    PROCEDURE OF EQUIPMENT GENERAL REPAIR BY PTSI WORKSHOP

    Doc No. PTSI-PLT-BUPR-013/R6 Issue Date: 11 March 2014

    Page 2 of 7

    1.0 PURPOSE

    The purpose of this procedure is to describe the process of equipment general repair that is conducted by PTSI Workshop

    2.0

    SCOPE

    This procedure applies for following:a) Repair process of PTSI equipment and external customer equipmentb) Repair of mobile vehicle, heavy equipment and crane

    3.0 RELATED DOCUMENTATION AND/OR REFERENCES

    a) Store Operational Procedure PTSI-PLT-BUPR-012b) Guideline related to repair activitiesc) Manufacturer recommendation

    4.0 RELATED FORMS AND/OR ATTACHMENTS

    a) Equipment Defect List & Completion Repair Certificate PTSI-PLT-BUF-037b) Work Request Form PTSI-PLT-BUF-051c) Quotation Review Form PTSI-PLT-BUF-061d) Individual Daily Activity Report PTSI-PLT-BUF-028e) PR Manual Approval

    5.0 DEFINITION

    Equipment Defect List &Completion Repair

    Certificate

    The form (PTSI-PLT-BUF-037) which used by Workshop to detail the damage ofequipment, material/spare part required to repair the equipment and used as

    document agreement during equipment handing over process to user after jobcompletion

    Work Request Form The form (PTSI-PLT-BUF-051) which used by user to request service from Workshop.(This form is used as notification)

    Quotation Review Form The form (PTSI-PLT-BUF-061)which is used by Workshop to give estimation of repairprice. (This form is used for repair process of external customers equipment)

    Individual Daily ActivityReport

    The form (PTSI-PLT-BUF-028) which is used by Mechanic to record the maintenancejob (repair/service) that has been done and time start and end of the job(maintenance time)

    PR Manual Approval The form used to get approval from FC and GM for the proposed PR before the PR is

    created and approved in SAP system by the authorized approver as per matrix

    User (Internal Customer) Department under PTSI

    External Customer Customer from outside of PTSI ( e.g. IKBB, RAPPl)

    6.0 BASIC PRINCPLES/ROLES AND RESPONSIBILITIES

    a) All cost for equipment repair is acknowledged and approved by user (equipment owner) through MO (MaterialOrder), PR (Purchase Request) approval mechanism and quotation review form (for external customer)

    b) Workshop Department is responsible to ensure the quality of repair process to reduce the rework and achievecustomer satisfaction

  • 7/25/2019 PTSI-PLT-BUPR-013-R6 Procedure of Equipment General Repair by PTSI Workshop

    3/7

    PROCEDURE OF EQUIPMENT GENERAL REPAIR BY PTSI WORKSHOP

    Doc No. PTSI-PLT-BUPR-013/R6 Issue Date: 11 March 2014

    Page 3 of 7

    7.0 PROCEDURE

    7.1. Repair Process of PTSI Equipment

    7.1.1 Work Requisition Process and Initial Inspection

    a) User to create notification in SAP system and describe the equipment malfunctionb) Based on notification, Workshop Superior to arrange mechanic to inspect and dismantle the equipment in order to

    find the malfunction details. Result of inspection is noted in Equipment Defect List and Certificate CompletionRepair (PTSI-PLT-BUF-037). The damage spare part is placed besides the unit for user to check

    c) Based on inspection result, Planner to create MO in SAP system and list out the spare part/material required.Planner then release the MO for user approval

    d) User to review the MO and approve in SAP system if MO cost is acceptable by user. In case user needs revision ofsome item in MO, user to inform Planner for Planner then revise the MO as per user requirement. Once revisioncomplete, Planner to release the MO and user to approve the MO

    7.1.2 Spare Part/Material Ordering Process

    Sources of spare part/material are from PTSI Store, VMI Store and direct PR.

    a) Spare Part/material from PTSI Store

    - Reservation form is auto-generated in SAP system once user approve the MO- Mechanic to inform Store the MO number and bring the used spare part to Store. Return of used spare part is

    referring to Returned Used Stock Item Guideline (PTSI-PLT-BUGL-070)- Store to issue the requested spare part/material to Mechanic, perform goods issue in SAP system, as referring to

    Store Operational Procedure (PTSI-PLT-BUPRL-002)- Store to arrange the placement and record of used part received

    b) Spare Part/material from VMI Store

    - Reservation form is auto-generated in SAP system once user approve the MO-

    Planner to print reservation form and arrange Workshop PIC to sign the reservation from- Mechanic to submit the approved reservation form to Store- Store to send the reservation form to VMI Vendor- Vendor to deliver the spare part to PTSI Store- Store to do the spare part incoming inspection in order to ensure the spare part received is confirmed to the

    request (check the physics of spare part, check the part number, etc)- If spare part received is confirmed, Store to perform the documentation required (GR, DO/DN) and issue the spare

    part to mechanic and ensure mechanic to bring the used spare part, as referring to Returned Used Stock ItemGuideline (PTSI-PLT-BUGL-070) and Store Operational Procedure (PTSI-PLT-BUPRL-002)

    - If spare part is not confirmed as per request, Store to raise NCR, submit NCR to Procurement and ensure therecording and action for the reported NCR is taken

    c) Spare Part/material from direct PR

    -

    PR form is auto-generated in SAP system once user approve the MO- Planner to fill in PR manual approval and get approval from FC and GM- If FC and GM not approve PR manual, Planner to get advise and decision by GM and User for further process- If FC and GM approve the PR manual, Planner then to create PR in SAP system and also attach the PR manual- Authorized PR approver as per matrix to approve PR in SAP system- Procurement to search the Vendor/Supplier and issue PO to rewarded Vendor/Supplier. If PO price is different from

    PR, Procurement to inform planner to revise PR as per PO- Procurement to follow up delivery of requested spare part/material- Vendor/Supplier to deliver the spare part to PTSI Store- Store to do the spare part incoming inspection in order to ensure the spare part received is confirmed to request

    (check the physics of spare part, check the part number, etc)- If spare part received is confirmed, Store to perform the documentation required (GR, DO/DN) and issue the spare

    part to mechanic and ensure mechanic to bring the used spare part, as referring to Returned Used Stock ItemGuideline (PTSI-PLT-BUGL-070) and Store Operational Procedure (PTSI-PLT-BUPRL-002)

    -

    If spare part is not confirmed as per request, Store to raise NCR, submit NCR to Procurement and ensure therecording and action for the reported NCR is taken

  • 7/25/2019 PTSI-PLT-BUPR-013-R6 Procedure of Equipment General Repair by PTSI Workshop

    4/7

    PROCEDURE OF EQUIPMENT GENERAL REPAIR BY PTSI WORKSHOP

    Doc No. PTSI-PLT-BUPR-013/R6 Issue Date: 11 March 2014

    Page 4 of 7

    7.1.3 Repair Execution & Work Closing

    a) Mechanic to do the repair process as referring to the applicable SOP/guideline/manufacturer recommendationb) Workshop Superior to ensure the quality of work performed by Mechanic, ensure the ordered part is fitted to the

    equipment and witness the old part before disposal

    c)

    Once repair process complete, Workshop to complete the Equipment Defect List and Certificate Completion RepairForm (PTSI-PLT-BUF-037)and inform user for handover process

    d) If user accept the repair, both user and Workshop to sign the Equipment Defect List and Certificate CompletionRepair Form (PTSI-PLT-BUF-037)

    e) Planner then close the MO in SAP system, Mechanic to complete IDAR form (PTSI-PLT-BUF-028)

    7.2. Repair Process of External Customer Equipment

    a) External customer request Workshop PTSI to repair their equipment, request can be in form of email requisition,phone, radio or direct request to PTSI Workshop

    b) Based on information received, Workshop Superior to arrange mechanic to inspect and dismantle the equipment inorder to find the malfunction details. Result of inspection is noted in Equipment Defect List and CertificateCompletion Repair (PTSI-PLT-BUF-037).

    c)

    Based on inspection result, Planner to create Quotation Review Form (PTSI-PLT-BUF-061)and submit to customerfor approval

    d) If customer approves the quotation, Customer to create PR and arrange PO issued to PTSI Workshope) Once PO received, Planner to create notification in SAP system and MO approved by Workshopf) After MO is approved, Planner to arrange the source of material/spare part required either from PTSI Store, VMI

    Store or PR. The process of sourcing spare part/material is same as the repair process of PTSI equipment but theapproval process is performed by PTSI Workshop.

    g) Once spare part/material is available, Store to issue the spare part/material to mechanic and ensure the process ofreturned of used part as referring to Returned Used Stock Item Guideline (PTSI-PLT-BUGL-070) and StoreOperational Procedure (PTSI-PLT-BUPRL-002)

    h) Mechanic then to perform the repair/maintenance activitiesi) Once completed, handover the equipment to customer and both to sign the Defect List and Certificate Completion

    Repair Form(PTSI-PLT-BUF-037) as agreementj) Mechanic to complete IDAR form (PTSI-PLT-BUF-028)k)

    Planner then to close MO and submit all documentation for billing to CAD

    8.0 APPENDIX

    8.1 Appendix-1: Equipment Repair Process of PTSI Equipment Flowchart8.2 Appendix-2: Equipment Repair Process of External Customer Equipment Flowchart

  • 7/25/2019 PTSI-PLT-BUPR-013-R6 Procedure of Equipment General Repair by PTSI Workshop

    5/7

    PROCEDURE OF EQUIPMENT GENERAL REPAIR BY PTSI WORKSHOP

    Doc No. PTSI-PLT-BUPR-013/R6 Issue Date: 11 March 2014

    Page 5 of 7

    Appendix-1 Equipment Repair Process of PTSI Equipment Flowchart

    CreateNotification

    InformPlannerifthereispartwhichnot

    requiredtopurchase

    MOapprovedbyUser?

    ReviseMOasperuserrequirementandre-

    releaseMO

    - CreateMOandlistoutthesparepart

    required.Thesourceofsparepartiseither

    fromPTSIstore,VMIstoreordirectPR.

    - ReleaseMO- InformusertheMOnumbertoreview

    Dismantleandchecktheconditionofunit

    andidentifysparepartrequirementeitherto

    replaceorrepair.Thedamagesparepartisplacedbesidestheunitforusertocheckif

    necessary

    user

    Mechanic

    Planner

    user

    Planner

    yes

    No

    EquipmentDefectListand

    CertificateCompletionRepair

    (PTSI-PLT-BUF-037)

    A

  • 7/25/2019 PTSI-PLT-BUPR-013-R6 Procedure of Equipment General Repair by PTSI Workshop

    6/7

    PROCEDURE OF EQUIPMENT GENERAL REPAIR BY PTSI WORKSHOP

    Doc No. PTSI-PLT-BUPR-013/R6 Issue Date: 11 March 2014

    Page 6 of 7

    ProcurementconvertPRtoPO(aging

    repeatordermax2days,non-repeatordermax21days).IfPOpriceisdifferentwith

    PR,informPlannertorevisePR.

    Expeditortofollowupthedeliveryof

    sparepart/material

    SparepartreceivedbyStore.Storemaninspectthephysicofsparepart(ensure

    partnumber&specificationisconfirmed

    asperrequirement)

    Sparepartdeliveredasper

    requirement?

    VendordeliverspareparttoPTSIStore

    Sparepartdeliveredasper

    requirement?

    ApprovedbyFCandGM?

    CreatePRinSAPsystemandattachthe

    approvedmanualapproval

    Yes

    No

    Informmechanictotakethesparepartto

    Store.Mechanicbringtheusedpartand

    submittoStore

    No

    Sparepart/materialfromPTSIStore

    ReservationautogeneratedinSAP

    system

    Materialsourcing

    Sparepart/materialVMIStore

    ReservationautogeneratedinSAP

    system

    Sparepart/materialfromdirectPR

    PRautogeneratedinSAPsystem

    InformStoretheMOnumberandbringtheusedspareparttoStore

    Printreservationform,getapprovalfrom

    WSPICandsubmittoStore

    CreatePRmanualapprovalandget

    approvalfromFCandGM

    Issuethematerialrequestedandperform

    goodsissueandensuretheusedpartis

    returned

    Mechanic

    Store

    Planner/Mechanic

    SendreservationtoVMIstore

    VendordeliverthespareparttoPTSI

    store

    Store

    VMIVendor

    Inspectthephysicofsparepartreceived(ensurepartnumber&specificationis

    confirmedasperrequirement)

    RaiseNCRandsubmitProcurementforfurtherprocess

    Carryoutmaintenancejob

    PTSI-PLT-BUPR-002

    STOREOPERATIONAL

    PRCOEDURE

    Store

    Handoverunittouserandbothtosigncertificatedefectlistandcompletion

    report

    EQUIPMENTDEFECTLIST&

    CERTIFICATECOMPLETION

    REPAIR(PTSI-PLT-BUF-037)

    PRMANUALFORM

    Yes

    No

    Store

    Planner

    Planner

    Procurement

    Vendor

    Store

    Yes

    Issuethesparepart/materialtomechanic

    andperformgoodsissue

    Carryoutmaintenancejob

    Handoverunittouserandbothtosigncertificatedefectlistandcompletion

    report

    Mechanic

    Mechanic/user

    Store

    Store

    Mechanic

    Mechanic/user

    EQUIPMENTDEFECTLIST&

    CERTIFICATECOMPLETION

    REPAIR(PTSI-PLT-BUF-037)

    RevisePRbasedonProcurement

    information

    Planner

    PTSI-PLT-BUGL-070

    RETURNEDUSED

    STOCKITEM

    GUIDELINE

    PTSI-PLT-BUPR-

    002

    STORE

    OPERATIONAL

    PROCEDURE

    PRisapprovedbyauthorizedapproverin

    SAPsystemasperapprovalmatrix

    Approver

    A

    MechanictocompleteIDARform

    Planner

    MechanictocompleteIDARform

    INDIVIDUALDAILYACTIVITY

    REPORT

    (PTSI-PLT-BUF-028)

    CloseMOinsystem

    INDIVIDUALDAILYACTIVITY

    REPORT

    (PTSI-PLT-BUF-028)

    Mechanic

  • 7/25/2019 PTSI-PLT-BUPR-013-R6 Procedure of Equipment General Repair by PTSI Workshop

    7/7

    PROCEDURE OF EQUIPMENT GENERAL REPAIR BY PTSI WORKSHOP

    Doc No. PTSI-PLT-BUPR-013/R6 Issue Date: 11 March 2014

    Page 7 of 7

    Appendix-2 Equipment Repair Process of External Customer Equipment

    RequesttherepairprocessofequipmenttoPTSIWorkshop

    Reviewanddiscussthequotationforagreement

    QuotationapprovedbyCustomer?

    Basedoninspectionresult,preparethequotationandsendtocustomerforreview

    andapproval

    Basedoninformation,checkandinspecttheequipmentandrecordtheinspectionresult

    inEquipmentDefectListandCertificate

    CompletionRepair

    Customer

    Mechanic

    Planner

    Sourcingthesparepart/materialrequired

    eitherfromPTSIStore,VMIStoreorDirectPR.Approverofdocumentationisarranged

    byWorkshop(reservation&PR)followingalldocumentationaspergeneralmaintenance

    ofPTSIequipment

    CreatePRandPOforPTSIWorkshop

    Issuethematerialrequestedandperformgoodsissueandensuretheusedpartis

    returned

    Customer/Planner

    Planner

    Store

    Carryoutmaintenancejob

    yes

    No

    Handoverunittocustomerandbothtosign

    certificatedefectlistandcompletionreport

    EQUIPMENTDEFECTLIST&

    CERTIFICATECOMPLETION

    REPAIR(PTSI-PLT-BUF-037)

    Mechanic

    PTSI-PLT-BUGL-070RETURNEDUSED

    STOCKITEMGUIDELINE

    PTSI-PLT-BUPR-002STORE

    OPERATIONALPROCEDURE

    Customer

    OncePOreceived,Plannercreate

    notificationandMOinSAPsystem.MOisapprovedbyWorkshop

    Planner

    EQUIPMENTDEFECTLIST&

    CERTIFICATECOMPLETION

    REPAIR(PTSI-PLT-BUF-037)

    CompleteIDARform

    Planner

    CloseMOinSAPsystemandsubmitalldocumentationforbillingtoCAD

    Planner

    MechanicINDIVIDUALDAILYACTIVITY

    REPORT

    (PTSI-PLT-BUF-028)

    LEGEND

    : Form References Terminator

    : Process References Procedure/Data References

    : Decision References Process Line

    : Sequential : Document/Form Reference Line