PUBLIC SAFETY BOND MEASURE $55.8M

Embed Size (px)

Citation preview

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    1/14

    CITY OF SALEM

    PUBLIC SAFETY BOND MEASU

    NEW POLICE FACILITYAND

    SEISMIC STRENGHTHENING OF CIVIC C

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    2/14

    THE PUBLIC SAFETY BOND MEAS

    $55.8M

    THIS ONE WILL PASS

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    3/14

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    4/14

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    5/14

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    6/14

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    7/14

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    8/14

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    9/14

    RECOMMENDATIONS

    !

    DETERMINE THAT THE $83M BOND MEASURE ISUNLIKELY TO PASS

    ! DETERMINE THAT THE $72M BOND MEASURE ISUNLIKELY TO PASS

    ! ACCEPT THE JUNE 3 (2013) STAFF REPORT

    ! PLACE THE $55.8M (plus inflation) PUBLIC SAFETYMEASURE ON THE BALLOT

    ! ALTERNATIVELY, REGROUP AND PLAN ON A 2017MEASURE

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    10/14

    HOW TO REDUCE COST (further)

    !

    DESIGN-BUILD TEAM … architects & builders! DESIGN-BUILD CONTRACT … AIA document

    ! VALUE ENGINEERING … seeking the best value

    ! TILT-UP CONCRETE CONSTRUCTION … like State

    ! INDUSTRIAL FINISHES … concrete floors, exposed sys

    ! SURFACE PARKING … like shown in staff report

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    11/14

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    12/14

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    13/14

    THE SOLUTION

    ! NEW POLICE FACILITY at O’Brien site

    ! SURFACE PARKING … no expensive parking garag

    ! SEISMIC strengthening of Civic Campus

    !

    ACCEPTABLE COST … that public will support

  • 8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M

    14/14

    THE PUBLIC SAFETY BOND MEAS

    $55.8M

    THIS ONE WILL PASS