Upload
geoffrey-james
View
217
Download
0
Embed Size (px)
Citation preview
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
1/14
CITY OF SALEM
PUBLIC SAFETY BOND MEASU
NEW POLICE FACILITYAND
SEISMIC STRENGHTHENING OF CIVIC C
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
2/14
THE PUBLIC SAFETY BOND MEAS
$55.8M
THIS ONE WILL PASS
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
3/14
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
4/14
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
5/14
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
6/14
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
7/14
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
8/14
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
9/14
RECOMMENDATIONS
!
DETERMINE THAT THE $83M BOND MEASURE ISUNLIKELY TO PASS
! DETERMINE THAT THE $72M BOND MEASURE ISUNLIKELY TO PASS
! ACCEPT THE JUNE 3 (2013) STAFF REPORT
! PLACE THE $55.8M (plus inflation) PUBLIC SAFETYMEASURE ON THE BALLOT
! ALTERNATIVELY, REGROUP AND PLAN ON A 2017MEASURE
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
10/14
HOW TO REDUCE COST (further)
!
DESIGN-BUILD TEAM … architects & builders! DESIGN-BUILD CONTRACT … AIA document
! VALUE ENGINEERING … seeking the best value
! TILT-UP CONCRETE CONSTRUCTION … like State
! INDUSTRIAL FINISHES … concrete floors, exposed sys
! SURFACE PARKING … like shown in staff report
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
11/14
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
12/14
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
13/14
THE SOLUTION
! NEW POLICE FACILITY at O’Brien site
! SURFACE PARKING … no expensive parking garag
! SEISMIC strengthening of Civic Campus
!
ACCEPTABLE COST … that public will support
8/15/2019 PUBLIC SAFETY BOND MEASURE $55.8M
14/14
THE PUBLIC SAFETY BOND MEAS
$55.8M
THIS ONE WILL PASS