January, 15 2010 VCWG Proxy Offer Curve – RUC Effect REVISED Settlement and Billing - Market Analysis Pamela Shaw

Proxy Offer Curve – RUC Effect REVISED Settlement and Billing - Market Analysis

Embed Size (px)

DESCRIPTION

Proxy Offer Curve – RUC Effect REVISED Settlement and Billing - Market Analysis. Pamela Shaw. Background Information. Protocol Section 6.4.2 Output Schedule - PowerPoint PPT Presentation

Citation preview

Page 1: Proxy Offer Curve – RUC Effect REVISED Settlement and Billing - Market Analysis

January, 15 2010

VCWG

Proxy Offer Curve – RUC EffectREVISED Settlement and Billing - Market Analysis

Pamela Shaw

Page 2: Proxy Offer Curve – RUC Effect REVISED Settlement and Billing - Market Analysis

2

Background Information

• Protocol Section 6.4.2 Output Schedule(1) A QSE that represents a Resource, other than an RMR Unit, must submit and maintain either an Energy Offer Curve or an Output Schedule for the Resource for all times when the Resource is On-Line.

(3) The entry of an Energy Offer Curve for a Resource automatically nullifies the Output Schedule for that Resource and prohibits entry of future Output Schedules for that Resource for the time during which the Energy Offer Curve is in effect.

(4) For a Resource for which an Energy Offer Curve has not been submitted, the SCED process uses the Output Schedule submitted for that Resource as desired Dispatch levels for the Resource.

• ERCOT system shall construct a proxy offer curve when Energy Offer Curve is not submitted by the QSE as described in 6.5.7.3(3).

• ERCOT system shall construct a proxy offer curve when an Energy Offer Curve is withdrawn during certain period of the operation day( MMS SCED and Real Time MMS Process requirement v3.01 )

Page 3: Proxy Offer Curve – RUC Effect REVISED Settlement and Billing - Market Analysis

3

Proxy Curve Generation Preparation

Has an EOC? Valid?

Submitted TWOS?

Has INC/DEC curves?

Construct Proxy CurveUsing INC, DEC and OS

Construct Proxy CurveCapped by SWCAP and

Floor Price

Begin Energy Offer Curve

Truncation and Extension process

Yes

Yes

Data ErrorNo

TWTG Exist? Yes

No

No

Yes

No

Error Message Yes

No

Calculate RTAIEC

Done

Done

Done

Page 4: Proxy Offer Curve – RUC Effect REVISED Settlement and Billing - Market Analysis

4

TWOS Proxy Offer Curve Example

MW Price (per MWh)

160 2250

81 2249.99

80 -$249.99

15 -$250.00

Inputs

Outcome

For Interval 14TWOS=80 MWs HSL= 160 MWLSL=15 MW

For that Operation daySWCAP=2250

RTMG for that intervalRTMG=24RTMG*4=96

MW Price (per MWh)

HSL SWCAP

Output Schedule MW plus 1 MW

SWCAP minus $0.01

Output Schedule MW -$249.99

LSL -$250.00

Page 5: Proxy Offer Curve – RUC Effect REVISED Settlement and Billing - Market Analysis

5

Proxy Offer Curve and Negative AIECAREA - REVISED

$ 2249.99$ 2250

-$ 249.99

RTAIECAREA_<Q>_<R>_<SP> part3

15mw 80mw 81mw 160mw

EOCPRCAP_<Q>_<R>_<SP>

RTMG

EOCQTYCAP_<Q>_<R>_<SP>

LSLHSL

TWOSTWOS+

1mw

Price

QTY

-$ 250

Proxy Offer Curve

RTAIECAREA_<Q>_<R>_<SP> part1

RTAIECAREA_<Q>_<R>_<SP> part2

ResultsRTAIEC = -$183

Page 6: Proxy Offer Curve – RUC Effect REVISED Settlement and Billing - Market Analysis

6

Negative AIEC’s impact to RUC revenues

Maximum of 0 or sum of all RUC intervals

RTSPP * Maximum of 0 or {Real-Time Metered Gen – (1/4 of LSL)}

Real-Time AIEC * Maximum of 0 or {Real-Time Metered Gen – (1/4 of LSL)}

-

RUCEXRR =

RUCEXRQC = Maximum of 0 or sum of all QCLAW intevals

(RTSPP * Real-Time Metered Gen )

Real-Time AIEC * Maximum of 0 or {Real-Time Metered Gen – (1/4 of LSL)} -

RUCMWAMT = (-1) * Max (0, RUCG – RUCMEREV

– RUCEXRR – RUCEXRQC) / RUCHR

May potentially increase the revenue subtracted from the RUC Guarantee and

decrease your Make Whole payment or subject you to Clawback charge