16
remas remas project project Martyn Cheesbrough Project Manager [email protected] [email protected] www.remas.info

Remas project remas project Martyn Cheesbrough Project Manager [email protected] [email protected]

Embed Size (px)

Citation preview

Page 1: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

remas remas projectproject

Martyn CheesbroughProject Manager

[email protected]

[email protected]

www.remas.info

Page 2: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

A pan-European project that A pan-European project that examines the value of examines the value of

environmental management environmental management systems systems

in the context of regulationin the context of regulation

remaslinking environmentalmanagement andperformance

www.remas.info

Page 3: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

3

Who is involved?Who is involved?The Environment AgencyThe Environment Agency

Scottish Environment Protection Scottish Environment Protection

AgencyAgency

Irish Environmental Protection AgencyIrish Environmental Protection AgencyInstitute of Environmental Institute of Environmental

Management & AssessmentManagement & Assessment

EU LIFE environmentEU LIFE environment

European Environment AgencyEuropean Environment Agency

IMPELIMPEL

www.remas.info

Page 4: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

remaslinking environmentalmanagement andperformance

www.remas.info

ProjectProject ObjectivesObjectives

To gather data on environmental To gather data on environmental performance of industrial sites and performance of industrial sites and correlate this with the level of EMScorrelate this with the level of EMSMake-up

of

EMS

Environmental

performance

Page 5: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

remaslinking environmentalmanagement andperformance

www.remas.info

ProjectProject ObjectivesObjectives

• To define the components of the To define the components of the EMS and/or particular EMS and/or particular implementation that leads to implementation that leads to improved performance – the improved performance – the ‘remas criteria’‘remas criteria’

• To demonstrate these criteria To demonstrate these criteria can be implemented at a number can be implemented at a number of sites, and lead to better of sites, and lead to better performanceperformance

Page 6: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

6

Project timetableProject timetable

Nov 02 to June 03 - project set-upNov 02 to June 03 - project set-up June 03 to June 04 - data gatheringJune 03 to June 04 - data gathering July 04 to Sept 04 - analysis July 04 to Sept 04 - analysis Sept 04 to Sept 05 - implement Sept 04 to Sept 05 - implement

remas criteriaremas criteria Oct 05 to Nov 05 - reportingOct 05 to Nov 05 - reporting

Page 7: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

7

Where are we now Where are we now

Implementing questionnaire based Implementing questionnaire based on partner definition of remas on partner definition of remas criteria and environmental criteria and environmental performance measurementperformance measurement

Setting up for phase 2 Setting up for phase 2 remas criteria reviewremas criteria review RecruitmentRecruitment Designing the analysisDesigning the analysis

Page 8: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

8

Real dataReal dataremaslinking environmentalmanagement andperformance

www.remas.info

Remas Graph

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0%

EP

Cement Aluminium Combustion Paper/Pulp Chemicals Food/Drink Other

Page 9: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

9

This meetingThis meeting

Make sure all understand how we Make sure all understand how we will review remas criteriawill review remas criteria

Agree the format of the certifier Agree the format of the certifier documentdocument

Agree the major headings of the Agree the major headings of the certifier documentcertifier document

Agree the main points under each Agree the main points under each headingheading

Page 10: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

10

After this meetingAfter this meeting

Claire will draft the document Claire will draft the document and circulate for commentand circulate for comment

Discuss the document(s) at Discuss the document(s) at IEMA conferenceIEMA conference

Make further amendments in Make further amendments in May/JuneMay/June

Take account of the document Take account of the document in the writing of version 2 of in the writing of version 2 of the remas criteria in July.the remas criteria in July.

Page 11: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

11

Remas criteria: Remas criteria: a definitiona definition

‘... those elements of an EMS that are key to

improving environmental performance and aiding

regulation ...’

remaslinking environmentalmanagement andperformance

www.remas.info

Page 12: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

12

partner experien

ce

P1 Q’s

P1 rema

s criter

ia

P2 Q’s

IMPEL

Imple-ment

Industry

Certifiers

Final rema

s criteria

Remas criteria: Remas criteria: developmentdevelopment

remaslinking environmentalmanagement andperformance

www.remas.info

Page 13: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

13

RC: where they RC: where they might applymight apply

remaslinking environmentalmanagement andperformance

www.remas.info

Certifier ==== ISO14001Certifier ==== ISO14001Verifier ==== EMASVerifier ==== EMASAuditor ==== OtherAuditor ==== Other

AccreditationAccreditation

Page 14: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

14

RC: EM as a systemRC: EM as a systemremaslinking environmentalmanagement andperformance

www.remas.info

poli

cy

poli

cy

SiteSiteManagementManagementp

roced

ure

pro

ced

ure

train

ing

train

ing

au

dit

au

dit

com

pli

an

ce

com

pli

an

ce

em

issi

on

sem

issi

on

s

eff

icie

ncy

eff

icie

ncy

Raw

mate

rials

Raw

mate

rials RemasRemas

criteriacriteria

Page 15: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

15

Questions?Questions?remaslinking environmentalmanagement andperformance

www.remas.info

Page 16: Remas project remas project Martyn Cheesbrough Project Manager martyn.cheesbrough@environment-agency.gov.uk mcheesbrough@remas.info

remaslinking environmentalmanagement andperformance

www.remas.info

Links and Links and contactscontactswww.remas.infowww.remas.info

[email protected]@remas.info

REMAS project, Environment Agency, REMAS project, Environment Agency, Block 1 Government Buildings, Block 1 Government Buildings,

Burghill Road, Westbury-on-Trym, Burghill Road, Westbury-on-Trym, BS10 6BFBS10 6BF

[email protected]@remas.info or or [email protected]@environment-agency.gov.ukncy.gov.uk

+44 (0) 7768 276947 +44 (0) 7768 276947