q~Doc Ref : QCP-05
QUALITY CONTROL Date: 1st January 2009
Kencana InfrastructurePROCEDURE Revision No : 0
-.. Cover Page
\ CONTROLL~D COpy NO. IPENALTY SYSTEM FOR WELDER
"
,----
KENCANA INFRASTRUCTURE SDN BHD
REV NO. DATEPREPARED BY REVIEWED BY APPROVED BY
NAME SIGN DATE NAME SIGN DATE NAME SI: N, DATE
0 26 .12.08 TLS flAl.. 15.12 .08 Suryono -r p»c. 19.1208 co (LIN' . 26 .12 08
('
Doc Ref : QCP-05
Date : 1st January 2009
Revision No : 0
PENALTY SYSTEM
FOR WELDER Page 1 of 4
TABLE OF CONTENTS
SECTION DESCRIPTION PAGE 1.0 PURPOSE 2 2.0 SCOPE 2 3.0 REFERENCE 2 4.0 DEFINITION / ABBREVIATION 2 5.0 PROCEDURE 5.1 Poor Welder Performance 2 5.2 Violation to General Welding Procedure/ Practice 3 5.3 Penalty System for Poor Welder Performance 3 - 4 5.4 Penalty System for other offence 4 6.0 SPECIAL REQUIREMENT 4 7.0 RECORDS 4 APPENDICES APPENDIX l - Notice of Penalty – Template I APPENDIX Il - Notice of Penalty – Template II APPENDIX III - Welder’s Penalty Record
Doc Ref : QCP-05
Date : 1st January 2009
Revision No : 0
PENALTY SYSTEM
FOR WELDER Page 2 of 4
1.0 PURPOSE
This procedure is established to enhance Welders performance in order to meet the minimum quality standards as per Client’s requirement, codes and standards.
2.0 SCOPE This procedure covers all matters with regard to welder’s performance,
welder’s attitude and violation to welding procedure and practices for every project under taken by Kencana Infrastructure.
3.0 REFERENCE
NIL 4.0 DEFINITION / ABBREVIATION HSE - Health, Safety and Environment UT - Ultrasonic Test RT - Radiography Test 5.0 PROCEDURE
Category of offense : a) Poor welder performance b) Violation to general welding procedure and practices.
5.1 Poor Welder Performance
a) Welder performance shall be calculated base on weld repair rate
occurred on weld metal which is detected by Radiography Test (RT) and Ultrasonic Test (UT).
b) The cumulative individual weld repair rate shall not exceed more
than 2.0% or client requirement or whichever is lower at the time of evaluation for each project.
c) Welders who exceed 2% of cumulative individual weld repair rate
shall be issued penalty (refer to item 5.3 for the penalty system).
Doc Ref : QCP-05
Date : 1st January 2009
Revision No : 0
PENALTY SYSTEM
FOR WELDER Page 3 of 4
5.2 Violation to General Welding Procedure and Practices
a) Violation to general welding procedure and practices may cause
welders for penalty. b) Violation to company general disciplinary rules, administration rules
and HSE rules and regulations are not apart of this Penalty System.
c) Type of violation, but not limited to : i. Unqualified welders ii. Deviate from qualified range and other limitations iii. No quiver or other portable storage for mobile handling
of low hydrogen coated electrode iv. Quivers not heated or not connected to power source v. Welding using cold of low hydrogen coated electrode vi. Not wearing or viewing welders ID pass vii. Not preheat of joint to be welded as per requirement viii. Other un-ethic attitude in welding works
5.3 Penalty System for Poor Welder Performance
a) Notice of Penalty (refer to Appendix I) shall be issued for type of
offense as mentioned in section 5.1. b) The information shall be recorded in Welder’s Penalty Record form
as per Appendix III for monitoring purpose.
c) Penalty system :
i. 1st time penalty - Shall be issued 1st Warning Letter ii. 2nd time penalty - Shall be issued 2nd Warning Letter
- Welder shall be suspended from full penetration weld, and only allowed for fillet weld
iii. 3rd time penalty - Shall be issued 3rd Warning Letter
Doc Ref : QCP-05
Date : 1st January 2009
Revision No : 0
PENALTY SYSTEM
FOR WELDER Page 4 of 4
- Welder shall attend the adequate training and re-WQT or permanently allowed for fillet weld until end of project
- If the welder passed the re-WQT, he shall continue with full penetration welding
- If the welder failed the re-WQT, he shall be terminated from the project
5.4 Penalty System for other offence
d) Notice of Penalty (refer to Appendix II) shall be issued for type of
offense as mentioned in section 5.2 e) The information shall be recorded in Welder’s Penalty Record form
as per Appendix III for monitoring purpose.
f) Penalty system :
i. 1st time penalty - Shall be issued 1st Warning ii. 2nd time penalty - Shall be suspended from current
project (case basis) iii. 3rd time penalty - Shall be terminated from current
project (case basis) 6.0 SPECIAL REQUIREMENT
Welder’s ID Pass shall be punched after the issuance of 1st and 2nd warning. This is for easy identification during monitoring of respective welders.
7.0 RECORDS Title Responsibility Retention Period Notice of Penalty QA/QC Coordinator End of project Welder’s Penalty Record QA/QC Coordinator End of project
APPENDICES
QCP-05 Rev-0Appendix I
KENCANA INFRASTRUCTURE SDN. BHD. Lot 50, Jalan BRP 8/2, Persiaran Bukit Rahman Putra 3, Perusahaan Bukit Rahman Putra, 47000 Sungai Buloh, Selangor Darul Ehsan, Malaysia. Tel : (03) 6140 5801 Fax: (03) 6140 5810
Project :Project No. : Date :Ref. No. :
To :CC :
Subject : NOTICE OF PENALTY - Poor Welding Performance
Offense :
Your individual cumulative weld repair rate as of ____________(date) is captured as _______%(exceed 2.0% or clients requirement or whichever is lower)
This is your :
1st Time Penalty This is your 1st Warning Letter
2nd Time PenaltyYou are suspended from full penetration welding, and only allowed for fillet weld
3rd Time PenaltyYou shall attend the adequate training and re-WQT or permanently as fillet welder
Result of WQT
Accepted, You shall continue with full penetration welding
Rejected, You are terminated from this project
Issued By : Acknowledged By :QA/QC Department Production/ Subcontractor
_________________________ _________________________Name : Name :Position : Position :Date : Date :
QCP-05 Rev-0Appendix II
KENCANA INFRASTRUCTURE SDN. BHD. Lot 50, Jalan BRP 8/2, Persiaran Bukit Rahman Putra 3, Perusahaan Bukit Rahman Putra, 47000 Sungai Buloh, Selangor Darul Ehsan, Malaysia. Tel : (03) 6140 5801 Fax: (03) 6140 5810
Project :Project No. : Date :Ref. No. :
To :CC :
Subject : NOTICE OF PENALTY - Violation to General Welding Procedure/ Practices
Offense :
You are violating general welding procedure/ practice (pls specify) :
This is your :
1st Time Penalty
This Notice served as 1st warning, DO NOT REPEAT IN FUTURE
2nd Time Penalty,
You will be suspended for _____ day(s) from this project
3rd Time Penalty
You will be terminated with immediate effect from this project
Issued By : Acknowledged By :QA/QC Department Production/ Subcontractor
_________________________ _________________________Name : Name :Position : Position :Date : Date :
QCP-05 Rev-0Appendix III
KENCANA INFRASTRUCTURE SDN. BHD. Lot 50, Jalan BRP 8/2, Persiaran Bukit Rahman Putra 3, Perusahaan Bukit Rahman Putra, 47000 Sungai Buloh, Selangor Darul Ehsan, Malaysia. Tel : (03) 6140 5801 Fax: (03) 6140 5810
Tittle : Welder’s Penalty RecordProject :Project No. :
S/N Welder's Detail No. of Penalty Detail of Offense
1 Name :
ID No. :
IC No. :
WD Pass No. :
2 Name :
ID No. :
IC No. :
WD Pass No. :
3 Name :
ID No. :
IC No. :
WD Pass No. :
4 Name :
ID No. :
IC No. :
WD Pass No. :
5 Name :
ID No. :
IC No. :
WD Pass No. :