24
Weston Super Mare: Dolphin Square Development Proposal By- Kevin Nealis Adam Forster Mothusi Lekgowe

Property Redevelopment Proposal (Final Yr Project)

Embed Size (px)

DESCRIPTION

We were given instructions as a group to advice on re-development of a town center.

Citation preview

Page 1: Property Redevelopment Proposal (Final Yr Project)

Weston Super Mare: Dolphin Square Development Proposal

By-Kevin NealisAdam ForsterMothusi Lekgowe

Page 2: Property Redevelopment Proposal (Final Yr Project)

Introduction

Weston Super Mare Summary.

Dolphin Square Site Summary.

Planning Policies & Strategies.

Redevelopment & Regeneration.

Restrictions/Constraints.

Page 3: Property Redevelopment Proposal (Final Yr Project)

Introduction Cont........

Proposed Uses of Site

Proposed Site Layout

Valuations: Market Evidence & Development Appraisal

Options available to client

Final Recommendations

Conclusions

Page 4: Property Redevelopment Proposal (Final Yr Project)

Weston Super Mare Town SummaryPrimarily, famous as a British Seaside Resort.

Nearby towns include Bristol, Bath and Taunton.

Primary focus for tourists in the North Somerset. (Holiday periods see increased economic growth)

Since the 1970’s the town has seen decline in its popularity. (Loss of the Pier in 2008)

Page 5: Property Redevelopment Proposal (Final Yr Project)

Weston Super Mare Cont......Current Population: 71,000 (2001 Census).35% of the town’s residents are classified as Mangers or Professionals (LDF, 2008).Has one of the highest national percentages of elderly residents; 20% compared to 16% national average. 70% of total population are aged between 16-74 yrs.

Source: 2001 Population Census

Page 6: Property Redevelopment Proposal (Final Yr Project)

Public Transportation Various modes of transport

operate within the Weston-Super-Mare area.

Buses and Trains provide hourly services to Bristol, Bath and direct services to London. (First Great Western and First Somerset)

Weston is close to the M5 Motorway.

Bristol International Airport is located 10 miles away.

Source: North Somerset Council, 2010

Page 7: Property Redevelopment Proposal (Final Yr Project)

Dolphin Square• 2.62 Hectares in size.

Predominately in Council Ownership, subject to a long leasehold interest by Kilmartin and other private owners.

Ownership Structure:

4. Sands Night Club: Private Ownership.

5. Dolphin Square: 125yr Leasehold to Kilmartin from 1987

6. Beach Road Car Park: Jointly owned by NSC and Kilmartin

7. Oxford Cafe: Private Ownership

8. Corner of Oxford Street/Beach Road: NSC

Source: Google Maps 2009

Source: SPD Dolphin Square 2008

12

3

45

Page 8: Property Redevelopment Proposal (Final Yr Project)

Dolphin Square

Residential Flats

Car park and bowling alley

Dolpin Square Retail

Listed church building

Retail Anchor Tenant

Exit to High Street

Page 9: Property Redevelopment Proposal (Final Yr Project)

Weston-Super Mare LDF The Core Strategy sets out North Somerset Council's spatial vision and strategic objectives for the development of Weston Super Mare in the future.

:Key areas outlined

’ , Is s ue s problems &challengesDemand for housing, in particular affordable housing.The preservation of Weston Super Mare's ecology is essential, therefore this must be considered when new developments are being introduced.Specific parts of the town centre requires redevelopment to meet modern standards.

Spatial Vis ion &Strategic ObjectivesEnvironmental Objective- To ensure sustainable development and enhance the quality of life and improve environmental, social and economic opportunities Social Objective- create a range of housing developments, both affordable and special needs housing. Economic Objective- promoting development that would provide job opportunities.

Page 10: Property Redevelopment Proposal (Final Yr Project)

Regeneration & Redevelopment

Policy E1/A of the North Somerset Replacement Local Plan-

Make a positive and distinctive contribution to the exising built environment.

Promote more efficent use and re-use.

Increase the diversity of land use activities.

Provide investment opportunities.

Contribute to improving the environmental quality and strenghten transport and other linkages.

Capitalise on the coastal setting.

Source: North Somerset Replacement Local Plan, Adopted March 2007.

Page 11: Property Redevelopment Proposal (Final Yr Project)

Restrictions/ Constraints

Maintain access for Electricity Sub-StationCertain Areas of the Site are within the Flood

Plain.Certain buildings are Grade II Listed.Building Heights (Max Five storey)

Page 12: Property Redevelopment Proposal (Final Yr Project)

Potential Site Usage

Potential Uses Proposed Uses

Luxury Apartments Affordable Housing

Affordable Housing Leisure

Leisure Retail

Retail Multi-Storey Car Parking

Underground parking/Street Parking Offices

Offices Cafes/Restaurants

Cafes/Restaurants Gallery/Museum

Gallery/Museum Library

Library Children's Play Park

Open Spaces Pedestrianised Access

Landscaping

Revised Children's Play Area

Roundabouts to ease Traffic

Page 13: Property Redevelopment Proposal (Final Yr Project)

Revised Site LayoutOpen Space

Roundabout

Focal Point

Apartments

Residential Car Parking

Multi-Storey Office

Museum car space

Multi-Storey Car-Park

Museum

Tree’s/Landscaping

Restaurants/Cafes

Roadways

Library

Play Area

Museum over-ground car parking

Cinema

Page 14: Property Redevelopment Proposal (Final Yr Project)

Swot Analysis of Revised Site Layout

Strengths Weaknesses Opportunities ThreatsNew Town Focal Point. Overcrowding during summer

months.Future Investment Competition from nearby

towns

Benefit to local Economy: Increase town centre footfall.

Increased levels of road traffic.

Market opportunities Locals repelling planning consent

Increased Parking. Threat to local businesses. Improve Transport Links Competition for footfall from established retail centres, e.g. Flower Down Retail Park and Weston Retail Park

Access Improvement. Two way road system. Seaside Location Increased Anti-Social Behaviour

Increased Evening-Time Entertainment.

Employment-led Regeneration.

Acquisition difficulties from private owners with interest in the site.

Primary focus for tourists Increase Tourism

Page 15: Property Redevelopment Proposal (Final Yr Project)

Planning IssuesConcern of loss of car-parking.All roads are adopted.Volume of traffic along Oxford Road and Beach

Road.Acquisition of private interests (Planning and

Compulsory Purchase Act 2004). Sustainability.Change of use to a different use class.Tenants relocation for developments.

Page 16: Property Redevelopment Proposal (Final Yr Project)

Planning Policy Documentation/Strategies

PPS1: Sustainable Developments

PPS3:Affordable Housing

PPS4:Sustainable Economic Growth

North Somerset Replacement Local Plan.

Local Development Framework(LDF)

SPD for Dolphin Square

Landlord and Tenant Act/Legislation

Section 106

Page 17: Property Redevelopment Proposal (Final Yr Project)

Planning Policy StatementsPlanning Policy Statements Prepared by government to give Local Authorities guidance on planning policy and the planning system. 

Three main PPS-Planning Policy Statement 1: Delivering Sustainable DevelopmentLPA’s should promote outcomes in which economical, social and environmental objectives are achievedtogether overtime. Development plans must contribute to global sustainability, reduction of energy consumption, climate change should be considered in Location & Design of Development. Planning Policy Statement 3: HousingGreater opportunities for home ownership. Improved affordability by increasing the ssupply of housing. Also the creation of sustainable and mixed communities. Planning Policy Statement 4: Promoting Economic Growth.Local planning authorities should, through the core strategy development plan document, set out spatial vision and strategy for the network and hierarchy of centres, including local centres.

Page 18: Property Redevelopment Proposal (Final Yr Project)

1. Agreement with local planning authority to address

negative impacts caused by the development

2. Make a payment contribution towards:

Improvements to the streetscape,

Improvements to the open space and

Public transport improvements

to counteract negative effects of having increased

town centre footfall.

SECTION 106

Page 19: Property Redevelopment Proposal (Final Yr Project)

Development Appraisal

Total Rental Income £5,562,000

yp perp@10% 10

£55,620,000

Total Sales

45 Units (34 afffordable) £4,445,000

Gross Development Value £60,065,000

less purchasers costs @ 5.4% £3,243,510

Net Development Value £56,821,490

Page 20: Property Redevelopment Proposal (Final Yr Project)

Expenditure Purchase Price £ 11,750,000 Aquisition Costs @ 5.75% £ 675,625 Cost of Sands Nightclub £ 1,100,000 Cost of Oxford Cafe £ 170,000 Aquisition Costs @ 5.75% £ 73,025 Total Site Cost £ 13,768,650 Development Cost Construction Cost 21914 @ 924 per m2 £ 20,256,863 plus 5% piling foundations £ 1,012,843 Contingency @ 7% £ 1,417,980 Section 278 Works £ 75,000 Section 106 contributions £ 1,950,000 Preliminary Site Surveys £ 10,000 Total Construction Costs £ 24,722,687

Development Appraisal

Page 21: Property Redevelopment Proposal (Final Yr Project)

Expenditure Purchase Price £ 11,750,000 Aquisition Costs @ 5.75% £ 675,625 Cost of Sands Nightclub £ 1,100,000 Cost of Oxford Cafe £ 170,000 Aquisition Costs @ 5.75% £ 73,025 Total Site Cost £ 13,768,650 Development Cost Construction Cost 21914 @ 924 per m2 £ 20,256,863 plus 5% piling foundations £ 1,012,843 Contingency @ 7% £ 1,417,980 Section 278 Works £ 75,000 Section 106 contributions £ 1,950,000 Preliminary Site Surveys £ 10,000 Total Construction Costs £ 24,722,687 Cost of Construction finance 18 months @ 5% £ 927,101 Professional Fees (12.5% build costs) £ 3,206,223 Letting, Sales & Legals Letting @ 10% £ 556,200 Sales @ 1.5% £ 66,675 Legals @ £750 per unit sold £ 33,750 Total £ 656,625

Finance on Fees 18 months @ 5% £ 53,437.06 Contingency 7% including interest £ 2,065,884.53

Developm

ent Appraisal

Page 22: Property Redevelopment Proposal (Final Yr Project)

GDV £60,065,000

NDV £56,821,490Total Cost £45,400,608

Profit £11,420,882

Analysis Profit on Cost 25.16%Profit on NDV 20.10%Development Yield 12.25%Profit on GDV 19.01%

Profitability Calculation & Analysis

Page 23: Property Redevelopment Proposal (Final Yr Project)

Options available to client

Take No Action Now – uncertain economic circumstances, allow for economy to settle down until it is more predictable.

Form a Joint Venture- provide financial backing and spread risk.

Build in Phases- spread cost by building through phases.

Page 24: Property Redevelopment Proposal (Final Yr Project)

Conclusions & Final RecommendationsPresently, due to financial constraints amongst other uncertainties, we would advise that redevelopment in Dolphin Square is phased.

Our proposal will create employment, meet the needs of both current and new residents whilst addressing issues raised in the UDP and LDF.

Our proposal will also aim to create a centre point for the community.

Improvement in vitality of the area