1.0 Introduction1.1 Background and Context
The intersection at the University of the West Indies southern access way and the Churchill Roosevelt
Highway becomes very congested during peak hours. Congestion of the intersection affect students,
university employees and surrounding businesses. The congestion also delays traffic along the eastbound
and westbound lanes towards Port of Spain noted as the largest business center in Trinidad. Traffic
congestion is most often criticized as a waste of time and money, a cause of pollution and stress, and a
detriment to productivity (Bertini, 2005). It is in this context that a detailed analysis of the intersection be
undertaken to assess the current and future traffic patterns of the intersection and also to draw conclusions
about the efficiency and functionality of the intersection.
Aim
To study the intersection at the University of the West Indies southern access road and the Churchill
Roosevelt Highway, provide recommendations to improve the performance of the intersection and
evaluate the sustainability of the intersection in the year 2020 using an average annual traffic growth
rate of 4.0%.
Objective
The objectives of this traffic study are to:
1. Determine the flows and volumes passing through the intersection.2. Investigate the current behavior and trends of traffic passing through the intersection. 3. Determine the saturation flow rate of the intersection.4. Determine the Level of Service (LOS) of the intersection.5. Determine the capacity of the intersection6. Determine 3, 4 and 5 of the intersection in 2020 at a traffic growth rate of 4.0%
Scope
The study area for this study is confined only to the intersection is confined only to the intersection.
What vehicle did or where they went have little bearing on the study. Traffic counting was carried out in
two 3-hour sessions, 6:00 am–9:00 am and 3:00 pm-6:00pm. Manual Counting was the method used to
acquire data.
Theory
Volume of Traffic
The volume of traffic is defined as the total amount of traffic passing through a given point in a
specific direction within the specified period of time. By counting the number of vehicles that pass a
point on the roadway during a 15-minute period, you can arrive at the 15-minute volume. Volume is
commonly converted directly to flow, which is a more useful parameter.
Saturation Flow Rate
Saturation Flow rate of an intersection can be defined as the number of vehicles per hour that
could cross the line if the signal remained in a continuous green state. However it is not practical to
measure this quantity directly in the field because the signal will not normally remain green for the
required time. The saturation flow rate is typically derived from the steady-state headway. The headway
is defined as the average elapsed time between the passages of successive vehicles over the stop line in
the same lane. The Highway Capacity Manual (2010) states that the headway should be taken from the
passage of the fourth vehicle to the seventh, eighth, ninth or tenth vehicle. This method however
assumes that the queue length is at minimum ten vehicles.
Capacity of Intersection
The capacity of the intersection is defined as the maximum rate at which vehicles can pass
through an intersection in one hour under prevailing conditions. The capacity of the intersection
accounts for roadway conditions such as lane configurations, lane utilization and signalized conditions.
In order to calculate the Capacity of the Intersection, the effective green and the saturation flow rate are
also needed. The process for obtaining on the Saturation Flow rate is describe above. However the
effective green is measured as the time that is available to a designated movement, and generally taken
to be the green time plus the change and clearance interval minus the lost time for the designated
movement.
Level of Service (LOS)
The Highway Capacity Manual (HCM) defines the level of service of a signalized intersection as the total
delay of all movements through an intersection. Control delay is used to define the level of service at
signalized intersections, given delay not only indicates the amount of lost travel time and fuel
consumption but also a measure of the frustration and discomfort of motorists. Control or signal delay,
which is that portion of total delay that is attributed to the control facility, is computed to define the
level of service at the signalized intersection. This includes the delay due to the initial deceleration,
queue move-up time, stopped time, and final acceleration. Delay, however, depends on the red time,
which in turn depends on the length of the cycle (Garber & Hoel 2009, 460).
Cycle Length
Cycle length is composed of the total signal time to serve all of the signal phases including the green time
plus any change interval. Longer cycles will accommodate more vehicles per hour but that will also
produce higher average delays.
MethodologyFlow Chart Showing Methodology for Signalized Intersections
Chart 1 (Taken from the Highway Capacity Manual 2010, pg. 18-32)
Results and Calculations
MORNING 6:00AM-9:00AM
Table 1- Vehicular Traffic Morning
Time Period Northbound Southbound Eastbound Westbound Total No.LEFT Through Right LEFT Through Right LEFT Through Right LEFT Through Right
6.00 - 6.15 31 23 31 7 27 42 7 255 7 12 567 16 10256.15 -6.30 23 42 23 16 27 43 18 409 5 9 441 14 10706.30-6.45 33 55 33 8 51 56 34 307 5 7 480 16 10856.45-7.00 74 33 74 17 71 59 36 421 10 15 502 22 13347.00-7.15 28 70 28 15 62 71 47 370 8 11 521 66 12977.15-7.30 39 83 39 19 87 67 82 430 10 27 447 70 14007.30-7.45 35 61 35 19 72 63 70 444 15 43 489 112 14587.45-8.00 50 78 50 21 76 94 96 375 13 43 465 114 14758.00-8.15 46 79 46 23 64 90 97 482 7 72 454 115 15758.15-8.30 36 69 36 13 49 88 106 490 16 54 644 87 16888.30-8.45 34 74 34 19 58 89 126 387 10 39 614 113 15978.45-9.00 34 88 34 18 69 86 128 446 13 30 479 87 1512Total 463 755 463 195 713 848 847 4816 119 362 6103 832
Vehicular Traffic @ 6am - 9 am
Table 2- Northbound & Southbound Peak Hour Factor
Through Lane Through Lane15 min 60min 15 min 60min 15 min 60min 15min 60min 15 min 60min 15 min 60min
6.00 - 6.15 31 23 31 7 27 426.15 -6.30 23 42 23 16 27 436.30-6.45 33 55 33 8 51 566.45-7.00 74 74 33 153 74 161 17 48 71 176 59 2007.00-7.15 28 28 70 200 28 158 15 56 62 211 71 2297.15-7.30 39 39 83 241 39 174 19 59 87 271 67 2537.30-7.45 35 35 61 247 35 176 19 70 72 292 63 2607.45-8.00 50 50 78 292 50 152 21 74 76 297 94 2958.00-8.15 46 46 79 301 46 170 23 82 64 299 90 3148.15-8.30 36 36 69 287 36 13 76 49 261 88 3358.30-8.45 34 34 74 300 34 166 19 76 58 247 89 3618.45-9.00 34 34 88 310 34 150 18 73 69 240 86 353
Peak Hour FactorMax 15min 74 88 74 23 87 94Max 60min 74 310 176 82 299 361
Left Lane Right Lane Left Lane Right LaneNorthbound Southbound
Time Period
0.25 0.88 0.59 0.89 0.86 0.96
Table 3 - Eastbound & Westbound Peak Hour Factor
6.00 - 6.156.15 -6.306.30-6.456.45-7.007.00-7.157.15-7.307.30-7.457.45-8.008.00-8.158.15-8.308.30-8.458.45-9.00
Peak Hour FactorMax 15minMax 60min
Time PeriodThrough Lane Through Lane
15 min 60min 15 min 60min 15 min 60min 15 min 60min 15 min 60min 15 min 60min7 255 7 12 567 16
18 409 5 9 441 1434 307 5 7 480 1636 95 421 1392 10 27 15 43 502 1990 22 6847 135 370 1507 8 28 11 42 521 1944 66 11882 199 430 1528 10 33 27 60 447 1950 70 17470 235 444 1665 15 43 43 96 489 1959 112 27096 295 375 1619 13 46 43 124 465 1922 114 36297 345 482 1731 7 45 72 185 454 1855 115 411
106 369 490 1791 16 51 54 212 644 2052 87 428126 425 387 1734 10 46 39 208 614 2177 113 429128 457 446 1805 13 46 30 195 479 2191 87 402
128 490 16 72 644 115457 1805 51 212 2191 429
0.74 0.85 0.930.92
Left Lane Right LaneEastbound Westbound
0.85
Left Lane Right Lane
0.89
Table 4 - Northbound Saturation Flow Rate
7th veh. 8th veh. 9th veh 10th veh. 7th veh. 8th veh. 9th veh 10th veh.
1 6 1 7
2 8 10 2 83 12 3 44 6 4 115 13 5 116 18 6 77 10 7 108 11 8 69 13 9 8
10 9 10 911 13 11 912 9 12 813 13 13 1014 8 14 1015 17 15 4
Total 41 31 50 54 Total 32 34 28 28
1336.082 veh/hr 1834.655 veh/hrSaturation Flow Rate Saturation Flow Rate
Through Lane Righ Turn
Time: 6 - 9 am
Obs. No.
Time (sec) between 4th vehicle and …
Obs. No.
Time (sec) between 4th vehicle and …
SATURATION FLOW RATE NORTHBOUND
Bound Traffic: North
Lane(s): Through; Right Turn
Table 5- Southbound Saturation Flow Rate
15
Through Right-Turn
7th veh. 8th veh. 9th veh 10th veh. 7th veh. 8th veh. 9th veh 10th veh.1 5 1 82 8 2 73 11 3 104 13 4 115 9 5 156 11 6 77 5 7 128 7 8 109 8 9 8
10 5 10 911 8 11 612 9 12 713 8 13 1414 9 14 615 11 15 7
Total 23 32 37 35 Total 33 23 33 48
1869 veh/hr 1722.488 veh/hr
SATURATION FLOW RATE SOUTHBOUND
Total # of observations
Obs. No.Time (sec) between 4th vehicle and …
Obs. No.Time (sec) between 4th vehicle and …
Saturation Flow Rate Saturation Flow Rate
Bound Traffic: South Lane(s): Through; Right TurnTime: 6 to 9 am
Table 6 - Eastbound Saturation Flow Rate
Lane 1 +2 Lane 3
7th veh. 8th veh. 9th veh 10th veh. 7th veh. 8th veh. 9th veh 10th veh.1 9 1 122 9 2 19 123 9 3 9 134 9 4 85 10 5 86 13 6 117 17 7 118 9 8 79 11 9 11
10 13 10 1011 6 11 912 9 12 813 10 13 714 14 14 915 8 15 0 9
Total 14 65 37 40 Total 7 93 37 36
1543.592 veh/hr 1385.207 veh/hrX2 3087.184 veh/hr
Average Saturation Flow Rate 1490.797 veh/hr NO SAT FLOW FOR RIGHT TURNING LANE
SATURATION FLOW RATE EASTBOUND
Bound Traffic: EastLane(s): Through; Right Turn
Saturation Flow Rate Saturation Flow Rate
Time: 6 to 9 am
Obs. No.Time (sec) between 4th vehicle and …
Obs. No.Time (sec) between 4th vehicle and …
Table 7- Westbound Saturation Flow Rate
Lane 1 +2 Lane 3 Turn Lane
7th veh. 8th veh. 9th veh 10th veh. 7th veh. 8th veh. 9th veh 10th veh. 7th veh. 8th veh. 9th veh 10th veh.1 6 1 9 1 62 12 2 12 2 93 9 3 13 3 84 5 4 7 4 85 10 5 8 5 76 7 6 9 6 117 11 7 8 7 128 10 8 8 8 79 8 9 7 9 6
10 13 10 10 10 1111 10 11 12 11 1012 9 12 5 12 913 8 13 6 13 1114 15 14 16 14 1215 11 15 6 15 5
Total 40 39 42 23 Total 31 33 19 53 Total 19 22 56 35
1529.023 veh/hr 1729.845 veh/hr 1870.67 veh/hrX2 3058.046 veh/hr
Average Saturation Flow Rate 1595.964 veh/hr
Time (sec) between 4th vehicle and …Obs. No.
Time (sec) between 4th vehicle and …
Saturation Flow Rate Saturation Flow Rate Saturation Flow Rate
Time: 6 to 9 am
Obs. No.Time (sec) between 4th vehicle and …
Obs. No.
Bound Traffic: WestLane(s): Through; Right Turn
SATURATION FLOW RATE WESTBOUND
Table 8 - Theoretical Saturation Flow Rate
Lane Width
fw
Heavy Vehicles
fHV
Grade fgParking
fp
Bus Blockage
fbb
Utilisation Factor
Area Type fa
Right Turn fRT
Left Turn fLT
Table 9-5 Table 9-6 Table 9-7 Table 9-8 Table 9-9 Table 9-4 Table 9-10 Table 9-11 Table 9-12
L 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1863T 1900 1 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1810
R 1900 1 1.00 0.97 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1845
L 1900 1 1 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1889
T 1900 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1876R 1900 1 1.00 0.97 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1845L 1900 1 1.00 0.98 1 1 1 1 1 1 1 1862T 1900 3 1.00 0.94 1.00 0.95 1.00 0.91 1.00 1.00 1.00 4649R 1900 2 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.95 1.00 3550L 1900 1 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1805T 1900 3 1.00 0.97 1.00 0.95 1.00 0.91 1.00 1.00 1.00 4770R 1900 2 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1.00 3581
Theoretical Saturation Flow Rate
Ideal Saturation Flow
No. of Lanes (N)
Adjustment FactorsAdjusted
Saturation Flow Rate, S
Movement
NB
SB
EB
WB
Table 9 - Calculation of Adjusted Flow Rate
L 74 0.25 296 1.00 296
T 310 0.88 352.272727 1.00 352.2727273
R 176 0.59 298.305085 1.00 298.3050847
L 82 0.89 92.1348315 1.00 92.13483146
T 299 0.86 347.674419 1.00 347.6744186
R 361 0.96 376.041667 1.00 376.0416667
L 457 0.89 513.483146 1.00 513.4831461
T 1805 0.92 1961.95652 0.91 1785.380435
R 51 0.85 60 1.00 60L 212 0.74 286.486486 1.00 286.4864865T 2191 0.85 2577.64706 0.91 2345.658824R 429 0.93 461.290323 1.00 461.2903226
NB
SB
EB
WB
Traffic Characteristics
Intersection MovementVolume in
veh/hrPeak Hour
Factor [PHF]
Adjusted Volume in
veh/hrLane Group
Lane Utilization
Factor [LUF]
Adjusted Flow Rate [v]
in veh/hr
Table 10 - Cycle Length
NorthBound SouthBoundThrough(s) Through(s) Through(s) Right (s) Through(s) Right (s)
194 194 188 191196 189 187 189
188 188 194Average 195 190.33 187.67 191.33Total Average 191.08
Traffic Light SignalsCycle Length
West Bound EastBound
Table 11- Phase Length
NorthBound SouthBound NorthBound SouthBoundThrough(s) Through(s) Through(s) Right (s) Through(s) Right (s) Through(s) Through(s) Through(s) Right (s) Through(s) Right (s)
25 34 76 9 100 20 3 3 5 6 5 925 34 76 9 100 20 3 3 5 6 5 925 34 76 9 20 3 3 5 6 9
Amber to Red EastBound West Bound
Traffic Light Signals
EastBound West Bound Green to Amber
Table 12 - Lane Capacity
L 296.0 N/A N/A 191 N/A N/A N/A N/AT 352.3 1336 25 191 0.131 174.80 2.015 0.264R 298.3 1834.65 25 191 0.131 240.03 1.243 0.163L 92.1 N/A N/A 191 N/A N/A N/A N/AT 347.7 1868.51 34 191 0.178 332.47 1.046 0.186R 376.0 1722.49 34 191 0.178 306.49 1.227 0.218L 513.5 N/A N/A 191 N/A N/A N/A N/AT 1785.4 1490.80 76 191 0.398 592.94 3.011 1.198R 60.0 N/A 9 191 0.047 N/A N/A N/AL 286.5 N/A N/A 191 N/A N/A N/A N/AT 2345.7 1595.96 100 191 0.523 835.22 2.808 1.470R 461.3 1870.66975 20 191 0.105 195.80 2.356 0.247
EB
WB
Capactiy
Effective green [g/C]
Lane Group Capacity [c] in
Lane Group Ratio [X=v/c]
Flow Ratio = v/s
NB
SB
Intersection MovementAdj. Flow Rate [v] in
Saturation Flow Rate [s]
Green Time [g] in sec
Cycle [C] in sec
Table 13 - Level of Service
k 0.5 T 0.25 I 1 Cycle length 191
L 296.0 N/A N/A N/A 0.33 N/A 1.0 N/A N/A N/A N/A N/AT 352.3 0.131 2.015 174.80 0.33 0.043 1.0 1.101 2.015 41.189 45.3427 FR 298.3 0.131 1.243 240.03 0.33 0.043 1.0 1.101 1.243 66.791 73.52699 FL 92.1 N/A N/A N/A 0.33 N/A 1.0 N/A N/A N/A N/A N/AT 347.7 0.178 1.046 332.47 0.33 0.059 1.0 1.145 1.046 75.074 85.9612 FR 376.0 0.178 1.227 306.49 0.33 0.059 1.0 1.145 1.227 63.986 73.26551 FL 513.5 N/A N/A N/A 0.33 N/A 1.0 N/A N/A N/A N/A N/AT 1785.4 0.398 3.011 592.94 0.33 0.131 1.0 1.442 3.011 19.102 27.55345 FR 60.0 0.047 N/A N/A 0.33 0.016 1.0 1.033 N/A N/A N/A N/AL 286.5 N/A N/A N/A 0.33 N/A 1.0 N/A N/A N/A N/A N/AT 2345.7 0.523 2.808 835.22 0.33 0.173 1.0 1.736 2.808 16.209 28.13209 FR 461.3 0.105 2.356 195.80 0.33 0.035 1.0 1.078 2.356 36.293 39.13521 F
Intersection
Level Of Service
EB 27.55 C
WB 29.94 C
LOS by Approach
NB 58.27 E
SB 79.36 E
d1 in s/veh
d in s/veh
LOS by Lane
Group Ratio
Delay by Approach in s/veh
Lane Group Capacity [c] in veh/hr
Rp [Arrival Type 1]
P = Rp x (g/C)fp [Assumed Arrival Type
1]
PF = (1-P)fp/(1-[g/C])
Lane Group Ratio [X=v/c]
Lane Group Ratio
[X=v/c]
Effective Green [g/C]
Adjusted Flow Rate
[v] in veh/hrMovement
Table 14 - Projected Growth Rate
L 5 0.04 N/A N/A N/A N/A N/AT 2 0.04 1336.08247 1445.11 0.131 174.80 189.07R 2 0.04 1834.65459 1984.36 0.131 240.03 259.62L 2 0.04 N/A N/A N/A N/A N/AT 2 0.04 1868.51211 2020.98 0.178 332.47 359.60R 2 0.04 1722.48804 1863.04 0.178 306.49 331.50L 2 0.04 N/A N/A N/A N/A N/AT 2 0.04 1490.79724 1612.45 0.398 592.94 641.32R 2 0.04 N/A N/A N/A N/A N/AL 2 0.04 N/A N/A N/A N/A N/AT 2 0.04 1595.96381 1726.19 0.523 835.22 903.37R 2 0.04 1870.66975 1870.6697 0.105 195.80 195.80
WB 29.94 32.38 C
NB 58.27 70.89 E
SB 79.36 85.84 F
EB 27.55 29.80 C
Projected Growth Rate for the year 2020Assumed
Unchanged Effective
Lane Group Capacity [c] 2015
in veh/hr
Projected Lane Group Capacity [c]
Delay by Approach 2015
in s/veh
Projected Delay by
Approach LOSIntersection Movement
# of years of prediction
traffic growth rate/r
Saturation Flow Rate 2015 [s] in
Projected Saturation Flow Rate
EVENING 3:00PM-6:00PM
Table 15- Vehicular Traffic Evening
LEFT THROUGH RIGHT LEFT THROUGH RIGHT LEFT THROUGH RIGHT LEFT THROUGH LEFT6:00-6:15 9 42 20 16 51 131 96 581 37 62 505 65 16156:15-6:30 8 39 43 5 56 145 79 580 18 27 432 67 14996:30-6:45 5 41 27 11 51 105 87 618 32 27 476 53 15336:45-7:00 6 58 33 16 61 131 120 552 23 14 380 65 14597:00-7:15 11 58 29 20 38 119 103 675 31 32 528 55 16997:15-7:30 6 45 25 16 58 148 97 489 26 42 440 67 14597:30-7:45 8 69 30 8 38 129 120 656 23 46 575 52 17547:45-8:00 6 46 23 13 50 149 90 480 14 20 398 70 13598:00-8:15 12 50 22 16 41 120 94 613 15 22 573 60 16388:15-8:30 9 50 29 28 45 129 77 504 19 19 389 56 13548:30-8:45 8 56 34 21 53 119 93 563 12 14 521 53 15478:45-9:00 11 57 39 8 29 88 76 594 17 29 445 51 1444
Total 99 611 354 178 571 1513 1132 6905 267 354 5662 714
Total No.Time PeriodNorthbound Southbound Eastbound Westbound
Vehicular Traffic @3pm-6pm
Table 16 - Northbound & Southbound Peak Hour Factor
15 min 60 min 15 min 60 min 15 min 60 min 15 min 60 min 15 min 60 min 15 min 60 min6:00-6:15 9 42 20 16 51 1316:15-6:30 8 39 43 5 56 1456:30-6:45 5 41 27 11 51 1056:45-7:00 6 28 58 180 33 123 16 48 61 219 131 5127:00-7:15 11 30 58 196 29 132 20 52 38 206 119 5007:15-7:30 6 28 45 202 25 114 16 63 58 208 148 5037:30-7:45 8 31 69 230 30 117 8 60 38 195 129 5277:45-8:00 6 31 46 218 23 107 13 57 50 184 149 5458:00-8:15 12 32 50 210 22 100 16 53 41 187 120 5468:15-8:30 9 35 50 215 29 104 28 65 45 174 129 5278:30-8:45 8 35 56 202 34 108 21 78 53 189 119 5178:45-9:00 11 40 57 213 39 124 8 73 29 168 88 456
PHF 0.83 0.83 0.77 0.70 0.90 0.92Max 15min 12 69 43 28 61 149Max 60min 40 230 132 78 219 546
SouthboundLeft Lane Through Lane Right LaneTime Period Left Lane Through Lane Right Lane
Northbound
Table 17 - Eastbound & Westbound Peak Hour Factor
6:00-6:156:15-6:306:30-6:456:45-7:007:00-7:157:15-7:307:30-7:457:45-8:008:00-8:158:15-8:308:30-8:458:45-9:00
PHFMax 15minMax 60min
Time Period Right Lane15 min 60 min 15 min 60 min 15 min 60 min 15 min 60 min 15 min 60 min 15 min 60 min
96 581 37 62 505 6579 580 18 27 432 6787 618 32 27 476 53
120 382 552 2331 23 110 14 130 380 1793 65 250103 389 675 2425 31 104 32 100 528 1816 55 24097 407 489 2334 26 112 42 115 440 1824 67 240
120 440 656 2372 23 103 46 134 575 1923 52 23990 410 480 2300 14 94 20 140 398 1941 70 24494 401 613 2238 15 78 22 130 573 1986 60 24977 381 504 2253 19 71 19 107 389 1935 56 23893 354 563 2160 12 60 14 75 521 1881 53 23976 340 594 2274 17 63 29 84 445 1928 51 220
0.92 0.90 0.88 0.76 0.86 0.93120 675 32 46 575 67
440 2425 112 140 1986 250
Right LaneLeft Lane Through LaneWestboundEastbound
Left Lane Through Lane
Table 18 - Northbound Saturation Flow Rate
Time: 3 to 6 pmTotal # of observations = 15
Lane 1 Right-Turn
7th veh. 8th veh. 9th veh 10th veh. 7th veh. 8th veh. 9th veh 10th veh.1 9 1 72 10 2 83 9 3 44 13 4 115 5 5 116 12 6 87 5 7 108 6 8 79 7 9 8
10 5 10 911 10 11 912 7 12 813 8 13 1014 6 14 1115 6 15 4
Total 27 33 23 35 Total 26 42 28 29
1950.6321 1824.324324
Bound Traffic: North Lane(s): Through; Right Turn
Obs. No.Time (sec) between 4th vehicle and …
Obs. No.Time (sec) between 4th vehicle and …
Saturation Flow Rate Saturation Flow Rate
SATURATION FLOW RATE NORTHBOUND
Table 19 - Southbound Saturation Flow Rate
Time: 3 to 6 pmTotal # of observations = 15
Lane 1 Right-Turn
7th veh. 8th veh. 9th veh 10th veh. 7th veh. 8th veh. 9th veh 10th veh.1 14 1 112 9 2 83 8 3 84 5 4 55 9 5 86 7 6 67 9 7 98 13 8 109 13 9 9
10 12 10 811 13 11 1112 15 12 913 7 13 814 5 14 615 10 11 15 11
Total 17 34 46 63 Total 25 33 27 42
1594.488 1863.14Saturation Flow Rate Saturation Flow Rate
Obs. No.Time (sec) between 4th vehicle and …
Obs. No.
Bound Traffic: South Lane(s): Through; Right TurnSATURATION FLOW RATE SOUTHBOUND
Time (sec) between 4th vehicle and …
Table 20 - Eastbound Saturation Flow Rate
Time: 3 to 6 pmTotal # of observations = 15
Lane 1 & 2 Lane 3
7th veh. 8th veh. 9th veh 10th veh. 7th veh. 8th veh. 9th veh 10th veh.1 13 1 42 11 2 103 12 3 64 7 4 75 7 5 66 12 6 77 10 7 68 8 8 89 11 9 11
10 8 10 911 6 11 912 9 12 913 11 13 1514 11 14 1715 13 15 13
Total 13 43 46 47 Total 24 87 0 26
3362.74 1584.352
Average Saturation Flow Rate 1649.031 veh/hr NO SAT FLOW FOR RIGHT TURNING LANE
Time (sec) between 4th vehicle and …
Saturation Flow Rate Saturation Flow Rate
Bound Traffic: East Lane(s): Through; Right Turn
Obs. No.Time (sec) between 4th vehicle and …
Obs. No.
SATURATION FLOW RATE EASTBOUND
Table 21 - Westbound Saturation Flow Rate
Time: 3 to 6 pmTotal # of observations = 15
Lane 1 & 2 Lane 3 Turn Lane
7th veh. 8th veh. 9th veh 10th veh. 7th veh. 8th veh. 9th veh 10th veh. 7th veh. 8th veh. 9th veh 10th veh.1 6 1 8 1 62 12 2 8 2 63 9 3 6 3 164 5 4 9 4 95 10 5 10 5 106 7 6 5 6 127 11 7 8 7 98 10 8 8 10 8 109 8 9 11 9 6
10 13 10 6 10 911 10 11 11 11 712 9 12 10 12 1113 8 13 6 13 13 714 15 14 6 14 1115 11 15 12 15 10
Total 40 39 42 23 Total 25 46 32 44 Total 25 25 41 48
3058.046 1608.739 1754.196
Average Saturation Flow Rate 1555.595 veh/hr
Saturation Flow Rate
Obs. No.Time (sec) between 4th vehicle and …
Saturation Flow Rate
SATURATION FLOW RATE WESTBOUNDBound Traffic: West Lane(s): Through; Right Turn
Obs. No.Time (sec) between 4th vehicle and …
Obs. No.Time (sec) between 4th vehicle and …
Saturation Flow Rate
Table 22 – Theoretical Saturation Flow Rate
Lane Width
fw
Heavy Vehicles
fHV
Grade fg Parking fpBus Blockage
fbb
Utilization Factor fbb
Area Type fa
Right Turn fRT
Left Turn fLT
Table 9-5 Table 9-6 Table 9-7 Table 9-8 Table 9-9 Table 9-4 Table 9-10 Table 9-11 Table 9-12
L 1900 1 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1800T 1900 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1880R 1900 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1878L 1900 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1888T 1900 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1878R 1900 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1893L 1900 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1900T 1900 3 1.00 0.96 1.00 0.95 1.00 0.91 1.00 1.00 1.00 5497R 1900 1 0.97 0.97 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1692L 1900 1 0.97 0.96 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1764T 1900 3 0.97 0.95 1.00 1.00 1.00 0.91 1.00 1.00 1.00 5269R 1900 1 0.97 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1730
Adjusted Saturation
Flow Rate, S
Theorectical Saturation Flow Rate
Intersection Movement
EB
WB
NB
SB
Adjustment FactorsIdeal Saturation
Flow
No. of Lanes (N)
Table 23 - Calculation of Adjusted Flow Rate
L 40 0.833 48 1 48
T 230 0.833 276 1 276
R 132 0.767 172 1 172
L 78 0.696 112 1 112
T 219 0.898 244 1 244
R 546 0.916 596 1 596
L 440 0.917 480 1 480
T 2425 0.898 2700 0.91 2457
R 112 0.875 128 1 128
L 140 0.761 184 1 184
T 1986 0.863 2300 0.91 2093
R 250 0.933 268 1 268
Traffic Characteristics
SB
NB
EB
WB
Intersection MovementVolume in
veh/hrPeak Hour
Factor [PHF]Adjusted
Volume in Lane Group
Lane Utilization
Adjusted Flow Rate [v] in veh/hr
Table 24 – Cycle Length
SouthBound EastBound WestBoundThrough Right Through
198 199 198198 203 199198 200 198
Average 198 201 198Average Cycle
Length
Traffic Light SignalsCycle Length
198
NorthBoundThrough/Right
198198
Through/Right192200197196198
Table 25 - Phase Length
Through Right Through Right Through Right Through Right94 12 99 21 6 4 4 997 12 102 21 4 3 5 992 12 99 21 5 4 5 9
333
Traffic Light Signals
33320
2020 35
3939
Through/Right Through/Right
Amber to RedNorthBound SouthBound EastBound WestBound
Through/Right Through/Right
Green to AmberNorthBound SouthBound EastBound WestBound
Table 26 - Lane Capacity
L 48 N/A N/A 198 N/A N/A N/A N/AT 276 1950.6321 20 198 0.101 197.03 1.401 0.141R 172 1824.3243 20 198 0.101 184.28 0.933 0.094L 112 N/A N/A 198 N/A N/A N/A N/AT 244 1594.4882 36 198 0.182 289.91 0.842 0.153R 596 1863.1397 36 198 0.182 338.75 1.759 0.320L 480 N/A N/A 198 N/A N/A N/A N/AT 2457 1649.0307 93 198 0.470 774.54 3.172 1.490R 128 N/A 12 198 0.061 N/A N/A N/AL 184 N/A N/A 198 N/A N/A N/A N/AT 2093 1555.595 100 198 0.505 785.65 2.664 1.345R 268 1754.196 21 198 0.106 186.05 1.440 0.153
Capacity
WB
NB
Effective green [g/C]
Lane Group Capacity [c] in
Lane Group Ratio [X=v/c]
Flow Ratio = v/s
SB
MovementAdj. Flow Rate [v] in
Saturation Flow Rate
Green Time [g] in sec
Cycle [C] in sec
Intersection
EB
Table 27 - Level of Service
k= 0.5 T 0.25 I 1.0 Cycle Length (sec) 198
L 48 N/A N/A N/A 0.33 N/A 1.0 N/A N/A N/A N/A N/AT 276 0.101 1.4007767 197.03355 0.33 0.0333 1.0 1.075 1.401 63.536 68.32 FR 172 0.101 0.9333867 184.275184 0.33 0.0333 1.0 1.075 0.93 95.352 102.53 EL 112 N/A N/A N/A 0.33 N/A 1.0 N/A N/A N/A N/A N/AT 244 0.182 0.8416494 289.906943 0.33 0.0600 1.0 1.149 0.84 96.240 110.57 ER 596 0.182 1.7593957 338.752679 0.33 0.0600 1.0 1.149 1.76 46.039 52.89 FL 480 N/A N/A N/A 0.33 N/A 1.0 N/A N/A N/A N/A N/AT 2457 0.47 3.1721861 774.544721 0.33 0.1550 1.0 1.593 3.17 16.550 26.37 FR 128 0.061 N/A N/A 0.33 0.0200 1.0 1.043 N/A N/A N/A N/AL 184 N/A N/A N/A 0.33 N/A 1.0 N/A N/A N/A N/A N/AT 2093 0.51 2.6640224 785.654053 0.33 0.1667 1.0 1.684 2.66 18.393 30.97 FR 268 0.11 1.4404646 186.05109 0.33 0.0350 1.0 1.079 1.44 61.439 66.32 F
Adj. Flow Rate [v] in
veh/hr
Effective Green [g/c]
Lane Group Ratio
C
d in s/vehLOS by
Lane Group Ratio
Level Of Service
WB 34.98 D
NB 85.42 F
Delay by Approach in s/veh
LOS by Approach
SB 69.65 E
X [Ratio for Lane
Group]d1 in s/veh
Lane Group Capacity
Rp [Arrival Type 1]
P = Rp x (g/c)fp [Assumed Arrival Type
1]
PF = (1-P)fp/(1-
[g/c])Intersection Movement
EB 26.37
Table 28 - Projected Growth Rate
L 5 0.04 N/A N/A N/A N/A N/AT 5 0.04 1950.6321 2373.24 0.101 197.03 239.72R 5 0.04 1824.3243 2219.57 0.101 184.28 224.20L 5 0.04 N/A N/A N/A N/A N/AT 5 0.04 1594.4882 1939.94 0.182 289.91 352.72R 5 0.04 1863.1397 2266.79 0.182 338.75 412.14L 5 0.04 N/A N/A N/A N/A N/AT 5 0.04 1649.0307 2006.30 0.470 774.54 942.35R 5 0.04 N/A N/A N/A N/A N/AL 5 0.04 N/A N/A N/A N/A N/AT 5 0.04 1555.595 1892.62 0.505 785.65 955.87R 5 0.04 1754.196 2134.25 0.106 186.05 226.36
Lane Group Capacity [c] 2015
in veh/hr
Projected Lane Group Capacity [c] 2020 [s] in
veh/hr
Delay by Approach
2015 in s/veh
Intersection Movement# of years
of prediction
traffic growth rate/r
Saturation Flow Rate 2015 [s] in
veh/hr
34.98
Projected Growth Rate for Year 2020
EB 26.37 32.08 C
WB 42.56 D
NB 85.42 103.93 F
Prejected Delay by
Approach 2020 in s/veh
LOS
SB 69.65 84.74 F
Projected Saturation Flow Rate 2020 [s] in
veh/hr
Assumed Unchanged
Effective green [g/C]
SAMPLE CALCULATIONS
Volume Data
The hourly volume is calculated as follows, (V) (veh/hr)
Hourly Volume = ∑ (Vehicles∈15mins intervals for one (1 )hr time period )
Using the East bound through lane as an example
Hourly Volume (veh/hr), 8 am to 9 am = 255+409+307+421
= 1805veh/hr
Peak 15min Value (V15) (veh/hr)
Peak Flow Rate (veh/hr) = Peak Flow Rate (withinhour)
= 490
Peak Hour Factor (PHF)
Again using the East bound through lane as an example
Peak Hour factor (PHF) =Hourly Volume(V 60)
4×Peak Flow Rate (V 15)
Peak Hour factor (PHF), 6 am to 9am =1805
4×490
= 0.92
Saturation Flow Rate (Actual)
Using the calculation for lane 3 (East bound through)
Observed Saturation Flow Rate ,[ SFR ]=3600× ¿of Observations ¿∑ 7 th veh
3+∑ 8 thveh
4+∑ 9 th veh
5+∑ 10 th veh
6
Observed Saturation Flow Rate , [SFR ]= 3600×1573+
934
+375
+366
=1490.8 veh/hr
Traffic Characteristics
Given the following information:
Max Hourly Volume (veh/hr), 8 am to 9 am = 1805
Peak Hour Factor [PHF] = 0.92
Lane Utilization Factor [LUF] = 0.0.91
The following calculations are made:
Adjusted Volume (veh/hr) = 18050.92
=1961.95
Adjusted Flow Rate [v] in (veh/hr) = 1961.95×0.91=1785.98
L 457 0.89 513.483146 1.00 513.4831461
T 1805 0.92 1961.95652 0.91 1785.380435
R 51 0.85 60 1.00 60
Intersection MovementVolume in
veh/hr
Peak Hour Factor [PHF]
Adjusted Volume in
veh/hr
Lane Group
Lane Utilization
Factor [LUF]
Adjusted Flow Rate
[v] in veh/hr
EB
Capacity
Given the following information:
Adjusted Flow Rate [v] in (veh/hr) = 1785.4
Saturation Flow Rate [SFR] (veh/hr) = 1490.8
Green Time [g] (sec) = 76
Cycle [C] = 191
The following calculations are made:
Effective Green [g/C] = gC
= 76191
=0.398
Lane Group Capacity [c] in (veh/hr) = SFR×gC
=1490.8×0.393=592.94
Lane Group Ratio X ¿vC
=1785.4592.94
=3.011
Flow Ratio = vs=1785.4
1490.8=1.198
L 513.5 N/A N/A 191 N/A N/A N/A N/AT 1785.4 1490.80 76 191 0.398 592.94 3.011 1.198R 60.0 N/A 9 191 0.047 N/A N/A N/A
EB
Effective green [g/C]
Lane Group Capacity [c] in
Lane Group Ratio
Flow Ratio = v/s
Intersection MovementAdj. Flow Rate [v] in
Saturation Flow Rate
Green Time [g] in
Cycle [C] in sec
Level of Service Calculations
Given the following information:
Adjusted Flow Rate [v] (veh/hr) = 1785.4
Effective Green [g/C] = 0.398
Lane Group Ratio [X=v/c] = 3.011
Once X > 1.0, Level of Service = F
Lane Group Capacity [c] (veh/hr) = 592.94
Rp [Arrival Type 1] = 0.33
fp [Assumed Arrival Type 1] = 1.0
We can calculate the following:
P = Rp×( gC )= 0.33×0.398
= 0.131
PF= (1−P ) fp
(1−[ g/C ])
= (1−0.131 ) 1(1−0.398 )
= 1.442
d1= 0.5C(1− g
C )2
(1− gC )X
= 0.5×191 (1−0.398 )2
(1−0.398 )×3.011
= 19.102 s/veh
d= d1PF
= 19.02 (1.442 )
= 27.55 s/veh
= 20> 27.55> 35 s/veh hence LOS by Approach = C
Growth Rate for the Year 2020
Given The following information:
No. of years of prediction (from 2015 to 2020) = 5 years
Traffic Growth Rate = 4%
Saturation Flow Rate [SFR] (veh/hr) 2015 = 1490.8
Assumed unchanged Effective Green [g/C] = 0.398
Lane Group Capacity [c] (veh/hr) 2015 = 592.94
Delay Approach (veh/hr) 2015 = 176.28
We can calculate the following:
Projected SFR 2015 = 1490.8× (1+0.04 )5=1612.45 veh/hr
Projected Lane Group Capacity [c] 2015 = 592.94× (1+0.04 )5=641.32veh/hr
Projected Delay by Approach 2015 = 27.55× (1+0.04 )5=29.80 s/ veh
L 513.5 N/A N/A N/A 0.33 N/A 1.0 N/A N/A N/A N/A N/AT 1785.4 0.398 3.011 592.94 0.33 0.131 1.0 1.442 3.011 19.102 27.55345 FR 60.0 0.047 N/A N/A 0.33 0.016 1.0 1.033 N/A N/A N/A N/A
LOS by Approach
d1 in s/veh
d in s/veh
LOS by Lane
Group Ratio
Delay by Approach in s/veh
Lane Group
Capacity [c] in
Rp [Arrival Type 1]
P = Rp x (g/C)
fp [Assumed
Arrival Type 1]
PF Lane Group
Ratio [X=v/c]
Lane Group Ratio
[X=v/c]
Effective Green [g/C]
Adjusted Flow Rate
[v] in veh/hr
MovementIntersection
EB 27.55 C
Resulting in a LOS of F.
https://www.cob.org/documents/planning/growth/fairhaven_high/eis%20info/2009-09-28-trans-Appendix%20A.PDF
https://www.cob.org/documents/planning/growth/fairhaven_high/eis%20info/2009-09-28-trans-Appendix%20A.PDF
http://www.westernite.org/annualmeetings/santabarb12/Compendium/2C-Yu-Sulijoadikusumo
L 2 0.04 N/A N/A N/A N/A N/AT 2 0.04 1490.7972 1612.45 0.398 592.94 641.32R 2 0.04 N/A N/A 0.047 N/A N/A
EB 27.55 29.80 F
Projected Growth Rate for the year 2020
Assumed Unchanged
Effective green [g/C]
Lane Group Capacity [c] 2015
in veh/hr
Projected Lane Group Capacity [c] 2020 [s] in
veh/hr
Delay by Approach
2015 in s/veh
Projected Delay by Approach
2020 in s/veh
LOSIntersection Movement# of years
of prediction
traffic growth rate/r
Saturation Flow Rate 2015 [s] in
veh/hr
Projected Saturation Flow Rate 2015 [s] in
veh/hr