REPORT
TO THE HALTON DISTRICT SCHOOL BOARD
SURVEY AND ASSESSMENT OF
ASBESTOS-CONTAINING MATERIALS T.A. BLAKELOCK HIGH SCHOOL
OAKVILLE, ONTARIO
Prepared by:
DECOMMISSIONING CONSULTING SERVICES 121 Granton Drive, Unit 11
Richmond Hill, Ontario L4B 3N4 CANADA
Tel: (905) 882-5984 Fax: (905) 882-8962 E-Mail: [email protected] Web Page: www.dcsltd.ca
Revised August 2013
701931-000
701931-000 30 August 2013 Halton District School Board J. W. Singleton Education Centre 2050 Guelph Line, P.O. Box 2005 Burlington, Ontario L7R 3Z2 Attention: Mr. Terry De Medeiros Regional Supervisor, Facilities Maintenance Re: Revised Survey of Asbestos-containing Materials T.A. Blakelock High School Oakville, Ontario Dear Mr. De Medeiros: We are pleased to submit our revised report on the survey of asbestos-containing materials. This report has been updated to include information regarding the friability of asbestos-containing materials on the floor plan(s). We trust that the enclosed is suitable for your current purposes. Please call if you have any questions. Yours very truly, DECOMMISSIONING CONSULTING SERVICES
Rein Andre, B.A. Manager, Hazardous Materials Group
Enc.
HALTON DISTRICT SCHOOL BOARD
T. A. BLAKELOCK HIGH SCHOOL
LOCATION OF ASBESTOS CONTAINING
MATERIALS
FIRST FLOOR
AUGUST 2013
N.T.S
J.B.S. R.A.
701931-000
Drawn By:
Date:
Scale:
NOTES:
REVISIONS:
No. Date: By: Revisions
REFERENCE:
1.
1.
Approved By:
Drawing No:
Project No:
LEGEND:
701931-000-1
HALTON DISTRICT SCHOOL BOARD
T. A. BLAKELOCK HIGH SCHOOL
LOCATION OF ASBESTOS CONTAINING
MATERIALS
FIRST AND SECOND FLOOR
AUGUST 2013
N.T.S
J.B.S. R.A.
701931-000
Drawn By:
Date:
Scale:
NOTES:
REVISIONS:
No. Date: By: Revisions
REFERENCE:
1.
1.
Approved By:
Drawing No:
Project No:
LEGEND:
701931-000-2
HALTON DISTRICT SCHOOL BOARD
T. A. BLAKELOCK HIGH SCHOOL
LOCATION OF ASBESTOS CONTAINING
MATERIALS
SECOND FLOOR
AUGUST 2013
N.T.S
J.B.S. R.A.
701931-000
Drawn By:
Date:
Scale:
NOTES:
REVISIONS:
No. Date: By: Revisions
REFERENCE:
1.
1.
Approved By:
Drawing No:
Project No:
LEGEND:
701931-000-3
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 82 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
101
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Concrete
12"x12" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 1 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Preparation Room 16 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
101A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Fume Hood
Drywall None Detected
Concrete
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
Assumed Asbestos Fume Hood Asbestos Cement Board Non-Friable 1 A
Assumed asbestos cement panels in fume hood.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 2 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 81 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
103
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Fume Hood
Drywall None Detected
Concrete
12"x12" Vinyl Tile None Detected
Concrete
Assumed Asbestos Fume Hood Asbestos Cement Board Non-Friable 1 A
Assumed asbestos cement panels in fume hood.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 3 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Work Room 22 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
103A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Concrete
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 4 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 81 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
104
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Concrete
12"x12" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 5 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Work Room 14 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
104A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Concrete
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 6 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 81 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
106
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Acoustic Tile None Detected
9"x9" Vinyl Tile 13% Chrysotile All 10 to 50 sq m Non-Friable 1 A
Concrete
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 7 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 22 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
106A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
9"x9" Vinyl Tile 13% Chrysotile All 10 to 50 sq m Non-Friable 1 A
Concrete
Medium (10-20 cm) straights 36% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable5 to 10 pipe fittingsBelow Ceiling80% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 8 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 81 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
107
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
9"x9" Vinyl Tile 13% Chrysotile All 50 to 100 sq m Non-Friable 1 A
Concrete
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 9 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 80 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
108
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Acoustic Tile None Detected
Concrete
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 10 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 81 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
109
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Wood Panel
Masonry Below Paneling
Acoustic Tile None Detected
Concrete
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 11 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 81 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
110
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Wood Panel
Masonry Below Paneling
Acoustic Tile None Detected
Concrete
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 12 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 78 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
111
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile 50% 50 to 100 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected 50%
12"x12" Tile 4.8% Amosite All 50 to 100 sq m Non-Friable 1 C (exposed)
Medium (10-20 cm) fittings 80% Chrysotile Below Ceiling <5 pipe fittings Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing acoustic ceiling tiles.
Asbestos-containing insulation on one pipe fitting at ceiling level, partially enclosed by ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 13 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 22 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
112
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 10 to 50 sq m Non-Friable 1 A
12"x12" Tile 4.8% Amosite All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 14 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 81 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
113
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall None Detected
12"x12" Vinyl Tile 16.8% Chrysotile 75% 50 to 100 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected 25%
12"x12" Tile 4.8% Amosite All 50 to 100 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 15 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 78 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
114
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry 50%
Drywall None Detected 50%
12"x12" Vinyl Tile 16.8% Chrysotile 50 % 50 to 100 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected 50%
12"x12" Tile 4.8% Amosite All 50 to 100 sq m Non-Friable 1 C (exposed)
Medium (10-20 cm) fittings 80% Chrysotile Above Ceiling 5 to 10 pipe fittings Friable 1 C (concealed)
Asbestos-containing acoustic ceiling tiles and vinyl floor tiles.
Asbestos-containing insulation on pipe fittings above ceiling.
Suspect mould observed on some building materials.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 16 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 11 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
114A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Ceramic Tile
2'x4' Suspended Ceiling Tile None Detected
Medium (10-20 cm) fittings 80% Chrysotile Above Ceiling <5 pipe fittings Friable 1 C (concealed)
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 17 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 10 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
114B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall None Detected
12"x12" Vinyl Tile 16.8% Chrysotile 50% 10 to 50 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected 50%
12"x12" Tile 4.8% Amosite All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 18 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 10 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
115
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry 85%
12" x 12" Tile 3.3% Amosite 15% <10 sq m Non-Friable 1 C (exposed)
12"x12" Vinyl Tile None Detected
12"x12" Tile 4.8% Amosite All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing acoustic wall tiles.
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 19 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 22 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
116
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Cement Pipe
Masonry
9"x9" Vinyl Tile 15.1% Chrysotile All 10 to 50 sq m Non-Friable 1 A
Concrete
Assumed Asbestos Above Ceiling 3 to 15 m pipe straights Non-Friable 1 C (concealed)
Asbestos-containing vinyl floor tiles.
Assumed asbestos-containing cement pipe above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 20 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 67 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
117
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Fume Hood
Wood Panel
Masonry Below Paneling
Acoustic Tile None Detected
12"x12" Vinyl Tile 17.2% Chrysotile All 50 to 100 sq m Non-Friable 1 A
Concrete
Assumed Asbestos Fume Hood Asbestos Cement Board Non-Friable 1 A
Asbestos-containing vinyl floor tiles.
Assumed asbestos cement board in fume hood.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 21 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 81 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
118
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Wood Panel
Masonry Below Paneling
Acoustic Tile None Detected
9"x9" Vinyl Tile 19.9% Chrysotile All 50 to 100 sq m Non-Friable 1 A
Concrete
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 22 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 22 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
118A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
Medium (10-20 cm) fittings 36% Chrysotile Above Ceiling 5 to 10 pipe fittings Friable 1 C (concealed)
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 23 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Family Studies Room 8 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
119
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 24 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Entry 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
120
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 25 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Vestibule 11 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
121
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile None Detected 50%
2'x4' Suspended Ceiling Tile None Detected 50%
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 26 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 390 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
122
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Cement Pipe
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile None Detected 90% C (exposed)
2'x4' Suspended Ceiling Tile 0.75% Chrysotile 10% 10 to 50 sq m Non-Friable 1 C (exposed)
Medium (10-20 cm) straights 36% Chrysotile Above Ceiling >30 m pipe straights Friable 1 C (concealed)
C (concealed)1Friable>20 pipe fittingsAbove Ceiling80% ChrysotileMedium (10-20 cm) fittings
Assumed Asbestos Above Ceiling >30 m pipe straights Non-Friable 1 C (concealed)
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings and straights above ceiling.
Assumed asbestos-containing cement pipe above ceiling at entrance to Room 116.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 27 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Stairwell 61 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
123
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Texture Spray 2.8% Chrysotile 50% <10 sq m Friable 2 A
Masonry
Terrazzo
12"x12" Tile None Detected
Asbestos-containing spray-applied acoustic finish (texture) on wall above east doors.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 28 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 2 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
123A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
9"x9" Vinyl Tile 15.6% Chrysotile All <10 sq m Non-Friable 1 A
Texture Spray None Detected
Small (<10 cm) straights 36% Chrysotile Below Ceiling <3 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling40% ChrysotileSmall (<10 cm) fittings
Large (>20 cm) straights 36% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 2 A
A2Friable<3 m pipe straights - pargingBelow Ceiling42% ChrysotileLarge (>20 cm) straights
Asbestos-containing vinyl floor tiles.
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 29 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Mechanical Room 125 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
124
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
Medium (10-20 cm) straights 36% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 2 A
A2Friable>20 pipe fittingsBelow Ceiling80% ChrysotileMedium (10-20 cm) fittings
Large (>20 cm) straights 36% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 2 A
A2Friable>20 pipe fittingsBelow Ceiling40% ChrysotileLarge (>20 cm) fittings
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 30 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Mechanical Room 37 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
125
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
12"x12" Tile None Detected
Medium (10-20 cm) fittings 40% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 1 A
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 31 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Girls' Washroom 37 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
126
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Plaster (Textured) None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 32 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Custodial Room 8 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
126A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
Medium (10-20 cm) fittings 36% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable5 to 10 pipe fittingsBelow Ceiling36% ChrysotileLarge (>20 cm) fittings
Medium (10-20 cm) straights None Detected
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 33 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Boys' Washroom 37 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
127
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Plaster (Textured) None Detected
Medium (10-20 cm) fittings 80% Chrysotile Below Ceiling <5 pipe fittings Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings below ceiling in bulkhead at southeast corner and one in radiator at northwest corner.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 34 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Vestibule 36 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
128
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 1 to 5% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 35 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Stairwell 22 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
129
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 36 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Landing 6 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
130
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 37 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Washroom 22 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
131
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall 2.3% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
No access above ceiling at the time of our site inspections.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 38 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Washroom 22 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
132
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall 2.3% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
No access above ceiling at the time of our site inspections.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 39 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 4 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
133
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 40 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Library 193 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
134
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Carpet
2'x4' Suspended Ceiling Tile None Detected 50%
2'x4' Suspended Ceiling Tile 0.75% Chrysotile 50% >100 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings Assumed Asbestos Above Ceiling 10 to 20 pipe fittings Friable 1 A
Asbestos-containing suspended ceiling tiles.
Assumed asbestos-containing insulation on pipe fittings above ceiling.
No access above ceiling at the time of our site inspections.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 41 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Office 63 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
134A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Cement Pipe
Masonry
Drywall 2.3% Chrysotile 50% 10 to 50 sq m Non-Friable 1 A
Carpet
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Assumed Asbestos Above Ceiling >30 m pipe straights Non-Friable 1 C (concealed)
Asbestos-containing drywall joint compound.
Asbestos-containing suspended ceiling tiles.
Assumed asbestos cement piping above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 42 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Office 23 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
134B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall 2.3% Chrysotile 50% 10 to 50 sq m Non-Friable 1 A
Carpet
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 43 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Office 16 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
134C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry 75%
Drywall 2.3% Chrysotile 15% <10 sq m Non-Friable 1 A
Carpet
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings 40% Chrysotile Above Ceiling <5 pipe fittings Friable 1 C (concealed)
Asbestos-containing drywall joint compound.
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 44 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Office 16 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
134D
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall 2.3% Chrysotile 25% <10 sq m Non-Friable 1 A
Carpet
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 45 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 143 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
135
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All >100 sq m Non-Friable 1 A
Metal
Small (<10 cm) fittings 40% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing vinyl floor tiles.
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 46 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Edit Room 7 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
135A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and CommentsNo access at the time of our site inspections.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 47 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Audio Room 7 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
135B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All <10 sq m Non-Friable 1 A
Concrete
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 48 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Control Room 19 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
135C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Carpet
12"x12" Tile 4.8% Amosite All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 49 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Electrical Shop 187 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
136
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall 1.5% Chrysotile 20% 10 to 50 sq m Non-Friable 1 A
12"x12" Vinyl Tile 25.5% Chrysotile All >100 sq m Non-Friable 1 A
Metal Deck
Small (<10 cm) fittings 40% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable5 to 10 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing drywall joint compound.
Asbestos-containing vinyl floor tiles.
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 50 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Machine Shop 187 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
137
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Metal Deck
Small (<10 cm) fittings 40% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 1 A
C (exposed)1Friable<5 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 51 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Auto Shop 208 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
138
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall
Concrete
Metal Deck
Small (<10 cm) fittings 40% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 1 A
C (exposed)1Friable10 to 20 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
No drywall joint compound anticipated to be present on drywall applied to walls.
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 52 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Wood Shop 155 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
139
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Metal Deck
Small (<10 cm) fittings 40% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 53 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Office 40 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
140
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All 10 to 50 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 54 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Office 9 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
140A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All <10 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 55 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Office 13 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
140B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All 10 to 50 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 56 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 105 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
141
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Cement Pipes
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All >100 sq m Non-Friable 1 C (exposed)
Assumed Asbestos Above Ceiling Adjacent to Rooms 144 and 145 Non-Friable 1 C (concealed)
Asbestos-containing suspended ceiling tiles.
Assumed asbestos-containing cement pipes above ceiling adjacent to Rooms 144 and 145.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 57 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 105 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
142
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Cement Drain Pipe
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All >100 sq m Non-Friable 1 C (exposed)
Assumed Asbestos Pipe Chase (Vestibule Wall) 3 to 15 m pipe straights Non-Friable 1 B
Asbestos-containing suspended ceiling tiles.
Assumed asbestos cement piping in pipe chase in vestibule wall.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 58 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 17 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
143
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Cement Board
Cement Pipe
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Assumed Asbestos Above Ceiling 15 to 30 m pipe straights Non-Friable 1 C (concealed)
C (exposed)1Non-Friable<10 sq mWest Exterior SoffitAssumed Asbestos
Asbestos-containing suspended ceiling tiles.
Assumed asbestos-containing cement pipe above ceiling.
Asbestos-containing cement board on west exterior soffit.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 59 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 117 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
144
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All >100 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All >100 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 60 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 9 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
144A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings 40% Chrysotile Below Ceiling <5 pipe fittings Friable 1 A
C (concealed)1Friable<5 pipe fittingsAbove Ceiling40% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings above and below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 61 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Custodial Room 3 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
144B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Drywall 2.3% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 62 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 73 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq. m JYH/CGCLevel Area Usage Floor Area
145
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All 50 to 100 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 63 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 73 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
146
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall 2.3% Chrysotile 25% 10 to 50 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Medium (10-20 cm) fittings 40% Chrysotile Above Ceiling 10 to 20 pipe fittings Friable 1 C (concealed)
Asbestos-containing drywall joint compound.
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 64 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 73 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
147
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings 40% Chrysotile Above Ceiling <5 pipe fittings Friable 1 C (concealed)
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 65 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 73 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
148
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall 2.3% Chrysotile 50% 10 to 50 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings 40% Chrysotile Above Ceiling <5 pipe fittings Friable 1 C (concealed)
Asbestos-containing drywall joint compound.
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 66 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 73 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
149
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall 2.3% Chrysotile 25% 10 to 50 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings 40% Chrysotile Above Ceiling 5 to 10 pipe fittings Friable 1 C (concealed)
Asbestos-containing drywall joint compound.
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 67 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 73 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
150
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings 57% Chrysotile Above Ceiling 5 to 10 pipe fittings Friable 1 C (concealed)
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 68 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
151
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All 10 to 50 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings 36% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 69 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 94 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
152
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All 50 to 100 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All >100 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings 36% Chrysotile Above Ceiling 5 to 10 pipe fittings Friable 1 C (concealed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 70 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 16 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
152A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All 10 to 50 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 71 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 73 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
153
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall None Detected 75%
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings 40% Chrysotile Above Ceiling 10 to 20 pipe fittings Friable 1 C (concealed)
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 72 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Classroom 73 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
154
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall None Detected 25%
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Small (<10 cm) fittings 40% Chrysotile Above Ceiling 5 to 10 pipe fittings Friable 1 C (concealed)
Asbestos-containing suspended ceiling tiles.
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 73 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 142 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
155
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All >100 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 74 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 28 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
156
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
Small (<10 cm) fittings 40% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable5 to 10 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Large (>20 cm) fittings 40% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 75 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Stairwell 73 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq. m JYH/CGCLevel Area Usage Floor Area
156A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Drywall None Detected 10%
Terrazzo
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 76 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Equipment Storage Room 28 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
157
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
Medium (10-20 cm) fittings 40% Chrysotile Below Ceiling <5 pipe fittings Friable 1 C (exposed)
C (exposed)2Friable<3 m pipe straightsBelow Ceiling36% ChrysotileLarge (>20 cm) straights
Small (<10 cm) straights 36% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable3 to 15 m pipe straightsBelow Ceiling36% ChrysotileMedium (10-20 cm) straights
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 77 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Change Room 50 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
158
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
Small (<10 cm) fittings 40% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 78 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Office 15 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
158A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 79 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Washroom 15 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
158B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Texture Spray None Detected
Medium (10-20 cm) straights 65% Chrysotile Pipe Chase in Wall <3 m pipe straights Friable 2 B
Asbestos-containing insulation on pipe straights in pipe chase in wall.
No access above ceiling at the time of our site inspections.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 80 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Shower Room 15 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
158C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 81 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Change Room 50 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
159
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
Small (<10 cm) fittings 40% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing insulation on pipe fittings below ceiling.
Suspect mould observed on some building materials in area.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 82 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Washroom 15 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
159A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Plaster (Textured) None Detected
Small (<10 cm) fittings 40% Chrysotile Above Ceiling 5 to 10 pipe fittings Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 83 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Office 15 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
159B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
Small (<10 cm) fittings 40% Chrysotile Above Ceiling 5 to 10 pipe fittings Friable 1 C (concealed)
C (concealed)1Friable3 to 15 m pipe straightsAbove Ceiling36% ChrysotileSmall (<10 cm) straights
Small (<10 cm) fittings 40% Chrysotile Below Ceiling <5 pipe fittings Friable 1 A
A1Friable<3 m pipe straightsBelow Ceiling36% ChrysotileSmall (<10 cm) straights
Asbestos-containing insulation on pipe fittings and straights above and below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 84 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Shower Room 15 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
159C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 85 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Theatre 106 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
160
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
12"x12" Vinyl Tile None Detected 67%
12"x12" Vinyl Tile None Detected 33%
12"x12" Tile None Detected
Small (<10 cm) fittings 57% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable3 to 15 m pipe straightsBelow Ceiling57% ChrysotileSmall (<10 cm) straights
Large (>20 cm) fittings 57% Chrysotile Below Ceiling <5 pipe fittings Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 86 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 28 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
161
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Terrazzo
12"x12" Tile None Detected
Small (<10 cm) fittings 36% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 2 C (exposed)
C (exposed)1Friable5 to 10 pipe fittingsBelow Ceiling36% ChrysotileMedium (10-20 cm) fittings
Medium (10-20 cm) straights 57% Chrysotile Below Ceiling 15 to 30 m pipe straights Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 87 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Water Pump Area 4 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
161A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Concrete
Concrete
Concrete
Small (<10 cm) fittings 57% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling57% ChrysotileLarge (>20 cm) fittings
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 88 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Theatre Storage Room 133 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
162
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Concrete
Concrete
Concrete
Small (<10 cm) fittings 80% Chrysotile Below Ceiling <5 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable3 to 15 m pipe straightsBelow Ceiling36% ChrysotileSmall (<10 cm) straights
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 89 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 84 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
163
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Terrazzo
Concrete
12"x12" Tile None Detected
Medium (10-20 cm) straights 36% Chrysotile Below Ceiling >30 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable>20 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Large (>20 cm) straights 36% Chrysotile Below Ceiling >30 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable>20 pipe fittingsBelow Ceiling40% ChrysotileLarge (>20 cm) fittings
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 90 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Student Council Room 19 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
164
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 91 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Athletic Council Room 73 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
165
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 4.3% Chrysotile All 50 to 100 sq m Non-Friable 1 A
Concrete
Small (<10 cm) fittings 36% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 2 A
Asbestos-containing vinyl floor tiles.
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 92 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Workshop 42 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
166
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
Small (<10 cm) fittings 40% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable3 to 15 m pipe straightsBelow Ceiling36% ChrysotileSmall (<10 cm) straights
Medium (10-20 cm) fittings 40% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable3 to 15 m pipe straightsBelow Ceiling36% ChrysotileMedium (10-20 cm) straights
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 93 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Lunch Room 26 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
167
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
Medium (10-20 cm) straights 36% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 1 A
A1Friable5 to 10 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 94 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Washroom 7 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
167A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
Small (<10 cm) straights 36% Chrysotile Below Ceiling <3 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable5 to 10 pipe fittingsBelow Ceiling40% ChrysotileSmall (<10 cm) fittings
Medium (10-20 cm) straights 36% Chrysotile Below Ceiling <3 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 95 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Transformer Room 44 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
168
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 96 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Shop 11 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
168A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 97 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Caretaker's Office 9 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
168B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Carpet
Concrete Below Carpet
2'x4' Suspended Ceiling Tile None Detected
Medium (10-20 cm) straights 36% Chrysotile Above Ceiling 3 to 15 m pipe straights Friable 1 C (concealed)
Asbestos-containing insulation on pipe straights above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 98 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Electrical Room 19 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
169
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Brick
Concrete
Concrete
Small (<10 cm) straights 36% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling40% ChrysotileSmall (<10 cm) fittings
Medium (10-20 cm) straights 36% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 99 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 58 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
170
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
Small (<10 cm) straights 36% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable5 to 10 pipe fittingsBelow Ceiling40% ChrysotileSmall (<10 cm) fittings
Medium (10-20 cm) straights 36% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable5 to 10 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 100 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Corridor 18 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
171
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
Small (<10 cm) straights 36% Chrysotile Below Ceiling <3 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling40% ChrysotileSmall (<10 cm) fittings
Medium (10-20 cm) straights 36% Chrysotile Below Ceiling <3 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling40% ChrysotileMedium (10-20 cm) fittings
Large (>20 cm) straights 36% Chrysotile Below Ceiling <3 m pipe straights Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling40% ChrysotileLarge (>20 cm) fittings
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 101 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 54 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
172
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 102 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 14 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
172A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 103 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 14 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
172B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 104 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
1 Storage Room 61 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
173
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 105 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 53 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
201
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
12"x12" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 106 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 19 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
202
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 10 to 50 sq m Non-Friable 1 A
Wood
12"x12" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 107 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 53 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
203
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
9"x9" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 108 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 53 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
204
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
12"x12" Vinyl Tile 16.8% Chrysotile All 10 to 50 sq m Non-Friable 1 A
Concrete
Asbestos-containing acoustic wall tiles.
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 109 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 53 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
205
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
12"x12" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 110 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 53 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
206
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
9"x9" Vinyl Tile 7% Chrysotile All 50 to 100 sq m Non-Friable 1 A
Concrete
Asbestos-containing acoustic wall tiles.
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 111 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage 4 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
206A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Wood
9"x9" Vinyl Tile None Detected
Wood
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 112 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 53 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
207
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
12"x12" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 113 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 53 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
208
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
9"x9" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 114 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 53 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
209
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
9"x9" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 115 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 53 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
210
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
12"x12" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 116 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 53 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
211
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Masonry
12"x12" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 117 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 67 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
212
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile 50% 10 to 50 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected 50%
Concrete
Asbestos-containing acoustic wall tiles.
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 118 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
213
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 119 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 67 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
214
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile 50% 10 to 50 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected 50%
Concrete
Asbestos-containing acoustic wall tiles.
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 120 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 67 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
215
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile 50% 10 to 50 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected 50%
Concrete
Asbestos-containing acoustic wall tiles.
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 121 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 6 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
215A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 122 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Darkroom 6 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
215B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
9"x9" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 123 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Computer Room 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
216
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
9"x9" Vinyl Tile None Detected
Concrete
Small (<10 cm) fittings 80% Chrysotile In Bulkhead at South Wall <5 pipe fittings Friable 1 C (concealed)
Asbestos-containing insulation on pipe fittings in bulkhead at south wall.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 124 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 76 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
217
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
9"x9" Vinyl Tile None Detected Below Carpet
Carpet
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 125 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
217A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 10 to 50 sq m Non-Friable 1 A
Drywall None Detected
9"x9" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 126 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 59 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
218
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 10 to 50 sq m Non-Friable 1 A
Drywall None Detected
12"x12" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 127 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 78 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
219
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
9"x9" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 128 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
220
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 10 to 50 sq m Non-Friable 1 A
Wood
9"x9" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing acoustic wall tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 129 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 78 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
221
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile 3.3% Amosite 50% 50 to 100 sq m Non-Friable 1 A
Wood
9"x9" Vinyl Tile None Detected
Concrete
Asbestos-containing acoustic wall tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 130 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Stairwell 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
222
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile None Detected 25%
Masonry
Terrazzo
12"x12" Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 131 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Girls' Washroom 41 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
223
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Plaster (Textured) None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 132 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 6 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
223A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 133 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Boys' Washroom 41 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
224
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Plaster (Textured) None Detected
Concrete
Small (<10 cm) fittings 2.3% Chrysotile Below Ceiling <5 pipe fittings Friable 2 B
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 134 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Men's Washroom 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
225
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 135 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Women's Washroom 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
226
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 136 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Custodial Room 6 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
227
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Cement Drain Pipe
Masonry
Concrete
Concrete
Assumed Asbestos Below Ceiling ~5 m in length Non-Friable 1 A
Assumed asbestos-containing cement drain pipe below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 137 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Stairwell 27 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
228
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 138 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Vestibule 36 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
229
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Cement Drain Pipe
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Assumed Asbestos Above Ceiling >30 m pipe straights Non-Friable 1 C (concealed)
Asbestos-containing suspended ceiling tiles.
Assumed asbestos-containing drain pipe above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 139 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 400 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
230
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
12"x12" Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 140 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 30 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
231
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
12"x12" Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 141 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 45 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
232
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
12"x12" Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 142 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Stairwell 82 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
233
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Texture Spray 2.8% Chrysotile 50% 10 to 50 sq m Friable 1 A
Terrazzo
Concrete
Asbestos-containing spray-applied acoustic finish (texture) on wall above east door in southwest corridor.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 143 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Mechanical Room 41 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
234
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 144 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 28 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m KMSLevel Area Usage Floor Area
235
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
2'x4' Suspended Ceiling Tile None Detected
12"x12" Tile 4.8% Amosite Above Ceiling 10 to 50 sq m Non-Friable 1 C (concealed)
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 145 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m KMSLevel Area Usage Floor Area
235A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
2'x4' Suspended Ceiling Tile None Detected
12"x12" Tile 4.8% Amosite Above Ceiling 10 to 50 sq m Non-Friable 1 C (concealed)
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 146 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 25 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m KMSLevel Area Usage Floor Area
235B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
2'x4' Suspended Ceiling Tile None Detected
12"x12" Tile 4.8% Amosite Above Ceiling 10 to 50 sq m Non-Friable 1 C (concealed)
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 147 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 70 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m KMSLevel Area Usage Floor Area
235C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
12"x12" Vinyl Tile 4.8% Amosite Above Ceiling 50 to 100 sq m Non-Friable 1 C (concealed)
2'x4' Suspended Ceiling Tile None Detected
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 148 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 9 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
235D
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 149 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 61 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m KMSLevel Area Usage Floor Area
235E
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
12"x12" Tile None Detected Above Ceiling
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 150 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 9 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m KMSLevel Area Usage Floor Area
235F
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
2'x4' Suspended Ceiling Tile None Detected
12"x12" Tile None Detected Above Ceiling
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 151 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 9 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
235G
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 152 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 9 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
235H
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 153 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 13 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
235I
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 154 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 9 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
235J
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 155 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 9 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
235K
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 156 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Staff Room 95 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m KMSLevel Area Usage Floor Area
236
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall 2.3% Chrysotile 50% 50 to 100 sq m Non-Friable 1 A
Masonry
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
12"x12" Tile 4.8% Amosite Above Ceiling 10 to 50 sq m none 1 C (concealed)
Asbestos-containing drywall joint compound.
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 157 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Kitchen 8 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m KMSLevel Area Usage Floor Area
236B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected 20%
Masonry
12"x12" Vinyl Tile None Detected
Drywall None Detected
12"x12" Tile 4.8% Amosite Above Ceiling <10 sq m Non-Friable 1 C (concealed)
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 158 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Coat Room 5 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m KMSLevel Area Usage Floor Area
236C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile
2'x4' Suspended Ceiling Tile None Detected
12"x12" Tile 4.8% Amosite Above Ceiling <10 sq m Non-Friable 1 C (concealed)
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 159 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Washroom 8 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
236D
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall None Detected 20%
Ceramic Tile
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 160 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Washroom 8 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
236E
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 161 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 School Store 30 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
237
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall 2.3% Chrysotile 50% 10 to 50 sq m Non-Friable 1 C (exposed)
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 162 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 4 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
237A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and CommentsNo access at the time of our site inspections.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 163 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 10 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
237B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and CommentsNo access at the time of our site inspections.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 164 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 13 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
238
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 10 to 50 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 165 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 10 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
238A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 10 to 50 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 166 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 7 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
238B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All <10 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 167 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Washroom 4 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
238C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All <10 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 168 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 25 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
239
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 10 to 50 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 169 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 11 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
239A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 10 to 50 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 170 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 75 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
240
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 50 to 100 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 171 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 47 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
241
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 50 to 100 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 172 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 41 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
241A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 10 to 50 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 173 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Vestibule 3 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
242
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 174 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Mechanical Room 102 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
242A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
Small (<10 cm) fittings 36% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 2 C (exposed)
C (exposed)1Friable10 to 20 pipe fittingsBelow Ceiling36% ChrysotileMedium (10-20 cm) fittings
Large (>20 cm) fittings 36% Chrysotile Below Ceiling 10 to 20 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable10 to 50 sq mBelow Ceiling57% ChrysotileDuctwork
Asbestos-containing insulation on pipe fittings below ceiling.
Asbestos-containing insulation on ductwork below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 175 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Stairwell 14 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
243
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 176 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 40 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
244
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 50 to 100 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 177 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 50 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
245
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Wood
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 50 to 100 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 178 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 3 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
245A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All <10 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 179 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 6 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
245B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall 2.3% Chrysotile 50% <10 sq m Non-Friable 1 A
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All <10 sq m Non-Friable 1 A
Drywall 2.3% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 180 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 67 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
246
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 50 to 100 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 181 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSJYH/CGCLevel Area Usage Floor Area
247
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and CommentsNo access at the time of our site inspections.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 182 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Stairwell 11 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
248
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 183 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 184 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
249
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All >100 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 184 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Kitchen 61 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
250
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Texture Spray 4.5% Chrysotile 50% 10 to 50 sq m Friable 1 C (exposed)
Concrete
Asbestos-containing spray-applied acoustic finish (texture) on ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 185 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 5 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
250A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and CommentsNo access at the time of our site inspections.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 186 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 2 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
250B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected
9"x9" Vinyl Tile 4.8% Chrysotile All <10 sq m Non-Friable 1 A
12"x12" Tile None Detected
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 187 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 2 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
250C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall None Detected 25%
Terrazzo
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 188 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 35 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
250D
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
Medium (10-20 cm) fittings 57% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 189 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSJYH/CGCLevel Area Usage Floor Area
250E
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and CommentsNo access at the time of our site inspections.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 190 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 10 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
250F
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 191 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Lunch Room 46 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
251
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Wood
12"x12" Vinyl Tile None Detected
Drywall None Detected 25%
12"x12" Tile 4.6% Amosite 75% 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 192 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Lunch Room 315 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
252
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Cement Board
Masonry
Drywall None Detected
9"x9" Vinyl Tile 15.1% Chrysotile All >100 sq m Non-Friable 1 A
Drywall None Detected
12"x12" Tile 4.9% Amosite 75% >100 sq m Non-Friable 1 C (exposed)
Assumed Asbestos Wall Pipe Chase >3 m Non-Friable 1 B
Asbestos-containing vinyl floor tiles.
Asbestos-containing acoustic ceiling tiles.
Assumed asbestos-containing cement board within pipe chase.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 193 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Washroom 33 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
253
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected 50%
Concrete
Small (<10 cm) straights 75% Chrysotile In Pipe Chase 3 to 15 m pipe straights Friable 2 B
Asbestos-containing insulation on pipe straights in pipe chase.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 194 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Custodial Room 11 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
254
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
Medium (10-20 cm) straights 40% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 1 A
A1Friable<5 pipe fittingsBelow Ceiling57% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing insulation on pipe fittings and straights below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 195 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 78 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
255
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Wood
Acoustic Tile None Detected
12"x12" Vinyl Tile 25.5% Chrysotile All 50 to 100 sq m Non-Friable 1 A
Concrete
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 196 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Training Room 135 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
256
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected 25%
Masonry
Rubber Composite
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 197 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
257
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
12"x12" Tile None Detected
Medium (10-20 cm) fittings 57% Chrysotile Above Ceiling 5 to 10 pipe fittings Friable 1 C (concealed)
Asbestos-containing insulation on pipe fittings above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 198 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 14 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
257A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile None Detected All
12"x12" Tile None Detected Above T-Bar
Medium (10-20 cm) straights 57% Chrysotile Above Ceiling 3 to 15 m pipe straights Friable 1 C (concealed)
C (concealed)1Friable5 to 10 pipe fittingsAbove Ceiling57% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing insulation on pipe fittings and straights above ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 199 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 57 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
258
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected 75%
Masonry
12"x12" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 200 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Change Room 27 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
259
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 201 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Washroom 19 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
259A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected
Small (<10 cm) fittings 57% Chrysotile Below Ceiling <5 pipe fittings Friable 1 A
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 202 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Shower Room 17 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
259B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 203 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 13 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
259C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 204 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Change Room 27 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
259D
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 205 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 24 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
260
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Cement Pipe
Masonry
Concrete
Drywall None Detected
Small (<10 cm) fittings 57% Chrysotile Below Ceiling 5 to 10 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable<5 pipe fittingsBelow Ceiling57% ChrysotileMedium (10-20 cm) fittings
Large (>20 cm) fittings 57% Chrysotile Below Ceiling 3 to 15 m pipe straights Friable 1 C (exposed)
Assumed Asbestos Below Ceiling 3 to 15 m pipe straights Non-Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings below ceiling.
Assumed asbestos-containing cement drain pipe below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 206 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Gymnasium 269 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
261
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Wood
Metal
Large (>20 cm) fittings 36% Chrysotile Below Ceiling <5 pipe fittings Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 207 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 6 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
262
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
12"x12" Tile 4.8% Amosite All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 208 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Washroom 5 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
262A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 25.5% Chrysotile All <10 sq m Non-Friable 1 A
Drywall None Detected
Asbestos-containing vinyl floor tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 209 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 79 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
263
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile All 50 to 100 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 210 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 51 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
264
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile None Detected
Medium (10-20 cm) straights 57% Chrysotile Above Ceiling >30 m pipe straights Friable 1 C (concealed)
C (concealed)1Friable>20 pipe fittingsAbove Ceiling36% ChrysotileMedium (10-20 cm) fittings
Asbestos-containing insulation on pipe fittings and straights above ceiling (observed through hole in ceiling assembly above).
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 211 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 46 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
265
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile 0.75% Chrysotile 50% 10 to 50 sq m Non-Friable 1 C (exposed)
2'x4' Suspended Ceiling Tile 1 to 5% Chrysotile 50% 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 212 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 45 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
266
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 213 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 18 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
267
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 214 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Washroom 27 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
268
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 215 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Mechanical Room 17 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
268A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Concrete
Concrete
Small (<10 cm) fittings 57% Chrysotile Below Ceiling >20 pipe fittings Friable 1 C (exposed)
Asbestos-containing insulation on pipe fittings below ceiling.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 216 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Stage 102 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
269
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Wood
Concrete
Small (<10 cm) fittings 57% Chrysotile Below Ceiling <5 pipe fittings Friable 1 C (exposed)
C (exposed)1Friable>20 pipe fittingsBelow Ceiling57% ChrysotileLarge (>20 cm) fittings
Large (>20 cm) straights None Detected Below Ceiling
Asbestos-containing insulation on pipe fittings below ceiling.
Suspect mould observed on some building materials in area.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 217 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Gymnasium 540 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
270
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Wood
Wood
Metal
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 218 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 14 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
271
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
12"x12" Tile 4.8% Amosite 50% <10 sq m Non-Friable 1 C (exposed)
12"x12" Tile None Detected 50%
Asbestos-containing acoustic ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 219 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 20 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
272
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
12"x12" Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 220 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 133 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
273
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
12"x12" Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 221 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 74 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
274
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 222 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Vestibule 45 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
275
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile None Detected 75%
Drywall None Detected 25%
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 223 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Drama Room 200 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
276
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
No access above ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 224 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Stage 93 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
276A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Wood
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
No access above ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 225 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Control Room 28 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
276B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 226 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 37 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
277
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile None Detected 50%
2'x4' Suspended Ceiling Tile None Detected 50%
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 227 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 28 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
278
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile None Detected 50%
2'x4' Suspended Ceiling Tile 1 to 5% Chrysotile 50% 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 228 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Music Room 49 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
279
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Carpet
2'x4' Suspended Ceiling Tile 1 to 5% Chrysotile All 10 to 50 sq m Non-Friable 1 C (concealed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 229 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 15 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
279A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Carpet
Drywall 2.3% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 230 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 2 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
279B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Ceramic Tile
Drywall 2.3% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 231 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Storage Room 2 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
279C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Ceramic Tile
Plaster None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 232 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 10 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
279D
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Tectum
Carpet
Drywall 2.3% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 233 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 10 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
279E
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall 2.3% Chrysotile 50% <10 sq m Non-Friable 1 A
12"x12" Vinyl Tile None Detected
Drywall 2.3% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing drywall joint compound.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 234 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Practice Room 8 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
279F
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Tectum
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 235 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Practice Room 8 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
279G
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile 1 to 5% Chrysotile All <10 sq m Non-Friable 1 C (exposed)
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 236 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Stage 52 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
279H
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile 16.8% Chrysotile All 50 to 100 sq m Non-Friable 1 A
2'x4' Suspended Ceiling Tile 1 to 5% Chrysotile All 10 to 50 sq m Non-Friable 1 C (exposed)
Asbestos-containing vinyl floor tiles.
Asbestos-containing suspended ceiling tiles.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 237 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 84 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
280
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 238 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 13 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
280A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 239 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 19 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
280B
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall None Detected 25%
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 240 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 33 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
280C
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Drywall None Detected 50%
Masonry
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 241 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 24 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq. m JYH/CGCLevel Area Usage Floor Area
280D
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall None Detected 25%
Carpet
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 242 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 5 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
280E
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Carpet
Drywall None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 243 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 8 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
280F
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall None Detected 50%
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 244 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 13 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
280G
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Drywall None Detected 50%
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 245 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 13 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
280H
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 246 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Office 13 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
280I
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Carpet
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 247 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 64 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
281
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile None Detected
Wood
9"x9" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 248 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 64 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
282
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile None Detected
Wood
12"x12" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 249 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 64 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
283
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Wood
Acoustic Tile None Detected
9"x9" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 250 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Mechanical Room 42 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
284
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
9"x9" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 251 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Custodial Room 8 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
284A
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
9"x9" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 252 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 64 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
285
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile None Detected
Wood
9"x9" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 253 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Stairwell 18 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
286
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 254 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 64 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
287
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Wood
Acoustic Tile None Detected
9"x9" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 255 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Classroom 64 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
288
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Acoustic Tile None Detected
Wood
9"x9" Vinyl Tile None Detected
Concrete
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 256 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Corridor 56 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
289
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
12"x12" Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 257 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Stairwell 16 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
290
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
Terrazzo
12"x12" Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 258 of 259
Building Assessment Survey for Asbestos-Containing MaterialsT.A. Blakelock Public School (HDSB)
2 Light Room 33 09-May-200749131
Building Name:DateConsultantConsultant Job # Inspector
DCSsq.m JYH/CGCLevel Area Usage Floor Area
291
Component of the Room Assembly Wall
Asbestos Content Description c/w Quantity Friable or Non-Friable Exposure Risk AccessibilityLocation within Space
Floor
Ceiling
Mechanical
Fireproofing (Sprayed)
Other
Notes and Comments
Masonry
12"x12" Vinyl Tile None Detected
2'x4' Suspended Ceiling Tile None Detected
No asbestos-containing materials observed.
Exposure Risk Rating:1 - Little or no perceived risk associated with material in its present condition.2 - Minor upgrades or repairs are required to reduce a potential exposure hazard.3 - A significant exposure hazard exists, with immediate remedial action required.
Accessibility:A - Areas of the building within reach (from floor level) of all building users.B - Frequently entered maintenance areas within reach of maintenance staff, without the need for a ladder.C (exposed) - Areas of the building above 2.4 m where use of a ladder is required to reach the asbestos.C (concealed) - Areas of the building which require the removal of a building component, including lay-in ceilings and access panels into solid ceiling systems.D - Areas of the building behind inaccessible solid ceiling systems, walls or mechanical equipment, etc. where demolition of the ceiling, wall or equipment, etc., is required to reach the asbestos.
Page 259 of 259