3
PT-R4300 SERVICE MANUAL B-19 B.Installation 2) Installation of the main unit Install the main unit using leveling bolts. The unit's casters should be set at 11 mm above the floor surface as shown in the figure. Adjust all leveling bolts uniformly so that they touch the floor surface evenly. Be aware that if the distance between the bottom of casters and the floor surface exceeds 22 mm, the leveling bolts may detach from the main unit. 11 (mm) 95 4-2-2. Removing the transport fixing brackets The number of the transport fixing brackets for each PT-R unit is as follows. PT-R4300E/S: 23 transport fixing brackets (including the stabilizer set mentioned earlier) In addition, five cushioning materials are used. Ensure that all of them have been removed finally. The tag shown below is attached to each transport fixing bracket. Note, however, that it is not attached to the cushioning materials.

PT-R4300ES SM V10 Eng Agfa · B-20 PT-R4300 SERVICE MANUAL B.Installation 1) Open the operation door. Insert a thin rod (e.g., a hexagonal wrench) into the door-releasing hole for

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PT-R4300ES SM V10 Eng Agfa · B-20 PT-R4300 SERVICE MANUAL B.Installation 1) Open the operation door. Insert a thin rod (e.g., a hexagonal wrench) into the door-releasing hole for

PT-R4300 SERVICE MANUAL B-19

B.Installation

2) Installation of the main unit

Install the main unit using leveling bolts. The unit's casters should be set at 11 mm above the floor

surface as shown in the figure. Adjust all leveling bolts uniformly so that they touch the floor surface

evenly.

Be aware that if the distance between the bottom of casters and the floor surface exceeds 22

mm, the leveling bolts may detach from the main unit.

11

(mm)

95

4-2-2. Removing the transport fixing brackets

The number of the transport fixing brackets for each PT-R unit is as follows.

PT-R4300E/S: 23 transport fixing brackets (including the stabilizer set mentioned earlier)

In addition, five cushioning materials are used.

Ensure that all of them have been removed finally.

The tag shown below is attached to each transport fixing bracket. Note, however, that it is not

attached to the cushioning materials.

Page 2: PT-R4300ES SM V10 Eng Agfa · B-20 PT-R4300 SERVICE MANUAL B.Installation 1) Open the operation door. Insert a thin rod (e.g., a hexagonal wrench) into the door-releasing hole for

B-20 PT-R4300 SERVICE MANUAL

B.Installation

1) Open the operation door.

Insert a thin rod (e.g., a hexagonal wrench) into the door-releasing hole for the operation door, which is

located at the right section of the plate table, and lower the rod. This will open the operation door.

2) Remove all covers from the main unit.

3) Remove the fixing brackets, shown below, from the front of the main unit.

Page 3: PT-R4300ES SM V10 Eng Agfa · B-20 PT-R4300 SERVICE MANUAL B.Installation 1) Open the operation door. Insert a thin rod (e.g., a hexagonal wrench) into the door-releasing hole for

PT-R4300 SERVICE MANUAL B-21

B.Installation

4) Remove the fixing brackets, shown below, from the back of the main unit. Also Squeeze Roller brackets.

Remove both. Remove both.