18
Sydney Football Stadium Redevelopment Stage 2 Environmental Monitoring Summary – September 2020 Author: Cameron Newling Date: 10 October 2020

Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Sydney Football Stadium Redevelopment Stage 2

Environmental Monitoring Summary – September 2020 Author: Cameron Newling

Date: 10 October 2020

Page 2: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 2

Table of contents

1 Vibration Monitoring .............................................................................................................................. 3

1.1 Real time monitoring ...................................................................................................................... 3

1.2 Attended Monitoring ....................................................................................................................... 8

2 Noise Monitoring .................................................................................................................................... 8

2.1 Real time monitoring ...................................................................................................................... 8

2.2 Attended Monitoring ..................................................................................................................... 11

3 Dust Monitoring .................................................................................................................................... 12

3.1 Real Time Monitoring ................................................................................................................... 12

3.2 Dust Deposition Monitoring .......................................................................................................... 17

4 Water Quality Monitoring ..................................................................................................................... 17

Page 3: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 3

1 Vibration Monitoring

1.1 Real time monitoring

1.1.1 Results

Real time vibration monitoring is conducted in 4 locations

- Busbys Bore Shaft 9 – Criteria of 5mm/s

- Busbys Bore Shaft 10 - Criteria of 5mm/s

- SCG Members Stand – Criteria of 3mm/s

- Noble Stand adjacent to Fox Studios Boundary – adopted criteria of 7.5mm/s

Busbys Bore Shaft 9

Page 4: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 4

Busbys Bore Shaft 10

Page 5: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 5

SCG Members Stand

Page 6: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 6

Page 7: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 7

Noble Stand

Page 8: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 8

1.1.2 Discussion

Results were compliant with the relevant criteria during the period. There were a number of short-term

events (less than 3 seconds) that exceeded the trigger levels. After investigation it was determined they were

not attributed to construction activities and were a result of interference with the monitors.

1.2 Attended Monitoring Attended monitoring was not conducted during this period as real time monitors were installed and functional

during the assessed period.

2 Noise Monitoring

2.1 Real time monitoring

Real time monitors are located at the following locations

- Kira Childcare

- North East Boundary near Moore Park Road

The adopted criteria are as per the conditions of the Development Consent below:

Page 9: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 9

C7. All works that generate noise exceeding 75dB(A) LAeq (15mins) are subject to the intra-day respite

periods, as approved by the Planning Secretary in the CNVMP in condition B28

B28e(iv). the following intra-day respite periods (as defined by ICNG) for works exceeding 75dB(A) LAeq(15

mins), unless otherwise agreed with the identified sensitive receivers such as UTS, Kira Child Care Centre

and / or Fox Studios and evidence of the agreement provided to the Planning Secretary, prior to the

commencement of the works:

- in continuous blocks not exceeding 3 hours each with one hour of respite every three hours block;

- scheduling of works outside of the examination time for educational establishments; and

- noise intrusive works commencing after 8am and be undertaken within the approved standard

construction hours.

2.1.1 Results

Kira Child Care Centre

Page 10: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 10

Moore Park Road

Page 11: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 11

2.1.2 Discussion

Works were compliant with the criteria. The predominant source of noise was due to peak hour traffic.

2.2 Attended Monitoring

Attended monitoring was carried out at 4 locations as below

Page 12: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 12

Date Time Location Predicted

Laeq(15)

Result

(Laeq)

Activities Comment

14/09/2020

11:30

E5 77

66.8 Piling, rolling,

excavation works,

hammering (pile

trimming)

Traffic dominant

noise source,

construction works

are audible

14/09/2020

11:12

CC2 74

71.6 Piling, rolling,

excavation works,

hammering (pile

trimming)

Traffic dominant

noise source

14/09/2020

10:54

R6 80 75.3 Piling, rolling,

excavation works,

hammering (pile

trimming)

Traffic dominant

noise source,

construction works

are audible

15/09/2020

14:45

C1 76 71.7 Piling, rolling,

excavation works,

hammering (pile

trimming)

Construction noise

audible

3 Dust Monitoring

3.1 Real Time Monitoring

2 Real time dust monitors are installed on the site

- North eastern boundary near Moore Park Road

- SCG

- Kira Childcare Centre

The criteria and trigger values are as below:

Page 13: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 13

3.1.1 Results

Moore Park Road

Page 14: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 14

SCG

Page 15: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 15

Kira Childcare Centre

Page 16: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 16

Page 17: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 17

3.1.2 Discussion

The were no exceedances of the trigger levels.

3.2 Dust Deposition Monitoring

Gauge ID Location Trigger value

g/m2/month

Result

g/m2/month

Comment

August 2020

DDG1 1 4 Not possible to access gauge for

analysis, will be included in next

report

DDG2 2A 4 6.4 No trigger level events were

recorded by real time monitors

4 Water Quality Monitoring

Water quality monitoring was undertaken in 3 locations in Kippax Lake.

Date Time Location Temp pH

(c)

EC

mS/cm

NTU DO

Mg/L

TDS

g/L

Comment

23/09/2020 13:02 1 (north) 20.59 7.01 0.21 30.80 10.13 0.14 No evidence of

overland flow or

impacts from SFs

project activities.

23/09/2020 13:04 2 (mid) 20.67 6.83 0.20 30.20 7.69 0.13 No evidence of

overland flow or

impacts from SFs

project activities.

Page 18: Redevelopment Stage 2 - Infrastructure NSW · 2020. 10. 20. · hammering (pile trimming) Traffic dominant construction works are audible 15/09/2020 excavation works, 14:45 audible

Environmental Monitoring Summary – September 2020 | 18

23/09/2020 13:06 3 (south) 21.69 6.78 0.20 35.30 7.05 0.13 No evidence of

overland flow or

impacts from SFs

project activities.

29/09/2020 12:49 1 (north) 17.34 7.58 0.22 29.70 11.77 0.14 No evidence of

overland flow or

impacts from SFs

project activities

29/09/2020 12:52 2 (mid) 17.22 7.50 0.21 31.30 8.18 0.14 No evidence of

overland flow or

impacts from SFs

project activities,

very low water

levels

29/09/2020 12:54 3 (south) 18.51 7.48 0.21 63.10 7.49 0.14 No evidence of

overland flow or

impacts from SFs

project activities.

Significant scum

layer