25
The 2016 Continuity Insights and KPMG LLP Global Business Continuity Management (BCM) Program Benchmarking Study The 2016 Continuity Insights and KPMG LLP Global Business Continuity Management (BCM) Program Benchmarking Study

r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

The 2016 Continuity Insights and KPMG LLP Global Business Continuity Management (BCM) Program Benchmarking Study

The 2016Continuity Insights and KPMG LLP Global Business Continuity Management (BCM) Program Benchmarking Study

rnakao
Text Box
Segment Report Steering Committee - YES
Page 2: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

i

Statistics used in this report are based on anonymous survey responses from 349 executives in public and private compa-nies, government agencies and authorities, educational institutions and not-for-profit entities.

The online survey, conducted by Continuity Insights during November 2015 through February 2016, explores changes to the global risk landscape, regulatory requirements and supply chain interdependencies, and compares the programs of organi-zations with a steering committee in place against those without a steering committee in place, highlighting some dramatic differences.

This Report is based on and generated from the KPMG LLP sponsored Survey entitled: The 2016 Continuity Insights and KPMG LLP Global Business Continuity Management (BCM) Program Benchmarking Study.

Research MethodologyRespondents for the 2016 Continuity Insights and KPMG LLP Global Business Continuity Management (BCM) Program Benchmarking Study were obtained from the Continuity Insights subscriber base by way of its newsletter, website, email deployments and social media channels, as well as from other professional organizations that supported the study. The 25-minute online survey included 47 questions and was fielded from November 2015 through February 2016. Information was collected from 349 respondents, of which 305 respondents completed the entire survey.

The information contained herein is of a general nature and is not intended to address the circumstances of any particular individual or entity. Although Continuity Insights endeavor to provide accurate and timely information, there can be no guar-antee that such information is accurate as of the date it is received or that it will continue to be accurate in the future. No one should act on such information without appropriate professional advice after a thorough examination of the particular situa-tion. For more information on the study methodology, please contact Robert Nakao at [email protected].

About Continuity InsightsContinuity Insights is business continuity from management’s perspective. It speaks directly to the strategic view, embrac-ing the issues and concerns of senior-level managers. With its results-oriented approach, Continuity Insights is a discussion of the “why’s” of business continuity and offers a comprehensive review of the vast continuity landscape. Its audience represents a wide range of businesses and industries, government and other public sector entities, and serves an array of professional disciplines. It’s highly specialized portfolio includes Continuity Insights online/electronic media including its highly-trafficked website, e-Newsletters, webinars, and research project; and its annual Continuity Insights Management Conference and regional events.

About KPMGKPMG LLP, the audit, tax and advisory firm (HYPERLINK “http://www.kpmg.com/us” www.kpmg.com/us), is the U.S. member firm of KPMG International Cooperative (“KPMG International”). KPMG International’s member firms have 145,000 profes-sionals, including more than 8,000 partners, in 152 countries. The KPMG name, logo and “cutting through complexity” are registered trademarks of KPMG International.

KPMG Information Protection and Business Resilience services help clients effectively manage and control corporate infor-mation assets across a broad spectrum of evolving threats and scenarios. Companies today increasingly realize that secu-rity is not a one-time project, but instead a strategy that must be adaptive to changing threats, remain consistent with the organization’s business initiatives, and deliver benefits such as manageability, assurance, and efficiency. We help companies identify their most important information assets, and work with them to develop an effective approach combining technolo-gy and business processes. We work with clients to maximize the value that can be obtained from their data while protecting key business processes, information assets, and the company’s brand and reputation.

To learn more about KPMG’s Information Protection and Business Resilience, please contact:

About This Report

Greg Bell National Practice Leader,Information Protection and Business ResilienceKPMG LLPT: 404 222 7197E: [email protected]

Anthony Buffomante Principal, Advisory Information Protection and Business ResilienceKPMG LLPT: 312 665 1748E: [email protected]

Robbie Atabaigi Manager, Advisory Information Protection and Business ResilienceKPMG LLPT: 404 222 3257E: [email protected]

Page 3: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

ii

AcknowledgmentsContinuity Insights and KPMG LLP would like to acknowledge the following organizations for their contributions in helping raise the awareness — and hence the value — of the 2016 Continuity Insights and KPMG LLP Global Business Continuity Man-agement (BCM) Program Benchmarking Study.

In addition, we would like to acknowledge the subject-matter professionals that took the time to review the survey results and provide their point of view for use in this report, the companion article, and the panel discussion at the 2016 Continuity Insights Management Conference.

Requests for Benchmarking Reports and Key Contact

A number of custom reports are available and can be accessed on the Continuity Insights website. Those custom reports are:

• Annual revenue.

• Entity type (public companies, private companies, government agencies or authorities, and not-for-profits).

• Governance (Entities with an Advisory Steering Committee, Entities with no Advisory Steering Committee).

• Industries (Computers/IT hardware, software and services; Financial services; Government; Healthcare; Manufacturing; Professional services and Utilities).

• Number of employees.

If you would like to request a custom report that has not already been developed and available on the website, please provide the following information to Robert Nakao at [email protected].

• Your name, organization, and e-mail address

• The type of custom report(s) you would like to receive

You will be provided the custom report(s) generally within five (5) business days of the receipt of your request.

• Association Of Contingency Planners (ACP)

• Association Of Sacramento Area Planners (ASAP)

• BC Management

• BCI-USA

• Business Continuity Institute (BCI)(UK)

• Business & Industry Council For Emergency Planning & Preparedness (BICEPP)

• Business Resumption Planners Association (BRPA)

• Canadian Security Partners’ Forum

• Contingency Planners Of Ohio (CPO)

• Contingency Planning Exchange (CPE)

• Continuity Central

• Disaster Recovery Journal (DRJ)

• Disaster Resource Guide

• Forbes Calamity Prevention (Singapore/Asia)

• Global Conference On Disaster Management

• Mid Atlantic Disaster Recovery Association (MADRA)

• New England Disaster Recovery Information Exchange (NEDRIX)

• Risk & Insurance Management Society (RIMS)

• Rothstein Business Survival

• Southeastern Business Recovery Exchange (SEBRE)

• Southeastern Contingency Planners Association (SCPA)

Page 4: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Yes 54.01%

No 45.99%

Total 100.00%

Aerospace/Defense 2.67%

Automotive 0.00%

Biotechnology 0.53%

Chemical/Petroleum 0.00%

Communications/Media 0.00%

Computer/Information Technology

Telecommunications 3.74%

Computer/Information Technology Software 2.14%

Computer/Information Technology Services 2.14%

Education 4.28%

Entertainment/Media 0.53%

Financial Services – Banking 17.65%

Financial Services – Brokerage 1.60%

Financial Services – Credit Card 0.53%

Financial Services – Investment 5.35%

Utilities 0.53%

Government 6.42%

Healthcare Medical – Hospital 0.53%

Healthcare Medical – Service Provider 2.14%

Insurance 11.76%

Manufacturing - Consumer Goods 2.67%

Manufacturing - Industrial Goods (Non-technology)1.60%

Manufacturing - Medl Devices/Other 0.53%

Not for Profit Organization 1.60%

Pharmaceuticals 1.60%

Power (Oil and Gas) 1.60%

Power (Generation/Transmission) 1.07%

Professional Services (Business Continuity/Operational

Risk Consulting) 6.42%

Professional Services (Other) 4.81%

Retail 2.14%

Transportation – Aviation 0.53%

Transportation – Mass Transit 0.00%

Transportation – Shipping 0.53%

Transportation - Trucking 1.07%

Utilities 4.81%

Wholesale Distributors 1.07%

Other (Please indicate industry) 5.35%

Total 100.00%

Less than 25 10.16%

25 to < 100 1.60%

100 to < 500 8.56%

500 to < 1,000 6.42%

1,000 to < 5,000 23.53%

5,000 to < 10,000 14.44%

1. Does your enterprise use survey results to generate or enhance executive support for your Business Continuity Management (BCM)

Program?

2. Which best describes your primary type of industry?  (Select only one response)

3. How many people are employed by your organization (at all locations)?  (Select only one response)

Page 1

Page 5: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

10,000 to < 20,000 10.16%

20,000 or more 25.13%

Total 100.00%

Public company 41.18%

Privately-held company 36.90%

Government agency or Authority 9.63%

Education 2.14%

Not-for-profit organization 10.16%

Total 100.00%

Local - Single site operation in one location 12.30%

Regional - Multi-site operations in one region of one

country 19.79%

National - Multi-site operations throughout one

country 14.44%

Global - Multi-site operations worldwide 53.48%

Total 100.00%

Yes - Same Building 42.53%

Yes - Same Campus 12.64%

No 44.83%

Total 100.00%

Brazil 1.20%

Canada 5.99%

United States 61.08%

Americas - Other (Specify) 3.59%

Australia 4.19%

Singapore 0.60%

South Korea (Republic of Korea) 0.60%

Taiwan 0.00%

Turkey 0.60%

Asia Pacific - Other (Specify) 3.59%

France 0.60%

Germany 1.80%

The Netherlands 2.40%

Spain 0.00%

Switzerland 1.80%

United Arab Emirates 0.00%

United Kingdom 7.19%

Europe, Middle East, and Africa - Other (Specify)4.79%

Total 100.00%

Less than $10 million 10.70%

$10 million to < $50 million 3.21%

$50 million to < $100 million 3.74%

$100 million to < $500 million 8.56%

4. Which best describes your organization, entity, or enterprise?  (Select only one response)

5. How would you describe the geographical range of your operations?  (Select only one response)

6. Are your headquarters operations AND your primary data center located in the same building or the same campus?

7. If your organization has operations in multiple countries, in what country is your organization’s headquarters located?

8. What is your company’s approximate annual revenue in ($US) for the last fiscal year (FY15)? (Government agencies, please select Not

Applicable)?

Page 2

Page 6: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

$500 million to < $1 billion 7.49%

$1 billion to < $5 billion 19.79%

$5 billion to < $10 billion 9.09%

$10 billion or more 16.04%

Not Applicable 9.09%

Unknown 12.30%

Total 100.00%

Business Continuity Management or Business

Resilience Management in Business Unit/Site/Support

Group 14.44%

Business Continuity Management or Business

Resilience Management in Corporate Program Office45.99%

Compliance/Internal Audit 2.14%

Consultant/Analyst 4.81%

Crisis Management/Emergency Management 4.81%

Enterprise Risk Management 4.28%

Employee Health and Safety 0.53%

Facilities Management/Real Estate 1.07%

Finance/Accounting 1.60%

Insurance/Liability Management 0.00%

IT Disaster Recovery (IT DR) Planning 6.42%

Legal 0.00%

Security Management 3.21%

Other (Please Define) 4.81%

Corporate Executive 5.88%

Total 100.00%

Less than 1 year 7.49%

1 year to < 3 years 8.02%

3 years to < 5 years 12.30%

5 years to < 10 years 31.02%

10 years to < 20 years 30.48%

20 years or more 6.42%

Unknown 4.28%

Total 100.00%

Address Audit finding(s) 9.42%

Continuity of business operations 24.66%

Customer request or requirement 8.22%

Government regulations/Compliance 15.41%

Lessons learned from other companies who

experienced actual events 9.25%

Lower insurance premiums 2.74%

Reputation 17.12%

Required by law 4.97%

Unique competitive advantage 6.34%

Other (Define) 1.88%

Total 100.00%

9. Which best describes your primary job function?  (Select only one response)

10. How long has the BCM Program been in place in your organization? (Select only one response)

11. What are the primary reasons that your organization has established a BCM Program? (Select all that apply)?

Page 3

Page 7: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Audit findings 13.87%

Benchmarking/comparison to industry norms 9.39%

Maturity modeling 6.50%

Metrics program (including executive reporting)10.98%

Business Continuity performance reviews 10.12%

Business Continuity Plan exercises 18.50%

Service level monitoring 2.60%

Review program capabilities vs. standards 9.10%

Technology recovery test results 12.28%

Cost / Benefit Analysis 3.32%

Other - Please define: 1.16%

N/A - We do not measure BCM Program performance2.17%

Total 100.00%

ISO 22301, NFPA 1600, SOX 404,

BCI

FFIEC / DRII Professional Practices / NFPA 1600

ISO

ISO 22301

CSA Z1600, NFPA 1600, DRI Profession Practices

DRII and BCI

Certified to ISO 22301

ISO22301

NFPA 1600; FEMA COOP

FFEIC / FINRA / SIFMA / 22301

ISO22301, FFIEC

ISO 22301

ISO 22301, NFPA 1600

BCI GPG2013, ISO 22301

ISO 22301

Not Applicable

ISO 9000, SSAE 16

ISO 22301

Not Applicable

ISO 22301, NFPA 1600, FFIEC, Z1600

FFIEC

NA

FEMA CGCs 1 and 2

n/a

None at this time

ISO 22301

ISO 22301

22301

ISO 22301 / BS 25999

N/A

12. How does your organization measure the performance of your BCM Program? (Select all that apply)

• ISO 22301 – International Organization for Standardization, Business Continuity Management requirements / • ISO 31000 – International

Organization for Standardization, Risk Management requirements / • BS25999, British Standards Institution (BSI) / • NFPA1600, National

Fire and Protection Association / • NIST SP 800-34, Contingency Planning Guide for Information Technology Systems / • AS9100 Rev C, SAE -

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations / • SPC.1-2009, ASIS International -

Organizational Resilience: Security, Preparedness and Continuity Management System /

13. In addition to any regulatory requirements that your organization may be required to meet, please list the business continuity

standard(s) that your organization is using to support your BCM Program? Please list standards (Example: ISO 22301, NFPA 1600, FFIEC,

Not Applicable, etc.)

Page 4

Page 8: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

NA

Not Applicable

ISO/SAFR

ISO 22301

None

GOVERNMENT CODE / SECTION 8555-8561 / / Article 15 of the California Emergency Services Act

XXX

FFIEC

ISO 22301

Not Applicable yet

ISO 22301, NFPA 1600,

iso 22301

UAE guidance on BCM

Not Applicable

ISO 22301

ISO 22301

ISO 22301

ISO 22301. BS 11200:2014

FFIEC

Follow ISO22301 principles, and link into ISO27001 & PCI-DSS certifications where applicable.

ISO 22301 / ISO 22313

NFPA 1600, ISO 22301 - though with both we just 'align' to them; we don't try to certify

Implementing ISO 22301

n/a

ISO 22.301, ISO 31000, ISO 22.320 and BSI 25.999

SIFMA, FINRA 4370

ISO 22301

CMU CERT Resilience Management Model

ISO22301

Not sure, I just do some internal reporting for my area.

FFIEC

ISO 22301, ISO22313, ISO27031, BS65000, BS11200

FFIEC, NCUA

ISO 22301

ISO 22301

FFIEC, NIST

NFPA 1600

iso 22301

FFIEC, NFPA, ISO

Not applicable

primarily ISO 22301

ISO 22301

NA

NFPA 1600

Not applicable

ISO 22301

NA

na

22301, 22317, FFIEC

Not applicable

NA /

ISO 22301 / NFPA 1600

NFPA 1600

NIST, ISO 22301

NA

All listed above.

ISO 22301

Individual interviews at various times, depending of nature of job/source nature

ISO 22301

Page 5

Page 9: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Ffiec

DRII Professional Practices

Iso 22301/fema/fsa

None

ISO 22301 PS-Preparedness (Certified)

ISO 22301

ASIS Business Continuity Guidelines, 2005

Not Applicable - just regulatory requirement

ISO 22301

Not Applicable

We used the services of a third party to establish our BCM program. I believe this third party has followed ISO 22301 in setting up our program.

None....

ISO 22301

ISO 22301; NFPA 1600

ISO 22301 / BCI GPG

GPG2013

ISO 22301

ISO 22301, NFPA,

N/A

NFPA 1600

We are too new and are researching all we should follow.

ISO 22301

Unknown

not applicable

ISO 22301

NA

ISO and NFPA

FFIEC

ISO 22301, NFPA 1600, FFIEC, NIST 800-34, ASIS SPC.1-2009, ASIS/BSI BCM.01

ISO 22301 & NFPA 1600

NCUA, FFIEC

ISO9001

Iso 22301

Not applicable

ISO 22301, plus CMS 422.504 and 423.505 which are mandated for any organizations working with Medicare or Medicaid.

FFIEC

DRII Professional Practices; DRII/DRJ Business Continuity Planning Model; FFIEC; ISO22301

NFPA 1600, HIPAA, HL7

N/A

Not applicable

unknown

Continuity 2.0; RPC (Resource, Procedures, Capabilities) Model

Public Law 110-53, NFPA 1600, BSI25999 and ASIS International 12009

ISO 22301

non applicable

N/A

Not applicable

We use ISO 22301

Not applicable

NFAP 1600

ISO 22301 /

ISO22301, BCI Good Practices

NIST

ISO22301, HIPAA

Iso27001, ISAE

ISO 22301:2012

None

ISO 9000

ISO 22301

Page 6

Page 10: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

N/A

n/a. we do benchmark several

DRII, BCI, ISO NERC-CIP

ISO 22301 and related standards; BCI GPG

ISO 22301, 22313, 22317, 27031, NFPA 1600, NFPA 99, JCI.

nothing special

ISO 22301

DRII

ISO23301

NOT APPLICABLE

Na

na

No standards. But the framework includes areas covered by some of these standards

FFIEC

Don't know

ISO 9001, NFPA,

ISO 22310, GPG 2013

Not Applicable

FFIEC and all local country regulations

ISO 22301

NFPA 1600, DRI 10 PP's

FFIEC

ISO22301

FINRA

ISO 22301

Not Applicable - just business resumption that works for us.

FFIEC

ISO 22301

ISO 23001

N/A

Federal mandates (FCD1, FCD2)

Primarily ISO 22301, FFIEC, IS0 27001. / / Also reference: Good Practice Guidelines (GPG), DRII

N/A

NFPA 1600

ISO 22301, NFPA 1600, DRII, BCI

Awareness Program 9.49%

Business Continuity Plans 10.51%

Communications 28.81%

Crisis/Emergency Management Plans 17.97%

IT Disaster Recovery Plans 4.75%

Plans are in development 3.05%

None 21.02%

Not sure 4.41%

Total 100.00%

Full Time 79.68%

Part Time 16.04%

No 4.28%

Total 100.00%

14. Is your organization utilizing social media in any of the following plans? (Check all that apply)

15. Does your organization have a designated full time or part time lead BCM Program Coordinator authorized to administer and keep

the BCM Program current? (Select only one response)

Page 7

Page 11: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Yes 100.00%

No 0.00%

Total 100.00%

CEO/President 8.02%

Chief Financial Officer 1.60%

Chief Information Officer 2.67%

Chief Operating Officer 2.67%

Chief Risk Officer 1.07%

Chief Security Officer, VP/Director 1.07%

Director, Business Continuity Management or Business

Resilience 20.32%

Director, Information Technology 2.67%

Director or Manager, Risk Management 9.09%

Manager, Business Continuity Management or Business

Resilience 17.11%

Manager, Information Technology 2.67%

Vice President, Business Continuity Management or

Business Resilience 8.02%

Vice President, Information Technology 0.53%

Vice President, Risk Management 2.14%

Specific Department Director / Manager. Please

identify the business function (name of department):6.95%

Other (please enter job title) 13.37%

Total 100.00%

CEO 14.44%

Chief Administrative Officer 5.35%

Chief Compliance Officer 3.74%

Chief Financial Officer 8.02%

Chief Information Officer 14.44%

Chief Information Security Officer 3.74%

Chief Operating Officer 12.83%

Chief Risk Officer 12.83%

Chief Security Officer, VP/Director 4.81%

Chief Technology Officer 3.21%

General Counsel 2.14%

President 3.21%

Other C-Level Executive (Please identify the

corporate/executive management title) 11.23%

Total 100.00%

Business Continuity Management specific certifications

from the Business Continuity Institute (CBCI/DBCI,

AMBCI, MBCI, AFBCI, FBCI)26.54%

16. Does your organization have a Senior Management Advisory or Steering Committee that provides input and assistance to the lead

BCM Program Coordinator and BCM Program Coordination Team in the preparation, implementation, evaluation and revision of your

organization’s BCM Program? (Select only one response)

17. Which best describes the job title of the lead BCM Program Coordinator? (Select only one response)

19. Please identify any certifications that your organization seeks from employees that lead your program or have a significant role in

your program: (Select all that apply)

18. Which best describes the C-Level executive with ultimate reporting responsibility for your BCM Program? (Select only one response)

Page 8

Page 12: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Business Continuity Management certified

professionals from the Disaster Recovery Institute

International (ABCP, CFCP, CBCP or MBCP)33.95%

Business Continuity Management certified specialties

from the Disaster Recovery Institute International

(Certified Auditor, Public Sector, Health)5.25%

IT specific certifications (i.e., ITIL, CISSP, CISA, etc.)12.35%

Non-Business Continuity specific certifications (i.e.,

PMP, CIPP, etc.) 10.80%

Other: (Define) 11.11%

Total 100.00%

Less than 1 year 5.88%

1 year to < 3 years 8.56%

3 years to < 5 years 7.49%

5 years to < 10 years 29.41%

10 years to < 20 years 25.13%

20 years or more 14.97%

Do not know 8.56%

Total 100.00%

0 FTEs 9.58%

1 to 2 FTEs 49.10%

3 to 5 FTEs 18.56%

6 to 9 FTEs 7.19%

10 to 20 FTEs 7.78%

More than 20 FTEs 2.40%

I don’t know 5.39%

Total 100.00%

0 FTEs 31.14%

1 to 2 FTEs 23.35%

3 to 5 FTEs 9.58%

6 to 9 FTEs 4.79%

10 to 20 FTEs 7.19%

More than 20 FTEs 13.77%

I don’t know 10.18%

Total 100.00%

0 FTEs 29.34%

1 to 2 FTEs 38.32%

21. For the following question, please estimate the number of Full Time Equivalent (FTE) headcount who are dedicated to your BCM

program in your Corporate Program Office AND in your various Business Units/Functions (including contractors). (cont'd)

Various Business Units/Functions

20. Please identify the number of years of BCM program leadership experience of your BCM Program leader has (Leading a Program):

(Select only one response)

21. For the following question, please estimate the number of Full Time Equivalent (FTE) headcount who are dedicated to your BCM

program in your Corporate Program Office AND in your various Business Units/Functions (including contractors).

Information Technology/Disaster Recovery

21. For the following question, please estimate the number of Full Time Equivalent (FTE) headcount who are dedicated to your BCM

program in your Corporate Program Office AND in your various Business Units/Functions (including contractors). (cont'd)

Crisis Management

Page 9

Page 13: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

3 to 5 FTEs 9.58%

6 to 9 FTEs 4.79%

10 to 20 FTEs 4.79%

More than 20 FTEs 4.79%

I don’t know 8.38%

Total 100.00%

0 FTEs 11.38%

1 to 2 FTEs 46.71%

3 to 5 FTEs 15.57%

6 to 9 FTEs 4.79%

10 to 20 FTEs 4.19%

More than 20 FTEs 7.78%

I don’t know 9.58%

Total 100.00%

Less than $50,000 17.37%

$50,000 to < $100,000 12.57%

$100,000 to < 250,000 20.36%

$250,000 to < $500,000 13.77%

$500,000 to < $1 million 7.78%

$1 million to < $5 million 7.19%

$5 million or more 1.20%

I don’t know 19.76%

Total 100.00%

Less than $50,000 26.35%

$50,000 to < $100,000 10.78%

$100,000 to < 250,000 14.97%

$250,000 to < $500,000 3.59%

$500,000 to < $1 million 4.19%

$1 million to < $5 million 2.99%

$5 million or more 1.80%

I don’t know 35.33%

Total 100.00%

Less than $50,000 32.93%

$50,000 to < $100,000 11.38%

$100,000 to < 250,000 13.77%

21. For the following question, please estimate the number of Full Time Equivalent (FTE) headcount who are dedicated to your BCM

program in your Corporate Program Office AND in your various Business Units/Functions (including contractors). (cont'd)

Corporate BCM Program Office

22. Please estimate the total budget for the staff that is in place across the organization (i.e. in your Corporate Program Office AND in

the organization’s business units and corporate functions (excluding contractors). Use the Total Equivalent Headcount estimates from

your response to the table in the previous question and use estimated loaded salaries, benefits, travel and living expenses (combined).

BCM Program Third-Party Consultants (Include program assessments, improving capabilities, etc.)

22. Please estimate the total budget for the staff that is in place across the organization (i.e. in your Corporate Program Office AND in

the organization’s business units and corporate functions (excluding contractors). Use the Total Equivalent Headcount estimates from

your response to the table in the previous question and use estimated loaded salaries, benefits, travel and living expenses. (cont'd)

Various Business Units/Functions (employees)

22. Please estimate the total budget for the staff that is in place across the organization (i.e. in your Corporate Program Office AND in

the organization’s business units and corporate functions (excluding contractors). Use the Total Equivalent Headcount estimates from

your response to the table in the previous question and use estimated loaded salaries, benefits, travel and living expenses. (cont'd)

Crisis Management (employees)

Page 10

Page 14: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

$250,000 to < $500,000 5.39%

$500,000 to < $1 million 2.99%

$1 million to < $5 million 1.80%

$5 million or more 0.60%

I don’t know 31.14%

Total 100.00%

Less than $50,000 13.77%

$50,000 to < $100,000 15.57%

$100,000 to < 250,000 19.76%

$250,000 to < $500,000 7.78%

$500,000 to < $1 million 3.59%

$1 million to < $5 million 2.99%

$5 million or more 5.39%

I don’t know 31.14%

Total 100.00%

Less than $50,000 41.92%

$50,000 to < $100,000 11.98%

$100,000 to < 250,000 8.98%

$250,000 to < $500,000 1.80%

$500,000 to < $1 million 1.20%

$1 million to < $5 million 1.20%

$5 million or more 1.20%

I don’t know 31.74%

Total 100.00%

Less than $50,000 37.72%

$50,000 to < $100,000 19.16%

$100,000 to < $250,000 14.97%

$250,000 to < $500,000 5.39%

$500,000 to < $1 million 2.40%

$1 million to < $5 million 1.80%

$5 million or more 1.20%

I don’t know 17.37%

Total 100.00%

Less than $50,000 34.73%

$50,000 to < $100,000 15.57%

$100,000 to < $250,000 9.58%

22. Please estimate the total budget for the staff that is in place across the organization (i.e. in your Corporate Program Office AND in

the organization’s business units and corporate functions (excluding contractors). Use the Total Equivalent Headcount estimates from

your response to the table in the previous question and use estimated loaded salaries, benefits, travel and living expenses. (cont'd)

BCM Program Third-Party Consultants (Include program assessments, improving capabilities, etc.)

23. Please estimate individually your organization’s additional budget for the following components o... - BCM Software and Hardware

(Include plan-related document repository and emergency notification solutions)

BCM Software and Hardware (Include plan-related document repository and emergency notification solutions)

23. Please estimate individually your organization’s additional budget for the following components o... - BCM Software and Hardware

(Include plan-related document repository and emergency notification solutions) (cont'd)

Work Area Recovery (Include recovery site costs, third-party service providers, etc.)

22. Please estimate the total budget for the staff that is in place across the organization (i.e. in your Corporate Program Office AND in

the organization’s business units and corporate functions (excluding contractors). Use the Total Equivalent Headcount estimates from

your response to the table in the previous question and use estimated loaded salaries, benefits, travel and living expenses. (cont'd)

Information Technology / Disaster Recovery (employees)

Page 11

Page 15: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

$250,000 to < $500,000 5.39%

$500,000 to < $1 million 2.99%

$1 million to < $5 million 3.59%

$5 million or more 1.80%

I don’t know 26.35%

100.00%

Less than $50,000 15.57%

$50,000 to < $100,000 8.38%

$100,000 to < $250,000 6.59%

$250,000 to < $500,000 13.77%

$500,000 to < $1 million 9.58%

$1 million to < $5 million 8.98%

$5 million or more 5.99%

I don’t know 31.14%

Total 100.00%

Less than $50,000 53.89%

$50,000 to < $100,000 16.77%

$100,000 to < $250,000 5.39%

$250,000 to < $500,000 3.59%

$500,000 to < $1 million 0.00%

$1 million to < $5 million 0.60%

$5 million or more 0.00%

I don’t know 19.76%

Total 100.00%

Less than $50,000 46.71%

$50,000 to < $100,000 16.17%

$100,000 to < $250,000 9.58%

$250,000 to < $500,000 2.99%

$500,000 to < $1 million 1.80%

$1 million to < $5 million 2.99%

$5 million or more 0.00%

I don’t know 19.76%

Total 100.00%

On a case-by-case basis based on individual needs30.54%

As an individual line item in each functional budget18.56%

On a hybrid chargeback basis with a base fee plus

additional usage charges 2.40%

As a percentage of the IT budget 13.17%

23. Please estimate individually your organization’s additional budget for the following components o... - BCM Software and Hardware

(Include plan-related document repository and emergency notification solutions) (cont'd)

BCM Program Exercises (Include planning, conducting exercises, third-party participation, travel and living expenses, etc.)

23. Please estimate individually your organization’s additional budget for the following components o... - BCM Software and Hardware

(Include plan-related document repository and emergency notification solutions) (cont'd)

IT Disaster Recovery Costs (Include hardware, software, internal recovery capabilities, 3rd party service provider fees, etc.)

23. Please estimate individually your organization’s additional budget for the following components o... - BCM Software and Hardware

(Include plan-related document repository and emergency notification solutions) (cont'd)

Training and Awareness Programs (Include internal training and related costs, external training, registration fees, travel and living

expenses for conference attendance, etc.)

24. Which statement best describes how funds are allocated for BCM Program related initiatives? (Select only one response)

Page 12

Page 16: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

As a percentage of the risk management budget16.77%

As a percentage of the individual functional budget5.99%

Other, please briefly describe how funds are allocated

(BCM Funding) 12.57%

Total 100.00%

Business Continuity Management software 19.69%

Business Impact Analysis software 10.72%

Change Management software 7.00%

Emergency Notification software 23.85%

Enterprise GRC (Governance Risk and Compliance)

software 7.88%

Risk Assessment software 7.44%

Microsoft Office Tools (i.e., Word, Excel, etc.) 20.79%

Other (Please specify) 2.63%

Total 100.00%

There is no business continuity management program

in place 2.44%

We are currently in the process of establishing a BCM

Program, defining program governance, scope,

objectives, budgeting and format for plans4.27%

We are currently in the Assessment phase (i.e. Risk

Assessment, Business Impact Analysis, Strategy

Selection, etc.) for the first time in the program’s

lifecycle 4.88%

We are currently developing Business Continuity Plans,

Crisis Management Plans and Disaster Recovery Plans12.20%

We have a BCM Policy, Senior Management Steering or

Advisory Committee, Business Continuity, Crisis

Management and Disaster Recovery Plans in place and

have developed a process for updating those plans on a

regular basis to reflect changes in the business and

lessons learned from exercises, tests or real events76.22%

Total 100.00%

Level 1 (Self Governed) – The state of preparedness is

generally low across the enterprise 3.05%

Level 2 (Supported Self Governed) - Senior

Management may see value in a BCM Program but

they are unwilling to make it a priority at this time10.37%

26. Which statement best describes your organization’s current BCM program status? (Select only one response)

27. In your opinion, how would you rate the maturity of your organization’s program? Please rate on the scale of 1 to 6 as noted.

(Select only one response via drop down menu using definitions that follow)

25. Indicate the BCM Program-related software type packages your organization has implemented or plans on implementing in the next

year. (Select all that apply)

Page 13

Page 17: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Level 3 (Centrally Governed) - A BCM Program Office or

Department has been established which centrally

delivers BCM Program governance and support services

to the business units and other departments within the

organization21.95%

Level 4 (Enterprise Awakening) – Senior management

understands and is committed to the strategic

importance of an effective BCM Program. All business

continuity plans are updated routinely 28.66%

Level 5 (Planned Growth) – A multi-year plan has been

plan has been adopted to “continuously raise the bar”

for planning sophistication and enterprise wide state of

preparedness 26.22%

Level 6 (Synergistic) – Cross functional coordination has

led participants to develop and successfully test

upstream and downstream integration of their business

continuity plans 9.76%

Total 100.00%

Yes 63.80%

No 25.77%

Don’t know 10.43%

Total 100.00%

Yes 70.55%

No 19.02%

Don’t know 10.43%

Total 100.00%

Extremely 19.63%

Very much 38.04%

Somewhat 28.22%

Not at all 6.13%

Not Applicable 7.98%

Total 100.00%

Extremely 27.61%

Very much 42.94%

Somewhat 22.09%

Not at all 3.68%

Not Applicable 3.68%

Total 100.00%

28. Does your organization maintain and foster relationships with external government agencies to ensure the recovery of your

organization during a disaster? (Select only one response)

29. Are mission critical 3rd party service providers required to show evidence they have a viable BCM Program? (Select only one

response)

30. How well integrated is the BCM Program with the following capabilities?

Compliance/Audit

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Corporate Security

Page 14

Page 18: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Extremely 43.56%

Very much 39.88%

Somewhat 11.04%

Not at all 3.07%

Not Applicable 2.45%

Total 100.00%

Extremely 21.47%

Very much 42.33%

Somewhat 26.99%

Not at all 6.13%

Not Applicable 3.07%

Total 100.00%

Extremely 27.61%

Very much 38.65%

Somewhat 25.77%

Not at all 4.29%

Not Applicable 3.68%

Total 100.00%

Extremely 19.02%

Very much 36.81%

Somewhat 35.58%

Not at all 4.29%

Not Applicable 4.29%

Total 100.00%

Extremely 42.33%

Very much 39.88%

Somewhat 14.72%

Not at all 0.61%

Not Applicable 2.45%

Total 100.00%

Extremely 33.74%

Very much 37.42%

Somewhat 23.31%

Not at all 2.45%

Not Applicable 3.07%

Total 100.00%

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Crisis Management

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Enterprise Risk Management

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Facilities/Real Estate Management

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Information Technology Management

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Information Security Management

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Employee Health and Safety

Page 15

Page 19: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Extremely 14.11%

Very much 31.90%

Somewhat 36.81%

Not at all 10.43%

Not Applicable 6.75%

Total 100.00%

Extremely 14.11%

Very much 33.13%

Somewhat 39.26%

Not at all 10.43%

Not Applicable 3.07%

Total 100.00%

Extremely 11.04%

Very much 36.81%

Somewhat 38.65%

Not at all 10.43%

Not Applicable 3.07%

Total 100.00%

Extremely 11.66%

Very much 26.38%

Somewhat 43.56%

Not at all 14.72%

Not Applicable 3.68%

Total 100.00%

Extremely 9.20%

Very much 26.38%

Somewhat 45.40%

Not at all 14.72%

Not Applicable 4.29%

100.00%

In response to business changes 15.34%

Semi-annually 3.07%

Annually 52.76%

Every two years 15.95%

Every three years 5.52%

Never 3.07%

Other (please specify) 4.29%

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Management of Insurance Coverage

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Relationships with Public Authorities (Police, Fire, EMS, Local Emergency Management Agencies, etc.)

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Relationships with Third Party Service Providers (Utilities, Telecommunications, Information Technology Service Providers or Business

Process Service Providers)

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Strategic Planning

30. How well integrated is the BCM Program with the following capabilities? (cont'd)

Strategic Sourcing/Procurement

31. How often does your organization conduct Risk Assessments? (Select only one response)

Page 16

Page 20: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Total 100.00%

In response to business changes 10.37%

Semi-annually 1.22%

Annually 46.95%

Every two years 17.07%

Every three years 6.71%

Never 4.88%

Other (Please specify) 10.37%

Do not know 2.44%

Total 100.00%

Less than $100,000 36.20%

$100,000 to < $500,000 16.56%

$500,000 to < $1 million 7.36%

$1 million to < $5 million 8.59%

$5 million or more 3.07%

Do not know 28.22%

Total 100.00%

Yes 20.86%

No 79.14%

Total 100.00%

Yes 28.83%

No 71.17%

Total 100.00%

Yes 12.88%

No 87.12%

Total 100.00%

Yes 18.40%

No 81.60%

Total 100.00%

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Earthquake

32. How often does your organization conduct a Business Impact Analysis (BIA)? (Select only one response)

33. How much would you estimate business disruptions have cost your organization in both outlays and internal (soft) costs in the past

12 months? Please consider the estimated costs of delayed or cancelled product and service revenues from existing offers as well as

new products and services delayed or cancelled, lifetime cost of lost customers and erosion/loss of brand value. (Select only one

response)

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Fire

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Cyber (i.e. Breach, DoS, etc.)

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans?

Civil Unrest

Page 17

Page 21: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Yes 30.06%

No 69.94%

Total 100.00%

Yes 12.27%

No 87.73%

Total 100.00%

Yes 33.74%

No 66.26%

Total 100.00%

Yes 36.20%

No 63.80%

Total 100.00%

Yes 41.72%

No 58.28%

Total 100.00%

Yes 25.15%

No 74.85%

100.00%

Yes 38.04%

No 61.96%

Total 100.00%

Yes 53.37%

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Power Outage

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

IT Related - Upgrade/Scheduled Outage

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Flood

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Indirectly Due to Supplier Issues or High Profile Neighbor

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

IT Related - Change Management Issue, Data Corruption, Denial of Access, Virus, IT Security, etc.

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

IT Related - Hardware/Software in Production

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

IT Related - Telecommunications (i.e., Voice, Data, Converged, etc.)

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

IT Related - Third Party Service Provider in Production (Hosted Solution)

Page 18

Page 22: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

No 46.63%

Total 100.00%

Yes 11.66%

No 88.34%

Total 100.00%

Yes 61.35%

No 38.65%

Total 100.00%

Yes 7.36%

No 92.64%

Total 100.00%

Yes 11.66%

No 88.34%

Total 100.00%

Yes 19.63%

No 80.37%

100.00%

Within the past six months 46.01%

Within the past year 19.63%

Within the past two years 11.66%

More than two years ago 9.20%

Never 9.20%

Do not know 4.29%

Total 100.00%

Completely 38.04%

Mostly 26.38%

Somewhat 17.79%

Not at all 3.68%

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Privacy

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Severe Weather (i.e., Hurricane, Tornado, Winter Weather, etc.)

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Social Media Related

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Terrorist Attack

36. For the most recent interruption that required you to activate one or more business continuity plans, how well was your recovery

time objectives met? (Select only one response)

34. Has your organization experienced an incident or interruption in the past year that caused you to activate any documented business

continuity plans, crisis management plans or disaster recovery plans? (cont'd)

Theft

35. When was the most recent interruption requiring you to activate one or more business continuity plans? (Select only one response)

Page 19

Page 23: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Do Not Know 14.11%

Total 100.00%

Within the past 6 months 67.48%

Within the past year 17.79%

Within the past 2 years 2.45%

2 years or more 2.45%

We do not exercise our plans 3.68%

Other (Please specify) 2.45%

Do not know 3.68%

Total 100.00%

< 1% 6.21%

1% to < 2% 4.35%

2% to < 4% 12.42%

4% to < 10% 11.80%

10% or more 8.07%

Do Not Know 57.14%

100.00%

There is no BYOD Program in place and the

organization has no plans to establish one 40.37%

We are currently in the process of establishing a BYOD

Program in the next year7.45%

We have established a BYOD Program that includes

some implementation issues that we are addressing at

this time 12.42%

We have successfully established a BYOD Program that

includes smartphones only 11.18%

We have successfully established a BYOD Program that

currently includes smartphones with plans to include

laptops and/or tablets6.83%

We have successfully established a BYOD Program that

includes laptops, tablets and smartphones21.74%

Total 100.00%

Yes, included in current plans 63.35%

No, not included in current plans 9.32%

Plans to address in the future 21.12%

No plans to address it at this time 6.21%

Total 100.00%

40. Has your organization addressed cyber terrorism in your Business Continuity Management Program and related Business Continuity

Plans, Disaster Recovery Plans, and/or Crisis Management Plans? (Select only one response)

39. Which statement best describes the status of your organization’s "bring your own device" (BYOD) program? (Select only one

response)

37, When was the most recent Business Continuity Plan exercise? (Select only one response)

38. What percentage of your Information Technology budget does your organization spend on disaster recovery capabilities? (Select

only one response)

Page 20

Page 24: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

In response to business changes 5.56%

Semi-annually 12.96%

Annually 41.98%

Every two years 6.17%

Every three years 5.56%

Never 11.73%

Do not know 8.02%

Other 8.02%

Total 100.00%

Internal – Hardware and Software Solution 28.63%

External – Hardware and Software Solution 12.50%

Combination/Hybrid of Internal and External Solutions34.68%

Move certain capabilities to a Public Cloud Vendor6.05%

Move certain capabilities to a Private Cloud Solution15.73%

Other (Please specify) 2.42%

None 0.00%

Total 100.00%

BaaS Strategies (Backup as a Service) 10.22%

DRaaS Strategies (Disaster Recovery as a Service)7.11%

IaaS Strategies (Infrastructure as a Service) 7.56%

NaaS Strategies (Network as a Service) 8.44%

PaaS Strategies (Platform as a Service) 4.00%

RaaS Strategies (Recovery as a Service) 4.44%

SaaS Strategies (Software as a Service) 16.44%

Do Not Know 41.78%

Total 100.00%

None 21.74%

< 10% 16.15%

10% to < 25% 5.59%

25% to < 50% 6.83%

50% to < 75% 1.24%

75% or more 4.97%

Do not know 43.48%

Total 100.00%

Within the past six months 29.81%

Within the last year 19.88%

Within the last two years 6.21%

More than two years ago 3.73%

Never 17.39%

41. How frequently does your organization carry out full scenario testing of its disaster recovery plan involving relevant people,

processes and technologies? (Select only one response)

42. What is your current IT recovery strategy? (Select all that apply)

43. Regarding your organization’s disaster recovery strategies in the cloud, please indicate which strategies your organization has

currently implemented: (Select all that apply)

44. What percentage of application data is stored in the cloud? (Select only one response)

45. When did your organization last conduct any tests of the IT Disaster Recovery Plans with representatives from other key stakeholder

companies or agencies (e.g. supply chain partners, service providers, public sector agencies)? (Select only one response)

Page 21

Page 25: r Steering Committee - YESabm-website-assets.s3.amazonaws.com... · zations with a steering committee in place against those without a steering committee in place, highlighting some

Segment Report: Revenue - Steeering Committee YES

Do not know 22.98%

Total 100.00%

Bring Your Own Device 9.97%

Cloud applications 10.90%

Mobile applications 17.13%

Supply Chain Dependencies 15.58%

All of the above 7.48%

None of the above 11.53%

Cyber Attacks 19.31%

Social media 8.10%

100.00%

Attend industry conferences 22.38%

Attend association meetings 18.76%

Attend continuing education courses at

colleges/universities 7.23%

Attend internal company training 17.38%

Attend training provided by third-party companies12.39%

Pursue professional certification course 16.52%

Undergraduate degree program 1.72%

Graduate degree program 2.07%

None 1.03%

Other: (Please specify) 0.52%

Total 100.00%

46. For which of the following capabilities does your Disaster Recovery plan have documented procedures and written guidelines?

(Select all that apply)?

47. What types of ongoing business continuity management training have your organization’s employees utilized? (Select all that apply)

Page 22