Quality management systems – Requirements 6 Planning 6.1 Actions to address risks and opportunities 6.2 Quality objectives and planning to achieve them 6.3 Planning of changes In Clause 4: the organization is required to determine risks that can affect its ability to meet objectives” In Clause 5: top management are required to commit to ensuring Clause 4 is followed In Clause 6: the organization is required to plan and take action to address risks and opportunities In Clause 8: the organization is required to have processes which identify and address In Clause 9: the organization is required to consider risks and opportunities when determining what needs to be monitored, measured, analyzed and evaluated In Clause 10: the organization is required to improve by responding to changes in risk

Quality management systems – Requirements 6Planning 6.1Actions to address risks and opportunities 6.2Quality objectives and planning to achieve them 6.3Planning

Embed Size (px)

Citation preview

Quality management systems – Requirements

6 Planning

6.1 Actions to address risks and opportunities

6.2 Quality objectives and planning to achieve them

6.3 Planning of changes

In Clause 4: the organization is required to determine risks that can affect its ability to meet objectives”

In Clause 5: top management are required to commit to ensuring Clause 4 is followed

In Clause 6: the organization is required to plan and take action to address risks and opportunities

In Clause 8: the organization is required to have processes which identify and address risk in its operations

In Clause 9: the organization is required to consider risks and opportunities when determining what needs to be monitored, measured, analyzed and evaluated

In Clause 10: the organization is required to improve by responding to changes in risk and opportunities

6.1 Inventive principles that address risk and risk based thinking

Philip B. Crosby explaining what should top management do for reliable organization

TRIZ tools for RISK management

• Separate conflicting requirements using “SEPARATION PRINCIPLES”• “TRIM” a system of unnecessary elements (less parts, higher reliability of a system)• Use “Anticipatory Failure Determination “(AFD) tool to identify possible failure points in a system.

EXAMPLE: how to reduce risk of Alcohol related traffic fatalities

Solution could be:DON’T DRINK AND DRIVE

These inventive principles have been used by inventors to solve similar problems.

Select separation between conditions principle

6.2 Quality objectives and planning to achieve themWe are going to show how QMS operates on strategic and operational level using PDCA approach.Each management level is using its’ own PDCA loop. Both loops are connected and synchronized by information exchange.

QMS

P

D

C

A

Top management Process owners

Plan: establish the objectives of the system and its processes, and the resources needed to deliver results in accordance with customers' requirements and the organization's policies;

QMS

P

D

C

A

Top management Process owners

Do: implement what was planned;

QMS

P

D

C

A

Top management Process owners

Check: monitor and (where applicable)measure processes and the resultingproducts and services against policies,objectives and requirements and report the results;

QMS

P

D

C

A

Top management Process owners

Act: take actions to improve performance, as necessary.

QMS

P

D

C

A

Top management Process owners

Quality policy

Business plan with quality objectives

Target values

Action plan8.1

6.1 and 6.2

5.2

8.1

Top management shall establish, implementand maintain a quality policy and establish qualityobjectives at relevant functions, levels andprocesses needed for the quality managementsystem.

Actions

6.1

FMEA, SWOT

Quality plan

QMS

P

D

C

A

Top management Process owners

Quality policy

Business plan with quality objectives

Target values

Action plan8.1

6.1 and 6.2

5.2

8.1

The organization shall plan actions to address these risks and opportunities.

Actions

6.1

FMEA, SWOT

Quality plan

QMS

P

D

C

A

Top management Process owners

Quality policy

Business plan with quality objectives

Managing organizationaccording to Quality policy and objectives

Target values

Action plan

Operations as planned

8.1

8.2 to 8.5

6.1 and 6.2

5.2

8.1

The organization shall plan, implement andcontrol the processes needed to meetthe requirements for the provision of productsand services

Actions

6.1

FMEA, SWOT

Quality plan

QMS

P

D

C

A

Top management Process owners

Quality policy

Business plan with quality objectives

Managing organizationaccording to Quality policy and objectives

Target values

Action plan

Operations as planned

Check

Control ofnonconformities

Correctiveactions

Analyzing data

Nonconformance

Internal audits

8.1

8.2 to 8.5

9.2

8.7

9.1.3

10.2

8.6

6.1 and 6.2

5.2

8.1

Check

Customers

The organization shall implement planned arrangements, at appropriate stages, to verifythat the product and service requirements have been met and control nonconforming output.

Actions

6.1

FMEA, SWOT

Quality plan

QMS

P

D

C

A

Top management Process owners

Quality policy

Business plan with quality objectives

Managing organizationaccording to Quality policy and objectives

Management reviewAnalyzing results and

action taking

Target values

Action plan

Operations as planned

Check

Customers

Control ofnonconformities

Correctiveactions

Analyzing data

Nonconformance

Internal audits

8.1

8.2 to 8.5

9.2

9.1.2

8.7

9.1.3

10.2

8.6

6.1 and 6.2

5.2

9.3

8.1

Quality plan

Check

6.1

9.3.3

Top management shall review the organization's

QMS, at plannedIntervals.

Actions

6.1

FMEA, SWOT

QMS

P

D

C

A

Top management Process owners

Quality policy

Business plan with quality objectives

Managing organizationaccording to Quality policy and objectives

Management reviewAnalyzing results and

action taking

Target values

Action plan

Operations as planned

Check

Customers

Control ofnonconformities

Correctiveactions

Analyzing data

Nonconformance

Internal audits

8.1

8.2 to 8.5

9.2

9.1.2

8.7

9.1.3

10.2

8.6

6.1 and 6.2

5.2

9.3

8.1

Quality plan

Check

9.3.3

Actions

6.1

FMEA, SWOT

Practical example

Companyowners

Top management Process owners Project manager and experts

P LAN

Quality policy

CHEC

KAC

TD

O

Business plan with quality objectives

Process plan

Approval

Approvedbusiness plan

OK

Work according to plan

Checkingmonthly

Analyzing results Monthly

Quarterly

Action plan

Targets

Work according to plan

Checking

Customer

Customer satisfaction feedbackAnalysis of customer

perception of quality

Work according to plan

Annual report

CheckingQuarterly

AuditingAuditreport

Corrective & preventive

actions

Non conformance

NOTOK

Annual management review

Prototype production(vendor)

Checking

Non conformance

Checking

Non conformance

Analysisof NC

AC

A

C