16
1

Quality Control

  • Upload
    lamond

  • View
    25

  • Download
    0

Embed Size (px)

DESCRIPTION

1. 2003. 92 even today. Evolution of the quality management system in Smar. New version ISO 9001 2000. Beginning: October 1992 ISO 9001 BVQI – Bureau Veritas Quality International Certificate recognized by international organ. Quality Management. Examples Petrobrás Dow Química. - PowerPoint PPT Presentation

Citation preview

Page 1: Quality Control

1

Page 2: Quality Control

QualityQualityControlControl

QualityQualityManagementManagement

BeforeBefore 9292

92 even today92 even today

Standard: CSA Z 299.1

ExamplesPetrobrás

Dow Química

Beginning: October 1992ISO 9001BVQI – Bureau Veritas Quality InternationalCertificate recognized by international organ 20032003

New versionISO 9001

2000

Evolution of the quality management system in Smar

Page 3: Quality Control

QCReceiving

•Inspection Plan•Sampling Plan

Supplier Feed Back

QC Factory: inspections and tests of components

• Electronic: PCB tests and inspectons

Customer Feed Back ( CCM )

Final QC•Inspection Plan Technical Support

Smar - Quality Management SystemDesign

Page 4: Quality Control

DesignDevelopment

Phase Development Documents Evolution

Product Definition• PGD - General Development Plan• DRE - Input Requirements Document• RHP - Project History Record

Ideas

Planning • DPL - Project Planning Document Specifications Sudies

Development

• Procedure defining the development procedures• Follow-up, interface and Critical Analysis Meeting minutes• Project Verifications records

Prototype manufacturing

Project Validation• DRS - Output Results Document• Technical report

Prototype test

Transference

• CI - Internal communication• Test procedures and / or assembling / manufacturing• minutes

Product manufacturing

Project Alterations • ALT - Technical Alterations Product

Page 5: Quality Control

Purchasing

Page 6: Quality Control

ManufacturingSequence and Interaction of Processes

Electronic and device

AssemblyVisual

InspectionFinal

Assembly

FunctionalTest

Electronic and device quality

control

Page 7: Quality Control

99,7

99,75

99,8

99,85

99,9

99,95

2005/2006 99,84 99,77 99,83 99,9 99,89 99,87 99,9 99,89 99,82 99,87 99,85 99,89

jul /05 ago/05 se t/05 out/05 nov/05 dez /05 jan/06 fev/06 mar/06 abr/06 mai/06 jun/06

Functional Test – Quality Index

99,89%

Page 8: Quality Control

Inspection and Testing

Page 9: Quality Control

Inspection and Testing Sampling plan: 100% Control of monitoring and measuring devices. Human Resources: 2 Seniors engineers and 8 technicians Participation in the corrective action system. Records of the results of inspection and testing.

Features

Page 10: Quality Control

Identification and Traceability

Page 11: Quality Control

Identification and Traceability

Page 12: Quality Control

Director

Technical ServiceTechnical ServiceNationalNational

& International& International

Support & AdministrationSupport & Administration [email protected] / [email protected] [email protected] / [email protected]

Engineers and TechniciansEngineers and TechniciansLive Chat Support via WEBLive Chat Support via WEB

Service CenterTechnical

PartnersPartners

Technical Support Channel

InsttalationInsttalationNationalNational

& International& International

Technical ServiceTechnical ServiceSP OfficeSP Office

Technical ServiceTechnical ServiceNorthwest OfficeNorthwest Office

24 hr Desk24 hr DeskPhonePhone: (5516) : (5516) 9129-68859129-6885

Page 13: Quality Control

Customer Complaints

Page 14: Quality Control

Customer Complaints

Responsability :Quality Engineer Staff

Page 15: Quality Control

TechSupport

Page 16: Quality Control

Identification and TraceabilityRecall

QualityDepartment

Collect data Review Customer