    EPC FOR ASAB FFD PROJECT MOL+CDS ME&I WORKS

    ADCO Abu Dhabi, UAE

    Installation inspection report for Earthing of Diesel GeneratorDoc No: PSF-QC-188

    DRAWING /

    REFERENCE NO. :DATE. :

    LOCATION / AREA . : RFI NO. :

    Inspection Tekfen

    RemarksEarthing of Diesel Generator Construction QC

    Ensure the neutrals of generator shall be connected to dedicated earth

    electrode.

    All incoming armoured cables shall be bonded either to the earth ring.

    All earthing connection shall be thoroughly cleaned then coated with copper

    based anti-size grease after assembly.

    Measure the continuity of diesel generator earthing to main earth.

    Check the condition of earthing bar and connections.

    DG bonding connections are in good condition and tight.

    Check DG Earthing has been performed correctly according to approveddrawing.

    Check the diesel generator body properly earthed.

    All earthing cables shall be terminated at equipment or bus-bars using a

    crimped type cable lug.

    ADCO

    B : REMARKS / OBSERVATION:

    TEKFEN PIL

    Name:

    Signature:

  • 7/28/2019 PSF-QC-187-&188- DG SUBS

    2/3

    Date:

  • 7/28/2019 PSF-QC-187-&188- DG SUBS

    3/3

    Rev.No: 0

    1.0

    1.1.0

    1.1.1

    1.1.2

    1.1.3

    1.1.4

    1.1.5

    1.1.6

    1.1.7

    1.1.8

    1.1.9

    1.1.10

    1.1.11

    1.1.12

    1.1.13

    1.1.14

    1.1.15

    1.1.16

    1.1.17

    1.1.18

    1.1.19Spacing between clean earth electrode group and nearest main earth

    electrode group shall be greater than 5 meters.

    Signature:

    Date:

    TEKFEN PIL ADCO

    Name:

    B : REMARKS / OBSERVATION:

    All earthing connection shall be thoroughly cleaned then coated with copper

    based anti-size grease after assembly.

    Check CCB equipment earthing continuity and resistance value Ohms.

    All incoming armoured cables shall be bonded either to the earth ring.

    PECs of cable trenches shall be bonded to the substation earth ring.

    Check the transformer body properly earthed

    Central control building earthing as per drawing.

    Condition of Neutral Earth & Neutral Earth continuity in m. Ohms.

    Measure the continuity of switchboard to main earth

    Test continuity of earth electrode to transformer star point

    Check transformer with star winding neutral shall be connected to separate

    earth pit as shown for both primary & secondary.

    Check all electrical equipment earthing continuity.

    All earthing cables shall be terminated at equipment or bus-bars using a

    crimped type cable lug.

    All substation equipment bonding connections are in good condition andtight.

    Sub-distribution boards shall be connected to the earth bar by two earthing

    conductors.

    Ensure Metallic enclosures of HV electrical equipment in substation earthing

    cable shall be 300mm.

    Where surge arrestor are provided in HV and MV transformer terminal

    boxes, these shall be connected to dedicated supplementary earth electrode

    which shall be interconnected separately with transformer neutral earth pits

    and body earth pits.

    Check the condition of earthing bar and connections.

    Check Substation Earth grid Earthing cable shall be 300mm.

    TekfenRemarks

    Substation & CCB Earthing. Construction QC

    Check substation Earthing has been performed correctly according to

    approved drawing.

    DRAWING /

    REFERENCE NO. :DATE. :

    LOCATION / AREA . : RFI NO. :

    EPC FOR ASAB FFD PROJECT MOL+CDS ME&I WORKS

    ADCO Abu Dhabi, UAE

    Installation inspection report for Earthing of Substation & CCBDoc No: PSF-QC-187