Problem 3.14 - The Molokai Nut Company Production Planning Problem Whole Cluster Crunch Roasted Pounds produced 1000 500 80 200 Min Req'd 1000 400 0 0 Max Needed 500 150 200 Unit Selling Price $5.00 $4.00 $3.20 $4.50 Unit Variable Cost $3.15 $2.60 $2.16 $3.10 Unit Profit Margin $1.85 $1.40 $1.04 $1.40 Total Profit ### Machine Use Minutes required per pound Hulling 1.00 1.00 1.00 1.00 Roasting 2.00 1.50 1.00 1.75 Coating 1.00 0.70 0.20 0.00 Packaging 2.50 1.60 1.25 1.00 Direct Materials Ingredients required per pound Nuts 0.60 0.40 0.20 1.00 Chocolate 0.40 0.60 0.80 0.00

Ragsdale Homework Week 2

Embed Size (px)

Citation preview

Page 1: Ragsdale Homework Week 2

Problem 3.14 - The Molokai Nut Company Production Planning Problem

Whole Cluster Crunch RoastedPounds produced 1000 500 80 200Min Req'd 1000 400 0 0Max Needed 500 150 200

Unit Selling Price $5.00 $4.00 $3.20 $4.50Unit Variable Cost $3.15 $2.60 $2.16 $3.10Unit Profit Margin $1.85 $1.40 $1.04 $1.40

Total Profit $2,913.20

Machine Use Minutes required per pound Used Hulling 1.00 1.00 1.00 1.00 1780 Roasting 2.00 1.50 1.00 1.75 3180

Coating 1.00 0.70 0.20 0.00 1366 Packaging 2.50 1.60 1.25 1.00 3600

Direct Materials Ingredients required per pound Used Nuts 0.60 0.40 0.20 1.00 1016 Chocolate 0.40 0.60 0.80 0.00 764

Page 2: Ragsdale Homework Week 2

Available3600 minutes3600 minutes3600 minutes3600 minutes

Available1100800

Page 3: Ragsdale Homework Week 2

ch3no18

Page 3

Problem 3.18- Valu-Com Electronics Production Planning Problem

HyperLink FastLink SpeedLink MicroLink EtherLinkQuantity Made 500 1000 1500 2250 500Minimum Req'd 500 500 500 500 500

2

1000

Selling Price $189.00 $149.00 $129.00 $169.00 $139.00 Manuf. Cost $136.00 $101.00 $96.00 $137.00 $101.00

Profit Margin $53.00 $48.00 $33.00 $32.00 $38.00

Per Unit RequirementsHyperLink FastLink SpeedLink MicroLink EtherLink

PC Board (sq in) 20 15 10 8 5Resistors 28 24 18 12 16Memory chips 8 8 4 4 6Assembly Hours 0.75 0.6 0.5 0.65 1

Ratio of FastLinks to HyperLinks:

Required FastLink production given HyperLink production:

C8
Linda Leon: Must produce twice as many FastLinks as HyperLinkds
Page 4: Ragsdale Homework Week 2

ch3no18

Page 4

Total Profit

$215,000.00

Used Available60,500 80,000 sq.in.

100,000 100,000 resistors30,000 30,000 chips3,688 5,000 hours

Page 5: Ragsdale Homework Week 2

ch3no20

Page 5

Problem 3.20- Weedwacker Company Make or Buy Problem

Electric GasNumber to Make 30,000 10,000

Number to Buy 0 5,000

Cost to Make $55 $85

Cost to Buy $67 $95 Total Cost $2,975,000

Total Available 30,000 15,000Total Needed 30,000 15,000

Dept Processing Hours Req'd per Unit Used AvailableProduction 0.20 0.40 10,000 10,000 hoursAssembly 0.30 0.50 14,000 15,000 hoursPackaging 0.10 0.10 4,000 5,000 hours

Page 6: Ragsdale Homework Week 2

Problem 3.25- Maintenance Labor Scheduling Problem

Time Period (T.P.) Shift 1 Shift 2 Shift 3 Shift 4 Shift 5 Shift 612 am to 4 am 1 1 4 am to 8 am 1 1 8 am to 12 pm 1 112 pm to 4 pm 1 1 4 pm to 8 pm 1 1 8 pm to 12 am 1 1

90 250 0 175 125 0Total Employees: 640

Employees Assigned to

Shift:

Page 7: Ragsdale Homework Week 2

90 90 0340 215 125250 250 0175 165 10300 300 0125 125 0

Employees Scheduled

Minimum Employees Needed

Surplus Employees Scheduled