    SPrice Breakdown for Coating Works

    1. Work paid by measurement

  • 8/6/2019 Quote Breakdown

    2/17

    SPrice Breakdown for Coating Works

    1. Work paid by measurement

  • 8/6/2019 Quote Breakdown

    3/17

    SPrice Breakdown for Coating Works

    1. Work paid by measurement 50mm IM-CHEM 1.0 m in case of neepipes < 50mm IM-CHEM 1.0 m in case of neesupports IM-CHEM 1.0 m in case of neepipes > 50mm IM-W/Im2 1.0 m in case of neepipes < 50mm IM-W/Im2 1.0 m in case of neesupports IM-W/Im2 1.0 m in case of neepipes > 50mm IM-BUR/Im3 1.0 m in case of needpipes < 50mm IM-BUR/Im3 1.0 m in case of neesupports IM-BUR/Im3 1.0 m in case of neepipes > 50mm PP/PVC 1.0 m in case of needpipes < 50mm PP/PVC 1.0 m in case of needsupports PP/PVC 1.0 m in case of neepipes > 50mm STAIN 1.0 m in case of neepipes < 50mm STAIN 1.0 m in case of neesupports STAIN 1.0 m in case of necomponents, tanks STAIN 1.0 m in case of needtanks EXT/C4 1.0 m in case of netanks INT/C3 1.0 m in case of netanks SER-EXT/C4 1.0 m in case of neetanks SER-INT/C3 1.0 m in case of neetanks Oil 1.0 m in case of ne

    tanks IM-W 1.0 m in case of netanks IM-C 1.0 m in case of nepumps/compressors EXT/C4 1.0 m in case of needpumps/compressors INT/C3 1.0 m in case of needpumps/compressors SER-EXT/C4 1.0 m in case of needpumps/compressors SER-INT/C3 1.0 m in case of needpumps/compressors Stain 1.0 m in case of need-skids Stain 1.0 m in case of ne-skids INT/C3 1.0 m in case of ne-skids EXT/C4 1.0 m in case of ne-skids T1 1.0 m in case of ne-skids T2 1.0 m in case of ne- valves Stain 1.0 m in case of nee- valves INT/C3 1.0 m in case of ne

    - valves EXT/C4 1.0 m in case of ne- valves T1 1.0 m in case of ne- valves T2 1.0 m in case of ne- valves T3 1.0 m in case of ne- valves T4 1.0 m in case of ne

    5,998.0 m2,160.0 m

    Total 6,322.0 m 0Remarks

    The above mentioned Unit Prices shall be deemed as all inclusive rates (excluding VAT) and include therefore: coating material, labour, tools,

    accommodation of staff, wear and tear material, profit, overhead costs, hardship allowance,

    replacement of gratings, cleaning of delivered/provided and prime coated surfaces, removal of Contractor's surplus material and waste material etc.

    S ff ldi

  • 8/6/2019 Quote Breakdown

    4/17

  • 8/6/2019 Quote Breakdown

    5/17

    1. Work paid by measurement 50 mm i INT/C3 5.0 m

    - pipes < 50 mm i INT/C3 5.0 m

    - supports i INT/C3 2.0 m

    MBV Lubricant supply system (Gas turbine plant)

    - tanks i INT/C3 210.0 m

    - pipes > 50 mm i INT/C3 270.0 m

    - pipes < 50 mm i INT/C3 360.0 m

    - supports i INT/C3 90.0 m

    MBQ Ignition fuel supply system

    - pipes > 50 mm i INT/C3 20.0 m

    - pipes < 50 mm i INT/C3 65.0 m

    - supports i INT/C3 2.0 m

    Generator

    MKA Generator, complete, incl. Stator, rotor and all integral cooling equipment

    - generator gas turbine i INT/C3 750.0 m

    - pipes > 50 mm i INT/C3 300.0 m

    - pipes < 50 mm i INT/C3 100.0 m

    - supports i INT/C3 180.0 m

    MPR Forced cooling system

    - pipes > 50mm i INT/C3 450.0 m

    - pipes < 50mm i INT/C3 430.0 m

    - supports i INT/C3 310.0 m

    Additional Steam-, Water-, Gas- and Fuel Oil PipesEKG & Piping system for supply of gaseous fuels

    - pipes > 50 mm i INT/C3 80.0 m

    - pipes < 50 mm i INT/C3 135.0 m

    - supports i INT/C3 420.0 m

    Water Supply and Disposal

    GM Plant drainage system

    - pipes > 50 mm i INT/C3 3.0 m

    - supports i INT/C3 2.0 m

    in-/ outdoor

    m /m

    Unit Price per m / m / pc

  • 8/6/2019 Quote Breakdown

    6/17

    - pipes > 50 mm i INT/C3 80.0 m

    - pipes < 50 mm i INT/C3 135.0 m

    - supports i INT/C3 10.0 m

    SGC Fire Fighting System

    - pipes > 50 mm i INT/C3 80.0 m- pipes < 50 mm i INT/C3 135.0 m

    - supports i INT/C3 10.0 m

    3,777.0 m1,295.0 m

    Total 3,971.3 mRemarks

    The above mentioned Unit Prices shall be deemed as all inclusive rates (excluding VAT) and include therefore: coating material, labour, tools,

    accommodation of staff, wear and tear material, profit, overhead costs, hardship allowance,

    replacement of gratings, cleaning of delivered/provided and prime coated surfaces, removal of Contractor's surplus material and waste material etc.

    Scaffolding

    - The above mentioned unit rates shall include scaffolding/access up to 4m height (upper platform level), including but not limited to erection, dismantling and transportation.

    - Scaffolding over 4m height (upper platform level) will be paid extra based on the unit rates for scaffolding.

    Process water, electricity are excluded. Process water and electricity are paid on basis of verifiable invoices, if not already provided free of charge.

    - The unit rates for the tanks shall include all necessary scaffolding/access (internal and external) and foils including but not limited to erection, dismantling and transpor

  • 8/6/2019 Quote Breakdown

    7/17

    tor's Name >>

    Remarks

    linear m

    linear m

    linear m

    linear m

    linear m

    linear m

  • 8/6/2019 Quote Breakdown

    8/17

    linear m

    linear m

    n.

  • 8/6/2019 Quote Breakdown

    9/17

    1. Work paid by measurement 50 mm o EXT/C4 340.0 m

    - pipes < 50 mm o EXT/C4 530.0 m

    - supports o EXT/C4 200.0 m

    Water Supply and Disposal

    GM Plant drainage system

    - pipes > 50 mm o EXT/C4 3.0 m

    - supports o EXT/C4 2.0 m

    GHC- Demineralized water distribution system

    GQA - supports o EXT/C4 21.0 m

    Ancillary SystemsSCA Compressed air distribution system

    - pipes > 50 mm o EXT/C4 80.0 m- pipes < 50 mm o EXT/C4 135.0 m

    - supports o EXT/C4 10.0 m

    SGC Fire Fighting System

    - pipes > 50 mm o EXT/C4 170.0 m

    - pipes < 50 mm o EXT/C4 200.0 m

    - supports o EXT/C4 10.0 m

    1,446.0 m865.0 m

    Total 1,575.8 m 0Remarks

    The above mentioned Unit Prices shall be deemed as all inclusive rates (excluding VAT) and include therefore: coating material, labour, tools,

    accommodation of staff, wear and tear material, profit, overhead costs, hardship allowance,

    replacement of gratings, cleaning of delivered/provided and prime coated surfaces, removal of Contractor's surplus material and waste material etc.

    Scaffolding

    - The above mentioned unit rates shall include scaffolding/access up to 4m height (upper platform level), including but not limited to erection, dismantling and transportation.

    - Scaffolding over 4m height (upper platform level) will be paid extra based on the unit rates for scaffolding.

    in-/ outdoor

    m /m

    Unit Price per m / m / pc

    - The unit rates for the tanks shall include all necessary scaffolding/access (internal and external) and foils including but not limited to erection, dismantling and transportatio

  • 8/6/2019 Quote Breakdown

    10/17

    tor's Name >>

    Remarks

    linear m

    linear m

    linear m

  • 8/6/2019 Quote Breakdown

    11/17

    1. Work paid by measurement

  • 8/6/2019 Quote Breakdown

    12/17

    tor's Name >>

    Remarks

    including blasting

    n.

  • 8/6/2019 Quote Breakdown

    13/17

    1. Work paid by measurement

  • 8/6/2019 Quote Breakdown

    14/17

    tor's Name >>

    Remarks

    n.

  • 8/6/2019 Quote Breakdown

    15/17

    INT C3

    Paint total sq m

    Interseal 670HS Top coat 6.56 4.92 125 80 4.92 4000

    EXT C4Intergard 475 Internediate 6.4 4.8 125 110 4.8 1600Interthane 990 Top coat 11.4 8.55 50 50 8.55 1600

    IM WInterline 850 Top coat 6.1 4.58 125 300 1.53 700

    SER INTInterseal 670HS Top coat 6.56 4.92 125 100 4.92 110

    NB: Paint mark up 40%loss factor 25%thinner estimate: 30% of paint

    1.64

    loos factor 0.25thinner 0.3

    10 months to complete coating1 month for interior of tank 670 1340

    56006 months for coating

    monthly rateno of mthsspray painter 1blaster 1painters 4helpers 2

    spreadm2/litre

    Actualspread

    Thicknessmicrons

    expectedthickness

    spread for expectedthickness

  • 8/6/2019 Quote Breakdown

    16/17

    total vol cost per litr total cost thinner vol

    813.01 4,176.00 3,395,121.95 243.9 2137.6 521,365.85 4,753,170.73 729,912.20

    333.33 3,132.80 1,044,266.67 100 2137.6 213,760.00 1,461,973.33 299,264.00187.13 5,080.00 950,643.27 56.14 2137.6 120,005.61 1,330,900.58 168,007.86

    459.02 4,688.00 2,151,868.85 137.7 2137.6 294,358.03 3,012,616.39 412,101.25

    22.36 4,176.00 93,365.85 6.71 2137.6 14,337.56 130,712.20 20,072.59

    7,635,266.60 1,163,827.06 10,689,373.24 1,629,357.89

    123206,386.90

    8640 blastin and painting4800 intermediate final

    1422600

    thinner cost per litre

    total costthinner

    cost of paintwith mark up

    cost of thinner withmark up

  • 8/6/2019 Quote Breakdown

    17/17

    labour cost