mm gauge system and connects all the major cities across Java island.
PT KAI handles a substantial proportion of passenger traffic and freight traffic. The main
power for carrying out the above traffic is provided by hydraulic diesel locomotives and
electric diesel. The other power for carrying the sub-urban passenger traffic is provided by
hydraulic diesel railcar and electric multiple unit systems. The major portion of the passenger
and freight traffic on Java island is carried out by diesel electric locomotives.
Among 421 units of diesel registered in PT KAI, the total numbers of medium locomotives
operationally ready are 347 units, out of which 74 units are aged above 30 years with 24 units
in condition more than 50% and 50 units in a condition less than 50%. Operational rate of these
locomotives shall be maintained at desired label to secure reliability of the transportation
service. However, spare part of aged and depreciated units are no longer available and need
special order which requires costs and leads time. It is, therefore, urgently required to replace
these locomotives with new units.
7. Scope of Work
Procurement of diesel electric locomotive.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of diesel electric locomotive in Java island.
b. Outcome
Enhancing the transport system to meet the demand of passengers and freight railway,
especially during holiday seasons, and for coal transportation.
10. Project Cost
Foreign Funding
- Loan : US$ 51,000,000
- Grant : US$ 0
Sub Total : US$ 51,000,000
Counterpart Funding
- Central Government : US$ 7,650,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,650,000
TOTAL : US$ 58,650,000
280
BB-ID: BBP1-02208-04-072009-1060260
1. Project Title : Procurement of Electric Rail Cars for Jabodetabek
2. Duration : 48 months
3. Location : DKI Jakarta, Bekasi City and District, Bogor City and District,
Depok City, Tangerang City and District
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Railways, Ministry of Transportation
6. Background and Justification
An improvement in the public rail transport system will greatly improve the urban
environment in Jakarta-Bogor-Depok-Tangerang-Bekasi (Jabodetabek). To meet the demand
on urban transportation, the passenger capacity has to be increased from 400,000 pax/day up to
12,100,000 pax/day within the next five years. For this target the electric railcars of Jabodetabek
Commuter System has to be increased up to 1,000 units.
Therefore, the government has implemented the first stage of procurement of 40 electric
multiple units (EMU) as part of a total of 200 new EMU program. The second stage shall
consist of procurement of EMU and further improvement of the railway infrastructure to meet
the urgently demand on more capacity by increasing the headway and workshop capacity.
7. Scope of Work
a. Consulting services for international tender process and procurement control;
b. Procurement of Electric Rail Cars in Jabodetabek;
c. Capacity building.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of electric rail cars in Jabodetabek.
b. Outcome
Increasing the mobility of people in Jabodetabek.
10. Project Cost
Foreign Funding
- Loan : US$ 67,680,000
- Grant : US$ 0
Sub Total : US$ 67,680,000
Counterpart Funding
- Central Government : US$ 20,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 20,000
TOTAL : US$ 67,700,000
281
BB-ID: BBP1-02208-04-072009-1060261
1. Project Title : Procurement of Track Material and Turnouts
2. Duration : 48 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Railways, Ministry of Transportation
6. Background and Justification
Indonesia has a railway network of approximately 6,400 km of route length separated in Java,
North Sumatera, West Sumatera, and South Sumatera. The network on Java island has
4,726km route length and 3,672 km route in operational condition by 1,067 mm gauge system.
Major routes of the railway network are still single track type and Java Main Lines from
Jakarta area are already double track type or are changing into double track type by double
tracking construction projects. Axle load typically varies from 9 tons to 18 tons and track
condition has been deficient due to insufficient of daily maintenance. As the result, the number
of train derailing accident significantly increased from 40 in 2000 to 116 in 2007.
To reduce the accident risks, Indonesia Railway Company/PT Kereta Api Indonesia (PT KAI) has
established a policy to introduce train speed limits. Maximum speed on heavily used lines is
restricted to as low speed as 20-30km/hour. This has caused to substantial decrease in
transport capacity and affected railway performance targets both for passenger transportation
and goods distribution, which shall be solved by track rehabilitation and track modernization
by replacing track material and turnouts.
7. Scope of Work
a. Procurement of track materials of Type UIC-54;
b. Procurement of Turnouts;
c. Consulting services for international tender process and procurement control.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of track materials of Type UIC-54;
2) Availability of Turnouts.
b. Outcome
1) Improving the existing tracks into original capacity to maintain the designed train
speed;
2) Enhancing track service level for train operation of passenger and freight transport;
3) Reducing train accident.
10. Project Cost
Foreign Funding
- Loan : US$ 169,700,000
- Grant : US$ 0
Sub Total : US$ 169,700,000
Counterpart Funding
- Central Government : US$ 16,970,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 16,970,000
TOTAL : US$ 186,670,000
282
BB-ID: BBP1-02208-04-072009-1060262
1. Project Title : Railway Double Tracking Cirebon-Kroya - Segment I & III
2. Duration : 60 months
3. Location : East Java, Central Java
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Railways, Ministry of Transportation
6. Background and Justification
Railway network in Java is approximately 4,700 km of route length forming main line for
intercity passenger and freight transport. Among others, Java South line connects Jakarta and
Surabaya through Cirebon, Kroya, Yogyakarta, Solo for major intercity passenger transport.
To cope with the transport demand, double tracking for line capacity increase is implemented
by staging execution. Railway Double Tracking Cirebon - Kroya is scheduled in three
segments of implementation, Cirebon-Prupuk (segment I), Prupuk-Purwokerto (segment II),
and Purwokerto-Kroya (segment III). While Prupuk-Purwokerto (segment II) is already under
double tracking construction as the middle part of Cirebon-Kroya section, this project is
implemented for remaining parts of Cirebon-Prupuk (segment I) and Purwokerto-Kroya
(segment III) to complete full section of double track between Cirebon and Kroya. On
completion of the project, intercity train traffic will increase on Java South Line.
7. Scope of Work
a. Construction of double track infrastructure on Cirebon-Prupuk and Purwokerto- Kroya;
b. Construction of double track supporting facility on Cirebon- Prupuk and Purwokerto-
Kroya;
c. Construction of double track station on Cirebon-Prupuk and Purwokerto-Kroya;
d. Installation of double track electrical system on Cirebon-Prupuk-Purwokerto-Kroya;
e. Installation of train operational system on Cirebon-Prupuk-Purwokerto-Kroya.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of railway double tracking Cirebon – Kroya.
b. Outcome
1) Expanding the transport capacity for entire route of Java South Line;
2) Increasing contribution for public transport services and social economy development
enhancement to the regional cities and areas along Java South Line.
10. Project Cost
Foreign Funding
- Loan : US$ 136,000,000
- Grant : US$ 0
Sub Total : US$ 136,000,000
Counterpart Funding
- Central Government : US$ 20,400,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 20,400,000
TOTAL : US$ 156,400,000
283
BB-ID: BBP1-02208-04-072009-1060263
1. Project Title : Surabaya Regional Railway Line - Phase I
2. Duration : 24 months
3. Location : Surabaya
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Railways, Ministry of Transportation
6. Background and Justification
In the recent years, there have been many changes and development in Surabaya and its
vicinity areas. Living standard has significantly improved and, as the ownership of car and
motorbike has tremendously grown, there has been a boom in the number of vehicles on the
roads. The resulting difficulties have prompted the national authorities turn their attention to
the potential solutions offered by the rail mode.
Since the start of decade, a variety of study has been conducted into regional intercity
transport system in the introduction of the first trail of suburban commuter service on
Surabaya-Sidoarjo Line. An additional segment has been introduced with Surabaya-Lamongan
Line. As this was proven to be right solution, the Ministry of Transportation has requested a
complete study, conducted in 2006-2007, for the development of comprehensive regional rail
transport system to be the backbone of Surabaya Metropolitan Area (SMA) Commuter
Transport.
7. Scope of Work
a. Construction of double tracking and electrification for Lamongan - Pasar Turi - Surabaya
Kota route
b. Construction of track elevation and electrification for Surabaya Kota - Wonokromo -
Sidoarjo route
c. Procurement of electric railcar for Lamongan - Surabaya - Sidoarjo route
d. Construction of electric railcar depot and workshop facility in Surabaya Kota area
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of double tracking and electrification for Lamongan-Pasar Turi-Surabaya
Kota route;
2) Availability of track elevation and electrification for Surabaya Kota-Wonokromo-
Sidoarjo route;
3) Availability of electric railcar for Lamongan-Surabaya-Sidoarjo route;
4) Availability of electric railcar depot and workshop facility in Surabaya Kota area.
b. Outcome
1) Improving the public transportation in Surabaya and its surrounding areas;
2) Enhancing the social-economy in Surabaya and its surrounding areas.
284
BB-ID: BBP1-02208-04-072009-1060263
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 0
Sub Total : US$ 100,000,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 115,000,000
285
BB-ID: BBT1-02208-04-072009-1060264
1. Project Title : Mass Rapid Transit (MRT) East-West and Extension North-South
Engineering Services
2. Duration : 12 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Transportation
5. Implementing Agency : Directorate General of Railways, Ministry of Transportation
6. Background and Justification
Jakarta Mass Rapid Transit (MRT) System was commenced in 2006 by the finance arrangement
for service program to prepare the infrastructure construction and facility procurement for
MRT System on the route between Lebak Bulus and Dukuh Atas (North-South Line) which is
currently under progress. Farther route between Dukuh Atas and Jakarta Kota (North-South
Line Extension) is to cross the center of Jakarta city along Thamrin street with the maximum
passenger volume expected in North-South Line.
Actual implementation of construction and procurement for MRT System is required to
program the total staging plans within North-South line and its extension line (Lebak Bulus,
Dukuh Atas, Jakarta Kota). For preparing the total implementation of MRT system program,
Engineering Services is initiated urgently after completion of the ongoing Feasibility Study for
MRT System on North-South line Extension.
Engineering services are to prepare the construction and procurement programs for MRT
System within the same standards and operation concepts for entire system in North-South
Line and its extension line. Finance arrangement for execution of construction and
procurement for MRT System is to be scheduled by the comprehensive result of engineering
services for both North-South Line and its extension line.
7. Scope of Work
a. Conducting analysis on MRT system in term of operation, maintenance, facility,
construction, and procurement plans;
b. Conducting analysis on MRT system in term of route alignment, infrastructure, and
station facility design;
c. Implementing the program planning, project funding analysis, and tender document
preparation.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Establishment of MRT system on North-South Line extension;
2) Integrated system for North-South Line (Lebak Bulus, Dukuh Atas, Jakarta Kota).
b. Outcome
1) Maximizing services on the existing railway as well as the planned MRT system;
2) Contributing to the enhancement of public transport system and social-economy in
Jakarta city.
286
BB-ID: BBT1-02208-04-072009-1060264
10. Project Cost
Foreign Funding
- Loan : US$ 20,000,000
- Grant : US$ 0
Sub Total : US$ 20,000,000
Counterpart Funding
- Central Government : US$ 3,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,000,000
TOTAL : US$ 23,000,000
287
Ministry of Defense (Kementerian Pertahanan)
289
BB-ID: BBP1-01224-06-211560-1020282
1. Project Title : Improvement of Aeromedical Hospital - Phase II
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Defense
5. Implementing Agency : Ministry of Defense
6. Background and Justification
Constituted with the spirit of Indonesian military devotion to the people, especially the Air
Force, as well as guardians of national sovereignty, the hospital also has a role in supporting
the health service for Indonesian society. Air Force Hospitals/Rumah Sakit Angkatan Udara
(RSAU) spread across Indonesia are not only serving members of the Air Force and their
families, but also as a function of public hospital serving the communities living in the vicinity.
Since a few years ago, the Air Force Health Department has launched a program to improve
environmental health services at hospital and healthcare union in its ranks.
By the recent earthquake that struck Yogyakarta and Central Java Provinces in 2006, RSAU Dr.
Hardjolukito must be rehabilitated due to the damage. Its performance can be further
enhanced maximally like level II hospitals in general compliance as well as upgraded
equipment of medical services.
7. Scope of Work
a. Procurement of aero-medical hospitals medical equipment;
b. Installation and trials of medical equipments;
c. Training for using and maintenance of equipments.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
1) Availability of aero-medical hospitals medical equipment;
2) Availability of competent human resources.
b. Outcome
Increasing the capability and capacity of the aero-medical hospital in providing health
services and treatment for patients.
10. Project Cost
Foreign Funding
- Loan : US$ 13,200,000
- Grant : US$ 0
Sub Total : US$ 13,200,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 13,200,000
290
BB-ID: BBP1-01223-06-181528-1020283
1. Project Title : Procurement of Maritime Medical Facilities Program
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Defense
5. Implementing Agency : Ministry of Defense
6. Background and Justification
Currently, the existing medical equipment is inadequate in providing services for patients.
Therefore, there is a need to specifically propose enhancement for the quality of hospital
service. This proposal also includes the training for the management of logistics.
7. Scope of Work
a. Analysis of the existing medical equipment within the hospital;
b. Analysis of the beneficiary of the medical equipment procurement;
c. Procurement of medical equipment, pre-installation and final installation;
d. Training for medical equipment users;
e. Provision of training material and logistic management arrange manual maintenance.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
1) Improvement on diagnostic and treatment for hospital patients;
2) Improvement of human resource capacity in diagnosis, therapy, rehabilitation, and
maintenance/logistic management;
3) Increasing the supporting services for the hospital care.
b. Outcome
1) Meeting medical needs to carry out optimum services for military personnels, public
servants, and communities;
2) Improving navy professionalism, dentist institutions, and other navy medical
facilities.
10. Project Cost
Foreign Funding
- Loan : US$ 20,000,000
- Grant : US$ 0
Sub Total : US$ 20,000,000
Counterpart Funding
- Central Government : US$ 2,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 2,500,000
TOTAL : US$ 22,500,000
291
BB-ID: BBP1-01222-06-151490-1020284
1. Project Title : Procurement of Medical Equipment for Army Hospital
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Defense
5. Implementing Agency : Ministry of Defense
6. Background and Justification
The ability of Army Hospitals is conceived by the Indonesian military and government
officials for treating patients that cannot be handled by the public hospitals. So it is very much
expected that the availability of Army Hospitals will increase the capability to fully serve not
only military and government officials, but also the society in general.
The army hospital, Rumah Sakit Pusat Angkatan Darat (RSPAD) Gatot Subroto, needs to
urgently upgrade its medical equipment and health care facility, considering most of the
existing medical equipment that is no longer meeting medical standard requirement.
Meanwhile, the number of personnel and public to be served by the hospital in general has
been increasing significantly.
The procurement of medical equipment for RSPAD Gatot Subroto is critically needed to
support its operating function, besides to replace the absolute equipment, the additional
medical equipment is also needed to cope with the increasing number of patients
7. Scope of Work
Procurement of hospital equipments for below needs:
a. Central surgery;
b. Psychiatric;
c. Radiology;
d. Urology operation;
e. Anestology;
f. Teeth and mouth care;
g. Electrocardiogram (EKG 3) channel;
h. Antroscopy set;
i. Computed tomography (CT) scan, Electroencephalography (EEG), and brain mapping;
j. Enchocardiografy and other equipments.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
Availability of adequate medical equipments in RSPAD Gatot Subroto.
b. Outcome
Meeting the medical needs to carry out treatment services to the maximum.
292
BB-ID: BBP1-01222-06-151490-1020284
10. Project Cost
Foreign Funding
- Loan : US$ 22,000,000
- Grant : US$ 0
Sub Total : US$ 22,000,000
Counterpart Funding
- Central Government : US$ 3,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,000,000
TOTAL : US$ 25,000,000
293
BB-ID: BBP1-01221-06-011423-1020285
1. Project Title : Provision of Mobile Clean and Drinking Water Treatment System
for Emergency
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Defense
5. Implementing Agency : Ministry of Defense
6. Background and Justification
Indonesian Army/Tentara Nasional Indonesia (TNI) has a duty to assist in natural disaster relief
and provide humanitarian aid as stated within Law Number 34/2004 on TNI. In performing
this duty, TNI has many times suffered from the lack of basic equipment and facilities. One of
this facilities is the provision of clean water and drinking water facility in disaster location.
7. Scope of Work
a. Procurement of clean and drinking water treatment system in a modular (containerized)
form, including spare parts, special treatment equipment, disposable equipment;
b. Training for operating and maintaining the equipment system.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
1) Availability of clean water treatment system mobilized to disaster location with
sufficient capacity for qualified water to support health;
2) Availability of trained human resources to operate and maintain the clean water
treatment system.
b. Outcome
Supporting TNI in assisting the natural disaster relief and other humanitarian aids.
10. Project Cost
Foreign Funding
- Loan : US$ 11,000,000
- Grant : US$ 0
Sub Total : US$ 11,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 11,000,000
295
Ministry of Agriculture (Kementerian Pertanian)
297
BB-ID: BBP1-01811-09-141834-1050286
1. Project Title : Smallholder Livelihood Development Programmes in Eastern
Indonesia (SOLID)
2. Duration : 60 months
3. Location : DKI Jakarta, Maluku, North Maluku
4. Executing Agency : Ministry of Agriculture
5. Implementing Agency : Agency of Food Security, Ministry of Agriculture
6. Background and Justification
Food security problem is not only dominated by food consumers but also experienced by food
producers especially those small holder farmers/fishermen. The problems faced by this
community are relatively low productivity and accessibility to food in terms of both physically
and economically.
The majority of people in Maluku province rely on agriculture sector for their livelihood.
Actually they have already had agricultural institution like farmer groups, but not yet
functioned optimally. This leads to the implementation of agricultural techniques tend to be
subsistence or the production is only to meet the actual demand and could not be able to
produce optimally. Technically, this region has potency to be developed through the
improvement of farmer group awareness and technical ability. It is expected that the farmer
groups would be able to adopt and implement more efficient and effective cultivation
techniques, so it could increase productivity and production of their farming.
In the framework of improving the prosperity of farmers and their families, it is necessary to
broaden the scope of productive economic activities of the farmers and improve their
efficiency and competitiveness. In line with those reasons, the government, through the
Ministry of Agriculture, has proposed “the improvement program for farmers welfare” which
aims to facilitate the farmers to achieve the improving income through community
empowerment, accessibility improvement to farming resources, farmer institution
development, and farmer protection.
7. Scope of Work
a. Food production and infrastructure support;
b. Building up social, economy capital, and bargaining power of the small holder farmer;
c. Community-based natural resources management.
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
1) Improvement of agricultural production;
2) Establishment of rural infrastructures and reservation of natural resources.
b. Outcome
Achieving sustainable food security and resilient rural economy.
298
BB-ID: BBP1-01811-09-141834-1050286
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 10,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 10,000,000
TOTAL : US$ 60,000,000
299
BB-ID: BBP1-01809-02-121818-1050287
1. Project Title : Sustainable Management of Agricultural Research and Technology
Dissemination (SMART-D)
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Agriculture
5. Implementing Agency : Indonesian Agency for Agricultural Research and Development
6. Background and Justification
In the foreseeable future, agricultural development will be directed as the main actor of
sustainable economic development that can guarantee the growth, equity, and its
sustainability. In this case, research and development on agriculture will play an important
role in accelerating an intensive knowledge and innovative agribusiness. To cope with the
rapid change, agricultural sector in Indonesia requires significant upgrading of the current
research and development system. An empirical study indicated that the capacity of
Assessment Institute for Agriculture Technology (AIATs) to conduct decentralized adaptive
research and National Resources Institute (NRI's) capabilities to generate up-stream
technology strategic research still need substantial improvement.
Indonesian Agency for Agricultural Research and Development (IAARD) nowadays leads in
increasing the capacity and professionalism of human resources through training activities,
ranging from formal academic degree programs to short courses and on-the-job training.
In order to continue and maintain the institutional development of Agricultural Research
Agency in all areas, it is important for Indonesia to increase and strengthen institutional
development in terms of accreditation of laboratories and equipment capacity as well as
professionalism of human resources.
7. Scope of Work
a. Capacity building;
b. Provision of facilities and infrastructure that supports research and development activities
of agriculture;
c. Implementation of action programs on specific agricultural commodities to support
agricultural development;
d. Implementation of strategic research activities;
e. Development and strengthening of linkages/relationships between farmers-researchers,
private sector and farmers;
f. Implementation of collaborative research program.
8. Priority
Economy
9. Output and Outcome
a. Output
1) Availability of qualified human resources for research and development of
agricultural technology;
300
BB-ID: BBP1-01809-02-121818-1050287
2) Availability of infrastructure with international qualification;
3) Availability of accredited laboratories and research/experiment station with
international qualification;
4) Availability of research result and dissemination of agricultural technology.
b. Outcome
Improving and strengthening institutional development for agriculture research.
10. Project Cost
Foreign Funding
- Loan : US$ 80,000,000
- Grant : US$ 0
Sub Total : US$ 80,000,000
Counterpart Funding
- Central Government : US$ 20,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 20,000,000
TOTAL : US$ 100,000,000
301
BB-ID: BBP1-01808-04-111816-1050288
1. Project Title : The Post Tsunami Rehabilitation of Agricultural Infrastructure in
Nanggroe Aceh Darussalam Province - Phase II
2. Duration : 48 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Agriculture
5. Implementing Agency : Directorate General of Land and Water Management, Ministry of
Agriculture
6. Background and Justification
The earthquake immediately followed by giant tsunami wave of December 26th 2004 brought
about a devastating impact on coastal community of one of the western Indonesian provinces
of Nanggroe Aceh Darussalam (NAD). Within the province, approximately 24,968 ha of
productive irrigated agricultural areas and 40,550 of productive rain fed areas were destroyed
by massive mud sea and debris burial on the surface of growing cultivated crops. This caused
severe impacts to the social and economic aspects of the community in affected rural areas
where the majority of the population was farmers (80%). The catastrophic tsunami affected
almost 70,984 farmers and killed 17,632 of them.
The negative effects of the tsunami and earthquake to agricultural areas were particularly
including the loss of crop yield, vanishing job opportunity, loss of rice-field/farm holding plot
boundaries, destruction of main and tertiary irrigation facilities, drastic change in physical and
chemical condition of soil due to overlaid saline soil (high content of salt or sodium element on
the new surface). The Post Tsunami Project Phase II in Aceh Province is designed as a
continuation of phase I, and concentrated in the same district where the remaining civil work
such as agricultural infrastructure still needs to be rehabilitated and improved.
7. Scope of Work
a. Construction of infrastructure;
b. Institutional strengthening and farmer training;
c. Dissemination/counseling;
d. Extension and field trials;
e. Procurement of farm machinery and equipment;
f. Project management, design and supervision consultants, and project financial auditing.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Rehabilitation and establishment of irrigation, on-farm irrigation, on-farm drainage,
farm road, farm ponds;
2) Field trial and demonstration, including field school, farmer training, farming
demonstration;
3) Availability of capable human resources in agricultural;
302
BB-ID: BBP1-01808-04-111816-1050288
4) Availability of farm machinery and equipment;
5) Establishment of project data management system.
b. Outcome
1) Improving agriculture production;
2) Enhancing farmer institution management;
3) Improving farmers' perception and skills in agriculture.
10. Project Cost
Foreign Funding
- Loan : US$ 18,000,000
- Grant : US$ 0
Sub Total : US$ 18,000,000
Counterpart Funding
- Central Government : US$ 1,800,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,800,000
TOTAL : US$ 19,800,000
303
Ministry of Public Housing (Kementerian Perumahan Rakyat)
305
BB-ID: BBP1-09103-04-063797-1060300
1. Project Title : Infrastructure Development for Large Scale Housing
2. Duration : 48 months
3. Location : Bantul District, Gresik District, Luwu Timur District, Balikpapan
City, Banjarmasin City, Bontang City, Kendari City, Palembang
City, Pangkal Pinang City, Pekanbaru
4. Executing Agency : Ministry of Public Housing
5. Implementing Agency : Ministry of Public Housing
6. Background and Justification
One of the main aspects required to support the success of housing provision program for the
low income people is through the increasing access to the land for housing and settlements by
large scale housing settlements development. The approach of developing the large scale
housing through the Self-help Ready to Build Area/Environment Scheme or
Kawasan/Lingkungan Siap Bangun Berdiri Sendiri (Kasiba/Lisiba BS) has been regulated in Law
Number 4/1992 regarding Housing and Settlements, in which the details can be found in
Government Regulation Number 80/1999 on Kasiba/Lisiba BS.
One of the most frequent problems faced in terms of the development of Kasiba/Lisiba BS or
large-scale settlements in general is the scarce and expensive infrastructure, such as road (area
scale), drainage, clean water, electricity, and waste water, etc. This condition makes a planned
Kasiba/Lisiba BS faces some difficulties to develop. It is actually understandable because
generally the cheap land locations selected as Kasiba/Lisiba BS are usually located in urban
fringe areas and relatively isolated, with little supporting infrastructure. It is expected, through
this infrastructure provision project assistance, the development of Kasiba/Lisiba BS can be
maintained based on the plan made and in turn will be able to increase the availability of
affordable housing for low and medium income people.
The importance of infrastructure provision in the development of Kasiba/Lisiba BS can be
explained as follow:
a. The infrastructure can direct the development of Kasiba/Lisiba BS based on the plan and
development stages - Spatial Detailed Plan / Rencana Rinci Tata Ruang (RRTR) and
Development Plan Documents;
b. The infrastructure can reduce the housing end-price;
c. The infrastructure development can integrate and synergize the regions within
Kasiba/Lisiba BS.
7. Scope of Work
a. Preparing DED (detailed engineering design) for each infrastructure in the proposed
Kasiba/Lisiba BS locations, based on the recommendation of RRTR, both in building new
infrastructure and improving quality of the existing ones;
b. Building the new infrastructure and improving the quality of the existing infrastructure in
each proposed location.
8. Priority
Infrastructure
306
BB-ID: BBP1-09103-04-063797-1060300
9. Output and Outcome
a. Output
Availability of adequate housing infrastructure such as roads, drainage, clean water,
electricity, waste water, etc in each proposed location.
b. Outcome
Increasing adequate and affordable housing for low income people in large scale areas.
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 0
Sub Total : US$ 100,000,000
Counterpart Funding
- Central Government : US$ 15,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 115,000,000
307
BB-ID: BBP1-09103-04-063796-1060301
1. Project Title : Infrastructure Development for Slum Area Upgrading
2. Duration : 48 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Housing
5. Implementing Agency : Ministry of Public Housing
6. Background and Justification
Since the colonial times,slum environmental management effort, especially in urban areas, has
had a long phase of development, either held by the government and the community itself.
Some of these efforts are Kampong Improvement (Kampoong Verbetering), MH. Thamrin and
WR. Supratman program, Kampong Improvement Program (KIP), Comprehensive KIP,
Environmental Management Program for Slum Settlement, Program of Integrated Urban
Infrastructure Development, Environmental Quality Improvement Program, Urban Poverty
Program, Community Based Housing and Local Development Initiative (CoBILD), owning
and rental Simple Flats, Ready to Build Area/Environment/Kawasan Siap Bangun (Kasiba) and
Lingkungan Siap Bangun (Lisiba), and Procurement of House Building Loan (mortgage) for
subsidized Simple House and Very Simple House.
During the period of 2004-2009, the Ministry of Public Housing had implemented several
programs and activities to improve the environmental quality of housing, especially for low
income people. These activities include Self-help Housing Development Stimulants Assistance,
Improvement of Housing Quality, Development of Owning and Rental Simple Flats, Utilities
Stimulant Assistance for Housing and Settlement and Distribution of Simple-House
Ownership Credit/Kredit Pemilikan Rumah Sederhana (KPRS)/Micro-Subsidized KPRS. These
programs need to be integrated into multisectoral and sustainable regional development
scenarios.
7. Scope of Work
a. Formulation of Infrastructure Development for Slum Area Upgrading/Penanganan
Lingkungan Perumahan dan Permukiman Kumuh Berbasis Kawasan (PLP2K-BK)
1) Implementation of a series of activities for planning analysis PLP2K-BK;
2) Formation of community activator;
3) Analysis of community action plan.
b. Detailed engineering design document and supervision
1) Implementation on field;
2) Technical planning which includes: planning, geometric, pavement, drawing/ design,
calculating the quantity of work, and the calculation of the cost of implementation.
c. Infrastructure Development
Implementation of housing and settlement development technically referring to the
regulations and technical standards governing the construction of housing and
settlements in force.
The proposed locations: Yogyakarta City, Palembang, Makassar, Kendari, Singkawang,
Pontianak, Banjarmasin, Medan, Jambi, West Java, Batam, Central Jakarta, Donggala District,
Palu, Blitar, Probolinggo, Rembang District, Semarang District, Sumbawa District, Denpasar,
East Belitung District, Pangkal Pinang, and Serang District.
308
BB-ID: BBP1-09103-04-063796-1060301
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Provision of regional scale infrastructure, including roads, drainage, clean water,
electricity, waste water, as well as the existing infrastructure
b. Outcome
1) Increasing the quality of environment with system and network activities in the
surrounding areas
2) Improving the quality of life and welfare of the community in slum area.
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 7,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,500,000
TOTAL : US$ 57,500,000
309
BB-ID: BBT1-09103-04-063794-1060302
1. Project Title : New Town Development Policy for Low Income People
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Ministry of Public Housing
5. Implementing Agency : a. Local Government
b. Ministry of Public Housing
6. Background and Justification
One of the main aspects required to support the success of housing provision for low income
people is increasing the access to the land for housing and settlements through the
development of new town. The new large-scale settlements can be developed either through
the concept of Ready to Build Area/Kawasan Siap Bangun (Kasiba) and the development of new
town which will be equipped with supporting facilities to independently meet the need of
residents.
Efforts to provide land for housing and settlement for the low income people in the new town
is one of the policy alternatives that may be one alternative solutions to the problems of
scarcity and high price of land today. The government intervention, both central and local
governments, in the form of policies to overcome the problem, is very much needed.
Therefore, in order to formulate the policy in managing the new town development to ensure
the provision of housing for the low income people, the Ministry of Public Housing
proposes the project of New Town Development Policy for Low Income People.
7. Scope of Work
a. Technical assistance for large scale housing development pilot project of Kota Kekerabatan
Maja in Tangerang and Lebak (Banten) and Bogor (West Java);
b. Development of new town policy for securing housing provision for the poor in Bandung
(West Java), Surabaya (East Java), and Medan (North Sumatera);
c. Provision of infrastructure for supporting the new town development project in Medan,
Bantul, Gresik, Ngawi, Pontianak, Balikpapan, Palu, and Manado.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Availability of preliminary study documents in each proposed location;
2) Availability of development policy and master plan for Kota Kekerabatan Maja;
3) Availability of development concepts and strategic program for the large scale
settlements area as a new town in the selected location;
4) Development of infrastructure in the proposed Kasiba.
5) Availability of appropriate and affordable large scale housing for the low income
people.
310
BB-ID: BBT1-09103-04-063794-1060302
b. Outcome
Fulfilling the demand on housing for low income people in the proposed locations.
10. Project Cost
Foreign Funding
- Loan : US$ 50,000,000
- Grant : US$ 0
Sub Total : US$ 50,000,000
Counterpart Funding
- Central Government : US$ 6,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 6,000,000
TOTAL : US$ 56,000,000
311
Ministry of National
Development Planning/National
Development Planning Agency
(Kementerian Perencanaan Pembangunan Nasional/Badan Perencanaan
Pembangunan Nasional - Bappenas)
313
BB-ID: BBP1-05501-07-032974-1080315
1. Project Title : Institutional Capacity Building for Bureaucracy Reform
2. Duration : 96 months
3. Location : Nationwide
4. Executing Agency : Ministry of National Development Planning/National
Development Planning Agency
5. Implementing Agency : a. Ministry of National Development Planning/National
Development Planning Agency,
b. Ministry of Finance
6. Background and Justification
As mentioned in Long-Term National Development Plan/Rencana Pembangunan Jangka Panjang
Nasional (RPJPN 2005-2025), the development in the area of the state apparatus through
bureaucracy reform is aimed to improve the professionalism of the apparatus and to achieve
good governance at central and local governments to support the success of development in
other fields.
Furthermore, in the National Medium-Term Development Plan/Rencana Pembangunan Jangka
Menengah Nasional (RPJMN 2010-2014), it is elaborated that in order to support the realization
of a prosperous society, democracy, and justice, the development on the state apparatus is
aimed to enhance good governance with the strategy used among others to increase the
capacity and accountability of bureaucracy and consolidation of the implementation of
bureaucracy reform.
The government also has set eleven national priorities, one of which is bureaucracy and
government reform. One of the main activities of the national priorities is the implementation
of bureaucracy reform at central and local levels. At the central levels, it is expected that in
2011, all agencies have been implementing bureaucracy reform which requires the support of
good quality of human resources, both to manage the implementation of bureaucracy reform
itself and to produce high-performance agencies based on the core tasks of each agency.
There are significant gaps between the ideal and the existing capacity, so that it is necessary to
accelerate the development of human resource capacity through the scholarship program in
order to support the bureaucracy reform.
7. Scope of Work
Capacity building of institutional for bureaucracy reform by dispatching 4,033 scholars,
consisting of domestic and overseas PhD degree, master degree, non-degree program
(managerial, functional, individual, internship, and certification), and pre-departure
preparation program.
8. Priority
Law and State Apparatus
314
BB-ID: BBP1-05501-07-032974-1080315
9. Output and Outcome
a. Output
Availability of about 4,033 graduate trainees consist of 127 alumni of domestic and
overseas PhD degree; 1,257 of domestic, overseas, and linkage Master degree, 2,078 of
domestic and overseas non-degree programs (managerial, functional, individual,
internship and certification); and 571 alumni in pre-departure preparation program.
b. Outcome
Realizing the implementation of an efficient and effective bureaucracy reform program in
the ministries/agencies, that hold the key role in designing various national polices in
bureaucracy reform.
10. Project Cost
Foreign Funding
- Loan : US$ 112,650,000
- Grant : US$ 0
Sub Total : US$ 112,650,000
Counterpart Funding
- Central Government : US$ 1,850,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,850,000
TOTAL : US$ 114,500,000
315
BB-ID: BBT1-05501-07-032974-1080316
1. Project Title : Public Procurement and State Audit Reform (Pro STAR)
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of National Development Planning/National
Development Planning Agency
5. Implementing Agency : a. Supreme Audit Board,
b. Government Internal Control Agency,
c. Ministry of Home Affairs,
d. Ministry of Education,
e. Ministry of National Development Planning/National
Development Planning Agency,
f. National Public Procurement Agency.
6. Background and Justification
One of sector priorities in the National Medium-Term Development Plan 2010-2014 is the
implementation of good governance which is aimed to establish a clean government that is
free from corruption, collusion, and nepotism. The focus of this sector priority includes
numerous national issues/policies, such as (i) implementation of government internal audit
institution system, (ii) development of e-procurement, (iii) accountability of government
financial management, (iv) handling of public complaint.
Accordingly, the government has initiated various programs to realize the section priorities,
among others, through the State Audit Reform Sector Development Project (STAR-SDP) which
has brought about significant result, in implementation of state audit reform.
Based on the evaluation of the results of STAR-SDP, continuous improvement of Government
financial management and accountability is highly required. The proposed PRO-STAR-SDP, is
expected to support the Government in the implementation of Government Internal Control
System (GICS), development of e-procurement, improvement of capacity and accountability of
government financial management and handling public complaint.
7. Scope of Work
a. Provision of scholarship programs (degree/non-degree) for government external and
internal auditors, and finance officials of central and local government institutions;
b. Development of e-procurement:
1) preparation of new audit procedures;
2) development of application and procedures of audit evidence collection;
3) system installation which includes software and hardware for reporting and audit
evidence,
4) assistance to the implementation of e-procurement,
5) dissemination and training on e-procurement audits, and
6) preparation of the application modules of e-procurement system in accordance with
international standard.
c. Establishment of public complaint unit in local inspectorates.
8. Priority
Law and State Apparatus
316
BB-ID: BBT1-05501-07-032974-1080316
9. Output and Outcome
a. Output
1) Availability of adequate number and qualified accountants majoring in Government
Audit and Accounting at central and local governments institutions;
2) Availability of Government Internal Auditors with Functional Auditor/Jabatan
Fungsional Auditor (JFA) certifications to be located in central and local government;
3) Availability of accountable e-procurement system in all targeted government
administration;
4) Availability of public complaint units in selected provinces.
b. Outcome
1) Improving the quality of e-procurement system services in all targeted government
administrations;
2) Improving the quality in handling public complaint.
10. Project Cost
Foreign Funding
- Loan : US$ 90,000,000
- Grant : US$ 5,000,000
Sub Total : US$ 95,000,000
Counterpart Funding
- Central Government : US$ 9,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 9,500,000
TOTAL : US$ 104,500,000
317
Ministry of Research and
Technology (Kementerian Riset dan Teknologi)
319
BB-ID: BBP1-04201-03-062690-1040356
1. Project Title : Research and Innovation in Science and Technology (RISET)
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : Ministry of Research and Technology
5. Implementing Agency : a. Ministry of Research and Technology
b. Indonesian Institute of Sciences
c. Assessment and Application of Technology Agency
d. National Institute of Aeronautic and Space Agency
e. Nuclear Energy Regulatory Agency
f. National Standardization Agency
g. National Nuclear Energy Agency
6. Background and Justification
Development of science and technology is highly correlated to the strengthening of research
institute capacity, research incentive, and governance. The strengthening of research institute
capacity consists of activities of human resources capacity building and improvement of
research facilities.
In general, the quality of human resources on science and technology is low. The significant
decline has occurred since 1997 when the government of Indonesia implemented the policy of
zero recruitment. Meanwhile, many researchers are in aging and there is a big gap between
senior and junior researchers' capacity. These conditions directly influence the productivity of
the research institutions. From other perspective, this lack of productivity is not only caused
by the quality of researchers but also by other factors, such as the availability of researchers,
management of research institutions, and lack supply of expertise.
During 1992-1995, the Ministry of Research and Technology had developed many tools to
generate research activities called Integrated Supreme Research/Riset Unggulan Terpadu (RUT)
and Partnership Supreme Research/Riset Unggulan Kemitraan (RUK). There were 22 schemes of
incentive research released by the Ministry of Research and Technology. Since 2006, those
schemes have been compressed to five programs, i.e.: basic research, applied research, research
of science and technology capacity enhancement on production system, research on science
and technology dissemination, and national strategic research. However, by reviewing their
history, the quality of research penetration on those programs has not significantly influenced
the Indonesian people’s prosperity, particularly the economic growth.
7. Scope of Work
a. Strengthening the research institute capacity through human resources capacity building
and improvement of research facilities;
b. Strengthening the provision of research incentive;
c. Strengthening the cooperation among research institutions.
8. Priority
Science and Technology
320
BB-ID: BBP1-04201-03-062690-1040356
9. Output and Outcome
a. Output
1) Increased number of master and doctoral degree;
2) Fulfillment of the needed for equipment to accommodate research at government
research institutions;
3) Increased cooperation network among government research institutions, universities,
and international research institutions;
4) Increased number of scientific paper publications.
5) Increased productivity and effectiveness of management at government research
institutions.
b. Outcome
1) Increasing the quantity and quality of deliverability from each government research
institutions such as technology policy formulation (patent, prototype, innovation, and
scientific papers);
2) Increasing the utilization of technology services from government research
institutions to private sectors (small and medium enterprises, national corporation,
State-Owned Enterprises);
3) Increasing the dissemination of information on science and technology from
government research institutions to society;
4) Increasing the quality of researcher and research output in international scientific
communities.
10. Project Cost
Foreign Funding
- Loan : US$ 95,000,000
- Grant : US$ 0
Sub Total : US$ 95,000,000
Counterpart Funding
- Central Government : US$ 55,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 55,000,000
TOTAL : US$ 150,000,000
321
Ministry of Manpower and
Transmigration (Kementerian Tenaga Kerja dan Transmigrasi)
323
BB-ID: BBP1-02601-02-012205-1030358
1. Project Title : Revitalization of Vocational Training Centers (VTCs)
2. Duration : 36 months
3. Location : DKI Jakarta
4. Executing Agency : Ministry of Manpower and Transmigration
5. Implementing Agency : Ministry of Manpower and Transmigration
6. Background and Justification
Vocational training in simple meaning refers to a specifically technical learning process to
perform one or many tasks or jobs for work or position. Hence, it deals with competencies
applicable to arrange labor situation and occupational areas, as part of a life-long process of
training together with other forms of education with something broader understanding not
only technicalities of job but also of working environments and other aspects related to
working life. In general, the training is in fact oriented to provide qualifications for wage
employment or contract work and also too many matters related to work that can be found in
modern societies.
Vocational training should not only train people for all types of work and skills but also the
ability to understand social and working relations. Within this understanding, vocational
training is defined as an activity directed to identify and develop human capabilities for a
productive and satisfying working life.
Accordingly, it involves such activities like:
a. Learning and educational activities offer necessary knowledge and skills to perform a
particular job post, an occupation, or a professional activity in the labor market, including
supplementary form of other types by training people not only as workers but also as good
citizens.
b. An activity involves the processes of not only transfer technology, innovation, and
development, but also as a strategic tool that becomes essential for the fundamental basis
of technological innovation and development itself.
c. An elaboration and understanding on labor key issue within labor relations and the
relationship with all concerned institutions, such as Government, industry, and workers
themselves, and awareness on the importance of its contributions to distribution of
employment opportunities in general, to the rise in productivity and the improvement of
quality and competitiveness, to the achievement of appropriate and healthy working
conditions as well as the possibility for social dialogue at various levels.
7. Scope of Work
a. Formulation of program and activity planning;
b. Capacity building for vocational training center instructors;
c. Renovating the training centers, namely:
1) Nanggroe Aceh Darussalam province, Industrial Training Center/Balai Besar Latihan
Kerja Industri (BBLKI) Banda Aceh;
2) North Sumatera Province, BBLKI Medan;
3) Banten Province, BBLKI Serang;
4) West Java Province, BBPLKLN Bekasi and BBPLKDN Bandung;
5) Central Java Province, BBLKI Solo and BBLKI Semarang;
6) East Kalimantan Province, BBLKI Samarinda.
324
BB-ID: BBP1-02601-02-012205-1030358
8. Priority
Economy
9. Output and Outcome
a. Output
1) Improved quality of vocational training centers;
2) Improved quality and quantity of vocational training center instructors;
3) Establishment of mobile training unit for prioritized vocational training centers.
b. Outcome
1) Improving the competency of Indonesian work force;
2) Improving the competitiveness of Vocational Training Center;
3) Developing the Vocational Training Center as self-financing institution.
10. Project Cost
Foreign Funding
- Loan : US$ 32,500,000
- Grant : US$ 0
Sub Total : US$ 32,500,000
Counterpart Funding
- Central Government : US$ 8,125,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 8,125,000
TOTAL : US$ 40,625,000
325
Indonesian National Police (Kepolisian Negara Republik Indonesia)
327
BB-ID: BBP1-06001-06-023138-1020359
1. Project Title : Development of Communication Systems in the Border Area at
Polda Kepulauan Riau, East Nusa Tenggara, North Sulawesi, and
Papua
2. Duration : 12 months
3. Location : Kepulauan Riau, East Nusa Tenggara, North Sulawesi, Papua
4. Executing Agency : Indonesian National Police
5. Implementing Agency : Indonesian National Police
6. Background and Justification
The task and challenge of the Indonesian National Police will be increasingly diverse and
complex. Based on the demand of the duties and review on the technical aspects, the
Indonesian National Police needs a reliable, sophisticated, and high safety factor
communications system to support the police in carrying out its duties, particularly in security
system in the border regions of Polda. Kepulauan Riau, East Nusa Tenggara, North Sulawesi,
and Papua. By the communication systems and monitoring technology support, the
implementation of the police’s tasks is expected to run smoothly and the important state assets
around the border areas can be protected.
7. Scope of Work
a. Development of infrastructure for communication systems in border areas of Kepulauan
Riau, East NusaTenggara, North Sulawesi, and Papua;
b. Procurement of equipment and installation communication system at border areas;
c. Training for the human resource;
d. Commissioning and testing of the communication system.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
1) Availability of infrastructure for communication systems in border areas of
Kepulauan Riau, East Nusa Tenggara, North Sulawesi, and Papua;
2) Increased capacity of activities command and control;
3) Improved coordination between police offices within Regional Police (Polda) to
response to crime prevention at the Indonesian authority areas efficiently and
transparently.
b. Outcome
1) Optimally protecting the assets and natural resources in border regions;
2) Early detecting the disturbance of security in border areas;
3) Well serving the traffic of people and goods.
6 2
328
BB-ID: BBP1-06001-06-023138-1020359
10. Project Cost
Foreign Funding
- Loan : US$ 20,000,000
- Grant : US$ 0
Sub Total : US$ 20,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 20,000,000
329
BB-ID: BBP1-06001-06-023134-1020360
1. Project Title : Development of Indonesia Automatic Fingerprint Identification
System (INAFIS)
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : Indonesian National Police
5. Implementing Agency : Indonesian National Police
6. Background and Justification
Globalization and technology progress contribute significantly to the national welfare and
community development. However, both of them have also influenced criminal evidence and
security problem. For the last decade, Indonesia has been experiencing criminal evidence using
advanced technology. It is no doubt that Indonesia now is a location for trans-national and
organized crimes which usually apply advanced technology.
Meanwhile, trans-national and organized crime trend has increased, conventional crime trend
has not decreased yet. Data from many sources show that conventional crime index in almost
all provinces relatively unchange compared to previous years. Indeed, conventional crime in
many provinces is more various than before.
It is believed that free trade among countries which usually associates with population
mobility will have impact to the criminal modus. In another hand, every country has to
provide some requirements, especially security, in order to succeed the free trade activity.
Now, Indonesia is already entering Association of Southeast Asian Nations (ASEAN)- China
free trade. Therefore, Indonesia National Police has to be ready to anticipate security problem
including all crime evidence and illegal activities.
One of the weaknesses and the most basic problem in maintaining security and scientific crime
investigation for Indonesian National Police is the poor criminal database including
fingerprint, picture, and suspect identifications. This condition makes Indonesian National
Police often faces difficulties in investigating crime evidence, illegal activities, and terrorist. As
a part of international and regional forum cooperation such as International Criminal Police
Organization (Interpol), United Nation Office on Drugs and Crime (UNODC), European Police
Office (Europol), ASEAN Chiefs of Police (ASEANPOL), and World Customs Organization
(WCO), criminal database, including fingerprint, picture, and suspect identifications data, is
also a standard requirement for data change among the countries in order to investigate crime
evidence and to catch suspect attributively crosses country. Regarding that reason, many
countries have developed Automatic Fingerprint Identification System (AFIS). Through this
action, it is possible for each country to exchange the data among them.
7. Scope of Work
Procurement and operation of Indonesia Automatic Fingerprint Identification System.
8. Priority
Defense and Security
6 2
330
BB-ID: BBP1-06001-06-023134-1020360
9. Output and Outcome
a. Output
Strengthened national fingerprint center of Indonesian National Police in order to achieve
an effective and efficient management of fingerprint database.
b. Outcome
Supporting the criminal database development including fingerprint, picture, and suspect
identifications.
10. Project Cost
Foreign Funding
- Loan : US$ 56,000,000
- Grant : US$ 0
Sub Total : US$ 56,000,000
Counterpart Funding
- Central Government : US$ 12,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 12,000,000
TOTAL : US$ 68,000,000
331
BB-ID: BBP1-06001-06-023140-1020361
1. Project Title : Development of Police Technology Innovation Equipment
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : Indonesian National Police
5. Implementing Agency : Indonesian National Police
6. Background and Justification
Scientific and technological progress continues to develop, influencing and changing the
traditional ways to prevent and detect crime. The examples of science and technology in
assisting the police main tasks are: forensic science that is more accurate in detecting crime,
imprisoning suspects, and freeing the innocent and the use of information and communication
systems and hi-tech equipment that allow officers to carry out humanitarian tasks by spending
more time interacting with the community.
Due to the rapid rate of technological change, it is very important for the police to invest on
equipment and technology that will improve the ability to provide public services. On the
other side, the progress in science and technology is also used in the activities of organized
crime and terrorism. Therefore, the police has to stay a step ahead in science and technology in
order to fight crime and conduct its public services.
The key of science and technology utilization to support the task of police and sustainable use
of police equipment is innovation adoptions, the ability to participate in a creative and open-
minded way, and the ablility to conduct exploration of all possibilities.
Contrasting to this requirement, the technological equipment owned by the Indonesian
National Police has not met the need of local and diverse condition in Indonesia. In order to
overcome this situation, Indonesian National Polices will make an investment to improve
science and technology capacity to increase indigenous technological innovation and develop
autonomous capabilities for police equipment prototype, testing, and evaluation.
7. Scope of Work
a. Capacity building of Indonesian National Police in technological innovation, especially in
producing, developing, and testing main equipment and method;
b. Improving the quality of police equipment in accordance with international standards and
local values;
c. Development of testing and certification center of police equipment
8. Priority
Defense and Security
9. Output and Outcome
a. Output
1) Developed facilities and infrastructure/workshop for building prototype and
application of technology for police equipment;
2) Developed testing and certification center of police equipment, including laboratories
for testing and certification of criminal investigation, forensic, individuals, electronics
and IT, transport equipment, and riots control equipment.
2
332
BB-ID: BBP1-06001-06-023140-1020361
b. Outcome
1) Improving science and technology capacity of Indonesian National Police in
increasing indigenous technological innovation;
2) Developing autonomous capabilities for police equipment prototype, testing, and
evaluation.
10. Project Cost
Foreign Funding
- Loan : US$ 16,500,000
- Grant : US$ 0
Sub Total : US$ 16,500,000
Counterpart Funding
- Central Government : US$ 3,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,500,000
TOTAL : US$ 20,000,000
333
BB-ID: BBP1-06001-06-023135-1020362
1. Project Title : Fast Patrol Boat for the Indonesian National Police
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : Indonesian National Police
5. Implementing Agency : Indonesian National Police
6. Background and Justification
The increasing law violations in Indonesian territorial waters in such forms of piracy,
smuggling, illegal labor exporting, robbery, illegal fishing, as well as sea accidents very much
endanger sea safety. Thereby it endangers the security in Indonesian territorial waters. Thus,
the sea police is resposible for law enforcement in Indonesian waters. To answer this challenge,
the Indonesian National Police needs to be supported by fast patrol boats.
The purpose the police patrol boats is to complement the main sea police equipment whose
function is to increase the effectiveness of the sea police operations based on the operation
system and logistic support as well as Indonesian geographical condition. It is also to keep,
prevent, and take action against smuggling and handle disturbance in law violation in
Indonesian territorial waters as well as to increase the sea police profesionalism.
7. Scope of Work
a. Procurement of class A or B fast patrol boats;
b. Procurement of fast patrol boat spare parts;
c. Maintenance.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
Availability of adequate fast patrol boats.
b. Outcome
Increasing the professionalism of the Indonesian National Police operations.
10. Project Cost
Foreign Funding
- Loan : US$ 35,000,000
- Grant : US$ 0
Sub Total : US$ 35,000,000
Counterpart Funding
- Central Government : US$ 7,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 7,000,000
TOTAL : US$ 42,000,000
2
334
BB-ID: BBP1-06001-06-023138-1020363
1. Project Title : Integrated Trunking Radio Communication for Indonesian
National Police - Phase I
2. Duration : 12 months
3. Location : West Kalimantan and East Kalimantan
4. Executing Agency : Indonesian National Police
5. Implementing Agency : Indonesian National Police
6. Background and Justification
Due to the increasing criminal trend in several areas, to support its duties, the Indonesian
National Police needs specific equipment, including adequate communication equipment. The
prototype of radio communication should comply with the operational needs of the
Indonesian National Police. It will provide an integrated communication system for the
Indonesian National Police in Kalimantan area.
The main priority is to strengthen the Indonesian National Police long-distance
communication network by enhancing its command, coordination, communication, and
information. By providing the communication system, it is expected that the system will be
able to support the regional and central operation
7. Scope of Work
Providing radio communication network equipment in West Kalimantan and East Kalimantan.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
Availability of integrated trunking radio communication network in West Kalimantan and
East Kalimantan.
b. Outcome
Increasing the performance of Indonesian National Police in West Kalimantan and East
Kalimantan.
10. Project Cost
Foreign Funding
- Loan : US$ 40,000,000
- Grant : US$ 0
Sub Total : US$ 40,000,000
Counterpart Funding
- Central Government : US$ 16,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 16,000,000
TOTAL : US$ 56,000,000
2
335
BB-ID: BBP1-06001-06-023138-1020364
1. Project Title : Integrated Trunking Radio Communication for Indonesian
National Police - Phase II
2. Duration : 24 months
3. Location : South Kalimantan and Central Kalimantan
4. Executing Agency : Indonesian National Police
5. Implementing Agency : Indonesian National Police
6. Background and Justification
Due to the increasing criminal trend in several areas, to support its duties, the Indonesian
National Police needs specific equipment, including adequate communication equipment. The
prototype of radio communication should comply with the operational needs of the
Indonesian National Police. It will provide an integrated communication system for the
Indonesian National Police in Kalimantan area.
The main priority is to strengthen the Indonesian National Police long-distance
communication network by enhancing its command, coordination, communication, and
information. By providing the communication system, it is expected that the system will be
able to support the regional and central operation.
7. Scope of Work
Providing radio communication network equipment in South Kalimantan and Central
Kalimantan.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
Availability of integrated trunking radio communication network in South Kalimantan
and Central Kalimantan.
b. Outcome
Increasing the performance of Indonesian National Police in South Kalimantan and
Central Kalimantan.
10. Project Cost
Foreign Funding
- Loan : US$ 40,000,000
- Grant : US$ 0
Sub Total : US$ 40,000,000
Counterpart Funding
- Central Government : US$ 15,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 15,500,000
TOTAL : US$ 55,500,000
2
336
BB-ID: BBP1-06001-06-083176-1020365
1. Project Title : National Criminal Information Center for Indonesian National
Police - Phase II
2. Duration : 36 months
3. Location : Nationwide
4. Executing Agency : Indonesian National Police
5. Implementing Agency : Indonesian National Police
6. Background and Justification
In order to process crime information as fast and accurate as possible, an information
technology composed of modern on-line computerized system is required. Therefore, to obtain
reliable criminal data, a center of criminal information is needed to support the Indonesian
National Police in cooperation with other related departments and institutions in the criminal
justice system.
7. Scope of Work
a. Providing brainware and software program;
b. Developing network system.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
1) Provision of National Crime Information System;
2) Supply of fast, reliable, and accurate criminal data;
3) Support for Indonesian National police in its cooperation with other related
departments and institutions, including international police organization.
b. Outcome
Enhancing the National Crime Information Center for Indonesian National Police.
10. Project Cost
Foreign Funding
- Loan : US$ 20,000,000
- Grant : US$ 0
Sub Total : US$ 20,000,000
Counterpart Funding
- Central Government : US$ 3,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,500,000
TOTAL : US$ 23,500,000
2
337
BB-ID: BBP1-06001-06-053152-1020366
1. Project Title : Strengthening of Police Research and Development Institution
2. Duration : 24 months
3. Location : DKI Jakarta
4. Executing Agency : Indonesian National Police
5. Implementing Agency : Indonesian National Police
6. Background and Justification
The advances of modern technology today are progressing at a much faster rate than ever
before. The new forms of crimes and new innovation dealing with crimes brought by these
advances require the Indonesian National Police should be able to develop new equipments
and methods using modern technology advances in their main function for maintaining
security and public order. In order to achieve this, the Indonesian National Police needs a
support of strong and reliable Research and Development (R&D) institution to fulfill the police
technology needed by the Indonesian National Police.
The strengthening of police R&D institution is done with two main focuses. The first is the
strengthening of institutional's capability in creating designs of new innovative equipments
and police methods. This can be done through the use of modern Computer-Aided Design
(CAD) technology so that designs are made easier, faster, and with better qualities, thereby are
better presented for the police. CAD is widely used for designing purposes to create a digital
model that can be studied digitally and tested using information inputted to the software. This
decreases the need of many personnel to draft the new product. Beside the technology of the
software advances and the better capabilities of what programs can be implemented through
this software, there is also a higher need for better training in using the more complex
programs.
The second is through better capability of R&D staffs in developing models of new police
equipments. The capability of creating digital models will help in saving time and energy for
testing and adjusting new products to be created. This will also help the process of
transferring these new innovations from their designs to production within industries.
Through the capability strengthening of these institutions, the competitive advantages of the
products created will be better and more sufficient in fulfilling the needs of the Indonesian
National Police.
7. Scope of Work
a. Procurement of modern Computer-Aided Design (CAD) technology for R&D institutions
in Indonesian National Police with new innovative equipment and methods;
b. Strengthening the capacity of R&D institutions in developing new innovative models and
designs of tools and equipment that will be used by the Indonesian National Police.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
Strengthened capacity of the Indonesian National Police’s R&D institutions.
2
338
BB-ID: BBP1-06001-06-053152-1020366
b. Outcome
Supporting the Indonesian National Police in preventing and fighting crimes.
10. Project Cost
Foreign Funding
- Loan : US$ 16,500,000
- Grant : US$ 0
Sub Total : US$ 16,500,000
Counterpart Funding
- Central Government : US$ 3,500,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,500,000
TOTAL : US$ 20,000,000
339
BB-ID: BBP1-06001-06-023141-1020367
1. Project Title : Upgrading of Regional Police Hospital and Equipment
2. Duration : 18 months
3. Location : Makassar City, Medan City, Semarang City, Surabaya
4. Executing Agency : Indonesian National Police
5. Implementing Agency : Indonesian National Police
6. Background and Justification
In accordance with Law Number 2/2002, Indonesian National Police has duties and functions
of maintaining public security, enforcing the law, and providing protection to the community
in order to create security conditions in the country at the safe and conducive level.
The higher demand of physical capability needs from the activities of police officers and the
higher risks that sometimes must be taken by police officers in their line of duty can take high
toll of their own health and safety. This requires the provision of good quality of health
services for police members and also of their families so that they can perform professionally
in their task for public security and law enforcement. In the provision of qualified health
services, there is a high demand to provide upgrading of regional police hospitals, including
the health equipment within those hospitals, to be able to fulfill the health needs of police
members. These regional police hospitals also help the government respectively by opening
the hospitals for common people. The society within these regions benefits very strongly from
the expertise and service quality of these hospitals equipments.
7. Scope of Work
Procurement of equipment and installation of medical infrastructures and testing medical
devices.
8. Priority
Defense and Security
9. Output and Outcome
a. Output
Improvement and installation of medical infrastructures and devices.
b. Outcome
Increasing healthcare of police members and societies;
10. Project Cost
Foreign Funding
- Loan : US$ 14,000,000
- Grant : US$ 0
Sub Total : US$ 14,000,000
Counterpart Funding
- Central Government : US$ 1,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,000,000
TOTAL : US$ 15,000,000
2
341
Indonesian Institute of Sciences (Lembaga Ilmu Pengetahuan Indonesia / LIPI)
343
BB-ID: BBP1-07901-03-063450-1040374
1. Project Title : Animal Husbandry Technology and Practices Improvement to
Accelerate Meat and Milk Production (MEAT-MILK PRO)
2. Duration : 36 months
3. Location : Banten, West Java, South Sulawesi, West Sumatera
4. Executing Agency : Indonesian Institute of Sciences
5. Implementing Agency : Indonesian Institute of Sciences
6. Background and Justification
Indonesia is an agricultural country where most of the people depend on this sector. One
important part of the Indonesian agricultural sector is the livestock program which contributes
to fulfill the need for good quality of food and nutrient for the Indonesian people. A better
livestock practices could be directed to improve the quality of product and ensure resources
sustainability for sustainable economic development.
The demand for good quality of food will continuously increase due to the population growth
and the improvement of people income. On the other hand, Indonesia still faces a tremendous
challenge to establish prosperous livestock program due to some limitations and problems,
such as science and technology capability, insufficient research facility, lack of human
resources capacity, and lack of funding and program integration. The existing beef and dairy
cattle are no longer competitive and need to be upgraded. Therefore, Meat-Milk Pro Program
is needed to strengthen institutional capacity of animal husbandry development; introduce
new technology to improve animal husbandry productivity and innovation; and endorse an
integrated farming system to sustain and optimize the agricultural development program.
7. Scope of Work
a. Construction of building (laboratory and incubator technology);
b. Installation and maintenance of equipment;
c. Joint research and operation;
d. Capacity building (fellowship and training);
e. Meat-Milk development;
f. Dissemination.
8. Priority
Science and Technology
9. Output and Outcome
a. Output
1) Availability of infrastructures and laboratory facilities;
2) Improved capacity of human resources in livestock sub-sector;
3) Accelerated livestock development programs.
b. Outcome
1) Promoting the cooperation, networking, and linkages between authorized institutions
in the region to support beef and dairy production;
2) Providing job opportunity and income for farmer in rural areas;
3) Enhancing the capability of science and technology relevant to livestock development.
344
BB-ID: BBP1-07901-03-063450-1040374
10. Project Cost
Foreign Funding
- Loan : US$ 19,753,000
- Grant : US$ 0
Sub Total : US$ 19,753,000
Counterpart Funding
- Central Government : US$ 1,792,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,792,000
TOTAL : US$ 21,545,000
345
National Resilience Institute (Lembaga Ketahanan Nasional / Lemhannas)
347
BB-ID: BBT1-06401-06-033246-1020377
1. Project Title : Strengthening the Capacity Building of the National Resilience
Institute
2. Duration : 18 months
3. Location : DKI Jakarta
4. Executing Agency : National Resilience Institute
5. Implementing Agency : National Resilience Institute
6. Background and Justification
National Resilience Institute/Lembaga Pertahanan Nasional (Lemhannas) is aimed to prepare and
solidify national leaders and also to conduct the strategic assessment about national and
international issues (actual). The vision of Lemhannas is forming the national cadre and leader
who have a characteristic, moral, nationalist ethic, and also supremacy comparative and
competitive in order to certify the unity state of Republic of Indonesia that is based on the Five
Principles of the Republic of Indonesia (Pancasila) and the Constitution of the Republic of
Indonesia (Undang-undang Dasar/UUD'45).
The missions of Lemhannas as the government institution are:
a. Preparing the cadre and solidifying the national leader;
b. Arranging the national, regional, and international strategic assessment as the resource
materials for national leaders;
c. Strengthening the nationality values and national insight that national management
system transforms the universal values in accordance with developing national resilience;
d. Developing and enhancing cooperation with other institutions and agencies in the country
and overseas.
Therefore, Lemhannas as a prestigious course and assessment institute (think tank) requires re-
engineering in the organization, system and recruitment procedure, curriculum, leveraging the
capacity of human resources, assessment process, and the availability of infrastructure in
information technology which will solve the current issues.
7. Scope of Work
a. Planning and analyzing the information policy and system;
b. Re-designing, reconstruction, and re-implementation of system software, development
tools, and application software;
c. Re-development and rehabilitation of information network infrastructure;
d. Procurement and construction of hardware and network equipment supply;
e. Maintenance services (updated content, troubleshooting, and system monitoring);
f. Developing and upgrading the centralized database system;
g. Evaluation and audit of information system and policy;
h. Socialization and training for system user, administrator, and supporter.
8. Priority
Defense and Security
348
BB-ID: BBT1-06401-06-033246-1020377
9. Output and Outcome
a. Output
1) Establishment and maintenance of physical and non-physical infrastructure through
the usage of information system and technology proper to Lemhannas needs;
2) Establishment and maintenance of software applications designed for today and
future needs;
3) Availability of of accurate, reliable, accessible, and integrated database system;
4) Upgraded and enhanced expert, lecturer, student, and supporting staff skill and
competency.
b. Outcome
1) Creating an efficient and effective organization through the implementation of the
programs and activities;
2) Enhancing the quality of policy making, investigation on strategic policy,
implementation of policies on the area of education and training as well as
monitoring and evaluation on the strategy outcome;
3) Continuing revitalization of the organization in line with tasks and function of the
institution particularly related with the assessment and education;
4) Enhancing the quality of assessment related to the national and international issues;
5) Enhancing the quality on the implementation of education and training to prepare
and strengthen national leadership candidates.
10. Project Cost
Foreign Funding
- Loan : US$ 10,080,652
- Grant : US$ 0
Sub Total : US$ 10,080,652
Counterpart Funding
- Central Government : US$ 1,094,587
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 1,094,587
TOTAL : US$ 11,175,239
349
National Institute of Aeronautic
and Space Agency (Lembaga Penerbangan dan Antariksa Nasional / LAPAN)
351
BB-ID: BBP1-08201-03-063590-1040378
1. Project Title : Upgrading LAPAN's Remote Sensing Ground-station to Support
Climate Change Mitigation
2. Duration : 37 months
3. Location : DKI Jakarta, Parepare - South Sulawesi, Biak
4. Executing Agency : National Institute of Aeronautic and Space Agency
5. Implementing Agency : National Institute of Aeronautic and Space Agency
6. Background and Justification
Climate change is natural condition which has to be faced and anticipated to protect strategic
interest that involves sustainability, such as food sustainability. Regarding that condition, it is
necessary to build responsive monitoring system which has quick anticipating and recovering
process. Climate change mitigation also has more positive impact, especially to support
natural resources management and economic activities. The integrated mitigation climate
change system for all coverage Indonesia can support the continuity of national development.
As Indonesia has large territory, the ideal monitoring system should have large coverage to
cover all Indonesian territories. Remote sensing technology is the best solution to answer that
requirement. The coverage remote sensing data of about 60-1,000 km and its repetition
capability will provide the best information to measure climate change. Therefore, we need to
build ground-station for directly receiving remote sensing satellite data, automation for
processing and delivery of data information.
National Institute of Aeronautic and Space Agency / Lembaga Penerbangan dan Antariksa
Nasional (LAPAN) has a basic experience to operate and maintain remote sensing ground
station system. Since 1975, LAPAN has been receiving multi remote sensing satellite data and
success to operate the processing and distribution system. LAPAN has main ground-station
system in the middle of Indonesian territory (in Parepare - South Sulawesi) which efficiently
covering all Indonesian territory. Thus, the mitigation system will be quicker and more reliable
to be implemented by upgrading LAPAN system. By adding redundant-antenna system
feature, automation processing, and information data delivery, the integrated mitigation
system will be ready to support national interest.
7. Scope of Work
a. Maintaining the continuity in providing of remote sensing data to support climate change
mitigation;
b. Upgrading of LAPAN ground-station and infrastructure to support climate change
mitigation.
8. Priority
Science and Technology
9. Output and Outcome
a. Output
1) Availability of remote sensing ground-station and infrastructure of optical remote
sensing satellite data and multiresolution radar to support climate change mitigation;
2) Availability of automation processing and delivery of remote sensing data
information system;
352
BB-ID: BBP1-08201-03-063590-1040378
3) Near real time data delivery and remote sensing information network system;
4) Availability of data management system in Parepare and Jakarta;
5) Availability of data management system in strategic user (10 nodes);
6) Sun observation in LAPAN (Biak);
7) Availability of capable human resources ready to operate the system.
b. Outcome
1) Supporting the continuity of climate change mitigation for Indonesian territory;
2) Increasing the availability and readiness for remote sensing data and sun observation
for climate change mitigation;
3) Providing quick response for climate change to fulfill national interest.
10. Project Cost
Foreign Funding
- Loan : US$ 20,975,000
- Grant : US$ 0
Sub Total : US$ 20,975,000
Counterpart Funding
- Central Government : US$ 3,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,000,000
TOTAL : US$ 23,975,000
353
Local Government of
Makassar City (Pemerintah Daerah Kota Makassar)
355
BB-ID: BBP2-01921-03-010000-1060397
1. Project Title : Regional Information and Communication Technology Center for
Human Resources Development and Public Administration
Services (RICT Makassar)
2. Duration : 26 months
3. Location : Makassar
4. Executing Agency : Local Government of Makassar City
5. Implementing Agency : Local Government of Makassar City
6. Background and Justification
The Development of National Information and Communication Technology (ICT) Center for
Human Resources is not merely the construction of ICT-equipped buildings but also it implies
the transfer and transformation of skill, technology, and knowledge. Government of Indonesia
through the Ministry of Communication and Information Technology in adopting the
international commitment of Millennium Development Goals and referring to World Summit
on the Information Society (WSIS) Communiqué, agrees that information and communication
technology hold significant role in poverty alleviation as ICT is a tool to reach better life
quality. The global commitment also signifies the creation of Information Society in 2015 and
Knowledge-based Society in 2025.
As stated by the Ministry of National Development Planning / National Development
Planning Agency or Kementerian Perencanaan Pembangunan Nasional / Badan Perencanaan
Pembangunan Nasional (Bappenas), priorities of Indonesian development are 1) poverty
reduction by improving the basic services for society and rural development; 2) economic
growth acceleration by strengthening economic power through the development of
agriculture, infrastructure, and energy; 3) improvement of institutional quality through anti-
corruption efforts, bureaucracy reform, and democracy enforcement. The commitment is
transferred by Ministry of Communication and Information Technology in arranging its
strategic goals of 2007-2009 periods, namely the creation of knowledge based-society and the
competitive advantage. The achievement of National Information and Communication
Technology-Human Resource Development Project shall be continued to eastern part of
Indonesia, in which, South Sulawesi leads the development.
7. Scope of Work
a. Consulting services in implementing the development of regional ICT center;
b. Construction of building for Training Center, Data Center, Service Center;
c. Procurement of ICT equipment by constructing broadband network in all city
organizations;
d. Land acquisition;
e. Human resources development through training and certification, experts dispatch, course
and learning program;
f. Application Development and Integration of Makassar City government officials, citizens,
companies, and other governmental organizations.
8. Priority
Science and Technology
356
BB-ID: BBP2-01921-03-010000-1060397
9. Output and Outcome
a. Output
1) Availability of ICT center in eastern Indonesia;
2) Implementation of ICT in Makassar City governance;
3) Availability of reliable and professional human resources of the local government of
Makassar to comply the needs for domestic or foreign market and industry.
b. Outcome
1) Realizing the more effective and efficient Makassar City goverment by using ICT;
2) Saving times of giving services to community;
3) Accelerating the economy potential development in Eastern of Indonesia;
4) Increasing Gross Domestics Regional Product (GDRP).
10. Project Cost
Foreign Funding
- Loan : US$ 12,510,079
- Grant : US$ 0
Sub Total : US$ 12,510,079
Counterpart Funding
- Central Government : US$ 3,131,600
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 3,131,600
TOTAL : US$ 15,641,679
357
Local Government of DKI Jakarta
Province (Pemerintah Daerah Propinsi DKI Jakarta)
359
BB-ID: BBP2-00100-04-010000-1060398
1. Project Title : Construction of Jakarta Mass Rapid Transit Project
2. Duration : 60 months
3. Location : DKI Jakarta
4. Executing Agency : Local Government of DKI Jakarta
5. Implementing Agency : a. Local Government of DKI Jakarta Province
b. PT Mass Rapid Transit Jakarta
6. Background and Justification
Jabotabek, a large scale metropolitan with a population of 24 million (2005), consists of DKI
Jakarta Province and 7 local governments. Its gross regional domestic product is estimated at
23.7% (2005) of the national domestic product showing that Jabotabek is the most important
area in terms of economy and politics. The population of Jabotabek has increased 1.4 times in
these 15 years. Population in the suburb is especially significant. However, business area is still
concentrated in DKI Jakarta Province and daily commuters to DKI Jakarta Province are about
700,000 per/day. According to a Study in Transportation Master Plan for Jabotabek (SITRAMP
1 & 2), it is predicted that the total number of trips made in Jabotabek will increase by 40% in
2020 compared to that of 2002.
Today, significant economic loss is caused due to traffic congestion. Moreover, the traffic
congestion as well as pollution is predicted to get worse with the increasing traffic volumes
and automobile numbers. To deal with these tasks, road expansion, traffic demand
management, and public transportation enhancement are needed.
DKI is now struggling with these issues by adopted "3 in 1" policy in Sudirman Street,
charging car drivers with less than 3 passengers for penalty, and by introducing Mass Rapid
Transit (Bus Way) networks. However, to accommodate the increasing passenger volume, it is
necessary to build a new mass rapid transit system in the region.
7. Scope of Work
a. Civil and track works (elevated and depot):
1) 8 elevated Stations (Lebak Bulus, Fatmawati, Cipete Raya, Haji Nawi, Blok A, Blok M,
Sisingamangaraja, Senayan)
2) Elevated guide way (10.5 km)
3) Track works (10.5 km)
4) Depot and connecting guide way
5) Traffic management & utilities diversion
b. Civil and Track Works (Underground):
1) 4 underground stations (Istora, Bendungan Hilir, Setiabudi, Dukuh Atas)
2) Underground guideway (4.0 km)
3) Track works (4.0 km)
4) Traffic management & utilities diversion
c. Mechanical and Electrical:
1) Station facilities
2) Depot facilities
3) Environmental control system (station ventilation & air conditioning, tunnel
ventilation)
360
BB-ID: BBP2-00100-04-010000-1060398
4) Power supply & distribution system
5) Signaling & train control system
6) Supervisory Control and Data Acquisition (SCADA) system
7) System Integration
d. Rolling Stocks: 17 train sets (102 cars)
e. Management and Operation Consultant:
1) Assistance for business planning
2) Assistance for financial planning
3) Assistance for efficient operation
4) Assistance for organization start up
5) Assistance for organization capability building
6) Assistance for Plan-Do-Check-Act (PDCA) cycle design and its implementation
f. Supervision Consultant
1) Assistance for environmental social issues
2) Assistance for construction arrangement
3) Assistance for checking, evaluating, and approving the contractor's detailed design,
drawings, work plans, the progress schedule and work execution
4) Carrying out safety inspection
5) Assistance for negotiations with contractors in changing contracts, etc.
6) Inspection of materials, machinery, and rolling stocks.
7) Submission of reports: progress report, and completion report
g. Procurement Assistance Consultant (for mechanical and electrical)
1) Assistance for pre-qualification and its evaluation
2) Assistance for pre-bid orientation for tender process
3) Assistance for evaluation of bids
4) Assistance for clarification / negotiation with bidders
5) Preparation of contract agreement for prospective contractor(s)
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of mass rapid public transportation in Jakarta area;
b. Outcome
1) Increasing the transportation infrastructure and facilities capacity to reduce backlog
and bottleneck of transportation infrastructure capacity;
2) Increasing the accessibility of community towards transportation infrastructure and
facilities service;
3) Improving the adaptation and mitigation for climate change by the use of mass
transportation;
4) Reducing personal vehicle use in big cities resulting in reducing motor vehicles
emissions.
361
BB-ID: BBP2-00100-04-010000-1060398
10. Project Cost
Foreign Funding
- Loan : US$ 500,000,000
- Grant : US$ 0
Sub Total : US$ 500,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 75,000,000
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 75,000,000
TOTAL : US$ 575,000,000
363
Local Government of Kepulauan
Riau Province (Permerintah Daerah Propinsi Kepulauan Riau)
365
BB-ID: BBP2-03200-04-010000-1070399
1. Project Title : Kepulauan Riau Sea Transportation Project
2. Duration : 36 months
3. Location : Kepulauan Riau
4. Executing Agency : Local Government of Kepulauan Riau Province
5. Implementing Agency : PT. Pembangunan Kepulauan Riau
6. Background and Justification
Geographically Kepulauan Riau Province borders with neighboring countries, namely
Singapore, Malaysia, and Vietnam. Having an area of 251,810.71 km ² with 96% of it is water
with 1,350 large and small islands, the province has shown progress in the implementation of
the activities of government, development, and community. This province lies in the maritime
transport traffic and the strategic air and densest at the international level as well as on the lips
of the world market which has a market opportunity. Due to this condition, the mobility of the
community relies on the sea transportation. Therfore, the support of adequate sea
transportation is deemed necessary.
In some areas of Kepulauan Riau Province, like Bintan, Batam, and Lingga islands, the weather
remains calm for most of the year with sea wave below one meter. During the monsoon
season, the islands are also well protected from the northern winds. Meanwhile, in the islands
of Natuna and those adjoining islands within Kepulauan Riau Province and the territorial
waters of the Republic of Indonesia, the route for six months of the year is subject to the
monsoon winds prevailing from the north. The winds during this time can produce waves to a
height of four meters that makes it impossible for small to medium craft to reach islands by
sea.
In order to mitigate this problem, Kepulauan Riau Province needs to improve its sea
transportation facilities among others through the procurement of various vessels based on the
need of each proposed area. The vessels are expected to support the province in coordinating
the activities of its community within the region and with Riau Province.
7. Scope of Work
Procurement of vessels in Kepulauan Riau province:
a. Small fast monohull passenger ferry for operation in Bintan, Batam, and Lingga islands;
b. Large fast passenger ferry (95 meters in overall length), equipped with a sophisticated ride
control system with a capacity for 500 passengers and up to 400 tons of cargo either by
way of goods, truck, cars, or fuel for operation in Natuna and those adjoining islands..
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of small and large passenger vessels in Kepulauan Riau.
b. Outcome
Improving the sea transportation to support the province in coordinating the activities of
its community within the region and with Riau Province.
366
BB-ID: BBP2-03200-04-010000-1070399
10. Project Cost
Foreign Funding
- Loan : US$ 87,142,000
- Grant : US$ 0
Sub Total : US$ 87,142,000
Counterpart Funding
- Central Government : US$ 13,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 13,000,000
TOTAL : US$ 100,142,000
367
Local Government of Nanggroe
Aceh Darussalam Province (Pemerintah Daerah Propinsi Nanggroe Aceh Darussalam)
369
BB-ID: BBP2-00600-04-010000-1050400
1. Project Title : Development of Seulawah Agam Geothermal Becoming
Geothermal Power Plant (GeoPP) 40 MW in NAD Province
2. Duration : 60 months
3. Location : Nanggroe Aceh Darussalam
4. Executing Agency : Local Government of Nanggroe Aceh Darussalam Province
5. Implementing Agency : Local Government of Nanggroe Aceh Darussalam Province
6. Background and Justification
Nanggroe Aceh Darussalam (NAD) Province has a high demand for electricity due to the loss
of generation capacity in 2004 tsunami and on going growth in demand. Over the next decade,
the current peak load demand of 185 MW within NAD is expected to increase by 260 %.
Seulawah Agam geothermal prospect area that is located in Aceh Besar district has a potential
of probable resources of 282 MW and its distance about 20 km from 150 kV of the transmission
of State Electricity Company. A pre-feasibility study for Seulawah Agam Geothermal (2 x 20
MW) was completed at the end of 2005.
7. Scope of Work
a. Exploration drilling;
b. Feasibility study;
c. Exploitation;
d. Utilization and power plant construction;
e. Other related activities, e.g.: building a transmission until the interconnection point of
electricity infrastructures, etc.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Utilization and construction of power plant in Seulawah Agam
2) Improvement of electricity supply in Aceh Province
b. Outcome
1) Accelerating geothermal potential development for geothermal power plant in
Seulawah Agam, Nanggroe Aceh Darussalam Province;
2) Increasing the electricity supply in Nanggroe Aceh Darussalam Province by using the
available renewable energy in Nanggroe Aceh Darussalam Province;
3) Reducing the dependency on fossil fuel based energy resources;
4) Reducing the environmental disturbance by the use of flow or no emission renewable
energy;
5) Supporting the implementation of government geothermal road map program;
6) Increasing the prosperity of Indonesian people in general and especially for Nanggroe
Aceh Darussalam people.
370
BB-ID: BBP2-00600-04-010000-1050400
10. Project Cost
Foreign Funding
- Loan : US$ 72,800,000
- Grant : US$ 9,100,000
Sub Total : US$ 81.9000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 76,500,000
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 76,500,000
TOTAL : US$ 158,400,000
371
Local Government of Riau
Province (Pemerintah Daerah Propinsi Riau)
373
BB-ID: BBP2-00900-04-010000-1060401
1. Project Title : Southern Pekanbaru Water Supply Project
2. Duration : 60 months
3. Location : Pekanbaru
4. Executing Agency : Local Government of Riau Province
5. Implementing Agency : Local Government of Riau Province
6. Background and Justification
The increasing population of Pekanbaru City at 4,5% annually has resulted in the increasing
demand for safe water. In 2008, the Regional Water Supply Enterprise or Perusahaan Daerah Air
Minum (PDAM) Tirta Siak was only able to serve 12% of the population (from 390.399)
inhabitants. The water quality provided by PDAM Tirta Siak was far from adequate water,
among other color of the water due to different type of soil.
7. Scope of Work
a. Construction of Water Treatment Plant (WTP), including transmission pipeline, main
distribution pipe, reservoir, booster pump, laboratorium, and supporting consultation;
b. Consultancy of planning and supervision.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of water supply services for communities in Pekanbaru City and Kampar
District
b. Outcome
1) Building of WTP
2) Building transmission, disribution network, reticulation and house connection to
cover Southern Pekanbaru area.
10. Project Cost
Foreign Funding
- Loan : US$ 20,000,000
- Grant : US$ 0
Sub Total : US$ 20,000,000
Counterpart Funding
- Central Government : US$ 5,000,000
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 5,000,000
TOTAL : US$ 25,000,000
6
375
Local Government of North
Sulawesi Province (Pemerintah Daerah Propinsi Sulawesi Utara)
377
BB-ID: BBP2-01700-04-010000-1060402
1. Project Title : North Sulawesi e-Government Implementation Project
2. Duration : 32 months
3. Location : North Sulawesi
4. Executing Agency : Local Government of North Sulawesi Province
5. Implementing Agency : Local Government of North Sulawesi Province
6. Background and Justification
North Sulawesi represents one of the more politically stable provinces in Indonesia thanks to
its strong history of religious and ethnic tolerance. North Sulawesi has shown great potential
in economic growth of about 6% over the last couple of years. Its overall investment climate
has always been positive towards foreign investment.
In addition to its strong economic growth, North Sulawesi has been formulating a
development strategy and implementing it proactively to take a quantum leap.
To achieve its strategy and objectives for a more prosperous province, e-Government
implementation can play a key role to support the strategy in terms of government innovation
in delivering services to its customers - citizens, business, other government agencies.
7. Scope of Work
a. Construct ICT infrastructure for the Provincial Government and Council
1) Provision of office automation equipments
2) Enhancement of networks infrastructure
3) ICT center construction (ICT Service Center, Data Center, ICT Training Center)
4) ICT Human Resources development
b. Streamlining government business processes and developing application support systems
to provide customers (citizen, business, and other governmental agencies) with more
convenient and efficient services.
c. Providing government administration portal (government service portal respectively) for
government employees and citizens
8. Priority
Science and Technology
9. Output and Outcome
a. Output
1) Availability of ICT infrastructure for the provincial government and council
2) Availability of business processes and supporting application systems to provide
customers (citizens, businesses, and other governmental agencies) with more
convenient and efficient services
3) Availability of government employees and citizens with government administration
portal, government service portal respectively
378
BB-ID: BBP2-01700-04-010000-1060402
b. Outcome
1) Improving and enhancing Government services delivery;
2) Empowering citizens through greater access to government information and ability to
interact and participate in the decision making process of the government;
3) Enhancing transparency and increasing accountability of the government;
4) Increasing the internal efficiency and revenue generation by the government;
5) Improving the relationship between the government and the citizens.
10. Project Cost
Foreign Funding
- Loan : US$ 40,000,000
- Grant : US$ 0
Sub Total : US$ 40,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 10,000,000
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 10,000,000
TOTAL : US$ 50,000,000
379
Indonesia Infrastructure
Guarantee Fund (PT. Penjaminan Infrastruktur Indonesia)
381
BB-ID: BBP3-01510-04-061740-1040403
1. Project Title : Indonesia Infrastructure Guarantee Fund
2. Duration : 12 months
3. Location : DKI Jakarta
4. Executing Agency : Indonesia Infrastructure Guarantee Fund (IIGF)
5. Implementing Agency : Indonesia Infrastructure Guarantee Fund (IIGF)
6. Background and Justification
With regard to the infrastructure development to support the economic growth, the
Government of Indonesia (GoI) is fully aware that private sector participation is important due
to limited fiscal capacity of the government and the better skills offered by private sector.
Based on that, GoI has developed the framework of doing Public Private Partnerships (PPP) as
stipulated in the Presidential Regulation number 67/2005.
As part of support to this policy, it is necessary to give some certain levels of comfort and
certainty to private sectors to attract their investment for infrastructure development. The
establishment of the Indonesia Infrastructure Guarantee Fund is part of the Government's
effort to provide guarantees to PPP infrastructure projects in which the guarantees are well
and professionally managed to improve the creditworthiness of the projects. On the other
hand, it will improve the management of contingent liabilities from guarantees to avoid
sudden impact to the budget by providing ring fencing from claims.
As a guarantee agency, capacity and credibility of fund are the central issues to gain trust from
the markets. In that regard, the involvement of multilateral agencies will be the key issue to
maintain the credibility of the fund in the sense that the capacity to manage guarantees and
payment of claims are assured by triple “A” agencies.
7. Scope of Work
a. Providing guarantees on government obligation in PPP contracts between the involved
agencies and private sectors.
b. Partnership with other agencies in arranging credible guarantees.
c. Providing consultancy and information services to improve the quality of risk allocation of
infrastructure projects.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Increasing creditworthiness of PPP infrastructure projects to attract more private
investment.
2) Better management of contingent liabilities by establishing ring fencing for State
Budget Revenue and Expenditure or Anggaran Pendapatan Belanja Negara (APBN)
from sudden impact caused by claims from government guarantees.
382
BB-ID: BBP3-01510-04-061740-1040403
b. Outcome
1) Maintaining fiscal sustainability;
2) Being a reputable company which supports the government to develop trustworthy
relationships with business entities involved in PPP infrastructure projects by
providing guarantee products to protect their investments from certain risk as
defined in the regulation and to help the government in its management of contingent
liabilities.
10. Project Cost
Foreign Funding
- Loan : US$ 30,000,000
- Grant : US$ 0
Sub Total : US$ 30,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 30,000,000
383
PT Pertamina
385
BB-ID: BBP3-02006-09-081943-1050404
1. Project Title : Geothermal Total Project Development in Karaha, Unit 1 (30 MW)
2. Duration : 60 months
3. Location : West Java
4. Executing Agency : PT. Pertamina
5. Implementing Agency : PT. Pertamina Geothermal Energy
6. Background and Justification
To optimize the local geothermal potential within Karaha, West Java of >250 MW which is a
renewable and environmental friendly, the project is deemed necessary. It is directed to fulfill
the electricity needs due to consumption increment of 9-10% annually and at the same time to
reduce oil dependencies whose reserve is being depleted and raising its price. The project is
developed for unit 1 with capacity of 30 MW based on resources and in accordance with the
government geothermal development road map up to 2020 and the oil subsidized withdrawal
policy. As a richest country in geothermal energy, Indonesia will develop geothermal as its
main energy sources. The output of the project also increases the geothermal contribution
within national scale with the additional target of 530 MW in 2012.
7. Scope of Work
a. Land acquisition for roads and drill;
b. Provision of facilities and steam/brine pipelines;
c. Exploration and development of drilling;
d. Assessment of the reserve capacity;
e. Engineering, design, and procurement preparation;
f. Construction of power plants
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
Geothermal energy supply for Karaha power plant, unit 1 (30 MW).
b. Outcome
Increasing the utilization of geothermal energy to support the renewable and
environmental friendly electricity supply by utilizing the local potency in accordance with
the "sustainable development" policy.
10. Project Cost
Foreign Funding
- Loan : US$ 89,056,000
- Grant : US$ 0
Sub Total : US$ 89,056,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 30,124,000
- Others : US$ 0
Sub Total : US$ 30,142,000
TOTAL : US$ 119,180,000
386
BB-ID: BBP3-02006-09-081943-1050405
1. Project Title : Geothermal Total Project Development in Lahendong, Unit 5&6
(2x20 MW).
2. Duration : 60 months
3. Location : North Sulawesi
4. Executing Agency : PT. Pertamina
5. Implementing Agency : PT. Pertamina Geothermal Energy
6. Background and Justification
To optimize the local geothermal potential within Lahendong, North Sulawesi of ~200 MW
which is renewable and environmental friendly, the project is deemed necessary. It is directed
to fulfill the electricity needs due to consumption increment of 9-10% annually and at the
same time to reduce oil dependencies whose reserve is being depleted and raising its price.
The project is in accordance with the government geothermal development road map up to
2020 and the oil subsidized withdrawal policy. As a richest country in geothermal energy,
Indonesia will develop geothermal as its main energy sources. The output of the project also
increases the geothermal contribution within national scale with the additional target of 530
MW in 2012.
7. Scope of Work
a. Preparation of well pad, road, and cellar;
b. Drilling production of well and re-injection wells;
c. Well testing;
d. Provision of steam gathering system (Production Facility) and Power Plant Facility
1) Engineering;
2) Procurement;
3) Construction;
e. Power plant commissioning.
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
Development of geothermal project in Lahendong, unit 5&6 of 40 MW
b. Outcome
Increasing the utilization of geothermal energy to support the renewable and
environmental friendly electricity supply by utilizing the local potency in accordance with
the "sustainable development" policy.
10. Project Cost
Foreign Funding
- Loan : US$ 95,150,000
- Grant : US$ 0
Sub Total : US$ 95,150,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 56,844,000
- Others : US$ 0
Sub Total : US$ 56,844,000
TOTAL : US$ 151,994,000
387
BB-ID: BBP3-02006-09-081943-1050406
1. Project Title : Geothermal Total Project Development in Lumut Balai, Unit 1&2
(2x55 MW)
2. Duration : 60 months
3. Location : South Sumatera
4. Executing Agency : PT. Pertamina
5. Implementing Agency : PT. Pertamina Geothermal Energy
6. Background and Justification
To optimize the local geothermal potential within Lumut Balai, South Sumatra of ~600 MW
which is renewable and environmental friendly, the project is deemed necessary. It is directed
to fulfill the electricity needs due to consumption increment of 9-10% annually and at the
same time to reduce oil dependencies whose reserve is being depleted and raising its price.
The project is in accordance with the government geothermal development road map up to
2020 and the oil subsidized withdrawal policy. As a richest country in geothermal energy,
Indonesia will develop geothermal as its main energy sources. The output of the project also
increases the geothermal contribution within national scale with the additional target of 530
MW in 2012.
7. Scope of Work
a. Land acquisition;
b. Preparation of well pad, road, and cellar;
c. Exploration and production of well, and re-injection of wells drillings;
d. Well testing;
e. Construction of steam gathering system (production facility) and power plant facility:
1) Engineering;
2) Procurement;
3) Construction;
f. Power plant commissioning.
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
Geothermal energy supply for Lumut Balai power plant, unit 1&2 of 11 MW capacity.
b. Outcome
Increasing the utilization of geothermal energy to support the renewable and
environmental friendly electricity supply by utilizing the local potency in accordance with
the "sustainable development" policy.
10. Project Cost
Foreign Funding
- Loan : US$ 257,630,000
- Grant : US$ 0
Sub Total : US$ 257,630,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 129,453,000
- Others : US$ 0
Sub Total : US$ 129,453,000
TOTAL : US$ 387,083,000
388
BB-ID: BBP3-02006-09-081943-1050407
1. Project Title : Geothermal Total Project Development in Lumut Balai, Unit 3&4
(2x55 MW)
2. Duration : 60 months
3. Location : South Sumatera
4. Executing Agency : PT. Pertamina
5. Implementing Agency : PT. Pertamina Geothermal Energy
6. Background and Justification
To optimize the local geothermal potential within Lumut Balai, South Sumatra of ~600 MW
which is renewable and environmental friendly, the project is deemed necessary. It is directed
to fulfill the electricity needs due to consumption increment of 9-10% annually and at the
same time to reduce oil dependencies whose reserve is being depleted and raising its price.
The project is in accordance with the government geothermal development road map up to
2020 and the oil subsidized withdrawal policy. As a richest country in geothermal energy,
Indonesia will develop geothermal as its main energy sources. The output of the project also
increases the geothermal contribution within national scale with the additional target of 530
MW in 2012.
7. Scope of Work
a. Land acquisition;
b. Preparation of well pad, road, and cellar;
c. Exploration and production of well, and re-injection of wells drillings;
d. Well testing;
e. Construction of steam gathering system (production facility) and power plant facility;
1) Engineering;
2) Procurement;
3) Construction;
f. Power plant commissioning.
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
Geothermal energy supply for Lumut Balai power plant, at the capacity of 2x55 MW equal
to 5,203 BOPD (Barrels of Oil per Day).
b. Outcome
Increasing the utilization of geothermal energy to support the renewable and
environmental friendly electricity supply by utilizing the local potency in accordance with
the "sustainable development" policy.
10. Project Cost
Foreign Funding
- Loan : US$ 320,610,000
- Grant : US$ 0
Sub Total : US$ 320,610,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 55,784,000
- Others : US$ 0
Sub Total : US$ 55,784,000
TOTAL : US$ 376,394,000
389
BB-ID: BBP3-02006-09-081943-1050408
1. Project Title : Geothermal Total Project Development in Ulu Belu, Unit 3&4
(2x55 MW).
2. Duration : 60 months
3. Location : Lampung
4. Executing Agency : PT. Pertamina
5. Implementing Agency : PT. Pertamina Geothermal Energy
6. Background and Justification
To optimize the local geothermal potential of > 300MW which is renewable and environmental
friendly within Lampung Province, the project is directed to fulfill the electricity needs due to
consumption increment of 9-10% annually and at the same time to reduce oil dependencies
whose reserve is being depleted and raising its price. The project is developed for Unit 3&4
capacity 2x55MW based on the resources and in accordance with the government geothermal
development road map up to 2020 and the oil subsidized withdrawal policy. As a richest
country in geothermal energy (~27 GW, 40% from global resource and reserve), geothermal
will be developed as the main energy sources. The project also increases the geothermal
contribution within national scale with the additional target of 530MW in 2012.
7. Scope of Work
a. Land acquisition for roads and drill;
b. Production facilities and the steam/brine pipelines;
c. Exploration and development drillings;
d. Assessment of the reserve capacity;
e. Engineering, design, and procurement preparation;
f. Construction of power plants.
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
Geothermal energy supply for Ulu Belu power plant, unit 3&4 (2x55 MW).
b. Outcome
Increasing the utilization of geothermal energy to support the renewable and
environmental friendly electricity supply by utilizing the local potency in accordance with
the "sustainable development" policy.
10. Project Cost
Foreign Funding
- Loan : US$ 255,310,000
- Grant : US$ 0
Sub Total : US$ 255,310,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 123,487,000
- Others : US$ 0
Sub Total : US$ 123,487,000
TOTAL : US$ 378,797,000
390
BB-ID: BBP3-02006-09-081943-1050409
1. Project Title : Geothermal Upstream Project Development in Hululais, Unit 1&2
(2x55 MW).
2. Duration : 60 months
3. Location : Bengkulu
4. Executing Agency : PT. Pertamina
5. Implementing Agency : PT. Pertamina Geothermal Energy
6. Background and Justification
To optimize the local geothermal potential within Bengkulu Province of >250 MW which is a
renewable and environmental friendly, the project is deemed necessary. It is directed to fulfill
the electricity needs due to consumption increment of 9-10% annually and at the same time to
reduce oil dependencies whose reserve is being depleted and raising its price. The project is
developed for unit 1&2 with capacity of 2x55 MW based on resources and in accordance with
the government geothermal development road map up to 2020 and the oil subsidized
withdrawal policy. As a richest country in geothermal energy, Indonesia will develop
geothermal as its main energy sources. The output of the project also increases the geothermal
contribution within national scale with the additional target of 530 MW in 2012.
7. Scope of Work
a. Land acquisition for roads and drill;
b. Production facilities, and the steam/brine pipelines;
c. Exploration and development drillings;
d. Assessment of the reserve capacity;
e. Engineering, design, procurement preparation;
f. Construction of power plants.
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
Geothermal energy supply for Hululais power plant, unit 1&2 GeoPP (Geothermal Power
Plant) of 110 MW capacity.
b. Outcome
Increasing the utilization of geothermal energy to support the renewable and
environmental friendly electricity supply by utilizing the local potency in accordance with
the "sustainable development" policy.
10. Project Cost
Foreign Funding
- Loan : US$ 135,449,000
- Grant : US$ 0
Sub Total : US$ 135,449,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 42,607,000
- Others : US$ 0
Sub Total : US$ 42,607,000
TOTAL : US$ 178,056,000
391
BB-ID: BBP3-02006-09-081943-1050410
1. Project Title : Geothermal Upstream Project Development in Kotamobagu, Unit
1,2,3,4 (4x20 MW).
2. Duration : 60 months
3. Location : North Sulawesi
4. Executing Agency : PT. Pertamina
5. Implementing Agency : PT. Pertamina Geothermal Energy
6. Background and Justification
To optimize the local geothermal potential of >250MW which is renewable and environmental
friendly within Kotamobagu, North Sulawesi, the project is directed to fulfill the electricity
needs due to consumption increment of 9-10% annually and at the same time to reduce oil
dependencies whose reserve is being depleted and raising its price. The project is in
accordance with the government geothermal development road map up to 2020 and the oil
subsidized withdrawal policy. As a richest country in geothermal energy (~27 GW, 40% from
global resource and reserve), geothermal will be developed as the main energy sources. The
project also increases the geothermal contribution within national scale with the additional
target of 530MW in 2012.
7. Scope of Work
a. Land acquisition;
b. Preparation of well pad, road and cellar;
c. Exploration, production well and re-injection of wells drillings;
d. Well testing;
e. Construction of steam gathering system (production facility)
1) Engineering;
2) Procurement;
3) Construction;
f. Commissioning.
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
Geothermal energy supply for Kotamobagu power plant, unit 1, 2, 3, 4 (4x20 MW).
b. Outcome
Increasing the utilization of geothermal energy to support the renewable and
environmental friendly electricity supply by utilizing the local potency in accordance with
the "sustainable development" policy.
10. Project Cost
Foreign Funding
- Loan : US$ 117,000,000
- Grant : US$ 0
Sub Total : US$ 117,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 16,325,000
- Others : US$ 0
Sub Total : US$ 16,325,000
TOTAL : US$ 133,325,000
392
BB-ID: BBP3-02006-09-081943-1050411
1. Project Title : Geothermal Upstream Project Development in Sungai Penuh, Unit
1&2 (2x55 MW).
2. Duration : 60 months
3. Location : Jambi
4. Executing Agency : PT. Pertamina
5. Implementing Agency : PT. Pertamina Geothermal Energy
6. Background and Justification
To optimize the local geothermal potential of >250MW which is renewable and environmental
friendly within Sungai Penuh, Jambi, the project is directed to fulfill the electricity needs due
to consumption increment of 9-10% annually and at the same time to reduce oil
dependencies whose reserve is being depleted and raising its price. The project is in
accordance with the government geothermal development road map up to 2020 and the oil
subsidized withdrawal policy. As a richest country in geothermal energy (~27 GW, 40% from
global resource and reserve), geothermal will be developed as the main energy sources. The
project also increases the geothermal contribution within national scale with the additional
target of 530MW in 2012.
7. Scope of Work
a. Land acquisition;
b. Preparation of well pad, road and cellar;
c. Exploration, production well and re-injection of wells drillings;
d. Well testing;
e. Construction of steam gathering system (production facility) and power plant facility:
1) Engineering;
2) Procurement;
3) Construction;
f. Power plant commissioning.
8. Priority
Natural Resources and Environment
9. Output and Outcome
a. Output
Geothermal energy supply for Sungai Penuh power plant, unit 1&2 (2x55 MW).
b. Outcome
Increasing the utilization of geothermal energy to support the renewable and
environmental friendly electricity supply by utilizing the local potency in accordance with
the "sustainable development" policy.
10. Project Cost
Foreign Funding
- Loan : US$ 176,400,000
- Grant : US$ 0
Sub Total : US$ 176,400,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 22,802,000
- Others : US$ 0
Sub Total : US$ 22,802,000
TOTAL : US$ 199,202,000
393
State Electricity Company
(PT Perusahaan Listrik Negara / PT PLN)
395
BB-ID: BBP3-02005-04-071939-1060412
1. Project Title : 500 kV Java - Bali Crossing
2. Duration : 60 months
3. Location : Bali
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
Demand growth for electricity in Bali is quite high with the average growth of 12.2% per year.
The Peak load in 2008 was 470 MW and will increase to 1,270 MW in 2018. At present, Bali is
supplied by oil fired gas turbine and diesel power plants and power transfer from Java through
submarine cables with the capacity of 200 MW. It has been planned that some Independent
Power Producer (IPP) projects will be built in Bali, however their progress is quite slow due to
financial and environment issues. Java-Bali Crossing 500 kV project is a long term solution for
providing the electricity in Bali because it is capable of transferring power up to 1,500 MW.
7. Scope of Work
a. Construction of overhead lines across Bali strait, 2 circuits, 2.4 km route;
b. Construction of overhead lines of 500 kV in Paiton - Kapal area, 2 circuits, 212 km route;
c. Extension of Paiton Gas Insulated Switchgear (GIS) substation, 2 diameters;
d. Extension of Kapal 500 kV GIS substation, 3 diameters, 1 interbus transformer 500/150 kV.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Increased access for services in electricity supply for the community in Bali.
b. Outcome
Fulfilling the electricity demand in Bali in long term
10. Project Cost
Foreign Funding
- Loan : US$ 300,000,000
- Grant : US$ 0
Sub Total : US$ 300,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 50,000,000
- Others : US$ 0
Sub Total : US$ 50,000,000
TOTAL : US$ 350,000,000
396
BB-ID: BBP3-02006-04-081943-1060413
1. Project Title : Bakaru II Hydro Electrical Power Plant (2x63 MW)
2. Duration : 60 months
3. Location : South Sulawesi
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
To meet the requirement of power demand growth in Sulawesi, State Electricity Company /
Perusahaan Listrik Negara (PT PLN) has a plan to develop some thermal power plants as well as
hydro power plants, including extension of Bakaru I power station, which was commissioned
in 1990. During operation, the hydro power plant suffers from sedimentation problem and in
the last few years its energy production has been declining.
The extension of Bakaru I is termed Bakaru II project which will share the same reservoir,
therefore the construction of this project will not be feasible without solving the sedimentation
problem of Bakaru I. Apart from the sedimentation problem, rehabilitation of Bakaru dam and
the existing turbines will also need to be made to reclaim its original productivity.
7. Scope of Work
a. Stage I:
1) Sedimentation Countermeasure;
2) Rehabilitation of Dam and Turbin of Bakaru I Hydro Electrical Power Plant (HEPP);
3) Engineering services for Bakaru II HEPP.
b. Stage II:
1) Construction of Bakaru II HEPP;
2) Engineering services for Construction Supervision.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Fulfillment of 126 MW peaker power plant
2) Optimized use of Bakaru Hidropower
b. Outcome
Improving the services for electricity in South Sulawesi area.
10. Project Cost
Foreign Funding
- Loan : US$ 133,000,000
- Grant : US$ 0
Sub Total : US$ 133,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 37,000,000
- Others : US$ 0
Sub Total : US$ 37,000,000
TOTAL : US$ 170,000,000
397
BB-ID: BBP3-02006-04-081946-1060414
1. Project Title : Containerized Diesel Power Plant
2. Duration : 12 months
3. Location : Nationwide
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
Kuala Enok in Riau province, Tobelo, Bacan, and Sofifi in North Maluku province, Timika and
Manokwari in West Papua province are the isolated systems mostly supplied by High Speed
Diesel (HSD) oil fired plants, therefore the generation cost is very high. In order to reduce the
generation cost and meet the growing demand, it is planned to develop diesel using Marine
Fuel Oil (MFO) in Manokwari, Timika, and Tobelo that is cheaper than HSD with the total
capacity of 9.6 MW. While in Tobelo, Bacan, and Sofifi, it is planned to develop diesel using
High Speed Diesel oil with the total capacity of 5.2 MW.
The development of these containerized diesel power plants is expected to meet the electricity
power demand in each system.
7. Scope of Work
Procurement and Construction:
a. Kuala Enok Diesel Power Plant 2x1.2 MW
b. Tobelo Diesel Power Plant 1x3.2 MW
c. Bacan Diesel Power Plant 1x1.2 MW
d. Sofifi Diesel Power Plant 1x1.6 MW
e. Manokwari Diesel Power Plant 1x3.2 MW
f. Timika Diesel Power Plant 1x3.2 MW
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Increased capacity of services for electricity in the proposed areas.
b. Outcome
Fulfilling the electricity power demand in the isolated systems.
10. Project Cost
Foreign Funding
- Loan : US$ 13,800,000
- Grant : US$ 0
Sub Total : US$ 13,800,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 13,800,000
398
BB-ID: BBP3-02006-04-081943-1060415
1. Project Title : Hululais 1&2 Geothermal Power Plant (2x55 MW)
2. Duration : 36 months
3. Location : Lebong District
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The peak demand in Southern Sumatera system was 1.797 MW in 2008 and has grown by 7.8%
per year. The demand is mostly supplied by oil fired power plants in which the generation cost
is very high. In order to meet the growing demand, it requires additional capacity by
developing some thermal power plants as well as geothermal prospect of Hululais.
The geothermal prospect of Hululais in Bengkulu has a potential of probable reserve of 200
MW. At the moment, the reserve has been developed in 2x55 MW and the State Electricity
Company / Perusahaan Listrik Negara (PT PLN) will develop generating facilities (downstream
field). Meanwhile, the upstream field will be developed by Pertamina Geothermal Energy
(PGE).
The development of Hululais geothermal power plant is expected to meet electricity power
demand and will reduce the generation cost substantially.
7. Scope of Work
a. Engineering Services for generating facilities
1) Detail design and preparation of tender document
2) Construction supervision
b. Construction of generating facilities
1) Procurement
2) Construction
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Increased supply of electricity in Southern Sumatera system;
2) Reduced cost of production;
3) Anticipation of delayed operation of Independent Power Producer (IPP) projects in
the area.
b. Outcome
1) Fulfilling the electricity power demand in Southern Sumatera system
2) Utilizing geothermal energy resources in Bengkulu island
399
BB-ID: BBP3-02006-04-081943-1060415
10. Project Cost
Foreign Funding
- Loan : US$ 147,000,000
- Grant : US$ 0
Sub Total : US$ 147,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 16,000,000
- Others : US$ 0
Sub Total : US$ 16,000,000
TOTAL : US$ 163,000,000
400
BB-ID: BBP3-02005-04-071939-1060416
1. Project Title : Improvement of Java-Bali Electricity Distribution Performance
2. Duration : 36 months
3. Location : Java Island
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The recent growth of electricity demand in Indonesia after the crisis has been considerably
high; meanwhile the State Electricity Company/PT Perusahaan Listrik Negara (PT PLN)’s
investment in distribution network expansion and supply is limited. This condition leads to
the overload of the existing network, increasing network losses, and reducing network
reliability.
Most problem of reliability and power quality in Java-Bali distribution network is due to the
overloaded network which in turn increases network losses. Additional feeders and
distribution network reconfiguration are needed to provide additional network capacity.
Numerous overloaded distribution transformers signal the need for new substation and
additional low voltage feeders.
7. Scope of Work
a. System reconfiguration
b. Re-conducting 20 kV lines
c. Installation of capacitors
d. Monitoring, Supervisory Control and Data Acquisition (SCADA) and feeder management
e. Consulting services
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Improving the efficiency by reducing distribution network losses and network reliability
improvement in West Java, Jakarta, Central Java, East Java and Bali Region by:
1) Loss Reduction by replacing transformers, building new substations, and
constructing new feeders.
2) Improving reliability with Supervisory Control and Data Acquisition (SCADA) and
reconfiguration network.
b. Outcome
1) Reducing the loss of energy in distribution network;
2) Improving the reliability and quality of power supply.
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 0
Sub Total : US$ 100,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 15,000,000
- Others : US$ 0
Sub Total : US$ 15,000,000
TOTAL : US$ 115,000,000
401
BB-ID: BBP3-02005-04-071939-1060417
1. Project Title : Java-Bali Submarine Cable 150 kV Circuit 3&4
2. Duration : 24 months
3. Location : Bali
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
As a tourism region that needs a reliable supply of electricity, the growth of demand for
electricity in Bali is quite high with the average growth of 12.2% per year. At present, all the
existing power plants in Bali use oil fuel in which the production cost is very high. Therefore,
this project is deemed necessary as an interim solution for the electricity crisis in Bali.
7. Scope of Work
a. Construction of submarine cable of 150 kV 2 CCT @ 100 MW;
b. Rock dumping (to protect cable from the Seadrift);
c. Construction of overhead line 150 kV in Java and Bali 2 CCT.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Availability of submarine cable 150 kV 2 CCT @ 100 MW.
b. Outcome
1) Increasing the supply for electricity demand in Bali subsystem;
2) Improving the reliability of Bali electricity system.
10. Project Cost
Foreign Funding
- Loan : US$ 56,000,000
- Grant : US$
Sub Total : US$ 56,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 6,000,000
- Others : US$ 0
Sub Total : US$ 6,000,000
TOTAL : US$ 62,000,000
402
BB-ID: BBP3-02006-04-081943-1060418
1. Project Title : Kotamobagu Geothermal Power Plant (4x20 MW)
2. Duration : 36 months
3. Location : North Sulawesi
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The peak demand in Minahasa system was 140 MW in 2008 and has grown 7.8% per year up to
2018. The demand is mostly supplied by oil fired power plants in which the generation cost is
high. In order to meet the growing demand, it requires additional capacity by developing
some thermal power plants as well as geothermal prospect of Kotamobagu.
The geothermal prospect of Kotamobagu in North Sulawesi has a potential of probable reserve
of 185 MW. At the moment, the reserve has been developed by 4x20 MW and the State
Electricity Company/PT Perusahaan Listrik Negara (PT PLN) will develop generating facilities at
downstream field. Meanwhile, the upstream field will be developed by Pertamina Geothermal
Energy.
The development of Kotamobagu geothermal power plant is expected to meet the electricity
power demand in North Sulawesi and will reduce the generation cost substantially.
7. Scope of Work
a. Engineering Services for generating facilities:
1) Detail design and preparation of tender document;
2) Construction supervision.
b. Construction of generating facilities:
1) Procurement;
2) Construction.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Increased supply of electricity in North Sulawesi system;
2) Reduced cost of production;
3) Anticipation of delayed operation of Independent Power Producer (IPP) projects in
the area.
b. Outcome
1) Fulfilling the electricity power demand in North Sulawesi
2) Increasing social economy in North Sulawesi
3) Utilizing geothermal energy resources in North Sulawesi
403
BB-ID: BBP3-02006-04-081943-1060418
10. Project Cost
Foreign Funding
- Loan : US$ 110,000,000
- Grant : US$ 0
Sub Total : US$ 110,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 12,000,000
- Others : US$ 0
Sub Total : US$ 12,000,000
TOTAL : US$ 122,000,000
404
BB-ID: BBP3-02006-04-081946-1060419
1. Project Title : Lombok Steam Coal Power Plant (2x25 MW)
2. Duration : 36 months
3. Location : West Nusa Tenggara
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
Feasibility study conducted in 2000 concluded that development of coal fired power plant in
Lombok with a capacity of 2 x 25 MW is feasible. The power plant will be located in Endok,
northern part of Lombok.
The peak demand in Lombok was 100 MW in 2008 and has grown by 10.5% per year. The
demand is mostly supplied by oil fired diesel plants in which the generation cost is very high.
The development of Lombok Steam Coal Power Plant (SCPP) will reduce the generation cost
substantially.
7. Scope of Work
Procurement and construction of steam coal power plant.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Increased capacity of services for electricity in Lombok;
2) Reduced production cost.
b. Outcome
Fulfilling the electricity demand in Lombok
10. Project Cost
Foreign Funding
- Loan : US$ 86,000,000
- Grant : US$ 0
Sub Total : US$ 86,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 10,000,000
- Others : US$ 0
Sub Total : US$ 10,000,000
TOTAL : US$ 96,000,000
405
BB-ID: BBP3-02006-04-081943-1060420
1. Project Title : Merangin Hydro Electrical Power Plant (2x175 MW)
2. Duration : 60 months
3. Location : Kerinci Regency, Jambi Province
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
To meet the growing demand of electricity in Southern Sumatera, the State Electricity
Company/PT Perusahaan Listrik Nagara (PT PLN) has a plan to develop some thermal power
plants as well as hydro power plants, including Merangin hydro power plant which will be
commissioned in 2016. The peak demand in Southern Sumatera system was 1,797 MW in 2008
with the growth of 7.8% per year. The peaking unit is mostly supplied by oil fired power plants
so that the generation cost is relatively high. Therefore, the development of Merangin hydro
power plant is aimed to reduce the generation cost substantially and to meet the peaking units
demand.
7. Scope of Work
a. Engineering Services:
1) Review of detailed design;
2) Preparation of tender document;
3) Construction supervision;
b. Procurement and construction.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Meeting the peaking generation with the capacity 350 MW in Southern Sumatera;
2) Reduced production cost.
b. Outcome
Reducing the fuel oil consumption by the utilization of renewable energy resources.
10. Project Cost
Foreign Funding
- Loan : US$ 476,000,000
- Grant : US$ 0
Sub Total : US$ 476,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 53,000,000
- Others : US$ 0
Sub Total : US$ 53,000,000
TOTAL : US$ 529,000,000
406
BB-ID: BBP3-02005-04-071940-1060421
1. Project Title : Muara Tawar Add-on Block 2 Combined-Cycle Power Plant (500
MW)
2. Duration : 30 months
3. Location : West Java
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The electricity demand in Java-Bali system is projected to grow at 9.3% per year for the period
between 2008 and 2018. In order to meet the growing demand, it requires additional capacity
of 3.500 MW per year.
The existing Muara Tawar Gas Turbine Power Plants (GTPP) Block 2, 3 and 4 are operated as
an open cycle mode. This mode of operation is not efficient due to the heat is released to the
atmosphere. Considering the high price of oil resulting in the high value of the heat, therefore
the heat is economically viable to be captured and reused.
Muara Tawar Block 2, 3 and 4 Add-on Project will add the steam cycle process to the existing
plant by recovering the heat from the exhausted gas and using it to produce steam. The steam
will be used to drive the turbine generator and produce the additional power of 1200 MW.
Thus, this mode will increase the plant efficiency.
This project is a strategic solution to obtain additional power capacity and to partially meet the
growth of electricity demand, while increasing the operation efficiency of Muara Tawar plant.
7. Scope of Work
a. Basic Design
b. Preparation of tender document
c. Procurement of equipment
d. Engineering, design and supervision
e. Construction and Installation
f. Testing and commissioning.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Provision of additional 500 MW of power close to the load center in short implementation
period.
b. Outcome
1) Improving the efficiency, reliability, and availability of power supply.
2) Utilizing the existing assets.
407
BB-ID: BBP3-02005-04-071940-1060421
10. Project Cost
Foreign Funding
- Loan : US$ 400,000,000
- Grant : US$ 0
Sub Total : US$ 400,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 60,000,000
- Others : US$ 0
Sub Total : US$ 60,000,000
TOTAL : US$ 460,000,000
408
BB-ID: BBP3-02005-04-071939-1060422
1. Project Title : Outside Java Bali Enterprise Resource Planning (ERP)
2. Duration : 36 months
3. Location : Outside Java-Bali
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
Government of Indonesia regulates the rights, responsibilities, and obligations of State
Electricity Company / Perusahaan Listrik Negara (PT PLN) and its subsidiaries. It also provides
challenge for electricity utility and related companies to become a better, more efficient and
independent business unit and to be able to compete in local and foreign market.
In order to meet that challenge, PLN needs to become a Capital and Information Technology
based company in the future. The change must be supported by Good Corporate Governance
(GCG) in management and adaptive business culture, better strategy and business plan, and
highly dependent on human resource capital.
7. Scope of Work
Implementation of Enterprise Resource Planning (ERP) in all business units outside Java,
including 7 PLN areas (Disco), 2 Generations, and 1 Transmission:
a. PLN Nanggroe Aceh Darussalam area, PLN North Sumatera area, PLN West Sumatera
area;
b. PLN Riau area, PLN Bangka Belitung area;
c. PLN area Lampung, PLN area South Sumatera-Jambi-Bengkulu;
d. PLN Northen Sumatera Generation and PLN Southern Sumatera Generation;
e. PLN Distributor and Center of Load Regulator/Penyaluran dan Pusat Pengatur Beban (P3B)
of Sumatera.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Implemented ERP in all business units of PT PLN.
b. Outcome
1) Performing standardization of business process, material codes, and information
technology infrastructure;
2) Achieving support of PLN GCG with transparency and control;
3) Providing timely and accurate PLN financial reports;
4) Increasing workforce efficiency and productivity;
5) Supporting potential annual saving;
6) Improving management in financial and decision making;
7) Improving services on transactions.
409
BB-ID: BBP3-02005-04-071939-1060422
10. Project Cost
Foreign Funding
- Loan : US$ 30,000,000
- Grant : US$ 0
Sub Total : US$ 30,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 30,000,000
410
BB-ID: BBP3-02006-04-081943-1060423
1. Project Title : Pangkalan Susu Steam Coal Power Plant (SCPP) 2x200 MW
2. Duration : 36 months
3. Location : North Sumatera
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The peak demand in Northern Sumatera system was 1,338 Mega Watt (MW) in 2008 and has
grown by 8.5% per year. The demand is mostly supplied by oil fired power plants in which the
generation cost is very high.
The development of Pangkalan Susu Steam Coal Power Plant (SCPP) will reduce the
generation cost substantially. This power plant is one of 10,000 MW projects included in
Presidential Regulation Number 71/2006.
7. Scope of Work
Engineering, procurement, construction.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Fulfillment of the electricity power demand in Northern Sumatera system with
annual growth of 8.5%.
2) Reduced operation cost;
3) Anticipation for delayed Independent Power Producer (IPP) projects.
b. Outcome
Increasing the electricity services in Northern Sumatera area.
10. Project Cost
Foreign Funding
- Loan : US$ 383,000,000
- Grant : US$ 0
Sub Total : US$ 383,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 68,000,000
- Others : US$ 0
Sub Total : US$ 68,000,000
TOTAL : US$ 451,000,000
411
BB-ID: BBP3-02006-04-081943-1060424
1. Project Title : Parit Baru Steam Power Plant (2x50 MW)
2. Duration : 36 months
3. Location : West Kalimantan
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The peak demand of electricity in West Kalimantan is 170 MW in 2008 and is growing by 12.6%
per year. The demand is mostly supplied by oil fired diesel plants, therefore the generation cost
is very high.
A feasibility study concluded that development of coal fired power plant in West Kalimantan
with a capacity of 2 x 50 MW is feasible. The development of the power plant will be located in
Parit Baru, Pontianak. It is aimed to fulfill the electric power demand in West Kalimantan area.
It is also expected to reduce high operation cost and to anticipate delayed operation of
Independent Power Producer (IPP) projects.
7. Scope of Work
Procurement and Construction.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Fulfillment of the electricity demand in Pontianak and West Kalimantan area;
2) Reduced production cost substantially.
b. Outcome
Increasing the electricity services in Pontianak and West Kalimantan area.
10. Project Cost
Foreign Funding
- Loan : US$ 133,000,000
- Grant : US$ 0
Sub Total : US$ 133,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 23,000,000
- Others : US$ 0
Sub Total : US$ 23,000,000
TOTAL : US$ 156,000,000
412
BB-ID: BBP3-02005-04-071939-1060425
1. Project Title : Scattered Transmission Line and Substation in Indonesia
2. Duration : 48 months
3. Location : Nationwide
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The growth of electricity demand in Indonesia is very high, 9.2% per-year (8.97% in Java-Bali
and 9.88% outside Java-Bali). Energy sales in 2009 was 138 TWh and estimated to increase to
334 TWh in 2019.
In order to improve the reliability of electricity supply and quality of service, transmission lines
and substations are needed to transfer the energy from the power plants to the customers by
increasing the transmission capacity. The development of transmission lines and substations in
Indoensia will also contributes in reducing fuel consumption by replacing diesel power with
the supply from the grid.
7. Scope of Work
Development of transmission lines and substations in Java-Bali and Sumatera.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Evacuation of power output of the power plant to the load center;
2) Fulfillment of the electricity demand in Indonesia;
3) Increased efficiency of electricity supply in Indonesia;
4) Reduced production cost of electricity in Indonesia.
b. Outcome
Improving the reliability of electricity supply and quality of service and contributing in
reducing fuel consumption in Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 525,000,000
- Grant : US$ 0
Sub Total : US$ 525,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 30,000,000
- Others : US$ 0
Sub Total : US$ 30,000,000
TOTAL : US$ 555,000,000
413
BB-ID: BBP3-02005-04-071939-1060426
1. Project Title : Scattered Transmission Line and Substation in Indonesia - Phase II
2. Duration : 60 months
3. Location : Nationwide
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The growth of electricity demand in Indonesia is very high, 9.2% per-year (8.97% in Java-Bali
and 9.88% outside Java-Bali). Energy sales in 2009 was 138 TWh and estimated to increase to
334 TWh in 2019.
In order to improve the reliability of electricity supply and quality of service, transmission lines
and substations are needed to transfer the energy from the power plants to the customers by
increasing the transmission capacity. The development of transmission lines and substations in
Indoensia will also contributes in reducing fuel consumption by replacing diesel power with
the supply from the grid.
7. Scope of Work
Development of transmission lines and substations in Java-Bali and Outside Java-Bali
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Evacuation of power output of the power plant to the load center;
2) Fulfillment of the electricity demand in Indonesia;
3) Increased efficiency of electricity supply in Indonesia;
4) Reduced production cost of electricity in Indonesia.
b. Outcome
Improving the reliability of electricity supply and quality of service and contributing in
reducing fuel consumption in Indonesia.
10. Project Cost
Foreign Funding
- Loan : US$ 375,000,000
- Grant : US$ 0
Sub Total : US$ 375,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 37,500,000
- Others : US$ 0
Sub Total : US$ 37,500,000
TOTAL : US$ 412,500,000
414
BB-ID: BBP3-02005-04-071939-1060427
1. Project Title : Strengthening West Kalimantan Power Grid
2. Duration : 36 months
3. Location : West Kalimantan
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The low installed generation capacity in West Kalimantan is critical. Recently, the entire energy
is generated by the State Electricity Company/PT Perusahaan Listrik Negara (PT PLN)’s own and
rented diesel power plants in which the generation cost is very high. Due to the wide
discrepancy between the generation cost and the tariff to end users, PT PLN suffers from huge
operation losses.
The peak demand of electricity in West Kalimantan system was 170 MW in 2008 and has
grown by 12.6 % per year. On the other hands, the additional supply capacity could not meet
the demand growth. Within the frame of "Fast Track" program, two coal fire power plants with
total capacity of 150 MW are planned to be constructed, however, the commencement of the
projects has already been delayed by more than one year.
This project will be located in West Kalimantan connecting West Kalimantan system and
Sarawak system to utilize the cheaper energy in Sarawak. For the first stage, in West
Kalimantan, the transmission lines will be constructed from the border of West Kalimantan -
Sarawak in Jagoibabang village to Bengkayang, then from Bengkayang to Singkawang in 2012.
It will be continued to the construction of Bengkayang-Ngabang-Tayan-Siantan line to
complete the loop network in West Kalimantan system.
7. Scope of Work
Engineering, procurement, and construction.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Reduced operation cost substantially by utilizing the cheaper energy from Sarawak;
2) Anticipation of delayed operation of Independent Power Producer (IPP) Projects;
3) Improved quality and reliability of power supply.
b. Outcome
Fulfilling the electricity power demand in West Kalimantan system in medium term.
10. Project Cost
Foreign Funding
- Loan : US$ 99,000,000
- Grant : US$ 0
Sub Total : US$ 99,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 11,000,000
- Others : US$ 0
Sub Total : US$ 11,000,000
TOTAL : US$ 110,000,000
415
BB-ID: BBP3-02006-04-081943-1060428
1. Project Title : Sungai Penuh 1&2 Geothermal Power Plant (2x55 MW)
2. Duration : 36 months
3. Location : Kerinci District
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The peak demand of electricity in Southern Sumatera system was 1,797 MW in 2008 and has
grown by 7.8% per year. The demand is mostly supplied by oil fired power plants in which the
generation cost is very high. In order to meet the growing demand, it requires additional
capacity by developing some thermal power plants as well as geothermal prospect of Sungai
Penuh.
The geothermal prospect of Sungai Penuh in Jambi has a potential of probable reserve of
200MW. At the moment, the reserve has been developed by 2x55 MW and the State Electricity
Company/PT Perusahaan Listrik Negara (PT PLN) will develop the generating facilities
(downstream field). Meanwhile, the upstream field will be developed by Pertamina
Geothermal Energy.
7. Scope of Work
a. Engineering Services for generating facilities:
1) Detail design and preparation of tender document;
2) Construction supervision;
b. Procurement and construction of generating facilities.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Reduced production cost substantially by utilizing renewable energy resources
2) Anticipatiion of delayed operation of independent power producer projects in the
area.
b. Outcome
1) Fulfilling the electricity power demand in Southern Sumatera system
2) Utilizing geothermal energy resources in Jambi.
10. Project Cost
Foreign Funding
- Loan : US$ 140,000,000
- Grant : US$ 0
Sub Total : US$ 140,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 16,000,000
- Others : US$ 0
Sub Total : US$ 16,000,000
TOTAL : US$ 156,000,000
416
BB-ID: BBP3-02006-04-081946-1060429
1. Project Title : Takalar Steam Coal Power Plant (2x100 MW) in South Sulawesi
2. Duration : 48 months
3. Location : Takalar District
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The feasibility study of Ujungpandang - Takalar Steam Coal Power Plant was started in 1994-
1996. Based on the study, the ultimate capacity of the plant was 600 MW and will be developed
by staging. The implementation of the three studies related to the Takalar Coal Fired Power
Plant is expected to cater the increasing demand in Ujungpandang. The main purposed of the
project is also to replace oil consumption.
7. Scope of Work
a. Preparation of detail design and tender document.
b. Construction
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Producing electricity power by 2 x 100 MW;
b. Outcome
1) Replacing oil consumption Fulfilling the electricity power demand in South Sulawesi
and surrounding area;
2) Replacing oil consumption on Takalar power plant.
10. Project Cost
Foreign Funding
- Loan : US$ 250,000,000
- Grant : US$ 0
Sub Total : US$ 250,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 44,100,000
- Others : US$ 0
Sub Total : US$ 44,100,000
TOTAL : US$ 294,100,000
417
BB-ID: BBP3-02006-04-081943-1060430
1. Project Title : Tulehu 1&2 Geothermal Power Plant (2x10 MW)
2. Duration : 36 months
3. Location : Central Maluku District
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The peak demand of electricity in Ambon was 36 MW in 2008 and has grown by 9.4 % per
year. The demand is mostly supplied by oil fired diesel plants in which the generation cost is
very high. In order to meet the growing demand, it requires additional capacity by developing
some thermal power plants as well as geothermal prospect of Tulehu.
Based on preliminary geosciences study, it has been found that the geothermal prospect of
Tulehu located in Central Maluku District has a potential of probable reserve of 20 MW. At the
moment, the reserve has been developed by 2x10 MW and the State Electricity Company/PT
Perusahaan Listrik Negara (PT PLN) will develop Tulehu project. This project will be performed
in 2 (two) fields, upstream and downstream, and will be developed as total project basis.
7. Scope of Work
a. Engineering Services
b. Production well drilling
c. Construction
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Reduced production cost significantly;
2) Anticipation of delayed operation of independent power producer projects in the
area.
b. Outcome
1) Fulfilling the electricity power demand in Ambon system with annual growth of
9.4%;
2) Utilizing renewable energy resources.
10. Project Cost
Foreign Funding
- Loan : US$ 65,000,000
- Grant : US$ 10,500,000
Sub Total : US$ 75,500,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 7,000,000
- Others : US$ 0
Sub Total : US$ 7,000,000
TOTAL : US$ 82,500,000
418
BB-ID: BBP3-02005-04-071940-1060431
1. Project Title : Upper Cisokan Pumped Storage Hydro Electrical Power Plant
(1,,000 MW)
2. Duration : 52 months
3. Location : Bandung District
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The growth of electricity demand in Java-Bali is quite high, 9.53% per year. The demand is
mostly supplied by oil fired diesel plants in which the generation cost is very high. In order to
meet the growing demand, it requires additional capacity by developing hydro electrical
power plants.
Based on a feasibility study, the capacity of Upper Cisokan Pumped Storage is 1,000 MW.
Therefore, the development of Upper Cisokan Pumped Storage Hydro Electrical Power Plant is
considerably needed. The proposed project is aimed to increase the reserve margin in Java-Bali
system, reduce oil fuel consumption during peak period, and improve the frequency and
voltage control. The development of Upper Cisokan Pumped Storage Hydro Electrical Power
Plant will also contributes in reducing fuel consumption.
7. Scope of Work
a. Land Acquisition and Resettlement Plant (LARAP);
b. Design review, project review panel, and construction supervision;
c. Construction of upper and lower dam;
d. Construction of waterways, underground power house, and spillway;
e. Provision of hydraulic pump-turbine and auxiliary equipment;
f. Provision of generator-motor and electrical equipment;
g. Construction of 500 kV transmission line;
h. Hydraulic metal works;
i. Building works;
j. Construction of access road, base camp, and facilities.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
1) Fulfillment of the electricity demand in Java-Bali system with the additional capacity
of 1,000 MW ;
2) Improved capacity factor base load power plant / steam-coal power plant.
b. Outcome
Improving capacity factor base load power plant / steam-coal power plant
419
BB-ID: BBP3-02005-04-071940-1060431
10. Project Cost
Foreign Funding
- Loan : US$ 774,000,000
- Grant : US$ 0
Sub Total : US$ 774,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 73,000,000
- Others : US$ 0
Sub Total : US$ 73,000,000
TOTAL : US$ 847,000,000
420
BB-ID: BBT3-02005-04-071940-1060432
1. Project Title : Indramayu Steam Coal Power Plant 2x1,000 MW - Phase I :
Engineering Services
2. Duration : 12 months
3. Location : Indramayu District
4. Executing Agency : State Electricity Company
5. Implementing Agency : State Electricity Company
6. Background and Justification
The peak demand in Java-Bali system in 2008 was 16.301 MW and is projected to be 28.800
MW in 2014 and 44.237 MW in 2019 with the growth rate of 8.97% per year. Fast track coal
fired power plant of 7.490 MW in Java-Bali which is planned to be operated in 2009-2013 will
be absorbed by system, so the new power plant is still needed to meet the electricity demand.
Feasibility study conducted in 2009 concluded that development of Indramayu coal fired
power plant 2x1.000 MW is feasible to meet the electricity demand and reduce oil
consumption, so the generation cost will decrease substantially.
Indramayu coal-fired power plant is planned to be environmental friendly because it is using
supercritical technology which produces less carbon emission than subcritical power plant.
7. Scope of Work
a. Preparation of detail design and bid documents;
b. Construction Supevision;
c. Procurement of equipment and construction.
8. Priority
Infrastructure
9. Output and Outcome
a. Output
Engineering Services of Indramayu Steam Coal Power Plant of 2x1,000 MW.
b. Outcome
Fulfillment of electricity demand in Java Bali system.
10. Project Cost
Foreign Funding
- Loan : US$ 21,000,000
- Grant : US$
Sub Total : US$ 21,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 0
- Others : US$ 0
Sub Total : US$ 0
TOTAL : US$ 21,000,000
421
PT. Semen Baturaja (Persero)
423
BB-ID: BBP3-01912-02-061912-1040440
1. Project Title : Baturaja II Project
2. Duration : 36 months
3. Location : Ogan Komering Ulu District
4. Executing Agency : PT. Semen Baturaja (Persero)
5. Implementing Agency : PT. Semen Baturaja (Persero)
6. Background and Justification
PT. Semen Baturaja is a State-Owned Enterprise (SOE) / Badan Usaha Milik Negara (BUMN) of
cement producer in South Sumatra. It has the task to meet the needs of cement for
communities in South Sumatera and surrounding areas. In fulfilling growing need of cement,
the company plans to build a new cement plant with a capacity of 1.5 million tons a year. In
other words, PT. Semen Baturaja will increase the cement production doubled from the current
production capacity.
7. Scope of Work
a. Feasibility study
b. Quarry preparation
c. Land acquisition
d. Engineering, procurement, and construction
8. Priority
Economy
9. Output and Outcome
a. Output
Availability of new cement plant with capacity of 1.5 million tons per year, so PT. Semen
Baturaja total production capacity will be 3 million tons a year.
b. Outcome
1) Stabilizing the supply and price of cement for development of infrastructure;
2) Developing the production capacity due to the increased demand of cement in
southern part of Sumatera;
3) Increasing the market share, job opportunity, and income of the community and local
government.
10. Project Cost
Foreign Funding
- Loan : US$ 100,000,000
- Grant : US$ 0
Sub Total : US$ 100,000,000
Counterpart Funding
- Central Government : US$ 0
- Regional Government : US$ 0
- State-Owned Enterprise : US$ 80,000,000
- Others : US$ 0
Sub Total : US$ 80,000,000
TOTAL : US$ 180,000,000