robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 1 of 1

Reference List

Enclosed you receive a survey of plants generated by

robecco.

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 2 of 2

HOLCIM, Holderbank Vessel 3,0/80 April 2000 BELOIZVORSKI CEMENT Inerting system Bulgaria Controlling inertizing vessel and valve station, engineering KRUPP POLYSIUS, Beckum Vessel 1,5/80 August 2000 FUJAIRAH CEMENT DIBCOM Inerting system Dubai Controlling inertizing vessel and valve station, engineering LOESCHE, Düsseldorf Vessel 3,0/80 May 2001 CURICO COAL – Chile Inerting system Controlling inertizing vessel and valve station, engineering CLAUDIUS PETERS, Buxtehude Vessel 3,0/80 August 2001 CEMENTARNA TRBVOLJE Inerting system Slowenia Controlling inertizing vessel and valve station, engineering ALTMAYER, Rehlingen Vessel 5,0/80 August 2001 RWE RHEINBRAUN Inerting system POWER PLANT Niederaußem Controlling inertizing vessel and valve station, engineering LOESCHE, Düsseldorf Vessel 5,0/80 December 2001 TITAN CEMENT SALONIKI Inerting system Greece Controlling inertizing vessel and valve station, engineering LOESCHE, Düsseldorf Vessel 5,0/80 December 2001 NASICE CEMENT – Croatia Inerting system Controlling inertizing vessel and valve station, engineering ALTMAYER, Rehlingen Vessel 5,0/80 December 2001 HEIDELBERGCEMENT Inerting system ZLATNA PANEGA - Bulgaria Controlling inertizing vessel and valve station, engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 3 of 3

CLAUDIUS PETERS, Buxtehude Vessel 10,0/80 December 2001 Controlling inertizing vessel Inerting system and valve station, engineering ALTMAYER, Rehlingen Vessel 5,0/80 January 2002 HEIDELBERGCEMENT Inerting system ISTRA CEMENT PULA Croatia Controlling inertizing vessel and valve station, engineering KRUPP POLYSIUS, Beckum Vessel 5,0/80 March 2002 LAFARGE KUJAWY – Poland Inerting system Controlling inertizing vessel and valve station, engineering STADTWERKE NÜRNBERG Valve station March 2002 SLUDGE DRYING PLANT Inerting system Controlling inertizing and valve station, engineering gasanalyzing system HOLCIM, Holderbank Vessel 5,0/80 April 2002 CIMUS – Romania Inerting system Controlling inertizing vessel and valve station, engineering KRUPP POLYSIUS, Beckum Battery 48/30 April 2002 URUMINCOM – Argentina Inerting system Controlling inertizing battery and valve station, engineering IMSAT, Bukarest vessel 5,0/80 April 2002 LAFARGE JCF FUHAIS vessel 3,0/80 Jordan Inerting system Controlling inertizing vessel and valve station, engineering IMSAT, Bukarest vessel 5,0/80 April 2002 LAFARGE JCF RASHADIYA Inerting system Jordan Controlling inertizing vessel and valve station, engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 4 of 4

HOLCIM, Holderbank Vessel 5,0/80 April 2002 ALCIM – Romania Inerting system Controlling inertizing vessel and valve station, engineering ALTMAYER, Rehlingen Vessel 10,0/80 August 2002 HEIDELBERGCEMENT Inerting system AKCANSA BUYUCEKMECE Turkey Controlling inertizing vessel and valve station, engineering SHARR, Skopje Vessel 3,2/80 August 2002 SHARR CEMENT – Macedonia Inerting system Controlling inertizing vessel and valve station, Engineering CLAUDIUS PETERS, Buxtehude Vessel 5,0/80 September 2002 HEIDELBERGCEMENT Kakanj Inerting system Bosnia Controlling inertizing vessel and valve station, Engineering KHD, Köln Battery 78/20 October 2002 JIANGXI II - China Inerting system Controlling inertizing battery and valve station, Engineering CLAUDIUS PETERS, Buxtehude Battery 120/20 October 2002 JIANGXI II - China Inerting system Controlling inertizing battery and valve station, Engineering LAS CEMENTAS NAT., Vessel 5,0/80 October 2002 Guayaquil Inerting system Cement Works – Ecuador Controlling inertizing vessel and valve station, Engineering GEBR. PFEIFFER, Kaiserslautern Battery 78/30 October 2002 KOHAT – Pakistan Inerting system Controlling inertizing battery and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 5 of 5

LOESCHE, Düsseldorf vessel 5,0/80 November 2002 TITAN CEMENT KOSJERIC Inerting system Serbia Controlling inertizing vessel and valve station, Engineering CEMENTOWNIA, Opole valve station February 2003 HEIDELBERGCEMENT Inerting system GORAZDZE - Poland Controlling inertizing vessel and valve station, Engineering CLAUDIUS PETERS, Buxtehude vessel 10,0/80 March 2003 RMC DALMACIJ CEMENT Inerting system Croatia Controlling inertizing vessel and valve station, Engineering GEBR. PFEIFFER, Kaiserslautern vessel 5,0/80 May 2003 CEMENTAS BALBOA – Spain Inerting system Controlling inertizing vessel and valve station, Engineering LOESCHE, Düsseldorf vessel 10,0/80 May 2003 LAFARGE BEOCIN – Serbia Inerting system Controlling inertizing vessel and valve station, Engineering LOESCHE, Düsseldorf vessel 5,0/80 May 2003 HOLCIM NOVI POPOVAC Inerting system Serbia Controlling inertizing vessel and valve station, Engineering LOESCHE, Düsseldorf 2 x N2-packs + valve stat. May 2003 HOLCIM NOVI POPOVAC Inerting system Serbia Controlling inertizing N2-packs and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 6 of 6

STANDARD KESSEL, Duisburg N2-valve station July 2003 Bio power plant, Ulm Inerting system Controlling inertizing vessel and valve station, Engineering, gasanalyzer system CEMAG Anlagenbau, Hameln Battery 120/30 October 2003 FAUJI CEMENT – Pakistan Inerting system Controlling inertizing battery and valve station, Engineering CEMAG Anlagenbau, Hameln Battery 120/30 October 2003 ASKARI CEMENT Inerting system Pakistan Controlling inertizing battery and valve station, Engineering LOESCHE, Düsseldorf vessel 5,0/80 November 2003 NUH CEMENT Hereke 5 Coal Inerting system Turkey Controlling inertizing vessel and valve station, Engineering KRUPP POLYSIUS, Beckum vessel 3,0/80 December 2003 MIDLAND CONSTRUCTION Inerting system CORP Da Nang plant – Vietnam Controlling inertizing vessel and valve station, Engineering KRUPP POLYSIUS, Beckum valve station December 2003 CEMENTAS La Robla plant, Inerting system Spain Controlling inertizing and valve station, Engineering CEMEX, Manila vessel 5,0/80 December 2003 SOLID CEMENT CORP Inerting system Makati City – Philipines Controlling inertizing vessel and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 7 of 7

STANDARD KESSEL, Duisburg N2-valve station January 2004 Bio power plant, Elsterwerda Inerting system Controlling inertizing battery and valve station, Engineering, gasanalyzersystem AJOtec, Freudenberg vessel 1,5/80 March 2004 MAN power plant, Nuremberg Inerting system Controlling inertizing vessel and valve station, Engineering gasanalyzersystem CEMENTO ANDINO, vessel 10,0/80 April 2004 New Coal Mill Kiln 2 – Peru Inerting system Controlling inertizing vessel and valve station, Engineering SALONIT ANHOVO vessel 5,0/80 August 2004 New Coal Mill – Slovenija Inerting system Controlling inertizing vessel and valve station, Engineering SILOBAU THORWESTEN, vessel 15,0/80 August 2004 Beckum Inerting system HEIDELBERGCEMENT, Schelklingen Controlling inertizing vessel and valve station, Engineering MÄRKER ZEMENT, Harburg vessel 10,0/80 September 2004 Coal grinding plant Inerting system Controlling inertizing vessel and valve station, Engineering MÄRKER ZEMENT, Harburg vessel 1,5/80 September 2004 Limestone plant Inerting system Controlling inertizing vessel and valve station, Engineering GEBR. PFEIFFER, Kaiserslautern vessel 5,0/80 Dezember 2004 READYMIX RIGA – Lettland Inerting system Controlling inertizing vessel and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 8 of 8

ALTMAYER, Rehlingen N2-valve station Dezember 2004 MÄRKER Limestone plant, Inerting system Herrlingen Controlling inertizing and valve station, Engineering PAUL WURTH, Luxembourg N2-valvestation April 2005 Primorec Primus Prozeß plant Inerting system Controlling inertizing vessel and valve station, Engineering FCB.CIMENT, Villeneuve d'Ascq vessel 3,9/25 May 2005 LAFARGE TULA CEMENT, Inerting system Mexico Controlling inertizing vessel and valve station, Engineering LOESCHE, Düsseldorf battery 168/30 September 2005 PENGZHOU COAL – China Inerting system Controlling inertizing battery and valve station, Engineering LOESCHE, Düsseldorf battery 168/30 November 2005 RUICHANG COAL – China Inerting system Controlling inertizing battery and valve station, Engineering POLYSIUS, Beckum vessel 5,0/80 November 2005 La Cruz Azul - Cycna de Oriente Inerting system Mexico Controlling inertizing vessel and valve station, Engineering PEG Engineering, Genf vessel 5,0/80 November 2005 LAFARGE HOPE CEMENT – UK Inerting system Controlling inertizing vessel and valve station, Engineering CEMENTO ANDINO, renovation vessel 10,0/80 February 2006 Old KHD Coal powder silo – Peru + valve station Controlling inertizing vessel Inerting system and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 9 of 9

CEMAG, Hameln vessel 6,8/25 March 2006 Les Ciments du Sahel – Senegal Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 5,0/80 March 2006 THALOFA – Vietnam Inerting system Controlling inertizing vessel and valve station, Engineering GEBR. PFEIFFER, Kaiserslautern vessel 3,0/80 April 2006 CHEKKA II – Lebanon Inerting system Controlling inertizing vessel and valve station, Engineering LOESCHE S A, Johannesburg vessel 3,0/80 April 2006 ANTOFAGASTA – CHILE Inerting system Controlling inertizing vessel and valve station, Engineering CARPATCEMENT, Bucharest vessel 5,0/80 November 2006 HC DEVA CEMENT – Romania Inerting system Controlling inertizing vessel and valve station, Engineering CARPATCEMENT, Bucharest vessel 5,0/80 November 2006 HC BICAZ CEMENT – Romania Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 5,0/80 Dezember 2006 HATIKOM – Vietnam Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum battery 48/30 Dezember 2006 HATIKOM – Vietnam Inerting system Controlling inertizing battery and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 10 of 10

FCB.CIMENT, Villeneuve d'Ascq vessel 3,9/25 January 2007 VINAINCON THAI NGUYEN Inerting system Vietnam Controlling inertizing vessel and valve station, Engineering GEBR. PFEIFFER, Kaiserslautern vessel 10,0/80 January 2007 CIMSA ESKISESHIR – Turkey Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 5,0/80 March 2007 LOMACOM – Argentina Inerting system Controlling inertizing vessel and valve station, Engineering HOFFMEIER, Hamm vessel 5,0/80 July 2007 SEIBEL CEMENT – Germany Inerting system Controlling inertizing vessel and valve station, Engineering CLAUDIUS PETERS, Buxtehude N2-packs + valvestation July 2007 LKAB – Sweden Inerting system Controlling inertizing N2 packs and valve station, Engineering AJOtec, Freudenberg vessel 3,0/80 July 2007 VATTENFALL ALSTOM OXYFUEL Gas Analyzer system Germany Inerting system Powerplant Controlling inertizing vessel and valve station, Engineering, AJOtec, Freudenberg gas analyzer system July 2007 Rheinkalk Inerting system Flandersbach – Germany Lime burning plant Engineering, Controlling SINOMA CBMI, Beijing N2-packs + valvestation July 2007 LAFARGE REZINA – Moldavia Inerting system Controlling inertizing N2-packs and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 11 of 11

AS CEMENT, Bucak vessel 10,0/80 October 2007 KIZILKAYA plant – Türkei Inerting system Controlling inertizing vessel and valve station, Engineering BASTAS CIMENTO, Ankara vessel 5,4/80 October 2007 Baskent plant – Türkei Inerting system Controlling inertizing vessel and valve station, Engineering CTIEC China Triumph, Nanjing vessel 10,0/80 October 2007 HC AKCANCA PLANT – Turkey Inerting system Controlling inertizing vessel and valve station, Engineering GEBR. PFEIFFER, Kaiserslautern vessel 5,4/80 Oktober 2007 BIZERTE – Tunisie Inerting system Controlling inertizing vessel and valve station, Engineering CHRISTIAN PFEIFFER, Liezen vessel 3,0/80 November 2007 CEMEX ANDORRA – Spain Inerting system Controlling inertizing vessel and valve station, Engineering CHRISTIAN PFEIFFER, Liezen vessel 5,4/80 November 2007 CEMEX – Lettland Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 5,4/80 Dezember 2007 DIBER – UAE Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 3,0/80 Dezember 2007 HONDUVER – Honduras Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 5,4/80 January 2008 TEBECOM – Mexico Inerting system Controlling inertizing vessel and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 12 of 12

Altmayer Rehlingen N2-packs + valvestation January 2008 Kröner Stärke, Germany Inerting system Controlling inertizing N2 packs and valve station, Engineering Coal Mill vessel 10.0/80 February 2008 Detmarovice, Czech Republik Inerting system Controlling inertizing vessel and valve station, Engineering KHD, Köln, Germany CO2 Battery February 2008 Bizerte Tunisie Inerting system Controlling inertizing battery and valve station, Engineering AJOtec, Freudenberg Silocontrol February 2008 RWE Power Germany gas analyzer system Power plant Engineering, Silocontrol LOESCHE, Düsseldorf 2x battery 168/40 March 2008 PENGZHOU COAL – China Inerting system Controlling inertizing battery and valve station, Engineering Holcim Campulung, Romania extension CO2 vessel 5.0/80 March 2008 Controlling inertizing battery Inerting system and valve station, Engineering Steinmüller, Berlin N2 valvestation March 2008 VATTENFALL ALSTOM OXYFUEL Gas analyzer system Germany Inerting system Powerplant Controlling inertizing valve station, Engineering, Heidelberger Cement, Romania extension CO2 vessel 5.0/80 April 2008 Carpartcement Inerting system Controlling inertizing battery and valve station, Engineering Holcim Alesd, Romania extension CO2 vessel 5.0/80 April 2008 Controlling inertizing battery Inerting system and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 13 of 13

Carmeuse Belgium vessel 10.0/80 April 2008 Doboy Bosnia Inerting system Controlling inertizing vessel and valve station, Engineering AC Consultores, Spain vessel 3.0/80 April 2008 Cimpor Odessa Ukraine Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 5,4/80 May 2008 BINFHA – Vietnam Inerting system Controlling inertizing vessel and valve station, Engineering Felswerke Germany vessel 5.4/80 May 2008 Kaltes Tal Inerting system Engineering Controlling inertizing system and valve station, Engineering Schenk Process, Darmstadt Gas analyzer system July 2008 Salonit Anhovo, Slowenia Engineering Thorwesten, Beckum Germany Gas analyzer system July 2008 Salonit Anhovo, Slowenia Engineering silo control Loesche, Düsseldorf CO2 valvestation August 2008 RWE Power Germany Inerting system Power plant Engineering, Dosingcontrol valvestation CHRISTIAN PFEIFFER, Liezen 3x valve station August 2008 CEMEX – Lettland Inerting system Controlling inertizing system and valve station, Engineering POLYSIUS, Beckum extension vessel VTC7 August 2008 Kirefa – Senegal new valvestation Controlling inertizing vessel Inerting system and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 14 of 14

CEMEX vessel 5.0/80 October 2008 Philipines Inerting system Controlling inertizing vessel Engineering Lafarge Bamburi ND vessel VTC7 November 2008 Kenia Inerting system Controlling ND inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 5,4/80 Dezember 2008 FAUFA – Pakistan Inerting system Controlling inertizing vessel and valve station, Engineering Intercem Transorga, Oelde vessel 5.4/80 Dezember 2008 Dubai UAE Inerting system Controlling inertizing vessel and valve station, Engineering CHRISTIAN PFEIFFER, Liezen vessel 10/80, Dezember 2008 CEMEX – Poland Gas analyzer system Controlling inertizing vessel Inerting system and valve station, Engineering POLYSIUS, Marseille N2 valve station Dezember 2008 Socofa – Senegal Inerting system Controlling inertizing vessel and valve station, Engineering TWE, Dierdorf Germany Non Woven Production Plant January 2009 TWE Hangzhou, China Complete Controlling Engineering Ostra, Darmstadt Germany N2 valve station February 2009 Märker Zement Herlingen Inerting system Controlling valve station Engineering Felswerke, Goslar vessel 5,4/80 February 2009 Limestone Plant Saal, Germany Inerting system Controlling inertizing vessel, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 15 of 15

KHD, Cologne CO2 battery February 2009 Akmenes – Litauen Inerting system Controlling inertizing CO2 battery and valve station, Engineering Altmayer Rehlingen N2-packs + valve station March 2009 Oettelshofen, Germany Inerting system Controlling inertizing N2 packs and valve station, Engineering SINOMA CBMI, Beijing vessel 5.4/80 March 2009 Titan Cement – Antea, Albania Inerting system Controlling CO2 vessel and valve station, Engineering Felswerke Germany vessel 5.4/80 March 2009 Kalkwerk Saal Inerting system Engineering Controlling inertizing system and valve station, Engineering KHD, Köln battery 48/30 April2009 Akmenes Cemetas – Latvia Inerting system Controlling inertizing battery, Engineering CBMI, Tangshan vessel 5,4/80 April 2009 Titan Cement, Antena plant Inerting system Albania Controlling inertizing vessel, Engineering TWE, Dierdorf Germany Non Woven Production Plant April 2009 TWE Dierdorf Complete Controlling Engineering Thorwesten, Beckum gas analyzer system May 2009 Kirene Senegal Engineering Fives Group FCB, France vessel 10.0/80 May 2009 Hermosillo – Mexico Inerting system Controlling CO2 vessel and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 16 of 16

Schäfer Kalk, Germany vessel 3.0/80 May 2009 Lime burning plant gas analyzer system Controlling CO2 vessel and valve station, Engineering Cement Engineering S.A., CO2 battery June 2009 Switzerland Inerting system CESA Kirene Senegal Controlling inertizing CO2 battery and valve station, Engineering POLYSIUS, Beckum vessel 5,4/80 July 2009 INDOCOM – Indonesia Inerting system Controlling inertizing vessel and valve station, Engineering LOESCHE, Düsseldorf 3 x CO2 battery 168/40 July 2009 PENGZHOU COAL – China Inerting system Controlling inertizing battery and valve station, Engineering POLYSIUS, Marseille France ND vessel VTC July 2009 Cimatfa 1+2, Morocco Inerting system Controlling inertizing vessel and valve station, Engineering Loesche, Düsseldorf CO2 battery 168/30 July 2009 Tianzhen 1 – China Inerting system Controlling inertizing battery and valve station, Engineering Loesche, Düsseldorf CO2 battery 168/30 August 2009 Ruichang 4 – China Inerting system Controlling inertizing battery and valve station, Engineering Loesche, Düsseldorf CO2 battery 168/30 August 2009 Pengzhou 3 – China Inerting system Controlling inertizing battery and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 17 of 17

POLYSIUS, Beckum vessel 5,4/80 August 2009 KRIMFA – Ukraine Inerting system Controlling inertizing vessel and valve station, Engineering HEIDELBERGCEMENT, Georgia gas analyser system August 2009 Rustav Cementi Gas analyser system Engineering HEIDELBERGCEMENT, Georgia gas analyser system August 2009 Kartuli Cementi Gas analyser system Engineering POLYSIUS S.A.S, vessel 4,0/25 September 2009 Aix en Provence Inerting system Cimatfa 2 – Morocco Controlling CO2 vessel and valve station, Engineering SINOMA CBMI, Beijing vessel 5.4/80 September 2009 Nostra Cement – Peks Hungary Inerting system Controlling CO2 vessel and valve station, Engineering POLYSIUS, Beckum vessel 5,4/80 September 2009 HATIFA 2 – Vietnam Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 5,4/80 September 2009 SOHARMUE – Oman Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 5,4/80 September 2009 OHORONGOFA – Namibia Inerting system Controlling inertizing vessel and valve station, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 18 of 18

Thorwesten, Beckum N2-valve station October 2009 Papierfabrik Wuppertal Inerting system Germany Controlling N2-valve station Engineering Christian Pfeiffer, Liezen vessel 10,0/80 October 2009 Sharjah Cement plant – UAE Inerting system Controlling inertizing vessel, Engineering CBMI, Tangshan vessel 5,4/80 November 2009 Nostra Cement Kirayegyhaza Inerting system Hungary Controlling inertizing vessel, Engineering TDCRI, China vessel 10,0/80 January 2010 Tula – Russia Inerting system Controlling inertizing vessel, Engineering Loesche, Düsseldorf battery 168/30 March 2010 XInzhou 2 – China Inerting system Controlling inertizing battery and valve station, Engineering Wopfinger vessel 3,0/80 March 2010 Waldegg – Austria Inerting system Controlling inertizing vessel, Engineering AltmayerBTD vessel 10,0/80 April 2010 RWE – Ibbenbüren Inerting system Controlling inertizing vessel, Engineering CBMI, Tangshan vessel 10,0/80 May 2010 Holcim Garadagh, Inerting system Azerbeijan Controlling inertizing vessel, Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 19 of 19

Thorwesten Vent Silo Control May 2010 Romania Silo Controlling Engineering Natex CO2 vessel June 2010 Ternitz, Austria Inerting System Controlling CO2 vessel Engineering RWE-Power vessel 10.0/80 July 2010 Coal-Terminal Brandenburg inerting system Controlling inertizing vessel and valve station, Engineering Ferromikeli CO2 vessel July 2010 Steel Plant - Kosovo Inerting system Controlling CO2 vessel Engineering Hoffmeier gas analyser system August 2010 Warstein, Germany Gas analyser system Engineering Hoffmeier N2 – valve station August 2010 Warstein, Germany Inerting system Controlling inertizing N2 packs and valve station, Engineering Carmeuse robecco secure center September 2010 Plant Aisemont silo control Belgium Full automatic controlling of inerting plant Carmeuse N2 valve station September 2010 Plant Aisemont - Belgium Inerting system Controlling valve station Engineering Scheuch CO2 valve station October 2010 Cementos Argos, Columbia Inerting system Controlling CO2 valve station Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 20 of 20

Titan Cement robecco secure center December 2010 Thessaloniki robecco G.A.S. Greece Full automatic controlling of inerting plant and silo Gas Analyser System Titan Cement CO2 valve station December 2010 Thessaloniki Inerting system Greece Controlling CO2 vessel Engineering AltmayerBTD CO2 valve station December 2010 Akcanca – Turkey Inerting system Controlling inertizing system, Engineering Walhalla, Lime Stone plant CO2 vessel February 2011 Germany Inerting system Controlling CO2 vessel Engineering Thorwesten Vent robecco G.A.S. March 2011 Walhalla, Lime Stone plant Germany Gas Analyser System Thorwesten Vent robecco secure center March 2011 Trzukawiska robecco G.A.S. Poland Silo Control Full automatic controlling of inerting plant Gas Analyser System Complete Silo Controling Trzuskawica CO2 vessel March 2011 Poland Inerting system Controlling CO2 vessel and valve station Engineering

robecco GmbH

Reference list

Project & Country kind of installation initiation

Date: 01.01.11 page 21 of 21

HeidelbergCement CO2 vessel April 2011 Don Cement - Ukraine Inerting system Controlling CO2 vessel and valve station Engineering Loesche, Düsseldorf CO2 vessel May 2011 Tan Truong – Vietnam Inerting system Controlling CO2 vessel and and valve station, Engineering POLYSIUS, Madrid vessel 3.0,0/80 July 2011 Gragulfa – Mexico Inerting system Controlling inertizing vessel and valve station, Engineering POLYSIUS, Beckum vessel 15,0/80 August 2011 Cementos Progreso – Guatemala Inerting system Controlling inertizing vessel and valve station, Engineering