20
CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile 1 VER+ MONITORING REPORT REGIONAL LANDFILL PROJECTS IN CHILE CDM registration reference number 1435 Monitoring period VER+: 16 December 2007 to 3 July 2008 Date of report: 30 March 2009 Version 2

REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

Embed Size (px)

Citation preview

Page 1: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

1

VER+ MONITORING REPORT

REGIONAL LANDFILL PROJECTS IN CHILE

CDM registration reference number 1435

Monitoring period VER+: 16 December 2007 to 3 July 2008

Date of report: 30 March 2009

Version 2

Page 2: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

2

INDEX

PREAMBLE ....................................................................................................................................................... 3

OBJECTIVES ..................................................................................................................................................... 3

1. GENERAL PROJECT ACTIVITY INFORMATION .......................................................................... 3

1.1. Title of the project activity ..................................................................................................................................................................... 3

1.2. CDM registration date, crediting period and monitoring period ..................................................................................... 3

1.3. Contact details .............................................................................................................................................................................................. 3

1.4. Description of the project activity ..................................................................................................................................................... 4

1.5. Real project implementation ................................................................................................................................................................ 4

1.6. Baseline and monitoring methodology .......................................................................................................................................... 8

1.7. Changes against the PDD ........................................................................................................................................................................ 8

2. MONITORING OF THE PROJECT ACTIVITY ................................................................................. 9

2.1. Monitoring equipment ............................................................................................................................................................................. 9

2.2. Data logging technology ....................................................................................................................................................................... 10

2.3. Data transmission and processing ................................................................................................................................................. 11

2.4. Data validation and storage ............................................................................................................................................................... 11

2.5. Managerial responsibilities ................................................................................................................................................................ 12

2.6. Quality assurance and quality control.......................................................................................................................................... 13

2.7. Training of monitoring personnel .................................................................................................................................................. 13

2.8. Calibration and maintenance ............................................................................................................................................................ 13

2.9. Changes against the PDD: calibration of the gas analyzer ................................................................................................ 14

3. FORMULAS AND PARAMETERS USED FOR CALCULATIONS ............................................ 16

3.1. Formulas ....................................................................................................................................................................................................... 16

3.2. Parameters ................................................................................................................................................................................................... 18

4. MONITORED AND CALCULATED DATA..................................................................................... 19

4.1. Monitored data .......................................................................................................................................................................................... 19

4.2. Calculated data .......................................................................................................................................................................................... 19

4.3. Calculation results ................................................................................................................................................................................... 20

Page 3: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

3

Preamble Format: Values are presented in International System of Units

Dates are presented in the format dd/mm/yyyy Significant figures use three decimals

Abbreviations: CDM Clean Development Mechanism VER+ Verified Emission Reductions Plus GHG Greenhouse gas LFG Landfill gas

Objectives The purpose of this Monitoring Report is to quantify the amount of Greenhouse Gas Emission Reductions achieved, in tons of carbon dioxide equivalent (tCO2eq), to be certified by the Designated Operational Entity as per the Kyoto Protocol and CDM Modalities Procedures requirements (decision 17.CP7).

1. General project activity information

1.1. Title of the project activity Project #1435: Regional landfill projects in Chile

1.2. CDM registration date, crediting period and monitoring period Registration date: 4 July 2008 Crediting period: 4 July 2008 – 3 July 2018 Monitoring period: 16 December 2007 – 3 July 2008

1.3. Contact details Stephane Vidaillet / Anne-Sophie Zirah Director of carbon finance / CDM project manager LFG Carbon Trading 4, rue de la Presse 1000 Brussels, Belgium

Page 4: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

4

1.4. Description of the project activity The project activity is to build, operate and maintain a landfill gas (LFG) collection and flaring system on Viñita Azul landfill in Copiapo (Region III), Lajarilla landfill in Viña del Mar (Region V) and Leña Dura landfill in Punta Arenas (Region XII), Chile. The equipment to be employed includes, inter alia:

a gas collection network, permeable pipes, and vertical gas wells and/or horizontal trenches a high temperature enclosed flare monitoring and control systems to measure the actual flow and composition of the LFG civil works

Figure 1.1 – Location of the project activity

1.5. Real project implementation The project activity has been implemented on the landfills of Lajarilla and Leña Dura. Gas collecting system

Lajarilla

Leña Dura

Viñita Azul

Page 5: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

5

The LFG collection system is composed of a network of vertical wells and interconnected pipes. The Lajarilla landfill network also includes horizontal trenches.

Figure 1.2 – LAYOUT DIAGRAM LEÑA DURA

Figure 1.3 – LAYOUT DIAGRAM LAJARILLA

Page 6: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

6

The following pictures illustrate elements of the collecting system:

Figure 1.4 – Pipes Figure 1.5 – Well head

Figure 1.6 – Well head (Leña Dura) Figure 1.7 – Main collector

Page 7: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

7

Figures 1.8 and 1.9 – Horizontal trench at Lajarilla

Degassing unit The degassing station includes a blower that produces suction for the extraction of the LFG. The LFG extracted is fed into a high temperature flare which enables the methane contained in the LFG to be completely oxidized by the flaring process. The system is equipped with a monitoring unit to measure the flow, the pressure and the temperature. At Lajarilla, the equipments are connected to the public electricity grid to satisfy their energy needs. At Leña Dura, a diesel generator is used for electricity supply. The technology employed in the project activity is the HOFGAS® extracting and flaring station developed by the Swiss company Hofstetter Umwelttechnik. We use the complete extracting and flaring unit with the following particulars:

the complete degassing unit is built in a ventilated container, providing securities against any weather or burglary risks and which would prove beneficial for noise reduction;

safe and low emission combustion is guaranteed by a high temperature flare; safety devices:

o EEX motor o flame arrester o slam shut valve o burner control with UV detector.

The main elements of the unit are:

a flare station a pump station a monitoring unit

Page 8: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

8

Figure 1.10 - Degassing Unit

Figure 1.11 – Degassing station (Leña Dura)

1.6. Baseline and monitoring methodology Methodology ACM0001 version 05, “Consolidated baseline and monitoring methodology for landfill gas project activities”, has been applied to this project.

1.7. Changes against the PDD Implementation of the project activity took place on two sites, Leña Dura and Lajarilla, whereas three sites were included in the registered PDD. Besides, the degassing plant of Lajarilla is currently under commissioning, hence VER+ resulting from LFG destruction at Lajarilla are not considered in the present Monitoring Report.

Page 9: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

9

2. MONITORING OF THE PROJECT ACTIVITY

2.1. Monitoring equipment The flare unit of Leña Dura was installed on 15/12/2007. It is equipped with the following instruments to capture the required monitoring data:

Instrument Data monitored Manufacturer and model

Serial number

Flowmeter LFGflare,y Volume of gas sent to the flare

Elster-Instromet Turbine meter

SM-RI-X-K

10509860

Thermometer T Temperature of the LFG

Jumo Type EBL 160 AF

6700201 3858

Pressure sensor P Pressure of the LFG Rosemount Type 2088 Smart

8349705/04/07

Gas analyzer wCH4,y Fraction of methane in LFG NUK GAE 11025 Thermocouple Tflare Temperature of the flare Jumo

Type S 90.1000.21

89 Electricity meter ECy Electricity consumed by the

equipment Landis + Gyr

ZMD120ASer53 88991093

Figure 2.1 – Gas flow sensor Figure 2.2 – Pressure, temperature and flow control

Page 10: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

10

Figure 2.3 – Gas analyzer Figure 2.4 – Electricity meter

Note that flare efficiency has not been monitored during the first monitoring period. A default flare efficiency ratio has been applied to VER+ calculations. Data measured by the instruments is gathered in a data collecting system called Memograph with a Readwin2000 software for the visualization of the registered data. The Memograph enables to read graphics, event lists (e.g. alarms) etc.

2.2. Data logging technology The data from the instruments will be collected in MemoGraph (type: Visual Data Manager, Provider: Endress+Hauser), equipped with a Compact Flash card of 256 MB for the archive. The unit comes also with a preinstalled copy of software ReadWin2000 (from Endress+Hauser), that is used for the configuration and display of the MemoGraph. The system also offers 2 different ways of communication for output:

- USB Interface - Modem transmission, using either protocol RS232, protocol RS485 or Ethernet Interface

The MemoGraph is secured by means of a seal so the displayed value is true and protected against manipulation. The Monitoring unit collects the following parameters from the flare unit every minute (see Memograph output table 4.1):

- Date & Hour:Min of the measure - Status validity of the measure - Average Gas Pressure in degree in mbar. - Methane concentration (CH4). - Normalized gas Flow in Nm3/h. - Oxygen concentration (O2).

Page 11: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

11

- Average Gas Temperature in degree Celsius. - Average Flare Temperature in degree Celsius.

The data are recorded on spreadsheet file with a predefined format. The file is then directly used for the monitoring report.

2.3. Data transmission and processing All parameters mentioned above are processed according to the following methodology: a) Automatic transmission:

The MemoGraph is configured to communicate data by modem once a day. The results are sent using a direct dedicated phone line to a dedicated server machine that is physically installed in the office of Bionersis in Santiago de Chile. The Monitoring Director checks that this process is working correctly. b) Manual transmission:

If automatic transmission fails, the Monitoring Director dials directly into the monitoring unit to collect the data. c) Physical Logging:

If manual transmission fails, the Monitoring Director send a technician physically on site to retrieve the data from the monitoring unit using the USB interface. These data are then sent back to the office and recorded on the server. d) If all options above do not work, the following procedures will be used:

1. If data can be retrieved subsequently, they will be reintegrated on the server. 2. If data cannot be retrieved, no emissions reductions will be claimed for the period of data

failure.

2.4. Data validation and storage Monitored values are controlled at 3 stages:

A first control happens on site, when collecting data and reporting events

Then a second check takes place at the time of uploading values to the server machine and to the on-line database

The final validation is the responsibility of the monitoring director who analyses the events, cross-check the consistency of data and eventually take action if necessary

Data calculations and storage

Data transmitted by ReadWin is systematically exported to Excel (.xls format) and Real SQL Database (.rsd format) on a weekly and a monthly basis

Data from ReadWin and data exports are stored physically on the disk of the server machine A daily backup of the server is done

Page 12: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

12

Weekly and monthly calculations are uploaded on a secured on-line database (restricted access) A copy of the backup on a portable electronic storage device is held securely at the Bionersis

office in Santiago. Copies of the files will be stored up to two years after the end of the crediting period of the project.

2.5. Managerial responsibilities

The CDM aspects of the project are managed by the Director of Carbon Finance of LFG Carbon Trading SA, based in Belgium. The Director of Carbon Finance supervises the CDM Project Manager who is in charge of validation and verification activities (PDD writing and preparing the monitoring report). It is the ultimate responsibility of the Director of Carbon Finance to ensure the content of the monitoring report is correct at the time of requesting issuance.

The monitoring plan is the responsibility of the Monitoring Director of the project, who reports to the Director of Carbon Finance for CDM matters (collection and storage of monitoring data) and to the Chief of Operations for operational matters. The Monitoring Director is accountable for the monitoring activities, the logging and record keeping of all monitored data.

The Maintenance Director supervises the calibration and maintenance procedures.

Maintenance programs are carried out on site by the Field Technician, who also makes sure the

monitoring tools are operating correctly.

Figure 2.5 – Managerial organization

CEO Bionersis S.A. Paris, France

COO Bionersis Chile SA

Santiago, Chile

Director of Carbon Finance LFG Carbon Trading Brussels, Belgium

Maintenance Director Bionersis Chile SA

Santiago, Chile

Monitoring Director Bionersis Chile SA

Santiago, Chile

Field Technician Bionersis Chile SA

On site, Chile

CDM Project Manager LFG Carbon Trading Brussels, Belgium

Page 13: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

13

2.6. Quality assurance and quality control

The monitoring report is the responsibility of the Director of Carbon Finance. As such, he will be allowed to control consistency of monitored data by any means, such as on-site audit, visual control of data existence on the server, cross-checking of data on the server with data provided by the Field Technician and/or the Maintenance Director and/or the Monitoring Director.

Proper management processes and systems records will be kept by the monitoring director. The

auditors can require copies of such records to judge compliance with the required management systems.

2.7. Training of monitoring personnel Employees involved in the monitoring were trained externally (17/12/2007) and internally (20/01/2008) on the following topics:

Review of equipment and captors Calibration requirement Configuration of monitoring equipment Maintenance requirement

2.8. Calibration and maintenance Maintenance includes all preventive and corrective actions that aim at ensuring the good functioning of equipment, for instance:

Functioning check up: visual control of the equipment state and of parameters allowing to identify a malfunctioning,

Registration of operating settings, Cleaning up the equipment and the sensors, Adding lubricant, Replacement and change of defective parts of the dispositive, etc.

Example: maintenance of the flare includes inter alia changing starting electrodes and UV lights, check and clean engine valve, check the insulating ceramics. Calibration of equipment consists in verifying, by comparison with a standard, the accuracy of a measuring instrument. The critical maintenance and calibration frequency and procedures are detailed below:

Page 14: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

14

A) Flow meter The flow meter is subject to a regular maintenance and calibrated once a year by an external certified company.

B) Gas analyzer The gas analyzer is calibrated by comparison with canisters of calibrated gases purchased from a certified gas supplier. This calibration was not done every month as stated in the monitoring plan of the PDD therefore the conservative approach was used (cf. §2.9). The maintenance of the gas analyzer consists in checking filters, ventilation system, thermostat, lights, pipe, emptying the condensate deposit, etc. The maintenance program is performed every week.

C) Temperature and pressure of the LFG The temperature and pressure sensor calibration are calibrated annually.

D) Temperature of the flare The thermocouple will be checked annually by an independent third-party

E) Electricity meters

The reading from electricity meters will be cross-checked annually with the invoices from and the national grid company or fuel supplier. Calibration frequency: every 5 years.

General malfunction of equipment If the equipment (flow meter, gas analyzer, gauge, controller, MemoGraph, etc.) fails, the equipment supplier will be immediately notified. If possible, repairs will be carried out. If the damaged equipment cannot be repaired, it will be replaced at the earliest by the same or an equivalent unit. In some cases, portable tools will be used in order to carry out daily monitoring of the missing parameter(s). This data will be recorded on paper.

2.9. Changes against the PDD: calibration of the gas analyzer The PDD contains a few inconsistencies related to maintenance and calibration frequency and program. For instance, according to sections B.7.1 and B.7.2, the gas analyzer should be subject to a “monthly maintenance”, a “monthly calibration” and an “annual calibration”

Maintenance and calibration: definition and frequency As stated in § 2.8, the gas analyzer is calibrated by comparison with canisters of calibrated gases purchased from a certified gas supplier. This calibration ought to be done at least every 3 months. The maintenance of the gas analyzer consists in checking filters, ventilation system, thermostat, lights, pipe, emptying the condensate deposit, etc. The maintenance program is done every week. Hence, “maintenance” is performed weekly and “calibration” is done quarterly.

Page 15: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

15

Actual implementation Since January 2008 the gas analyzer has been checked as part of a weekly maintenance program. Nevertheless, the gas analyzer was calibrated only on 10/04/2008, 29/08/2008 and 19/09/2008. In order to be conservative and because the PDD was not clear, we have applied a deviation to CER calculations to correct the lack of monthly calibration of the gas analyzer.

Deviation Gas preparation was requested to AGA SA in early January 2008, nevertheless, the gas patron (44.9% CH4 and 46.1% CO2) was received only in March 2008. Hence, the first calibration performed by an external accredited company (High Solutions) took place on April 10. Results show that there is a deviation with respect to the gas certificate. This deviation was applied to the date, taking as reference the calibration date and the error for each calibration report. Therefore, we have applied the following deviations in order to adjust CER calculations for the first monitoring period:

o From 16/17/2007 to 09/04/2008, calculations take into account a percentage of deviation of 5.3%

o From 10/04/2008 to 03/07/2008, calculations take into account a percentage of deviation of 3.1%.

These percentages of deviations can be considered acceptable as we were conservative in applying maximum error for the above-mentioned period.

Page 16: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

16

3. FORMULAS AND PARAMETERS USED FOR CALCULATIONS

3.1. Formulas Emissions reduction (ERy) As specified by the methodology ACM0001 version 5, the CO2e emissions reduction shall be calculated as follows:

ERy = (MDproject,y – MDreg,y) * GWPCH4 + ELy * CEFelectricitry,y − ETy * CEFthermal,y Where: ERy Emission reduction in a given year y, in tonnes of CO2 equivalent (tCO2e) MDproject,y Amount of methane that would have been destroyed/combusted by the project activity

during the year, in tonnes of methane (tCH4) MDreg,y Amount of methane that would have been destroyed/combusted during the year in the

absence of the project, in tonnes of methane (tCH4) GWPCH4 Global Warming Potential value for methane for the first commitment period is 21

tCO2e/tCH4 ELy Net quantity of electricity exported during year y, in megawatt hours, in MWh CEFelectricity,y CO2 emissions intensity of the electricity displaced, in tCO2e/MWh ETy Incremental quantity of fossil fuel, defined as difference of fossil fuel used in the

baseline and fossil fuel used during project, for energy requirement on site under project activity during the year y, in TJ

CEFthermal,y CO2 emissions intensity of the fuel used to generate thermal/mechanical energy, in tCO2e/TJ

No energy is produced in the project activity, and since there is no methane destroyed for electricity or thermal energy generation, all the methane destroyed is the one destroyed by flaring, the above formulae can be simplified as follows:

ERy = (MDflare,y – MDreg,y) * GWPCH4 Methane destroyed by flaring (MDflare) MDflare,y = (LFGflare,y * wCH4 * DCH4) – (PEflare,y / GWPCH4) Where: LFGflare,y Quantity of landfill gas flared during the year measured in cubic meter (Nm3) wCH4 Average methane fraction of the landfill gas (m3CH4/m3LFG) DCH4 Methane density in tCH4/m3CH4 PEflare,y Project emissions resulting from flaring of the residual gas stream in year y (tCO2)

Page 17: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

17

GWPCH4 Global warming potential of methane (tCO2/tCH4) Methane destroyed in the absence of the project (MDreg) MDreg,y = MDflare * AF Where AF is an adjustment factor set to 4%. Project emissions resulting from flaring (PEflare,y) During the considered monitoring period, continuous monitoring of the methane destruction efficiency of the flare (flare efficiency ηflare,h) was not available; hence we have applied the following default values, in accordance with the Tool to determine project emissions from flaring gases containing methane:

0% if the temperature in the exhaust gas of the flare (Tflare) is below 500 °C for more than 20 minutes during the hour h.

50%, if the temperature in the exhaust gas of the flare (Tflare) is above 500 °C for more than 40 minutes during the hour h, but the manufacturer’s specifications on proper operation of the flare are not met at any point in time during the hour h.

90%, if the temperature in the exhaust gas of the flare (Tflare) is above 500 °C for more than 40 minutes during the hour h and the manufacturer’s specifications on proper operation of the flare are met continuously during the hour h.

The manufacturer’s specifications that is applied is the condition on LFG flow: LFGflare,h > 40 m3/h. A 90% flare efficiency is the only value that happened to apply during the crediting period. Project emissions resulting from electricity consumption (PEPR,y) Electricity supply to Leña Dura, comes from diesel generators. According to methodology AMS-I.A, a default emission factor (EFCO2 or CEFelectricity) of 0.8 tCO2/MWh can be applied to calculate project emissions resulting from electricity consumption. PEPR,y = ELPR,y * CEFelectricity Where: ELPR,y Quantity of electricity consumed by the project activity during year y (in MWh) CEFelectricity CO2 emission factor for diesel generator systems (in tCO2/MWh)

Page 18: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

18

3.2. Parameters Fixed parameters applied

Parameter Description Value Unit Source

GWPCH4 Global warming potential of CH4 21 tCO2e / tCH4 IPCC 2006 guidelines

CEFelectricity,y

CO2 emissions intensity of the electricity consumed by the project activity – electricity produced by a diesel generator

0.8 tCO2e/MWh

Methodology AMS-I.A

DCH4 Density of methane 0.0007168 tCH4/m3CH4 Default

AF Adjustment factor 4 %

Legal report on regulatory requirements and on-site inspection

Monitored parameters included into emission reductions calculations

Parameter Description Unit Source

LFGflare,y Quantity of landfill gas flared during the year y measured in cubic meter

Nm3 Flow meter

wCH4 Average methane fraction of the LFG % (m3CH4/m3LFG) Gas analyzer ηflare,h Flare efficiency % Thermocouple

ELPR,y Quantity of electricity consumed by the project activity during year y

MWh Electricity meter

Other monitored parameters

Parameter Description Unit Source Tgas Temperature of the LFG C° Thermometer P Pressure of the LFG mBar Pressure sensor O2 Concentration of oxygen in LFG % (m3O2/m3LFG) Gas analyzer

Regulatory requirements relating to landfill gas projects

Laws and

regulations

Page 19: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

19

4. MONITORED AND CALCULATED DATA

4.1. Monitored data Regulatory requirements regarding landfill gas projects Chilean regulations regarding biogas management have been screened in January 2008 and July 2008. In January 2008, there were no regulations related specifically with landfill management. A new relevant administrative regulation was enacted in July 2008 by Supreme Decree n°189 of 2005. The decree includes interalia new procedures to obtain sanitary permits to develop landfill projects and the obligation to include a landfill gas management system to ensure safety conditions within landfill and surrounding places. Memograph The data collected by the MemoGraph are displayed via ReadWin2000, with a precision of a minute. Though, for practical reasons, monitored data of the period cannot be nested in the monitoring report (table exceeds 130,000 lines), an example of the Memograph output is presented below for 2 minutes: Table 4.1 - Example: Leña Dura, 1st March 2008 00:00:00 and 00:01:00

Date Time State Pressure (mbar)

CH4 (%)

Flow (Nm3/h)

O2 (%) Tflare (°C) Tgas (°C)

01/03/08 00:00:00 OK 26 39.6 325.2 1.8 1,117 37

01/03/08 00:01:00 OK 27 39.5 326.8 1.8 1,108 37

4.2. Calculated data Methane destroyed by the project activity: MDflare The average methane fraction of the landfill gas in the hour h (wCH4,h) is calculated from the average methane fraction of the landfill gas every minute compounded with the LFG flow in the same minute. LFGflare,h is the average flow of LFG in the hour h. For practical reasons, only 2 examples are presented in the table below: Table 4.2 - Example: Leña Dura, 1st March 2008 0:00 and 1:00

Date/Time wCH4,h (%) LFGflare,h (m3) ηflare,h MDflare,h (tCH4) =

LFGflare,h*WCH4,h*ηflare,h *DCH4

01/03/2008 0:00 39.6 325.8 0.9 0.078

01/03/2008 1:00 39.5 321.5 0.9 0.076

Page 20: REGIONAL LANDFILL PROJECTS IN CHILE - netinform - Monitoring report... · CDM Monitoring report - VER+ Project 1435 Regional ... monitoring and control systems to measure the

CDM Monitoring report - VER+ Project 1435 Regional landfill projects in Chile

20

Electricity consumed by the project activity: ELPR,y The quantity of electricity consumed during the period is determined through a physical check on the electricity meter Emission reductions: ER As stated in the above formulae in paragraph 3.1, the emission reductions are calculated as follows: Table 4.3 - Example: Leña Dura, March 2008

MDproject (tCH4) MDreg (tCH4) PEPR (tCO2e) Leakage Total emission reductions (tCO2e)

MDproject = MDflare MDreg = MDproject*AF PEPR = ELPR * CEFelectricity

N/A ERy = (MDproject – MDreg)*GWPCH4 –

PEPR

56.32 2.25 3.02 0.00 1,132.31

4.3. Calculation results

Emissions reductions (tCO2e)

Leña Dura Lajarilla Viñita Azul

16/12/2007 – 31/12/2007 231 0 0 01/01/2008 – 31/01/2008 933 0 0 01/02/2008 – 29/02/2008 968 0 0 01/03/2008 – 31/03/2008 1,132 0 0 01/04/2008 – 30/04/2008 1,152 0 0 01/05/2008 – 31/05/2008 1,165 0 0 01/06/2008 – 30/06/2008 1,145 0 0 01/07/2008 – 03/07/2008 101 0 0 Total emissions reductions monitoring period 6,827 0 0