PV-1 : PLOT PLAN
PROJECT OVERVIEW
7.0 KW SOLAR SYSTEM
(28) SolarWolrd 250W Modules
(28) Enphase M215 Microinverters
PV-2 : ATTACHMENT LAYOUT AND DETAILS
PV-3 : FIRE SIGNS/LABELS PV-4 : SINGLE LINE DIAGRAM
SYSTEM OVERVIEW
Markings, Labels and Warning Signs.
A. Purpose: Provides emergency responders with appropriate warning and
guidance with respect to isolating the solar electrical system. This can facilitate
identifying energized electrical lines that connect the solar panels to the inverter, as
these should not be cut when venting for smoke removal.
B. Main Service Disconnect
1. Residential buildings - the marking may be places within the main service
disconnect. the marking shall be placed on the outside cover if the main service
disconnect is operable with the service panel closed.
3. Markings: Verbiage, Format, and Type of material.
a. Verbiage: CAUTION: SOLAR ELECTRIC
SYSTEM CONNECTED
b. Format:
(1) White Lettering on a red background.
(2) Minimum
3
8
inches letter height.
(3) All letters shall be capitalized
(4) Arial or similar font, non-bold.
c. Material:
(1) Reflective, Weather resistant material
suitable for the environment (use UL -
969 as standard for weather rating).
Durable Adhesive materials meet this
requirement.
C. Marking Requirements on DC Conduit, Raceways,
Enclosures, Cable Assemblies, DC Combiners, and
Junction Boxes:
1. Marking Placement, Verbiage, Format, and Type of
Material.
(a.) Placement: Marking shall be placed at every
10 feet on all interior and exterior DC Conduit,
Raceways, Enclosures, Cable Assemblies, at
turns, above and/or below penetrations, all DC
Combiners, and Junction Boxes.
(b.) Verbiage: CAUTION: SOLAR CIRCUIT
NOTE: The Format and Type of material
Shall adhere to "V. B-3b, c" of this requirement.
D. Inverters - Are Not Required To Have Caution Markings
1. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT
PER NEC 310.0(D)
2. CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE FOR USE IN WET
LOCATIONS PER NEC 310.8(C)
3. WORKING CLEARANCES AROUND THE EXISTING AND NEW ELECTRICAL
EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH THE NEC 110.26
4. EXPOSED CONDUIT TO BE PAINTED TO MATCH ROOF COLOR
5. SMOKE ALARMS AND C02 ALARMS TO BE INSTALLED
6. STRUCTURAL MEMBER LOCATIONS ARE ESTIMATED AND SHOULD BE LOCATED
AND VERIFIED AS NECESSARY FOR LAG BOLT PENETRATIONS BY CONTRACTOR.
7. SEAL CONNECTION POINTS WITH ROOF GRADE
8. ROOF PENETRATIONS ARE SEALED WITH SCHNEE MOREHEAD 7108 SEALANT.
1. PV ARRAYS CONTAIN (28) SOLARWOLRD 250W MODULES
2. PV ARRAY WIRING TO JUNCTION BOX IS #12 AWG (ENPHASE TRUNK CABLE) WITH
FACTORY PROVIDED MC CONNECTORS.
3. PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY WIRING
TO CONDUIT WIRING.
4. PV POWER SOURCE, 600Vdc, NEMA 3R RAINPROOF, 30A AC DISCONNECT
5. PROVIDE GROUND ELECTRODE SYSTEM FROM INVERTER TO EXISTING MAIN
SERVICE GROUND ELECTRODE PER C.E.C. ARTICLE 250.50 THROUGH 250.86.
6. GROUND ELECTRODE CONDUCTOR FROM INVERTER TO GROUND ELECTRODE TO
BE MINIMUM PROTECTION OF BARE ARMOR SHEATED CABLE FOR ALL CONDUCTOR
SIZES.
7. ALL GROUND CONNECTED TO MAIN SERVICE GROUND IN MAIN SERVICE PANEL.
8. CONNECTORS SHALL BE POLARIS IT-4.
9. INVERTERS SHALL BE (28) ENPHASE M215 MICROINVERTERS
10. INVERTER IS LISTED TO UL-1741 "UTILITY INTERACTIVE"
11. AC DISCONNECT IS VISIBLE OPEN, LOCKABLE, 240Vac,30A
12. EQUIPMENT GROUNDING CONDUCTORS ON AC AND DC SIDE SIZED
13. NEGATIVE POLE OF PV ARRAY REFERENCED TO GROUND AT THE INVERTER.
14. ALL CONDUCTORS SHALL BE 600V, 90C STANDARD COPPER. ALL CONDUCTORS IN
CONDUIT SHALL BE THWN-2.
15. MAXIMUM DC/AC VOLTAGE DROP SHALL BE NO MORE THAN 1.5%
16. ALL CONDUCTORS SHALL BE CONDUIT UNLESS OTHERWISE NOTED.
17. DC ARRAY CONDUCTORS ARE TO REMAIN OUTSIDE OF BUILDING PRIOR TO
FUSIBLE COMBINER BOX OR FUSIBLE DISCONNECT MEANS.
1. ALL WORK TO COMPLY WITH (2011 NEC) 2013 CALIFORNIA ELECTRIC
CODE ARTICLE 690, 2013 CALIFORNIA BUILDING CODE.
2. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS
SUNLIGHT RESISTANT PER NEC 310.0(D)
3. CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE
FOR USE IN WET LOCATIONS PER NEC 310.8(C)
4. WORKING CLEARANCES AROUND THE EXISTING AND NEW
ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH
THE NEC 110.26
5. EXPOSED CONDUIT TO BE PAINTED TO MATCH ROOF COLOR
6. SMOKE ALARMS AND C02 ALARMS TO BE INSTALLED
7. EXACT CONDUIT RUN LOCATIONS SUBJECT TO CHANGE.
Cover
NOTE: All Text To Be Minimum
1
8
",
Unless Insufficient Space Is Available.
CUSTOMER INFORMATION
CONTRACTOR INFORMATION
X_________________________
PAGE INDEX
PROJECT NOTES:
PHOTOVOLTAIC LAYOUT :
ATTACHMENT LAYOUT & CALCULATIONS:
ATTACHMENT DETAILS:
FIRE SIGNS/LABELS:
SINGLE LINE DIAGRAM:
SINGLE LINE DIAGRAM CALCULATIONS:
MANUFACTURE SPEC. SHEETS:
COVER
PV-1
PV-2
PV-2.1
PV-3
PV-4
PV-4.1
ATTACHED
VICINITY MAP
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
N
90
120
150
180
210
240
270
300
330
0
30
60
80
70
50
4O
20
10350
320
310
290
280
260
250
230
220
200
190 170
160
140
130
110
100
340
PV-1
Date: 4/3/14
Contractor:
C-10# X____________________________________
Solar Photovoltaic System For:
JOB # : 148
Drafter: NM01 Scale: 13/256" = 1'-0"
Notes:
Building Occupancy Type: R-3 ( Residential: One or Two Dwelling Units)
Construction Type: TYPE V-B ( Unprotected Wood Frame, Examples: Single
Family Homes and Garages.)
(N) Proposed Solar Array Location
(28) SolarWolrd 250W Modules
(28) Enphase M215 Microinverters
Roof Mounted
Junction Box
(E) 100A M.S.P. W/ 100A Main Breaker
(N) 200A M.S.P. W/ 200A Main Breaker
C
h
i
a
C
t
.
(
E
)
1
S
t
o
r
y
H
o
m
e
(
E
)
D
r
i
v
e
w
a
y
(N) Proposed Conduit Run
(N) 30A AC Disconnect
(E) Conduit Run From Sub-Panel
Located in Garage to Main
Service Panel, Through Trench
(E) 100A Sub-Panel
(N) 30A AC Disconnect
(N) Proposed Conduit Run
Through Garage Interior
Junction Box
AZIMUTH
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Module InformationSunModule SW 250 Mono
65.94 in X 37.44 in X 1.22 inSquare Footage : 17.144
Weight In Pounds: 46.7Roof Information
Roof Type:Comp.Shingle
Roof Pitch: 18°Rafter Size: 2" x 6"
Rafter Spacing: 24"Array Square Footage: 480.04
Array Weight (Lbs): 1307.6
Racking Weight (Lbs): 252.84Total Weight (Lbs): 1560.44
Lbs/Sq.Ft. : 3.2506Lbs/Footing: 22.9476
Azimuth: 122°, 212°Racking Material List
ProSolar 136 in. Rails 20End Clamps 28Mid Clamps 42
Splice Kits 19Attachments 68
Weebs 28
N
90
120
150
180
210
240
270
300
330
0
30
60
80
70
50
4O
20
10350
320
310
290
280
260
250
230
220
200
190 170
160
140
130
110
100
340
PV-2
Date: 4/3/14
Contractor:
C-10# X____________________________________
Solar Photovoltaic System For:
JOB # : 148
Drafter: NM01
Scale: 1/8" = 1'-0"
Notes:
All Rafters & Attachment Points are approximate and should be verifed on site.
GARAGE MOUNTING DETAILSHOUSE MOUNTING DETAILS
F
i
r
e
C
l
e
a
r
a
n
c
e
:
3
'
A
t
t
a
c
h
m
e
n
t
S
p
a
c
i
n
g
:
4
'
M
a
x
.
F
i
r
e
C
l
e
a
r
a
n
c
e
:
3
'
R
a
f
t
e
r
S
i
z
e
:
2
"
x
6
"
R
a
f
t
e
r
S
p
a
c
i
n
g
:
2
'
F
i
r
e
C
l
e
a
r
a
n
c
e
:
3
'
R
a
i
l
L
e
n
g
t
h
:
3
3
'
-
4
"
R
a
i
l
L
e
n
g
t
h
:
3
3
'
Scale: 3/16" = 1'-0"
F
i
r
e
C
l
e
a
r
a
n
c
e
:
3
'
F
i
r
e
C
l
e
a
r
a
n
c
e
:
3
'
F
i
r
e
C
l
e
a
r
a
n
c
e
:
3
'
F
i
r
e
C
l
e
a
r
a
n
c
e
:
4
'
-
53
1
6"
A
t
t
a
c
h
m
e
n
t
S
p
a
c
i
n
g
:
4
'
M
a
x
R
a
f
t
e
r
S
i
z
e
:
2
"
x
6
"
R
a
f
t
e
r
S
p
a
c
i
n
g
:
2
'
AZIMUTH
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
PV-2.1
Date: 4/3/14
Contractor:
C-10# X____________________________________
Solar Photovoltaic System For:
JOB # : 148
Drafter: NM01 Scale:
Notes:
Racking and Roof Mounting Details
ProSolar Fast Jack # FJ-450-18
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
WARNING
ELECTRICAL SHOCK HAZARD
DO NOT TOUCH TERMINALS.
TERMINALS ON BOTH LINE AND
LOAD SIDE MAY BE ENERGIZED
IN THE OPEN POSITION
DC VOLTAGE IS ALWAYS PRESENT
WHEN SOLAR MODULES
ARE EXPOSED TO SUNLIGHT
PER NEC 690.17(4)
WARNING
ELECTRICAL SHOCK HAZARD
DO NOT TOUCH TERMINALS.
TERMINALS ON BOTH THE LINE AND
LOAD SIDE MAY BE ENERGIZED
IN THE OPEN POSITION
PER IFC 690.17(4)
MAIN PV SYSTEM
AC DISCONNECT
PER 605.14.(C)(2), IFC 605.11.1,
NEC 690.11.1.4, NEC 690.15 & NEC 690.53
PHOTOVOLTAIC
AC DISCONNECT
PER 605.11.1, IFC 605.11.14,
NEC 690.15 & NEC 690.14 (C)(2)
WARNING
ELECTRICAL SHOCK HAZARD
IF A GROUND FAULT IS INDICATED,
NORMALLY GROUNDED CONDUCTORS
MAY BE UNGROUNDED AND ENERGIZED
PER NEC 690.5(C)
PER IFC 609.14(C)(2)
PHOTOVOLTAIC AC DISCONNECT
MAXIMUM AC OPERATING CURRENT:
MAXIMUM AC OPERATING VOLTAGE:
PER NEC 690.35(F)
PER NEC 690.14(7)
INTERACTIVE PV SYATEM
CONNECTED
MAXIMUM AC OPERATING CURRENT:
MAXIMUM AC OPERATING VOLTAGE:
WARNING
ELECTRICAL SHOCK HAZARD
DO NOT TOUCH TERMINALS.
TERMINALS ON BOTH THE LINE AND
LOAD SIDE MAY BE ENERGIZED
IN THE OPEN POSITION
PER IFC 609.17(4)
CAUTION
PV SYSTEM CIRCUIT IS BACKFED
WARNING
SECOND SOURCE IS PV SYSTEM
DUAL POWER SOURCE
WARNING
TURN OFF PHOTOVOLTAIC AC
DISCONNECT PRIOR TO WORKING
INSIDE PANEL
WARNING
ELECTRICAL SHOCK HAZARD
IF A GROUND FAULT IS INDICATED,
NORMALLY GROUNDED CONDUCTORS
MAY BE UNGROUNDED AND ENERGIZED
PER NEC 690.5(C)
J-BOX
CONDUIT
AC DISCONNECT
SUB-PANEL
MAIN PANEL
WARNING
ELECTRICAL SHOCK HAZARD. THE DC
CONDUCTORS OF THIS PHOTOVOLTAIC
SYSTEM ARE UNGROUNDED AND MAY BE
ENERGIZED.
PV POWER SOURCE
PV-3
Date: 4/3/14
Contractor:
C-10# X____________________________________
Solar Photovoltaic System For:
JOB # : 148
Drafter: NM01 Scale: Not To Scale
Notes:
SOLAR PV ARRAY
ROOF MOUNTED
CAUTION
POWER TO THE BUILDING IS ALSO SUPPLIED FROM
THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AT SHOWN
MAIN SERVICE PANEL
PV DISCONNECT
N
PV DISCONNECT
SUB PANEL
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
N
G
L1
L2
-
+
-
+
-
+
N
G
L1
L2
-
+
-
+
-
+
L1
L2
N
G
L1
L2
N
G
L1
L2
N
G
L1
L2
L1
L2
G
N
M
A
B
String A:
12 SolarWorld 250W Modules
12 Enphase M215 Microinverters
Over Household
Terminator Cap Installed At End Of Cable
Enphase Trunk Cable
To Utility Grid
Junction Box
(2) 30A AC Disconnect
(E) Main Service Panel Rating: 100A
(E) Main Breaker Size: 100A
(N) Main Service Panel Rating: 200A
(N) Main Breaker Size: 200A
15A
20A
L1
L2
G
N
N
G
L1
L2
N
G
L1
L2
Junction Box
(E) 100A Sub-Panel
100A x 120% = 120A Max
20A PV Breaker
100A + 20A = 120A
N
G
G
String B:
16 SolarWorld 250W Modules
16 Enphase M215 Microinverters
Over Garage
(E) Sub-Panel Breaker
Existing Breaker Size
To Be Rated For 100A
Minimum. To Be
Verified in Field.
AC.1
AC.2
AC.3
AC.3
AC.4
Existing Ground Rod
Existing Ground Rod
PV-4
Date: 4/3/14
Contractor:
C-10# X____________________________________
Solar Photovoltaic System For:
JOB # : 148
Drafter: NM01 Scale: Not To Scale
NOTES:
1. PV CIRCUIT BREAKER SHALL BE INSTALLED AT THE OPPOSITE END OF THE PANEL BUSS FROM THE MAIN CIRCUIT BREAKER.
2. "RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END" CEC 250.64(E)
3. BECAUSE THE DC CIRCUIT IS ISOLATED AND INSULATED FROM GROUND, THESE MICROINVERTERS DO NOT REQUIRE A GROUNDING ELECTRODE CONDUCTOR (GEC) CONNECTED BETWEEN EACH MICROINVERTER.
AC VOLTAGE DROPFrom Inverter(s) To Load Center/Sub-Panel
Operating Voltage: 240Length Of Conduit Run: 60
Operating Current: 18Voltage Drop: 2.684
Load At End Of Run: 237.32Voltage Drop %: 1.118
AC.1 (3) #10 AWG THWN-2
(1) #10 AWG GROUND
3
4
" EMT CONDUIT
ABOVE ROOF
AC.2 (3) #10 AWG THWN-2
(1) #10 AWG GROUND
3
4
" EMT CONDUIT
THROUGH GARAGE ATTIC
AC.3 (3) #10 AWG THWN-2
(1) #10 AWG GROUND
3
4
" EMT CONDUIT
INTERIOR/EXTERIOR WALL
AC.4 EXISTING WIRE SIZE
TO BE RATED FOR 100A
MINIMUM. TO BE VERIFIED IN FIELD. CONDUIT RUN EXISTING THROUGH TRENCH
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Strut Strap
Bell Box
Rain Tight, Steel
EMT Connector.
EMT Conduit
Max Height 3-1/2"
Conduit Above Roof To
Load Center/Main
Service
Strain Relief
DC Cable or
AC Cable For
MicroInverter
Module
2" x 6" Block
Rafter: 2" X 6"
MID-CLAMP
WEEB-PMC
SLIDING NUT
MOUNTING RAIL
Bell Box
Rain Tight, Steel
EMT Connector.
Galvanized Flashing, 9"x 12
1
2
"
Base, No-Calk Coollar
Strut Strap
EMT Conduit
Conduit Through Attic To
Load Center/Main Service
Strain Relief
DC Cable or
AC Cable For
MicroInverter
Module
Rafter: 2" X 6"
PV-4.1
Date: 4/3/14
Contractor:
C-10# X____________________________________
Solar Photovoltaic System For:
JOB # : 148
Drafter: NM01 Scale: Not To Scale
Main Panel Calculations
Sub Panel/Load Center Calculations
Per NEC 690.64 (B)(7)(E) Main Panel Rating (A): 100(E) Main Breaker Size (A): 100
(N) Main Panel Rating (A): 200(N) Main Breaker Size (A): 200
Total Amps Allowed (120%): 240
Total PV Load (A): 35Total Amps On Main Panel: 235
Sub-Panel Rating: 100PV Breaker Size (A): 20PV Breaker Size (A): 0PV Breaker Size (A): 0PV Breaker Size (A): 0
Output to Main Panel (A): 20
Module Information
28 SunModule-SW 250 Mono ModulesPower: 250
I-SC 8.28I-MP 8.05V-OC 37.8V-MP 31.1
7 KW SYSTEM
28 SunModule-SW 250 Mono Modules
28 Enphase-M215-60-2LL-S22/S23 Inverter
SYSTEM INFORMATION
Max Out Put In Amps (1.25 x1.25 x 8.28) : 12.9375
Number of strings: 2
Conduit Run: Above RoofWire Choice : 12
Wire Ampacity At 90°C : 30Conduit Correction Per NEC
310.15 (B)(3)(a): 0.8Ambient Tempature °C : 39
Correction Per NEC310.15(B)(3)(c) : 22
Total Ambient Temp. : 61Per NEC 310.18(B)(2)(a) : 0.65
After Derate Factors (30A x 0.8x 0.65) : 15.6
DC CALCULATIONSGROUNDING DETAIL CONDUIT HEIGHT DETAIL
28 Enphase-M215-60-2LL-S22/S23 MicroInvertersMax Number Of Modules Per String : 17
Max Input Voltage 45Modules In String 1 16Modules In String 2 12Modules In String 3 0Modules In String 4 0Modules In String 5 0Modules In String 6 0
Module Output Voltage V-OC : 37.8Number Of Strings : 2
Individual MicroInverter Out Put In Amps : 0.9Max Out Put In Amps (1.25 x 0.9 x 16) : 18
Circuit Breaker Choice: 20 AConduit Run: Above RoofWire Choice : 10
Wire Ampacity At 90°C : 40Conduit Correction Per NEC 310.15 (B)(3)(a): 0.8
Ambient Tempature °C : 39Correction Per NEC 310.15(B)(3)(c) : 22
Total Ambient Temp. : 61Per NEC 310.18(B)(2)(a) : 0.65
After Derate Factors (40A x 0.8 x 0.65) : 20.8
Sub Panel Out Put: 20
Conduit Run: Through Trench
Wire Choice :
Wire Ampacity At 90°C :
Conduit Correction Per NEC 310.15 (B)(3)(a): 1
Ambient Tempature °C : 39
Correction Per NEC 310.15(B)(3)(c) : 0
Total Ambient Temp. : 39
Per NEC 310.18(B)(2)(a) : 0.91
After Derate Factors ( A x 1 x 0.91) :
AC CALCULATIONS
NOTES:
CONDUIT HEIGHT DETAIL
To Be Verified In FieldProperty Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering
Property Of CNG Solar Engineering