M4 Corridor around Newport PUBLIC INQUIRY DOCUMENT REFERENCE NO. : ID/109a RAISED BY: Matthew Jones DATE: 13/09/17 RESPONDED BY: Matthew Jones DATE: 25/09/17 SUBJECT: Letter from Sophie Howe - Future Generations Commissioner issued 13 September 2017 Please find attached a letter from Sophie Howe - Future Generations Commissioner issued 13 September 2017 to the Inspectors. Now revised to include attachments referred to in the letter - 5 ways of working and 7 well-being goals. A Welsh Government Response to the above will be provided in due course.

PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

M4 Corridor around Newport

PUBLIC INQUIRY DOCUMENT

REFERENCE NO. : ID/109a

RAISED BY: Matthew Jones DATE: 13/09/17

RESPONDED BY: Matthew Jones DATE: 25/09/17

SUBJECT: Letter from Sophie Howe - Future Generations Commissioner issued 13 September 2017

Please find attached a letter from Sophie Howe - Future Generations Commissioner issued

13 September 2017 to the Inspectors. Now revised to include attachments referred to in

the letter - 5 ways of working and 7 well-being goals.

A Welsh Government Response to the above will be provided in due course.

Page 2: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

By email

13th September 2017.

The M4 Corridor Around Newport Public Local Inquiry

Dear Inspector, It has recently been brought to my attention that one of the objectors to the proposed M4 corridor around Newport has alleged that the Welsh Government has not appropriately interpreted the provisions of the Well-being of Future Generations (Wales) Act 2015 in relation to its proposals for the M4 corridor around Newport. As somebody that is independent of the Welsh Government I am unable to comment on that allegation. However, I am concerned that such an allegation has been made and I feel duty bound to ensure that the duties under the Act are being applied in the correct manner.  This is, not least, because the incorrect adoption and interpretation of the principles under the Act may lead to misunderstanding and ambiguity across those parts of the Welsh public sector covered by the Act. The misapplication of the duties under the Well-being of Future Generations (Wales) Act 2015 in this case might set a wrong precedent which I am keen to avoid. The legislation provides a new framework for decision making in Wales, and requires a dramatic shift in the way we take decisions in Wales; my role is to ensure that these new ways of working and making decisions are adopted by those organisations covered by the Act. It is for these reasons that I wish the inquiry to admit this letter as evidence, giving due consideration to its contents. I therefore ask that you exercise your discretion under regulation 24(10) of the Highways (Inquiries Procedure) Rules 1994 and regulation 18(11) of the Compulsory Purchase (Inquiries Procedure) (Wales) Rules 2010 and allow this letter to be taken into account as written representations made to the inquiry. You will no doubt appreciate that it is my duty to promote the sustainable development principle and to act as the guardian of the ability of future generations to meet their needs.  In holding an office that is independent of government, and impartial in decision making, this letter seeks to address, independent of any preference or view concerning the M4 corridor around Newport, the relevant issues when considering the duties under the Well-being of Future Generations (Wales) Act 2015.  In February 2017, I submitted a proof of evidence to the inquiry and this letter is supplementary to, and should be read in light of, that proof of evidence. Sustainable development under the Act Although sustainable development is not a new concept, its approach in Wales has evolved over the last few years culminating in the passing of the Act, which has introduced clearer, better defined, and

Page 3: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

stronger principles that should be embedded in the decision-making process. I would like firstly to stress the importance of transitioning from a traditional approach to sustainable development to the innovative concepts introduced in the Act. I submit therefore that claims made by officials and witnesses in the Inquiry that they have been carrying out sustainable development for years and therefore know how to apply the Act, cannot be accepted without further scrutiny as to whether the actions being taken and the decision making framework being applied actually meets the new statutory requirements which are quite different from those set out in previous policy. I need to stress that while the terminology remains the same: ‘sustainable development principle’, its meaning under the Act has changed. I would therefore expect all public bodies covered by the Act and those taking decisions within them to demonstrate how they are doing things differently. I would expect to see reference to the new sustainable development definition and consideration of short term/long term needs and an explanation as to how they have reached their decision using the five ways of working. I recognise that sustainability objectives have been part of the WelTAG process (guidance and criteria), and that this has been used to appraise various proposals and options. However, the current guidance dates back to 2008 and again doesn’t sufficiently reflect the current thinking or statutory requirements introduced by the Act, such as wider impacts on health, culture and communities. I have designed a framework to help take decisions in accordance with the sustainable development principle in relation to infrastructure projects, and in this case the framework may be useful when seeking to ensure that both the seven well-being goals and the five ways of working have been fully considered. Using the framework, it is anticipated that the questions I have listed or similar ones have 1) been asked and 2) considered properly in reaching a conclusion on the advantages and/or disadvantages of pursuing certain courses of action – in this case the decision whether or not to build a new section of motorway; and in deciding if a route is better than the others. I anticipate that applications not demonstrating how the sustainable development principle has been applied would not be progressed as they would not be compliant with the duty to carry out sustainable development under the Act. Balancing under the Act Secondly, it has been alleged that the balancing exercise between different pillars of Well-being meant that one or more could outweigh others. I need to explain that the four pillars of well-being and the five ways of working under the Act should be considered together and equally (i.e. a true balancing exercise). The same applies to the seven goals and the well-being objectives of public bodies. I understand that historically it has not been uncommon for the economic benefits to be given precedence but this is one of the reasons why legislation was needed to redress the balance between the different needs and the different core elements leading to decisions which are sustainable in the long-term. Under the Act, we must look for solutions which address the four pillars of well-being together and select the one which delivers best against the four pillars of well-being. One pillar cannot override the

Page 4: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

others. The same applies to balancing the needs of both current and future generations. I expect public bodies to demonstrate that they are seeking to take decisions which deliver the best outcomes across all four pillars of well-being. The projects and decisions must contribute to all of them as if they were one. The new Act requires public bodies to take holistic decisions and to cease making decisions which harm critical elements of well-being, including social economic environmental and cultural elements. I appreciate that this is difficult, and this is why in choosing between options, a public body must identify and retain the solution which maximises a contribution to all the pillars of well-being as well as take reasonable steps to meet their well-being objectives. I would expect that decisions only contributing to one or two pillars of well-being to be disregarded and those that have multiple benefits across each of the elements of Wellbeing to be selected. The balancing in this revolutionary Act means giving as equal as possible weight to each element and not allowing one to tip the scale. I mean that all decisions must improve the economic, social, environmental and cultural well-being of Wales which is the duty to carry out sustainable development under the Act. Within these decisions, those achieving best balance should be favoured. This should also apply to the weighing of different public interests. The Act, and Welsh Government’s guidance, clearly refer to this as a “balancing” exercise rather than an exercise of trade-offs. I therefore cannot agree with statements made by Morag Ellis, QC in the Welsh Government’s Opening Statement. By way of example, whilst I agree that:

“4.38 [The sustainable development principle, therefore, precludes decision makers from taking a short-termist approach at the expense of future generations. The 5 ways of working are complementary to and subject to the imperative under s 5(1) to avoid compromising the interests of future generations;”

I fundamentally disagree with the next paragraph which states: “The ways of working acknowledge the fact that there may be trade-offs between desirable objectives and goals. The sustainable development principle therefore involves striking a balance between different desiderata.”

It is my view that not only is this is an incorrect interpretation of the Act but it could set a damaging precedent which could undermine the spirit and intention of the legislation. The Act moves us away from the traditional trades-offs approach to one of balancing in a more literal sense. The Oxford Dictionary defines balance as "A situation in which different elements are equal or in the correct proportions", and it appears that some evidence put forward in this inquiry is directly the opposite i.e. Allowing one element of Wellbeing, in this case economic wellbeing (although there are of course arguments to the contrary and questions as to whether it achieves even this given the definition of A Prosperous Wales under Act) to outweigh another. The Act imposes on public bodies a duty to take into account the importance of balancing short term needs with the need to safeguard the ability to meet long term needs, especially where things done to

Page 5: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

meet short term needs may have detrimental long term effect. This requires an approach which actively seeks to give equal weight to different sets of needs. I would therefore expect public bodies to demonstrate how they are operating this safeguard. This is where the mitigation elements of any proposals (including in relation to biodiversity, culture etc.,) should be very carefully considered and again taken in a holistic manner to maximise positive impacts. I am therefore very concerned when I read in the Welsh Government’s Rebuttal to Friends of the Earth statement that:

“7  The evidence presented by the Welsh Government clearly identifies the long term environmental effects of the Scheme and I acknowledge this in my proof, but this does not mean that such development must be rejected out of hand.  The WFG Act requires action to be taken to ensure the needs of the present are met: there is a pressing need to take action now to address the problems associated with the M4 around Newport.  8.  A balanced judgement is required to decide whether taking action as proposed and constructing the new section of motorway would preclude choices for future generations.   9. In paragraphs 244-249 of my proof of evidence I have weighed all the evidence relating to economic, social, environmental and cultural issues in order to reach a balanced conclusion on the merits of the Scheme.  I conclude that the benefits the Scheme would bring to meet the needs of the present provide a compelling case in its favour.  The Scheme is in accordance with the Welsh Government’s duties under the WFG Act, it has been developed in accordance with the sustainable development principle, and it would contribute to achievement of the well-being goals.”

This is clearly wrong as demonstrated by the letter of the law. Section 3(1) of the Act requires public bodies to carry out sustainable development, and in doing so section 5 of the Act requires the public body to “act in a manner which seeks to ensure that the needs of the present are met without compromising the ability of future generations to meet their own needs”. Good and compliant decision making under the Act requires that BOTH sets of needs are met by the decision, or at least without compromising the ability of future generations to meet their own needs. I would anticipate a decision which does not allow for this would be abandoned as not complying with the statutory duty. Interface between the Act and other duties Thirdly it was alleged that the Act was used as a justification not to comply with other duties under the Environment (Wales) Act 2015 and the Wildlife and Countryside Act 1981. Again, while not commenting on the allegation itself, I feel I must stress that it would be damaging not to interpret the duties under other legislation in the light of the Well-being of Future Generations (Wales) Act 2015. It is a common public law principle that public bodies frequently find themselves under several duties and that when this happens the public body will have to comply with all their duties. A selective or trade-off is not a suitable course and risks a decision being open to challenge. From the perspective of the duties under

Page 6: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

the Act, again I would anticipate mitigation being important when duties under the Act contradict others. I note the submissions of Natural Resources Wales in this regard, which clearly set out their position on this matter.  The Environment (Wales) Act was developed alongside the Well-being of Future Generations (Wales) Act 2015 and therefore the Acts should reinforce each other. The duties under the Environment Act particularly resonate with the Resilient Wales Goal which “maintains and enhances a biodiverse natural environment with healthy functioning ecosystems that support social, economic and ecological resilience and the capacity to adapt to change (for example climate change)”. Welsh Government has recently published the statutory Natural Resources Policy, required under the Environment (Wales) Act 2016, which states that for Transport “we are promoting a more sustainable road transport network and a modal shift away from roads for people and freight. This will reduce emissions and the impacts that transport has on our environment and our health. We are committed to improving active travel opportunities and promoting public transport. In taking this action forward we will take action on our transport network that enhances the resilience of our ecosystems and reverses the decline of biodiversity”.  The M4 proposals seems to directly contradict this policy statement as the scheme and the mitigation do not seem to support this aspiration. Integrated approach Finally, I refer to the provisions of section 5(2) of the Act, which states:

(2) In order to act in that manner, a public body must take account of the following things— […] (b)the need to take an integrated approach, by considering how— (i)the body’s well-being objectives may impact upon each of the well-being goals; (ii)the body’s well-being objectives impact upon each other or upon other public bodies’ objectives, in particular where steps taken by the body may contribute to meeting one objective but may be detrimental to meeting another;

I believe it is clear from this provision that decisions must be made in light of the bigger picture and not ignoring the impact a decision would have on others. Conclusion I fully recognise the challenge of transitioning from a traditional approach (when the idea of a new section of motorway was conceived) to this new innovative and revolutionary way of working in the Act but I believe that we must all rise to the challenge to ensure the benefits foreseen by the Act are fully realised. Business as usual is no longer an option. As I previously say the M4 project given its scale and importance must not set the wrong example which could permanently damage the spirit of the legislation. In my first submission, I stressed the importance of using the five ways of working to reach any sustainable decision (which I felt were not accurately addressed by the Welsh Government) and the

Page 7: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

importance of demonstrating that these decisions amount to them meeting their duty to take all reasonable steps to meet their well-being objectives and I will not repeat these arguments here. I also would like to offer the Future Generations Framework as a useful tool to be used when considering any infrastructure projects which I would suggest can help the inspector in reaching a suitable decision in the light of the Well-being of Future Generations Act 2015. I look forward to monitoring the progress of the proposals and the outcome of the inquiry. Should you require any further information or assistance concerning this letter, please do not hesitate to contact me. Yours sincerely,

Sophie Howe

Page 8: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

NEW ECONOMICS FOUNDATION / FUTURE GENERATIONS COMMISSIONER:

INFRASTRUCTURE FRAMEWORK BASED ON WELL-BEING OF FUTURE GENERATIONS ACT

(Not for reproduction without permission from The Office of the Future Generations Commissioner)

5 WAYS OF WORKING

Ways of working Initial project development

Long term: the importance of

balancing short-term needs with the

need to safeguard the ability to also

meet long-term needs.

Start designing your project from an understanding of how Wales might

be different several generations from now.

o Identify the long term trends that are most relevant to your project.

These might be social, economic/political, environmental or

technological and include known (e.g. depleting fossil fuels), and those

with a higher level of uncertainty (e.g. jobs and skills needed in the

future).

o How does your project mitigate or facilitate these trends?

Prevention: prevent problems

occurring or getting worse may help

public bodies meet their objectives.

Start from a broad consideration of the types of problem that your

project could help prevent in the future e.g. social, economic, cultural,

environmental.

How does your project support breaking negative cycles such as

poverty, poor health, environmental damage and loss of biodiversity?

How could your project minimise its own negative impacts e.g.

minimising waste and resource use?

Review of the project

Return to the trends you identified initially.

Consider how realistic the underlying assumptions are about future trends:

o If these assumptions are found to be incorrect – how useful is your project

to the future of Wales?

Consider what will happen to the project at the end of its proposed lifespan.

o Can the materials be reclaimed / re-used / re-purposed?

Consider how sustainable the project will be over its lifespan.

o How does the project support long-term well-being of people in Wales?

o Will the project be self-sustaining, or require significant additional

resources?

Return to the problems and negative cycles that you identified that your

project could address.

Consider the assumptions underlying your project:

o Is your project reliant on other interventions being in place to

address the causes of long term cycles alongside your project?

o What are the trade-offs emerging between different aspects of well-

being and sustainability and how have these been minimised?

Page 9: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

Integration: considering how public

bodies' wellbeing objectives may

impact upon each of the wellbeing

goals, on their other objectives, or on

the objectives of other public bodies.

Start by considering how your project objectives impact on other public

bodies wellbeing objectives.

o How could your project connect different public policy agendas and

generate co-benefits e.g. how can a transport project support

improvements in health, culture, worklessness.

o Consider each of the seven wellbeing goals and identify any risks of

negatively impacting on other public bodies wellbeing objectives (noting

likelihood of negative impacts accumulating over time).

o What practical steps will you take in your project to integrate your

project with existing plans and strategies of other public bodies to

maximise the project’s contribution across the seven wellbeing goals.

Collaboration: acting in

collaboration with any other person

(or different parts of the body itself)

that could help the body meet its

wellbeing objectives.

Start by considering who are the key stakeholders from a range of

related sectors and disciplines who could support the development of

this project.

o Identify these key stakeholders early so that collaboration can be

productive and meaningful.

o Does your range of stakeholders include public, private and third

sector organisations?

o How will key stakeholders be involved in developing the project, and

at which stage of the project

Return to how your project integrates with other public bodies wellbeing

objectives.

Consider the projects impact on the seven wellbeing goals:

o Which of wellbeing goals does your project directly impact?

o How can your project extend it’s positive impact by alignment with relevant

public body strategies and wellbeing objectives?

o What measures are in place to ensure that the project continues to positive

contribute to the Well-being Goals throughout its life?

Return to your key stakeholder list.

o Which groups/bodies have you identified who are working towards similar

goals around sustainability and well-being?

o What mechanisms are in place to ensure this collaboration is effective?

o How will you ensure that collaboration continues through the life of the

project?

Page 10: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

Involvement: the importance of

involving people with an interest in

achieving the well-being goals, and

ensuring that those people reflect the

diversity of the area which the body

serves.

Start by considering how well you understand the needs, and lived

experiences, of citizens who will be affected by this project, and how you

will use this to inform consideration of the need for the project.

o Consider how you will engage stakeholders with different forms of

expertise or knowledge, including how you will understand the needs of

the broader population and those not represented by specific interest

groups.

o How well do you understand the needs and challenges of people in

the area? Well-being Assessments will give some insight.

o Identify the key stakeholders affected directly and indirectly by the

project. How will stakeholders be involved in the identification of the

need for this project, and how will it be informed by their needs?

o How will key stakeholders be involved in the design and

development of the project?

o How will key stakeholders be involved in the delivery and / or

oversight of this project?

Return to how your project will involve citizens and stakeholder.

o How has the project been shaped by key stakeholders affected by the

project, and particularly their needs and challenges?

o How will key stakeholders affected by the project continue to influence the

project throughout it’s life?

Page 11: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

NEW ECONOMICS FOUNDATION / FUTURE GENERATIONS COMMISSIONER:

INFRASTRUCTURE FRAMEWORK BASED ON WELL-BEING OF FUTURE GENERATIONS ACT

(Not for reproduction without permission from The Office of the Future Generations Commissioner)

SEVEN WELL-BEING GOALS

Aspect of the Act/ definitionInterpretation of key elements of act for

frameworkMeeting the Act at a strategic level

Designing your proposal to support the intentions

of the Act

An innovative Wales is one with a thriving new business

sector, supporting social innovation and entrepreneurs.

Consider how innovation can be used to tackle social

determinants of poor health, growing businesses in areas

that have suffered economic decline, and opportunities for

green growth across Wales.

The social determinants of poor health;

Growing businesses in areas that have suffered

economic decline;

Opportunities for green growth across Wales

How will this project push infrastructure provision

in a more sustainable, innovative direction?

How will this project open up opportunities for new

business sectors and production of public goods?

How will this project innovate to meet the challenges, and take

advantage of the opportunities, set by the relevant trends

identified when thinking about the 'long term' in the Ways of

Working?

Is your project modular, and could it be adapted to a changed

Wales in future?

A productive Wales is creating goods and providing

services to meet its own needs, as well developing

strong export markets.

Consider environmental sustainability and social wellbeing.

Environmental sustainability and green growth;

Supporting resilient local communities and economies

How will it support the growth of low carbon

business sectors?

How will this project support productivity e.g. building local supply

chains, supporting economic resilience through diversity, or

providing energy through a thriving renewables sector?

How will this project have negative impacts on parts of local

economies? e.g. reduced costs of transporting food damaging

viability of local food producers: this may have some consumer

benefits but damages local economy and employment.

A low carbon Wales has an economy driven by green

growth, and supports people to live low carbon

lifestyles.

consider the need for skills development, innovation, and

employment.

Need for skills development and employment;

Innovative economy, agile and able to adapt to future

change

How will this project encourage industry and

government to shift towards low carbon and green

economic growth?

What behaviours does this project encourage or discourage?

e.g. does it encourage private car use? Does it increase local

provision of services? Does it support an economy where jobs are

located where people live, rather than just in bigger cities? Does it

encourage people and businesses to buy local?

How will this project help or impede people in living low carbon

lifestyles?

e.g. improving access to public transport access, and increasing

the supply of renewable energy.

A Wales which uses resources effectively and

proportionately builds efficiency into design (e.g.

lowering embedded carbon; building energy efficient

into design) and prioritises strategic use of globally

limited resources.

consider how you will reduce Wales' ecological footprint

and source materials locally. Also consider how you can

work with other public bodies in pursuit of shared goals to

allocate resources most efficiently.

Need to reduce Wales' ecological footprint and source

materials locally;

Working with other public bodies in pursuit of shared

goals to allocate resources most effectively

In a context where financial, ecological, and

material resources are finite, does this project

offer a responsible solution to the problems

posed?

Have less resource-intensive alternatives been

looked at, and if so what does this approach offer

over and above them?

How will the design of this project use resources efficiently and

proportionately?

For example:

How will it integrate low-carbon production techniques and reduce

the embedded carbon in materials used?

How will it maximise use of local resources and supply chains?

How will it minimise waste and its impact?

Related areas of wellbeing

Prosperous: An innovative,

productive and low carbon society

which recognises

the limits of the global environment

and therefore uses resources

efficiently and proportionately

(including acting on climate change);

and which develops a skilled and

well-educated population in

an economy which generates wealth

and provides employment

opportunities, allowing people to

take advantage of the wealth

generated through securing decent

work.

Page 12: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

Improving employment in Wales requires reducing

unemployment and underemployment as well as

ensuring that new jobs created are good quality jobs.

consider the role of employment in reducing inequality, the

need to develop jobs in low carbon industries, and how you

might collaborate with other skills/education bodies in

Wales.

Role of employment in reducing inequality;

need to develop jobs in low carbon industries;

how might you collaborate with other skills/education

bodies in Wales.

How will your project create long-term, sustainable

jobs?

Are you creating jobs in places with high levels of unemployment

and underemployment?

To what extent are you creating jobs that are: decently paid;

satisfying with opportunity for progression; secure; local; not

overly long hours; environmentally sustainability

A skilled and well-educated Wales requires investments

which both create opportunities for individuals and

which develop a stronger workforce.

consider the development of a low carbon economy, a more

equal spread of economic activity across the country, and

how you might collaborate with other skills/education bodies

in Wales. .

Low carbon economy;

a more equal spread of economic activity across the

country;

how might you collaborate with other skills/education

bodies in Wales.

How will your project provide training that will

develop skills and knowledge which the Welsh

labour market needs?

Will training delivered in your project change people's labour

market position in a lasting way, putting them in a stronger

position for other jobs when the project ends?

For example:

How will it embed lasting opportunities for skills development?

How will it widen accessibility of educational institutions?

Ecosystems which support social resilience and

community wellbeing, by offering opportunities for

people to enjoy nature, share outdoor space, and

strengthen social ties with their communities.

consider the importance of heritage and access to

recreation, and the restorative health effects of access to

nature, and the importance of cohesive communities.

Importance of heritage and access to recreation;

restorative health effects of access to nature;

importance of cohesive communities.

How will your project enhance or reduce access

to, and quality of, green and open spaces?

How do the green/open spaces near your project currently help

communities come together and bond? How will your project build

on these benefits?

Ecosystems which support economic resilience protect

and enhance opportunities for people to work and

produce in a sustainable way.

consider the importance of building sustainable employment

in rural and coastal communities to tackle regional

inequalities and maintain viable productive non-urban

communities where local people can prosper.

Building sustainable employment in rural and coastal

communities to tackle regional inequalities;

maintain viable productive non-urban communities

where local people can prosper.

How will this project build on and unlock

opportunities for green growth across Wales?

How will your project protect and enhance ecosystems which

support economic activity in Wales?

For example:

How will it impact opportunities for employment in wildlife and

conservation?

How will it impact livelihoods in rural communities e.g. quality of

coastlines and beaches, and agricultural resources e.g. soil,

pollination, regulated drainage?

Ecosystems which support ecological resilience make

the Welsh environment more self-sustaining, and

enables Wales to adapt better to changes such as

climate change.

Consider the need to adapt to future environmental trends

and to use resources efficiently and proportionately.

Need to adapt to future environmental trends;

and to use resources efficiently and proportionately.

How will this project develop innovative solutions

for infrastructure provision which prioritises

environmental resilience?

How will this project integrate the 'precautionary

principle' where environmental trends and impacts

on ecosystems are unknown?

How will your project enhance biodiversity?

How will your project directly impact ecosystems? For example:

Will it disturb important breeding grounds or animal migration

routes? Does it cut through any sites of designated environmental

significance?

How will your project add to the health, reach, and size of

population that ecosystems can support? e.g. protecting areas of

wildlife and investing in green infrastructure.

How will your project indirectly impact nearby ecosystems? For

example: Will it increase light pollution, damaging nearby owls'

ability to hunt?

Will replanting a forest elsewhere replace the services provided

by a more mature forest?

Will your project push ecosystems over a threshold beyond which

they are at risk of collapsing?

How will this project help Wales adapt to climate change, for

example the effects of increased flooding?

Prosperous: An innovative,

productive and low carbon society

which recognises

the limits of the global environment

and therefore uses resources

efficiently and proportionately

(including acting on climate change);

and which develops a skilled and

well-educated population in

an economy which generates wealth

and provides employment

opportunities, allowing people to

take advantage of the wealth

generated through securing decent

work.

Resilient: A nation which maintains

and enhances a biodiverse natural

environment with healthy functioning

ecosystems that support social,

economic and ecological resilience

and the capacity to adapt to

change (for example climate

change).

Page 13: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

A healthier Wales understands and acts with an

understanding of the social determinants of mental and

physical poor health and wellbeing.

consider the unequal distribution of environmental

characteristics (e.g. noise and light from motorways) which

have negative psychosocial impacts, and the importance of

social connectedness and good work to mental health and

wellbeing.

Unequal distribution of environmental characteristics

(e.g. noise and light from motorways) which have

negative psychosocial impacts;

and the importance of social connectedness and good

work to mental health and wellbeing.

How will this project improve aspects of

mental/physical health and wellbeing which are

tied to poverty?

How will your project impact air quality? How will these changes

be distributed between different areas, enhancing or reducing

health inequalities?

How will this project affect local mental health, both during the

construction phase and afterwards in its everyday functioning, for

example increasing stress and anxiety of people living locally?

A healthier Wales needs to develop the infrastructure

that enables people to make healthier choices.

consider income inequalities and the need for low carbon

supply chains in food production. Also consider public

bodies who are working on reducing health inequalities.

Income inequalities;

need for low carbon supply chains in food production;

public bodies who are working on reducing health

inequalities.

How will this project encourage or discourage

people to make healthier choices and behaviours?

How will this project protect and improve local access to quality

outdoor spaces for revival, restoration and exercise? For

example, adding new public pathways, existing cycling, walking

and riding trails, clean beaches and other opportunities for

outdoor swimming.

How will this project impact opportunities for active travel?

How will this project impact local supply chains to improve

affordable access to sustainable, healthy, fresh produce?

A more equal Wales uses spending strategically to

reduce social, geographic and economic inequalities.

consider the important role of cultural diversity in creating

vibrant culture, the relationship between health and

inequality, and the value to a more productive Wales of

developing better skills and jobs in Wales.

Role of cultural diversity in creating vibrant culture;

relationship between health and inequality;

need to develop skills and job opportunities in Wales.

Is the project based in a place which is in priority need of

investment?

How have you identified and considered how the scheme will

bring opportunity to areas of high multiple deprivation in the

region?

Who benefits most from this project? For example, poorer people

stand to benefit more from public transport, affordable energy,

and public space and amenities.

Who is negatively impacted - directly or indirectly - by this

project? Are these impacts avoidable, and if not how will those

affected be compensated?

How will this project affect marginalised groups, for example

BAME (black, Asian, minority ethnic) people, women, LGBT

(lesbian, gay, bisexual, transgender) people, and disabled

people?

A more equal Wales needs to tackle the accumulation of

wealth and power at the top which has failed to "trickle

down"

Consider what affect a more equal dispersal of power and

wealth could have on Wales' options to tackle ecological

degradation and greenhouse gas emissions, and supporting

the development of a prosperous, geographically distributed

economy?.

Think also about the Ways of Working, Involvement

What affect a more equal dispersal of power and wealth

could have on Wales' options to tackle ecological

degradation and greenhouse gas emissions and

supporting the development of a prosperous,

geographically distributed economy?

Need to involve local people meaningfully

How will this project ensure that decisions are made in a

democratic and egalitarian way, rather than allowing powerful

voices to dominate?

Consider, for example, where decisions are made and which

groups have access to decision-makers.

How will this project engage with social enterprises, co-operatives

and employee-owned businesses in its supply chains?

Healthier: A society in which

people’s physical and mental well-

being is

maximised and in which choices and

behaviours that benefit future

health are understood.

More equal: A society that enables

people to fulfil their potential no

matter what

their background or circumstances

(including their socio economic

background and circumstances).

How will this project provide leavers for reversing

long-term disadvantage, and support

disadvantaged groups in ways which are

sustainable in the long term?

How will this project be developed in such a way

that it does not lead to massive transfers of public

resources and assets to a small groups of

corporations?

Page 14: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

A more equal Wales need to address poverty, lack of

wealth and opportunities for those worst off in society.

Consider the need to improve education and employment

opportunities, tackling low pay, and aligning improvements

in material conditions with sustainable lifestyles.

Need to improve education and employment

opportunities;

tackling low pay;

and aligning improvements in material conditions with

sustainable lifestyles.

How will this project add additional resources to areas of

multiple deprivations, e.g. employment, public facilities to

built social capital, quality infrastructure such as schools and

healthcare?

Viable communities need to be able to provide basic

goods, services and jobs locally.

Consider how this can support low carbon lifestyles, decent

and local jobs, and attractive places to live.

How this can support low carbon lifestyles, decent and

local jobs, and attractive places to live?

How will this project impact improve access to and availability of

amenities locally?

How will this project provide long-term local jobs?

A well-connected Wales needs people to be able to

access local amenities which help communities connect

to themselves, and provide good links to other parts of

the country for recreation and internal tourism.

Consider the need for local jobs, local supply chains,

opportunities to develop local arts, music, culture etc.

Need for local jobs, local supply chains, opportunities to

develop local arts, music, culture etc.

How will this project support local amenities and strengthen social

relationships?

For example, will it make local businesses and amenities more or

less viable?

How will improved transport links positively and negatively impact

diverse groups?

It is important that people feel safe, and a sense of

belonging and support in their communities.

Consider how inequality impacts who can feel safe in public

space and under what circumstances.

How does inequality impact who can feel safe in public

space and under what circumstances?

How will this project make public space feel safer and more

welcoming, particularly for children, older people, people with

disabilities, women and other groups to ensure diverse and lively

public space.

If this project is creating new public space - e.g. parks and

woodlands - how will local people be involved in its management

to build social ties and increase local cohesion?

Attractive communities in Wales should offer distinctive

neighbourhoods reflecting local character, where

people want to live and perceive as supporting a good

life.

Consider how outdoor space, heritage sites and cultural

activities can provide opportunities for learning and

recreation, vibrant and diverse local arts/music/culture.

Think also about the Ways of Working, Involvement.

How can outdoor space, heritage sites and cultural

activities can provide opportunities for learning and

recreation, vibrant and diverse local arts/music/culture?

How can local people be meaningfully consulted on their

desires and needs for their area?

How will this project create neighbourhoods that are pleasant to

live and work in? For example, infrastructure that makes it easier

to move around locally (e.g. cycleways); quality public space;

green infrastructure.

How will this project design these features in partnership with the

community to meet their needs and desires for the area/space?

This could include the design concept, the design of street

furniture, and involvement of local artists as well as residents.

How will this project mitigate and compensate for negative

impacts on the physical appeal of a place?

Cohesive communities: Attractive,

viable, safe and well-connected

communities.

How will your project support communities to be

more cohesive?

More equal: A society that enables

people to fulfil their potential no

matter what

their background or circumstances

(including their socio economic

background and circumstances).

How will this project provide leavers for reversing

long-term disadvantage, and support

disadvantaged groups in ways which are

sustainable in the long term?

How will this project be developed in such a way

that it does not lead to massive transfers of public

resources and assets to a small groups of

corporations?

Page 15: PUBLIC INQUIRY DOCUMENT - bailey.persona-pi.combailey.persona-pi.com/Public-Inquiries/M4-Newport/E... · I mean that all decisions must improve the economic, social, environmental

A culturally vibrant Wales is one where communities

and ways of life are sustainable, as part of a Wales

where cultural diversity also flourishes.

Consider the impacts of inequality on community viability,

the ability of diverse groups to participate in cultural life, and

other bodies (e.g. land use planning) who you can work with

to support this goal.

Impacts of inequality on community viability;

the ability of diverse groups to participate in cultural life

and;

other bodies (e.g. land use planning) who you can work

with to support this goal.

Consider the direct impacts of this project.

How will this project retain and enhance local cultural

opportunities, e.g. providing new venues e.g. art/music/dance

studios, sports facilities, arts festivals, museums/galleries, live

music venues, cinemas) and protecting established ones;

supporting local artists and traditional builders by involving them

in the design of the project and new bits of public space.

How will this project ensure that these opportunities are

accessible to all, e.g. affordable, public transport accessible, have

disability access.

Consider the indirect impacts this project might have on the

sustainability of local cultural diversity. This is about the

behaviours that your project may trigger. For example, might it

distort local housing markets by encouraging second home

ownership? Or impact the viability of local facilities venues

(consider those that cater to minority groups e.g. LBGT venues as

well as more mainstream venues), or marginalise Welsh

language? If so, what efforts will be taken to sustain vibrant

culture, for example protecting cultural venues and facilities?

A culturally vibrant Wales requires protection and

enhancement of natural, cultural and historical heritage

sites.

Consider the employment provided by heritage sites -

particularly in rural areas - and the importance of equal

access to heritage.

Employment provided by heritage sites - particularly in

rural areas;

importance of equal access to heritage.

How will this project affect nearby natural or other heritage sites?

What impact does your project have on the overall landscape of

the area?

How will this project increase accessibility of local heritage sites?

A culturally vibrant Wales requires arts, sports and

recreation being locally available, accessible, and

affordable.

Consider the importance of building social ties, flourishing

diversity, and prosperous localities which can support lots of

activities for a lively public life.

Importance of building social ties, flourishing diversity,

and prosperous localities which can support lots of

activities for a lively public life.

How will the project increase local access to arts, sports and

recreational activities?

Can the scheme make extra investments which offer more

opportunities that are affordable and accessible to local people?

Globally responsible: A globally

responsible Wales. A nation which,

when doing anything to

improve the economic, social,

environmental and cultural well-

being

of Wales, takes account of whether

doing such a thing may make a

positive contribution to global well-

being and the capacity to adapt to

change (for example climate

change).

A globally responsible Wales should support global

wellbeing through sustainable consumption of

resources, reduced greenhouse gas emissions, and

contributing to global knowledge on sustainability good

practice.

for example, the need for low carbon economies and

lifestyles, and proportionate use of resources.

Need for low carbon economies and lifestyles;

and proportionate use of resources.

How will this project offer global leadership or

innovation in sustainable infrastructure?

How will this project contribute to a system where

resources used and greenhouse gas emissions

can be brought down?

How has this project so far, and how will it

continue to, build on best practice in sustainability

from around the world?

Consider:

What Wales is bringing in from the rest of the world e.g.

responsible purchasing (sustainable and ethical sourcing); the

volume of resources that Wales is consuming (both in the

development of the project and behaviours that it will induce).

And what Wales is putting out into the world e.g. developing

sustainable technologies; providing a positive example of how

infrastructure projects can integrate wellbeing.

Overall, how is your project impacting the rest of the world -

ecological footprint, reducing greenhouse gas emissions, both in

its production and its use?

Vibrant culture: A society that

promotes and protects culture,

heritage and the Welsh

language, and which encourages

people to participate in the arts,

and sports and recreation

How will this project contribute to a culturally