20
December 11, 200 3 1 Profiling Working Group Profiling Working Group PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting December 11, 2003

PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

  • Upload
    remy

  • View
    30

  • Download
    0

Embed Size (px)

DESCRIPTION

PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting December 11, 2003. Annual Profile Type and Weather Zone Validation . LPGRR Draft – 11.4.1 Validation of Profile Type. PRR draft - NIDR default settlement process improvements. - PowerPoint PPT Presentation

Citation preview

Page 1: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 20031

Profiling Working GroupProfiling Working Group

PWG Update Report

By

Ernie Podrazaof Reliant Energy

ERCOT PWG Chair

for

RMS Meeting

December 11, 2003

Page 2: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 20032

Profiling Working GroupProfiling Working Group

1) Annual Profile Type and Weather Zone Validation.

2) LPGRR Draft – 11.4.1 Validation of Profile Type.

3) PRR draft - NIDR default settlement process improvements.

4) Protocols Section 18.6.5, Future IDRs Impact Analysis.

5) ERCOT Load Research – PR30014 Project Timeline.

6) PRR Draft – Weather Response Determination for IDR Proxy Day Process.

7) New TOU Schedule Process.

8) Distribution Loss Calculation Issue (Actual vs. Forecast ERCOT Load).

9) Update Reports:

a) Oil and gas properties profile change request.

b) Gas/Convenience 24 hr Stores profile change request.

c) Direct Load Control (DLC) Project Status.

d) IDR Requirement Report.

e) PRR469 for Protocols Section 18 to PRS.

f) PRR471 for NIDR to IDR Default Profile.

g) PRR478/LPGRR2003-004 – Lagged Dynamic for new profile.

h) PRR479 IDR Optional Removal Threshold

i) Next PWG Meetings 1/7, and 1/28.

Page 3: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 20033

Profiling Working GroupProfiling Working Group

Annual Profile Type and Weather Zone Validation.DUE

DATE TASKRESPONSIBLE

PARTYACTUAL

DATE STATUS

6/30/03 Preliminary Profile ID changes due to ERCOT

TDSP 8/5/2003 Last file received from Centerpoint 8/5all others TDSPs met due date

7/15/03

List available to CRs of record

ERCOT 8/6/2003 Partial list available 7/15Complete list available 8/6ERCOT has received and completed 13 request from different CRs

8/1/03

List of discrepancies to TDSP

ERCOT complete AEP, TNMP sent 7/29 Centerpoint Res 8/6 Bus 8/15 Oncor - Res 8/11 Bus 8/14

8/21/03Reconciliation complete

TDSP/ERCOT complete AEP, TNMP, ONCOR, CNP - COMPLETE

9/1/03Final list of Profile ID changes available to CR of record

ERCOT Partial list available 9/4CNP Res. list available 11/17. ERCOTwaiting on delivery of Bus File from CNP since 11/20

10/1/03

814_20s sent by meter read

TDSP TNMP, Oncor, AEP_C, AEP_N, all expectedtransactions received as of 11/20CNP Res expecting 500,000 received 381,724 CNP reports complete as of 11/26

11/10/03

EDI transactions complete

TDSP/ERCOT All transactions received will be processedas of 12/2/03. Waiting on confirmation of 814_21s rejects completed, excluding (CNP - Business) before proceding to next step.

11/12/03Final Sample Validation

ERCOT

Validation Complete - 99% accuracy achieved

TDSP/ERCOT

Page 4: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 20034

Profiling Working GroupProfiling Working Group

Annual Profile Type and Weather Zone Validation.

1. CNP expressed to the PWG Chair concern for the manpower needed for annual validation of profile ID assignments and concern for residential migration based on winter ratio of 1.5. Chair shall propose that the PWG reexamine the annual validation and profile id assignment process.

2. RMS to add to week market call meeting per RMS meeting 9/26/03.

3. PWG has discussed feasibility of ERCOT coding the Profile ID instead of TDSPs.

4. Major Causes of Migration of Profile ID Assignments.

a) Use of a new usage month methodology.

b) Significant portion of BusNoDem moving to a BusxxxLF profile.

c) 1.5 winter ratio factor may need a dead band and/or reevaluation.

5. CNP Residential algorithm is complete.

6. CNP has sent a list of Business changes to ERCOT for validation on 12/4, 814_20s begin pending ERCOT approval.

Page 5: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 20035

Profiling Working GroupProfiling Working Group

LPGRR Draft – 11.4.1 Validation of Profile Type.

1. PWG reviewed 12/4 an initial draft, ERCOT staff to refine.

Page 6: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 20036

Profiling Working GroupProfiling Working Group

PRR draft - NIDR default settlement process improvements.

1. PWG reviewed 7/30/03.

2.2. NIDR NIDR default profile settlement routine was discussed at the 9/30 and 10/22 PWG meetings. ERCOT to review possible options with the current software.

3. PRR draft discussed at PWG 12/4 meeting, and to be reviewed at a future meeting.

Page 7: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 20037

Profiling Working GroupProfiling Working Group

Protocols Section 18.6.5, Future IDRs Impact Analysis.1. Per 8/19/03 PWG meeting discussions began on compliance to Section 18.6.5.

2. 18.6.5    Future Requirements for IDRs

ERCOT and the appropriate ERCOT TAC subcommittee shall evaluate the impact of the IDR Requirement as defined in this Section for possible revision prior to the introduction of competitive metering services to the market on January 1, 2004.

3. ERCOT staff is working on comparing current IDR premises below 1000 KW verses if the premise had been on a NIDR profile as the basis of the impact study.

4. At 10/22 and 11/05 PWG meetings, part of the impact report was presented comparing current IDRs below 1000 kW as if they had been NIDR. Remaining analysis is on schedule.

5. Outline of final analysis was reviewed at the 12/4 PWG meeting.

Page 8: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 20038

Profiling Working GroupProfiling Working Group

ERCOT Load Research – PR30014 Project

• 10/23/03 Kickoff meeting with TDSPs.

• 11/06/03 Second TDSP coordinating meeting.

• TDSPs have agreed to use ebXML, FTP Replacement for sample data transfer in .LS format.

• 11/26/03 CR Survey due.

• 12/05/03 CR coordinating meeting.

• Estimated sample design target to TDSPs: 1/5/2004

• Estimated sample design acceptance: 1/15/2004

• Estimated complete IDR installation: 7/15/2004

• See ERCOT Report for the RMS meeting for the latest timeline and current status.

Page 9: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 20039

Profiling Working GroupProfiling Working Group

Weather Response Determination for IDR Proxy Day Process

1. PRR draft has been written and introduced at the 12/4 PWG mtg.

2. Expected to submit RMS for January approval.

Page 10: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200310

Profiling Working GroupProfiling Working Group

New TOU Schedule Process

1) PWG 12/04 reviewed a first draft of a document to assist in how a CR would go about requesting and getting approval of a new TOU Schedule.

Page 11: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200311

Profiling Working GroupProfiling Working Group

Distribution Loss Calculation Issue

(Actual vs. Forecast ERCOT Load)

1. PRR draft has been written and introduced at the 12/4 PWG meeting.

2. ERCOT Staff shall write a WMS issue document.

Page 12: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200312

Profiling Working GroupProfiling Working Group

Update Reportsa) Oil and gas properties profile change request.

b) Gas/Convenience 24 hr Stores profile change request.

c) Direct Load Control (DLC) Project Status.

d) IDR Requirement Report.

e) PRR471 for NIDR to IDR Default Profile.

f) PRR469 for Protocols Section 18 to PRS.

g) PRR478/LPGRR2003-004 – Lagged Dynamic for new profile.

h) PRR479 IDR Optional Removal Threshold

Page 13: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200313

Profiling Working GroupProfiling Working Group

Oil and gas properties profile change request 1. Submitted to ERCOT 3/6/03 by Pioneer Natural Resources, Priority Power Management, and Energy Data Source .

2. ERCOT to post to WEB.

3. Argument is that the aggregate profile is a very high load factor profile, close to flat.

4. ERCOT is to evaluate and submit recommendation to PWG.

5. May test the new PUCT Rule 25516 for reimbursement.

6. ERCOT shall post the methodology request to the Market Information System (MIS) and respond to the request within sixty (60) days of the posted date of the request. This period does not include the time to analyze and render the complete assessment of the request.

7. “ERCOT withholds a decision on making a recommendation on whether to adopt or to deny adoption of the suggested profile change; instead ERCOT finds the request, as submitted, is incomplete and deficient. The requestors are invited to address the incompleteness and deficiencies listed below and re-submit the request for further review.”

8. Per 6/19 PWG meeting, a straw-man in development for changes to the profile change request process and to allow lagged dynamic samples. PRR drafts to be reviewed at the 9/30 and 10/1 PWG meetings.

9. ERCOT staff has submitted a load research sample design to the requestor for approval.

10. PWG submitted to RMS on 11/13, PRR and LPGRR for added validation of profile change requests and lagged dynamic samples.

11. Requestor has concerns there are little CR interest in the profile.

12. Two of the Three Requestors have withdrawn from this request.

Page 14: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200314

Profiling Working GroupProfiling Working Group

Gas/Convenience 24 hr Stores Profile Change Request

1. Submitted to ERCOT by Coral Energy.

2. ERCOT staff is discussing a load research sample design with the requestor.

Page 15: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200315

Profiling Working GroupProfiling Working Group

Direct Load Control (DLC) Project Status1. PRR 385 Section 18 is complete with Board Approval 5/20/03.

2. LPGRR2003-001 is attached to PRR385, approved by TAC 7/02, reviewed by Board, and the LPG is updated).

3. ERCOT Schedule is pending, Project Manager assigned.

4. ERCOT and some Market Participants question priority going forward.

5. Memo, on Project 26359 on Competitive Metering, May 8, 2003, by Commissioner Perlman suggests that wires companies need to develop a rate structure that provides strong incentives for demand responsiveness by charging different rates during high load periods.

6. PRR388 and PRR400 does not completely cover DLC issues.

7. PRR Section 6 Language for DLC is written for a PRR.

8. DSWG expected to submit Section 6 PRR draft to PRS on 12/10/03.

Page 16: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200316

Profiling Working GroupProfiling Working Group

IDR Requirement Report1. 07/03/03, ERCOT issues IDR_threshold_analysis_20030627.xls.

2. July 30, 2003, ERCOT issues a Market Notification for IDR Requirement File on Portal.

3. PWG discussed on 7/30/03. Background:

a) The report was issued in the spring of 2002 and manually sent to MP contacts. 

b) The report was again issued in the spring of 2003 and manually sent to MP contacts.

c) The report was automated on monthly basis on 5/2, 6/2, and 7/2/03.

As of 9-6-03

Total Overdue1 Newly Reported Total AEP_Central 4 1 1 2AEP_North 3 1 2 3Centerpoint 45 25 12 37Oncor 119 68 26 94TNMP 6 5 2 7

177 100 43 143

*** Sharyland TDSP numbers are excluded from this to prevent possible identif ication of individual premises.

IDR Requirement Report Summary

1 As defined in Load Profiling Guides Section 17.2 -- Any ESIID listed in the IDR Requirement report w hich has not had an IDR meter installed w ithin 120 days.

As of 11-02-03

Page 17: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200317

Profiling Working GroupProfiling Working Group

PRR469 for Protocols Section 18 to PRS.1. On 9/15/03 the PWG submitted a draft PRR entitled, “Compliance for Competitive Metering and 25516

Rulings to Load Profiling” to update Protocols Section 18 per the PUCT Rulings on Project 25516 Load Research and Load Profiling and Project 26359 on Competitive Metering.

2. RMS Chair approved the PWG going directly to PRS to assist in the timeline for the PRR approval by year end before competitive metering becomes effective on 1/1/04.

3. PRS comments due 10/17.

4. PRS to review 10/23.

5. Additional PRR is drafted by PRS for PWG review to ensure where the use of REP, CR and LSE is appropriate.

6. PRS Remanded the PRR to PWG for review of changes to language. At the 11/05 PWG meeting the PWG approved the PRS suggested changes.

• Reference to the Load Profiling Guides removed.

• Examples of Load Profile Types removed.

• Specific URL and Substantive Rules references removed.

7. To TAC 1/8/04.

Page 18: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200318

Profiling Working GroupProfiling Working Group

PRR471 for NIDR to IDR Default Profile1. RMS approved 9/26/2003.

2. PRS issued to market 10/09/2003 requesting a vote on urgency, comments due 10/22.

3. PRS to review 10/23.

4. To TAC 1/8/04.

Page 19: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200319

Profiling Working GroupProfiling Working Group

PRR478 for Use of Lagged Dynamic Samples for New Load Profiles

LPGRR2003-004 for Update of LPG Section 12

1) Approved by RMS 11/13.

2) Submitted to PRS. PRS to review 12/18/03.

1) Approved by RMS 11/13.

2) Submitted to RMS.

Page 20: PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting

December 11, 200320

Profiling Working GroupProfiling Working Group

PRR479 on IDR Optional Removal Threshold1. RMS requested PWG review Sara Ferris’s IDR Removal draft PRR on 9/26/2003.

2. PWG on 10/01 wrote a new draft.

3. PWG reviewed the threshold value amount and discussed the PRR language on 10/22.

4. PWG Chair sent a status report to the RMS exploder on 10/27.

5. PWG met on 11/05 to prepare a recommendation for RMS.

6. PWG shall submit final recommended PRR to RMS on 11/13 with voting motions where the PWG is divided.