19
Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009 1 Scanning Report from Salerno • Brick scanning overview • Pending Events • An Interesting Event • Conclusions

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009 1 Scanning Report from Salerno Brick scanning overview Pending Events An Interesting

  • View
    216

  • Download
    1

Embed Size (px)

Citation preview

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

1

Scanning Report from Salerno

• Brick scanning overview

• Pending Events

• An Interesting Event

• Conclusions

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

2

Bricks

Delivered Scanning Started

NotConnected

LocatedPass/

Edge outDeadMaterial

Doing/Pending

CC 79 75 1 55 6 2 12*

NC 13 13 1 7 2 0 4**

Total 92 88 2 62 8 2 16

Brick Scanning Summary

More details in the next slides

* Brick 58076 not connected

** Brick 45758 not connected

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

3

CC Events

Muon on CS Located Pass\Edge Dead Material Doing/Pending Not Started

Yes 53 41 6 2 3 1

No 22 13 0 0 7 2

Black CS 4 1 0 0 2 1

Total 79 55 6 2 12 4

NC Events

NC Event Located Pass\Edge Doing/Pending Not Started

At least one SB track 12 7 2 3 0

Black CS 1 0 0 1 0

Total 13 7 2 4 0

Brick Scanning Summary

Not started: 1 damaged brick, 1 black CS, 2 CS-brick connection in progress

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

4

Pending/Doing

CC EventsType of study Number f bricks

SB of candidate found 2

Total Scan 2

Dedicated scanning for candidate search 5 (2 Black CS)

Under study 2*

3 / 4 requested 1

Total 12

* More details in next slides

NC EventsType of study Number f bricks

Dedicated scanning for candidate search 1 ( Black CS)

Total Scan OK, studying reconstruction 1

3 / 4 requested 2

Total 4

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

5

Scanning Report from Salerno

Some Problematic Events

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

6

Problematic Events – Brick 146712

Events 236738649 - Brick 146712 – Fog 8 grains/1000 m3

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

7

Candidate found on CS : 5 (no Muon found )

Candidate connected : 4

XZ View

‘Fake’ SB stop – Path 6

Missing segments reconstructed in Total Scan

(using microtracks!)

Restart with another SB to check the track is a passing

through

Tracks possibly correlated to event.

Total Scan performed, short tracks, checking reconstruction (wide

angle + short tracks, high background)

Problematic Events – Brick 146712

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

8

It seems that Path 6 crosses muon in upstream brick

We are scanning a 2 cm2 zone from plate 6

to plate 1

The scanning zone is chosen taking into

account the predicted position of the muon.

Problematic Events – Brick 146712

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

9

Problematic Events – Brick 94673

Events 238099347 - Brick 94673 – Fog 10 grains/1000 m3

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

10

Problematic Events – Brick 94673

Candidate Found on CS : 20 (one of which is flagged as possible muon).

Muon candidate is not found on PL 57-50

CS Muon candidate

We started with a shower search

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

11

Problematic Events – Brick 94673

Hint for shower in the CS candidates

Human-assisted TotalScan, plates 5733: 1 cm2 around shower axis,reconstruct every 10 plates, check for shower/vertex

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

12

Problematic Events – Brick 94673

Tilted XY

EM activity

Muon not found at vertex, but event looks like a high-energy one

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

13

Problematic Events – Brick 94673

Maybe secondary interaction found

More study needed to restart muon search

None of the tracks found can be the

muon

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

14

Scanning Report from Salerno

An Interesting Event

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

15

Interesting Events

Events 227114419 Brick 142310 – Fog 10 grains/1000 m3

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

16

Interesting Event – Brick 142310

Candidate Found on CS : 11 (no Muon found)

We started with a shower search

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

17

Interesting Event – Brick 142310

Hint for shower in the CS candidates

Human-assisted TotalScan, plates 5744: 1 cm2 around shower axis,reconstruct every 10 plates, check for shower/vertex

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

18

Interesting Event – Brick 142310

Tilted XY

Muon found at primary vertex

EM activity

XZ View

Muon

CS Candidates

Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr 2009

19

Conclusions

Scanning restarted

Training 1 more scanner (young student)

Feedback/Publication restarting next week

Salerno data will be the “crash test dummies” to test schema upgrades in Central DB

Scanforth performed whenever applicable

Momentum estimation with likelihood-based algorithm (see last Phys. Coord.) performed whenever applicable (also re-evaluating old momentum measurements) – waiting for soft muon dataset for fine tuning