PR808-11-M11 Bolt Torquining Report.

eni Iraq b.v. - Zubair Oil Field Development ProjectWork Package of Existing DGS ModificationForm No. QIR -121

Report No.:

BOLT TORQUE REPORTSheet of

Reference : Steel Structure Fabrication / Installation Procedure No. 00250600DBPC4053M

SYSTEM TITLE or NO:_____________________

AREA / ISOMETRIC NUMBER : ___________________________ SHT NO :___________ DWG NO : ___________

JOINT REFERENCE/ LOCATION:______________________________ SPEC NO:________________________

FLANGE DETAILS (SIZE / RATING ) _____________________________________________________________

BOLT SIZE:___________________ NO OF BOLTS:________________BOLTING MATERIAL:____________________

REQUIRED TORQUE:_______________________________ NO OF STEPS _____________________________WRENCH MANUFACTURER: ______________________________________________________________________

SERIAL NUMBER: ________________________ CALIBRATION DATE__________________________________

TIGHTENING SEQUENCE:

REMARKS:

THE ABOVE BOLT TORQUE RECORD HAS BEEN SATISFACTORILY VERIFIED IN ACCORDANCE WITH THE DRAWINGS & SPECIFICATIONS.

SIGNED :_________________________________________________________________________

Contractor ConstructionNAME

DATE:

SIGNED :______________________________________________________________

SIGNED Contractor QCICompanyNAME NAMEDATE: DATE