    PULL-OFF TEST REPORT

    PROJECT : PUBS PEDESTRIAN BRIDGE ACROSS SUNGEI DATE OF ATTACHMENT : 17 DEC 2009

    SERANGOON LORONG HALUS WETLANDS. (TEST PULL STUBS/DOLLIES)OWNERS CONSULTANT : CPG CONSULANTS PTE LTD DURATION OF LAST COAT : > 14 DaysMAIN CONTRACTOR : WAN SHENG HAO CONSTRUCTION PTE LTD (DRY TIME)APPLICATOR : EASTERN BLASTING & COATING PTE LTD DATE OF TEST : 18 DEC 2009 SPECIFICATION REF : TOTAL Paint Specification.TYPE OF ADHESIVE USED : ARALDITE 2-PACK EPOXY GLUE.

    Location / Areas DFT(m)

    Pull-off Strengt

    h

    Type of Failure Remarks

    Stub/Dolly # 1 399 9.0 MPa 100% glue failure. Galvanized pipes 24 x 12-mLength abraded before painting

    Stub/Dolly # 2 408 9.5 MPa 100% glue failure.with the following 2-coat paintsystem:-

    Stub/Dolly # 3 424 6.0 MPa 100% glue failure.1 st coat Sigmacover 200 Primer(Grey) @ 150 microns DFT.

    Average value of the test areas:- 410 8.2 MPa

    2 nd coat SigmaDur 550 Finishing(RAL 7030) @ 50 microns DFT.Primer Batch Nos.: Base5934002559 and HardenerFinishing Batch Nos.: Base5942003230 and Hardener

    The pull-off test and dry film thickness test were carried out with Elcometer H.A.T.E. 108 in accordance with ASTM 4541 and Elcometer456 respectively. Both tests were conducted at the same spot.

    Test Conducted by: Witnessed by:Lam Pin Min 1) CPG Consultants Representative,

    Technical Service Representative 2) Main Contractors Representative andPPG Coatings (Singapore) Pte Ltd. 3) Applicators Representative.