“ eni Iraq b.v. - Zubair Oil Field Development Project” Work Package of Existing DGS Modification Form No. QIR -121 Report No.: BOLT TORQUE REPORT Sheet of Reference : Steel Structure Fabrication / Installation Procedure No. 00250600DBPC4053M SYSTEM TITLE or NO:_____________________ AREA / ISOMETRIC NUMBER : ___________________________ SHT NO :___________ DWG NO : ___________ JOINT REFERENCE/ LOCATION:______________________________ SPEC NO:________________________ FLANGE DETAILS (SIZE / RATING ) _____________________________________________________________ BOLT SIZE:___________________ NO OF BOLTS:________________BOLTING MATERIAL:____________________ REQUIRED TORQUE:_______________________________ NO OF STEPS _____________________________ WRENCH MANUFACTURER: ______________________________________________________________________ SERIAL NUMBER: ________________________ CALIBRATION DATE__________________________________ TIGHTENING SEQUENCE: REMARKS:

QIR 121 Bolts Torque Report

Embed Size (px)

DESCRIPTION

QIR 121 Bolts Torque Report

Citation preview

PR808-11-M11 Bolt Torquining Report.

eni Iraq b.v. - Zubair Oil Field Development ProjectWork Package of Existing DGS ModificationForm No. QIR -121

Report No.:

BOLT TORQUE REPORTSheet of

Reference : Steel Structure Fabrication / Installation Procedure No. 00250600DBPC4053M

SYSTEM TITLE or NO:_____________________

AREA / ISOMETRIC NUMBER : ___________________________ SHT NO :___________ DWG NO : ___________

JOINT REFERENCE/ LOCATION:______________________________ SPEC NO:________________________

FLANGE DETAILS (SIZE / RATING ) _____________________________________________________________

BOLT SIZE:___________________ NO OF BOLTS:________________BOLTING MATERIAL:____________________

REQUIRED TORQUE:_______________________________ NO OF STEPS _____________________________WRENCH MANUFACTURER: ______________________________________________________________________

SERIAL NUMBER: ________________________ CALIBRATION DATE__________________________________

TIGHTENING SEQUENCE:

REMARKS:

THE ABOVE BOLT TORQUE RECORD HAS BEEN SATISFACTORILY VERIFIED IN ACCORDANCE WITH THE DRAWINGS & SPECIFICATIONS.

SIGNED :_________________________________________________________________________

Contractor ConstructionNAME

DATE:

SIGNED :______________________________________________________________

SIGNED Contractor QCICompanyNAME NAMEDATE: DATE