Pyramid ProjectPyramid ProjectNumber and Number ProcessesNumber and Number Processes MNU 4-MNU 4-
03a03a
Money MNU 4-09cMoney MNU 4-09c
Time MNU 4-10aTime MNU 4-10a
Measurement MNU 4-11aMeasurement MNU 4-11a
Data and Analysis 4-20aData and Analysis 4-20a
About the companyAbout the company
Responsible for the construction of Responsible for the construction of many famous buildings around the many famous buildings around the worldworld
Trustworthy and reliableTrustworthy and reliable Always meet targetsAlways meet targets
About the companyAbout the company
The Great Pyramid Construction Company built:The Great Pyramid Construction Company built: The Pyramids of GizaThe Pyramids of Giza The Great Wall of ChinaThe Great Wall of China The Hanging Gardens of BabylonThe Hanging Gardens of Babylon The Great Pyramid of CholulaThe Great Pyramid of Cholula Colossus of RhodesColossus of Rhodes The London EyeThe London Eye The Grand CanyonThe Grand Canyon The Death StarThe Death Star
Pyramid RequirementsPyramid Requirements
Needs clean, fresh water supply so visitors Needs clean, fresh water supply so visitors can cleanse themselves.can cleanse themselves.
Must be on solid ground and unlikely to Must be on solid ground and unlikely to flood.flood.
Must be difficult to attack.Must be difficult to attack. Must be visible to all those around.Must be visible to all those around. Must be at least 50 metres wide and 25 Must be at least 50 metres wide and 25
metres tall.metres tall. Should be built in less than two months.Should be built in less than two months.
Our Design: Our Design: HoolakmulHoolakmul
Our VillageMulhun
Mulcaa Mulox
Mulcan MulhooFlood gates
Happy Leader
Our Design: Our Design: HoolakmulHoolakmul
Pyramid ConstructionPyramid Construction
Pyramid ConstructionPyramid Construction
Pyramid ConstructionPyramid Construction
ExpensesExpenses
For pyramid n metres wide at base: For pyramid n metres wide at base: number of blocks = nnumber of blocks = n22 + (n-1) + (n-1)22
ExpensesExpenses
Height (m) Number of blocks
Pyramid 1: 50 4901
Pyramid 2: 25 1201
Pyramid 3: 25 1201
Pyramid 4: 25 1201
Pyramid 5: 25 1201
Total: 9705
ExpensesExpenses
25 labourers can move 4 blocks of 25 labourers can move 4 blocks of stone per hourstone per hour
5 labourers can dig 4 metres of 5 labourers can dig 4 metres of waterway per hourwaterway per hour
Time to complete with 250 labourers: Time to complete with 250 labourers: 20.6 days20.6 days
Total labour days: (20.6 x 250)Total labour days: (20.6 x 250)5158.9 days5158.9 days
ExpensesExpenses
Item Cost Each Quantity Total
Block 1.5 9705 14557.5
Labourers/day 10 5158.9 51588.5
Statue 1000 5 5000
Bridge 1000 5 5000
Gift 500 1 500
Fiesta 2000 1 2000
Metre of water 10 1000 10000
Flood gate 5 2 10
Total: 88656.0
Budget: 100000.0
Remaining: 11344.0
EvaluationEvaluation
Good water supply surrounds pyramidGood water supply surrounds pyramid On solid groundOn solid ground Flood gates prevent floodingFlood gates prevent flooding Easy to defend – surrounded by water. Easy to defend – surrounded by water.
Only entry is via four narrow bridgesOnly entry is via four narrow bridges 50 metres tall – easily visible for miles 50 metres tall – easily visible for miles
aroundaround Can be built in 21 days with 250 Can be built in 21 days with 250
labourerslabourers We will have 11344 shells of our budget We will have 11344 shells of our budget
left overleft over
Thank you for Thank you for listeninglistening