Technical Part 4: RadICS Digital I&C Platform Topical Report
RadICS Platform Qualification Test Plan
(Closed Session)
August 30, 2017, Rockville, Maryland
Non-Proprietary
2
Agenda
• Foundational Testing During Development• US Qualification Test Specimen• US Qualification Test Plan• US Qualification Test Elements• US Qualification Test Schedule• Regulatory Alignment• Phase 0 Meeting Follow-up Actions
RPC Radiy
Non-Proprietary
3
Foundational Testing during Development
● RadICS Platform equipment previously qualified to European and US standards– Electromagnetic compatibility tests to IEC 61000-4 series standards and EPRI
TR-102323 (including MIL-STD-461E) in laboratories certified to ISO/IEC17025:2005
– Seismic testing to IAEA NS-G-1.2 (3.43), IEC 60780 (5.3.4.1, 5.3.2), and IEC 60980 (4.1), and IEEE Std 344
– Power fluctuation tolerance requirements testing to IEC 60987 (5.5)
● Previous qualification tests provided good confidence for successful US qualification testing program
RPC Radiy
Non-Proprietary
4
US Qualification Test Specimen
● Equipment to be Tested
● Industrial-grade data acquisition system and test specimen application program will exercise QTS during qualification testing
– Generate a series of known inputs to the QTS – Monitor the corresponding outputs of the QTS
● Correct correspondence between input and output before, during, and after qualification tests and lack of spurious behavior are key
RPC Radiy
– Chassis and Backplane– Logic Modules (LM)– Analog Inputs Modules (AIM)– Discrete Inputs Modules (DIM)– Analog Outputs Modules (AOM)
– Discrete Outputs Modules (DOM)– Optical Communication Modules (OCM)– Equipment Protection Modules for
External Interfaces – Fan Cooling Hardware
Non-Proprietary
5
US Qualification Test Plan (1/5)
● QTS Factory Acceptance Testing– Demonstrate compliance of RadICS QTS and Test System with QTS Specification
● Pre-Qualification Acceptance Testing– Based on EPRI TR-107330 Section
● Radiation Exposure Withstand– Radiation exposure susceptibility analysis to demonstrate no unacceptable degradation
due to expected radiation exposure from normal and abnormal service conditions as required by RG 1.209 and EPRI TR-107330 Section 4.3.6
● Environmental Testing– Based on EPRI TR-107330 Section 4.3.6
● Seismic Testing– Based on EPRI TR-107330 Section 4.3.9
RPC Radiy
Non-Proprietary
6
US Qualification Test Plan (2/5)
● Electromagnetic Compatibility Testing– Based on RG 1.180, Revision 1, and EPRI TR-107330 Section 4.3.7– EMC Emissions Tests to MIL-461E Series Tests
● Electrical Fast Transient Testing– Based on RG 1.180, Revision 1, and EPRI TR-107330 Sections 4.6.2 and 4.3.7
● Surge Withstand Testing– Based on RG 1.180, Revision 1, and EPRI TR-107330 Sections 4.6.2 and 4.3.7)
RPC Radiy
Non-Proprietary
7
US Qualification Test Plan (3/5)
● Electrostatic Discharge (ESD) Testing– Based on Part 4-2 of IEC 61000-4-2
● Class 1E to Non-Class 1E Isolation Testing– Based on IEEE Standard 384-1992 and EPRI TR-107330 Sections 4.6.4 and 6.3.6
● Performance Proof Testing– Following completion of all hardware qualification testing based on EPRI TR-107330,
Section 5.5
RPC Radiy
Non-Proprietary
8
US Qualification Test Plan (4/5)
● Operability Testing– Based on EPRI TR-107330 Sections 5.3 and 5.5– Operability testing is performed at the following: With Pre-Qualification Acceptance Testing At completion of the high temperature, high humidity phase of Environmental Testing At completion of the low temperature, low humidity phase of Environmental Testing At completion of Environmental Testing At completion of Seismic Testing With Performance Proof Testing
RPC Radiy
Non-Proprietary
9
US Qualification Test Plan (5/5)
● Prudency Testing– Based on EPRI TR-107330 Sections 5.4 and 5.5– Prudency testing is performed at the following : With Pre-Qualification Acceptance Testing At completion of the high temperature, high humidity phase of Environmental Testing At completion of Seismic Testing With Performance Proof Testing
RPC Radiy
Non-Proprietary
10
US Qualification Test Schedule
● Radiy will use a qualified laboratory for US RadICS Platform qualification test program
● Testing will supervised by Radiy to ensure proper handling and operation of the RadICS Platform equipment
● Testing is planned for the
RPC Radiy
Non-Proprietary
11
Regulatory Alignment (1/2)
● Environmental qualification testing of the RadICS QTS will be performed in accordance with
– Regulatory Guide 1.209 and IEEE Standard 323-2003– Regulatory Guide 1.152, Revision 3, and IEEE Standard 7-4.3.2-2003– EPRI TR-107330
● Seismic qualification testing will be performed in accordance with Regulatory Guide 1.100 and IEEE Standard 344-1987 to the generic seismic spectra provided in TR-107330
● Electromagnetic compatibility (EMC) qualification testing will be performed in accordance with Regulatory Guide RG 1.180, Revision 1
RPC Radiy
Non-Proprietary
12
Regulatory Alignment (2/2)
● Interested in feedback from NRC on any potential impacts to the RadICS qualification test plan from the ongoing NRC effort to update RG 1.180
● Interested in feedback from NRC on test laboratory selection
RPC Radiy
Non-Proprietary
13
Phase 0 Meeting Follow-up Actions
● NRC staff will check on whether smoke testing is needed to be considered in the EQ program
● RG 1.209 directly speaks to the topic in the discussion (Section B)– However, no specific qualification test requirements were defined as a Regulatory Position
(Section C)– The most effective approach for addressing smoke susceptibility is to minimize the
likelihood of smoke exposure by rigorously adhering to the fire protection requirements in 10 CFR Part 50.48, “Fire Protection,” or other individual plant license commitments.
● NUREG/CR-6579 has the following relevant conclusions:– … there is no practical, repeatable testing methodology so it is not feasible to assess
smoke susceptibility as part of environmental qualification.– In the absence of consensus methods and practices for smoke-tolerant design and
implementation, the most effective approach is to rigorously adhere to the fire protection guidance given in Appendix R of the Code of Federal Regulations, Title 10, Part 50.
RPC Radiy
Non-Proprietary
Thank you for your attention!Research & Production Corporation Radiy29, Geroyiv Stalingrada Street, Kropyvnytskyi 25006, Ukrainee-mail: [email protected]://www.radiy.com