SITE:243
QUALITY CONTROL Inspection Checklist
Project Details
Project Name
Area/BuildingDate:
Person doing site inspection: (Print name)JAIME MANALILI LANDINGIN
Person doing site inspection: (Signature)
Items for inspection Concrete Repair Works
Item(X or N/AItem(X or N/A
Application of bituminous based primer is completed and found satisfactory.
Installation of first layer of bituminous membrane, 4mm thk, is completed with compliance to approved method statement and shop drawings.
Installation of second layer of bituminous membrane, 4mm thk, torched bonded over the first layer is completed with compliance to approved method statement and shop drawings.
Membrane ends to vertical wall is terminated by means of extruded flashing 1mm x 60mm girth and sealed with approved sealant.
(= yesX = noN/A = not applicableQuality Control Site Inspection checklist
Page 1 of 1Current Version 1 by JML