Peningkatan Efektifitas Quality Control Project melalui Implementasi QA / QC PROGRAM
April 2015
ASSET INTEGRITY MANAGEMENT, means:DATA MANAGEMENT• EDMSDOCUMENT CONTROLLERQA/QC
• NCR SYSTEMRELIABILITY & INTEGRITY
• RISK BASED INSPECTION (RBI)• RISK BASED CERTIFICATION (RBC)• RELIABILITY CENTERED MAINTENANCE (RCM)• RELIABILITY, AVAILABILITY & MAINTAINABILITY (RAM)• ASSET PERFORMANCE ASSESSMENT (APA)• FITNESS FOR SERVICE (FFS)• PIPELINE INTEGRITY MANAGEMENT SYSTEM (PIMS)• MAINTENANCE ASSESSMENT PROTOCOL (MAP)• SHUTDOWN & TURN AROUND (SDTA)
COMPLIANCE ASSURANCE• CERTIFICATION• PERMIT
MEETING OBJECTIVES
1. To have feed back and improvement for QA / QC Program
2. To validate and to ensure the proposed QA / QC Program meeting with
PGE’s requirements and comply with applicable regulations
3. To know that QA / QC Program as Part of Asset Integrity Management
Process
4. Can be as references for QA / QC Team to develop each of Quality
Controller System
5. To know what is the meaning of QA (Quality Assurance) and QC
(Quality Controller)
6. To know where QA / QC Implementation
PROGRAM OBJECTIVES
1. To ensure compliance with project requirements (target HSE, quality &
performance, schedule, cost)
2. To minimize rework with main target is minimized potential hazard
3. Measurement Process (Key Performance Index)
4. As tools for main process:
• Data Management Function As Built Drawings, Equipment No, PSV
No, MOC, PSM, CDM, PROPER
• Reliability Function RBI, RCM, Safety Devices
• Document Controller Function Traceability System
• Compliance Assurance Function Certification, Color Coding, HSE
Program, Permit
Objectives of this program :
PROGRAM SCOPE
To develop QA / QC program for Karaha Project, geothermal power plant(GPP) including switchyard, the associated fluid collection and reinjectionsystem (FCRS) and 150 km Transmission System in Karaha, West Java,Indonesia.
1. Project Description
2. Scope of QA / QC Program
1. Piping2. Mechanical3. Civil4. Electrical5. Instrumentation & Controller
for following system (where applicable):
a) Fluid Collection and Reinjection Systemb) Geothermal Power Plantc) Civil and Insfracturesd) Additonal Supply and Servicese) Transmission 24.68 km
WHAT IS QA / QC ?
(ISO 9000, 3.2.10 – 11)
_____________________________________________
QUALITY ASSURANCE
• “A part of quality
management focused
on providing confidence
that quality
requirements will be
fulfilled”
QUALITY CONTROL
• “A part of quality
management focused
on fulfilling quality
requirements”
WHAT IS QA / QC ?
(ISO 9000, 3.2.10 – 11)
_____________________________________________
QUALITY ASSURANCE
A Strategy of Prevention
• It is focused on planning,
documenting and guidelines to
assure quality.
– specifications and
– industry or company standards.
• It is undertaken at the beginning of
a project,
• Activities are quality plans,
inspection and test plans, the
selection of defect tracking tools
QUALITY CONTROL
A Strategy of Detection
• All activities that are designed to
determine the level of quality.
• QC is a reactive means by which
quality is gauged and monitored.
These techniques and activities are agreed with customers and/or stakeholders
before project work is commenced.
QA / QC PIPING SYSTEM – an example
_____________________________________________
QUALITY ASSURANCE
No DescriptionCode
/Standard Ver.
1
Material
• Spec
• Receiving
• Storage and
Handling
ASME II,ASME
B36.10,ASME
B36.19M, etc.
• Mill
Certificate
and
• PMI (If
needed)
2 Design ASME B 31.1. • Stress
Analysis
3 Welding
• Procedure
• Personnel
ASME IX • WPS /
PQR
• WPQT
QUALITY CONTROL
No DescriptionCode
/Standard Ver.
1
Material
• Receiving
• Storage and
Handling
Approval
Procedure• Report
2 Integrity ASME B 31.1. Hydro test
3
Welding
• Consumable
Control
• Purity Gas
• Fit Up
• Welding
Inspection
• Preheating
• PWHT
• Hardness
ASME II Part C
ASME B 31.1
ASME V
• Certificate
Electrode
• Certificate
Gas
(Argon)
• Report (Fit
Up, Visual)
• NDE
(RT,PT,UT,
MT)
QA / QC PIPING SYSTEM – an example
_____________________________________________
QUALITY ASSURANCE
No DescriptionCode
/Standard Ver.
4• Cleaning
Before Paint
ISO 8501-1
SSPC
Approval
Procedure
5 • Painting &
Coating
NACE Approval
Procedure
6 • InsulationASTM C1696
Approval
Procedure
7 • Pickling Approval
Procedure
8 • Steam Blow Approval
Procedure
9 • ReinstateApproval
Procedure
QUALITY CONTROL
No DescriptionCode
/Standard Ver.
4• Sand
Blasting
ISO 8501-1
SSPC
• Report
Visual
Compare
ISO pic
5
• Painting &
Coating
Inspection
NACE • Ultra
Thickness
Measurem
ent
6 • Insulation ASTM C1696 • Report
7• Pickling Approval
Procedure
• Endoscopic
8
• Steam Blow Approval
Procedure
• Report
Target
Plate
9 • Reinstate
Approval
Procedure
• Line Check
• Torque
Report
QA / QC MECHANICAL STATIC SYSTEM – an example
_____________________________________________
QUALITY ASSURANCE
No DescriptionCode
/Standard Ver.
1
Material
• Spec
• Receiving
• Storage and
Handling
ASME VIII Div.
I & II
ASME II
• Mill Cert
• Certificate
Guarantee
2 • Design ASME VIII Div.
I & I
• Approved
Drawing
3 • Fabricator
Pressure
Vessel
ASME VIII Div.
I & II
ASME Stamp
U
4 Welding
• Procedure
• Personnel
ASME IX • WPS /
PQR
• WPQT
QUALITY CONTROL
No DescriptionCode
/Standard Ver.
1
Material
• Receiving
• Storage and
Handling
• Report
2Integrity ASME VIII Div.
I & I
• Hydro test
3
Fabricator ASME VIII Div.
I & II
• Expire
ASME
Stamp U
4
Welding
• Consumable
Control
• Purity Gas
• Fit Up
• Welding
Inspection
• Preheating
• PWHT
• Hardness
ASME II Part C
ASME B 31.1
ASME V
• Certificate
Electrode
• Certificate
Gas
(Argon)
• Report (Fit
Up, Visual)
• NDE
(RT,PT,UT,
MT)
QA / QC MECHANICAL STATIC SYSTEM – an example
_____________________________________________
QUALITY ASSURANCE
No DescriptionCode
/Standard Ver.
5 • Installation• Approved
Procedure
6 • Grouting Manufacture
Standard
• Approved
Procedure
• Certificate
Grouting
7 • Final Check
QUALITY CONTROL
No DescriptionCode
/Standard Ver.
5 • Installation
Approved
Procedure
• Report
Orientation,
Leveling,
Elevation,
Centerline
6
• Grouting Approved
Procedure
• Check
Material,
Surface
Preparation
, Mix of
Grout,
Curing,
Tightening
Anchor Bolt
7 • Final Check • Punch list
QA / QC MECHANICAL ROTATING SYSTEM – an
example
_____________________________________________
QUALITY ASSURANCE
No DescriptionCode
/Standard Ver.
1
Material
• Spec
• Receiving
• Storage and
Handling
ASME VIII Div.
I & II
ASME II
• Mill Cert
• Certificate
Guarantee
2 • Design ASME VIII Div.
I & I
• Approved
Drawing
3• Installation
• Approved
Procedure
QUALITY CONTROL
No DescriptionCode
/Standard Ver.
1
Material
• Receiving
• Storage and
Handling
• Report
• FAT
2Integrity ASME B 31.1. • Perform
test
3 • InstallationApproved
Procedure
• Report
Leveling,
Elevation,
Centerline
• Report Pre-
Alignment
• First
Alignment
(after
grouting)
• Final
Alignment
QA / QC MECHANICAL ROTATING SYSTEM – an
example
_____________________________________________
QUALITY ASSURANCE
No DescriptionCode
/Standard Ver.
4 • Grouting Manufacture
Standard
• Approved
Procedure
• Certificate
Grouting
5 • Final Check • Approval
Procedure
QUALITY CONTROL
No DescriptionCode
/Standard Ver.
6
• Grouting Approved
Procedure
• Check
Material,
Surface
Preparation
, Mix of
Grout,
Curing,
Tightening
Ancor Bolt
7• Final Check Approved
Procedure
• Punch list
QA / QC CIVIL SYSTEM – an example
_____________________________________________
QUALITY ASSURANCE
No DescriptionCode
/Standard Ver.
1 • Survey
2 • Soil
Investigation
3 • Excavation • Investigatio
n Existing
Facility
• Approval
Procedure
4 • Design ASCE 7
QUALITY CONTROL
No DescriptionCode
/Standard Ver.
1 • Survey • Report
Coordinate
s, Elevation
2 • Soil
Investigation
• Report
SPT,
DCPT,
Electric
Resistivity
3 • Excavation • Report
Depth and
with
excavation,
Slope
4
QA / QC CIVIL SYSTEM – an example
_____________________________________________
QUALITY ASSURANCE
No DescriptionCode
/Standard Ver.
5 Material
• Spec
• Receiving
• Storage and
Handling
SNI 03-1729-
2002• Mill Cert
6 • Foundation • Approved
Procedure
• Approved
Drawing
7 • Grouting Manufacture
Standard
• Approved
Procedure
• Certificate
Grouting
8 • Concrete
Work
ACI 207, ACI
301
QUALITY CONTROL
No DescriptionCode
/Standard Ver.
5 Material
• Receiving
• Storage and
Handling
SNI 03-1729-
2002• Report
6 • Foundation • Report
Elevation,
Padding
7 • Grouting Approved
Procedure
• Check
Material,
Surface
Preparation
, Mix of
Grout,
Curing,
Tightening
Anchor Bolt
8 • Concrete
Work
ACI 207, ACI
301
• Mechanical
Testing
QA / QC CIVIL SYSTEM – an example
_____________________________________________
QUALITY ASSURANCE
No DescriptionCode
/Standard Ver.
9 • Form Work ACI 347
ACI 318• Mill Cert
10 • Reinforcing
Bar Work
ACI 301, ACI
315, ACI 318
• Mill Cert
11 • Anchor Bolt • Mill Cert
12 Steel Structure
• Welding
• Painting
• Erection
• Final
• AWS D1.1
• SSPC
• WPS,PQR,
WPQT
QUALITY CONTROL
No DescriptionCode
/Standard Ver.
9 • Form Work ACI 347
ACI 318
• Material
Inspection
10 • Reinforcing
Bar Work
ACI 301, ACI
315, ACI 318
• Mechanical
Testing
11 • Anchor Bolt • Mechanical
Testing
12 Steel Structure
• Welding
• Painting
• Erection
• Final• AWS D1.1
• SSPC
• Report VT
NDE
• Report
Paint thick
• Report
Plumbness
, centerline,
elevation
• Punch List