CPAR status Incomplete incident (outstanding incident before this month) 1. conduct incident review at Safeth talk/ P5M Yes 2. conduct Personal contact Yes 3.Warning to victim Open 4.conduct refresh training for victim about Excavator operation Open 1. Administrative punishment to Pak Aditya Open 2. Socialization through safety talk related parking methods in inadequate condition (ie: unlevel surface, wet, ect). And remind the two way communication to the operators yes 3. Disciplinary in arranging the parking location for unit when rest time. yes 5. Parking inspection when rest time and installation of safety line for inactive location as a parking location. yes 6. Equip the light vehicle of supervisor with safety line. yes 7. Knowledge / training for Mr, Randy related Hazard identification Risk Assessment (HIRA) Open 8. Improvement programs to the operator (Mr. Aditya) related oerientation to HD 785-7 Open 9. Insert the counseling materials to HD / Scania operator after leave period related of parking methods in inadequate condition yes 1. Develop routine cleaning schedule for sub-cotractor's heavy equipment open 2. Optimize PS heavy equipment of Sub-contactors open 3. Re-commisioning unit after repairing open 1. conduct incident call to all exploration crews Yes 2. conduct daily safety inspection to workplace include access road Yes 3. conduct re-assessment about safety shoes tahat used in exploration Yes 1.Re-call Incident through safety talks Yes 2.Administrative sanction to involved person Yes 3.speedlimit inspection evidence on DT 902 attached with valid stamp dan signatures Yes 4.Re-fresh socialization related method of speed limiter and their function Yes 5.inspection brake report continualy in all units Yes 1. conduct incident review at safey talk / tool box meeting Yes 2. Perform socialization procedures of horn before starting and no stop at front loading Yes 3. Perform personal contact to Asep and Eko Wahyudi Yes 4. Giving punisment to Eko (warning Letter) Yes 5. Giving punisment to Asep (warning Letter) Yes 1. Behavior - Employee perceived haste - overspeeding that allowed on that area 1. Administrative punishment to the involved person Yes 2. Behavior - Inadequate identification of critical safe behavior - inappropriate of motivation (failure in lowering the transmission) 2. raise the issue through memorandum related the prohibition of substandart HINO operationals Yes 3. Engineering/ Design - Inadequate standards, specifications, and/or design criteria - improper design of the physical of vessel on DT SFI 336 3. review the require of speedbump to the bend area 22+500. Yes 4. Engineering/ Design - Other - Redesign of placement the speedbump to the bend area where it could reducing the effect of getting shaky when it passed through 4. installation of speed awareness system on that area during 3 x 24 hrs Yes 5. Training/ Knowledge Transfer - Inadequate knowledge transfer - misunderstood instructions - Vertical and horizontal alignment of road condition (bend, ascending, descending roads) 5. review the aligment of road construction on Km 22+500 Yes 6. recall Incident to hauling road and socialization related speed max Yes Cancel the operator KIMPER Yes Conduct incident recall in preshift talk Yes Resocialize the need to report to supervisor if in fatigue condition Yes Supervisor will pro actively ensure all driver take their rest time Yes (Continue) 1. Conduct incident recall to all related worker Yes 2. Release an internal memo to all group leader / supervisor regarding supervising working near water activities. Open 3. Send the operator for safety Improvement class. Yes 4. Reassess the skill & knowledge of the operator Yes 5. Resocialisation of specific related procedure and distribute to the dewatering crew. Yes 1. Perform socialize incident to all worker Yes 2. Perform personal contact (counseling) to victim Yes 3. Perform re-socialization of SOP set Up rig Open 4. Perform insect control fo night shift including sting bee Open Yes Work Rules/Policies/Standards/ Procedures (PSP) - Inadequate implementation of PSP. due to deficiencies - Lack of awarenes of procedure Geologist SCS Non Hauling, KRA South Hery Prast is a well site performed coal core description at SCS-150-1, suddenly a bee sting his right eyelid Exploration Activity Yes Yes 1. Behavior - Inadequate identification of critical safe behaviors - The operator wasn’t ensuring the work environment prior conduct the work 2. Work Place Environment /Layout - Other - the work environment covered by mud. 3. Skill Level - Inadequate assessment of required skills. 4. Training/Knowledge Transfer - Inadequate knowledge transfer - inability to comprehend. 82/SC/2012 15-Nov-12 10:30 PM MTI Well site GL Prod Semindo (PAMA) Non Hauling Sump Panel 11 IUP JMB An excavator (SMX 85) was slided down at sump floor due to travelling on soft soil layer. Mobile equipment operation Yes Yes 1. Physical Condition - Fatigue - due to lack of rest. 2. Behavior - Improper performance is rewarded - saves time or effort 73/PM/2012 20-Oct-12 9:30 AM NM Opr Exca GL Coal PAMA (SFI) Hauling road Km 19+700 A dump truck (DT SFI 334) was leaving from front loading to port site, when it approach Km 19+700, the operator lost control of the truck and ran across the safety berm Mobile equipment operation Yes Yes Yes 64/SF/2012 1-Sep-12 4:15 Wita PD - Driver Hino Group Leader SFI (PAMA) Hauling, KM 22 + 500 A loaded dump truck (DT 336) was entering a curved road at Km 22.5 on high speed. It hit the speed bump and the driver could not control the truck and the truck tipped over to the left. Mobile equipment operation Yes Yes 1. Behavior - Inadequate identification of critical safe behaviors. The operator was focus only to his right rear view mirror afraid the cabin hit by the materials. 2. Communication - Inadequate horizontal communication between peers - DT 704 operator reversing his unit with no sounding as it should be due to hurry in loading materials 59/PM/2012 04-Aug-12 11:10 AM PD Driver DT Driver DT Group Leader UTSG (PAMA) Non Hauling, Panel 11 Pit ABE DT 905 was loading and continued by DT 702, DT 704 further behind them ready to take a position for loading by manuvered to the left and there was a collision occurred with the vessel 905. Mobile equipment operation Yes Yes 1. Behavior - Inadequate identification of critical safe behaviors. - take a break in a short distance. 2. Work Planning - Inadequate audit/inspection/monitoring - no reguler inspection for brake system 54/PM/2012 20-Jul-12 7:15 AM PD Driver DT Driver DT Foreman MMR (PAMA) Hauling, Km 1 + 500 Hauling DT MMR 902 and DT-UTSG 709 traveled from portsite to Pit. When DT UTSG 709 entered the constriction of Km 1.5 the unit stopped in order to gave an opportunity to the another unit (PJM 09) that was in loading direction. at that moment, MMR 902 failed to brake and finally hit the rear vessel of UTSG 709 in front of him. Mobile equipment operation Yes Yes Protective Systems - Defective personal protective equipment 44/PM/2012 9-Jun-12 4:48 AM PD Driver DT group leader DJPM (SCS) Non Hauling, Pulomas Village ABE Warsito intent to go to rig DPM 2004 south ABE at Pulomas village through padi field (belong to local people). 20 meters before rig he stepped on wood nail, and nail pierced his foot. Exploration activity Yes Yes 1. Work Rules/Policies/Standards/ Procedures (PSP) - Lack of Supervision - Inadequate development of PSP 2. Work Rules/Policies/Standards/ Procedures (PSP) - Inadequate implementation of PSP. due to deficiencies - Lack of implementation the pre start check 37/SC/2012 10-May-12 8:30 AM MTI crew drilling group leader Semindo (PAMA) Non Hauling, Pit 204 (JMB) Excavator SMX 110 was operated by Dedy Toding, it was loading top soil at pit 204, suddenly he saw a burst of flame out of the machine, he leaves the cabin and ask for help to the others. They came back to fight the fire with fire extinguisher but failed until water truck came and put out the fire. Fire 31/PM/2012 3-Apr-12 11:15 PM PD Operator Excavator Mobile equipment operation Yes Yes 1. Communication - Inadequate horizontal communication between peers 2. Behavior - Inadequate identification of critical safe behaviors Operator HD operator HD Group Leader PAMA Non Hauling, Disposal 203 IUP JMB Three units were parked facing to the east, where the HD 3151 was positioned to the left at the end, the right was HD 3202 and then HD 2539. When HD 3202 was about to start moving forward into the loading point at panel 10, the operator felt the unit was slipped and moved to the left before finally the rear left of his vessel hit the right side rearview mirror of HD 3151 which were parked next to him, it cause it broken. yes yes 1. Communication - Inadequate vertical communication between supervisor and person 2. Skill Level - Inadequate practice of skill 015/PM/2012 19 Feb 12 1:05 PM PD group leader PAMA Pit 4 PC 1250 CN EX1038 was operated by Teguh Wiyono performed loading activity. When it was loading over burden to HD DT 2782 for the second bucket, suddenly the ground surface of left track was failure and PR 1250 tipped over to left mobile equipment operation Root causes Corrective action Closed? 002/PM/2012 4-Jan-12 9:30 PM PD Opr Excavator Type of activity Investigation status Investigation result Remark Date Time Direct Indirect Data collection Investigation Potential incident Involved persons (POSITION) Direct supervisor (POSITION) Related departments / company Incident location Incident description Incident No. When Class of incident

rekap ins.pdf

Embed Size (px)

Citation preview

Page 1: rekap ins.pdf

CPAR status

Incomplete incident (outstanding incident before this month)1. conduct incident review at Safeth talk/ P5M Yes2. conduct Personal contact Yes3.Warning to victim Open

4.conduct refresh training for victim about Excavator operationOpen

1. Administrative punishment to Pak Aditya Open2. Socialization through safety talk related parking methods in inadequate condition (ie: unlevel surface, wet, ect). And remind the two way communication to the operators

yes

3. Disciplinary in arranging the parking location for unit when rest time.

yes

5. Parking inspection when rest time and installation of safety line for inactive location as a parking location.

yes

6. Equip the light vehicle of supervisor with safety line. yes7. Knowledge / training for Mr, Randy related Hazard identification Risk Assessment (HIRA)

Open

8. Improvement programs to the operator (Mr. Aditya) related oerientation to HD 785-7

Open

9. Insert the counseling materials to HD / Scania operator after leave period related of parking methods in inadequate condition

yes

1. Develop routine cleaning schedule for sub-cotractor's heavy equipment

open

2. Optimize PS heavy equipment of Sub-contactors open3. Re-commisioning unit after repairing open

1. conduct incident call to all exploration crews Yes2. conduct daily safety inspection to workplace include access road

Yes

3. conduct re-assessment about safety shoes tahat used in exploration

Yes

1.Re-call Incident through safety talks Yes2.Administrative sanction to involved person Yes3.speedlimit inspection evidence on DT 902 attached with valid stamp dan signatures

Yes

4.Re-fresh socialization related method of speed limiter and their function

Yes

5.inspection brake report continualy in all units Yes1. conduct incident review at safey talk / tool box meeting Yes2. Perform socialization procedures of horn before starting and no stop at front loading

Yes

3. Perform personal contact to Asep and Eko Wahyudi Yes4. Giving punisment to Eko (warning Letter) Yes5. Giving punisment to Asep (warning Letter) Yes

1. Behavior - Employee perceived haste - overspeeding that allowed on that area

1. Administrative punishment to the involved person Yes

2. Behavior - Inadequate identification of critical safebehavior - inappropriate of motivation (failure in lowering the transmission)

2. raise the issue through memorandum related the prohibition of substandart HINO operationals

Yes

3. Engineering/ Design - Inadequate standards,specifications, and/or design criteria - improper design of the physical of vessel on DT SFI 336

3. review the require of speedbump to the bend area 22+500.

Yes

4. Engineering/ Design - Other - Redesign of placement the speedbump to the bend area where it could reducing the effect of getting shaky when it passed through

4. installation of speed awareness system on that area during 3 x 24 hrs

Yes

5. Training/ Knowledge Transfer - Inadequate knowledgetransfer - misunderstood instructions - Vertical and horizontal alignment of road condition (bend, ascending, descending roads)

5. review the aligment of road construction on Km 22+500 Yes

6. recall Incident to hauling road and socialization related speed max

Yes

Cancel the operator KIMPER YesConduct incident recall in preshift talk YesResocialize the need to report to supervisor if in fatigue condition

Yes

Supervisor will pro actively ensure all driver take their rest time

Yes (Continue)

1. Conduct incident recall to all related worker Yes2. Release an internal memo to all group leader / supervisor regarding supervising working near water activities.

Open

3. Send the operator for safety Improvement class. Yes4. Reassess the skill & knowledge of the operator Yes5. Resocialisation of specific related procedure and distribute to the dewatering crew.

Yes

1. Perform socialize incident to all worker Yes

2. Perform personal contact (counseling) to victim Yes3. Perform re-socialization of SOP set Up rig Open4. Perform insect control fo night shift including sting bee Open

Yes Work Rules/Policies/Standards/ Procedures (PSP) - Inadequate implementation of PSP. due to deficiencies - Lack of awarenes of procedure

Geologist SCS Non Hauling, KRA South Hery Prast is a well site performed coal core description at SCS-150-1, suddenly a bee sting his right eyelid

Exploration Activity Yes

Yes 1. Behavior - Inadequate identification of critical safe behaviors - The operator wasn’t ensuring the work environment prior conduct the work2. Work Place Environment /Layout - Other - the work environment covered by mud.3. Skill Level - Inadequate assessment of required skills.4. Training/Knowledge Transfer - Inadequate knowledgetransfer - inability to comprehend.

82/SC/2012 15-Nov-12 10:30 PM MTI Well site

GL Prod Semindo (PAMA) Non HaulingSump Panel 11

IUP JMB

An excavator (SMX 85) was slided down at sump floor due to travelling on soft soil layer.

Mobile equipment operation Yes

Yes 1. Physical Condition - Fatigue - due to lack of rest.2. Behavior - Improper performance is rewarded - saves time or effort

73/PM/2012 20-Oct-12 9:30 AM NM Opr Exca

GL Coal PAMA (SFI) Hauling roadKm 19+700

A dump truck (DT SFI 334) was leaving from front loading to port site, when it approach Km 19+700, the operator lost control of the truck and ran across the safety berm

Mobile equipment operation Yes

Yes Yes

64/SF/2012 1-Sep-12 4:15 Wita PD - Driver Hino

Group Leader SFI (PAMA) Hauling, KM 22 + 500 A loaded dump truck (DT 336) was entering a curved road at Km 22.5 on high speed. It hit the speed bump and the driver could not control the truck and the truck tipped over to the left.

Mobile equipment operation

Yes Yes 1. Behavior - Inadequate identification of critical safebehaviors. The operator was focus only to his right rear view mirror afraid the cabin hit by the materials.2. Communication - Inadequate horizontal communication between peers - DT 704 operator reversing his unit with no sounding as it should be due to hurry in loading materials

59/PM/2012 04-Aug-12 11:10 AM PD Driver DT

Driver DT Group Leader UTSG (PAMA) Non Hauling, Panel 11 Pit ABE DT 905 was loading and continued by DT 702, DT 704 further behind them ready to take a position for loading by manuvered to the left and there was a collision occurred with the vessel 905.

Mobile equipment operation

Yes Yes 1. Behavior - Inadequate identification of critical safe behaviors. - take a break in a short distance. 2. Work Planning - Inadequate audit/inspection/monitoring - no reguler inspection for brake system

54/PM/2012 20-Jul-12 7:15 AM PD Driver DT

Driver DT Foreman MMR (PAMA) Hauling, Km 1 + 500 Hauling DT MMR 902 and DT-UTSG 709 traveled from portsite to Pit. When DT UTSG 709 entered the constriction of Km 1.5 the unit stopped in order to gave an opportunity to the another unit (PJM 09) that was in loading direction. at that moment, MMR 902 failed to brake and finally hit the rear vessel of UTSG 709 in front of him.

Mobile equipment operation

Yes Yes Protective Systems - Defective personal protectiveequipment

44/PM/2012 9-Jun-12 4:48 AM PD Driver DT

group leader DJPM (SCS) Non Hauling, Pulomas Village ABE Warsito intent to go to rig DPM 2004 south ABE at Pulomas village through padi field (belong to local people). 20 meters before rig he stepped on wood nail, and nail pierced his foot.

Exploration activity

Yes Yes 1. Work Rules/Policies/Standards/ Procedures (PSP) - Lack of Supervision - Inadequate development of PSP 2. Work Rules/Policies/Standards/ Procedures (PSP) - Inadequate implementation of PSP. due to deficiencies - Lack of implementation the pre start check

37/SC/2012 10-May-12 8:30 AM MTI crew drilling

group leader Semindo (PAMA) Non Hauling, Pit 204 (JMB) Excavator SMX 110 was operated by Dedy Toding, it was loading top soil at pit 204, suddenly he saw a burst of flame out of the machine, he leaves the cabin and ask for help to the others. They came back to fight the fire with fire extinguisher but failed until water truck came and put out the fire.

Fire31/PM/2012 3-Apr-12 11:15 PM PD Operator Excavator

Mobile equipment operation Yes Yes 1. Communication - Inadequate horizontal communication between peers2. Behavior - Inadequate identification of critical safe behaviors

Operator HD operator HD Group Leader PAMA Non Hauling, Disposal 203 IUP JMB Three units were parked facing to the east, where the HD 3151 was positioned to the left at the end, the right was HD 3202 and then HD 2539. When HD 3202 was about to start moving forward into the loading point at panel 10, the operator felt the unit was slipped and moved to the left before finally the rear left of his vessel hit the right side rearview mirror of HD 3151 which were parked next to him, it cause it broken.

yes yes1. Communication - Inadequate vertical communication between supervisor and person2. Skill Level - Inadequate practice of skill

015/PM/2012 19 Feb 12 1:05 PM PD

group leader PAMA Pit 4

PC 1250 CN EX1038 was operated by Teguh Wiyono performed loading activity. When it was loading over burden to HD DT 2782 for the second bucket, suddenly the ground surface of left track was failure and PR 1250 tipped over to left

mobile equipment operation

Root causes Corrective action Closed?

002/PM/2012 4-Jan-12 9:30 PM PD Opr Excavator

Type of activityInvestigation status Investigation result

RemarkDate Time Direct Indirect Data collection Investigation

Potential incident

Involved persons (POSITION) Direct supervisor(POSITION)

Related departments / company Incident location Incident descriptionIncident No.

When Class of incident