P r o j e c t e n 2 0 1 5 BIIG fi No Flame 446K14 Dakbedekki ngssyst eem conf orm NEN 6050 P r o j e c t : W y m o n d h a m C o l l e g e , Norfolk, U.K. Mastergold flat roof membrane has provided the optimum waterproofing solution for the urgent roof refurbishment on the sports complex at Wymondham College in Norfolk. Our U.K. distributor carried out a full condition survey and found that the original waterproofing was failing, in addition to a significant amount of standing water on the roof due to insufficient falls.They recommended stripping back the roof to the concrete deck and replacing it with a new warm roof incorporating a cut to falls tapered insulation system which would solve the problems of the standing water. Mastergold was chosen due to its suitability for warm roof refurbishment applications. The 20-year warranty was an important factor in the specification, and both roofing contractor and client were impressed with the aesthetics of the charcoal mineral finish.1200m² of Mastergold over a Rapid P Thermo-Adhesive underlay was installed. Type: Refurbishment Y e a r : 2012 M a s t e r g o l d Recent Projects

Recent Projects - iigo.it · Projecten 2015 BIIG® No Flame 446K14 Dakbedekkingssysteem conform NEN 6050 Project: Wymondham College, Norfolk, U.K. Mastergold flat roof membrane has

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Recent Projects - iigo.it · Projecten 2015 BIIG® No Flame 446K14 Dakbedekkingssysteem conform NEN 6050 Project: Wymondham College, Norfolk, U.K. Mastergold flat roof membrane has

Projecten 2015

BIIG® No Flame 446K14

Dakbedekkingssysteem conform NEN 6050

Project: Wymondham College, Norfolk, U.K.

Mastergold flat roof membrane has provided the optimum waterproofing solution for the urgent roof refurbishment on thesports complex at Wymondham College in Norfolk. Our U.K. distributor carried out a full condition survey and found that theoriginal waterproofing was failing, in addition to a significant amount of standing water on the roof due to insufficient falls.Theyrecommended stripping back the roof to the concrete deck andreplacing it with a new warm roof incorporating a cut to falls tapered insulation system which would solve the problems of thestanding water. Mastergold was chosen due to its suitability forwarm roof refurbishment applications. The 20-year warranty was animportant factor in the specification, and both roofing contractor andclient were impressed with the aesthetics of the charcoal mineralfinish.1200m² of Mastergold over a Rapid P Thermo-Adhesiveunderlay was installed.

Type: Refurbishment

Year: 2012

Mastergold