Page 1: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

Prospects for Nuclear New Build

Chris Savage

Nuclear Industry Association

10th July 2012

www.niauk.org

Page 2: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

UK Nuclear Industry

www.niauk.org

• Pioneer in nuclear generation

• Full fuel cycle capability• Highly skilled workforce• Mature and flexible

supply chain

Page 3: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

Closure dates for AGR and PWR fleet

Sizewell B2035

Hartlepool2019

Torness2023

Dungeness B 2018

Hinkley Point B2016

Heysham 12019

Heysham 22023

Hunterston B2016

www.niauk.org

Page 4: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

Nuclear Generation Capacity Profile

www.niauk.org

Page 5: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

New Build Locations

www.niauk.org

Page 6: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

New Build Plans for UK

EDF Energy UK(EDF Energy/Centrica Joint Venture)2 x 1600 MW EPRs for Hinkley2 x 1600 MW EPRs for Sizewell4 operating by 2025

NuGeneration Ltd(Iberdrola/GDF Suez Joint Venture)Up to 3600MW operating by 2023 at Moorside Technology to be decided

Horizon Nuclear Power Ltd(RWE/Eon Joint Venture) 6000 MW operating by 2025 at Wylfa and OldburyTechnology to be decided

www.niauk.org

Page 7: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

Fukushima and reactions

“Neither the reviews undertaken by the Licensees for the stress tests, nor the earlier national reviews has indicated any fundamental weaknesses in the definition of design basis events or the safety systems related to the stress tests to withstand them for UK NPPs.”

- ONR, January 2012

www.niauk.org

Page 8: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

Trend shows favourable opinion back to highest ever – though unfavourable opinion still above the baseline

Ipsos MORI poll. Base: All adults aged 16+ (1,000 – 2,000). Fieldwork December 2011

www.niauk.org

Page 9: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

Where are we now…?

• Justification: Completed October 2010

• GDA: Conclusions, end 2011

• National Policy Statements: Approved July 2011

• Electricity Market Reform: Energy Bill, 22 May 2012

• Investment approval for first plant: end 2012

www.niauk.org

Source: Office for Nuclear Development

Page 10: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

NIA UK Capability Report

• The UK capability to deliver a new nuclear build programme (NIA 2006)

• Report updated in 2008

New report in Autumn 2012

www.niauk.org

Page 11: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

New Nuclear Plant

www.niauk.org

Employment

Page 12: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

Next GenerationWorkforce for 16GWe New Build

Page 13: Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July 2012

w w w . n u c l e a r s u p p l y c h a i n . c o m

www.niauk.org