COSETTE V. CANILAO Executive Director
Public-‐Private Partnership Center
RA 7718: The Amended Build-‐Operate-‐Transfer (BOT) Law
BOT-IRR: BOT Law’s Implementing Rules and Regulations
RA 7160: The Local Government Code of the Philippines 1991
Other Related Laws o Charters of Government Owned and Controlled
Corporations (Republic Acts and Executive Issuances) o Legal Mandates of Implementing Agencies (Republic Acts) o Sectoral Regulatory Agencies (Republic Acts and Executive
Issuances)
Contracting Parties/Implementing Agencies Line Agencies (national agencies) Government Corporations Local Government Units
Other National Agencies Concerned Line Agencies/ Departments (policymaking) National Regulatory Bodies Sectoral Regulators (e.g. toll regulatory board)
Review and Approving Bodies Inter-Agency Investment Coordination Committee Local Government Councils
Coordinating and Monitoring Agency Public-Private Partnership Center
Executive Order No. 8 signed on September 9, 2010:
BOT Center renamed as PPP Center
Expanded mandate: BOT Law Joint Venture arrangements Other PPP arrangements
PPP Center to: o Provide advisory services o Facilitate development of PPP projects o Advocate policy reforms o Monitor implementation of PPP projects
Project Development and Monitoring Facility (PDMF)
• revolving fund for pre-‐investment activities such as preparation of pre-‐FS, FS and other transaction advisory services • GOP funded US$ 7M, US$ 6M from AusAid thru a TA managed by ADB • panel of advisors to provide assistance in structuring PPP projects
Strategic Support Fund (SSF)
• for right of way acquisition and related costs, including resettlement • costs of designing, building and otherwise delivering any part of the project
Continuous review of projects that may be pursued thru public-private partnerships
Developed institutional capacity to plan and deliver viable PPP projects
Created a stable macroeconomic environment and developed a domestic debt market
Streamlined processes and improved inter-agency coordination
Enhanced the legal and regulatory framework
Launched the Project Development & Monitoring Facility (PDMF) to help develop PPP projects
Successful bid of first PPP project in December 2010
" PPP for School Infrastructure " Vaccine Self Sufficiency Project (Phase
II) " Modernization of the Philippine
Orthopedic Center " New Water Supply Source Project " Operation & Maintenance of Angat
Hydro Electric Power Plant (AHEPP) Auxiliary Turbines 4 & 5
" Balara Water Hub " NLEX-SLEX Connector " CALA Expressway (Cavite & Laguna
Side)
" LRT line 1 South Extension " LRT line 2 East Extension and
Operation & Maintenance Privatization
" Operation & Maintenance of the Laguindingan Airport
" New Bohol (Panglao) Airport " Mactan Cebu International Airport
Passenger Terminal Building " Automatic Fare Collection System " Grains Central Project " Establishment of Cold Chain
Systems Covering Strategic Areas in the Philippines
Rollout of properly prepared projects PDMF pre-‐investment Winancing support IAs with technical and transaction advisors PPP Center’s direct project development assistance
Conduct of Capacity Development assistance National line agencies Local government units (LGUs)
Improved Policy Guidelines Revised BOT-‐IRR Guidelines for PPPs for LGUs Joint Venture Guidelines
Department of Health Usec Teodoro Herbosa 711-6075
• Vaccine Self-sufficiency project
• Dr. Remigio Olveda • (632) 809-7599
• Modernization of Philippine Orthopedic Center
• Mr.Jose Pujalte, Orthopedic Surgeon
• (632) 732-0452
PPP Center • Cosette V. Canilao,
Executive Director [email protected] (632) 929-5187
Department of Education • Francis Varela,
Undersecretary • (632) 633-9342
Department of Transportation and Communications
• Rene K. Limcaoco, Undersecretary • (632) 725-0204 loc. 247
Department of Public Works and Highways
• Maria Catalina E. Cabral, Assistant Secretary • (632) 304-3268
Department of Agriculture
• Antonio Fleta, Undersecretary • (632) 920-4085
Metropolitan Waterworks & Sewerage System (MWSS)
• Gerardo Esquivel, Administrator
• 922-3757
• New Water Supply Source Project • Ms. Vangie Dacanay, Project Manager • (632) 920-5413
• Operation & Maintenance of Angat Hydro Electric Power Plant (AHEPP) Auxiliary Turbines 4 & 5 • Mr. Jojo Dorado, Project Manager • (632) 920-5413
• Balara Waterhub Project • Ms. Cecille Bautista, Executive Assistant • (632) 922-2969