Structure meeting, 19.03.2014 CERN. I. Syratche Prospects for high- efficiency klystrons I. Syratchev, CERN

Prospects for high-efficiency klystrons

  • Upload
    nita

  • View
    41

  • Download
    5

Embed Size (px)

DESCRIPTION

Prospects for high-efficiency klystrons . I. Syratchev, CERN. State of art: L-band 10 MW MBK klystrons for ILC. . In terms of achieved efficiency at 10 MW peak RF power level, the existing MBK klystrons provides values very close to the 70%, as is specified in CLIC CDR. - PowerPoint PPT Presentation

Citation preview

Page 1: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Prospects for high-efficiency klystrons

I. Syratchev, CERN

Page 2: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

State of art: L-band 10 MW MBK klystrons for ILC.

In terms of achieved efficiency at 10 MW peak RF power level, the existing MBK klystrons provides values very close to the 70%, as is specified in CLIC CDR.

Page 3: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Extending technology: L-band 20 MW MBK klystron for CLIC. We made a study which indicates that the

scaling of existing tubes down in frequency may end up in rather powerful (>20 MW) and efficient (>70%) MBK.

Currently we are in process of purchasing such a tube(s).

Page 4: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

𝜇Perveance = 0.21Pout ≈ 2.3 MWEfficiency 78. %

Designing the klystronAJDISK (1-beam klystron optimised by C. Marrelli)

During optimisation, the tuning of all parameters is done to provide the highest bunched current harmonics at the entrance of the input cavity. The obtained solution is not unique and does not give enough information about the inner structure of the bunch, which also must be optimal in terms change density and electron velocities distributions to get highest efficiency.

Page 5: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Dedicated campaign to make parametric study of the high efficiency klystrons was conducted by Chiara Marrelli (Manchester/CERN) using 1D klystron computer code AJDISK:

Scaling of the klystron parameters

Perveance can be considered as well as a measure of space charge forces. Lower perveance beam with weaker space-charge forces enables stronger bunching and thus consequently higher efficiency.

𝐾=𝐼 /𝑉 3 /2Perveance indicates how much beam current comes out of the cathode when the voltage V is applied between the cathode and the anode.

Page 6: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Congregated bunch

For the optimal bunch, the input velocity distribution along the RF phase must be “congregating” – when each consequent electron entering the cavity has higher velocity than preceding one.If then, at the cavity exit all the electrons have equal velocities – the ultimately high efficiency can be obtained.

Elec

tron

vel

ociti

es a

t the

ou

tput

cav

ity e

ntry

For the given beam power and output cavity impedance this solution is unique.

Page 7: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

The first (and only?) ~80% efficient 7-beam MBK built in 1974-6 by S. Lebedinskiy, USSR. Simulations (dash)Measured (solid)

Pin (nominal)

Pin (nominal/2)

Frequency: 0.71 GHzN beams: 7I total: 2.5 AV beam: 14 kVP out: 27.5 kWEfficiency: 78.6%

Congregated bunch

Page 8: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Synthesizing the tube

V beam: 490 kVI beam: 270 ARF Power: 105 MWEfficiency: 81%

Still 10% of accelerated electrons reduced RF efficiency from 90% to about 80%. To approach efficiency in vicinity of 100%, it is necessary that all the particles, including those who experienced least modulation will reach the core of the bunch.

Page 9: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

90% efficient klystron.

To achieve this, peripherals should receive much stronger relative phase shift than the core and this could happens only, if the core of the bunch experiences oscillations due to the space charge forces, whilst the peripherals approach the bunch centre monotonously.

Page 10: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Benchmarking with different 1D codes (5 cavities tube)

A.BaikovKlypWin Efficiency 86%

I. GuzilovKLYS4.5

Efficiency 82.7%

C. MarrelliAJDisk

Efficiency 87%, with original parameters from A. Baikov.Found reflected electrons.

With Increasing the number of disk efficiency also growth – sign of stable solution.

Page 11: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Entrance of the last cavity

Exit of the last cavity

78%

80.3%

Page 12: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Recipe#1 for 20 MW. 80% efficient L-band MBK for CLIC

1. Stay at a low micro-perveance.2. Choose as many beams as you comfortable with: - Reduces the operating voltage (tube length) - Reduces the beam compression (beam dynamics) - Reduces current/beam, weaker magnetic focusing3. Use all the tricks explained previously

Collecting outside electrons

Bunch core oscillations

Tube length 3.0 m; 162kV; 80.3%

Example of the CLIC MBK designed using ‘conventional’ MBK gun technology (8 beams).Simulated by I. Guzilov

K=0.2

K=0.2K=0.3

K=0.3

Page 13: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

This method of spatial enhancing of the core oscillations frequency allows reducing at least by factor of 2 the length of the interaction space for high efficiency klystrons.

BAC method. I. Guzilov In order to intensify the process of the core oscillations, one can use the external forces delivered by additional specially tuned idle cavities– this is the base of BAC method

Each oscillation in BAC method is prepared in 3 stages:- first cavity gap – traditional bunching;- second cavity gap - alignment velocity spread of electrons;- third cavity gap – collecting the peripherals.

Page 14: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Recipe#2 for 20 MW. 80% efficient L-band MBK for CLIC 1. Stay at a low micro-perveance.2. Choose as many beams as you comfortable with: - Reduces the operating voltage (tube length) - Reduces the beam compression (beam dynamics) - Reduces current/beam, weaker magnetic focusing3. Use all the tricks explained previously4. Employ BAC method to reduce the tube length.

Bunch core oscillations

Example of the CLIC MBK designed using advanced MBK gun technology (30 beams).Simulated by I. Guzilov

K=0.2

K=0.2K=0.3

K=0.3

Tube length reduced to 1.2 m (2.5 times); 116 kV; 80.3%

Page 15: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

The company proposed to build MBK demonstrators/prototypes (at S-band) as the first step towards fabrication full scale CLIC 20 MW MBK with efficiency above 80%.

Page 16: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Tube#1. Technology demonstrator.To be built in 1 year (Low risk approach)

KIU-147. 40 beams, S-band, 6 MW, 52 kV, 50% with PPM reversed focusing

1. Keep the gun, focusing system and collector2. Replace the klystron body (the same length).

Expected efficiency 74.2% :

The PPM reversed focusing drawback:At each reverse of magnetic field there are ~5-7% of beam losses. With two periods, the expected efficiency will be dropped down to ~60 % . At a positive side – klystron will be very light , only 90 kg (0.8 m long).

Considering that 60 kV is safe limit for operation at air (discharge long the gun insulator), klystron will be able to deliver up to 8 MW peak RF power. With 40 kW average power, it will be able to operate at 1 kHz and 5 microsecond long pulses.

simulated

expected

Page 17: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Tube#1 as an RF power source candidate for TULIP project.

Low voltage 52KV. Compact (less expensive) modulator without oil tank. Light-weight klystron can be placed directly on the frame and connected to modulator via

HV cable. Thus eliminating needs for waveguide distribution system with rotary joints. The new klystron might be cheaper then conventional ones at the same peak power level

and it is way more efficient 60% instead of 45% (on the market).

Page 18: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Tube#2. Efficiency demonstrator.To be built in 2 years.

This tube will be an extension of the previous one. It will have doubled core oscillations in BAC method (longer body). The expected design efficiency is 85%. We will also implement the solenoidal focusing coil to keep the efficiency as high as possible. Because of the novelty of our approach and less experience with solenoidal coils, we cannot yet guarantee reaching the ultimate efficiency and suggest that demonstrating of efficiency >75% will be considered a success.

Page 19: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

S-band Demonstrator40 beams; 52 kV

L-band ILC6 beams; 116 kV

L-band CLIC6-8 beams; 164 kV

L-band CLIC30 beams; 116 kV

L-band CLIC/Double C. Gun12 beams; 164 kV

L-band CW (TLEP, proton linac)>30 beams; <30 kV?

Strategy for high-efficiency high RF power klystron development

Exploring X-band MBK

Optionally – gun with controlled electrode (2.5 kV)

2 years

4 years

2/gun+3years

2 yearsExists

??? years

20 4062

Page 20: Prospects for high-efficiency klystrons

Structure meeting, 19.03.2014 CERN. I. Syratchev

Special thanks to:

Igor GuzilovAndrey BaikovChiara Marrelli