7/28/2019 PSF-QC-187-&188- DG SUBS
1/3
Rev.No: 0
1.0
1.1.0
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
1.1.7
1.1.8
EPC FOR ASAB FFD PROJECT MOL+CDS ME&I WORKS
ADCO Abu Dhabi, UAE
Installation inspection report for Earthing of Diesel GeneratorDoc No: PSF-QC-188
DRAWING /
REFERENCE NO. :DATE. :
LOCATION / AREA . : RFI NO. :
Inspection Tekfen
RemarksEarthing of Diesel Generator Construction QC
Ensure the neutrals of generator shall be connected to dedicated earth
electrode.
All incoming armoured cables shall be bonded either to the earth ring.
All earthing connection shall be thoroughly cleaned then coated with copper
based anti-size grease after assembly.
Measure the continuity of diesel generator earthing to main earth.
Check the condition of earthing bar and connections.
DG bonding connections are in good condition and tight.
Check DG Earthing has been performed correctly according to approveddrawing.
Check the diesel generator body properly earthed.
All earthing cables shall be terminated at equipment or bus-bars using a
crimped type cable lug.
ADCO
B : REMARKS / OBSERVATION:
TEKFEN PIL
Name:
Signature:
7/28/2019 PSF-QC-187-&188- DG SUBS
2/3
Date:
7/28/2019 PSF-QC-187-&188- DG SUBS
3/3
Rev.No: 0
1.0
1.1.0
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
1.1.7
1.1.8
1.1.9
1.1.10
1.1.11
1.1.12
1.1.13
1.1.14
1.1.15
1.1.16
1.1.17
1.1.18
1.1.19Spacing between clean earth electrode group and nearest main earth
electrode group shall be greater than 5 meters.
Signature:
Date:
TEKFEN PIL ADCO
Name:
B : REMARKS / OBSERVATION:
All earthing connection shall be thoroughly cleaned then coated with copper
based anti-size grease after assembly.
Check CCB equipment earthing continuity and resistance value Ohms.
All incoming armoured cables shall be bonded either to the earth ring.
PECs of cable trenches shall be bonded to the substation earth ring.
Check the transformer body properly earthed
Central control building earthing as per drawing.
Condition of Neutral Earth & Neutral Earth continuity in m. Ohms.
Measure the continuity of switchboard to main earth
Test continuity of earth electrode to transformer star point
Check transformer with star winding neutral shall be connected to separate
earth pit as shown for both primary & secondary.
Check all electrical equipment earthing continuity.
All earthing cables shall be terminated at equipment or bus-bars using a
crimped type cable lug.
All substation equipment bonding connections are in good condition andtight.
Sub-distribution boards shall be connected to the earth bar by two earthing
conductors.
Ensure Metallic enclosures of HV electrical equipment in substation earthing
cable shall be 300mm.
Where surge arrestor are provided in HV and MV transformer terminal
boxes, these shall be connected to dedicated supplementary earth electrode
which shall be interconnected separately with transformer neutral earth pits
and body earth pits.
Check the condition of earthing bar and connections.
Check Substation Earth grid Earthing cable shall be 300mm.
TekfenRemarks
Substation & CCB Earthing. Construction QC
Check substation Earthing has been performed correctly according to
approved drawing.
DRAWING /
REFERENCE NO. :DATE. :
LOCATION / AREA . : RFI NO. :
EPC FOR ASAB FFD PROJECT MOL+CDS ME&I WORKS
ADCO Abu Dhabi, UAE
Installation inspection report for Earthing of Substation & CCBDoc No: PSF-QC-187
Inspection