Alafia River Basin
Projects
April 2011
Table of ContentsBasinBookReport-FY2011 v2.11 ProductionUsethisOne.rpt..................................................................................................................... 1
On-Going Activities
Z010 - Boards Services - Governing and Basin Board Support........................................................................................ 1
Z030 - Planning - Alafia River Basin................................................................................................................................. 2
Z050 - Information Resources (IT).................................................................................................................................... 3
Z060 - Public Information.................................................................................................................................................. 4
Z074 - Property Insurance (Facility).................................................................................................................................. 5
Z090 - Community and Legislative Affairs......................................................................................................................... 6
Z300 - Resource Data and Restoration Department - Alafia River Basin......................................................................... 7
Z500 - Resource Projects - Alafia River Basin.................................................................................................................. 8
Z600 - Operations - Alafia River Basin.............................................................................................................................. 9
Z700 - Land Resources - Alafia River Basin..................................................................................................................... 10
Property Appraiser & Tax Collector Commissions
Z910 - Property Appraiser and Tax Collection Commission - By Statute Collects All Ad Valorem Taxes........................ 11
Reserves
H100 - Water Supply & Resource Development Reserves - Future Alternative Supplies and Conservation................... 12
Z930 - Reserve For Contingencies - Basins..................................................................................................................... 13
Save Our Rivers (SOR) Reimbursable Projects
S032 - Little Manatee River............................................................................................................................................... 14
S034 - Alafia River Corridor.............................................................................................................................................. 15
S042 - Tampa Bay Estuarine Ecosystem.......................................................................................................................... 17
S099 - Save Our Rivers (SOR) Land Management and Use............................................................................................ 18
SB54 - Education - Polk's Nature Discovery Center Field Trips at District's & Polk County's Circle B Ranch.................. 20
Surface Water Improvement & Management (SWIM) Projects
W020 - Planning - Tampa Bay Protection and Restoration Planning................................................................................ 22
W027 - Planning - Tampa Bay Estuary Program Plan Development & Implementation................................................... 25
W028 - Education - Partial Funding for TBRPC's Bay Soundings.................................................................................... 28
W030 - Education - Tampa Bay Watch Field Trip Program at Tampa Bay Watch Marine Center.................................... 30
W032 - Education - Hillsborough CC Foundation Environmental Field Trips in Tampa Bay Area.................................... 32
W310 - Education - Tampa Bay Watershed and Stewardship Project.............................................................................. 34
W312 - Tampa Bay Habitat Restoration Regional Coordination....................................................................................... 36
W315 - Restoration - Fish Hawk Creek Preserve Habitat Restoration.............................................................................. 38
W316 - Cockroach Bay Restoration - Phases C-F............................................................................................................ 41
W331 - Data - Biennial Seagrass Coverage - Tampa Bay, Sarasota Bay, Lemon Bay and Charlotte Harbor................. 44
W336 - Restoration - Mulberry - NE 4th Ave Alafia Wetlands Restoration (REDI)........................................................... 47
W347 - The "Kitchen" Ecosystem Restoration.................................................................................................................. 49
W349 - Restoration - Lost River Preserve Habitat Restoration Project............................................................................. 51
W357 - Restoration - Apollo Beach Habitat Restoration................................................................................................... 53
W374 - Ruskin Inlet/Marsh Creek Ecosystem Restoration............................................................................................... 55
W384 - Restoration - Bahia Beach Habitat Restoration.................................................................................................... 57
W385 - Ekker Property Restoration (Tampa Bay)............................................................................................................. 59
W386 - Restoration - Newman Branch Habitat Restoration.............................................................................................. 62
W395 - Rock Ponds Ecosystem Restoration.................................................................................................................... 64
W398 - Restoration - Balm Boyette Habitat Restoration................................................................................................... 67
Basin Initiatives
B131 - Education - Hotel, Motel and Restaurant Water Conservation Programs (CHAMP & WATERPRO).................... 69
B136 - Data - IFAS Data Network - FL Auto Weather Network (FAWN) Data & Education.............................................. 71
B189 - Flood Control & Conservation - Medard Reservoir Berm and Structure Rehabilitation......................................... 73
B200 - IFAS Research - Evaluation & Dev of ETref Model for Irrigation of Woody Orn.................................................... 75
B226 - IFAS Research - Water Budget & Irrigation Requirements - Mature Southern Highbush Blueberries.................. 77
B227 - IFAS Research - Development of Irrigation Schedule & Crop Coefficients for Trees II......................................... 79
B238 - IFAS Research - Crop Coefficients & Water Use for Peppers in SWFWMD......................................................... 82
B239 - IFAS Research - Water Needs for Genetically Altered Lantana Camera.............................................................. 84
B240 - IFAS Research - Water Needs in Poly-Mulched & MBr Fumigation Alternatives -Tomatoes & Peppers.............. 86
B246 - FFL - Water Star Developers Outreach................................................................................................................. 88
B254 - IFAS Research - Determine Specific Irrigation Volumes/Freq/Fertiz Strawberries............................................... 91
B256 - IFAS Research - Feasibility of Low-Cost Automated Irrigation Pump Controllers................................................. 93
B264 - IFAS Research - Citrus Irrigation & Nutrient Mgt. to Improve Earlier Growth & Prod............................................ 95
B265 - IFAS Research - Optimizing Irrigation to Conserve Water for Shade Tree Production......................................... 97
B270 - MFL Establishment - North and South Prongs Freshwater System...................................................................... 99
B273 - MFL Research - Pilot Streamflow Reductions to Measure Effects of MFL 15% Reduction Criteria...................... 101
B274 - Data - SWUCA - Salt Water Intrusion Monitoring Network With Data Collected by Permit Holders..................... 103
B277 - Education - Florida Water Star Program - Builder Conservation Education.......................................................... 105
B307 - WMP - Maintenance, Updates, As Needed Peer Review and Outreach - Hillsborough........................................ 108
B314 - WMP - Maintenance, Updates, As Needed Peer Review and Outreach - Polk..................................................... 110
B620 - Mapping & GIS Spatial Data Management............................................................................................................ 112
B630 - Field Operations - Basin 11 Maintenance of District Works.................................................................................. 114
B670 - Flood Control & Water Conservation - Inspections, Operations & Maintenance of District Structures.................. 116
B726 - Education - Adopt-A-Pond Program in Hillsborough County................................................................................. 118
B730 - FFL - Polk County.................................................................................................................................................. 121
B738 - FFL - HOA Outreach Hillsborough/Polk................................................................................................................. 123
G003 - Aquatic Plant Management - Agreement with FWC to Control Major Waterways Districtwide............................. 125
G004 - Aquatic Plant Management - Treatment for Aquatic Plants Within Flood Control Canals..................................... 127
P259 - Education - Youth Water Resources Education Program...................................................................................... 128
P268 - Education - Public Water Resource Education Program....................................................................................... 131
Water Supply & Resource Development
H008 - Restoration - Lake Hancock Design, Permit & Mitigation to Raise Lake Nearly 1.5'............................................. 136
H009 - Lake Hancock Outfall Structure P-11 Replacement To Raise Lake Nearly 1.5'.................................................... 139
H015 - FARMS - Wells With Poor Water Quality in the SWUCA Back-Plugging Program............................................... 141
H017 - FARMS - Facilitating Agricultural Resource Management Systems..................................................................... 142
H024 - Identify Other Surface Water Storage and Release Options to Meet Peace River MFLs..................................... 144
H041 - Design & Construction - Pasco's Southeast Regional Reclaimed Water Transmission Loop............................... 148
H065 - Design & Construction - TBW System Configuration II - Plant from 66 to at least 99 MGD; Pipes, Pumps, etc... 150
H076 - Design & Construction - TECO's SW Polk Power Station Interconnects to Lakeland & Polk County................... 153
H082 - Feasibility - Potential for Expanding TBW's C.W. "Bill" Young Reservoir or Alternatives..................................... 156
H092 - Pasco County Reclaimed Water for Natural System Restoration & Aquifer Recharge......................................... 158
H541 - FARMS - Hopewell Business Center, LLC............................................................................................................ 160
H595 - FARMS - Mont-Lest, LLC ..................................................................................................................................... 162
H598 - FARMS - Francis White......................................................................................................................................... 163
H611 - FARMS - Alafia Berry Farm................................................................................................................................... 165
H612 - FARMS - Berry Patches, Inc................................................................................................................................. 166
H619 - FARMS - Ennis Strawberry Farm.......................................................................................................................... 167
H620 - FARMS - Blues Berry Farm, LLC ......................................................................................................................... 168
H622 - FARMS - Mathis Farms......................................................................................................................................... 170
Cooperative Funding Projects - Ongoing
K652 - Education - Water Conservation Theatre in Hillsborough County (Cancelled)...................................................... 171
L099 - WMP - Hillsborough - Watershed Model Update................................................................................................... 173
L445 - Stormwater Improvements - Flood Protection - Hillsborough - Hillgrove and Stearns........................................... 175
L672 - WMP - Polk - Polk County Area............................................................................................................................. 177
L693 - Education - Water Education Exhibits at the Glazer Childrens Museum in Tampa............................................... 181
L890 - WMP - Hillsborough - Parameters & Models Percolation Rate Assessment......................................................... 183
L900 - Education - Polk County Watershed Education - LEAD......................................................................................... 185
L914 - City of Lakeland Plumbing Retrofit Project............................................................................................................. 187
L967 - Stormwater Improvements - Flood Protection - Polk - Christina Watershed......................................................... 189
N004 - Education - Polk Is Florida-Friendly Education Initiative....................................................................................... 191
N029 - Education - MOSI Wetland Wonders Environmental Education Initiative............................................................. 193
N112 - Conservation - Lakeland - Plumbing Retrofit Project............................................................................................. 195
N150 - Mapping - Polk - NAVD88 Vertical Control Densification...................................................................................... 197
N156 - Design & Construction - Polk's SWRUSA Carter Road Transmission Main.......................................................... 199
N161 - Conservation - Polk Utilities - Rain Sensor Rebate Program................................................................................ 201
N223 - WMP - Polk - Mulberry Area.................................................................................................................................. 203
N321 - Conservation - Harbor Bay CDD - Mira Bay Weather-Based Controller Project................................................... 205
Cooperative Funding Projects - Ranked 1A
N287 - Feasibility and Pilot Testing - Hillsborough's Aquifer Recharge With Reclaimed Water in South County Coastal Area. 207
Cooperative Funding Projects - Ranked High
K057 - Education - Hillsborough County Lake & Stream Management Outreach Program.............................................. 209
L816 - Design & Construction - Plant City's Sydney Road to Walden Lake GC Transmission Main and Pump.............. 211
N014 - Education - Florida Aquarium's Watershed Education Initiative............................................................................ 213
N363 - Conservation - Polk County - Landscape and Irrigation Evaluation...................................................................... 216
N394 - WMP - Delaney/Archie Creek Watershed Update................................................................................................ 218
N397 - Conservation - Rainwater Harvesting and Commercial Reuse............................................................................. 220
N415 - Wildlands Watershed Training Program................................................................................................................ 222
Cooperative Funding Projects - Ranked Medium
L111 - Education - Suncoast Earth Force Teacher Training............................................................................................. 224
N299 - Stormwater Improvements - Flood Protection - Mulberry - Mulberry Watershed................................................. 226
Cooperative Funding Projects - Ranked Low
N396 - Conservation - Rivercrest Irrigation Water Conservation Pilot.............................................................................. 228
FEMA - Map Modernization Projects
M114 - FIRM Maps - Polk - Development and Outreach of Flood Insurance Rate Maps................................................. 230
M118 - FIRM Maps - Map Modernization Management Support - Districtwide FEMA Funding........................................ 233
Z010
Boards Services - Governing and Basin Board Support
Project Type On-Going Activities
AORs Strategic InitiativesManagement Srvc. Management Services
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
N/ACooperator(s)
Project Manager KAVOURAS, LOU
Task Manager(s)
Status Ongoing
DescriptionThe Boards and Executive Services Department provides administrative support to the Basin Board. These support
activities include noticing, scheduling and preparing the agenda and minutes for regular and special meetings and
workshops. Other functions include preparing meeting and travel arrangements and correspondence for Board
members. The Deputy Executive Director for Outreach, Planning and Board Services is the primary staff liaison for
members. The Deputy also assists with the conduct of meetings, works with the Governor's staff to ensure the legal
constitution of Boards, coordinates with appropriate staff to ensure follow up on meeting issues, conducts new
member orientation and ensures compliance with the Sunshine Laws. In addition, the Deputy and staff coordinate
Board field trips, including planning, scheduling, meals, logistics and arranging for staff support. This budget item also
provides funds for equipment and facility rental, legal advertisements for meeting notices, miscellaneous office
supplies and printing and Board member travel reimbursements (e.g., meals, conference registration, mileage, etc.).
Status As Of: March 13, 2007
As of this date, this project will not show an update. Ongoing project details are shown in the project description.
011 - Alafia River Basin 1
Z030
Planning - Alafia River Basin
Project Type On-Going Activities
AORs Strategic Initiatives
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager NEASMAN, TRISHA
Task Manager(s)
Status Ongoing
DescriptionPlanning is an Executive support function responsible for long-range comprehensive planning and near-term strategic
planning. Department staff administer the Comprehensive Watershed Management initiative; provide Basin Board
support; and assist the Basin Board with development of resource management priorities.
BenefitsPlanning Department staff support the Basin Board through the following tasks. Project Management Database project
worksheets that are used in the Budget Notebook for each Basin Board meeting are reviewed to ensure accuracy and
completeness. Planning staff work with project managers to identify any significant issues and resolve any
discrepancies. Staff take the lead in preparing for joint Governing and Basin Board Planning Workshops and for the
Basin Board's Annual Planning Workshop. Basin Board meetings are attended and presentations are made to the
Board on an as-needed basis. Staff often coordinate responses to issues raised during meetings. Staff respond to
Board Member questions and requests via oral and written communications. Staff assist Basin Board members by
creating and providing presentations on Basin-specific issues. At the Board's request, research is conducted and
special issues are presented during Board meetings. Department staff assist the Community Affairs Coordinators with
Cooperative Funding kick-off meetings held for local governments and other potential cooperators. Assistance is
provided for new Board member orientations.
Status As Of: March 13, 2007
As of this date, this project will not show an update. Ongoing project details are shown in the project description.
011 - Alafia River Basin 2
Z050
Information Resources (IT)
Project Type On-Going Activities
AORs Strategic InitiativesManagement Srvc. Management Services
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager LEWIS, JIM
MCNIFF, MAUREEN, WOOD, CLINT, CASH, KIMTask Manager(s)
Status Ongoing
DescriptionVideo production and conferencing staff provides audio-visual, archive tape, and video teleconferencing support for
Basin Board and Governing Board meetings, including staff presentations. Audio-visual staff provides support for
annual Basin Board planning workshops, and the semiannual Governing Board/Basin Board planning workshops, as
well as other non-regularly scheduled workshops not held in a District office, as needed. Based on the time devoted to
these activities, including travel, the appropriate salary percentage is allocated to each Basin Board.
Status As Of: March 13, 2007
As of this date, this project will not show an update. Ongoing project details are shown in the project description.
011 - Alafia River Basin 3
Z060
Public Information
Project Type On-Going Activities
AORs Strategic InitiativesFlood Protection Floodplain ManagementWater Supply ConservationWater Quality Water Quality Maintenance and ImprovementNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
N/ACooperator(s)
Project Manager MOLLIGAN, MICHAEL
Task Manager(s)
Status Ongoing
DescriptionThe Communications Department is an Executive support function responsible for a broad range of activities that
support the District's mission, Governing and Basin boards, and other departments. Departmental functions include
projects funded by the Governing and Basin boards, such as public information and media coordination; youth and
public education programs and initiatives in coordination with local governments and other community organizations;
promotion of sound water conservation practices; presentation of projects to the Basin boards in the budget adoption
process; and graphics support for Basin Board presentations. Communications Department staff support the Basin
Board through the following tasks. Basin Board meetings are attended on an as-needed basis to make presentations,
answer questions, and participate in budget discussions. Responses are prepared to answer Board Member questions
and requests via oral and written communications. Educational materials are developed, reviewed, updated, promoted,
and distributed. Assistance is provided to cooperators to develop education projects that support the District's mission.
Education and grant programs are promoted at schools and to cooperators. Support is provided to the Basin Board
Education Committee. Media contact summaries and articles are disseminated. The District's web site is maintained.
Status As Of: March 13, 2007
As of this date, this project will not show an update. Ongoing project details are shown in the project description.
011 - Alafia River Basin 4
Z074
Property Insurance (Facility)
Project Type On-Going Activities
AORs Strategic InitiativesWater Supply Alternative Water SupplyWater Quality Water Quality Maintenance and ImprovementFlood Protection Emergency Flood ResponseNatural Systems Minimum Flows and Level Establishment and Monitoring
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Withlacoochee
River, Peace River
Cooperator(s)
Project Manager PETRUCCELLI, LUCY
COX, JANICETask Manager(s)
Status Ongoing
DescriptionThe funds budgeted for this project apply to insurance on the Medard Reservoir, with a total insured value of
$986,000. Governing Board Policy 120-1, directs that a Risk Management function be maintained to protect the
assets of the District using an appropriate market based financing measure of a blend of self-insurance, insurance or
transfer of risk. Budgeting a known minimal expenditure annually for insurance premiums has been more cost
effective for the individual basins than establishing permanent reserves equal to the value of an individual structure or
maximum probable loss should any structure be damaged or destroyed. Property coverage is currently provided in
layers through several property insurance carriers. The current deductible is set at $5,000 on all losses except flood
and wind.
Status As Of: October 25, 2010
Property insurance renewal rates for period 10/01/2010-09/30/2011 were .28/$100 of insured value. All funds for FY
2011 have been expended to cover the annual premium for insurance on the insured structures. There will be no further
status reports this fiscal year unless there is a property damage claim reported on a structure.
011 - Alafia River Basin 5
Z090
Community and Legislative Affairs
Project Type On-Going Activities
AORs Strategic InitiativesWater Supply Alternative Water SupplyWater Quality Water Quality Maintenance and ImprovementNatural Systems Minimum Flows and Level Establishment and MonitoringFlood Protection Emergency Flood Response
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager RATHKE, DAVID
Task Manager(s)
Status Ongoing
DescriptionBasin Board funds budgeted are for the administration and coordination of the Cooperative Funding program, including
conducting cooperator workshops, processing applications, communicating with applicants and participating in project
ranking. Basin Board funds are budgeted for the Community Affairs Program Manager (CAPM) to attend and
participate in Basin Board meetings and new Board member orientations and briefings and for the CAPM's responses
to Board member information requests, as well as other "as needed" services to the Basin Board. Funds are also
budgeted for the CAPM's administration of the FARMS Program (but not for individual FARMS projects) within the
Basin.
Status As Of: March 13, 2007
As of this date, this project will not show an update. Ongoing project details are shown in the project description.
011 - Alafia River Basin 6
Z300
Resource Data and Restoration Department - Alafia River Basin
Project Type On-Going Activities
AORs Strategic Initiatives
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager DEHAVEN, ERIC
Task Manager(s)
Status Ongoing
DescriptionThe Resource Data and Restoration Department is involved in the collection, management, and analysis of water
resource data and the development and implementation of restoration projects to improve resource conditions. The
Department includes five sections comprised of professional and technical staff with oversight from an administrative
section. The FARMS Section is involved in the implementation of innovative agricultural water conservation and
alternative supply projects that are designed to reduce ground water withdrawals and improve water quality within the
Southern Water Use Caution Area (SWUCA). The Water Quality Monitoring Program (Section) performs water quality
sampling and analysis for a number of long-term ground and surface-water monitoring efforts, as well as specific,
short-term projects that investigate water quality issues. The Geohydrologic Data Section supports the Regional
Observation Monitor Well Program (ROMP) and the Quality of Water Improvement Program (QWIP), which provide
hydrogeologic data and well construction services. The Chemistry Laboratory Section conducts the water quality
analysis for District-related projects (Cooperative Funding and initiatives) and programs (regulation). Finally, the
Surface Water Improvement and Management (SWIM) Section is responsible for implementing the SWIM legislation
which requires that the water management districts prepare and maintain a priority list of water bodies requiring
management action for restoration or preservation; write management plans consistent with the rules established by
the Department of Environmental Protection; and implement the plans.
Status As Of: March 21, 2007
As of this date, this project will not show an update. Ongoing project details are shown in the project description.
011 - Alafia River Basin 7
Z500
Resource Projects - Alafia River Basin
Project Type On-Going Activities
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementFlood Protection Floodplain ManagementWater Supply Alternative Water SupplyNatural Systems Minimum Flows and Level Establishment and Monitoring
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager HAMMOND, MARK
Task Manager(s)
Status Ongoing
DescriptionThe Resource Projects Department addresses issues related to water supply, flood protection, water quality, and
natural systems and consists of the Conservation & Utility Outreach, Ecologic Evaluation,
Engineering, Environmental, Hydrologic Evaluation, and Water Supply and Resource Development sections. The
District's goal for water supply is to ensure an adequate supply of the water resource to provide for all existing and
future reasonable and beneficial uses while protecting and maintaining water resources and related natural systems.
The Department's efforts involve activities associated with the regional water supply planning, alternative water
supplies, conservation, and reclaimed water strategic initiatives. The District's goal for flood protection is to minimize
flood damage to protect people, property, infrastructure and investment. The Department's efforts primarily involve
activities associated with the floodplain management strategic initiative and support for the flood and emergency
response initiative. The District's goal for natural systems is to preserve, protect, and restore natural systems in order
to support their natural hydrologic and ecologic functions. The Department's efforts involve minimum flows and levels
and wetland system restoration. The District's goal for water quality is to protect and improve water quality to sustain
the environment, economy and quality of life. The Department's efforts involve diagnostic, monitoring and
implementing water quality improvement projects. The funds budgeted here are for coordinating the Water Supply
and Resource Development Program, Water Resource Assessment Projects, Minimum Flows and Levels Program,
Watershed Management Program, FEMA Map Modernization, and Cooperative Funding Programs, as-requested
attendance at citizen meetings, and those unforeseen basin analyses which occur during the year. The Department
works on ongoing projects and reviews, evaluates, and ranks each Fiscal Year's Cooperative Funding projects related
to water supply, water quality, natural systems, and flood protection. Staff makes recommendations regarding these
projects, and other items proposed in each year's budget. Staff also works to address any budget issues identified at
Basin Board meetings. The funds budgeted here are for staff time related to coordinating those activities that do not
relate to specific budgeted projects. These include the staff time of the Director, managers and several staff.
Status As Of: March 13, 2007
As of this date, this project will not show an update. Ongoing project details are shown in the project description.
011 - Alafia River Basin 8
Z600
Operations - Alafia River Basin
Project Type On-Going Activities
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and RestorationFlood Protection Emergency Flood Response
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager HOLTKAMP, MIKE
Task Manager(s)
Status Ongoing
DescriptionThe Operations Department consists of six sections including Administration, Field Operations, Aquatic Plant
Management, Hydrologic Data, Structure Operations and Mapping and GIS. The Administration section provides
support for departmental management, planning, budgeting, and clerical functions. The Field Operations section is
responsible for maintenance and restoration of all District-owned lands including fence construction, mowing, culvert
installations, road and bridge maintenance and construction, fire line maintenance, prescribed burn support, erosion
control, and well site preparation/restoration. The Aquatic Plant Management section is responsible for aquatic and
ditch bank vegetation management operations on District flood control systems, the control of exotic aquatic plants on
natural waters throughout the District, and the control of aquatic vegetation around water control structures and lake
level gauges. Additionally, the Aquatic Plant Management section controls/eradicates infestations of upland invasive
species including Brazilian pepper, Australian pine, cogongrass and tropical soda apple on all District-owned
conservation lands. The Hydrologic Data section is responsible for designing, installing, and maintaining data
collection sites in support of the District's resource monitoring and technical analysis, as well as data analysis and
database management. The Structure Operations section inspects, operates, maintains, and repairs all District-owned
flood and water conservation structures as well as salinity barriers throughout the District. This section also directs and
operates the District's Emergency Operations Center (EOC), which is part of a state and nationwide storm tracking
and emergency response network. The Mapping and GIS section is responsible for providing and maintaining all
mapping and Geographical Information System database support. Included in this project are administrative salary
allocations associated with overseeing field operations and maintenance, aquatic plant management, emergency
operations, Supervisory Control and Data Acquisition (SCADA), and structure operations programs throughout the
Basin, as applicable. Funds expended have been to prepare for Basin Board meetings as required or provide data to
Board members, local agencies or the public.
Status As Of: May 12, 2009
Ongoing project details are shown in the project description.
011 - Alafia River Basin 9
Z700
Land Resources - Alafia River Basin
Project Type On-Going Activities
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager SUTTON, ERIC
MILLER, WILL, WALSH, TOM, BLASCHKA, STEVEN, LOVE, KEVINTask Manager(s)
Status Ongoing
DescriptionThe Land Resources Department consists of five sections, including Administration, Land Acquisition, Land
Management, Survey, and Land Use and Protection. The Administration section provides support for departmental
management, planning, budgeting and clerical functions. The Land Acquisition section acquires lands as set forth in
the District's Florida Forever Workplan. These lands are acquired for various functions including flood control, water
storage and management, conservation and protection of water resources, aquifer recharge and recovery, water
resource development, and preservation of wetlands, streams, lakes, and other natural systems. The Land
Management section is responsible for the management and protection of natural and cultural resources on District
lands. Major functions include natural systems restoration, prescribed burning, forest management, exotic species
control, and monitoring. The Survey section is responsible for providing land surveying assistance in support of various
projects and programs within the District. The Land Use and Protection section is responsible for land use activities on
District lands including development of recreational trails and facilities, monitoring of public and private uses,
management of the security officer program and maintaining visitor safety. Included in this project are activities on
District-managed lands purchased with funds other than Florida Forever, Preservation 2000 and Save Our Rivers such
as surveying costs (salaries and equipment rental), miscellaneous land use requests (salaries), resource protection
(utilities and maintenance) and structural flood control projects.
Status As Of: March 13, 2007
As of this date, this project will not show an update. Ongoing project details are shown in the project description.
011 - Alafia River Basin 10
Z910
Property Appraiser and Tax Collection Commission - By Statute
Collects All Ad Valorem TaxesProject Type Prop. App.&Tax Coll.
AORs Strategic InitiativesManagement Srvc. Management Services
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager PILCHER, LINDA
LINSBECK, CATHY, CACIOPPO, MIKETask Manager(s)
Status Ongoing
DescriptionThese funds pay the commissions due to the counties within the Basin for tax collection and property appraisals.
Status As Of: March 01, 2011
During the five months ended February 28, 2011, $87,970 was remitted in commissions to Property Appraisers and Tax
Collectors. Property Appraiser and Tax Collector commissions are statutorily prescribed and are based on property tax
levies and collections, respectively. Amounts collected in excess of the underlying Property Appraiser and Tax Collector
budgets are returned to the Basin as excess fees. Excess fees not recorded as accounts receivable as of September 30,
2010 are reflected as current FY2011 revenue.
011 - Alafia River Basin 11
H100
Water Supply & Resource Development Reserves - Future
Alternative Supplies and ConservationProject Type Reserves
AORs Strategic InitiativesWater Supply Alternative Water Supply
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Peace River, Manasota
Cooperator(s)
Project Manager HERD, KEN
Task Manager(s)
Status Ongoing
DescriptionIn 1997, the Florida Legislature amended the Water Resources Act to clarify the water management districts'
responsibilities relating to water supply planning and water resource development. Specifically, the water management
districts were directed to complete a district-wide water supply assessment by July 1, 1998. Further, the districts were
to develop regional water supply plans for regions where demands are expected to exceed available supplies by 2020.
The SWFWMD regional water supply plan encompasses a ten-county area extending from Pasco County in the north
to Charlotte County in the south. This region encompasses the northern Tampa Bay region and the Southern Water
Use Caution area. The regional water supply plan includes the following elements: (1) projected water demands for all
use sectors through 2020, (2) available existing sources, (3) projected deficits in available supplies, (4) minimum flows
and levels, (5) recovery and prevention strategies, (6) water supply development options, (7) water resource
development options, (8) five-year work plan for water resource development projects, and (9) funding mechanisms
and project schedules for selected projects. Projected water needs increase from 1.4 billion gallons per day (bgd) in
2000 to 1.67 bgd in 2020, a 19 percent increase. Staff has identified over 500 mgd of potential supplies, including
demand management, to meet these needs. The reserves for water supply and resource development will be used to
cooperatively fund future water supply and resource development projects to meet the needs identified in the regional
water supply plan.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 104,372,352 0 (69,171,109) 173,543,461 0 0
011 Alafia River Basin 443,192 0 (1,768,788) 2,211,980 0 0
013 Hillsborough River Basin 24,337,216 0 (673,132) 11,162,870 0 13,847,478
015 Coastal Rivers Basin 1,644,104 0 (373,630) 2,017,734 0 0
016 Pinellas-Anclote River Basin 11,137,889 0 (2,129,914) 9,655,634 0 3,612,169
020 Peace River Basin 820,466 0 (1,950,942) 2,771,408 0 0
021 Manasota Basin 5,233,869 0 (1,552,578) 6,786,447 0 0
$147,989,088 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: January 10, 2011
In December 2010, $963,000 was transferred from the Pinellas-Anclote River Basin Board WSRD Reserves to N333 to
address flooding and natural systems issues in the Brooker Creek Watershed.
011 - Alafia River Basin 12
Z930
Reserve For Contingencies - Basins
Project Type Reserves
AORs Strategic InitiativesManagement Srvc. Management Services
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager PILCHER, LINDA
LINSBECK, CATHY, CACIOPPO, MIKETask Manager(s)
Status Ongoing
DescriptionFunds are budgeted for contingencies to be used at the Board's discretion. The goal is to set aside an amount equal to
approximately 5 percent (2.5 percent minimum target) of the ad valorem based budget (ad valorem taxes plus interest
plus balance forward multiplied by 5 percent).
Status As Of: March 01, 2011
To date, the Basin Board has not allocated any of its contingency funds.
011 - Alafia River Basin 13
S032
Little Manatee River
Project Type SOR
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Manasota
Hillsborough CountyCooperator(s)
Project Manager LOVE, KEVIN
MILLER, WILL, NELSON, BRIAN, KRUK, COLLEEN, VANGELDER, WILL, SOWDERS, GINA,
HAGBERG, JEFFREY
Task Manager(s)
Status Ongoing
DescriptionThe Little Manatee River project, located in Hillsborough and Manatee Counties, contains parcels of land along the
Little Manatee riverine corridor from downstream estuarine waters, to the river's headwaters. Dense forest dominates
the land along the river's floodplain with the adjoining uplands being comprised of a mixture of pine flatwoods, mixed
hardwoods and shrub and brushlands. The District has entered into an interlocal agreement with Hillsborough County
wherein the County has lead responsibility for lands jointly purchased by Hillsborough County and the District.
Recreational improvements/amenities made available by the County include: canoe landing sites adjacent to five
primitive campsites along the river; fishing; and hiking trails. District land management activities consist of road
stabilization, prescribed burning, natural systems restoration, mowing and recreational development/maintenance.
BenefitsPursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a
way as to ensure a balance between public access, general public recreational purposes, and restoration and
protection of their natural state and condition.
Costs
The FY2011 budget consists of salaries and operational costs for public use management, resource monitoring,
resource protection, road and bridge maintenance and 30 acres of hydro-ax restoration and maintenance. Costs for
these activities are reimbursable through the state's Water Management Lands Trust Fund.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) - Ad
Valorem Revenue
108,714 0
District Budgeted - Outside Revenue
(SOR)
011 Alafia River Basin 0 46,367
021 Manasota Basin 0 91,472
Project Funds Not Budgeted by the
District
Hillsborough County 0 0
Funding Funding
2011 FY 2012 FY
Status As Of: February 23, 2011
Aquatic Plant Management Section staff treated 13 acres infested with the invasive species Old World climbing fern.
011 - Alafia River Basin 14
S034
Alafia River Corridor
Project Type SOR
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Hillsborough CountyCooperator(s)
Project Manager LOVE, KEVIN
GATES, CYNDI, MILLER, WILL, NELSON, BRIAN, REED, CHRIS, FOX, AUGUST, SOWDERS,
GINA, KRUK, COLLEEN, HAGBERG, JEFFREY
Task Manager(s)
Status Ongoing
DescriptionThe Alafia River Corridor contains parcels of land along the Alafia River corridor from Bell Shoals Road and extends
upstream to the headwaters of the river. The river's natural floodplain is a mixture of hardwood swamps and upland
hammocks. Acquisition of the land within Hillsborough County was co-funded by the District and the County with fee
simple title conveyed to the District. In 1996 the District entered into a lease agreement with Hillsborough County that
designated the County as manager of lands jointly purchased by the County and the District. Recreational
improvements provided by Hillsborough County include three miles of hiking trails, eight miles of equestrian trails,
fishing, primitive and group camping. Approximately 5,228 acres of project lands in Hillsborough County acquired by
the District for the C.W. "Bill" Young Reservoir are jointly managed by the District and Tampa Bay Water and known as
the Chito Branch Reserve. In Polk County, the District and the County have co-funded and co-own 334 acres. Polk
County is responsible for a park site on the property and the District is responsible for resource management and trail
development.
BenefitsPursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a
way as to ensure a balance between public access, general public recreational purposes, and restoration and
protection of their natural state and condition.
Costs
The FY2011 budget consists of salaries and operational costs for public use management, resource monitoring,
resource protection, road and bridge maintenance, exotics plant control, 6 days of prescribed burning, 65 acres fireline
maintenance, 36 acres of road maintenance, 75 acres of clearing and chopping, 2.9 miles of fencing; seeds, springing
and herbicides for 10-acre restoration site ($11,450); portolet rental ($1,200); 1,324 hrs of security and an entrance
sign. Costs for these activities are reimbursable through the state's Water Management Lands Trust Fund.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) - Ad
Valorem Revenue
113,658 0
District Budgeted - Outside Revenue
(SOR)
010 General Fund (Districtwide) 0 0
011 Alafia River Basin 0 162,023
020 Peace River Basin 0 0
Project Funds Not Budgeted by the
District
Hillsborough County 0 0
Funding Funding
2011 FY 2012 FY
011 - Alafia River Basin 15
S034
Alafia River Corridor
Status As Of: February 22, 2011
Land Resources staff met with representatives from the Florida Fish and Wildlife Conservation Commission and
Hillsborough County Parks to discuss the possibility of creating a Fish Management Area at Medard Park. Aquatic Plant
Management Section staff treated 81 acres infested with the invasive species Japanese climbing fern, 27 acres of
cogongrass, 4 acres of Brazilian pepper and 8 acres of other invasive species infestations.
011 - Alafia River Basin 16
S042
Tampa Bay Estuarine Ecosystem
Project Type SOR
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Pinellas-Anclote River, Manasota
Hillsborough County, Florida State ParksCooperator(s)
Project Manager MILLER, WILL
LOVE, KEVIN, HAGBERG, JEFFREY, KRUK, COLLEEN, SOWDERS, GINA, VANGELDER, WILLTask Manager(s)
Status Ongoing
DescriptionThe Tampa Bay Estuarine Ecosystem project furthers the Tampa Bay Surface Water Improvement and Management
(SWIM) plan. Approximately half the project consists of mangroves and salt marsh which dominate the northern
project area along Bishop Harbor and the western area associated with the tidal bays of Moses Hole, Clambar Bay
and Williams Bayou. The natural upland and wetland habitats within the project area provide natural water quality
treatment of overland flows before reaching the receiving waters of Tampa Bay. A majority of lands within the Tampa
Bay Estuarine Ecosystem project were jointly purchased with the State or local governments. Under an agreement
with the State, the Department of Environmental Protection's Division Recreation and Parks is the lead land manager
for the Terra Ceia tract. Hillsborough County manages the Bullfrog Creek and Port Redwing tracts, and Pinellas
County manages the Clam Bayou tract.
BenefitsPursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a
way as to ensure a balance between public access, general public recreational purposes, and restoration and
protection of their natural state and condition.
Costs
The FY2011 budget consists of salaries and operational costs for public use management, resource monitoring,
resource protection, road and bridge maintenance, recreation equipment, nine acres of road mowing, two days of
prescribed burning; and contractual services for 271 acres of recreational mowing. Costs for these activities are
reimbursable through the state's Water Management Lands Trust Fund.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) - Ad
Valorem Revenue
35,081 0
District Budgeted - Outside Revenue
(SOR)
011 Alafia River Basin 0 21,038
016 Pinellas-Anclote River Basin 0 0
021 Manasota Basin 0 18,990
Project Funds Not Budgeted by the
District
Hillsborough County 0 0
Funding Funding
2011 FY 2012 FY
Status As Of: December 08, 2010
County has been working with the Sarasota Reg. office for permits to clean out ditches, this project has the potential to
extend into TECO/Rockpond parcels. In preparation for the SWIM restoration project the Land Resouces Department is
working with CSX and DEP on access and conservation easements on site.
011 - Alafia River Basin 17
S099
Save Our Rivers (SOR) Land Management and Use
Project Type SOR
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,
Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager SUTTON, ERIC
LOVE, KEVIN, MILLER, WILL, WALSH, TOM, HAGBERG, JEFFREY, NELSON, BRIANTask Manager(s)
Status Ongoing
DescriptionThe Save Our Rivers Administration project contains monies for those items not attributable to one unique project
during the budget cycle. Examples are studies affecting all conservation lands, preparation of resource evaluation
reports, heavy equipment used solely on conservation lands, overtime, staff time, vehicle charges and equipment
rental.
BenefitsPursuant to Section 373.1391(1)(a), Florida Statutes, lands within the project are managed and maintained in such a
way as to ensure a balance between public access, general public recreational purposes, and restoration and
protection of their natural state and condition.
Costs
The FY2010 budget includes salaries, central garage charges, tree removal in cases where trees fall from District
property onto adjoining owners' property in the Coastal and Hillsborough Basins, and aerial flights to view exotics
species in the General Fund, and Hillsborough, Peace and Manasota Basins. Costs for these activities are 100
percent reimbursed through the state's Water Management Lands Trust Fund.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) - Ad
Valorem Revenue
1,135,585 1,118,761
013 Hillsborough River Basin - Ad
Valorem Revenue
0 9,519
016 Pinellas-Anclote River Basin - Ad
Valorem Revenue
0 4,311
District Budgeted - Outside Revenue
(SOR)
010 General Fund (Districtwide) 0 0
011 Alafia River Basin 0 4,519
013 Hillsborough River Basin 0 0
015 Coastal Rivers Basin 0 9,519
016 Pinellas-Anclote River Basin 0 0
019 Withlacoochee River Basin 0 9,519
020 Peace River Basin 0 7,719
021 Manasota Basin 0 7,719
Funding Funding
2011 FY 2012 FY
011 - Alafia River Basin 18
S099
Save Our Rivers (SOR) Land Management and Use
Status As Of: March 12, 2009
With the exception of the District fund, the Save Our Rivers (SOR) Administration project is used primarily to budget
monies for SOR, Preservation 2000 and Florida Forever (reimbursable) projects. Generally, funds are not charged to this
project, but transferred to other reimbursable projects within the Basin. An example is overtime. Staff knows at budget
time that overtime will be required within the basins for work on SOR projects, but does not know for which projects, so
monies will be budgeted in S099. When overtime is used later in the year, the monies will show as being spent for the
actual project the staff member worked on (i.e., S009- Starkey, S016 - Weekiwachee Preserve, etc.). In the District funds
monies are primarily used for SOR program administration, purchase of equipment and contractual services.
011 - Alafia River Basin 19
SB54
Education - Polk's Nature Discovery Center Field Trips at District's &
Polk County's Circle B RanchProject Type SOR
AORs Strategic InitiativesWater Quality Water Quality MonitoringWater Supply ConservationNatural Systems Natural Systems Identification and MonitoringFlood Protection Floodplain Management
Basin(s) Alafia River, Hillsborough River, Peace River
Polk County Natural Resources, Polk County Natural ResourcesCooperator(s)
Project Manager HULL, MARY MARGARET
Task Manager(s)
Status Proposed
DescriptionThis Save Our Rivers (SOR) project proposes to educate students and adults about watersheds at Polk's Nature
Discovery Center on the Circle B Bar Reserve. The project will educate 1,514 Polk County students and adults about
water resources and natural systems on District land. There are two proposed components: 1) summer camps
including 30 hands-on water resources education field trips for 1,500 K-8 students, and 2) in-depth educator training
for 14 Polk County staff and volunteers, including 80 hours of UF's Florida Master Naturalist Program training. Funding
is requested to pay for summer camp bus transportation, program costs and training for Polk County staff and
volunteers. The District's previously funded water exhibits at the Center will be used as education tools enhancing the
field trip program. The on-site stormwater pond will serve as an outdoor classroom. The program's effectiveness will
be measured through pre/posttest data and educator evaluation forms.
BenefitsThis project proposes to enhance the District's watershed education efforts by educating participants about the
connection between natural systems and water resources. In addition, the programming will take place on District
lands. Existing District educational publications and tools will be used as supplemental material, along with
the District-funded exhibits Everyone Lives in a Watershed, The Green Swamp and The Lakes. Students will be
introduced to hydrological concepts through interactive curriculum activities. Using the location of the center, which is
adjacent to a marsh system that flows into Lake Hancock, field activities will reinforce key water resource concepts.
Lake Hancock has been identified as a major source of pollutants to the Peace River. Reducing the pollutant load to
the river and ultimately to Charlotte Harbor has been a goal of the District. Direct, hands-on water resources education
result in a deeper understanding of the current and future water issues. In addition, the project complements the
District's "Get Outside!" campaign by using District lands.
Costs
The total proposed cost of the FY2012 project is $26,296, with the District contributing $13,148. District funds are
being requested for field trip bus transportation, summer camp program costs and teacher/volunteer scholarships for
UF's Florida Master Naturalist Program training. The field trips and programming will reach 1,514 students/adults per
year at a cost to the District of $8.68 per person and $2.10 per participant contact hour. Both the cost per person and
cost per participant contact hour are approximately 40% lower than the averages of other youth education projects.
The FY2012 costs reflect a 47% reduction from those of FY2011 because school year field trip transportation and
substitute teacher costs, which are included in the FY2011 project, will be supported through the Alafia River,
Hillsborough River and Peace River Basin Initiatives for Youth Education (P259). The budget line below include costs
for staff to manage the project.
Additional Information
The total cost of the FY2011 project is $59,000, with the District contributing $25,000 (Alafia River $6,250;
Hillsborough River $6,250; Peace River $12,500). District funds are used for field trip assessment software, supplies
for the Center's classroom, substitute teacher fees for public school teachers as well as private school and summer
camp bus transportation for field trips to the Center. The dollar amount allocated per basin is determined by the
number of students projected to participate in the programming from each basin. The field trip and public outreach
programs will reach 10,500 students/adults per year at a cost to the District of $2.38 per person, significantly lower
than comparable youth education projects. The cost per participant contact hour ($.58) is significantly lower than the
average youth education project ($2.95). The District has supported this project since FY2007.
011 - Alafia River Basin 20
SB54
Education - Polk's Nature Discovery Center Field Trips at District's &
Polk County's Circle B Ranch
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) - Ad
Valorem Revenue
15,768 0
013 Hillsborough River Basin - Ad
Valorem Revenue
0 7,068
District Budgeted - Outside Revenue
(SOR)
011 Alafia River Basin 0 7,068
013 Hillsborough River Basin 0 0
020 Peace River Basin 0 13,318
Project Funds Not Budgeted by the
District
Polk County Natural Resources 13,148 34,000
Funding Funding
2011 FY 2012 FY
Critical Project Milestones ActualProjected Amended
FY2007 Budgeted FundsBid process for exhibit design and construction initiated by cooperator 6/30/07 6/30/07
Purchase order opened to Polk County Natural Resources 7/30/07 7/24/07
Exhibit design/construction vendor selected 9/30/07 11/30/07 11/30/07
Exhibit design specifications finalized 11/30/07 1/30/08 1/30/08
Bid awarded to vendor 1/15/08 1/15/08
Exhibit construction begins 1/30/08 8/4/08 10/14/08
Exhibits installed at center 8/30/08 10/15/08 10/20/08
Center's grand opening 11/1/08 11/1/08
Final report and invoice due to the District 11/20/09 3/13/09 5/29/09
FY2009 Budgeted FundsOpen purchase order for FY2009 1/5/09 12/17/08
Environmental educator hired by School Board; curriculum under development 3/1/09 2/20/09
Curriculum field-testing begins 8/17/09 8/17/09
Program components complete 10/30/09 9/30/10 9/30/10
Final report and invoice due to the District 11/20/09 10/8/10 11/29/10
FY2010 Budgeted FundsInitiate purchase order 10/1/09 2/8/10 2/12/10
Educational programming begins 11/2/09 2/8/10 2/22/10
Educational programming complete 10/29/10 10/31/10 10/31/10
Final report and invoice due to the District 12/3/10 11/29/10
FY2011 Budgeted FundsInitiate purchase order 12/6/10 1/10/11 2/21/11
Educational programming begins 1/17/11 2/21/11
Educational programming complete 8/31/11
Final report and invoice due to the District 9/30/11
Status As Of: February 18, 2011
ACTION TO DATE: On time. Summer camp planning is underway.
011 - Alafia River Basin 21
W020
Planning - Tampa Bay Protection and Restoration Planning
Project Type SWIM
AORs Strategic InitiativesWater Quality Water Quality Maintenance and Improvement
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Manasota
Tampa Bay Estuary ProgramCooperator(s)
Project Manager KAUFMAN, KRIS
Task Manager(s)
Status Ongoing
DescriptionThis project provides for the administration and implementation of projects as outlined in the SWIM Plan for Tampa
Bay. Administration and implementation includes assessment of implementation progress, a review and refinement of
the Pollutant Load Reduction Goal (PLRG) for the waterbody, periodic SWIM Advisory Committee meetings, new
project development (rationale and justification), development of relevant contracts and Requests for Proposals or
Quotes, invoicing, project related presentations, field visits, and miscellaneous duties as they arise. Additionally, this
project provides for the implementation of projects identified in the Tampa Bay SWIM Plan; including water quality
assessments necessary for SWIM plan implementation and periodic Tampa Bay Estuary Program (TBEP) Technical
Advisory Committee meetings.
BenefitsThis project's support of the Tampa Bay SWIM Plan creates an opportunity for a cohesive effort between the District,
and other state and local agencies to better implement resource management decisions and restoration activities.
Historically, SWIM projects have been eligible for state matching funds with the state funding 50 percent of the project
costs and the District funding the remaining 50 percent. In FY2011, all projects within the Tampa Bay SWIM watershed
are funded 100 percent by the Alafia, Hillsborough River, Pinellas-Anclote, and Manasota Basin Boards as no State
SWIM funds were available.
Costs
The FY2012ongoing costs for the Tampa Bay SWIM Plan Implementation are funded 25 percent from the
Pinellas-Anclote River, 25 percent from the Manasota, 25 percent from the Hillsborough River, and 25 percent from
the Alafia River Basin Boards. District funds shown in the table include staff salaries.
Additional Information
In 1987, the Florida Legislature established the Surface Water Improvement and Management (SWIM) Act having
recognized that water quality and habitat in surface waters throughout the state have degraded or were in danger of
being degraded. The Act requires the five water management districts to maintain a priority list of water bodies of
regional or statewide significance within their boundaries, and develop plans and programs for the improvement of
those water bodies. Tampa Bay was identified by the Legislature in the SWIM Act as the highest priority on the
District's SWIM priority list. To date, ten SWIM water bodies in the District have had plans developed and approved by
the state. Several plans have been updated one or more times as required by the Act.
011 - Alafia River Basin 22
W020
Planning - Tampa Bay Protection and Restoration Planning
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 149,813 12,500 (4,445) 98,215 21,990 21,553
013 Hillsborough River Basin 125,250 12,500 (29,445) 98,652 21,990 21,553
014 Northwest Hillsborough Basin 74,686 0 0 74,686 0 0
016 Pinellas-Anclote River Basin 151,254 12,500 (4,445) 99,656 21,990 21,553
021 Manasota Basin 150,300 12,500 (4,445) 98,702 21,990 21,553
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 193,160 0 (25,000) 218,160 0 0
State Trust Funds (SWIM) - Prior 2006 236,306 0 0 236,306 0 0
WMLTF (SWIM) - Prior Year Funds 44,220 0 0 44,220 0 0
$1,124,989 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Critical Project MilestonesTampa Bay SWIM Plan Update 2/8/99 2/8/99
Next Update of SWIM Plan 12/31/06 12/31/11
2. Critical Project MilestonesUSF Stable Isotope Analysis Purchase Order Opened 8/25/05 8/25/05
Coordination Meeting for Isotopic Investigation of OTB Pollutants 4/15/07 4/15/07
Expiration of Purchase Order 12/31/07 12/31/07
3. Critical Project MilestonesDesign and implementation of Tampa Bay Shallow Water Sampling 1/31/08 2/29/08 2/25/08
3. Critical Project MilestonesCompletion of first year of Tampa Bay Shallow Water Sampling 12/31/08 12/31/08
Completion of second year of Tampa Bay Shallow Water Sampling test 12/31/09 11/29/10 12/31/09
4. Critical Project MilestonesTBEP Old Tampa Bay Expert Technical Support P.O. Notice to Proceed 12/15/10 9/22/10
TBEP Old Tampa Bay Expert RFP Developement Meeting 1/13/11 1/13/11
TBEP Old Tampa Bay Expert Technical Support PO Expiration 12/31/11
5. Critical Project MilestonesTBEP Development of Water Quality and Nutrient Criteria PO Notice to Proceed 4/1/11
TBEP Development of Water Quality and Nutrient Criteria PO Expiration 12/31/11
Status As Of: March 04, 2011
Coordination and implementation of the Tampa Bay Shallow Water Quality Evaluation is complete. The final monthly
sampling event was held December 2009. The data was integrated into the District's EDMS/Adapt program and will be
uploaded to FDEP STORET. The data is currently being reformat for analysis purposes. Evaluations of TBEP's existing
monitoring programs and discussions of other cooperative implementation opportunities will continue to be reviewed
through participation in the TAC and subcommittee meetings. Coordination with the TBEP is ongoing to gather expert
advise and relevant information related to the modeling and assessment of Old Tampa Bay. A purchase order with the
TBEP was opened in December 2010, to procure the services of two experts for assisting in developing the OTB
assessment tool RFP and proposal review. The coordination and information gathering will provide support for
development of the FY11 Old Tampa Bay Assessment RFP (W200 and W201). An RFP development meeting with
participation by the TBEP OTB Experts was held Jan 2011. As an element of the District's ongoing participation in the
Estuary Program's estuarine numeric nutrient criteria setting efforts, the District is working with TBEP staff to coordinate
and cooperatively fund target setting for Boca Ciega Bay, Terra Ceia Bay and Manatee River bay segments. As of March
011 - Alafia River Basin 23
W020
Planning - Tampa Bay Protection and Restoration Planning
3, 2011, a purchase order with associated scope of work is being processed to have TBEP lead the effort for
development of water quality and nutrient load criteria for the above referenced segments.
011 - Alafia River Basin 24
W027
Planning - Tampa Bay Estuary Program Plan Development &
ImplementationProject Type SWIM
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Pinellas-Anclote River, Manasota
Tampa Bay Estuary Program, Tampa Bay Estuary ProgramCooperator(s)
Project Manager GARCIA, LIZANNE
CRAW, VERONICA, SEACHRIST, JENNETTETask Manager(s)
Status Ongoing
DescriptionThis project provides funding for the Tampa Bay Estuary Program (TBEP) as outlined in the Interlocal Agreement
which established the TBEP as a independent special district in 1998. The District participates in three main areas.
First the District's SWIM program, funded by the basin boards and State, carries out the projects that will address
water quality and habitat restoration within the bay. Second, the basin boards and State have contributed funding to
the TBEP since 1990 to carry out the administration and implement projects identified in the TBEP Comprehensive
Conservation and Management Plan. And finally, the District provides staff to sit on the technical, management and
policy (Governing Board Member) boards and the Nitrogen Management Consortium of the program. The District's
annual budget includes funding support to the TBEP and District staff salaries, travel and central garage to administer
the project, which includes attending board meetings and other workshops and invoicing.
BenefitsThis project's support of the Tampa Bay Estuary Program creates an opportunity for a cohesive effort between the
District, TBEP and other state and local agencies to implement resource management decisions and restoration
activities. Additionally, this project provides for leveraging funding between the partners.
Costs
The District has provided funding to the TBEP on an annual basis since 1990. The District's annual funding
commitment to the TBEP is $138,335. Prior to FY2010, the District share was split between State SWIM funds (50%)
and the Basin Boards (50%). In FY2011, the District's funding is funded 100% by the Basin Boards. The
FY2011 funding is split 25 percent ($34,583.75) from the Pinellas-Anclote River, 25 percent ($34,583.75) from the
Manasota, 25 percent ($34,583.75) from the Hillsborough River, and 25 percent ($34,583.75) from the Alafia River
Basin Boards. In FY2012 the proposed funding is $138,335 to be funded 100% by the Basin Boards with the same
percentages for each basin as in 2011. District funds are used to implement projects outlined in the Annual Workplan.
District funds shown in the table include staff salaries.
Additional Information
TBEP Background: In 1987, the Florida Legislature established the Surface Water Improvement and Management
Program (SWIM) Act having recognized that water quality and habitat in surface waters through out the state have
degraded or are in danger of being degraded. The Act requires the District maintain a priority list of waterbodies of
regional or statewide significance within their boundaries. The Act listed Tampa Bay as the District's number one
priority. Subsequently, in 1990, the United States Environmental Protection Agency identified Tampa Bay as an
estuary of Federal Significance and included it in the National Estuary Program. As a result of this designation, the
Tampa Bay National Estuary Program (TBNEP) was established in 1991 (with the District as a founding partner) to
assist the region in developing a comprehensive plan for the restoration and protection of Tampa Bay. The TBNEP
developed the first Comprehensive Conservation and Management Plan (CCMP) for Tampa Bay in 1996 which
included measurable goals for restoring seagrasses and related targets for reducing nitrogen discharges to the bay.
The parties unanimously adopted a "hold the line" target on nitrogen discharges that capped the load at a level that
would ensure adequate water clarity and light to sustain seagrass recovery. In August 1996, the NEP's governmental
partners joined with key industries in the Tampa Bay region to create a unique public/private partnership known as the
Tampa Bay Nitrogen Management Consortium (Consortium) for the express purpose of developing a Consortium
Action Plan to meet the "hold the line" target. The original Consortium Action Plan consisted of more than 100 projects
which collectively reduced or precluded nitrogen discharges to the bay by an estimated 134 tons/year between 1995
and 1999. In 1998, local government and agency partners in the TBNEP executed the Tampa Bay Estuary Program
Interlocal Agreement reinforcing their commitment to the NEP and its purpose (at which time the NEP became the
Tampa Bay Estuary Program or TBEP). Parties to the Interlocal Agreement include the U.S. Environmental Protection
Agency (EPA), Florida Department of Environmental Protection (FDEP), the District, Hillsborough, Manatee and
Pinellas counties and the cites of St. Petersburg, Tampa and Clearwater. The Interlocal Agreement requires that
parties provide annual funding to the TBEP, develop an agency action plan and to participate as a member of the
Consortium. Later in 1998, the public and private entities in the Consortium executed the "Resolution of the Nitrogen
011 - Alafia River Basin 25
W027
Planning - Tampa Bay Estuary Program Plan Development &
ImplementationManagement Consortium Adopting the 1995-1999 Nitrogen Management Action Plan and Committing to its
Implementation" (1998 Resolution). This resolution was presented to the five Basin Boards that represented Tampa
Bay (Alafia River, Northwest Hillsborough, Hillsborough River, Pinellas-Anclote River, and Manasota) and the
Governing Board at their meetings in June 1998 and the Governing Board approved this resolution and the District's
Action Plan June 23, 1998. Tampa Bay Total Maximum Daily Load (TMDL) Status: In 1998, pursuant to the federal
Clean Water Act, FDEP submitted a TMDL for nitrogen for Tampa Bay to the EPA. The TMDL is based on the annual
average total nitrogen loading to major bay segments estimated by the TBEP. These loadings are seen as the
maximum loadings that can occur and still meet the seagrass restoration goals. EPA approved the submitted TMDL
June 18, 1998. In 1999, the Florida Legislature passed the Florida Watershed Restoration Act which established the
state's TMDL process. This Act allows for stakeholders to show that existing or proposed pollution control programs
will provide "Reasonable Assurance" (RA) that impaired water bodies will meet their designated uses. If FDEP accepts
the documentation for RA, then the water body will not be included on the Verified List for Impaired Waters and will not
require the development of a TMDL. Subsequently, the TBEP and the Consortium developed and submitted a RA
document to the FDEP in 2002, based on the Consortium Action Plan. The document provided the FDEP with a
complete description of the Tampa Bay Nitrogen Management Strategy. The TBEP also provided FDEP with a copy of
the 1998 Resolution that committed both private and public partners to the projects identified in their action plans. The
FDEP accepted the 2002 RA document submitted by the TBEP and the Consortium as adequate to address nutrient
impairment in Tampa Bay segments, and removed Tampa Bay segments from the State's 303(d) list for 2002-2007.
Fertilizer Ordinance: The Estuary Program, through a consensus driven stakeholder process, developed a Model
Fertilizer Use Ordinance that is now being considered by several communities in the Tampa Bay region. The
ordinance is intended to reduce nitrogen pollution from stormwater flowing into the bay and other surface waters.
TBEP scientists estimate that a 50% compliance rate with the ordinance could reduce the amount of nitrogen entering
Tampa Bay each year by 84 tons.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 201,201 34,584 0 94,181 35,594 36,842
013 Hillsborough River Basin 201,201 34,584 0 94,181 35,594 36,842
014 Northwest Hillsborough Basin 57,684 0 0 57,684 0 0
016 Pinellas-Anclote River Basin 201,201 34,584 0 94,181 35,594 36,842
021 Manasota Basin 201,200 34,584 0 94,180 35,594 36,842
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 288,408 0 0 288,408 0 0
WMLTF (SWIM) - Prior Year Funds 7,648 0 0 7,648 0 0
Project Funds Not Budgeted by the
District
Local Government Partners 1,679,990 0 0 1,393,325 0 286,665
US EPA 3,402,983 0 0 2,602,983 0 800,000
$6,241,516 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2011 Annual Workplan Critical Project MilestonesFY2011 Draft Agreement to Management Services 6/2/10 5/18/10
Agreement fully executed 10/1/10 10/4/10
011 - Alafia River Basin 26
W027
Planning - Tampa Bay Estuary Program Plan Development &
ImplementationFY2011 First 1/2 payment 12/1/10 12/8/10
FY2011 Second 1/2 Payment 3/1/11
End of Contract 9/30/11
FY2012 Annual Workplan Critical Project MilestonesFY2012 Draft Agreement to Management Services 6/1/11
FY2012 Agreement Fully Executed 10/1/11
Fy2012 First 1/2 Payment 12/1/11
Fy2012 Second 1/2 Payment 3/1/12
FY2012 Contract Expiration 9/30/12
Status As Of: February 28, 2011
FY2011 Annual Work Plan: The FY2011 workplan has been executed and the invoice for the first payment has been
received and processed. TBEP Nitrogen Management Consortium (Consortium): The NMC had a joint meeting with the
TBEP Technical Advisory Committee on January 28, 2011. The group heard prestentations on the 2010 water quality
and seagrass mapping results. In December 2007, 40+ public and private participants in the Tampa Bay Nitrogen
Management Consortium proactively committed to develop an equitable process to propose TN load allocations to all
sources consistent with the TMDL. The RA Document was completed and the FDEP approved the technical changes to
the document. Compliance will be calculated annually for point sources and every 5 years part of the RA Plan updates
for non-point sources. FDEP used the allocations published in the Final 2009 Reasonable Assurance Addendum to
develop the Tampa Bay WQBEL (water quality-based effluent limitations). It provides TN limits for point and non-point
source discharges into Tampa Bay based on the. FDEP published its Final Order regarding the WQBELs on November
16, 2010. The WQBELs will be implemented in permits at the time of the next permit renewal. Numeric Nutrient Criteria
(NNC): The Consortium is continuing to meet to review and participate in the development of Numeric Nutrient Criteria
for FDEP and EPA. The TBEP and Consortium requested that USEPA accept and recognize the Consortium's TN and
TP loads as Interim Estuarine Numeric Nutrient Loading Targets. The TBEP Policy Board/elected officials sent a letter to
EPA (dated 3/18/10) endorsing the request of the NMC that EPA accept and finalize the TN and TP loads as the
protective loads for the TB estuary. On June 7, 2010, EPA and the Plaintiffs filed a Joint Notice to the Court of Extension
of Consent Decree Deadlines that recognized that peer review should be conducted prior to proposing or soliciting
additional comment on the criteria for estuarine and coastal waters. The publication of proposed criteria for coastal and
estuarine waters was changed to November 14, 2011 and final rulemaking was delayed until August 15, 2012. The
Consortium provided recommended methodology for Numeric Nutrient Criteria for estuaries to EPA in July 2010. The
recommended methodology is referenced within the master EPA methods document. There was a Joint Meeting
between FDEP, SW Florida NEP TACs and NMC on Sept. 2nd to discuss draft estuarine numeric nutrient criteria.
Janicki presented the results of his effort to develop bay segment-specific TN and TP concentrations consistent with the
TN and TP loads recommended previously. EPA has sought input from the NEP on several specific topics including:
consideration of spatial and temporal variability, non-anthropogenic exceptions (hurricanes, El Nino, etc.), and how to
address bayous and tidal creeks. Representatives from the NEP attended EPA's Science Advisory Board (SAB) meeting
held on December 13 - 14, 2010. The SAB was receptive to supporting local efforts in developing Site-Specific
Alternative Criteria. The SAB was critical of Downstream Protection Values and EPA's modeling approach. The TBEP
submitted recommendations to EPA regarding the establishment of numeric nutrient criteria for the Tampa Bay Estuary
on February 22, 2011. The document proposed TN and TP loading criteria for the four mainstem segments of Tampa
Bay. It included language addressing concentration-based criteria, the lack of need for downstream protection values,
and a recommendation that tidal creeks be considered as unique entities.
011 - Alafia River Basin 27
W028
Education - Partial Funding for TBRPC's Bay Soundings
Project Type SWIM
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply ConservationNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Pinellas-Anclote River, Manasota
Tampa Bay Regional Planning Council, Tampa Bay Regional Planning CouncilCooperator(s)
Project Manager HARROUN, AMY
Task Manager(s)
Status Proposed
DescriptionThis Surface Water Improvement and Management (SWIM) project consists of a full-color, 16-page, quarterly
environmental journal that provides important information on issues affecting Tampa Bay, its watershed and the
natural resources of the Tampa Bay region. The Bay Soundings publication supports the Tampa Bay SWIM plan and
is consistent with the Tampa Bay Estuary Program goals. Through the education efforts of Bay Soundings, residents in
the Tampa Bay area learn about the restoration and preservation of SWIM water bodies. This free publication is
distributed throughout Pasco, Pinellas, Hillsborough and Manatee counties to government and non-government
agencies, local attractions, private businesses, environmental clubs, schools, libraries, elected officials and sponsors.
District staff sits on the editorial board and provides story ideas featuring District projects that meet the editorial focus
of the publication. Bay Soundings' web site is www.tbsoundings.com. The effectiveness of this publication will be
measured by the total print circulation and number of online impressions.
BenefitsBay Soundings increases residents' knowledge and awareness of the District's educational outreach efforts on Tampa
Bay and helps to increase the readers' knowledge of local environmental issues. Each edition of this publication
features one or more topics pertaining to District projects or areas of responsibility. SWIM water bodies are often
featured in the publication's articles.
Costs
The total proposed cost for the FY2012 project is $45,000, with the District requested to contribute $22,500 (Alafia
River $2,250; Hillsborough River $7,875; Pinellas-Anclote River $7,425; Manasota $4,950). District funds are being
requested for the production, printing and circulation of 30,000 copies each issue.
Additional Information
The total cost for the FY2011 project was $45,000 with the District contributing $22,500 (Alafia River $2,250;
Hillsborough River $7,875; Pinellas-Anclote River $7,425; Manasota $4,950). The publication's circulation totaled
30,000 distributed copies each issue. In addition the web site was reporting 35,000 hits per month.
011 - Alafia River Basin 28
W028
Education - Partial Funding for TBRPC's Bay Soundings
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 10,415 0 0 5,915 2,250 2,250
013 Hillsborough River Basin 33,703 0 0 17,953 7,875 7,875
014 Northwest Hillsborough Basin 5,040 0 0 5,040 0 0
016 Pinellas-Anclote River Basin 39,226 0 0 24,376 7,425 7,425
021 Manasota Basin 24,928 0 0 15,028 4,950 4,950
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 45,806 0 0 45,806 0 0
Project Funds Not Budgeted by the
District
Tampa Bay Regional Planning Council 67,500 0 0 22,500 22,500 22,500
$226,618 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2008Winter issue 2/20/08 2/20/08
Spring issue 5/20/08 5/20/08
Summer issue 8/20/08 7/29/08
Fall issue 11/20/08 10/17/08
FY2009PO opened 10/1/08 10/20/08
Winter issue 2/20/09 2/5/09
Spring issue 5/20/09 5/18/09
Summer issue 8/20/09 8/20/09
Fall issue 11/20/09 11/20/09
FY2010PO opened 10/1/09 10/1/09
Winter issue 2/20/10 2/20/10
Spring issue 5/20/10 5/7/10
Summer issue 8/20/10 8/6/10
FY2011Fall issue 11/20/10 11/15/10
PO opened 1/28/11 2/28/11
Winter Issue 2/21/11 2/14/11
Status As Of: February 21, 2011
ACTION TO DATE: On time. The Winter issue was distributed on time. The issue contained stories about the District's
restoration efforts of Old Tampa Bay. SWIM manager, Jennette Seachrist, was interviewed for the story. Additional
stories included coverage of the District's "Skip a Week" campaign and information about District staff helping with the
Stewart Middle School "Living Laboratory."
011 - Alafia River Basin 29
W030
Education - Tampa Bay Watch Field Trip Program at Tampa Bay
Watch Marine CenterProject Type SWIM
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Pinellas-Anclote River, Manasota
Tampa Bay Watch, Tampa Bay WatchCooperator(s)
Project Manager HULL, MARY MARGARET
Task Manager(s)
Status Proposed
DescriptionThis Surface Water Improvement and Management (SWIM) project proposes to educate elementary, middle, high
school and college students about estuarine science and empower them to act as stewards of the Tampa Bay estuary
by combining classroom curriculum with 325 hands-on field experiences in and around Tampa Bay Watch's Marine
Science Center. The proposed programming will reach students and teachers in Hillsborough, Manatee and Pinellas
counties. In FY2012, the program will include educational field experiences, classroom presentations, teacher training,
coastal plantings, oyster reef enhancement efforts and coastal cleanups, while continuing a pilot
comprehensive program evaluation of student learning. The program evaluation will assess student knowledge gain
and retention of estuarine science and environmental literacy as well as behavioral changes due to progressive
experiences linked with the programming. The project will also provide restoration of approximately eight acres of
coastal and near-shore habitat, build and install 300 new oyster domes and construct approximately 600 linear feet of
new oyster shell bars. The program's effectiveness will be measured with student pre/posttests, journal work and
teacher surveys.
BenefitsTampa Bay was identified as the highest priority on the District's SWIM priority list in 1988. The program's proposed
goals are to educate students and teachers about the importance of estuarine habitats and restoration efforts and to
empower them to become lifelong stewards of Tampa Bay. The cooperator continues to look for ways to innovate the
program and implement improvements. A three-year comprehensive pilot study with three to five participating middle
schools will track students' progression and learning from sixth through eighth grade. A 32% gain in student knowledge
has been documented through pre/posttest analyses. Cooperator has a long history with the District and is well versed
in Florida's standards-based education guidelines.
Costs
The total proposed cost of the FY2012 program is $323,049, with the District contributing $159,925 (Alafia River
$7,996; Hillsborough River $39,981; Pinellas-Anclote River $95,955; Manasota $15,993). The dollar amount allocated
for each contributing Basin Board is determined by the projected participating schools within each basin. District
funds are being requested for program implementation, 325 field trips, three teacher training workshops, four student
newsletters, program evaluation, aquatic supplies, equipment and field guides. The proposed FY2012 program
includes a 7% cost increase due to adding 25 more field trips and adding college students in field trip
programming. The program will reach 12,968 students and adults at a cost to the District of $12.79 per person, 11%
lower than other comparable youth education projects. The cost per participant contact hour is $3.57, 9% lower than
the youth education average. The budget lines below include costs for staff to manage the project.
Additional Information
The total cost of the FY2011 program is $307,170, with the District contributing $147,850 (Alafia River $14,785;
Hillsborough River $36,963; Pinellas-Anclote River $88,710; Manasota $7,392). The dollar amount allocated for each
contributing Basin Board is determined by the participating schools within each basin. District funds are used for
program implementation and evaluation, 300 field trips, three teacher training workshops, four student newsletters,
aquatic supplies, equipment and field guides. The program will reach 12,600 students and adults at a cost to the
District of $11.73 per person, 28% lower than other comparable youth education projects. The cost per participant
contact hour is $2.05, 31% lower than the youth education average. The District has supported this project since
FY2007.
011 - Alafia River Basin 30
W030
Education - Tampa Bay Watch Field Trip Program at Tampa Bay
Watch Marine Center
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 67,409 0 0 44,585 8,039 14,785
013 Hillsborough River Basin 114,902 0 0 37,077 40,862 36,963
014 Northwest Hillsborough Basin 7,507 0 0 7,507 0 0
016 Pinellas-Anclote River Basin 376,340 0 0 188,903 96,949 90,488
021 Manasota Basin 46,554 0 0 22,293 16,869 7,392
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 152,033 0 0 152,033 0 0
WMLTF (SWIM) - Prior Year Funds 479 0 0 479 0 0
Project Funds Not Budgeted by the
District
Tampa Bay Watch 658,464 0 0 495,340 0 163,124
$1,423,688 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2009 Budgeted FundsPurchase order opened 10/27/08 10/31/08
Field trips and teacher training completed 8/30/09 8/30/09
Final report and invoice due to District 9/30/09 9/30/09
FY2010 Budgeted FundsInitiate purchase order 10/1/09 12/4/09
Field trips and teacher training completed 8/31/10 8/31/10
Final report and invoice due to District 9/30/10 10/14/10
FY2011 Budgeted FundsInitiate purchase order 11/1/10 12/21/10
Field trips and teacher training completed 8/31/11
Final report and invoice due to the District 9/30/11
Status As Of: February 18, 2011
ACTION TO DATE: On time. Cooperator completed field trips (81 on-site Estuary EDventures, 46 off-site Bay Grasses In
Classes field trips), 1 community ecotour, 9 outreach sessions and 1 community saltmarsh planting within the first
quarter (October through December). Teacher workshops will occur during the fourth quarter of grant cycle. One issue of
student newsletters has been completed and the second will be distributed in March. Summer camps are being
scheduled.
011 - Alafia River Basin 31
W032
Education - Hillsborough CC Foundation Environmental Field Trips
in Tampa Bay AreaProject Type SWIM
AORs Strategic InitiativesWater Quality Water Quality MonitoringWater Supply ConservationNatural Systems Natural Systems Identification and MonitoringFlood Protection Floodplain Management
Basin(s) Alafia River, Hillsborough River, Pinellas-Anclote River, Peace River
Hillsborough Community College Foundation, Hillsborough Community College FoundationCooperator(s)
Project Manager HULL, MARY MARGARET
Task Manager(s)
Status Proposed
DescriptionThis proposed Surface Water Improvement and Management (SWIM) project includes four different field trip
programs for elementary, middle, high school and college students in Hillsborough, Pasco, Pinellas and Polk counties.
The field expeditions will occur at Cockroach Bay, English Creek, Upper Tampa Bay Park and Hillsborough River
State Park. The program will give participants a better understanding of Florida's water resources through 120
hands-on field experiences with HCC science professionals and ultimately to create the next generation of
environmental stewards. Teachers can take part in a field trip orientation prior to participation in a field trip. Students
will complete a pre/posttest to measure knowledge gains. Most recent data provided demonstrates a significant 30%
knowledge gain. The project's effectiveness is also measured through use of teacher surveys.
BenefitsTampa Bay was identified as the highest priority on the District's Surface Water Improvement and Management
(SWIM) priority list in 1988. Further, this proposed project is designed to implement an environmental education
initiative in Tampa Bay. These field expeditions help the District reach its educational goals by emphasizing water
quality improvement, water conservation and protection of natural systems within the District. By participating in this
project, 2,500 students and teachers learn to be environmental stewards in their community and the District, promoting
a future of improved water quality, water conservation and natural systems preservation in Florida. The field trips occur
on publicly-owned lands.
Costs
The total proposed cost of the FY2012 program is $190,030, with the District contributing $40,935 (Alafia $11,481;
Hillsborough $29,454). The dollar amount allocated for each contributing Basin Board is determined by the
participating schools within each basin. District funding is for 120 field trips, four teacher orientations,
trail maintenance, printing of curriculum materials, and aquatic and water quality testing supplies. The
program reaches 3,200 students and teachers at a cost to the District of $12.79 per person, 11% below the average of
other proposed youth education projects. The costs per participant hour ($4.23) is 8% higher than the average youth
education project ($3.90). Cooperator feels they can reach more students in FY2012 using the same amount of
District funding. Budget lines below include costs to manage the project.
Additional Information
The total cost of the FY2011 program is $234,135, with the District contributing $40,935 (Alafia $11,277; Hillsborough
$28,822; Pinellas-Anclote $836). The dollar amount allocated for each contributing Basin Board is determined by the
participating schools within each basin. District funding is for 120 field trips, four teacher orientations, one 5-hour
teacher workshop, trail maintenance, printing of curriculum materials, and aquatic and water quality testing supplies.
The program reaches 2,500 students and teachers at a cost to the District of $16.34 per person, a decrease from
FY2010 costs and in line with the average of comparable youth education projects. The costs per participant hour
($4.13) is 39% higher than the average youth education project ($2.95). The District has supported this project since
FY2007.
011 - Alafia River Basin 32
W032
Education - Hillsborough CC Foundation Environmental Field Trips
in Tampa Bay Area
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 52,152 0 (2,057) 29,605 12,409 12,195
013 Hillsborough River Basin 150,280 0 (8,590) 98,915 30,315 29,640
014 Northwest Hillsborough Basin 10,873 0 0 10,873 0 0
016 Pinellas-Anclote River Basin 8,360 0 (726) 8,250 0 836
020 Peace River Basin 7,522 0 (726) 8,248 0 0
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 70,369 0 0 70,369 0 0
WMLTF (SWIM) - Prior Year Funds 479 0 0 479 0 0
Project Funds Not Budgeted by the
District
HCC Foundation 605,290 0 0 456,195 0 149,095
Other funding sources 32,000 0 0 32,000 0 0
$937,325 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2009 Budgeted FundsPurchase order opened 10/27/08 11/24/08
Teacher training workshops 6/30/09 9/25/09 9/25/09
Field trips end 7/31/09 9/25/09 9/25/09
Registration for 2009-2010 field trips 8/1/09 8/1/09
Final report and invoice received by the District 9/30/09 1/29/10 2/3/10
FY2010 Budgeted FundsInitiate purchase order 10/1/09 12/4/09
Teacher training workshop 6/29/10 6/26/10
Field trips end 7/30/10 9/30/10 9/30/10
Teacher training workshop 8/14/10 9/11/10 9/11/10
Final report and invoice received by the District 9/30/10 12/31/10 1/28/11
FY2011 Budgeted FundsInitiate purchase order 11/1/10 11/1/10
Teacher training workshop 9/10/11
Final report and invoice received by the District 9/30/11
Field trips end 9/30/11
Status As Of: February 18, 2011
ACTION TO DATE: On time with revised timeline. To date, cooperator has conducted a total of 60 field trips, 17 to
Cockroach Bay, 2 to English Creek, 24 to Upper Tampa Bay Park and 17 to Hillsborough River State Park. The FY10
final report and invoice are under review by staff.
011 - Alafia River Basin 33
W310
Education - Tampa Bay Watershed and Stewardship Project
Project Type SWIM
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply ConservationNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Pinellas-Anclote River
Tampa Bay Beautification (fka Mayor's Beautification Program), Tampa Bay Beautification (fka
Mayor's Beautification Program)
Cooperator(s)
Project Manager STERNBERGER, VIRGINIA
Task Manager(s)
Status Proposed
DescriptionThis Surface Water Improvement and Management (SWIM) project with Tampa Bay Beautification (formerly known as
Mayor's Beautification Program) is continuing and expanding previous education efforts focusing on behavior change
in the Hillsborough River watershed. The FY2012 project's goal is to educate residents about the Hillsborough River
and the greater Tampa Bay watershed and foster a sense of stewardship by promoting actions that protect the
watershed. Historically concentrating only on the Hillsborough River and its watershed, this year the project activity is
proposed also in the Pinellas-Anclote River and Alafia River Basins. Each basin board named education as one of the
priority needs within its basin. This program successfully addresses stormwater and water quality issues through
education and volunteer cleanups. Based on staff recommendation, TBB has added two new components to increase
the educational value of the program. First is an extensive outreach program in schools, educating about stormwater
runoff and conservation. Students will be empowered to take a proactive approach within their watershed through the
establishment of CLEAN & GREEN ZONES within schools and nearby neighborhoods. The second new component is
ambassador workshops. Volunteer leaders will be trained to lead cleanups and provide a more formal and
comprehensive watershed education session to volunteers. They will also be trained to give school and neighborhood
presentations. Effectiveness will be measured by number of participants, pre- and posttests, follow-up evaluation with
project participants and pounds of trash collected.
BenefitsTampa Bay is a SWIM priority water body and an "estuary of national significance." Through enhanced education in
schools and to volunteer leaders, as well as additional volunteer opportunities, approximately 11,500 residents will
learn specific behaviors that will have a positive impact on their watershed and Tampa Bay. The overall watershed
health will be improved through education and volunteer efforts to remove debris and restore habitats.
Costs
The total proposed cost of the FY2012 project is $228,746, with the District requested to contribute $79,600
(Hillsborough River $45,000; Alafia River $17,300; Pinellas-Anclote River $17,300). The program is projected to
reach 11,500 residents at a cost to the District of approximately $8 per contact hour and $7.52 per person reached.
Although the new pilot components have increased these costs to higher than the average FY2012 CFI public
education program, they are still within an acceptable range. The budget lines below reflects costs for staff to manage
the project.
Additional Information
Tampa Bay was identified as the highest priority on the District's Surface Water Improvement and Management
(SWIM) priority list in 1988. Since 1989, more than 56,000 volunteers removed 1.2 million ponds of litter, debris and
invasive species from the watershed. The total cost of the FY2011 project is $45,000 (Hillsborough River). The funds
are allocated toward 50 cleanup and stormdrain marking events and supplies, an educational brochure featuring the
Hillsborough River watershed and the annual Hillsborough River cleanup event. The project is estimated to
reach 5,000 participants at a cost of $9 per person and $3 per contact hour.
011 - Alafia River Basin 34
W310
Education - Tampa Bay Watershed and Stewardship Project
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 18,801 0 0 0 18,801 0
013 Hillsborough River Basin 158,817 0 0 66,565 47,252 45,000
016 Pinellas-Anclote River Basin 18,801 0 0 0 18,801 0
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 21,565 0 0 21,565 0 0
Project Funds Not Budgeted by the
District
Mayor's Beautification Program 368,231 0 0 121,085 149,146 98,000
$586,215 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Initiate purchase order 10/31/08 10/27/08
First task report due 12/31/08 12/31/08
Second task report due 3/31/09 3/31/09
Third task report due 6/30/09 6/30/09
Fourth task report due 9/30/09 10/15/09 10/15/09
Project close 10/15/09 10/15/09
FY2010 Budgeted FundsInitiate purchase order 10/1/09 11/4/09 11/4/09
Hillsborough River cleanup 11/27/09 11/27/09
Hillsborough River stakeholder tours 4/30/10 9/30/10 9/30/10
Volunteer projects, presentations and outreach 9/15/10 9/15/10
Project close 9/30/10 10/29/10 10/29/10
FY2011 Budgeted FundsInitiate purchase order 10/1/10 11/17/10 11/17/10
Hillsborough River cleanup 11/30/10 11/20/10 11/20/10
Volunteer cleanups 9/23/11
Project close 9/30/11
Status As Of: February 17, 2011
ACTION TO DATE: On time. The following tasks have been completed on the FY2011 scope of work: the annual
Hillsborough River & Waterways Cleanup took place on November 20. Approximately 1,300 volunteers marked 150
stormdrains, planted 4,500 plants, removed 2.21 tons of invasives and collected nearly 4 tons of litter.
011 - Alafia River Basin 35
W312
Tampa Bay Habitat Restoration Regional Coordination
Project Type SWIM
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Manasota
Cooperator(s)
Project Manager HENNINGSEN, BRANDT
Task Manager(s)
Status Proposed
DescriptionThis project provides funds for general support to SWIM habitat restoration efforts for Tampa Bay. Limited project
construction expenses are budgeted under this activity code. Additionally, this project includes funds for exotic plant
maintenance at the habitat restoration sites. Lastly, funds for this project allow planning of future projects, and facilitate
SWIM involvement with various environmental committees and task forces (e.g., various committees of the Tampa
Bay Estuary Program, etc.)
BenefitsThis project is important for meeting management goals of SWIM and the Tampa Bay Estuary Program (TBEP).
Coordination and planning of existing and future projects is a critical component of long term success of both
programs. If funds are not allocated, then SWIM's ability to successfully perform their habitat restoration projects for
Tampa Bay will be compromised. Accordingly, the District will not be meeting its (and the TBEP's) goals to restore
important habitats (and improve water quality) for the bay, habitats which have suffered great losses because of land
development and other human uses of the resource.
Costs
The FY2011 and proposed FY2012 costs are funded 25 percent from the Pinellas-Anclote River, 25 percent from the
Manasota, 25 percent from the Hillsborough River, and 25 percent from the Alafia River Basin Boards. District funds
shown in the table include staff salaries. District funds shown in the table include staff salaries, travel and central
garage.
Additional Information
Tampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is
a category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed
Restoration Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay
(National) Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its
seagrass acreage were lost as a result of physical destruction and water quality impairment. This resulted in a decline
in the aesthetic, recreational, and commercial value of the bay, as well as a loss of habitat for native plants and
animals.
011 - Alafia River Basin 36
W312
Tampa Bay Habitat Restoration Regional Coordination
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 207,887 12,500 (13,702) 169,793 20,750 18,546
013 Hillsborough River Basin 142,576 12,500 (77,691) 167,169 22,052 18,546
014 Northwest Hillsborough Basin 154,098 0 0 154,098 0 0
016 Pinellas-Anclote River Basin 229,190 12,500 (13,702) 191,096 20,750 18,546
021 Manasota Basin 213,237 12,500 (15,279) 176,720 20,750 18,546
District Budgeted - Outside Revenue
Ecosystem Trust Fund - Tampa-Allen's
Ck (SWIM)
1,500,000 0 0 1,500,000 0 0
State Trust Funds (SWIM) 203,312 0 (66,576) 269,888 0 0
State Trust Funds (SWIM) - Prior 2006 784,492 0 0 784,492 0 0
WMLTF (SWIM) - Prior Year Funds 15,012 0 0 15,012 0 0
$3,449,804 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: February 28, 2011
On 01/11/2011, SWIM in concert with Tampa Bay Watch conducted a volunteer marsh transplant event for the Clam
Bayou Ecosystem Restoration and Stromwater Treatment Project; working in concert with the project's contractor and
their trackhoe operator, the 30 volunteers transplanted thousands of units of three species of marsh grasses to a new
intertidal marsh platform of a newly excavated tidal lagoon; the plants were removed from a previously restored sector
(2001) of the Clam Bayou project, an area that now will have a tidal channel linking the previous phase to the new tidal
lagoon; this is the first time that SWIM has ever attempted this sort of restoration activity, and it appears to be very
successful. On 02/16/2011, Dr. Brandt Henningsen provided a requested overview of the Clam Bayou Ecosystem
Restoration and Stormwater Treatment project to and Environmental Ecology class from the University of South Florida.
At the request of the Pasco County Environmental Lands Acquisition and Management Program (ELAMP), Dr.
Henningen provided a tour of various Tampa Bay ecosystem and stormwater treatment projects (02/21/2011); Pasco
County ELAMP is planning to begin restoring and managing public lands that they have purchased over the last six years
and wanted to gain perspective on the restoration process and the maturation of restored habitats. In addition, Dr.
Henningsen was invited to serve as a member of an ecofocal group for the "Resilience Tampa Bay" workshop hosted by
the University of South Florida during 02/22-23/2011). Lastly, Dr. Henningsen provided an invited presentation
(02/24/2011) to the St. Petersburg "Exchange Club", providing an overview of Tampa Bay restoration and the ongoing
Clam Bayou project. With Tampa Bay Watch, SWIM staff are coordinating a volunteer marsh planting involving an
anticipated 150 volunteers to install 10,000 units of marsh grass and a number of upland trees on Saturday morning,
03/12/2011, at the Clam Bayou Ecosystem Restoration and Stormwater Treatment Project.
011 - Alafia River Basin 37
W315
Restoration - Fish Hawk Creek Preserve Habitat Restoration
Project Type SWIM
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Hillsborough County BOCCCooperator(s)
Project Manager LOPEZ, MANNY
Task Manager(s)
Status Ongoing
DescriptionStarting in FY2007, Phase 1 of this project is for habitat restoration of over 160 acres in five areas within the 2800-acre
Fish Hawk Creek Preserve owned by Hillsborough County. Lands within the Preserve are adjacent to District-owned
lands and within the watershed of Fish Hawk Creek, a direct tributary of the Alafia River and ultimately Tampa Bay. All
five sites are located along the south side of the creek. Restoration efforts will target the overgrown hardwood areas
and fallow pastures. The density of hardwoods will be reduced by mechanical means followed by a fuel reduction burn.
Sites will be monitored quarterly for at least one year to determine if the seed bank is sufficient to support return of a
diverse native herbaceous plant community. If necessary, Hillsborough County Conservation Services staff will
reintroduce appropriate herbaceous plant species through direct planting and/or seeding. Restoration efforts within the
fallow pastures will consist of first preparing the sites with repeated series of herbicide treatments followed by
mechanically turning the soil with a disc to kill the dominant Bahia grass and other undesirable plant species.
Subsequently, native herbaceous plants will be reintroduced by direct seeding and/or planting. Phase 2 for FY2009 is
for habitat restoration of an additional 100 acres of fire-supressed sandhill habitat within the preserve. Restoration will
include the reduction of hardwoods by mechanical or chemical means, followed by prescribed burning to reduce fuel
loads. Approved for FY2010, Phase 3 includes additional upland habitat restoration with the Fish Hawk Creek
Preserve. During Phase 3 sand pines and hardwood trees and shrubs will be reduced on approximately 126 additional
acres of fire-suppressed xeric uplands during the winter and spring of 2010. Restoration will consist of reducing
overgrown vegetation by mechanical means, followed by prescribed burns to consume the resultant debris and restore
understory components.
BenefitsThe project will restore natural cover to upland habitat areas within a public preserve in the vicinity of Fish Hawk Creek.
In addition to providing habitat for wildlife, restoration of natural vegetative cover will reduce stormwater run-off to Fish
Hawk Creek - a direct tributary of the Alafia River and ultimately Tampa Bay.
Costs
In FY2007 for Phase 1 of the project (160 acres of habitat restoration) the District and Hillsborough County each
contributed ($100,000) for a total cost of $200,000. The District's FY2007 share is split between the Alafia River Basin
Board ($50,000) and State SWIM ($50,000). In FY2009 for Phase 2 of the project (an additional 100 acres of habitat
restoration) the District originally budgeted $150,000 split between the Alafia River Basin Board ($75,000) and State
SWIM ($75,000) to cover the entire cost of the project (as indicated in the table below). Hillsborough County would use
a portion of their prior land acquisition costs as their match. However, because Hillsborough County was able to
provide $75,000 in funding (in lieu of the land match) the District funding commitment for Phase 2 was reduced to
$75,000. The District's 2009 share ($75,000) is split equally between the Alafia River Basin Board ($37,500) and State
SWIM ($37,500). For FY2010 (Phase 3 - 126 additional acres), the total project cost is $100,000, with Hillsborough
County and the District each contributing half ($50,000). Future funding requests may be forthcoming for additional
restoration work. The future funds identified for the project are contingent upon approval of such amounts by the Alafia
River Basin Board in the annual budget. District funds shown in the table include staff salaries, travel and central
garage.
Additional Information
Within Fish Hawk Creek Preserve there are upland habitats such as oak and sand pine scrubs, sandhill, and pine
flatwoods; all which support plant and animal species listed by the United States Fish and Wildlife Service (USFWS)
and/or Florida Fish and Wildlife Conservation Commission (FFWCC) as Endangered (E), Threatened (T), or are
considered Species of Special Concern (SSC). Among those listed by the USFWS and/or FFWCC as E or T
documented on site are the Florida golden aster (E), Eastern indigo snake (T), and the Southeastern American kestrel
(T). Among those listed SSC by FFWCC documented on site, or suspected to occur, are the gopher frog, gopher
tortoise, pine snake, short tailed snake, burrowing owl, Florida mouse, and Sherman's fox squirrel. Restoration will
provide additional habitat for these listed species as well as numerous other upland dwelling plant and animal species.
Conservation Services will monitor Pastures 1, 2, and 3 on a quarterly basis to determine success of the direct
011 - Alafia River Basin 38
W315
Restoration - Fish Hawk Creek Preserve Habitat Restoration
seeding and/or planting. Throughout the restoration and monitoring periods, all five areas will be managed to control
cogon grass and other exotic and undesirable species. Restoration of upland habitats along the floodplain areas of
Fish Hawk Creek would provide water quality benefits though the interception and treatment of stormwater run-off. As
a tributary of the Alafia River, restoration along Fish Hawk Creek will assist the overall restoration of habitat mosaics
within the greater Tampa Bay system.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 193,002 0 0 184,636 4,808 3,558
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 131,765 0 0 131,765 0 0
WMLTF (SWIM) - Prior Year Funds 2,869 0 0 2,869 0 0
Project Funds Not Budgeted by the
District
Hillsborough County 225,000 0 0 225,000 0 0
$552,636 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Contract Development & Execution - Phase 1Develop Draft Agreement with Hillsborough County 11/30/06 5/20/07 5/20/07
Cooperative Funding Agreement to Contract Administration 12/20/06 5/30/07 5/30/07
Execution of Cooperative Agreement by Hillsborough County 1/25/07 7/30/07 7/19/07
Execution of Cooperative Agreement by the SWFWMD 2/15/07 8/15/07 7/30/07
Issue Notice to Proceed 2/20/07 8/25/07 7/30/07
Contract Development & Execution - Phase 2 (FY09)Develop Draft Agreement with Hillsborough County 11/10/08 1/20/09 3/20/09
Cooperative Agreement to Contracts Administration 12/10/08 4/30/09 4/22/09
Execution of Cooperative Agreement By Hillsborough County 3/30/09 5/20/09 6/4/09
Execution of Cooperative Agreement by SWFWMD 4/11/09 5/29/09 6/10/09
Issue Notice to Proceed 4/15/09 6/1/09 6/12/09
Contract Development & Execution - Phase 3 (FY10)Develop Draft Agreement with Hillsborough County 9/15/09 10/15/09 11/16/09
Cooperative Agreement to Contracts Administration 10/5/09 10/30/09 11/16/09
Execution of Agreement by SWFWMD 11/30/09 5/7/10 5/25/10
Issue Notice to Proceed 12/1/09 5/10/10 5/25/10
Contract Development & Execution- Phase 3 (FY10)Execution of Agreement by Hillsborough County 11/15/09 4/20/10 5/5/10
Project Milestones - Phase 1Procurement of Contractor Services 10/30/07 1/31/08 2/28/08
Pre-Restoration Wildlife and Floral Surveys 1/30/08 4/30/08 4/30/08
Mechanical Reduction of Hardwoods 3/31/08 7/10/08 8/5/08
Site Preparation: Soil Discing & Herbicide Application 3/31/08 10/30/09 10/30/09
Seed Harvest and Seeding 10/30/09 11/15/09 11/30/09
Project Milestones - Phase 2Procure Contractor Services 5/31/09 8/31/11
011 - Alafia River Basin 39
W315
Restoration - Fish Hawk Creek Preserve Habitat Restoration
Pre-Restoration Wildlife and Floral Surveys 5/31/09 9/30/10 9/30/10
Mechanical Reduction of Hardwoods 8/31/09 11/30/11
Project Milestones - Phase 3 (FY10)Procure Contractor Services 11/30/10 12/30/11
Mechanical Reduction of Hardwoods 12/30/10 4/30/12
Post-restoration Wildlife and Floral Surveys 6/30/13
Status As Of: February 25, 2011
In preparation for hardwoods reduction, surveys for listed species including rare and listed plants, as well as listed wildlife
such as gopher tortoises (and their burrows) were completed in Sept. 2010. Because of unanticipated procurement
delays, the optimum time for hardwoods reduction has passed for 2010 and early 2011. Because of unsuccessful bid
responses in December 2010, Hillsborough County does not anticipate completing the contractor selection process for
the timber removal until August 31, 2011. In order to accommodate these delays, Hillsborough County has requested a
No-cost Time Extension to the agreement in order to complete contractor selection for Phase 2 timber removal. District
staff concurs with the request and has prepared an amendment to the agreement revising the project schedule and
extending the project completion schedule through December 31, 2011. Mechanical reduction of hardwoods will be
scheduled to begin by late September - October 2011.
011 - Alafia River Basin 40
W316
Cockroach Bay Restoration - Phases C-F
Project Type SWIM
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Hillsborough CountyCooperator(s)
Project Manager HENNINGSEN, BRANDT
Task Manager(s)
Status Ongoing
DescriptionThis 500 acre SWIM initiative project is an ecosystem restoration effort located in southeastern Tampa Bay on
property owned by Hillsborough County. The 651 acre property was purchased in 1991 for $2.1 million by the County's
Environmental Lands Acquisition and Protection Program (ELAPP), purchase, in part, contingent upon the District
(SWIM) assuming primary responsibility for wetland restoration of the tract; of the 651 acres, approximately 500 acres
are the primary target for restoration, with enhancement appropriate for the remaining 151. Since 1991, the project has
evolved into a much larger ecosystem project, encompassing a mosaic of habitats typically found in coastal areas of
the bay: uplands as well as freshwater and estuarine wetlands; stormwater treatment of regional agricultural runoff is
also a component of the restoration. While the County is the primary cooperator for this project, the effort also involves
15 other cooperators, collectively known as the "Cockroach Bay Restoration Alliance" (COBRA). Over the past six
decades, the property had been used for agriculture and mining activities. It has suffered from a number of
environmental problems including wetland and upland habitat loss/degradation, exotic plant infestation, adverse
hydrological alterations, and exposure to polluted runoff from an upstream agricultural watershed. Currently, 425 acres
of the 500 acre project have been completed.
BenefitsThis project has been and will continue to be important in meeting management goals of SWIM and the Tampa Bay
Estuary Program (TBEP), including several phases providing low salinity habitats and improvements to water quality
via stormwater treatment. Improved habitat values and the addition of habitat acreages will provide opportunities for
many differing species of coastal wildlife,inclusive of commercial and sportfishing species, bird populations, a host of
invertebrate species (crabs, shrimp, oysters, etc.), reptiles/amphibians, and small mammals. In addition, the site is part
of the State's and County's Cockroach Bay Aquatic and Park Preserves, (increasingly) popular destinations for the
public to visit for nature activities (canoeing/kayaking, fishing, bird watching, camping, hiking, etc.).
Costs
While early funding for this project originated as early as 1991, figures given here represent funds encumbered under
the 1996 cooperative agreement with the County. This project has been implemented by phases, contingent upon
available funds. Project updates given here cover four ongoing phases: Phases C (southeastern Leisey Shell Pit and
braided tidal creek), D (northeastern Leisey Shell Pit), E (uplands), F (freshwater wetlands). Grants for this
project have totaled $1.6 million. Aside from grants, mitigation funds from the FDOT have been used to help complete
the project. The FY2005 budget includes $500,000 for State Appropriation and approximately $420,000 of Basin and
State SWIM funds for construction of on-going phases. The FY2004 through FY2009 budgets included a total of
$257,781 of incoming revenue from the Gardinier Trust Fund; in addition, FY2006 and FY2007 included a total
of $200,000 of Basin and State SWIM funds. During FY2009, an additional $1,100,000 was budgeted by the Tampa
Port Authority to cover mitigation and restoration expenses for the project. District funds shown in the table include
staff salaries, travel and central garage.
Additional Information
Tampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is
a category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed
Restoration Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay
Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its seagrass acreage
were lost as a result of physical destruction and water quality impairment. This resulted in a decline in the aesthetic,
recreational, and commercial value of the bay, as well as a loss of habitat for native plants and animals. Adjacent to
the County's property lies Cockroach Bay, often touted as the "Crown Jewel" of Tampa Bay; it is one of the few
relatively pristine coastal ecosystems left in Tampa Bay. Despite these adverse watershed and estuarine impacts,
Cockroach Bay still maintains relatively abundant sea grass beds and recreational and commercially important
fisheries resources.
011 - Alafia River Basin 41
W316
Cockroach Bay Restoration - Phases C-F
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 644,576 0 0 628,269 5,605 10,702
District Budgeted - Outside Revenue
DEP/EPC Gardinier - (SWIM) (25,615) 0 (193,985) 168,370 0 0
Ecosystem Trust Fund - Cockroach Bay
(SWIM)
500,000 0 0 500,000 0 0
Gardinier - Cockroach Bay (W316) 200,000 0 0 200,000 0 0
State Trust Funds (SWIM) 150,169 0 0 150,169 0 0
State Trust Funds (SWIM) - Prior 2006 860,777 0 0 860,777 0 0
WMLTF (SWIM) - Prior Year Funds 4,247 0 0 4,247 0 0
Project Funds Not Budgeted by the
District
Tampa Port Authority 1,100,000 0 0 1,100,000 0 0
$3,434,154 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Critical Project MilestonesCompletion of USACE Feasibility Report (by USACE) 6/30/01 3/31/02 3/15/02
Completion of construction of freshwater wetlands 4/30/04 4/15/04
Planting of freshwater wetlands 8/15/04 8/2/04
Start construction of braided tidal creek by OPS 1/15/05 1/26/05
Complete construction of braided tidal creek by OPS 7/15/05 9/15/05 9/23/05
Planting of braided tidal creek 8/31/05 10/1/05 10/8/05
Begin Sediment Survey of NE Leisey Shell Pit 12/1/05 12/15/05 12/13/05
Complete Sediment Survey of NE Leisey Shell Pit 3/15/06 3/1/06
Restoration of E. Leisey Shell PitsSecure consulting firm to assist with rest. plans 8/31/08
Complete in-house draft 30% restoration plan 12/31/08 12/15/08
Complete 100% restoration plan set 3/31/09 3/13/09
Prepare/submit permit applications for E. Leisey Pits 4/30/09 4/24/09
Tpa Pt Authty Permitting Issues under Resolution-TBD 10/31/10 12/31/10 1/14/11
Construction of mitigation/restoration project by TPA 12/31/11
Status As Of: February 28, 2011
The Tampa Port Authority has received all permits needed for their habitat mitigation/restoration project for the
Cockroach Bay site, inclusive of addressing Hillsborough County EPC concerns. The Tampa Port Authority has released
its Request for Bids for the Cockroach Bay project. As noted in previous updates, the Tampa Port Authority (TPA) and
the District (SWIM) have entered into a cooperative agreement detailing the TPA's proposal to Hillsborough County to
perform mitigation and restoration at the County's Cockroach site ("Leisey Shell Pits" area). The TPA has received
permission from the County to perform 10.88 ac of wetland mitigation at the Cockroach site. In return for use of the
Cockroach site for the Port's mitigation, the TPA will provide $1.1 million for the restoration of up to 75 acres of wetlands
and the completion/maintenance of the upland systems (i.e., 75 acres of wetland restoration for 10.88 acres of wetland
mitigation plus remaining upland work); of those funds, $1.0 million will be earmarked for wetland (and possibly upland)
011 - Alafia River Basin 42
W316
Cockroach Bay Restoration - Phases C-F
restoration, and $100,000 will specifically be earmarked for upland restoration and site management. The TPA has been
responsible for the design, permitting, bidding, and ultimately the construction and monitoring of the project; bids are due
03/15/2011, with construction expected to take about 10 months. In essence, this effort should complete the overall
Cockroach Bay Ecosystem Restoration Project. No SWIM/District funds will be used for any mitigation expenses, only
restoration components over and above mitigation aspects. ACTION TO DATE: Mitigation/restoration project now being
bid by the Tampa Port Authority; construction anticipated to begin during May 2011.
011 - Alafia River Basin 43
W331
Data - Biennial Seagrass Coverage - Tampa Bay, Sarasota Bay,
Lemon Bay and Charlotte HarborProject Type SWIM
AORs Strategic InitiativesNatural Systems Natural Systems Identification and Monitoring
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Pinellas-Anclote River, Peace River,
Manasota
Charlotte Harbor National Estuary Program, Tampa Bay Estuary Program, Sarasota Bay Estuary
Program, Pinellas County
Cooperator(s)
Project Manager KAUFMAN, KRIS
Task Manager(s)
Status Ongoing
DescriptionThis SWIM initiative project involves mapping and monitoring seagrass within four SWIM priority waterbodies: Tampa
Bay, Sarasota Bay, Lemon Bay, and Charlotte Harbor. Funds requested in the FY2011 budget of $175,000 will be for
the 2012 phase of mapping. The funds needed for the 2012 effort will be budgeted in FY2011 and FY2012. In
addition to SWIM waterbodies, contractual services for the St. Joseph Sound/Clearwater Harbor Biennial GIS Mapping
of Seagrass (See K150) are completed under a single agreement to benefit from economy of scale. Specifically, the
District's consultant will provide digital aerial photography, photointerpretation, and GIS-based mapping in order to
generate calculations of seagrass acreage and distribution within each of the named waterbodies. The project is
conducted every two years to monitor the long-term health of these vital resources. Funds budgeted in FY2009 and
FY2010 are for the 2009 - 2010 effort. The digital format utilized in 2004 and 2006 allowed for more detailed GIS
analysis to be conducted beyond creation of the original seagrass map product and will allow for efficient transfer of
the imagery to fill agency and public requests. A new task started during the 2007-2008 effort was to scan historical
photography from previous seagrass mapping efforts in the 1990s and early 2000s at high resolution. The effort is
onging and the intent is to complete the georeferencing needed for creation of digital GIS imagery layers that will then
be uploaded to the District's GIS system.
BenefitsThe mapping of seagrasses within each estuary allows the District, the Estuary Programs, and other entities to monitor
the health and distribution of seagrasses. Seagrass health is used as an indicator of water quality conditions. Thus,
this project can assist with water resource management decision making, specifically in evaluating the effectiveness of
water quality improvement projects.
Costs
The project costs for mapping SWIM waterbodies in 2012 is estimated at $350,000, of which $175,000 was budgeted
in FY2011 and $175,000 is proposed for FY2012. The FY2011 funding is $175,000 with five basin boards (Alafia
River, Hillsborough River, Pinellas-Anclote River, Peace River, and Manasota) contributing equally. District funds
shown in the table include staff salaries.
Additional Information
The recently completed phase of mapping began in December 2009. Seagrass mapping for SWIM waterbodies
(W331) and St. Joseph Sound Clearwater Harbor (K150) will be completed under one agreement at a total estimated
cost of $350,000. Seagrass meadows serve as nurseries for a variety of commercially and recreational important
species of fin fish and shellfish, and they are highly dependent upon the maintenance of good water quality. The next
phase of mapping is planned for December 2011. The project meets the goals and objectives of the Tampa Bay,
Sarasota Bay, and Charlotte Harbor SWIM Plans, the Tampa Bay Estuary Program, Sarasota Bay Estuary Program,
and Charlotte Harbor National Estuary Program. The 2010 effort is complete and results are available. Between 2008
and 2010, seagrass coverage in Tampa Bay increased by approximately 11%, Sarasota Bayseagrass increased
0.4%, Lemon Bay seagrass coverage increased by 6%, and Charlotte Harbor coverage increased by 4%.
011 - Alafia River Basin 44
W331
Data - Biennial Seagrass Coverage - Tampa Bay, Sarasota Bay,
Lemon Bay and Charlotte Harbor
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 186,078 35,000 0 72,958 40,185 37,935
013 Hillsborough River Basin 186,078 35,000 0 72,958 40,185 37,935
014 Northwest Hillsborough Basin 52,954 0 0 52,954 0 0
016 Pinellas-Anclote River Basin 186,078 35,000 0 72,958 40,185 37,935
020 Peace River Basin 270,901 35,000 0 157,781 40,185 37,935
021 Manasota Basin 266,957 35,000 0 153,837 40,185 37,935
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 371,912 0 0 371,912 0 0
State Trust Funds (SWIM) - Prior 2006 165,904 0 0 165,904 0 0
WMLTF (SWIM) - Prior Year Funds 100,020 0 87,500 12,520 0 0
$1,786,882 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Critical Project MilestonesRequest for Proposals 6/15/03 7/11/03
Begin Review of Proposals 8/15/03 9/22/03
Draft Agreement to Management Services 10/31/03 12/17/03
Contract Executed 11/15/03 1/16/04
Photography Shot for 2003/2004 1/31/04 1/17/04
Final Report for 2003/2004 12/31/04 12/31/04
First Amendment to the 2003/2004 Agreement 12/1/05 12/13/05
Consultant Notice to Proceed 12/1/05 12/13/05
Acquisition of Aerial Photography 1/31/06 2/15/06 2/10/06
Final Deliverables for 2005/2006 12/31/06 12/31/06
Agreement Expiration Date 12/31/06 12/31/06
2. Critical Project MilestonesProcessing of Technical Specifications and Purchase Order 10/30/07 11/30/07
Purchase Order with scope of work Opened 11/30/07 11/30/07
Work Order #1 Opened 12/13/07 12/13/07
Consultant imagery acquisition 1/30/08 2/15/08 2/15/08
Consultant ortho-imagery production 3/31/08 3/31/08
Consultant photointerpretation 10/31/08 10/31/08
Consultant GIS validation 11/30/08 11/30/08
Consultant submittal of 2008 final deliverables 12/31/08 12/31/08
3. Critical Project MilestonesWork Order 1 under 2010 P.O. Executed 12/1/09 12/1/09
2010 Work Order 1: Imagery Acquisition Complete 2/15/10 1/12/10
4. Critical Project Milestone2010 Work Order 4: PI Variance Exercise Complete 12/31/10 12/31/10
2010 Work Order 5: Accuracy Assessment Complete 1/31/11 1/31/11
2010 Work Order 3: Georectification of Historical Photo Scans Executed 4/30/11
4. Critical Project Milestones2010 Work Order 2: P.O. Executed 3/1/10 3/1/10
2010 Work Order 2: GIS Mapping Complete 12/31/10 12/24/10
011 - Alafia River Basin 45
W331
Data - Biennial Seagrass Coverage - Tampa Bay, Sarasota Bay,
Lemon Bay and Charlotte Harbor
Status As Of: March 04, 2011
The first work order for the 2010 effort was executed December 2009. Imagery for all waterbodies was captured by
January 12, 2010. The second work order for photointerpretation and GIS based mapping was executed in March 2010.
Final imagery deliverables were submitted, approved, and are available to the public and District staff. Draft final map
deliverables were submitted to the District Dec. 21, 2010 and have been reviewed and approved by the District. The post
map production classification accuracy assessment is complete with the consultant achieving the required 90%
accuracy. Final 2010 seagrass maps were presented to project cooperators and the public January 18, 2011 at the
TBEP Seagrass Working Group Meeting. The 2010 results found Tampa Bay seagrass increased 11% from 2008 to
2010, Charlotte Harbor increased 4%, Lemon Bay increased 6%, while Sarasota and St. Joseph Sound / Clearwater
Harbor increased less than 1%.
011 - Alafia River Basin 46
W336
Restoration - Mulberry - NE 4th Ave Alafia Wetlands Restoration
(REDI)Project Type SWIM
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and RestorationWater Quality Water Quality Maintenance and Improvement
Basin(s) Alafia River
Mulberry, MulberryCooperator(s)
Project Manager GARCIA, LIZANNE
Task Manager(s)
Status Proposed
DescriptionThis project is in response to a FY2011 cooperative funding request from the City of Mulberry. The project consists of
the design, permitting, construction and maintenance to restore vegetation, habitat, and wetlands along a stretch of the
Ellis Branch of the North Prong of the Alafia River. The land was purchased in April 2009 by the City of Mulberry for
$134,125. The proposed restoration will be accomplished through removal of non-native and exotic species
and restoration of wetlands areas and habitats with appropriate native species. The project site is 2.08 acres in
size, located within the City of Mulberry and is adjacent to the Purcell Elementary School and the City of Mulberry
Community Center. Contingent upon sufficient funds for the restoration, up to three educational signs may be placed
throughout the site.
BenefitsUpon completion, this project will provide natural systems benefits through restoration of wetland habitat and provide
an educational component through the installation of educational signs.
Costs
The total cost of this project is $215,125 of which Alafia River Basin Board has approved funding in the amount of
$53,000 in its FY2011 budget for the project. The City has submitted a cooperative funding application for FY2012
requesting an additional $28,000 for the project. The City of Mulberry (in REDI Status) is matching the District's
contribution with $134,125 used for the land purchase. District funds shown in the table include staff salaries.
Additional Information
Since 1950, approximately 50 percent of Tampa Bay's natural shoreline has been lost due to development and
reduction in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the bay, as
well as a loss of habitat for native plants and animals. The SWIM Plan for Tampa Bay outlines goals to restore habitat
throughout the bay area and reduce pollutant loads entering Tampa Bay. The Alafia River and its watershed are within
the boundaries of the Tampa Bay watershed. The objectives of this project are consistent with the goals of the SWIM
Plan for Tampa Bay.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 86,835 0 0 0 32,971 53,864
Project Funds Not Budgeted by the
District
City of Mulberry 134,125 0 0 134,125 0 0
$220,960 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Contract Development and Execution
011 - Alafia River Basin 47
W336
Restoration - Mulberry - NE 4th Ave Alafia Wetlands Restoration
(REDI)Receive Scope of Work from Cooperator 9/15/10 11/30/01
Draft Agreement to Management Services 10/29/10 2/28/11
Agreement Sent to Cooperator 11/26/10 3/31/11
Signed Agreement Returned from Cooperator 12/22/10 4/1/11
Agreement Fully Executed 12/31/10 4/8/11
Contract ExpirationContract Expiration 1/31/14
Project TasksCity to Issue Notice to Proceed to Consultant 6/1/11
Complete Design and Permitting 9/1/11
Complete Construction 8/1/12
Boundary Survey, Title and Conservation Easement Recorded 9/1/12
Baseline Monitoring Report 9/1/12
Bi-annual Monitoring Report 3/1/13
Installation of Signs (optional) 3/1/13
Bi-Annual Monitoring Report 9/1/13
Final Report 12/31/13
Status As Of: February 23, 2011
The District's project manager contacted the city's representative and requested a scope of work. Additionally, on
November 8, 2010, the District project manager sent an example of a cooperative funding agreement for a similar
restoration project to assist in development of the scope of work. The scope of work was received from the cooperator
on November 23, 2010. Subsequently, the District's project manager edited the scope of work and attended a meeting
with the City's project manager and the City's consultant on December 20, 2010 to work out additional details in the
scope of work. The City has submitted an FY2012 cooperative funding request in the amount of $28,000 to complete the
project. The District requested a revised budget from the City showing the breakdown of costs for design, permitting,
construction and maintenance for the project. The revised budget has been received and the District's project manager
provided a final draft of the agreement to the City for review and approval on February 14, 2011. The City sent the draft
agreement to the interim City attorney on February 16, 2011. The interim City Attorney has reqested changes to the
language concerning completion of the project should the FY2012 funds not be budgeted. The District's project manager
is waiting for the ok from the City's project manager on the draft completion schedule and upon recieving it, will route the
agreement for District review. In order to make the project milestones, the City must approve the agreement at its April
2011 meeting.
011 - Alafia River Basin 48
W347
The "Kitchen" Ecosystem Restoration
Project Type SWIM
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Hillsborough County, Florida Audubon Society, Inc.Cooperator(s)
Project Manager HENNINGSEN, BRANDT
DALSIS, MIKETask Manager(s)
Status Completed
DescriptionThe Kitchen Ecosystem Restoration Project is comprised of three sites: Port Redwing (aka "Schultz Preserve"), Davis
Tract, Dug Creek (for project descriptions of Dug Creek and Davis Tract, please see their respective database
sections). The Kitchen effort involves at least 232 acres, a large ecosystem restoration project that is
being incrementally implemented. The Port Redwing portion involves 120 acres of habitat restoration providing a
mosaic of habitats (various estuarine and freshwater wetlands, transitional communities, and uplands). The project
was completed during late 2004, with some hurricane repairs completed during early 2005. The contractor is providing
three years of maintenance of upland and freshwater wetland habitats (i.e., keeping the habitats free of nuisance and
non-native vegetation through December 2007).
BenefitsThis project is part of the restoration activities identified in the Tampa Bay SWIM Plan. The project already is providing
valuable habitats for Tampa Bay fisheries and other coastal species. This is a true restoration project in that the site
historically was bay bottom and intertidal wetlands that were filled to create Port Redwing. An additional 200+ acres
within the Kitchen are being pursued for public acquisition and inclusion in the overall Kitchen restoration and
management. An effort will be spearheaded to have the Kitchen designated Tampa Bay's fifth Aquatic Preserve and
third State Park Preserve.
Costs
The Port Redwing Ecosystem Restoration Project cost approximately $2 million, with $1,025,834 (51.3%) coming from
outside grants (see below), the remainder coming from the State and Basin Board funds. Additional costs may
include the installation of additional upland plants. District funds shown in the table include staff salaries, travel, and
central garage.
Additional Information
Tampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is
a category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed
Restoration Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay
Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its seagrass acreage
were lost as a result of physical destruction and water quality impairment. This resulted in a decline in the aesthetic,
recreational, and commercial value of the bay, as well as a loss of habitat for native plants and animals.
011 - Alafia River Basin 49
W347
The "Kitchen" Ecosystem Restoration
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 172,549 0 (32,360) 201,871 913 2,125
District Budgeted - Outside Revenue
DEP/EPC Gardinier - (SWIM) 300,000 0 0 300,000 0 0
State Trust Funds (SWIM) 28,892 0 0 28,892 0 0
State Trust Funds (SWIM) - Prior 2006 257,885 0 0 257,885 0 0
U.S. Fish & Wildlife Service 500,000 0 0 500,000 0 0
WMLTF (SWIM) - Prior Year Funds 1,052 0 0 1,052 0 0
Project Funds Not Budgeted by the
District
IMC Agrico 225,834 0 0 225,834 0 0
$1,486,212 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Critical Project MilestonesComplete wetland design for Davis Tract 7/31/00 7/7/00
Execution of consulting contract for design/permitting 8/31/00 9/5/00
Receive permits for Davis Tract 12/31/00 6/4/01
Complete wetland design for Dug Creek 5/31/01 5/25/01
Begin wetland construction of Davis Tract (OPS/SWIM) 8/1/01 9/10/01 9/1/01
Complete wetland design for Port Redwing 8/31/01 10/31/01 10/31/01
Receive permits for Dug Creek 9/30/01 3/30/02 1/2/03
Construct Dug Creek 11/15/01 12/31/04
Complete wetland construction of Davis Tract 11/30/01 2/9/02 1/30/02
Receive permits for Port Redwing 2/1/02 8/4/02 5/1/02
RFB process for contractor to build Port Redwing 5/1/02 12/31/02 3/11/03
Start wetland construction of Port Redwing 8/1/02 9/1/03 8/22/03
Complete wetland construction of Port Redwing 5/1/03 8/31/04 8/15/04
Begin 3-Year Port Redwing Site Maintenance by Contractor 9/1/04 1/1/05 1/1/05
Contract Close Out 12/31/07 12/31/07
Status As Of: February 28, 2011
Tampa Bay Watch (TBW) continued their planning and permitting process for the addition of oyster reef culch to the
northwestern shoreline of the Schultz Preserve; the culch should provide additional substrate for the establishment of
new oyster reefs for the area and help alleviate erosional problems for portions of the Schultz project. SWIM coordinated
with the Tampa Electric Company (TECO) for an employee volunteer event held 11/05/2010; 40 TECO staff installed
3500 plugs of marsh grasses along the northwestern shoreline of the preserve, particularly in areas that had been
impacted due to high wave energy; in addition, TECO volunteers also picked up trash that had accumulated in the
intertidal areas of the northwestern shoreline.
011 - Alafia River Basin 50
W349
Restoration - Lost River Preserve Habitat Restoration Project
Project Type SWIM
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
PEER, Inc.Cooperator(s)
Project Manager POWERS, STEPHANIE
PRESTON, MATTTask Manager(s)
Status Ongoing
DescriptionThis project is in response to a cooperative funding request from the Ecosphere Restoration Institute (formerly PEER,
Inc.) to restore and create critical oligohaline habitat in the Cockroach Bay Aquatic Preserve. The project site is located
in southern Hillsborough County on a 43-acre parcel owned and managed by Hillsborough County's Environmental
Lands Acquisition and Protection Program. Approximately 25 acres of the site is severely disturbed with created fish
ponds and exotic vegetation. The project objectives will be achieved by re-contouring approximately 215 existing fish
ponds and removing exotic plant species followed by revegetation with native plant materials.
BenefitsThe project primarily focuses on creating a hydrologic connection to Cockroach Bay. This connection will provide
oligohaline conditions, which are optimal for the growth of juvenile fish species.
Costs
The total estimated project budget is $1,015,000. The FY2010 project cost is $100,000, with ERI contributing half
($50,000) and requesting half ($50,000) from the District. At their April 9, 2009 meeting, the Alafia River Basin Board
approved amending its FY2009 budget to include reallocated State SWIM funds to cover 50 percent of the District's
proposed FY2010 costs ($25,000). The remaining funds ($25,000) were included in the Alafia River Basin Board's
FY2010 proposed budget. The total District contribution is $200,000. District funding for FY2009 and FY2010 will be
used to remove exotic vegetation from the site and aid in construction of the project. District funds shown in the table
include staff salaries.
Additional Information
Since 1950, approximately 50 percent of the bay's natural shoreline has been lost due to development and reduction
in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the bay, as well as a
loss of habitat for native plants and animals. The SWIM Plan for Tampa Bay outlines goals to restore habitat
throughout the bay area and reduce pollutant loads entering Tampa Bay. The objectives of this project are consistent
with these goals.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 112,768 0 0 109,117 0 3,651
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 79,183 0 0 79,183 0 0
WMLTF (SWIM) - Prior Year Funds 29,933 0 25,000 4,933 0 0
Project Funds Not Budgeted by the
District
ERI 815,000 0 0 815,000 0 0
$1,036,884 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 51
W349
Restoration - Lost River Preserve Habitat Restoration Project
Critical Project Milestones ActualProjected Amended
1. Contract Development and ExecutionDraft Agreement Sent to Management Services 6/1/09 5/18/09
Draft Agreement Returned from Management Services 7/27/09 8/18/09
Agreement Sent to Cooperator 7/28/09 8/18/09
Signed Agreement Returned from Cooperator 9/1/09 9/23/09
Agreement Fully Executed 9/15/09 10/6/09
Notice to Proceed 9/21/09 10/8/09
2. Design PhaseComplete Final Design and Permitting 3/1/10 1/15/10
3. Construction PhaseCommence Construction 5/1/10 3/28/10
Completion of Construction 4/1/11 8/1/10 8/6/10
4. Expiration of AgreementProject Close Out 12/31/11
Status As Of: March 02, 2011
Construction has been completed. Native planting have been installed in the estuarine and freshwater areas of the site.
Monitoring of the site has begun and will be conducted through the Ecosphere Restoration Institute over the next year.
The District is awaiting the final invoice to close out the project.
011 - Alafia River Basin 52
W357
Restoration - Apollo Beach Habitat Restoration
Project Type SWIM
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Hillsborough CountyCooperator(s)
Project Manager POWERS, STEPHANIE
Task Manager(s)
Status Completed
DescriptionTampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is a
category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed Restoration
Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay Estuary
Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its seagrass acreage were lost
as a result of physical destruction and water quality impairment. This resulted in a decline in the aesthetic, recreational,
and commercial value of the bay, as well as a loss of habitat for native plants and animals. This thirty-seven (37) acre
estuarine wetland restoration project is located in Tampa Bay on land acquired by Hillsborough County. Numerous
tidal platforms and creeks will also be constructed to improve habitat for native fish and invertebrates. Removal of
exotic vegetation will also be necessary in a few areas. The marsh platforms will be created by re-contouring the site to
appropriate elevations for the desired plant communities and replanted with native Florida vegetation. Transitional and
upland communities will be created as well as preserving and enhancing a freshwater marsh that has become
established on the site. Funds in FY2003 are for project construction. The following grants have been secured to date:
U.S. Fish and Wildlife Service - $200,000; Gardinier Trust Fund (FDEP and HCEPC) - $100,000; State Water Advisory
Panel - $225,000. The restoration project is consistent with the Tampa Bay SWIM Plan and the Tampa Bay Estuary
Program's Master Plan for Habitat Restoration and Protection. Funds proposed for the FY2004 budget are for staff
time only.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 517,281 0 0 517,281 0 0
District Budgeted - Outside Revenue
Gardinier - Ruskin Inlet 100,000 0 0 100,000 0 0
State Trust Funds (SWIM) - Prior 2006 775,920 0 0 775,920 0 0
Project Funds Not Budgeted by the
District
State Water Advisory Panel (via
Hills.Co.)
225,000 0 0 225,000 0 0
US Fish & Wildlife 200,000 0 0 200,000 0 0
$1,818,201 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Contract ExecutionProject Completion 12/31/10 12/31/10
011 - Alafia River Basin 53
W357
Restoration - Apollo Beach Habitat Restoration
Status As Of: March 15, 2011
The County has completed all of the improvements in their immediate plan for Apollo Beach. The purchase order has
now expired and this will be the final update for this project.
011 - Alafia River Basin 54
W374
Ruskin Inlet/Marsh Creek Ecosystem Restoration
Project Type SWIM
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Hillsborough CountyCooperator(s)
Project Manager HENNINGSEN, BRANDT
DALSIS, MIKETask Manager(s)
Status Ongoing
DescriptionThe Ruskin Inlet/Marsh Creek Ecosystem Restoration Project is a SWIM initiative in response to Ruskin citizenry
efforts to bring the project to SWIM's attention. This project involves the restoration of approximately 40 acres of
Ruskin Inlet/Marsh Creek to enhance habitat and improve water quality for the creek and Tampa Bay. The lands along
Ruskin Inlet/Marsh Creek are owned by Hillsborough County and wind through the heart of Ruskin. These lands have
been identified by the District's Surface Water Improvement and Management (SWIM) Program, Florida Department
of Environmental Protection, Hillsborough County City Planning Commission, and the Ruskin Community
Development Foundation as being in need of management and restoration. A nine acre Phase 1 non-native plant
removal project was completed during June 2005, with maintenance through December 2005. Project costs for Phase
1 were met using $21,600 from the Gardinier Trust Fund, volunteers, and a private contractor performing in-kind
mitigation (as part of a legal settlement with FDEP/HCEPC (Note: no Basin or State funds used for Phase 1and the
Gardinier grant was secured for use by the Ruskin Community Development Foundation). Following Phase 1, the
County performed a $50,000 boundary survey to clarify parcels owned by the County. With project limits defined,
construction of the Phase 2 of the project began during June 2007, with Hillsborough County using $50,000 of their
funds for the removal of an estimated seven acres of non-native plants from county property (note: no maintenance
was performed though after initial removal). During 2009, the District bid and awarded a contract for non-native
plant removal for the whole 40 acre parcel; the project was under construction by May 2009 using 2008 Alafia River
Basin Board and State funds. Phase 2 construction was completed by September 2009 and is being followed by three
years of quarterly maintenance.
BenefitsThis project is unique in that it is very rare to find so much public land within an urban setting, encompassing a tidal
creek of Tampa Bay. The improvement of water quality and wildlife habitat along Ruskin Inlet/Marsh Creek is
consistent with the goals of the SWIM Plan, the District's Alafia River Comprehensive Water Management Plan, and
the Tampa Bay Estuary Program's Comprehensive Conservation and Management Plan. The land along Marsh Creek
is very important in that it represents one of the last urban tidal creek habitat restoration opportunities in Tampa Bay.
This project is consistent with the Tampa Bay SWIM Plan, the Tampa Bay CWM Plan, and the Hillsborough County
Strategic Action Plan for the Little Manatee River. The project could add valuable acreage of low salinity nursery
grounds for various important commercial and sportfishing species.
Costs
During fiscal years 2002 through 2006 the District spent approximately $37,000 to complete the Phase I restoration
work. Part of restoration work was performed by a citizen at no charge as a result of a settlement for performing work
without a District permit. Of the Phase I funds, $21,600 was spent for contracted construction and was reimbursed by
EPC through the Gardinier Trust Fund grant. The remaining Phase I funds ($15,400) were for staff time to manage
the project activities. These costs were funded by the Basin Board and the State SWIM Program. T he FY2008
budget of $250,000 was dedicated for restoration expenses for Phase 2. Budget breakdown is 50% from the Alafia
River Basin Board and 50% State SWIM funds. Hillsborough County is providing the land and $100,000 of matching
funds for the project. District funds shown in the table include staff salaries, travel, and central garage.
Additional Information
Tampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is
a category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed
Restoration Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay
Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its seagrass acreage
were lost as a result of physical destruction and water quality impairment. This resulted in a decline in the aesthetic,
recreational, and commercial value of the bay, as well as a loss of habitat for native plants and animals. Just south of
Marsh Creek lies Cockroach Bay, often touted as the "Crown Jewel" of Tampa Bay; the Marsh Creek project will
complement the Cockroach Bay restoration efforts (see W316 for details).
011 - Alafia River Basin 55
W374
Ruskin Inlet/Marsh Creek Ecosystem Restoration
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 294,513 0 0 281,994 0 12,519
District Budgeted - Outside Revenue
Ecosystem Trust Fund - Marsh Ck
Habitat (SWIM)
125,000 0 0 125,000 0 0
Gardinier - Ruskin Inlet 47,500 0 0 47,500 0 0
State Trust Funds (SWIM) 9,375 0 0 9,375 0 0
State Trust Funds (SWIM) - Prior 2006 211,310 0 0 211,310 0 0
WMLTF (SWIM) - Prior Year Funds 6,744 0 0 6,744 0 0
Project Funds Not Budgeted by the
District
Hillsborough County 100,000 0 0 100,000 0 0
$794,442 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Phase IProject Planning 1/31/04 1/31/04
Exotic Removal Commencement (Area 1 and 2) 7/31/04 5/1/04
Exotic Removal Completion (Area 1 and 2) 7/31/05 8/31/04
Recognition of Alafia River Basin Board in project signage 8/31/05 8/31/05
Phase 2Draft/process Coop Agmt with Hillsborough Cty. 8/15/07 8/9/07
Process/execute Coop. Agmt. with Hill. Cty. 12/15/07 4/15/08 7/16/08
Complete Phase 2 project construction 11/15/09 8/28/09
Three years quarterly maintenance for Phase 2 11/20/12
Status As Of: February 28, 2011
The District's contractor has successfully completed their fall/early winter quarterly maintenance event, rectifying a
number of problems throughout the project site. Winter maintenance (December-January-February) is being completed
now, with SWIM and Hillsborough County staff scheduled to inspect the site in mid-March to confirm that the contractor
successfully performed the maintenance. Previous site visits by SWIM have revealed adequate (re)growth of native
plants throughout the site; additional planting of native plant species may not be warranted if quarterly maintenance can
successfully curtail nuisance and non-native plant growth.
011 - Alafia River Basin 56
W384
Restoration - Bahia Beach Habitat Restoration
Project Type SWIM
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Hillsborough CountyCooperator(s)
Project Manager DALSIS, MIKE
BROWN, MARK, HENNINGSEN, BRANDTTask Manager(s)
Status Ongoing
DescriptionThe Bahia Beach restoration project is being implemented by the Surface Water Improvement (SWIM) program as a
FDOT wetland mitigation project. The Bahia Beach project is located in the town of Ruskin, adjacent to Tampa Bay on
144 acres acquired by Hillsborough County through its Environmental Lands Acquisition and Protection Program.
Numerous estuarine and freshwater marshes will be constructed to improve habitat for native fish, invertebrate, bird,
and mammal species. Upland plant communities (e.g., pine flatwoods) will be planted and interspersed among created
wetland areas. Enhancement of existing upland and wetland communities through the removal of exotic vegetation is
also a priority.
BenefitsThe creation/enhancement of estuarine and freshwater wetlands will help offset the historical wetland losses of Tampa
Bay. Fisheries species and various coastal bird species will especially benefit from this project, especially with the
restoration of freshwater wetlands near the bay. The majority of historical freshwater wetlands near the bay have been
degraded or destroyed, resulting in severe hardships for various coastal birds (especially nesting species needing to
feed their young); this project will help alleviate some of these nesting/feeding problems.
Costs
Design, permitting and construction of this project will be funded through the District's FDOT Mitigation
Program. FDOT has allocated up to $2.5 million to cover design, permitting, construction, planting, and five years of
maintenance. District funds shown in table include staff, salaries, travel, and central garage.
Additional Information
Tampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is
a category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed
Restoration Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay
(National) Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its
seagrass acreage were lost as a result of physical destruction and water quality impairment. This resulted in a decline
in the aesthetic, recreational, and commercial value of the bay, as well as a loss of habitat for native plants and
animals.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 74,858 0 0 63,788 8,997 2,073
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 1,738 0 0 1,738 0 0
State Trust Funds (SWIM) - Prior 2006 91,536 0 0 91,536 0 0
WMLTF (SWIM) - Prior Year Funds 1,025 0 0 1,025 0 0
$169,157 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 57
W384
Restoration - Bahia Beach Habitat Restoration
Critical Project Milestones ActualProjected Amended
1. Cooperative AgreementExecute coop agmt with HC 6/1/11
2. Request for BidDraft Request for Bid 6/30/11
Award Request for Bid 8/31/11
3. ConstructionCommence Construction 12/31/11
50% Complete Construction 12/31/12
Complete Construction 12/31/13
Status As Of: February 23, 2011
The Hillsborough County Environmental Protection Commission (HCEPC) was the lead agency responsible for the
design and permitting. SWIM staff will be the lead for the bidding and construction of the project. Permits have been
issued for the project, but construction management services for the project are still being secured.
011 - Alafia River Basin 58
W385
Ekker Property Restoration (Tampa Bay)
Project Type SWIM
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Hillsborough CountyCooperator(s)
Project Manager HENNINGSEN, BRANDT
BROWN, MARK, HENNINGSEN, BRANDTTask Manager(s)
Status Ongoing
DescriptionThe Ekker Property Restoration Project is located in the southeastern reaches of Hillsborough Bay of Tampa Bay,
along Bullfrog Creek. Lands for the project were co-purchased by the District and Hillsborough County specifically for
restoration and proper management. This is a cooperative project with Hillsborough County and represents 85 acres
of restoration that will provide the Tampa Bay estuarine ecosystem with additional low salinity tidal creek habitats,
marshes, transitional habitats, freshwater wetlands, and uplands. The Ekker site includes a former fish hatchery along
with adjoining lands of pine and oak forest, portions which are pine silvaculture. Phase 1 of the project is for Design
and Permitting of habitat restoration areas over the entire footprint of the former fish hatchery ponds and enhancement
of non-silvaculture uplands. Phase 2 is Construction and Maintenance. Habitat restoration targets include: high and
low freshwater marshes, permanent ponds, forested wetlands, ephemeral seasonal ponds, and upland habitats.
Restoration/enhancement of the pine silvaculture areas will be performed by Hillsborough County.
BenefitsThe project is important to the integrity and restoration of portions of Bullfrog Creek, being a component of a larger
ecosystem restoration project for this region of Tampa Bay. Accordingly, the project will provide valuable habitats for
Tampa Bay fisheries and other coastal species. This restoration project is part of the restoration activities identified in
the Tampa Bay SWIM Plan and the CCMP of the Tampa Bay Estuary Program.
Costs
The FY2004 budget for the Ekker Property project was $100,000, comprised of $40,000 from the Alafia River Basin
Board and $60,000 from the State SWIM program. Construction funds ($350,000) were budgeted for FY2005,
comprised of $140,000 from the Alafia River Basin Board and $210,000 from the State SWIM program. Additional
construction funds ($100,000) were budgeted for FY2006, comprised of $50,000 from the Basin Board and $50,000
from the State SWIM program. Funds budgeted in FY2010 and FY2011 will be used for staff salary, travel and central
garage. Project design/permitting/construction/maintenance costs to date total $827,475.48, of which $565,975.16
have come from the FDOT Mitigation Program. Additional funding from the FDOT Mitigation Program will offset future
potential project expenses (as needed, additional planting, etc.).
Additional Information
FY2004 funds were needed to secure the services of an environmental consulting firm to assist the District with the
design (including topographic surveys) of the restoration project, along with the necessary permitting to complete the
project. If this project is not completed, SWIM will not be meeting its (or the Tampa Bay Estuary Program's) goal to
restore important habitats for Tampa Bay, habitats which have suffered great losses because of land development
and other human uses of the resource. Tampa Bay is the District's top priority Surface Water Improvement and
Management (SWIM) program waterbody, is a category I (most in need of restoration) under the State's Unified
Watershed Assessment and Watershed Restoration Priorities, and is considered an "estuary of national significance"
with the designation of the Tampa Bay Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline
and 40 percent of its seagrass acreage were lost as a result of physical destruction and water quality impairment. This
resulted in a decline in the aesthetic, recreational, and commercial value of the bay, as well as a loss of habitat for
native plants and animals.
011 - Alafia River Basin 59
W385
Ekker Property Restoration (Tampa Bay)
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 281,187 0 0 267,805 2,907 10,475
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 77,445 0 0 77,445 0 0
State Trust Funds (SWIM) - Prior 2006 279,808 0 0 279,808 0 0
WMLTF (SWIM) - Prior Year Funds 3,819 0 0 3,819 0 0
$642,259 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. RFP, Consultant Selection & ContractAdvertise and Issue RFP for Consultant Services 6/30/04 8/6/04 7/30/04
Complete Evaluation of Proposals 9/14/04 9/25/04 9/25/04
Proposals Received and Opened 9/16/04 8/31/04 8/31/04
District Issues Notice of Award 9/17/04 9/28/04 9/28/04
Draft Agreement sent to Contractor 10/29/04 2/15/05 2/15/05
Agreement Executed 12/20/04 3/25/05 3/16/05
Notice To Proceed Issued 12/22/04 3/31/05 3/17/05
2. Critical Project MilestonesProject Kick-off Meeting 3/30/05 3/30/05
Preliminary Design / Development 7/30/05 8/11/05
Draft 30% Plans Received 11/30/05 3/31/06 4/1/06
Draft 60% Plans Received 4/30/06 7/1/06
Draft 60% Plans Approved 8/30/06 9/10/06
100% Plans Completed / Prepare Permit Documents 12/15/06 3/15/07 2/15/07
Permit Application Submitted 4/1/07 4/20/07 4/12/07
Permit Application Approved - Permit Issued 5/30/07 6/6/07
Prepare Request for Bids Documents 9/30/07 4/15/09 4/15/09
Advertise and Issue Request for Bids for Construction 12/15/07 5/25/09 5/25/10
2. Critical Project MilestonesPrepare New Agreement for Construction Management 1/20/09 4/20/09 4/20/09
Project Construction Contract 10/7/09 11/4/09
Construction Management Agreement Amendment Executed 12/31/09 1/4/10
Critical Project MilestoneCommence Project Construction 11/30/09 11/10/09
Complete Project Construction 9/30/10 9/9/10
Ekker restorationFive years of quarterly maintenance 12/31/15
Status As Of: February 28, 2011
December and January freezes have stressed freshwater wetland and young upland plants throughout the site. SWIM
staff conducted the "90-day plant guarantee" inspection for upland plants during early January; some plant replacement
may be necessary, but SWIM will wait and watch during spring months to see if a variety of upland plants are in need of
replacement; the contractor has been notified and also will address several other punch list items. Water levels in the
freshwater wetlands continue to fall, although December and January did have periodic light rains that helped hydrate
both the wetland and upland plants. Transplanted grass plugs spread over the five gopher tortoise "condos" continue to
show success although native grass and herbaceous plant seeds have shown little to no growth; nuisance weed species
(e.g., dog fennel) are having to be controlled via herbicide and hand-pulling. One gopher tortoise condo now has a new
011 - Alafia River Basin 60
W385
Ekker Property Restoration (Tampa Bay)
resident, indicating that the experiment to create gopher tortoise habitat appears to be working; SWIM and Hillsborough
County staff are eager to see if additional tortoises will take up residency this spring/summer. ACTIONS-TO-DATE:
Schedule Completed. Contracted wetland construction is complete.
011 - Alafia River Basin 61
W386
Restoration - Newman Branch Habitat Restoration
Project Type SWIM
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Tampa Electric Company, Ecosphere Restoration InstituteCooperator(s)
Project Manager DALSIS, MIKE
HENNINGSEN, BRANDTTask Manager(s)
Status Ongoing
DescriptionThis project is in response to a funding request from Ecosphere Restoration Institute, a non-profit group dedicated to
protecting and restoring the environment, and represents Phase 2 of the existing 12 acres of restored upland and
wetland communities of Newman Branch Creek Fisheries Habitat Restoration Project completed in 2007. Newman
Branch is a tidally influenced creek which flows into Tampa Bay. Portions of the creek were ditched in the 1940's to
improve drainage and the shoreline was hardened to prevent erosion. Phase 2 restoration will soften the shoreline
and restore approximately 12 acres of combined wetland and upland communities along the creek bank,
while creating estuarine wetlands that connect to the completed Phase 1 Newman Branch Creek Fisheries Habitat
Restoration Project. Phase 1 of the Newman Branch Creek Fisheries Habitat Restoration Project restored fisheries
habitat in Newman Branch Creek, a vital tributary to Tampa Bay. Phase 2 will consist of six acres of restored and
created estuarine habitat, in addition to six acres of restored uplands with the installation of native upland plants and
the construction of isolated freshwater ponds. The freshwater ponds will vary in size and depth to provide a variety of
freshwater habitats from ephemeral to permanent pool wetlands. Newman Branch Creek is a tidally influenced
waterway that drains into Tampa Bay from the southwestern reaches of Hillsborough County (just south of the Tampa
Electric Company [TECO] Big Bend power plant). The historically meandering creek has been channelized along
much of its run, its banks now dominated by non-native vegetation (i.e., Brazilian pepper, Australian pine). In addition,
adjacent uplands harbor fallow agricultural fields also dominated by non-native vegetation. The Phase 2 restoration
project will involve the removal of non-native plant species, supplemental planting of native plant species, and
restoration of a variety of estuarine habitats creating low salinity conditions vital for many marine species.
BenefitsThe restoration project will restore saltmarsh and mangrove forest to an area with little natural remaining fisheries
habitat and will provide valuable public education on the importance of restoring fisheries habitats in the Tampa Bay
area. The project is on properties owned by TECO, and TECO has agreed to place the restoration site under a
conservation easement and promote public access through their existing Manatee Viewing Center (MVC), a public
outreach facility. The MVC is just north of the restoration sites and currently receives approximately 175,000 visitors
annually. All of these visitors will have the opportunity to visit the restoration sites and learn more about the importance
of native coastal habitats via educational signs. This project is an excellent opportunity for forging public/private
partnerships which would benefit both the public and the Tampa Bay ecosystem. District partners will include:
Ecosphere Restoration Institute, TECO, and USFWS. Permission from TECO has been granted for implementation of
the project, and the design and permitting (in coordination with SWIM) will be provided by Ecosphere Restoration
Institute.
Costs
Total project cost for Phase 1 was $380,000. The total estimated project cost for Phase 2 is $570,000. The FY2011
budget is $50,000 requested from the Alafia River Basin Board, with $25,000 from the Water Protection and
Sustainability Program Trust Fund used as matching funds. These funds will be used to address design, permitting,
planting, educational signs, and some of the construction costs. USFWS has contributed $20,000 through a coastal
restoration grant with an additional $40,000 in future funding. TECO has contributed $465,000 for Phase 2 in land
value. District funds shown in the table include staff salaries, travel, and central garage.
Additional Information
Tampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is
a category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed
Restoration Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay
Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its seagrass acreage
were lost as a result of physical destruction and water quality impairment. This resulted in a decline in the aesthetic,
recreational, and commercial value of the bay, as well as a loss of habitat for native plants and animals.
011 - Alafia River Basin 62
W386
Restoration - Newman Branch Habitat Restoration
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 130,926 0 0 71,052 5,108 54,766
District Budgeted - Outside Revenue
State Trust Funds (SWIM) 47,072 0 0 47,072 0 0
State Trust Funds (SWIM) - Prior 2006 32,995 0 0 32,995 0 0
WMLTF (SWIM) - Prior Year Funds 1,982 0 0 1,982 0 0
Project Funds Not Budgeted by the
District
Ecosphere Restoration Institute 1,000 0 0 0 0 1,000
PEER, Inc. 250,618 0 0 250,618 0 0
TECO 465,000 0 0 465,000 0 0
USFWS 60,000 0 0 20,000 40,000 0
$989,593 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Phase 1 Construction Completion 12/31/07 7/31/07
1. Contract Development and Execution Phase 2Draft agreement sent to Management Services 12/6/10 1/31/11 2/7/11
Agreement returned from Management Services 2/25/11 3/21/11 3/21/11
Agreement sent to Cooperator 3/1/11 3/22/11
Signed agreement returned from Cooperator 3/15/11
Agreement fully executed 3/30/11
2. Project Tasks Phase 2Commence Design 1/1/11
Complete Design 5/1/11
Obtain Permits 7/1/11
Conservation Easement from Landowner 7/31/11
Construction Commence 8/1/11
Construction 50% Complete 9/30/11
Complete Construction 11/30/11
Education Signage 12/31/11
Status As Of: February 24, 2011
Conceptual design for phase 2 received from consultant. Tri-party agreement between the District, TECO, and
Ecosphere Restoration Institute currently being reviewed by Legal prior to execution. Topographic survey and geotech
services were completed in September with final design and permitting to be completed by April 2011. Draft
Conservation Easement for the Phase 2 restoration project received from TECO and approved by Land Resources.
011 - Alafia River Basin 63
W395
Rock Ponds Ecosystem Restoration
Project Type SWIM
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Hillsborough CountyCooperator(s)
Project Manager HENNINGSEN, BRANDT
DALSIS, MIKETask Manager(s)
Status Ongoing
DescriptionThe Rock Ponds Ecosystem Restoration Project is a SWIM initiative to restore various coastal habitats for Tampa
Bay. This project involves the design, permitting and construction of an ecosystem restoration effort in southwestern
Hillsborough County. Two parcels comprise the Rock Ponds Ecosystem Restoration Project, both parcels being
copurchased by the District and Hillsborough County. In December 2003, a 2389 acre parcel parcel was purchased
from the Tampa Electric Company. This parcel has 1756 acres of wetlands and 633 acres of uplands (2389 acres
total). During 2004, the "Sun City Shell Pit" parcel was purchased; this 153 acre parcel is comprised of 107 acres of
wetlands and 46 acres of uplands (153 acres total). The two parcels totaling 2542 acres are the footprint of the Rock
Ponds Ecosystem Restoration Project. Wetland acreage is comprised of a series of mining pits, estuarine open water,
mangrove forest, and salt barren communities. The majority of the uplands represent fallow farm fields, although some
acreage currently is leased for sod cultivation. Except for some fringe hammocks, few intact upland habitats remain on
site. Non-native vegetation is scattered throughout upland areas. Aside from mining impacts, other wetlands have
been subjected to mosquito ditching and other dredge/fill activities. The proposed project will restore/enhance various
coastal wetland communities (estuarine and freshwater) complementary with various upland habitats (e.g., pine
flatwoods, hammocks). Restoration of these communities will help offset habitat losses suffered throughout Tampa
Bay and will prove valuable for the public and thousands of coastal species that use the Tampa Bay ecosystem.
Restoration of the site will help meet management goals of both the SWIM Program and the Tampa Bay Estuary
Program. Two additional parcels (>700 acres) contiguous with the Rock Pond parcel have been under negotiation for
purchase and inclusion in the restoration project; both parcels are bordered on three sides by the existing Rock Pond
parcels, and would provide excellent opportunities for additional habitat restoration; as of March 2011, negotiations
have not been successful, as the private landowners will not accept only fair appraised value for their lands.
BenefitsThis project will be important in meeting the management goals of SWIM and the Tampa Bay Estuary Program
(TBEP), and should provide low salinity habitats and improvements to water quality via stormwater treatment.
Improved habitat values and the addition of habitat acreages will provide opportunities for many differing species of
coastal wildlife inclusive of commercial and sportfishing species, bird populations, a host of invertebrate species
(crabs, shrimp, oysters, etc.), reptiles/amphibians, and mammals. This project will significantly contribute to a
green-belt corridor along the east side Tampa Bay.
Costs
Based on the size, complexity, and opportunities for the project, it is anticipated that the budget could range from $7 to
$10 million and would be funded over multiple years; outside funding (grants) will be solicited for this project. Overall
project costs will be refined pending delineation of the absolute project footprint and design. Funds budgeted in
FY2006 were used for design, survey, and permitting, with any remaining funds to be used to help meet construction
expenses. Funds budgeted in FY2007 ($500,000), FY2008 ($500,000), FY2009 ($400,000) and FY2010 ($282,091)
are being used to help meet project construction expenses. The FY2011 budget of $260,480 is from the Alafia River
Basin Board ($130,240) and the State Ecosystem Trust Fund ($130,240) and will be used for construction
expenses.The proposed 2012 budget of $500,00 is from the Alafia River Basin Board and will be used for construction
expenses. District funds shown in the table include staff salaries. Additional future funds will be required for
construction.
Additional Information
Tampa Bay is the District's top priority Surface Water Improvement and Management (SWIM) program waterbody, is
a category I (most in need of restoration) under the State's Unified Watershed Assessment and Watershed
Restoration Priorities, and is considered an "estuary of national significance" with the designation of the Tampa Bay
Estuary Program. Since 1950, about 50 percent of the bay's natural shoreline and 40 percent of its seagrass acreage
were lost as a result of physical destruction and water quality impairment. This resulted in a decline in the aesthetic,
recreational, and commercial value of the bay, as well as a loss of habitat for native plants and animals.
011 - Alafia River Basin 64
W395
Rock Ponds Ecosystem Restoration
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 5,953,170 4,000,000 0 1,257,795 534,264 161,111
District Budgeted - Outside Revenue
DEP/EPC Gardinier - (SWIM) 193,985 0 193,985 0 0 0
Ecosystem Trust Fund - Prior Year
Funds (SWIM)
730,240 0 0 600,000 0 130,240
Ecosystem Trust Fund - Rock Pond
Rstr (SWIM)
750,000 0 0 750,000 0 0
State Trust Funds (SWIM) 391,747 0 0 391,747 0 0
WMLTF (SWIM) - Prior Year Funds 16,045 0 0 16,045 0 0
$8,035,187 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Secure Consulting ContractIssue RFP 9/15/06 9/10/07
1. Secure Consulting FirmProcess responses to RFP 12/15/06 12/18/06
Negotiate contract with consultant 2/15/07 3/15/07 3/15/07
Draft consulting contract 4/30/07 5/30/07
Finalize Consulting Contract 8/30/07 11/15/07
Execute Consulting Contract Issue NTP 12/31/07 12/12/07
Negotiate first work order 3/31/08 3/18/08
2. First Work OrderPerform 1st WO thru prelim concept plan 8/31/09 9/16/09
Ground-truth Prelim Concept Plan 12/31/09 12/18/09
3. Second Work OrderNegotiate Second Work Order 3/31/10 5/26/10
Complete topo/bathymetric/geotech surveys 2/28/11 3/31/11
4. Upland RestorationDraft RFB for Phase 1 Upland Restoration 10/15/10 10/26/10
Release RFB for Phase 1 Upland Restoration 11/30/10 11/15/10
Upland restoration Phase 1Award PO for Upland Restoration Phase 1 2/28/11 2/17/11
Status As Of: February 28, 2011
Completion of the topographic/bathymetric and geotechnical surveys is imminent, with draft final products to be
submitted to SWIM during early March 2011. After review of survey data, as appropriate, adjustments will be made to the
concept plan, followed by commissioning of the archaeological surveys of the proposed wetland footprint. After
completion of the archaeological surveys, final revisions to the concept plan will occur, followed by the drafting of 30%
plans (plans with elevation contours). Additional ground-truthing of the concept plan footprint may be necessary to
finalize the plan and prior to moving to 30% plan completion. Staking of property boundaries has revealed that a small
sliver of the Rock Pond property is owned by Port Manatee. Discussions have been held with Port Manatee, and it
appears that a cooperative relationship with the Port will allow that sliver to become part of the wetland restoration
project. Monthly collection of piezometer data continues, the data to be used to help design freshwater wetlands. The
011 - Alafia River Basin 65
W395
Rock Ponds Ecosystem Restoration
purchase order for Phase 1 Upland Restoration (250 acres) has been awarded to the low bidder: Tampa Contracting
Services (TCS). The pre-construction conference has been held and TCS is scheduled to begin work the first week of
March. ACTION TO DATE: On time; habitat mapping complete and preliminary concept plans have been completed;
Phase 1 upland restoration on schedule.
011 - Alafia River Basin 66
W398
Restoration - Balm Boyette Habitat Restoration
Project Type SWIM
AORs Strategic InitiativesNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River
Florida Department of Transportation, Hillsborough CountyCooperator(s)
Project Manager POWERS, STEPHANIE
DALSIS, MIKETask Manager(s)
Status Cancelled
DescriptionThe Balm Boyette Scrub Preserve is a 4,933-acre tract acquired by Hillsborough County Parks, Recreation and
Conservation Department through their Environmental Lands Acquisition Program (ELAPP). The objective of the
project includes restoration of approximately 400 acres of wetland and upland habitats. The majority of the tract has
high quality wetland and upland habitat communities. The eastern third of the tract was mined for phosphate ore in the
1960's, and has partially reclaimed landscapes comprised of wide linear open water pits, steep slopes, and rolling
upland terrain. Prior to mining, there were three wetland tributaries that formed the headwaters of a forested wetland
referred to as Stallion Hammock and an interior meandering creek called Pringle Branch. Pringle Branch is a tributary
of Fishhawk Creek and the Alafia River. The majority of two tributaries were mined, resulting in two isolated lobes of
forested wetlands that historically connected to Stallion Hammock.
BenefitsThis project will restore approximately 400 acres of wetland and upland habitats, which will improve habitat function
and water quality and restore hydrology.
Costs
The estimated project cost is $4.6 million, of which $2.6 million will come from 1997 Mulberry Phosphates/Alafia River
Spill funds (administered by the Florida Department of Environmental Protection) and $2 million will come from the
Florida Department of Transportation Mitigation Program. The District is managing the project and the District funds
shown in the table are for staff salaries, travel, and central garage.
Additional Information
Since 1950, the majority of Tampa Bay's coastal uplands have been lost due to development. This resulted in a loss of
habitat for the Bay's native plants and animals. This project was identified in the FY2002-FY2006 SWIM Five-year
Habitat Restoration Plan as an excellent site for the creation and enhancement of a habitat mosaic. With a proximity
only eight miles from Tampa Bay, the project will provide abundant habitat for wading birds as well as upland wildlife
species. The objectives of this project are consistent with the goals of the Tampa Bay SWIM Plan.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 27,948 0 0 21,147 0 6,801
District Budgeted - Outside Revenue
DEP - Mulberry Phosphate Spill (SWIM) 2,600,000 0 0 2,600,000 0 0
State Trust Funds (SWIM) 17,752 0 0 17,752 0 0
WMLTF (SWIM) - Prior Year Funds 3,394 0 0 3,394 0 0
Project Funds Not Budgeted by the
District
Florida Department of Transportation 2,000,000 0 0 2,000,000 0 0
$4,649,094 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 67
W398
Restoration - Balm Boyette Habitat Restoration
Status As Of: March 15, 2011
Project staff has contacted the Florida Department of Environmental Protection (FDEP) numerous times over the past
three years and never received direction on the agreement status or project funding. The District has released the
budgeted revenue and notified FDEP that they could request the District's assistance in the future.
011 - Alafia River Basin 68
B131
Education - Hotel, Motel and Restaurant Water Conservation
Programs (CHAMP & WATERPRO)Project Type Basin Initiatives
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply Conservation
Basin(s) General Fund (District), Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager ALTMAN, MELISSA
ALTMAN, MELISSATask Manager(s)
Status Proposed
DescriptionThis Basin Initiative (BI) project provides education to hotel/motel management and guests with the goal of reducing
water use. The District provides printed materials to all participating properties to assist owners/managers in
determining ways to save water through their properties' operational processes, including, but not limited to, a towel
and linen reuse program. To build on the success of Water CHAMP, the District created the Water Program for
Restaurant Outreach (Water PRO) to promote water conservation in restaurants. The CHAMP coordinator promotes
the program through the Florida Restaurant and Lodging Association, partnerships with utility companies, direct mail
and site visits to association members and independent restaurants. Materials include a button for wait staff to wear
declaring that the restaurant serves water only upon request, information tabletop displays, children's coloring sheets,
coasters and bathroom mirror cling stickers promoting water conservation to be placed on bathroom mirrors. Both
Water CHAMP and PRO are measured for effectiveness by number of participating properties. In addition, Water
CHAMP has proven its success by conducting two water audits on participating properties in 2003 and 2008.
BenefitsWater CHAMP provides the tools and education needed to help hotel/motel staff and guests learn to conserve water.
This program measures the effectiveness of this education effort via actual water savings. A five-year program water
audit was conducted in cooperation with 16 utility companies to determine the program's level of water savings. The
audit compared water consumption of 115 Water CHAMP participants before the program's implementation in 2002 to
the amount used in 2007. The Districtwide audit showed that participants saved an average of 17 gallons of water per
occupied room per day. Based on the audit results and occupancy rates, it is projected that more than 186 million
gallons of water was saved by participating properties in 2010. In addition to water savings, this program has
successfully prompted a change in water-use behavior as well as increased knowledge and awareness of the need for
water conservation to protect the water resources.
Costs
The total proposed cost for the FY2012 program is $35,338 (District $3,606; Alafia River $2,222; Hillsborough River
$7,556; Coastal Rivers $2,788; Pinellas-Anclote River $7,306; Withlacoochee River $2,285; Peace River $4,784;
Manasota $4,791). The large budget reduction from the FY2011 total cost of $90,436 to the FY2012 total cost of
$35,338 is attributed to a reduction in printing costs and in the amount of salary being attributed to the project. The
program coordinator's position has changed from contractor to a full-time equivalent position that includes additional
responsibilities. Costs for staff to manage the project are reflected in the budget lines below. District funds are used for
CHAMP/PRO properties in the Green Swamp Basin. Funds will be used to pay for travel, printed materials and costs
to educate the audience and promote the programs through advertising, workshops, tradeshows, professional
memberships, etc. The dollar amount allocated per basin is based on anticipated work within that basin. Based on the
average number of guests exposed to the program, the estimated per person cost for the program is less than $.01.
As the program grows, the cost per person decreases. Based on the FY2008 program audit, the cost benefit for the
project, using the total cost amortized over five years, is $0.47 per thousand gallons of water.
Additional Information
The total cost for the FY2011 program is $90,436 (District $7,436; Alafia River $5,370; Hillsborough River $18,593;
Coastal Rivers $6,994; Pinellas-Anclote River $19,906; Withlacoochee River $6,048; Peace River $13,858; Manasota
$12,231). The District has supported this project since FY2002. Survey results show a 96 percent approval rating from
hotel/motel guests.
011 - Alafia River Basin 69
B131
Education - Hotel, Motel and Restaurant Water Conservation
Programs (CHAMP & WATERPRO)
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 24,394 0 (5,296) 15,956 6,298 7,436
011 Alafia River Basin 33,015 0 (1,150) 24,420 4,375 5,370
013 Hillsborough River Basin 83,424 0 (3,705) 54,521 14,015 18,593
014 Northwest Hillsborough Basin 22,245 0 0 22,245 0 0
015 Coastal Rivers Basin 41,191 0 (1,871) 30,588 5,480 6,994
016 Pinellas-Anclote River Basin 252,761 0 (3,692) 222,782 13,765 19,906
019 Withlacoochee River Basin 37,090 0 (2,101) 28,705 4,438 6,048
020 Peace River Basin 122,549 0 (6,634) 106,774 8,551 13,858
021 Manasota Basin 117,244 0 (5,535) 101,451 9,097 12,231
District Budgeted - Outside Revenue
Tampa - Water CHAMP (B131) 5,000 0 0 5,000 0 0
$738,913 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Program begins in Pinellas 6/10/02 6/10/02
Program begins in Hillsborough 6/1/03 6/1/03
Program begins in Citrus and Hernando 9/15/04 11/10/04 11/10/04
Program begins in Manasota 10/1/04 10/1/04
Program begins in Peace River 10/1/05 10/1/05
Pilot continuing education program in Pinellas 9/1/06 8/1/08
300th property signs up 6/29/07 6/29/07
Education pilot program evaluation complete 1/31/08 4/1/10
Water PRO developed 5/15/08 5/15/08
400th property signs up 6/26/08 6/26/08
Districtwide water audit 12/31/08 10/31/08 10/31/08
Pilot restaurant conservation kit in Hillsborough 3/16/09 7/31/09 7/28/09
200th restaurant signs up 9/1/09 5/15/09
Restaurant conservation kit evaluation complete 11/1/09 6/30/10 6/30/10
300th restaurant signs up 12/31/09 12/31/10
FY2010Water CHAMP and Water PRO receive service marks. 8/4/10 8/4/10
Status As Of: February 21, 2011
Water CHAMP: ACTION TO DATE: On time. (1) Water CHAMP and Water PRO were awarded service marks by the
state of Florida. (2) Currently, Water CHAMP has 453 participants, representing more than 49 percent of all the hotels
and 68 percent of all available rooms in the District. Basin updates are as follows: Pinellas-Anclote River Basin has
approximately 322 properties; 133 are CHAMP properties. Hillsborough River and Alafia River basins have
approximately 186 properties; 124 are CHAMP properties. Coastal Rivers and Withlacoochee River basins have
approximately 89 properties; 59 are CHAMP properties. Manasota Basin has approximately 186 properties; 77 are
CHAMP properties. Peace River Basin has approximately 144 properties; 60 are CHAMP properties. Water PRO: Water
PRO, an extension of the Water CHAMP program that promotes water conservation in restaurants, began in May 2008.
The program coordinator promotes the program through the Florida Restaurant and Lodging Association, partnerships
with utility companies, direct mail and site visits to individual restaurants. (4) Currently, there are 281 restaurants
participating in Water PRO. Letters were mailed to all Water CHAMP and Water PRO participants informing them of the
service mark and providing guidelines to use the program names and logos with the superscript SM.
011 - Alafia River Basin 70
B136
Data - IFAS Data Network - FL Auto Weather Network (FAWN) Data &
EducationProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,
Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota
University of FloridaCooperator(s)
Project Manager LEWELLING, BILL
Task Manager(s)
Status Ongoing
DescriptionThe FAWN project started in 1997 and the District's involvement with the project started in 2003. This project collects
and distributes weather and climatic data, and has an educational component to teach the public how to use the data
to conserve water. Funding for the project was distributed over several years and is needed to continue data collection
and dissemination. In FY2009 FAWN is planning additional weather schools, fact sheets and enhanced irrigation
management tools. These elements will help conserve water and reduce fertilizer leaching.
BenefitsIncrease the growers' knowledge and provide climatic data to help them reduce water use. The amount of water saved
will be a function of the number of acres planted and their water use, which will change annually based on market and
climatic conditions. Estimated savings are in excess of one billion gallons of water and $500,000 per hour. Therefore
during a cold winter where growers could use cold protection five (5) to ten (10) nights, annual savings could be as
much as ten billion gallons of water and $5 million to producers. Few winters require no cold protection, and it would be
reasonable to assume this management tool would average saving five billion gallons of water and $2.5 million
annually. The key to realizing these water use savings is educating the public through schools, written material, trade
shows, etc. In addition to collecting the data, FAWN information is used for workshops and other public events to help
teach the public the significance of weather and climatic data for water conservation and how to use the data. An
in-depth weather school is held annually. FAWN has developed a youth training curriculum. In FY2008-2009 FAWN
will enhance its urban program, develop more educational components and add new weather tools.
Costs
The FY2008 budget includes $100,000 for the FAWN project. Half this funding ($50,000) will come from general
revenue and the remaining amount will be divided evenly between the eight Basin Boards with each budgeting $6,250.
Additional Information
The Florida Automated Weather Network (FAWN) has been a successful, on-going, multi Agency (IFAS, FDAC,
SFWMD, SJRWMD, and Industry) project with about a $500,000 annual budget. They are asking for continued
funding in FY2008. The other cooperators have not yet determined their level of continued support for FAWN.
FAWN's weather data has been used by local Emergency Management personal to supplement the District's and
other sources' climatic data. The project was first funded by the Peace River Basin Board and later expanded to the
Manasota Basin Board. This proposal is to expand the project into the Hillsborough River, Alafia and Withlacoochee
Basin Boards. FAWN has recently received new commitments for additional funds from FDACS, SFWMD and
SJRWMD. FAWN was created in 1997 with a legislative appropriation to the University of Florida, Institute of Food
and Agricultural Sciences (UF/IFAS). These funds were used to create infrastructure and to establish 11 weather sites
that were incorporated with a small UF/IFAS network of five sites in Central Florida. Over the next few years there is a
plan to expand FAWN's network to 33 sites. In 2002 additional funding was obtained from the Florida Division of
Emergency Management to complete the system and in 2003 the Peace River Basin Board recognized the
significance of FAWN and provided a $5,000 grant. A year later the Peace River and the Manasota Basin Boards
entered into a three-year agreement to provide FAWN with $15,000 per year. These funds were to help continue
FAWN's data collection efforts and to expand the program's educational components. That same year FDACS,
SJRWMD and SFWMD approved funds for FAWN. Currently there are 10 FAWN sites within the District located at:
Arcadia, Balm, Bradenton, Bronson, Brooksville, Dover, Frostproof, Lake Alfred, Ona and Sebring. In addition there
are several sites surrounding the District that provide useful information to the citizens of the District. Current and
historical climatic data from these sites, and FAWN irrigation tools, can be accessed on the web at:
http://fawn.ifas.ufl.edu/. The FAWN program was developed to provide real time weather information to help Florida
citizens make informed weather related decisions. This information is used to help conserve water and protect
Florida's natural systems. Irrigators use FAWN data to help determine when and how much to water. Also, FAWN
data is used to assist individuals to determine when to turn off irrigation systems used for cold protection. Urban and
agricultural chemical applicators use FAWN to help make decisions relative to the application of chemicals and
fertilizer. FAWN has been expanded to provide on-line water/irrigation management tools that require weather inputs.
011 - Alafia River Basin 71
B136
Data - IFAS Data Network - FL Auto Weather Network (FAWN) Data &
EducationExamples of these tools include insect and disease control, cold protection, irrigation, nutrient management and many
more. The District's Agricultural Advisory Committee has expressed their support for the FAWN program. In addition
to the current tools, FAWN is working with University of Florida scientists to develop others. Some of the studies
already funded by the District will be used to enhance the FAWN program. For example, the Wet Bulb Irrigation Cut
Off management tool has been able to allow strawberry, citrus, fern, vegetable, ornamental growers and home owners
determine when it is safe to shut off irrigation systems used for cold protection.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 1,188,829 700,000 0 287,500 101,329 100,000
011 Alafia River Basin 23,437 0 0 23,437 0 0
013 Hillsborough River Basin 23,438 0 0 23,438 0 0
014 Northwest Hillsborough Basin 23,437 0 0 23,437 0 0
015 Coastal Rivers Basin 23,438 0 0 23,438 0 0
016 Pinellas-Anclote River Basin 23,437 0 0 23,437 0 0
019 Withlacoochee River Basin 23,438 0 0 23,438 0 0
020 Peace River Basin 38,437 0 0 38,437 0 0
021 Manasota Basin 38,438 0 0 38,438 0 0
$1,406,329 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2007 Governing Board Notification 1/2/07 1/1/07
Basin Board Notification 1/3/07 1/3/07
FY2006 Project Ends 3/1/07 3/1/07
FY2007 Data Collection 12/1/07 12/1/07
FY2007 Completion Report 2/27/08 3/1/08
FY2007 Project Ends 2/28/08 7/31/08 7/31/08
FY2008 Contract to Cooperator 3/1/08 2/26/08
FY2007 No Cost Time Extension 3/31/08 3/31/08
FY2009 Contract to Cooperator 10/1/08 10/1/08
FY2008 Data Collection 12/31/08 12/31/08
FY2008 Project Ends 2/28/09 8/31/09
FY2009 Data Collection Ends 12/31/09 9/30/10
FY2009 Completion Report 2/1/10 8/31/10
Status As Of: October 13, 2010
Waiting for completion reports.
011 - Alafia River Basin 72
B189
Flood Control & Conservation - Medard Reservoir Berm and
Structure RehabilitationProject Type Basin Initiatives
AORs Strategic InitiativesFlood Protection Emergency Flood Response
Basin(s) Alafia River
Cooperator(s)
Project Manager HAGBERG, JEFFREY
HAGBERG, JEFFREYTask Manager(s)
Status Completed
DescriptionAt the June 2003 Alafia River Basin Board meeting, the Board recommended staff evaluate the long-term
maintenance requirements of the existing upstream dam face erosion protection and provide alternatives for repairs.
Findings indicate that a substantial portion, 815 feet, or 24%, of the armament system no longer provides adequate
protection against embankment erosion. The remaining portion, 2585 feet, has deficiencies of varying degrees of
severity. The upstream or front face of a dam is commonly protected against wave erosion by placement of an
armoring layer of material, typically rock riprap over a smaller diameter stone drainage blanket on geotextile filter
fabric. Other materials such as concrete, soil-cement, fabri-form bags, or articulated concrete block mats are also
commonly used. A properly designed constructed and maintained slope protection system can reliably protect against
embankment erosion. Protection systems fail due to erosion of the armament materials themselves, or the underlying
base material, from wave impacts, stormwater overland flows, internal erosion, slope instability, and human actions
such as vandalism. A cost-benefit analysis completed in February of 2005 determined that deterioration is occurring
throughout the system with the most notable impacts taking place at or below the water line. Recommendations called
for replacement of the existing rock riprap with new rock riprap on appropriate bedding materials, the sand-cement
bag armament be overtopped or replaced with either rock riprap or articulated block mats, and the toe of the protection
system be improved.
BenefitsThe Medard Dam and Reservoir is the only major operable structure and the largest single asset in the Alafia River
Basin. The reservoir is an important environmental resource providing habitat to a variety of flora and fauna. The
reservoir also provides flood control, ground water recharge and recreation benefits.
Costs
The total cost of the armament repairs has been budgeted over several fiscal years and funding is complete as of
FY2009. The FY2006 and FY2007 budgets provided $300,000 each year, the FY2008 budget provided $1,622,969,
and the FY2009 budget provided $602,031 toward the long term rehabilitation goals and consulting services.
Additional Information
As the dam owner, the District has a responsibility to ensure proper maintenance and safe operation of the facility. It is
an earth-fill type dam with a length of 6,030 feet, a height of 28 feet and a top elevation of 70 feet NGVD. The
SWFWMD has owned and operated the Medard Reservoir since its construction in 1970. Originally an old phosphate
mining operation, the American Cyanamid Company donated most of the land for this project. Serious undermining of
the spillway led to the emptying of the reservoir in February 1976. Reconstruction of a new spillway, toe drain,
emergency spillway and dam embankment was completed in May 1977. At the normal pool elevation of 60 feet
NGVD, it has a surface area of 770 acres and a storage volume of 8,300 acre-feet. In 1999, several deficiencies at the
Medard Reservoir structure and earthen levee were recognized as requiring further investigation and analysis. In
accordance with federal dam safety guidelines, a dam breach model and Emergency Action Plan (EAP) was
developed for the Medard facility. Additional activities included a comprehensive inspection, analysis and preliminary
design of maintenance and upgrade projects, video inspection of the toe drain system and a risk/cost/benefit
assessment of repair and upgrade alternatives. Recommendations were approved in the June 2003 Alafia River Basin
Board meeting. The Board-approved short-term projects were: (1) armor the existing emergency spillway (complete);
(2) temporarily lower the water surface elevation to 58.5' NGVD (complete); (3) design repair for cracked primary
discharge headwall (complete); (5) flush toe drains if necessary (not required); (6) replace stilling basin rip rap
(complete). Recommendations for long-term actions were: (1) evaluate redesigning the emergency spillway or design
a new second overflow spillway; (2) evaluate alternatives for upstream dam face erosion protection (complete); (3)
investigate permanent lowering of reservoir levels; (4) explore off-site hazard mitigation alternatives - under
consideration by Hillsborough County. The Board further directed District staff to: (1) coordinate with Hillsborough
County staff regarding the proposed upgrade of the culvert(s) under Turkey Creek Road (the county appropriated
$300,000 and the design phase is complete, bids received for the project were at the million dollar level or more and
the project is on hold; and (2) seek grants or other funding from other state and federal agencies. Other actions
011 - Alafia River Basin 73
B189
Flood Control & Conservation - Medard Reservoir Berm and
Structure Rehabilitationunderway include increasing monitoring and inspections and installation of an early warning siren system.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 3,360,000 0 (125,000) 3,485,000 0 0
$3,360,000 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: October 22, 2010
ACTION-TO-DATE: Embankment rehabilitation construction is complete.
011 - Alafia River Basin 74
B200
IFAS Research - Evaluation & Dev of ETref Model for Irrigation of
Woody OrnProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River
Cooperator(s)
Project Manager WHEALTON, JEFF
Task Manager(s)
Status Ongoing
DescriptionThe key to irrigation conservation is knowing when and how much to irrigate. To improve nursery growers' irrigation
water use, they must be more precise in the amount and frequency of irrigation they apply. Growers need to irrigate
based on plant requirements and maximizing the use of rain events. This project will develop a mathematic Nursery
Irrigation model based on reference evapotranspiration (ETref) to help them conserve water. The model will improve
irrigation management by helping to determine the amount and frequency of irrigation, thus, helping to reduce ground
water use in an area of water use concern.
BenefitsInformation from this project will help nursery producers; commercial landscapers and homeowners reduce water use.
The amount of water saved will be a function of the number of acres planted and their water use, which will change
annually based on market and climatic conditions.
Costs
This $99,900 project started in FY2005 and will continue through FY2007. The Alafia and Hillsborough River Basin
Boards will each fund $17,500 in FY2005, and $16,225 in FY2006 and FY2007.
Additional Information
Funding for the project was divided over several years and is need for data collection and analysis. The project will
help nursery producers improve their irrigation management. University of Florida's IFAS researchers will develop a
mathematic Nursery Irrigation model based on reference evapotranspiration (ETref). This model will improve irrigation
management by helping to determine the amount and frequency of irrigation, thus, helping to reduce ground water use
in an area of water use concern. In addition, the model will help reduce pollutant run-off from excess irrigation. Plant
water needs can be determined based on changes in substrate water content or from mathematic models based on
reference evapotranspiration (ETref) and plant size. Substrate sensors that measure water content are only fully
useful once the root system fills out a container volume. Until then, a sensor may average water content of a substrate
with and without roots, providing inaccurate measurements of water content and irrigation requirements. Sensor
based irrigation is also sensitive to, and must be calibrated for, substrate type and compaction. Thus it may also be
sensitive to substrate decomposition during production. Since root growth appears to be proportional to shoot growth
during most of the production period, several sensors will likely be required for at least representative species and
different container sizes. Estimating irrigation needs based on ETref will likely be of similar expense to that of a simple
substrate sensor based system. However, expansion to different species or different container sizes will require no
additional sensors and thus be less expensive. In addition the use of ETref could be used by more growers. A model
will be derived from the viburnum lysimeter data. This viburnum model, along with the control and the best
simplification procedure from the ligustrum model evaluation, would be used to evaluate water conservation and plant
growth of sweet viburnum. In the spring of 2006, Rhaphiolepis indica (Indian hawthorn) liners will be transplanted into
3 gallon containers and grown in suspension lysimeters to collect the data necessary to evaluate the model
assumptions for this representative species. Since Indian hawthorn are slower growing than either ligustrum or
viburnum, data collection for model evaluation is anticipated to extend into early fall 2007.
011 - Alafia River Basin 75
B200
IFAS Research - Evaluation & Dev of ETref Model for Irrigation of
Woody Orn
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 49,950 0 0 49,950 0 0
013 Hillsborough River Basin 49,950 0 0 49,950 0 0
$99,900 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Agreement to Cooperator 11/1/04 11/1/04
District Executes Agreement 1/1/05 1/1/05
Notice to Proceed 1/1/05 1/1/05
Basin Board Notification 1/1/05 1/1/05
Governing Board Notification 1/1/05 1/1/05
Year 1. Data Collection 12/1/05 12/1/05
Year 2. Data Collection 12/1/06 12/1/06
Year 3. Data Collection 12/1/07 12/1/07
No Cost amendment 2/28/08 1/31/08
Completion Report 12/1/08 10/30/09
Project Ends 1/1/09 1/31/10
No Cost Time Extension 6/1/09 6/1/09 6/1/09
Status As Of: October 13, 2010
10/6/2004 Ongoing coordination for the development of project milestones and negotiate agreement. 11/1/2004 -
Processed Agreement to Contracts Department. 12/20/2004 - Agreement mailed to IFAS. 1/19/2005 - Sent notice to
proceed. 3/1/2005 - 3/1/2005 - Ordering equipment and mobilizing resources. 5/2/2005 - Waiting for equipment. 7/1/2005
- Establishing research site. 9/1/2005 Data collection project continuing as planned. 11/1/2005 Data collection project
continuing as planned. 1/11/2006 - Data collection continuing as planned. 2/28/2006 - Data collection continuing as
planned. 4/17/2006 - Data collection continuing as planned. 6/17/2006 - Reviewed task completion report. 8/15/2006 -
Data collection continuing as planned. 10/12/2006 - Data collection continuing as planned. 10/12/2006 - Reviewed task
reports, data collection continuing as planned. 2/28/2007 - Data collection continuing as planned. 5/1/2007 - Data
collection continuing as planned. 7/6/2007 - Data collection continuing as planned 8/31/2007 - Data collection continuing
as planned. 11/1/2007 - Data collection continuing as planned. 1/2/2008 - Plant growth impacted by drought, need to
extend the agreement. 1/31/2008 - Executed no cost time extension. 2/29/2008 - Data collection continuing as planned,
plant growth still impacted by drought. 5/1/2008 - Data collection continuing as planned, plant growth recovering, but still
impacted by drought 7/1/2008 - Reviewed task report. Requested third party review. 9/1/2008 - Reviewed task reports.
11/1/2008 - Data collection continuing as planned. 12/17/2008 - Data collection continuing as planned. 3/6/2009 - Data
collection continuing as planned. 4/20/2009 - Reviewed draft calculations; Data collection continuing as planned.
6/1/2009 Executed no cost time extension because of PI's health condition. 6/22/2010 Expired contract extention.
10/2010 - Reviewed and commented on completion report, waiting for revised report.
011 - Alafia River Basin 76
B226
IFAS Research - Water Budget & Irrigation Requirements - Mature
Southern Highbush BlueberriesProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River
University of FloridaCooperator(s)
Project Manager ESTES, CAROLE
Task Manager(s)
Status Ongoing
DescriptionBlueberry production is a high valued cash crop. The estimated 2003 value of blueberry production in Florida was
about $18.6 million dollars. As the value of other crops decrease more growers have been converting their fields to
blueberries. A 1998 report estimated a 400% increase in blueberry acres by the year 2008. This four-budget year
research project will quantify how much water a typical blueberry plant needs and will develop irrigation guidelines to
help conserve water, reduce potential runoff and water quality impacts.
BenefitsThere are about 735Mgals permitted for annual blueberry irrigation. The amount of water saved will be a function of
the number of acres planted and their water use, which will change annually based on market and climatic conditions.
If we assume a 5% savings from this project it would conserve about 37 Mgals per year.
Costs
This project cost $153,000 and will be budgeted in four fiscal years. The Alafia, Hillsborough River, Peace River and
the Withlacoochee River Basin Boards will each budget $9,563 annually for this project.
Additional Information
Southern highbush blueberry acreage and production has steadily increased in Florida during the last decade
(Williamson and Lyrene, 2005). A recent survey of the industry identified Highlands, Polk, Hillsborough and Lake
counties as areas of rapid growth (Williamson and Lyrene, 2000). In fact, Highlands, Polk and Hillsborough counties
ranked 2nd, 3rd and 4th respectively, in blueberry acreage in the state. This is in addition to current blueberry
production in Marion, Hernando, Pasco and Levy Counties. The following table of blueberry acres and water use
comes from the District's regulatory database. * Most individual blueberry operations are below the District's water use
permitting thresholds. The individual acres are not large, but the water use is intensive. Recent observations have
seen growers converting their existing citrus and strawberry acres to blueberries. Most of the acreage planted during
the last decade is grown under a production system known as "pine bark culture" (Williamson and Lyrene, 2000;
Williamson and Lyrene, 2005). Beds of pine bark ranging from 3 (single row beds) to 8 (double row beds) feet wide
and 6 to 8 inches deep are laid out in rows and plants are set directly in the bark rather than in the soil. Blueberry
plants grow rapidly in pine bark but their root systems are restricted to the pine bark layer with some penetration into
the underlying soil. An informal grower survey revealed that Florida blueberry growers irrigated once every 2 to 3 days
during the growing season and apply ½ to ¾ inch of water at each irrigation event. Frequent irrigation is needed
because pine bark beds dry out rapidly due their low water holding capacities and because roots are confined to the
pine bark layer. There is a general thought that the amounts of water applied during each irrigation event are in excess
of what is needed to irrigate the effective root zone. The project is investigating this hypothesis. In these experiments,
IFAS will compare plant growth and yield under "standard" and "reduced" irrigation rates, and determine the total water
budget and crop coefficient of mature, bearing, southern highbush blueberry plants in Florida. Information from this
project will be provided to the growers to help them reduce water use and to the District for use in planning,
conservation and water use permitting. In addition, results from this project will help reduce fertilizer leaching, thus
helping to improve water quality. The project will also allow for more soil storage thus reduce potential off site flooding
issues.
011 - Alafia River Basin 77
B226
IFAS Research - Water Budget & Irrigation Requirements - Mature
Southern Highbush Blueberries
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 2,052 0 0 0 2,052 0
011 Alafia River Basin 38,251 0 0 38,251 0 0
013 Hillsborough River Basin 38,251 0 0 38,251 0 0
019 Withlacoochee River Basin 38,252 0 0 38,252 0 0
020 Peace River Basin 38,252 0 0 38,252 0 0
$155,058 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Agreement to Contracts 9/1/05 9/1/05
Agreement to Cooperator 11/1/05 11/1/05
District Executes Agreement 2/1/06 2/1/06
Notice to Proceed 3/1/06 3/1/06
Basin Board Notification 3/1/06 3/1/06
Year Data Collection 4/1/06 4/1/06
Year Data Collection 12/1/06 12/1/06
Year Data Collection 12/1/07 12/1/07
Contract Extension 3/19/08
Year Data Collection 12/1/08 11/30/08
Year Data Collection 12/1/09
Year Data Collection 12/12/10
Year Data Collection 12/1/11
Completion Report 5/3/12
Project Ends 8/31/12
Status As Of: February 28, 2011
4/30/10 - 9/1/2005 - Developing detailed scope of work. 9/9/2005 - Agreement sent to contracts for review. 11/1/2005 -
Agreement in contracts. 12/15/2005 - Sent agreement to cooperator. 1/11/2006 - Cooperator reviewing agreement.
2/16/2006 - Sent Notice to Proceed 4/17/2006 - Transplanting bushings and setting up data collection system. 6/12/2006
- Data collection project continuing as designed. 8/15/2006 - Reviewed first report. 10/12/2006 - Data collection project
continuing as designed. 12/4/2006 - Dormant for winter. 2/15/2007 - Basin Board presentation. 2/25/2007 - Growers filed
day at Balm. 5/1/2007 - Data collection project continuing as designed. 7/6/2007 - Reviewed task report. 8/31/2007 -
Data collection project continuing as designed. 11/1/2007 - Data collection project continuing as designed. 11/16/2007 -
Problems with lysemeters may need to install new ones. Could delay results by a year, a no cost contract amendment
would be needed. 1/2/2008 - Enhancing lysemeters 2/29/2008 - Plants dormant, researchers are gearing up for data
collection. 5/1/2008 - Installed enhanced lysemeters for better data collection. 7/1/2008 - Data collection project
continuing as planned. 9/1/2008 - Data collection project continuing as planned. 10/15/2008 - Data collection project
continuing as planned. 12/17/2008 - Constructing new lysimeters 3/6/2009 - Processing, $10,000 cost reduction time
extension. 4/20/2009 - Installing new lysimeters and starting to collect data. 6/10/2009 - Data collection project continuing
as planned. 9/1/2009 - Data collection project continuing as planned. 12/22/2009 - Site visit, installed new lysemeters.
4/30/10 - Data collection project continuing as planned 6/22/2010 - Data collection project continuing as planned.
10/2010 - Data collection project continuing as planned. 2/2011 - Data Collection project continuing as planned.
011 - Alafia River Basin 78
B227
IFAS Research - Development of Irrigation Schedule & Crop
Coefficients for Trees IIProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River
University of FloridaCooperator(s)
Project Manager COOPER, RANDY
Task Manager(s)
Status Ongoing
DescriptionThis project is an expansion and enhancement of the Hillsborough Basin Board project B083 and will investigate
additional tree species to help reduce nursery and landscape water use. Results from that project can be seen at:
http://mrec.ifas.ufl.edu/rcb/Tree_Lysimeters/lys_home.htm
BenefitsInformation from this project will help nursery producers; commercial landscapers and homeowners reduce water use.
The amount of water saved will be a function of the number of acres planted and their water use, which will change
annually based on market and climatic conditions.
Costs
This project will cost $98,750 and will be funded over 4 budget years. Project funds will be budgeted in FY2006,
FY2007, FY2008 and FY2009, with the Alafia and Hillsborough River Basin Boards each budgeting $12,500 annually.
Additional Information
As Florida becomes more urbanized, the demand for landscape trees increases. Along with increased demand for
landscape trees, comes an increase in the number and/or size of nurseries specializing in tree production. This also
increases the demand for water for tree production. To date, there is little useful information on tree water
requirements within the Hillsborough/Alafia Basins, especially for trees of larger (>2-inch) trunk caliper. Of the
information currently available in the literature, only three to five studies were conducted on landscape/forest trees that
could be applied to Florida. These indicate tree ETa amounts of near 0 to 10 gal per caliper inch per day, depending
on species, caliper and location. In none of these studies were information, such as crop coefficients or ETref supplied
that would allow these results to be readily applied elsewhere. Thus while there is some indication of tree ETa range,
these cannot be applied accurately to schedule tree irrigations during production nor during landscape establishment.
In 2001, the District contracted with the University of Florida to begin remedying the dearth of important information.
The data collection phase of the current research will be completed in 2006. Already it has been discovered that tree
ETa is much less than previously estimated, especially in the smaller size calipers. Simple guidelines for tree
irrigation, based on ETref calculated by the Penman equation have already been mined from the information collected
thus far, and posted to a web page http://mrec.ifas.ufl.edu/rcb so it is available to tree growers, landscape
maintenance companies and the general public. By basing tree water use to the Penman ETref, users of this
information estimate the previous day's water use by locating that day's ETref on the FAWN web site. The District
strongly supports FAWN as a tool to more efficiency manage water resources. However, the current research also
strongly suggests that each of the three species currently under study will require an individual algorithm. In order to
verify that reduced irrigation requirements for current species are valid for other species, similar data must be
collected and analyzed. To be better managers of their irrigation water usage, nurseries need a simple, accurate
method of determining tree water requirements on a day by day basis. This knowledge is currently only partially
available for the three trees species under study. This knowledge is becoming more essential, for at least the major
tree species produced, as production shifts from in-ground to containers for trees up to 6-inch in caliper. In container
production systems, proper irrigation is the key for economically viable tree growth and water conservation. When
properly irrigated, container-grown trees can grow as fast or faster than trees in the ground (Beeson, 2003). However,
as trees approach marketable size, they are often under-irrigated, reducing growth rates and vigor. Since most
moderate to large container-grown trees are micro-irrigated, it is conceivable that the relatively small amount of
additional water per day required to maintain good growth rates may actually conserve water in the long run by
shortening the production time compared to under-irrigated trees. As seasons change, or in cloudy weather, tree
water requirements also change. As tree canopies become large, the change can be quite dramatic. While many
nurserymen, landscapers and some home owners adapt their irrigation practices to the season, how accurate their
adaptions are is unknown. In woody shrubs, plant ETA was generally found to decrease by about 40% during the
winter, compared to July, for some species; but decrease by >75% for Indian hawthorn. In the current tree study, ETa
also drops each winter, but its normalized rate, relative to canopy size won't be determined until analysis at the end of
the data collection phase. By maintaining this project over a five year span and using three different major species, we
011 - Alafia River Basin 79
B227
IFAS Research - Development of Irrigation Schedule & Crop
Coefficients for Trees IIwill be able to provide guidance for managing irrigation practices with season and different stages of tree growth that
will cover a simple majority of trees produced in the District. Because of the methodology proposed, the results will
also be readily applicable to in-ground tree production and in landscapes. To improve survival of trees following
transplanting, landscape contractors and homeowners require a more extensive knowledge of tree water
requirements. Insufficient irrigation is the most frequent cause of transplant death. However as this becomes more
common knowledge, tree death by drowning is becoming more frequent. Management of tree and shrub irrigation is
one of the cornerstones of the Florida Yards and Neighborhoods program, developed along the Southwest coastal
counties, which promotes water conservation and less environmentally damaging residential and commercial property
maintenance. The question is how much is enough water? Previous research has answered the question for woody
shrubs. Current research is answering this for Live oak, red maple and 'Nellie R. Stevens' holly. This project would
provide the answer for an additional set of landscape trees (such as Southern magnolia, Shumard oak and slash
pine). The need for accurate tree water requirements is likely more acute in the Hillsborough county area than most
places in Florida. This region has been the site of the state's oldest Water Use Caution Area, caused by high water
withdraws from the Floridian Aquifer by municipalities, industry and agriculture. This area has the highest
concentration of woody landscape nurseries in the state, many of which grow containerized trees. This is also a rapidly
urbanizing area with tree ordinances that require minimum landscaping. Development in the region tends to be more
affluent and thus places a greater emphasis on landscape maintenance. With high capacity tree production,
continuous tree installation, escalating landscape maintenance water use and acknowledged potable water limitations,
development of accurate tree water requirements seems essential to help balance the economic vitality of the region
with water conservation.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 2,121 0 0 0 2,121 0
011 Alafia River Basin 50,000 0 0 50,000 0 0
013 Hillsborough River Basin 50,000 0 0 50,000 0 0
$102,121 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Draft Agreement to Contracts Administration 8/8/05 8/8/05
Notice to Proceed 12/31/05 12/31/05
Basin Board Notified 1/31/06 1/31/06
Governing Board Notified 1/31/06 1/31/06
Year 1. Data Collection 12/31/06 12/31/06
Year 2. Data Collection 12/31/07 12/31/07
Year 3. Data Collection 12/31/08 12/22/09
Year 4. Data Collection 12/31/09 12/22/09
Year 5. Data Collection 12/31/10
Year 6. Data Collection 12/31/11
Final Report 7/31/12
Agreement Ends 11/30/12
Status As Of: October 13, 2010
4/30/10 9/1/2005 - Draft Agreement is being processed by the District. 11/4/2005 - IFAS executes Agreement.
11/14/2005 - mailed Notice to proceed. 1/11/2006 - Data collection continuing as planned. 3/1/2006 - Data collection
continuing as planned. 4/17/2006 - Data collection continuing as planned. 6/17/2006 - Data collection continuing as
planned. 8/15/2006 - Data collection continuing as planned. 10/12/2006 - Data collection continuing as planned.
12/4/2006 - Data collection continuing as planned. 12/20/2007 - Site visit. 2/28/2007 - Data collection continuing as
planned. 5/1/2007 - Data collection continuing as planned. 7/26/2007 - Data collection continuing as planned. 8/31/2007 -
011 - Alafia River Basin 80
B227
IFAS Research - Development of Irrigation Schedule & Crop
Coefficients for Trees IIData collection continuing as planned. 11/1/2007- Data collection continuing as planned 1/2/2008- Data collection
continuing as planned. 2/29/2008 - Data collection continuing as planned. 5/1/2008 - Data collection continuing as
planned. 7/1/2008 - reviewed task completion report. 9/1/2008 - Data collection continuing as planned 11/1/2008 - Data
collection continuing as planned. 3/6/2009 - Data collection continuing as planned. 4/20/2009 - Researcher's health
issues have slowed down data collection. Should not impact final project results. 6/10/2009 - Researcher's health issues
have slowed down data collection. Should not impact final project results. 9/1/2009 - Researcher's health issues have
slowed down data collection. Should not impact final project results. 12/22/2009 - Data collection continuing as planned
4/30/10 - Data collection project continuing as planned 6/22/2010 - Site visit. 10/2010 - Data collection project continuing
as planned
011 - Alafia River Basin 81
B238
IFAS Research - Crop Coefficients & Water Use for Peppers in
SWFWMDProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River, Manasota
University of FloridaCooperator(s)
Project Manager LUCHTE, MARK
LYNCH, CAROL, MANUEL, LORI, MCLEOD, PATTY, KATHERINA, JUNETask Manager(s)
Status Ongoing
DescriptionPeppers are one of the major row crops grown in the District and in some regions, second only to tomatoes. The
actual amount of water these crops use is based on soils, growing season and climatic conditions. To improve the
crops' water use efficiency and to help conserve water, it is important for the grower and the District to know exactly
how much water the crops require. This lysimeter study will determine how much water pepper plants in Southwest
Florida need, determine crop coefficients and an irrigation schedule to help growers.
BenefitsCurrently there are over 8,000 acres directly permitted for pepper production and an additional 17,000 acres that might
be in a rotation with pepper. These sites are permitted for about 16.5 Mgd (27 Mgd for rotational sites). The number of
acres planted and their water use will change annually based on market and climatic conditions. Assuming that results
from this project will help reduce 10% of that water, the savings could be about 1.7 Mgd. Added benefits to this project
include a potential reduction in pollutant loading and information for AGMOD.
Costs
This two-year project will cost $135,000. These costs will be divided between the five basin boards that have the most
acres permitted for pepper production. Project costs have been prorated between the Alafia (49%), Hillsborough River
(19%), Manasota (15%), Peace River (8%) and the Withlacoochee River (9%) Basin Boards. Basin Board funds will
be budgeted in FY2007, FY2008 and FY2009. Alafia River will budget $21,891, Hillsborough River will budget $8,514,
Manasota will budget $4,257, Peace River will budget $3,649 and the Withlacoochee River will budget $6,689 each
year.
Additional Information
Currently, the District and the growers use water use values developed outside of Florida. Although these values
seem to be reasonable, local crop coefficients could help enhance irrigation scheduling and reduce water use. In
addition, the crop coefficients will help decrease the transport of nutrients into the ground and surface water. Water
use within the District is expected to increase by 2020. It is anticipated that a large portion of this increased demand
will be met by water conservation. Since agricultural water use accounts for the largest fraction of the total permitted
water amount in the District, efforts are needed to develop methods to help this water use sector reduce their water
use.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 65,673 0 0 65,673 0 0
013 Hillsborough River Basin 25,542 0 0 25,542 0 0
019 Withlacoochee River Basin 20,067 0 0 20,067 0 0
020 Peace River Basin 10,947 0 0 10,947 0 0
021 Manasota Basin 12,771 0 0 12,771 0 0
$135,000 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 82
B238
IFAS Research - Crop Coefficients & Water Use for Peppers in
SWFWMD
Critical Project Milestones ActualProjected Amended
Agreement to Contracts 8/1/06 5/1/07
Agreement to Cooperator 11/1/06 6/1/07
District Executes Agreement 12/1/06 8/31/07
Notice to Proceed 1/1/07 8/31/07
Basin Board Notification 2/1/07 10/31/07
Year 1. Data Collection 12/1/08 11/30/08
Year 2. Data Collection 12/1/09 12/22/09
Year 3. Data Collection 12/1/10
Project Ends 12/31/11
Status As Of: October 13, 2010
4/30/10 - 8/15/2006 - Develop agreement. 12/4/2006 - Reviewed draft scope of work. 2/28/2007 - Processing agreement.
5/1/2007 - Agreement in legal for review. 7/6/2007 - Waiting for IFAS to execute the Agreement. 8/31/2007 - Notice to
Proceed has been issued to IFAS. 11/1/2007 - - Data collection continuing as planned. 1/9/2007 - Data collection
continuing as planned. 2/29/2008 - Data collection continuing as planned. 5/1/2008 - Data collection continuing as
planned. 7/1/2008 - Dormant for summer. 9/1/2008 - Field preparation for new growing season. 11/1/2008 - Data
collection, project continuing as planned 12/17/2008 - Data collection, project continuing as planned 3/6/2009 - Data
collection, project continuing as planned. 4/20/2009 - Data collection, project continuing as planned. 4/20/2009 - Data
collection, project continuing as planned. 6/10/2009 - Data collection, project continuing as planned 12/22/2009 -
Dormant for winter. 4/30/10 - Data collection project continuing as planned. 6/22/2010- Data collection project continuing
as planned. 10/2010 - Data collection project continuing as planned
011 - Alafia River Basin 83
B239
IFAS Research - Water Needs for Genetically Altered Lantana
CameraProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River, Peace River, Manasota
University of FloridaCooperator(s)
Project Manager COOPER, RANDY
Task Manager(s)
Status Ongoing
DescriptionA large amount of water is permitted for nursery and landscape irrigation. With the increase of urban development it is
anticipated that the overall permitted amount for these uses will also increase. To reduce water use for landscape
irrigation and to conserve water, the District has been promoting Florida Friendly principles. One of the first and most
important principles of this practice is the selection and use of drought-tolerant plants (Koske and Owings). The intent
of this project is to develop a drought tolerant variety of Lantana camara; and determining its water needs for nursery
production and urban landscapes.
BenefitsIt is estimated that each year Florida nurseries sell as many as 40 million Lantana plants to other states, of those
plants about 5 million are grown within the District. The number of acres planted and their water use will change
annually based on market and climatic conditions. To quantify an estimated water savings from this project lets
assume one Lantana plant covers 12 square feet (3 ft x 4 ft) and the proposed Lantana plants will save 150 gallons of
water a year, thus these plants could save as much as 750 million gallons of water a year for this District.
Costs
This three-year project will cost $112,790. Currently over 80% of the District's permitted container nursery production
occurs within the jurisdictional region of four basin boards. Funding for this project is prorated between them (Alafia
River (22%), Manasota (22%), Hillsborough River (28%) and Peace River (28%)) boards. The Nursery industry has
provided $12,890 for this project and the Alafia Basin Board will budget $7,350, Hillsborough River will budget $9,350,
Manasota will budget $7,350 and the Peace River will budget $9,350 in FY2007; and $33, 250 (Alafia River - $7,315,
22% , Manasota - $7,315, 22%, Hillsborough River $9,310, 28% and Peace River $9,310, 28%) in both FY2008 and
FY2009.
Additional Information
In the past the industry has provided seed money to start this project and they are supportive of this proposal. Drought
tolerant plants develop various mechanisms that allow them to survive droughts, and stay green while producing
flowers without much water. Lantana depressa and Lantana involucrata are some of the best drought tolerant plants
available and are among the few plants recommended for desert landscaping in Arizona (City of Tucson; Hedding;
Master gardeners of the University of Arizona Pima County Extension Services). In addition they have been used
widely in many other states such as California (UC Sacramento County Extension) and Nevada (Southern Nevada
Water Authority) for landscape water conservation. Lantana depressa and Lantana involucrate are not widely used in
Florida.Several lantana species exist in Florida. Lantana depressa and Lantana involucrata provide year-round color,
use little irrigation, have excellent salt tolerance (Beaulieu), attracts butterflies (Schaefer et al., 2002) and
hummingbirds (Beaulieu), and have limited fertilization and pesticide requirements (Beaulieu; Owings, 2004), which
helps to reduce pollutant loading. Because of these attributes, Lantana depressa and Lantana involucrata, are
recommended for water saving in Florida landscapes (South Florida Water Management District). However, adoption
of these species of Lantana has been poor because they do not have appealing growth habits and flower colors.
Homeowners, nurseryman and landscapers prefer growing Lantana camara. This species of Lantana offers a
spectrum of long-lasting colors and is widely used in the U.S. (Koske and Owings; Russ, 2004). In Florida, Lantana
camara varieties produce abundance of viable pollen and hybridize with Florida's native species, Lantana depressa,
contaminating the native species' gene pool. Consequently, they have been listed as a Category I invasive species by
the Florida Exotic Pest Plant Council (http://www.fleppc.org/). Category I invasive species are defined as invasive
exotics that are altering native plant communities by displacing native species, changing community structures or
ecological functions, or hybridizing with natives. IFAS, FDACS and other entities do not recommend producing or
growing Category I invasive species plants. Genetic sterilization of Lantana camara could control its invasiveness,
thus protecting Florida's native species and ecosystems. Also, it will allow it to be used widely in public and residential
landscapes for water conservation and butterfly attraction. Thus conserving water and reducing pollutant loading into
the state's water resources. This project will develop a variety of Florida Friendly sterile Lantana camara plants. In
addition it will determine the plants water requirements for nursery and landscape irrigation.
011 - Alafia River Basin 84
B239
IFAS Research - Water Needs for Genetically Altered Lantana
Camera
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 2,121 0 0 0 2,121 0
011 Alafia River Basin 22,015 0 0 22,015 0 0
013 Hillsborough River Basin 28,010 0 0 28,010 0 0
020 Peace River Basin 28,010 0 0 28,010 0 0
021 Manasota Basin 22,015 0 0 22,015 0 0
Project Funds Not Budgeted by the
District
FNGLA 12,890 0 0 12,890 0 0
$115,061 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Agreement to Contracts 8/1/06 8/1/06
Agreement to Cooperator 11/1/06 10/1/06
District Executes Agreement 12/1/06 11/1/06
Notice to Proceed 1/1/07 11/1/06
Basin Board Notification 2/1/07 11/1/06
Governing Board Notification 2/1/07 11/1/06
Year 1. Data Collection 12/1/07 12/1/07
Year 2. Data Collection 12/1/08 11/30/08
Year 3. Data Collection 12/1/09 12/22/09
Completion Report 10/1/10
Project Ends 1/31/11
Status As Of: October 13, 2010
4/30/10 - 8/15/2006 - Agreement to Contracts. 10/12/2006 - Agreement sent to cooperator for review and execution.
11/2/2006 - Cooperator executes agreement. 11/8/2006 - NOP sent to cooperator. 12/4/2006 - Reviewed task report.
2/28/2007 - Project continuing as planned. 5/1/2007 - Reviewed task report, project continuing as planned. 7/6/2007 -
Site visit project continuing as planned. 8/31/2007 - Reviewed task report, project continuing as planned. 11/1/2007 -
Data collection continuing as planned 1/2/2008 - Reviewed task completion report, project continuing as designed.
2/29/2008 - Data collection continuing as planned. 5/1/2008 - Data collection continuing as planned. 7/1/2008 - Review
task report, project continuing as planned. 9/1/2008 - Data collection continuing as planned. 11/1/2008 - Data collection
continuing as planned. 12/17/2008 - Data collection continuing as planned. 3/6/2009 - Data collection, project continuing
as planned. 4/20/2009 - Data collection, project continuing as planned. 6/10/2009 - Modified scope of work to reduce
irrigation application rates. 9/1/2009 - Data collection, project continuing as planned. 12/22/2009 - Data collection, project
continuing as planned. 4/30/10 - Reviewed task completion report, project continuing as planned. 6/22/2010 - Reviewed
task completion report, project continuing as planned. 10/2010 - Reviewed task completion report and started to process
no cost time extension.
011 - Alafia River Basin 85
B240
IFAS Research - Water Needs in Poly-Mulched & MBr Fumigation
Alternatives -Tomatoes & PeppersProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Peace River, Manasota
University of FloridaCooperator(s)
Project Manager WHEALTON, JEFF
Task Manager(s)
Status Ongoing
DescriptionTomato and pepper producers use methyl bromide (MBr) to fumigate their beds before production. About 50 to 95% of
the MBr that is injected in to the soil can eventually enter the atmosphere and damage the earth's ozone layer. EPA's
Clean Air Act (Amendments of 1990) requires that MBr and other similar chemicals be phased out. The loss of MBr
has a major impact on the production practices of tomato and pepper producers in our District and can cause an
increase in their water use. This project will provide the water use information needed to address this change in
technology.
BenefitsWater use information from this project will be used by growers to save water and in the District's conservation,
planning and permitting programs. This will help preserve ground water, reduce off-site discharge of pesticides and
nutrients and flooding and improve water quality. Currently there are about 152,000 acres in the District that are
permitted for the production of tomatoes and peppers. These sites are permitted for about 335 Mgd. The number of
acres planted and their water use will change annually based on market and climatic conditions. Assuming that results
from this project will help reduce at a minimum 5% of the permitted water, the savings would be about 17 Mgd.
Costs
This project will cost $150,000. About 98% of the permitted tomato and pepper production is divided between three
basin boards. Project costs have been prorated between the Alafia (22%), Manasota (67%), and Peace River (11%)
Basin Boards. Funds will be budgeted in FY2007 and FY2008, Alafia will budget $33,500, Manasota will budget
$11,000 and the Peace River will budget $5,500 each year.
Additional Information
Tomato and pepper production relies on a relatively large quantity of water to provide the necessary soil moisture to
establish, grow and harvest both crops. These commodities are grown with either seepage or seepage plus drip
irrigation. Both systems require constant irrigation to maintain the water table relatively shallow during crop
establishment, which reduces the soil storage, increases the risks of flooding, off-site discharge and nutrient leaching.
A quick calculation of the irrigation volumes required to produce one acre of tomato indicates that between 4 and 6
ac-inches per acre of water are used to establish and maintain the crop with seepage irrigation. Most existing
recommendations for tomato and pepper production were generated when MBr was a viable option for bed
fumigation. Also, relatively inexpensive low density-polyethylene mulch (LDPE) was used and current environmental
regulations about water run-off and nutrient leaching were not always considered in research projects. Current
production practices have changed considerably since past water and production requirements were developed. This
project will look at the new technology and changes in growing practices. The University of Florida and the State of
Florida have started a vigorous campaign to address the phase out of MBr and the development of Best Management
Practices (BMP). Within that context, the use of new developments in fumigation techniques and mulch materials that
tend to reduce water use makes sense. Current MBr alternatives, such as 1,3-dichloropropene + chloropicrin (1,3-D +
Pic; Telone C-35) and methyl iodide (MI; Midas), have poor efficacy against soil borne pests when applied in saturated
soils, as it was customary for MBr, because these molecules can bind more tightly to water molecules than MBr.
Another reason that justifies exploring reduced water irrigation programs is the use of higher retentive mulch films
(virtually impermeable (VIF) and metalized films). These mulches retain more moisture in the planting beds than
previous materials, which adds another component to fumigant and water management in tomato and pepper
production. No defendable scientific research has been conducted in Florida to reduce water irrigation volumes for
tomato and pepper by combining the lower water requirement of new fumigants and the higher water retention of new
mulch films. This project will determine the effect of varying water management regimes on tomato and pepper
production, and assess the effect of high retentive mulches and MBr alternatives on the water volumes necessary for
tomato and pepper irrigation.
011 - Alafia River Basin 86
B240
IFAS Research - Water Needs in Poly-Mulched & MBr Fumigation
Alternatives -Tomatoes & Peppers
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 100,500 0 0 100,500 0 0
020 Peace River Basin 16,500 0 0 16,500 0 0
021 Manasota Basin 33,000 0 0 33,000 0 0
$150,000 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Agreement to Contracts 8/1/06 8/26/06
Agreement to Cooperator 11/1/06 10/1/06
District Executes Agreement 12/1/06 11/1/06
Notice to Proceed 1/1/07 11/1/06
Basin Board Notification 2/1/07 11/1/06
Governing Board Notification 2/1/07 11/1/06
Year 1. Data Collection 12/1/07 12/1/07
Year 2. Data Collection 12/1/08 11/30/08
Completion Report - Estimated 6/1/09 6/30/10
Project Ends 10/31/09 11/30/10
Year 3. Data Collection 12/1/09 1/1/10 12/22/09
Status As Of: October 13, 2010
4/30/10 - 8/15/2006 - Agreement to Contracts. 10/12/2006 - Agreement is being reviewed by Legal. 11/8/2006 - Sent
notice to proceed. 12/4/2006 - Field preparation. 2/28/2007 - Data collection project continuing as planned. 5/1/2007 -
Data collection project continuing as planned. 7/6/2007 - Dormant for summer. 8/31/2007 - Reviewed task completion
report. Project continuing as designed. 11/1/2007- Data collection project continuing as planned. 1/2/2008 - Field
preparation for next season. 2/29/2008 - Data collection continuing as planned. 5/1/2008 - Data collection continuing as
planned. 7/1/2008 - Dormant for summer. 9/1/2009 Field preparation for new season. 11/1/2008 - Data collection, project
continuing as planned. 12/1/2008 - Data collection, project continuing as planned 2/23/09 - Execute no cost time
extension. 4/20/2009 - Data collection, project continuing as planned 6/10/2009 - Project dormant for summer. 9/1/2009 -
Starting last season. 12/22/2009 - Field preperation for next season. 4/30/10 - Reviewed task 7 completion report.
6/22/2010 - Project continuing as planned. 10/2010 Waiting for completion report.
011 - Alafia River Basin 87
B246
FFL - Water Star Developers Outreach
Project Type Basin Initiatives
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply Conservation
Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Withlacoochee River,
Peace River, Manasota
Cooperator(s)
Project Manager DURELL, SYLVIA
Task Manager(s)
Status Proposed
DescriptionThis Basin Initiative (BI) project, the Florida-Friendly LandscapingTM (FFL) Water Star Developers Outreach Program,
will promote implementation of indoor and outdoor water conservation primarily for the Florida Water StarSM (FWS)
program through education to members of the building industry, landscape professionals, government employees and
green building groups. Effectiveness will be measured by the number of professional landscapers, irrigation system
installers and government staff who are educated about FWS and the number of professionals who incorporate FWS
criteria in their projects. Education will be accomplished through one-on-one outreach, site visits, trainings and
promotion of the program's benefits at meetings of industry groups and local governments.
BenefitsIf funded, the program will continue to educate members of the building industry, landscape professionals, government
employees and green building groups on the water conservation and water quality protection benefits of environmental
landscaping best management practices, especially as part of the FWS program criteria. The specialist will also
support FFL coordinators with outreach to builders and developers in their individual counties.
Costs
The total proposed cost of the FY2012 program is $69,553 (Alafia River $6,673; Hillsborough River $14,287; Coastal
Rivers $7,569; Pinellas-Anclote River $13,839; Withlacoochee River $6,673; Peace River $10,256; Manasota
$10,256). This reflects an approximate 37% reduction from FY2011. The reduction in costs is a result of scaling back
the number of the specialist's hours allocated to the project. Funding is requested to provide for project coordination,
program expenses and travel expenses for outreach to all basins. The dollar amount allocated for each contributing
basin is based on population. The budget lines below include costs for staff to manage the project.
Additional Information
The total cost of the FY2011 program is $77,500 (Alafia River $5,425; Hillsborough River $18,600; Coastal Rivers
$6,975; Pinellas-Anclote River $17,825; Withlacoochee River $5,425; Peace River $11,625; Manasota $11,625).
FY2011 is the fourth year of funding for this outreach. Education is based on the FWS criteria and landscape best
management practices, which reference the nine principles of the FFL program of the University of Florida/Institute of
Food and Agricultural Sciences.
011 - Alafia River Basin 88
B246
FFL - Water Star Developers Outreach
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 36,112 0 0 24,911 4,161 7,040
013 Hillsborough River Basin 91,707 0 0 59,594 11,091 21,022
014 Northwest Hillsborough Basin 21,134 0 0 21,134 0 0
015 Coastal Rivers Basin 45,062 0 0 31,591 4,881 8,590
016 Pinellas-Anclote River Basin 109,639 0 0 81,897 9,110 18,632
019 Withlacoochee River Basin 41,046 0 0 29,845 4,161 7,040
020 Peace River Basin 79,436 0 0 59,156 7,040 13,240
021 Manasota Basin 73,695 0 0 53,371 7,084 13,240
$497,831 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2008Purchase order created 3/1/08 3/3/08
First task report 3/31/08 3/31/08
Second task report 4/30/08 4/30/08
Third task report 5/31/08 5/31/08
Fourth task report 6/30/08 6/30/08
Fifth task report 7/31/08 7/31/08
Sixth task report 8/31/08 8/31/08
Seventh task report 9/30/08 9/30/08
Eighth task report 10/31/08 10/31/08
Ninth task report 11/30/08 11/28/08
Tenth task report 12/31/08 12/31/08
Eleventh task report 1/30/09 1/30/09
Twelfth task report 2/27/09 2/27/09
Project ends 2/28/10 2/28/09
FY2009Purchase order created 3/1/09 3/13/09 3/13/09
First task report 3/31/09 3/31/09
Second task report 4/30/09 4/30/09
Third task report 5/29/09 5/29/09
Fourth task report 6/30/09 6/30/09
Fifth task report 7/31/09 7/31/09
Sixth task report 8/31/09 8/31/09
Seventh task report 9/30/09 9/30/09
FY2010Purchase order created 10/1/09 12/3/09 12/3/09
Purchase order extended 10/12/09 10/12/09
First task report 11/5/09 11/5/09
Second task report 12/4/09 12/4/09
Third task report 1/5/10 1/5/10
Fourth task report 2/5/10 2/5/10
Fifth task report 3/5/10 3/5/10
Sixth task report 4/5/10 4/5/10
Seventh task report 5/5/10 4/30/10
Eighth task report 6/4/10 6/2/10
Ninth task report 7/5/10 7/5/10
011 - Alafia River Basin 89
B246
FFL - Water Star Developers Outreach
Tenth task report 8/5/10 8/2/10
Eleventh task report 9/6/10 9/6/10
Twelfth task report 10/5/10 10/5/10
FY2011Purchase order created 10/1/10 10/15/10 11/15/10
First task report 11/5/10 11/5/10
Second task report 12/6/10 12/2/10
Third task report 1/5/11 1/4/11
Fourth task report 2/4/11 2/4/11
Fifth task report 3/4/11
Sixth task report 4/5/11
Seventh task report 5/6/11
Eighth task report 6/6/11
Ninth task report 7/6/11
Tenth task report 8/5/11
Eleventh task report 9/6/11
Twelfth task report 10/7/11
Status As Of: February 16, 2011
ACTION TO DATE: On time. Among other efforts, Angela Maraj, the FFLTM Water Star Developers Outreach specialist
(1) Provided information to the project engineering team for Babcock Ranch on how incorporation of the FWS residential
and community criteria can help reduce overall water use, which led to the engineers stating they would recommend
FWS to the developer. (2) Continued discussion with Sarasota County on potential FWS commercial projects including
Urfer Park and other county parks. (3) Conducted landscape plan reviews and feedback for the Heritage project in Citrus
County that aided the project in becoming FWS Gold certified. (4) Conducted preliminary review of landscape plans
review for Hulbert Homes in Polk County and Sage Homes in Charlotte County. (5) Provided workshop to 20 attendees
at the Marion County Extension office. The workshop was approved for contractor CEUs by Marion County government
for landscaping ordinance requirements. As a result of the training, a builder, a remodeler and a county professional
building her own home expressed interest in certification of their projects. (6) Conducted a final review of the Sarasota
County Water Efficient Landscape ordinance in preparation for submission to the county commissioners. The proposed
code amendments are a combination of recent changes to the Florida Statutes and changes proposed by the Working
Group based upon DEP guidance, publications, the FWSG criteria, Leadership In Energy and Environmental Design
(LEED) certification, and professional experience. (7) Presented a training to representatives from ten landscape
companies and condominium associations at Gasparilla Island in Charlotte County.
011 - Alafia River Basin 90
B254
IFAS Research - Determine Specific Irrigation Volumes/Freq/Fertiz
StrawberriesProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River
University of FloridaCooperator(s)
Project Manager COOPER, RANDY
Task Manager(s)
Status Ongoing
DescriptionThis study will develop specific water use and nutrient recommendations for the most predominant (Strawberry
Festival, Winter Dawn and Ventana) varieties of strawberries grown in the District. Florida is the second leading state
in the U.S. in planted strawberry areas and most of the state's production is within the District. Currently there are
about 9,600 acres (22.8 MGD) within the District that are permitted for strawberry production and about 90% of those
acres are within the Hillsborough River and Alafia Basin Board's watershed. Historically these growers have been
following one set of irrigation and fertilizer recommendations. Recent research supported by the District indicates that
strawberry varieties responded differently to varying irrigation and nitrogen (N) fertilization programs. In those studies,
irrigation volumes between 4.6 and 9.1 acre-inch/season (25-50% of typical permitted amounts) were tested in
conjunction with drip-applied N rates ranging between 0.4 and 0.8 lb/acre/day. The planted cultivars, which have
different growth habits and production patterns reacted differently to these rates. These reactions strongly suggested
that the current one-size-fits-all recommendations for irrigation and N management in strawberry should be
reevaluated and considered depending on the planted variety. This project will develop irrigation information to reduce
agricultural water use and fertilizer loading from strawberry production. In addition the project will provide the District
with a tool for better planning and allocating strawberry water use. The project will also provide information to assist
the agricultural producers to water conservation and reduce fertilizer loading.
BenefitsThe actual water savings will depend on acres planted climatic and growing conditions. Assuming a 5% savings this
would amount to about 420 million gallons per year of reduced ground water use that would make that water available
for other uses. An added benefit to this project will be a reduction in fertilizer use, which will reduce the amount of
nutrients available to runoff and pollute the District's water bodies.
Costs
To cover different climatic conditions the project will continue for three years. The total cost will be $125,000 and it will
be divided over three budget years and two basin Boards (Alafia and Hillsborough River and) Basin Boards. Project
costs are divided by permitted water use, and it is proposed that the Alafia Basin Board fund $22,917 for FY2008 and
FY2009, and $22,916 in FY2010. Hillsborough River will fund $18,750 for the three budget years.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 43,788 0 0 41,667 2,121 0
011 Alafia River Basin 45,834 0 0 45,834 0 0
013 Hillsborough River Basin 37,500 0 0 37,500 0 0
$127,122 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Agreement to Contracts 10/1/07 6/19/07
Agreement to IFAS 10/15/07 7/24/07
011 - Alafia River Basin 91
B254
IFAS Research - Determine Specific Irrigation Volumes/Freq/Fertiz
StrawberriesNotice To Proceed 11/30/07 10/15/07
Notice To Basin Boards 1/31/08 12/1/07
Data Collection Yr 1 12/31/08 12/18/08
Data Collection Yr 2 12/31/09 12/22/09
Completion Report 7/30/10
Agreeement Ends 11/30/10
Status As Of: October 13, 2010
4/30/10 - 8/31/2007 - Agreement mailed to IFAS. 11/1/2007 - Mail IFAS Notice To Proceed. 1/2/2008 - Picking fruit
3/1/2008 - Season ended, analyzing data 5/1/2008 - Dormant 7/1/2008 - Dormant for summer. 9/1/2008 - Dormant for
summer. 11/1/2008 - Field preparation and transplanting. 12/17/2008 - Planted and collecting data. Project continuing as
designed. 3/6/2009 - Project continuing as designed. 4/20/2009 - Dormant for summer 6/10/2009 - Dormant for summer.
9/1/2009 - Dormant for summer 12/22/2009 - Mid season, data collection project continuing as planned. 4/30/10 - End of
season. 10/2010 - Waiting for completion report
011 - Alafia River Basin 92
B256
IFAS Research - Feasibility of Low-Cost Automated Irrigation Pump
ControllersProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River, Peace River, Manasota
University of FloridaCooperator(s)
Project Manager STINGHEN, GIO
Task Manager(s)
Status Ongoing
DescriptionAgriculture is the largest permitted water use in the District and citrus production is the largest of those permitted uses.
Over 366MGD are permitted for citrus irrigation and most of that water use is in the SWUCA. This project will help
citrus growers reduce their water use by developing tools to automate and improve irrigation scheduling. These tools
can be used by the District's FARMS program to further expand their conservation efforts. Although citrus acres have
been on the decline it seems to have reached a stabilizing point. With the increase in the recent price of citrus the
District might even see an increase in the number of acres. The permitted acres for citrus is still relatively high and
even a minor reduction in water use or fertilizer application could have a significant impact on the District's water
resources. The proposed project will investigate the use of new low-cost automatic irrigation pump controllers with
wireless remote monitoring and control. This low cost system (<$1,000) will enable growers to optimize the irrigation
scheduling and remotely manage over 100 acres. In addition the project will develop and compare new and improved
irrigation scheduling tools for citrus trees, particularly for automated systems. In the past the District has funded
several citrus irrigation projects. With the introduction on new technology some of the old information is no longer
applicable and some of the information needs to be incorporated into new technology. Where applicable this project
will build on past projects and use new technology to help reduce water and fertilizer use.
BenefitsThe actual water savings will depend on acres planted climatic and growing conditions. Assuming a 1% savings this
would amount to about a 3.7 million gallons per day reduction of ground water in an area of water use concern. The
reduced water use would make more water available for other uses and reduce the amount of funds that need to be
invested in alternative water supplies. An added benefit to this project will be that improved irrigation would improve
fertilizer use, which will reduce the amount of nutrients available to runoff and pollute the District's water bodies. Also
the project's information will provide the FARMs program with another tool to help reduce ground water use.
Costs
This will be a four year project and the total cost will be $150,000. Project costs are divided between four Basin Boards
based on the percent water permitted for citrus production within their watersheds. The following is the annual cost
break down by Basin Board: Alafia $4,500, Hillsborough River $4,000, Peace River $38,500 and Manasota $3,000 for
FY2008, FY2009 and FY2010.
Additional Information
Improved irrigation scheduling can conserve large volumes of water. Since current irrigation scheduling tools are
unreliable, growers are prone to over-irrigate to eliminate any risk of drought stress. Manually operated irrigation
systems are not adaptable to more efficient frequent, small irrigations or night-time irrigations due to logistics, conflicts
in schedules, and the inconvenience factor. Irrigation durations are most often rounded up, rather than down, even
after accounting for all these factors. Probability of rainfall is almost never considered and some irrigation systems are
even run during rain events. Over-irrigation and nutrient leaching consequently deplete and degrade our limited water
resources. The high cost of commercially available automatic control systems has, unfortunately, prevented their
widespread acceptance and use. Since often less than 100 acres are supplied per pump, quite commonly a grower
will have multiple well pumps to automate in a citrus grove. At a cost to automate of more than $20,000 per pump, the
financial burden is prohibitive, even with cost sharing. In addition, commercial automatic controllers have a limited
ability to interface with available soil moisture sensors or with more advanced scheduling tools such as simulation
models. Without adequate inputs, the full potential of automatic controllers cannot be realized. There is a great need
to develop low-cost automatic irrigation pump controllers to reliably schedule irrigation.
011 - Alafia River Basin 93
B256
IFAS Research - Feasibility of Low-Cost Automated Irrigation Pump
Controllers
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 51,446 0 0 50,000 1,446 0
011 Alafia River Basin 9,000 0 0 9,000 0 0
013 Hillsborough River Basin 8,000 0 0 8,000 0 0
020 Peace River Basin 77,000 0 0 77,000 0 0
021 Manasota Basin 6,000 0 0 6,000 0 0
$151,446 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Agreement To Contracts 10/1/07 8/30/07
Agreement To IFAS 10/15/07 10/15/07
Notice To Proceed 12/31/07 12/31/07
Data Collection Yr. 1 12/31/08 12/18/08
Data Collection Yr 2 12/31/09 12/22/09
Data Collection Yr. 3 12/31/10
Grower's Field Day 12/15/11
Completion Report 3/1/12
Agreement Ends 12/31/12
Status As Of: October 13, 2010
4/30/10 - 8/31/2007 - Reviewed final scope of work. 11/1/2007 - Agreement mailed to cooperator for review and
execution. 1/2/2008 - Notice to proceed sent to IFAS 3/7/2008 - Mobilizing equipment. 5/1/2008 - Reviewed task I report.
Project continuing as planned. 7/1/2008 - Data collection project continuing as planned. 9/1/2008 - Data collection project
continuing as planned. 11/1/2008 - Data collection project continuing as planned. 12/17/2008 - Data collection project
continuing as planned 3/6/2009 - Data collection project continuing as planned. 4/20/2009 - Data collection project
continuing as planned 6/10/2009 - Data collection project continuing as planned. 12/22/2009 - Data collection project
continuing as planned. 4/30/10 - Data collection project continuing as planned. 6/22/2010 - Data collection project
continuing as planned. 10/2010 - Data collection project continuing as planned
011 - Alafia River Basin 94
B264
IFAS Research - Citrus Irrigation & Nutrient Mgt. to Improve Earlier
Growth & ProdProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River, Peace River, Manasota
University of FloridaCooperator(s)
Project Manager BRUMBAUGH, DAVID
Task Manager(s)
Status Ongoing
DescriptionDue to Citrus Greening, Canker and labor issues the industry has had the University develop different techniques for
economical production of citrus in Florida. On of the most promising techniques, which includes high density planting
of smaller trees, was developed in Spain and commercialized in South Africa, Australia and California. This project will
develop irrigation and nutrient management recommendations for this new method of production to help conserve
water and reduce nutirent loading. Although recent citrus acres have declined District wide, it is still the largest
permitted agricultural water use. Also, with the decline in development and recent price increases, more citrus growers
are planning to expand their operations; therefore, it is important to help find ways for citrus producers to conserve
water. This water conservation project will utilize information developed in Spain and commercialized in South Africa,
Australia and California. The University will investigate and develop new cultural technology including changes to plant
density, nutrient and irrigation management. Plants will be grown with an intensive fertigation management technique
that is designed to provide essentially a non-limiting environment to those roots. This new fertilizer program will require
changes to existing irrigation management programs.
BenefitsCitrus production is the largest agricultural land use in the District. This project will help citrus producers conserve
water and reduce pollutant loading for fertilizer leaching. In addition, the information could be used by the District's
FARMS program to help design better BMP cost share systems. The amount of water saved will be a function of the
number of acres planted and their water use, which will change annually based on market and climatic conditions.
Costs
The project costs have been reduced from $182,500 to $122,300 because some of the ridge elements were removed.
Additional Information
Yield fundamentally drives profit for Florida citrus growers and is thus the key element to a grower's financial success.
Yield is tied directly to tree density and growth rate and is a simple function of numbers of trees and the related total
canopy volume over the unit area. Research over the last several decades has proven that growth of young trees and
productivity of both young and mature trees benefit from high frequency low volume irrigation. Improved tree growth
from intensive irrigation management could reduce the time required from planting to economic breakeven production,
thus provide management options in light of current devastating diseases such as Canker and Huanglongbing (citrus
greening). Florida growers have adopted Best Management Practices (BMPs) that reduce nutrient leaching by limiting
the amount of fertilizer that can be applied, and the time of year when fertilizer can be applied. These BMPs are based
on research under low-intensity management systems. However, production systems that combine grove design and
irrigation management to increase yield and grove operational efficiency have not been studied. High density plantings
of sweet oranges on low-vigor rootstocks have known advantages, but their long-term behavior and changes in the
functional relationship of tree density, growth rate, and yield over time are not well understood. The central hypothesis
of this project is improved and consistent early yields, with increased tree density on low vigor trees and/or improved
irrigation/nutrient management systems that would provide proactive management options in light of current
devastating diseases such as Canker and Huanglongbing (citrus greening). Growers normally achieve their expected
return on investment within 15 to 20 years of planting. If those goals would occur sooner (e.g., 10 to 12 years) through
increased early yields, the grower would benefit even if the grove declines over time due to the diseases mentioned
above and must be replanted. By knowing how to irrigate and manage their irrigation with this new method of
production, the grower would conserve water and reduce the amount of fertilizer thats being leached from the plant
root zone while maintaining an economical viable crop.
011 - Alafia River Basin 95
B264
IFAS Research - Citrus Irrigation & Nutrient Mgt. to Improve Earlier
Growth & Prod
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 100,270 12,800 0 36,500 14,470 36,500
011 Alafia River Basin 3,336 0 0 3,336 0 0
013 Hillsborough River Basin 2,979 0 0 2,979 0 0
020 Peace River Basin 28,106 0 0 28,106 0 0
021 Manasota Basin 2,079 0 0 2,079 0 0
$136,770 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Develop Contract 10/1/08 10/1/08
Notice To Proceed 1/2/09 10/30/08
No Cost Amendment 3/1/09 3/1/09
Year 1 - Data Collection 12/30/09 12/22/09
Year 2 - Data Collection 12/30/10
Year 3 - Data Collection 12/30/11
Growers Field Day 7/31/12
Journal Publication 7/31/12
Year 4 - Data Collection 12/30/12
Completion Report 10/31/13
Contract Ends 6/30/14
Status As Of: February 25, 2011
Project research is underway.
011 - Alafia River Basin 96
B265
IFAS Research - Optimizing Irrigation to Conserve Water for Shade
Tree ProductionProject Type Basin Initiatives
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River, Manasota
University of FloridaCooperator(s)
Project Manager COOPER, RANDY
Task Manager(s)
Status Ongoing
DescriptionThere are over 5,000 acres of nursery production in the central part of the District and typically they are permitted for
about 1.7 million gallons of water per acre. With the increase of urban development, it is anticipated that the number of
nursery acres will increase and landscape water use will too. This project will investigate ways to reduce nursery and
landscape irrigation by studying the relationships between moderate water stress, photosynthesis and shoot growth of
trees. The goal of the project is to develop irrigation management strategies that take advantage of gas exchange
properties occurring at moderate water stress. These strategies would be linked to the ongoing projects modeling tree
water use based on ETo, further increasing the level of irrigation precision of non-production situations beyond that
which will come from the ETo projects. Plant growth is a two stage process. First, new cells are produced by
meristematic tissues. Second, these cells enlarge. The first phase mainly requires new cellular components which are
derived from photosynthesis and absorbed minerals. The principal requirement for the second phase of growth, cell
enlargement, is hydrostatic (turgor) pressure. Plant water status, mainly as it affects cell turgor pressure, is the primary
driving force in this second phase. In pecans, nearly all leaf expansion occurred at night (Anderson, 1989). This is the
time when water stress in plants is the lowest, and water status and turgor pressure are the highest. This is
hypothesized as the primary reason cyclic irrigation of containerized plants accelerates growth, in that it results in
higher turgor pressures during the night by making more water available in the root ball late in the day. While this
information on leaf expansion was reported in the scientific literature over 10 years ago, it was never pursued much
further and will be investigated in this project.
BenefitsInformation from this project will help nursery producers, commercial landscapers and homeowners reduce water use.
The amount of water saved will be a function of the number of acres planted and their water use, which will change
annually based on market and climatic conditions. Assuming an annual 5% water savings from only nursery
production, there would be a total of about 1.9 mgd savings on permitted water use. In addition, information form this
project can be used by the District's FARMS program to help promote water conservation.
Costs
This four year project will cost the District a total of $83,875. Funding for this project is prorated between five Basin
Boards (Peace River - 23%, Hillsborough River 22%, Alafia - 18%, Manasota 18% and Withlacoochee 11%) based on
the number of permits for nursery production in their watershed. In FY2009, FY2010, FY2011, and FY2012 the Basin
Boards will budget each year: Peace River $5,159, Hillsborough River $5,008, Alafia River $4,103, Manasota $4,103
and Withlacoochee River $2,595.
Additional Information
Recently, data collection of a project at MREC supported by the Southwest Florida WMD, Horticultural Research
Institute and others quantified the daily water use of live oak and red maple to 7-inch calipers, and Nellie R. Stevens
holly to 5-inch calipers. Preliminary modeling of red maple reported a high correlation of predicted and actual water
loss based on a algorithm incorporating reference evapotranspiration (ETo) and trunk cross sectional area just below
the first major branch (Beeson, 2007). A project with a similar goal using D.D. Blanchard magnolia, Aliee, Chinese elm
and slash pine is currently in the second year. Maximum plant growth occurs when transpiration is maximum because
transpiration and photosynthesis are tightly linked. Reductions in stomata aperture reduce the flow of carbon dioxide
into leaves and water out of leaves. However, for the limited number of tree species studied, slight to moderate
reductions in stomatal aperture cause no to small reductions in photosynthesis, but resulted in relatively large
reductions in transpiration. Thus under moderate water stress, trees and woody plants, in general, tend become more
water efficient with little reduction in photosynthesis (Noble, 1999).
011 - Alafia River Basin 97
B265
IFAS Research - Optimizing Irrigation to Conserve Water for Shade
Tree Production
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 65,028 0 0 20,969 23,090 20,969
011 Alafia River Basin 4,103 0 0 4,103 0 0
013 Hillsborough River Basin 5,010 0 0 5,010 0 0
019 Withlacoochee River Basin 2,595 0 0 2,595 0 0
020 Peace River Basin 5,158 0 0 5,158 0 0
021 Manasota Basin 4,103 0 0 4,103 0 0
$85,997 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Develop Agreement 10/17/08 10/6/08
Notice To Proceed 1/2/09 1/30/09
Year I Data Collection 12/31/10
Year 2 Data Collection 12/31/11
Year 3 Data Collection 12/31/12
Completion Report 5/31/14
Agreement Ends 8/31/14
Status As Of: October 13, 2010
4/30/10 - 11/1/2008 - Contract sent to IFAS. 12/17/2008 - Waiting for University to return executed Agreement. 4/20/2009
- Data Collection continuing as planned. 6/10/2009 - Reviewed task completion report. 9/1/2009 - Tree growth is behind,
will need to modify project deliverable dates. 9/23/2009 - First Amendment processed to extend deliverable timeframes.
12/22/2009 - Data collection project continuing as designed. 4/30/10 - Data collection project continuing as planned
6/22/2010 - Project continuing as planned. 10/2010 - Data collection project continuing as planned
011 - Alafia River Basin 98
B270
MFL Establishment - North and South Prongs Freshwater System
Project Type Basin Initiatives
AORs Strategic InitiativesNatural Systems Minimum Flows and Level Establishment and Monitoring
Basin(s) Alafia River
Cooperator(s)
Project Manager MORALES, JON
Task Manager(s)
Status Ongoing
DescriptionRequest funds to aid in development and establishment of minimum flows for the North and South Prongs of the Alafia
River by 2012. Florida Statutes mandate that the District must establish Minimum Flows and Levels (MFLs) for water
bodies within its jurisdiction. This project is to provide technical information needed to develop and support the
adoption of MFLs for the North and South Prongs of the Alafia River. An understanding of ecosystem components is
needed so that relationships between minimum flows and significant harm can be evaluated in a defensible manner. It
is necessary for a number of reasons to document the abundance, diversity, and distribution of plants and animals that
are associated with these resources under seasonally changing flow conditions. Physico-chemical variables (e.g.,
dissolved oxygen, temperature), drainage alterations, and extensive hydrologic data also need to be evaluated. While
much of the data can be collected and developed in-house, manpower and time limitations and the specialized
expertise required for some analyses dictates that some of it must be consulted out. Funding under this project will
accomplish three goals specific to MFLs development: 1) characterization of wetland and floodplain vegetation and
soils along the river corridor; 2) evaluation of hydraulic characteristics of the stream for the purpose of describing
floodplain inundation patterns under various flows; and 3) assistance in the analysis of hydrologic and biologic data to
establish relationships between river hydrology (stage and flows) and the ecologic resources that are supported.
Funding requested in FY2009 is primarily to conduct vegetation transect analysis across the river channel and
floodplain, and to assess fish habitat using the Physical Habitat Simulation (PHABSIM) Analysis.
BenefitsCompletion of this project will support timely adoption of MFLs on this water body consistent with the Board adopted
MFLs priority list and schedule. Funding requested in FY2009 is primarily for use in evaluating the potential reduction
in fish and macroinvertebrate habitat and loss of floodplain wetland connection due to reductions in flow and includes
vegetation transect analysis and Physical Habitat Simulation Model (PHABSIM) analysis.
Costs
Funding for FY2010 is currently for $100,000 in new and non-recurring budget items. A small amount has been
budgeted for travel and parts and supplies. Total requested funding for FY2011 is $25,000 for new and non-recurring
budget items..
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 560,355 0 (21,313) 157,985 22,407 401,276
011 Alafia River Basin 40,250 0 0 40,250 0 0
$600,605 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Flow Measurement and AnalysisFlow Data Collection from USGS 3/1/12
Flow Data Analysis Summary 3/15/12
2. Field Site Selection
011 - Alafia River Basin 99
B270
MFL Establishment - North and South Prongs Freshwater System
Map Shoals 2/1/11
Identify Field Sites and Habitats 4/1/11
Obtain Permission to Access Private Property 4/30/11
3. Floodplain Vegetation AnalysisField Sampling /Survey 6/15/11
Vegetation Assessment Report 12/15/11
4. Instream Habitat Assessment/PHABSIM AnalysisField Data Collection/Survey 3/1/11
Habitat Assessment Summary 5/30/11
PHABSIM Analysis Summary 12/30/11
5. Hydraulic Model DevelopmentSurvey Data Acquisition 1/30/12
HEC-RAS Model Development 3/30/12
6. MFL Report DevelopmentData Analysis 5/1/12
Report Preparation 8/1/12
7. Peer ReviewPeer Review 11/1/12
Status As Of: February 28, 2011
This project is newly funded for this fiscal year. Staff have identified HSW Engineering, Inc. as one of the consultants
tasked to assess the wetland vegetation and soils communities found along the riparian corridor of these rivers.
Purchase orders have been completed and field data collections have commenced on the South Prong of the Alafia
River. District Survey will schedule transect clearing operations on the North Prong in the first quarter of 2011. Staff is
currently field sampling for PHABSIM analyses.
011 - Alafia River Basin 100
B273
MFL Research - Pilot Streamflow Reductions to Measure Effects of
MFL 15% Reduction CriteriaProject Type Basin Initiatives
AORs Strategic InitiativesNatural Systems Minimum Flows and Level Establishment and Monitoring
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager MORALES, JON
Task Manager(s)
Status Ongoing
DescriptionTo further validate existing stream Minimum Flows and Levels (MFL) methodology consistent with peer review
recommendation. A frequent focus of criticism of the MFL methodology applied by the District to rivers and estuaries
is the use of a 15 percent habitat loss criterion as a threshold for assessing "significant harm." Quoting from the peer
review of the Braden River MFL, the panel noted:
" The draft report describes the metrics used to define the limit at which further withdrawals would be significantly
harmful to the water resources or ecology of the area as stated in Florida statutes. The authors note that significant
harm was not defined in statute. The District chose to interpret significant harm as the loss of flows associated with
fish passage and maximization of stream bottom habitat with the least amount of flow and quantifiable reductions in
habitat. Overall, this is a reasonable approach from an ecological perspective and likely satisfies the intent of the
statute. The authors state that, [in] general, instream flow analysts consider a loss of more than 15% habitat, as
compared to undisturbed or current conditions, to be a significant impact on that population or assemblage. The
authors further note, in our opinion, correctly, that there are few `bright lines which can be relied upon to judge when
`significant harm occurs. Rather loss of habitat in many cases occurs incrementally as flow decline, often without a
clear inflection point or threshold. Nevertheless, the 15% habitat loss criterion remains one of the least rigorous, most
subjective aspects of the District's approach to setting MFLs. Justification for this threshold is based on common
professional practice in interpreting the results of PHABSIM analyses (Gore at al. 2002), a review of relevant literature
where reported percentage changes ranged from 10 to 33%, and on previous peer reviews that found the 15%
threshold to be reasonable and prudent, especially given the absence of clear guidance in the statute or in the
scientific literature on levels of change that would constitute significant harm (e.g., Shaw et al. 2005). The draft upper
Braden report continues the District's practice of using a 15% change in habitat availability as the threshold for defining
significant harm and now applies this threshold broadly to include both spatial and temporal loss of habitat or
connectivity. The Panel again acknowledges that the use of this criterion is rational and pragmatic, but also recognizes
that the specific value of 15% is subjective and has only modest validation or support from the primary literature. . . . .
More importantly, however, is the need for the District to commit the resources necessary to validate the presumption,
that a 15% decrease in spatial or temporal habitat availability or a 15% increase in violations of the low-flow threshold,
does not cause significant harm. "
This project represents the best means for validating the effect that a given flow reduction has on available habitat and
the biota of a stream segment. District staff proposes to locate an acceptable stream segment in order to conduct
controlled diversions from a defined stream segment in order to evaluate the impact that a range of flow and habitat
reductions has on the biota (e.g., fishes, macroinvertebrates) and water resource values. It is envisioned that such a
project will require a number of years to complete (possibly a decade), and an annual commitment of significant
resources to accomplish.
BenefitsIf implemented, this project will provide as definitive a test of the 15 percent habitat loss criterion as is practical under
field conditions, and the results will be widely applicable to stream assessments and the development of environmental
flows though out the country.
Costs
Funding in FY2010 is currently for $150,000 to be funded by the Governing Board. A small amount has been
budgeted for parts and supplies and travel. Total requested funding for FY2011 is $150,000.00.
011 - Alafia River Basin 101
B273
MFL Research - Pilot Streamflow Reductions to Measure Effects of
MFL 15% Reduction Criteria
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 644,649 0 0 245,384 217,931 181,334
011 Alafia River Basin 9,375 0 0 9,375 0 0
013 Hillsborough River Basin 9,375 0 0 9,375 0 0
014 Northwest Hillsborough Basin 9,375 0 0 9,375 0 0
015 Coastal Rivers Basin 9,375 0 0 9,375 0 0
016 Pinellas-Anclote River Basin 9,375 0 0 9,375 0 0
019 Withlacoochee River Basin 9,375 0 0 9,375 0 0
020 Peace River Basin 9,375 0 0 9,375 0 0
021 Manasota Basin 9,375 0 0 9,375 0 0
$719,649 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Pre-Diversion Baseline MonitoringFish Community Assessment - Year 1 6/1/11
PHABSIM Field Data Collection 6/1/11
Habitat Suitability Curve Development - Fish and Invertebrates 6/1/11
Community Metabolism Assessment 6/1/11
Riparian Vegetation Assessment and Recruitment 6/1/11
Macrophyte Community and Biomass Assessment - Year 1 6/1/11
Periphyton Community Assessment - Year 1 6/1/11
Stream Condition Index/Macroinvertebrate Assessments 10/1/11
Water Chemistry 10/1/11
Flow and Stage Monitoring - Year 1 10/1/11
Instream and Woody Habitat Assessments 10/1/11
Fish Community Assessment - Year 2 6/1/12
Macrophyte Community and Biomass Assessment - Year 2 6/1/12
Periphyton Community Assessment - Year 2 6/1/12
2. Permit Application for Long-Term Manipulation StudyERP Permit from DEP 12/1/13
ERP Permit from US Army Corps of Engineers 12/1/13
Status As Of: February 28, 2011
This project is now activated coinciding with the 2011 fiscal year. Staff is still developing project milestones. From an
operational standpoint, staff have narrowed a field site (Gum Springs) for the execution of this project. Current activity
related to this project is mapping of the entire field site for placement of potential experimental and control sites.
Currently, baseline assessment studies are underway to avail of the 150K budget for the first year. Staff has honed in on
using a passive swing/board design as a water control structure and is seeking engineering support for this. Final
adoption of this design would also pave the way for getting the necessary environmental resource permits issued by
Florida Department of Environmental Protection (DEP) and U.S. Army Corps of Engineers. A meeting with Florida DEP
scheduled last July 2009 was receptive to the issuance of an Environmental Resource Permit (ERP) based on certain
conditions. Similar favorable responses regarding the issuance of an ERP was also received from U.S. Army Corp of
Engineers when the project was described to them in a January 2010 meeting. All budgeted monies have already been
encumbered for FY2010 and second year data collections are currently ongoing.
011 - Alafia River Basin 102
B274
Data - SWUCA - Salt Water Intrusion Monitoring Network With Data
Collected by Permit HoldersProject Type Basin Initiatives
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply Alternative Water Supply
Basin(s) General Fund (District), Alafia River, Manasota
Cooperator(s)
Project Manager KRAFT, CAROL
STARKS, ROBERTATask Manager(s)
Status Ongoing
DescriptionThe Salt Water Intrusion Monitoring Network (SWIMN) was developed in an effort to work closely with Water Use
Permit (WUP) holders along the coastal areas of the Southern Water Use Caution Area (SWUCA), who have wells
that are identified through groundwater modeling efforts to be most at risk for salt-water intrusion. A water quality
baseline for the wells is established through a sampling assessment of current chloride, sulfate, dissolved solids, and
electrical conductivity concentrations. After the baseline assessment, the wells are sampled by the permittees for
electrical conductivity at regular intervals, using District supplied conductivity meters. This provides an early warning
for WUP holders to plan for alternative supplies, alternative use of the land, or to take advantage of the District's
backplugging, Facilitating Agricultural Resource Management Systems (FARMS) program, and Cooperative Funding
Initiative to attempt to mitigate the problem.
BenefitsThis project monitors groundwater quality data and works closely with WUP holders to help determine the degree of
salt-water intrusion experienced by the permittee in an effort to help mitigate potential impacts.
Costs
The FY2011 project cost is $60,225, with the District's General Fund contributing approx.half ($31,348). The remaining
funds will be split between the Alafia River Basin (approx. 20 percent; $8,924) and Manasota Basin (approx. 30
percent; $19,953). This project is expected to be ongoing. District funds shown include staff salaries, parts and
supplies, and equipment (non-capital outlay).
Additional Information
The SWIMN was established in order to track water quality in WUP well sites along the coastal areas of the SWUCA
that were predicted through modeling efforts to be at risk for salt-water intrusion. Approximately 190 WUP wells have
been identified by District modeling efforts to be at varying degrees of risk of salt-water intrusion. These wells have
been prioritized according to their degree of risk. Sampling of the wells predicted to be at the greatest risk has already
been conducted. The remaining wells will be sampled and WUP holders that agree to participate will be supplied with
training and equipment (conductivity meters) to periodically check water quality in their wells. All data collected is
analyzed for local trends, and WUP holders are informed of negative trends in their water quality. If it is determined
that a WUP holder is experiencing salt-water intrusion to the degree that groundwater in the wells is no longer suitable
for its intended use, the permittee can explore management actions available through the District, in an attempt to
mitigate the problem.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 83,080 0 0 61,013 0 22,067
011 Alafia River Basin 32,229 0 0 21,510 0 10,719
021 Manasota Basin 56,676 0 0 39,504 0 17,172
$171,985 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 103
B274
Data - SWUCA - Salt Water Intrusion Monitoring Network With Data
Collected by Permit Holders
Critical Project Milestones ActualProjected Amended
Kick-Off Meeting 8/28/08 8/28/08
Project status meeting 2/23/10 2/23/10
Complete Baseline Sampling of Candidate Wells 9/30/11
Provide conductivity meter training and support to select well owners 9/30/11
Status As Of: February 25, 2011
Reviews of associated WUPs and subsequent sampling of wells are currently ongoing. Staff is also currently evaluating
operation and training for conductivity meters for associated WUP holders. Conductivity meter training and subsequent
result reporting has been established with three WUP holders.ACTION-TO-DATE: On-time
011 - Alafia River Basin 104
B277
Education - Florida Water Star Program - Builder Conservation
EducationProject Type Basin Initiatives
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply Conservation
Basin(s) General Fund (District), Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager DURELL, SYLVIA
Task Manager(s)
Status Proposed
DescriptionThis Basin Iniative (BI) project, Florida Water StarSM (FWS), is a certification program that provides incentives to
builders and developers to encourage indoor and outdoor water efficiency and water quality protection. FWS was
originated by the St. Johns River Water Management District (SJRWMD). SJRWMD's original program, now known as
FWS Silver, was used as a base for this District to create a higher-tier version. The SFWMD also promotes the FWS
program. The FWS Gold, Silver and Commercial and Institutional programs are promoted in this District. They
are designed to increase the knowledge level of the building industry about water efficient building practices and to
provide educational resources and incentives to make these practices common to the marketplace. The FWS rating
system is integrated into the landscape evaluation component of the Florida Green Building Coalition's (FGBC)
certification program and has consistency with national green building programs such as the Leadership in Energy and
Environmental Design (LEED) by the U.S. Green Building Council and ENERGY STAR® from the Environmental
Protection Agency. As of Feb. 24, 77 properties have been certified by the District. If funded, this will be the fourth year
of the FWS program. Effectiveness will be measured by the number of properties certified and the number of
participants in trainings. Water savings data will also be collected when possible.
BenefitsThe program's objectives are to increase the knowledge level of efficient indoor and outdoor water use and to provide
educational resources and incentives to promote water conservation practices. Up to 50 percent of typical household's
water is used outside the home and inefficient or incorrectly installed irrigation can waste thousands of gallons of water
each month. Indoors, a leaking toilet can waste more than 200 gallons in a single day. The FWS program criteria
provide guidelines to follow that will positively impact water resources when the program is successfully implemented.
By providing an incentive for builders, developers and homeowners that encourages them to incorporate best
management practices, the District realizes water savings and water quality protection. Changes in
behavior occur when a builder signs a contract with the District to build houses according to the FWS criteria, and
agrees thereafter to include water conserving elements into future projects. Owners of new FWS properties receive the
benefits of the indoor and outdoor water-conserving elements of the program and can promote the certification as a
marketing edge at time of resale. The program's close partnership with the FGBC resulted in the FWS Gold outdoor
water conservation criteria being incorporated into the FGBC standards.
Costs
The total proposed cost of the FY2012 program is $110,667, with the District contributing $55,380 and the Basin
Boards contributing $55,287 (Alafia River $3,876; Hillsborough River $13,252; Coastal Rivers $4,982; Pinellas-Anclote
River $12,707; Withlacoochee River $3,876; Peace River $8,295; Manasota $8,299). Overall program costs have
decreased slightly since FY2011. The dollar amount allocated per contributing basin is based on population. Funding
provides for salary and travel for a project coordinator to manage the program, support for education outreach and
contractual services related to the delivery of the program. The budget lines below include costs for staff to manage
the project.
Additional Information
The total cost of the FY2011 program is $111,556, with the District contributing $55,698 and the Basin Boards
contributing $55,858 (Alafia River $3,919; Hillsborough River $13,386; Coastal Rivers $5,035; Pinellas-Anclote River
$12,839; Withlacoochee River $3,919; Peace River $8,375; Manasota $8,385). FY2011 is the third year of funding for
the FWS program.
011 - Alafia River Basin 105
B277
Education - Florida Water Star Program - Builder Conservation
Education
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 198,446 0 (5,855) 103,564 50,215 50,522
011 Alafia River Basin 19,184 0 (337) 9,553 4,966 5,002
013 Hillsborough River Basin 49,045 0 (1,362) 22,561 13,862 13,984
014 Northwest Hillsborough Basin 5,061 0 0 5,061 0 0
015 Coastal Rivers Basin 21,275 0 (512) 11,520 5,918 4,349
016 Pinellas-Anclote River Basin 50,806 0 (1,284) 26,799 12,583 12,708
019 Withlacoochee River Basin 20,145 0 (373) 10,550 4,966 5,002
020 Peace River Basin 38,113 0 (852) 19,712 9,589 9,664
021 Manasota Basin 34,906 0 (666) 17,931 8,781 8,860
$436,981 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2009Request for quotes issued 10/15/08 10/15/08
Purchase order/scope of work created 11/15/08 11/12/08
First task report 11/30/08 11/30/08
Second task report 12/30/08 12/30/08
FWS/FWSG certifier training 1/16/09 1/16/09
Third task report 1/30/09 1/30/09
Fourth task report 2/27/09 2/27/09
First home kick-off event 3/25/09 3/25/09
Fifth task report 3/31/09 3/31/09
Second house certified 4/17/09 4/17/09
Sixth task report 4/30/09 5/4/09 5/4/09
Seventh task report 5/29/09 5/29/09
Eighth task report 6/30/09 6/30/09
Ninth task report 7/31/09 7/31/09
Third house certified 8/18/09 8/18/09
Tenth task report 8/31/09 8/31/09
Eleventh task report 9/30/09 9/30/09
Twelfth task report 10/30/09 11/5/09 11/5/09
Project complete 10/31/09 12/15/09 12/15/09
FY2010First task report 12/4/09 12/4/09
Second task report 1/5/10 1/5/10
Third task report 2/5/10 2/5/10
Fourth task report 3/5/10 3/5/10
Fifth task report 4/5/10 4/8/10 4/8/10
Sixth task report 5/5/10 5/5/10
Seventh task report 6/4/10 6/4/10
Eighth task report 7/5/10 7/5/10
Ninth task report 8/5/10 8/4/10
Tenth task report 9/6/10 9/6/10
Eleventh task report 10/5/10 10/5/10
FY2011Purchase order created 10/1/10 10/15/10 10/15/10
011 - Alafia River Basin 106
B277
Education - Florida Water Star Program - Builder Conservation
EducationFirst task report 11/5/10 11/5/10
Second task report 12/6/10 12/6/10
Third task report 1/5/11 1/5/11
Fourth task report 2/4/11 2/4/11
Fifth task report 3/4/11
Sixth task report 5/5/11
Seventh task report 5/6/11
Eight task report 6/6/11
Ninth task report 7/6/11
Tenth task report 8/5/11
Eleventh task report 9/6/11
Twelfth task report 10/7/11
Status As Of: February 23, 2011
ACTION TO DATE: On time. On 3/25/2009, a model home in the Glencairn Cottages community in Dunedin (Pinellas
County) was the first house to be certified at the gold level in the District and the state. As of February 24, 2011, 77
properties have been certified by this District. This includes the first two Residential Silver properties in Marion County's
On Top of the World Communities. Agreements: Builders who intend to incorporate FWS criteria in current or future
projects sign nonbinding participation agreements with the District. To date, 23 agreements have been signed,
representing approximately 518 homes and 3 commercial properties. Education: (1) A "Designing for Florida Water
StarSM Projects" workshop held on Jan. 12 at the Marion County Extension office in Ocala attracted 20 landscape and
irrigation professionals. (2) A meeting of the statewide FWS Technical Advisory Committee was held Feb. 8. (3) Staff
presented to the Hernando County Cattleman's Alliance on Feb. 26. Certifications: (1) The Habitat for Humanity for East
and Central Pasco County agreed to incorporate FWS into its "Women Build Week" home construction. The project's
groundbreaking ceremony took place on Feb. 26. Governing Board chair Ron Oakley and Withlacoochee River Basin
Board member, Candy Nathe attended. (2) The District's Tampa Service Office Building Two was certified on February
15 to the Commercial and Institutional criteria. This is the first District building to achieve FWS certification and the first in
any of the water management districts. The achievement will be recognized at the June Governing board meeting. (3) A
Citrus County builder in the Heritage community has signed an agreement to build all future homes to the FWS
residential criteria. The first home has been certified and a celebratory event is planned for March 10. (4) Florida Home
Partnership, Inc. will include FWS certification for all its homes in its newest subdivision, Bayou Pass in Hillsborough
County. Water savings: Kyra InfoTech in Lakeland was the first commercial property certified in the District. The City of
Lakeland's water utility has tracked water used by the office building since it was certified on March 11, 2010, and
recently produced a report that compares water use of this FWS property to a similar commercial property nearby. Over
a period of 10 months, the FWS property used 7,000 gallons of water compared to the similar property, which used
29,000 gallons.
011 - Alafia River Basin 107
B307
WMP - Maintenance, Updates, As Needed Peer Review and Outreach
- HillsboroughProject Type Basin Initiatives
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) Alafia River, Hillsborough River
Cooperator(s)
Project Manager ARNOLD, DAVE
Task Manager(s)
Status Ongoing
DescriptionThis is a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's
Watershed Management Program (WMP) in Hillsborough County. This process will be applied to watersheds where
the parameters and model(s) were developed or updated based on the District's Guidelines and Specifications (G&S)
and where parameters from Environmental Resource Permitting (ERP) submittals can be converted to the District's
GIS system until a model is developed. Funding will be required each year to continue maintenance. With proposed
funding the work of capturing watershed parameter changes resulting from approved ERPs, and updates to
topographic, soils and land use information will continue throughout the District. The funding will also support the peer
review and public outreach process on the preliminary floodplain results, and presenting the results to Governing
Board for approval.
BenefitsA WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and
natural systems, while achieving flood protection. The information developed assists local governments with their land
management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to
address level of service deficiencies. In addition, the information provides the District with the best available
information to evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. The most up to date
information about the watershed will be available through the continuous maintenance of watershed parameters in the
GIS database: as ERP permits are approved, new information is provided to the District through aerial topographic
mapping and the public review and comment period. If a watershed model has not been developed, the maintenance
of parameters in the GIS processes the information in a format that will save time and funding when the watershed is
modeled.
Costs
For FY2011 the funding distribution between the Governing Board, Alafia River, and Hillsborough River Basins is
outlined in the funding table. The budget is based on the projected number of approved ERP permits and the average
development area within each Basin. Any local government matching funds are equally matched by Governing Board
and Basin Board funds. The Governing Board is also providing funds specifically to address public meetings and
unforeseen issues with projecting the floodplains to be used in the FEMA mapping process.
Additional Information
A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed
Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters
and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.
After the Topographic Information, Watershed Evaluation and Management Plan elements are completed; the
watershed parameters and models require continuous maintenance to simulate the watershed's characteristics as the
land form changes. The watershed's parameters change with the continued growth experienced in the District. If
continued maintenance of the models is not performed, the watershed parameters and model will no longer represent
the system. This limits their value in the areas of ERP and flood protection programs.
A revenue agreement will be developed with each community contributing funds towards maintenance. The District
will manage the project and enter into purchase orders and agreements to accomplish project tasks. Future funding
will be required each fiscal year to continue maintenance of watershed parameters and models. In the future those
local governments with the technical abilities to perform the maintenance activities will be encouraged to manage this
effort. The District will provide funding assistance to communities that can and those that cannot provide matching
funds. Matching funds will be requested from the Federal Emergency Management Agency (FEMA) for this basin
initiative. Failure to provide ongoing maintenance will diminish the return on the investment the District has made in
their respective Watershed Management Plans.
011 - Alafia River Basin 108
B307
WMP - Maintenance, Updates, As Needed Peer Review and Outreach
- Hillsborough
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 136,295 0 (61,036) 87,264 32,221 77,846
011 Alafia River Basin 23,175 0 (70,216) 42,272 11,987 39,132
013 Hillsborough River Basin 97,970 0 (24,030) 44,223 36,889 40,888
$257,440 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: February 25, 2011
Maintenance is being undertaken to convert ERP information into electronic format for incorporation into watershed
models. Model maintenance requirements within Hillsborough County are also related to completion of model updates
under the Hillsborough County Model Update project (L099). District staff is coordinating with Hillsborough County staff to
initiate model maintenance as this becomes necessary.
011 - Alafia River Basin 109
B314
WMP - Maintenance, Updates, As Needed Peer Review and Outreach
- PolkProject Type Basin Initiatives
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River
Cooperator(s)
Project Manager TURNER, DAWN
WEVER, DONNA, MCCLUNG, GORDONTask Manager(s)
Status Ongoing
DescriptionThis is a basin initiative to fund the Maintenance of Watershed Parameters and Models element of the District's
Watershed Management Program (WMP) in Polk County. This process will be applied to watersheds where the
parameters and model(s) were developed or updated based on the District's Guidelines and Specifications (G&S) and
where parameters from Environmental Resource Permitting (ERP) submittals can be converted to the District's GIS
system until a model is developed. Funding will be required each year to continue maintenance. With proposed
funding the work of capturing watershed parameter changes resulting from approved ERPs, and updates to
topographic, soils and land use information will continue throughout the District. The funding will also support the peer
review and public outreach process on the preliminary floodplain results, and presenting the results to Governing
Board for approval.
BenefitsA WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality and
natural systems, while achieving flood protection. The information developed assists local governments with their land
management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to
address level of service deficiencies. The information also provides the District with the best available information to
evaluate adverse impacts and mitigation of floodplain impacts for proposed ERPs. In addition, as ERP permits are
approved, new information is provided to the District through aerial topographic mapping and the public review and
comment period. If a watershed model has not been developed, the maintenance of parameters in the GIS processes
will allow the ERP information to be captured in a format that will save time and funding when the watershed is
modeled. As a result, the most up to date information about the watershed will be available in the District's GIS
database.
Costs
The budget is based on the projected number of approved ERP permits and the average development area within
each Basin. $20,000 in revenue was received from Polk County in FY2006, FY2007 and FY2008, (refer to B206
funding description). Due to County budget constraints, revenue funds will not be provided in FY2009, FY2010, or
2011. Revenue funds provided by Polk County in prior fiscal years are equally matched by Governing Board and Basin
Board funds. For FY2010 the funding distribution for Polk county is as follows: Governing Board $147,771; Alafia River
Basin $22,364; Hillsborough River Basin $2,023; and Peace River Basin $76,993. $20,000 in revenue was received
from Polk County in FY2006, FY2007 and FY2008, (refer to B206 funding description).For FY2011 the funding
distribution for Polk county is as follows: Governing Board $132,994; Alafia River Basin $20,128; Hillsborough River
Basin $1,820; and Peace River Basin $69,294. The Governing Board is also providing funds specifically to address
public meetings and unforeseen issues with projecting the floodplains to be used in the FEMA mapping process.
Future funding represents an annual cost to continue maintenance. Funding by Polk County may resume in 2012. A
projected annual funding amount from Polk County of $20,000 has been incuded in the funding table.
Additional Information
A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed
Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters
and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.
After the Topographic Information, Watershed Evaluation and Management Plan elements are completed; the
watershed parameters and models require continuous maintenance to simulate the watershed's characteristics as the
land form changes. The watershed's parameters change with the continued growth experienced in the District. If
continued maintenance of the models is not performed, the watershed parameters and model will no longer represent
the system. This limits their value in supporting the District's Resource Regulation and flood protection programs. A
revenue agreement will be developed with each community contributing funds towards maintenance. The District will
manage the project and enter into purchase orders and agreements to accomplish project tasks. Future funding will
be required each fiscal year to continue maintenance of watershed parameters and models. In the future those local
governments with the technical abilities to perform the maintenance activities will be encouraged to manage this effort.
011 - Alafia River Basin 110
B314
WMP - Maintenance, Updates, As Needed Peer Review and Outreach
- PolkThe District will provide funding assistance to communities that can manage maintenance; and accept cooperative
funding from those that cannot. Matching funds will also be requested from the Federal Emergency Management
Agency (FEMA) for this basin initiative. Failure to provide ongoing maintenance will diminish the return on the
investment the District has made in their respective Watershed Management Plans.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 255,340 0 (52,859) 149,773 24,176 134,250
011 Alafia River Basin 43,163 0 (9,857) 23,597 8,039 21,384
013 Hillsborough River Basin 11,944 0 (2,427) 3,256 8,039 3,076
020 Peace River Basin 98,538 0 (64,894) 78,226 13,399 71,807
Project Funds Not Budgeted by the
District
Polk County 140,000 120,000 0 0 20,000 0
$548,985 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: January 31, 2011
Polk Co. Maintenance: Previously performed under Projects B723 and B206. The Cooperative Funding Agreement with
Polk County (2006REV0008) was executed on December 2, 2005. A total of $120,000 was encumbered ($40,000 in
FY2006, $40,000 in FY2007, and $40,000 in FY2008) for continued maintenance of Polk County's WMPs. ERP data for
the Gator Creek and Itchepackesassa Creek watersheds was collected, and model maintenance was completed for the
Itchepackesassa Creek watershed. Maintenance of the Gator Creek watershed model was postponed, because
completing watershed models for other areas of Polk County became a higher priority. B314 funds are also being used to
retain Peer Review consultants to review deliverables for the following Watershed Management Plans: Christina;
Itchepackesassa Creek; Upper Peace River - Homeland; Peace Creek, and Polk City. Polk County was unable to fund
this project in 2009, 2010, and 2011. In addition, remaining matching funds from previous years are no longer available.
Consequently, the revenue agreement with Polk County will be allowed to expire, and unused revenue funds will be
releases.
011 - Alafia River Basin 111
B620
Mapping & GIS Spatial Data Management
Project Type Basin Initiatives
AORs Strategic InitiativesWater Supply Regional Water Supply PlanningWater Quality Water Quality MonitoringFlood Protection Floodplain ManagementNatural Systems Natural Systems Identification and Monitoring
Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,
Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager DICKS, STEVE
DICKS, STEVETask Manager(s)
Status Ongoing
DescriptionThis is a continuing initiative with the goal of providing Geographic Information System (GIS), aerial photo
interpretation and photogrammetric mapping services to support Governing and Basin Board activities. GIS support
includes the input, management, analysis and distribution of spatial data, the design and implementation of databases,
software training and map production. Aerial photo interpretation includes land use and cover mapping in support of
land acquisition, Surface Water Improvement and Management (SWIM), engineering, planning and environmental
studies. Photogrammetric support includes the mapping of topographic information, collection of aerial photographs
and satellite imagery and the production of digital orthophotographs. This program also supports the distribution of
data to the public and routine maintenance activities. The annual budget includes administrative costs for salaries,
travel, training, plotting and photographic supplies, maps and other data purchases, etc.
BenefitsMapping and GIS has been a continuing activity since 1987 and is required to support the District's GIS, digital
orthophoto, aerial mapping and other data collection, maintenance and management activities. The District's GIS
database is an integral component of planning, engineering, regulatory, and land acquisition and management
activities. In a rapidly growing area such as the District, continued maintenance and expansion is needed for the GIS
database to meet new demands and is required to protect the historical investment in the system. The data are
currently accessed by over 450 District staff using the ArcGIS software, and serves as the foundation for the Water
Management and Land Resources Information Systems. Additionally, the data collected by the Mapping and GIS
Section are viewable and downloadable from the District's Internet web site.
Costs
In addition to salaries, plotting or printing supplies, office supplies and travel or training the approved FY2011 budget
for the Governing Board funding includes: Administrative Assistant Contractor ($30,633), GIS Programming
Contractor ($220,000), Parcel Updates $48,000). Funding in the Basin Boards is for salaries only.
011 - Alafia River Basin 112
B620
Mapping & GIS Spatial Data Management
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 2,834,805 0 (604,911) 1,813,247 733,039 893,430
011 Alafia River Basin 106,642 0 0 64,754 11,633 30,255
013 Hillsborough River Basin 107,117 0 0 65,229 11,633 30,255
014 Northwest Hillsborough Basin 36,559 0 0 36,559 0 0
015 Coastal Rivers Basin 106,642 0 0 64,754 11,633 30,255
016 Pinellas-Anclote River Basin 108,542 0 0 66,654 11,633 30,255
019 Withlacoochee River Basin 108,542 0 0 66,654 11,633 30,255
020 Peace River Basin 110,917 0 0 69,029 11,633 30,255
021 Manasota Basin 114,502 0 0 72,614 11,633 30,255
$3,634,268 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
The following are major activities for FY2011Transfer GIS Contractor Funds to IRD and Fill Position 10/30/10
Issue work order for parcel update. 12/30/10
Status As Of: January 11, 2011
Mapping and GIS is an ongoing support activity and to date there were no unforeseen expenditures or activities in
FY2011. The section will continue supporting ad hoc requests for GIS data as well as conducting routine data
maintenance activities. Significant activities recently completed or underway include:
Staff has successfully coordinated its FY2011 Parcel Mapping efforts with the other water management districts. This will
result in a more consistent database that covers the entire state. The new dataset will also be available to state and
federal agencies to support emergency response activities.
Mapping and GIS has completed the initial version of the Waterbody Names Database. The database will be integrated
with the federal Geographic Names Information System (GNIS) were applicable.
Staff in the process of moving all imagery data from the Oracle database servers to the ESRI Image Server environment.
This will reduce the load on the Oracle servers and improve business continuity efforts.
ACCELERATE FLORIDA ACTION-TO-DATE: On-Time. The GIS and WMIS Contract Programming Funds ($440,000)
have been transferred to the Information Resources Department and have been encumbered to a private firm to provide
onsite GIS programming Services.
011 - Alafia River Basin 113
B630
Field Operations - Basin 11 Maintenance of District Works
Project Type Basin Initiatives
AORs Strategic InitiativesFlood Protection Emergency Flood ResponseNatural Systems Minimum Flows and Level Establishment and Monitoring
Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,
Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager HAGBERG, JEFFREY
HINKLE, RANDY, HANGE, ADAM, MARTIN, MIKETask Manager(s)
Status Ongoing
DescriptionAnnual field maintenance activities for this basin are for maintenance of District water control structures and well sites
which include mowing, painting, tree trimming, and fence repair. Various types of well sites include groundwater
sampling wells, data collection wells, and rainfall wells/gauges. Additional requirements at both water control structures
and well sites include erosion control, slope stabilization, fencing, along with road, culvert and channel maintenance.
These maintenance areas are District owned, but were not acquired using Save Our Rivers (SOR), P2000, and
Forever Florida funds. Currently there are two water control structures and 20 well sites to maintain. The largest asset
is Medard Park Reservoir which requires mowing approximately 50 acres per cycle. The berm banks are steeply
sloped and require special maintenance equipment.
BenefitsKeeping Medard Reservoir and the water control structure clear and maintained are required to maintain the designed
flow capacity. Well sites are maintained for Hydrologic Data and Resource Data crews to collect data easily and in a
safe manner. In addition, repairs as necessary for erosion control and slope stabilization at canals and water control
structures are accomplished with the use of materials such as rip-rap rock and filter fabric. In addition, maintenance
requirements at well sites include materials for road stabilization and fencing repairs.
Costs
The budget includes salaries, central garage charges, rental equipment, parts, supplies, landfill disposal fees, land
maintenance materials (limerock, shell, rock, and fill), and fencing repairs. Included in the costs for FY2011 and
FY2012 are $20,000 for contracted fencing repairs and contracted mowing. For FY2012 $25,000 is requested for
consulting services for wetland monitoring services during the refilling of the reservoir.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 6,078,169 0 127,000 4,949,751 512,730 488,688
011 Alafia River Basin 778,459 0 125,000 470,636 105,678 77,145
013 Hillsborough River Basin 4,890,744 0 600,000 3,474,676 394,761 421,307
014 Northwest Hillsborough Basin 251,043 0 0 251,043 0 0
015 Coastal Rivers Basin 592,579 0 0 435,189 89,466 67,924
016 Pinellas-Anclote River Basin 1,372,044 0 0 974,842 197,602 199,600
019 Withlacoochee River Basin 1,606,297 0 107,000 1,168,108 183,743 147,446
020 Peace River Basin 2,184,387 0 347,000 1,541,046 152,172 144,169
021 Manasota Basin 370,677 0 0 291,922 42,870 35,885
$18,124,399 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 114
B630
Field Operations - Basin 11 Maintenance of District Works
Status As Of: February 18, 2011
Field Operations crews completed site visits for mowing and spraying of well sites, and water control structures as
needed.
011 - Alafia River Basin 115
B670
Flood Control & Water Conservation - Inspections, Operations &
Maintenance of District StructuresProject Type Basin Initiatives
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementFlood Protection Emergency Flood ResponseWater Supply Alternative Water SupplyNatural Systems Minimum Flows and Level Establishment and Monitoring
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River
Cooperator(s)
Project Manager CRANE, DAVID
GANUN, JIM, BARTLETT, MIKETask Manager(s)
Status Ongoing
DescriptionThe B670 budget reflects costs for the inspection, maintenance, and operation of District water control structures. The
Medard Dam and Reservoir provides flood control, ground water recharge and recreation. It is an earth-fill type dam
with a length of 6,030 feet, a height of 28 feet at the top elevation of 70 feet NGVD. The reservoir was formed by the
damming of the prong of the Little Alafia River. At the normal pool elevation of 60 feet NGVD it has a surface area of
770 acres and a storage volume of 8,300 acre-feet. Structure Operations is responsible for the water control structure
within the earthen berm. The structure includes two gates, an environmental gate, to allow release of the stream flow
to Turkey Creek and an 18x18 drawdown gate to facilitate controlling water levels in the reservoir during an event. In
early 2010, the drawdown gate will be replaced in conjunction with the lowering of the reservoir for berm
reinforcement. The environmental gates will also be reconditioned as required by Structure Operations staff. District
staff, in conjunction with its consultant, identified several specific projects, developed a dam breach model and
prepared an Emergency Action Plan for the Medard Reservoir. These efforts also identified several potential
opportunities for enhancing the safe operation of the facility. The District received two awards in 2004 for the Medard
Reservoir rehabilitation effort: 2004 Contractor of the Year Award from the American Public Works Association and the
2004 SE Regional Award of Merit from the Association of Dam Safety Officials. See Activity B189 for a description and
budgetary details related to the Medard Reservoir Rehabilitation Project. In 2009, Structure Operations completed the
installation and testing of three emergency sirens. The sirens are tested monthly. In 2004, the Scott Lake Structure,
near Lakeland, and formerly in the Peace River Basin, became the second structure in the Alafia River Basin when
boundaries were modified to more correctly match hydrologic boundaries.
BenefitsDistrict Structure Operations involves three areas of responsibility: inspections, maintenance (including construction
and repair), and operation. A comprehensive structural/operational inspection program of water control structures, both
above and below water, is required to discover deficiencies related to human safety (both public and District
personnel), operational viability, and structural integrity of the structures. The objectives and benefits of the District's
inspection program, and Structure Operations activities in general, are: (1) early discovery of structural/operational
deficiencies and maintenance problems deficiencies, thereby forestalling costly repairs; (2) to find and mitigate safety
hazards to District personnel and the public; (3) to prevent/preempt structure failure with thorough, regular inspections,
thereby reducing the potential for loss of life and property; and, (4) to comply with applicable state/federal regulations
and guidelines for inspection, operation and maintenance of water control structures. The program has one full-time
inspector, who performs routine monthly inspections and is responsible for inspection reporting. The District also uses
engineering consultants for inspection services on the more critical structures on a two-year rotational basis. Structure
Operations section work orders are generated from inspection reports and the section's Five-Year Plan. Structure
Maintenance activities range from routine servicing and replacement of equipment, to repair and construction of water
control structures, to perform gate operations under established guidelines in response to developing weather events.
The Structure Operations section is additionally responsible for monitoring water levels and rainfall totals across the
District, and directing structure gate operations which are accomplished either manually or by remote control. Over the
last five years, Structure Operations has automated 32 structures with remote control capabilities. Water level and
rainfall data is received via the Supervisory Control and Data Acquisition (SCADA) system. The automated structure
gates can then be operated from a laptop computer using the SCADA program. The move to remote control structures
greatly increases operational efficiency, flexibility, and safety factors. Remote control also decreases response time,
which also has reduced the number of complaints received related to water levels and flood management. Current
plans are to automate up to approximately half of all District structures with remote control capabilities.
Costs
The FY2012 proposed budget includes costs for the Emergency Action Plan update, funding for the emergency
011 - Alafia River Basin 116
B670
Flood Control & Water Conservation - Inspections, Operations &
Maintenance of District Structuresnotification system, consultant cost for piezometer data review, and costs associated with communication and electric
utilities to operate the structure.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 2,982,366 0 (6,501) 2,248,670 344,129 396,068
011 Alafia River Basin 1,667,629 0 0 1,439,770 112,228 115,631
013 Hillsborough River Basin 8,298,460 0 (600,000) 7,211,023 861,292 826,145
014 Northwest Hillsborough Basin 2,181,176 0 52,000 2,129,176 0 0
015 Coastal Rivers Basin 81,641 0 0 79,039 1,304 1,298
016 Pinellas-Anclote River Basin 2,089,494 0 (2,166,986) 3,926,304 161,648 168,528
019 Withlacoochee River Basin 3,996,567 0 (107,000) 3,274,918 402,611 426,038
020 Peace River Basin 2,479,469 0 (347,000) 2,429,613 198,142 198,714
$23,776,802 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: March 01, 2011
Operation, maintenance and monitoring of the Medard structure continues; this is the first Viper radio installation for
STROPS and is expected to be running and tested by 6-30-11.
011 - Alafia River Basin 117
B726
Education - Adopt-A-Pond Program in Hillsborough County
Project Type Basin Initiatives
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementFlood Protection Floodplain ManagementWater Supply ConservationNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River
Hillsborough County BOCCCooperator(s)
Project Manager STERNBERGER, VIRGINIA
Task Manager(s)
Status Proposed
DescriptionThis Basin Initiative program restores pond treatment and flood protection functions while reducing stormwater
pollution and increasing habitat. Program goals include enlisting citizen volunteers to help restore stormwater ponds,
reducing litter, marking storm drains and increasing citizens' awareness of their impact on stormwater ponds.
Participants learn about the program through county staff referral and public outreach. FY2012 proposed program
components include pond management (pond site visits, education meetings, pond adoptions and pond cleanups),
youth education, a quarterly newsletter, stormdrain markings, pond walks and education at special events.
Effectiveness will be measured by pre- and posttests, number of participants, activities accomplished and pond
inspections at the beginning and end of each pond adoption. Follow-up inspections will determine the condition of the
pond and if recommended management practices have been adopted.
BenefitsStaff considers this project core to District outreach efforts for water quality in Hillsborough County. Approximately
5,500 Hillsborough County residents will receive watershed education through program components. As a result,
participants will engage in specific behaviors leading to improved water quality, better maintained ponds and reduced
pollution sources (e.g., trash, fertilizer).
Costs
The total proposed cost of the FY2012 project is $165,369, with the District requested to contribute $50,000 (Alafia
River $16,667; Hillsborough River $33,333) reflecting no increase from FY2011. District funds will pay for pond
management, youth education, a newsletter, pond walks, stormdrain marking events and outreach at special events.
The dollar amount allocated per basin is determined by the amount of work projected to occur within the basin. The
program is projected to reach 5,500 residents at a cost to the District of approximately $3 per contact hour and $9 per
person reached, which falls within an acceptable range for FY2012 Public Education projects. Budget lines below
include costs for staff to manage the project.
Additional Information
The total cost of the FY2011 project is $165,369, with the District contributing $50,000 (Alafia River $16,667;
Hillsborough River $33,333). The funds are allocated toward pond management, youth education, a newsletter and
outreach at special events. The dollar amount allocated per basin is determined by the amount of work projected to
occur within the basin. The program is projected to reach 5,260 residents at a cost to the District of $9.50 per person.
Budget lines below include costs for staff to manage the project.
011 - Alafia River Basin 118
B726
Education - Adopt-A-Pond Program in Hillsborough County
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 34,801 0 0 0 17,434 17,367
013 Hillsborough River Basin 68,222 0 0 0 34,140 34,082
Project Funds Not Budgeted by the
District
Hillsborough County 768,139 0 0 768,139 0 0
$871,162 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2008 Budgeted FundsInitiate purchase order 10/1/07 10/31/07 10/31/07
First task report due 12/31/07 12/18/07
Second task report due 3/31/08 3/31/08
Third task report due 6/30/08 6/9/08
Fourth task report due 9/15/08 9/30/08 9/30/08
Quarterly newsletter 9/15/08 9/15/08
Pond management 9/15/08 9/15/08
Officer Snook/Stormwater Ecologist 9/15/08 9/15/08
Special events 9/15/08 9/20/08 9/20/08
Additional outreach, communication & education 9/15/08 9/15/08
FY2009 Budgeted FundsInitiate purchase order 10/1/08 11/25/08 11/25/08
First task report due 12/31/08 12/31/08
Second task report due 3/31/09 3/31/09
Third task report due 6/30/09 6/30/09
Fourth task report due 9/30/09 9/30/09
Quarterly newsletter 9/30/09 9/30/09
Pond management 9/30/09 9/30/09
Officer Snook/Stormwater Ecologist 9/30/09 9/30/09
Special events 9/30/09 9/30/09
Additional outreach, communication & education 9/30/09 9/30/09
FY2010 Budgeted FundsInitiate purchase order 10/1/09 10/30/09 10/30/09
First task report due 12/31/09 12/30/09
Second task report due 3/31/10 2/12/10
Third task report due 6/30/10 6/30/10
Fourth task report due 9/15/10 9/30/10 9/30/10
Pond management 9/15/10 9/30/10 9/30/10
Quarterly newsletter 9/15/10 9/15/10
Officer Snook/Stormwater Ecologist 9/15/10 9/30/10 9/30/10
Special events 9/15/10 9/30/10 9/30/10
Additional outreach, communication & education 9/15/10 9/15/10
Project close 9/30/10 12/31/10 12/31/10
FY2011 Budgeted FundsInitiate purchase order 10/1/10 12/23/10 12/21/10
First task report due 12/31/10 12/31/10
Second task report due 3/31/11
Third task repord due 6/30/11
011 - Alafia River Basin 119
B726
Education - Adopt-A-Pond Program in Hillsborough County
Fourth task report due 9/30/11
Status As Of: February 21, 2011
ACTION TO DATE: On time. The cooperator distributed the winter newsletter (reaching 5,500 residents), held 4 Pete the
Pelican Pirate presentations (135 students); conducted 4 stormdrain marking events (28 participants) marking 368 storm
drains, 3 pond education meetings (35 participants), 4 AAP committee meetings (49 participants), 12 pond evaluations
(reaching 29 participants), 5 pond plantings (utilizing 36 volunteers), 1 pond cleanup and 6 pond walks (reaching 22
participants); attended 3 special events (reaching 162 participants); and held 23 Stormwater Ecologists presentations
(reaching 424 students).
011 - Alafia River Basin 120
B730
FFL - Polk County
Project Type Basin Initiatives
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply ConservationNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Peace River
Polk County Cooperative Extension ServiceCooperator(s)
Project Manager DURELL, SYLVIA
Task Manager(s)
Status Proposed
DescriptionThis Basin Initiative (BI) project will provide specific education on Florida-Friendly LandscapingTM (FFL) in Polk
County to these target audiences: (1) Homeowners will learn how to make appropriate plant choices for their area;
how to apply the correct amount of supplemental water for their turf and landscape plants; how to use the correct
fertilizers; and how to apply fertilzer at appropriate rate to prevent polluted runoff. (2) Youth/students will learn what
they and their families can do to conserve water and protect water quality. (3) Builders and developers will learn that
the water conservation and water quality protection acheived through FFL can be a selling point and a marketing tool
and how FFL can meet the needs of their clients as well as protect the environment. In addition, the coordinator will
provide assistance to the Florida Water StarSM program. Effectiveness will be measured by the number of
participants in workshops, one-on-one interactions, and school visits; potential exposure to electronic media; and
distribution of printed education materials.
BenefitsIn past years, approximately 27,000 people have received education annually at presentations, workshops and
exhibits, and through one-on-one interactions and printed education materials. In addition, each year approximately 3.5
million people are exposed to education through mass media outlets, such as newspaper articles, web media and
county government television programming. Education increases knowledge and promotes behavior change in
landscaping practices resulting in conservation of water and protection of water quality and natural systems.
Costs
The total proposed cost of the FY2012 program is $102,416, with the District requested to contribute $51,208 (Alafia
River $6,657; Hillsborough River $8,193; Peace River $36,358). Program costs have remained stable since FY2009.
The dollar amount allocated per basin is determined by the number of residents projected to participate in the
programming from each basin. District funds support salary and benefits for the coordinator and provide program and
travel expenses. The program is projected to reach 27,000 Polk County residents at a cost to the District of
approximately $1.89 per person. The budget lines below include costs for staff to manage the project.
Additional Information
The total cost of the FY2011 program is $102,416, with the District contributing $51,208 (Alafia River $6,657;
Hillsborough River $8,193; Peace River $36,358). The District has funded this program since 2002. Education is
based on the nine FFL principles that were created by the University of Florida/Institute of Food and Agricultural
Sciences: Right Plant, Right Place, Water Efficiently, Fertilize Appropriately, Mulch, Attract Wildlife, Manage Yard
Pests Responsibly, Recycle, Reduce Stormwater Runoff and Protect the Waterfront. The following outreach was
accomplished in FY2010: 20 workshops/presentations reaching 504 people; 7 events for 5,105 youth; 27 exhibits
attracting 4,542 people 4,134 telephone/email and mail contacts contacts; 13,148 pieces of educational literature
distributed; newsletter and newspaper articles creating 1,038,985 impressions; 234,000 website visits and 761 hours
contributed by volunteers.
011 - Alafia River Basin 121
B730
FFL - Polk County
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 14,952 0 0 0 7,488 7,464
013 Hillsborough River Basin 19,640 0 0 0 9,832 9,808
020 Peace River Basin 75,989 0 0 0 38,016 37,973
Project Funds Not Budgeted by the
District
Polk County 82,068 0 0 0 0 82,068
$192,649 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2008Purchase order issued 10/1/07 10/2/07
First task report 1/31/08 1/31/08
Second task report 4/30/08 4/18/08
Third task report 7/31/08 7/31/08
Project complete 9/30/08 9/30/08
Fourth task report 10/31/08 10/2/08
FY2009Purchase order issued 10/1/08 11/15/08 11/18/08
First task report 2/2/09 2/2/09
Second task report 4/30/09 4/13/09
Third task report 7/31/09 7/31/09
Project complete 9/30/09 9/30/09
Fourth task report 10/30/09 10/30/09
FY2010Purchase order issued 10/12/09 11/17/09
First task report 1/29/10 1/29/10
Second task report 4/30/10 4/9/10
Third task report 7/30/10 7/30/10
Project complete 9/30/10 9/30/10
Fourth task report 10/29/10 10/1/10
FY2011Purchase order created 10/1/10 10/1/10
First task report 1/31/11 3/15/11 3/9/11
Second task report 4/29/11
Meeting with project manager 6/21/11
Third task report 7/29/11
Project complete 9/30/11
Fourth task report 10/31/11
Status As Of: February 25, 2011
ACTION TO DATE: On time. The following outreach was accomplished by the Polk County FFL coordinator, Anne
Yasalonis, in the first task period of FY2011: 4 workshops/presentations reaching 99 people; 4 exhibits attracting 840
people; 1,050 pieces of educational literature distributed; newsletter and newspaper articles resulting in 4,015
readers;51,612 website visitors and 112 hours contributed by volunteers. The "Spring Obsession" event will be held Sat.,
Mar. 12, from 9:00 a.m. to 4:00 p.m. at Munn Park in Lakeland. The FFL coordinator will provide a workshop on rain
barrels and FFL and rain barrels will be sold at the event.
011 - Alafia River Basin 122
B738
FFL - HOA Outreach Hillsborough/Polk
Project Type Basin Initiatives
AORs Strategic InitiativesWater Supply ConservationWater Quality Water Quality Maintenance and ImprovementNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Peace River
Cooperator(s)
Project Manager DURELL, SYLVIA
Task Manager(s)
Status Proposed
DescriptionThis Basin Initiative (BI) project will provide specific education on Florida-Friendly LandscapingTM
(FFL) in Hillsborough and Polk Counties to these targeted audiences in FY2012: (1) Members of HOA/COA boards of
directors, landscaping committees and architectural review boards will learn about FFL and the Green Industry-Best
Management Practices (GI-BMPs) and receive information on SB2080 and SB 494. (2) Property managers will receive
information on SB 2080 and SB494 and how to incorporate FFL in vendor contracts. (3) Homeowners will learn about
FFL. (4) Landscaping professionals will be provided with information on GI-BMPs and SB2080 and SB494. In addition,
the coordinator will be available to provide advice to participants of Florida Water StarSM projects. Effectiveness will
be measured by reported changes to landscapes and irrigation systems, tracking the amount of water saved as a
result of the outreach and number of people reached. Outreach includes presentations, workshops, one-on-one
interactions and site visits.
BenefitsIn past years, approximately 8,000 decision-makers for homeowner and community associations have received
education annually through workshops, presentations,one-on-one interactions and at site visits. In FY2012, outreach
will emphasize how changes in landscape practices can protect water resources while still creating and maintaining
attractive and desirable properties. Water savings in common grounds have been documented through water use
comparisons at several properties, including 14.6 million gallons of water in 20 months at Brockton Place in
Hillsborough County and 30,000 gallons over one year at West View Ridge in Polk County. The water savings
occurred through replacement of high-volume irrigation with microirrigation systems, detection and repair of leaky or
inefficient systems, planting the right plant in the right place, commitment to following watering restrictions and
watering only when needed.
Costs
The total proposed cost of the FY2012 program is $72,660 and the District is requested to contribute $45,000 (Alafia
River $9,000, Hillsborough River $26,100, Peace River $9,900). Program costs have remained stable since FY2006.
The dollar amount allocated per basin is determined by the number of residents projected to participate in the
programming from each basin. District funds support salary and benefits for the coordinator. An office, computer,
supervision and transportation for the coordinator is provided by the Hillsborough County Extension office. The
program is projected to reach 8,000 HOA board members and residents and landscape professionals at a cost to the
District of approximately $5.62 per person. The higher-than-average cost per person is justified because of the
influential audience and the more direct opportunity to affect behavior change. The budget lines below include staff
time to manage the project.
Additional Information
The total cost of the FY2011 program is $72,660, with the District contributing $45,000. Maria Carver became the FFL
HOA Outreach Coordinator on Oct. 11, 2010. The following outreach was accomplished by the program in FY2010: 14
presentations attracting 562 people; 24 site visits; 3,397 telephone/email and mail contacts; 4 meeting involving 29
HOA board members; 2,959 web site visits and 1,782 pieces of educational materials distributed. Education is based
on the nine FFL principles that were created by the University of Florida/Institute of Food and Agricultural Sciences
(UF/IFAS): Right Plant, Right Place, Water Efficiently, Fertilize Appropriately, Mulch, Attract Wildlife, Manage Yard
Pests Responsibly, Recycle, Reduce Stormwater Runoff and Protect the Waterfront.
011 - Alafia River Basin 123
B738
FFL - HOA Outreach Hillsborough/Polk
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 19,649 0 0 0 9,842 9,807
013 Hillsborough River Basin 53,849 0 0 0 26,942 26,907
020 Peace River Basin 21,449 0 0 0 10,742 10,707
$94,947 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
2010Purchase order created 10/11/09 11/4/09 11/4/09
First task report 1/29/10 1/29/10
Second task period report 4/30/10 4/28/10
Third task report 7/30/10 7/13/10
Project complete 9/30/10 9/30/10
Fourth task report 10/29/10 10/11/10
FY2011Purchase order created 10/6/10 10/6/10
First task report 1/31/11 1/31/11
Project manager meeting 4/17/11
Second task report 4/29/11
Third task report 7/29/11
Project complete 9/30/11
Fourth task report 10/31/11
Status As Of: March 03, 2011
ACTION TO DATE: On time. The following outreach was accomplished by the FFL HOA outreach coordinator Maria
Carver in the first task period of FY2011: 6 presentations attracting 57 people; 16 site visits; 202 telephone/email and
mail contacts; 6 exhibits attracting 38,900 people and 1,525 pieces of educational materials distributed. After Carver
conducted a site visit for Radison I HOA board members, the board decided to implement the coordinator's suggestions
for improving drainage and landscape design. By taking the coordinator's suggestions, the HOA should save
approximately $5,000 on the job estimate the board received from a vendor.
011 - Alafia River Basin 124
G003
Aquatic Plant Management - Agreement with FWC to Control Major
Waterways DistrictwideProject Type Basin Initiatives
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementFlood Protection Floodplain ManagementNatural Systems Natural Systems Conservation and Restoration
Basin(s) General Fund (District), Alafia River
Citrus County, Florida Fish and Wildlife Conservation CommissionCooperator(s)
Project Manager NELSON, BRIAN
Task Manager(s)
Status Ongoing
DescriptionThe District cooperates with The Florida Fish and Wildlife Conservation Commission (FWC) pursuant to an existing
ten-year agreement to manage troublesome aquatic plant populations on public waters within the District. District costs
are reimbursed 100% by FWC and Citrus County. Note: This is an ongoing maintenance project.
BenefitsUnmanaged infestations of the rapidly growing exotic species hydrilla, waterhyacinth and waterlettuce cause jams on
bridges and other structures reducing natural river flows during flood periods, they hinder navigation and recreational
uses, reduce and damage beneficial native plant communities impacting fish and wildlife habitat and water quality.
Costs
The budget for implementing the Cooperative Aquatic Plant Control Program with the Florida Fish and Wildlife
Conservation Commission (FWC) includes salaries/wages, herbicides, contracted harvesting services and overtime.
Central garage charges and overhead/indirect costs are not included. A total of $662,528 was budgeted in FY2009,
$641,072 in FY2010 and the proposed budget for FY2011 is $602,439. District expenditures for this project are
reimbursed 100% by FWC. The future funds identified for the project are contingent upon approval of such amounts
by the District Basin and Governing Boards in the annual budget(s).
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) (580,985) 0 200,000 (652,382) (65,094)(63,509)
011 Alafia River Basin 2,211 0 0 0 2,211 0
019 Withlacoochee River Basin 19,100 0 0 19,100 0 0
District Budgeted - Outside Revenue
Aquatic Weeds - Citrus County 120,000 0 0 80,000 20,000 20,000
Aquatic Weeds - Hernando County 239,000 0 0 217,000 0 22,000
FL Fish & Wildlife - Aquatic Weeds 5,370,406 0 0 4,258,300 462,106 650,000
Sumter Co - Aquatic Weeds 78,000 0 0 78,000 0 0
$5,247,732 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Ten year agreement with FWC (DEP) 7/31/02 8/8/02
FY04/05 Annual DEP Task Assignment 7/1/04 6/29/04
FY05/06 Annual DEP Task Assignment 7/1/05 6/30/05
011 - Alafia River Basin 125
G003
Aquatic Plant Management - Agreement with FWC to Control Major
Waterways DistrictwideFY06/07 Annual DEP Task Assignment 7/1/06 6/28/06
FY07-08 Annual DEP Task Assignment 7/1/07 7/2/07
FY08-09 Annual Task Assignment 6/30/08 6/17/08
FY09-10 Annual Task Assignment 7/1/09 7/3/09
Status As Of: January 07, 2011
Annual Florida Fish and Wildlife Conservation Commission (FWC) task assignment for FY10-11 was executed on June
30, 2010. A total of $912,652.00 has been allocated by FWC to the District to manage noxious aquatic plants on District
waters. Work has begun on all of the 25 waterbodies managed. Task assignment work orders have been approved as
necessary to adjust the plant species listed and approved control control methods. The District has begun using a new
software system provided by FWC to submit weekly work schedules and monthly invoices.
011 - Alafia River Basin 126
G004
Aquatic Plant Management - Treatment for Aquatic Plants Within
Flood Control CanalsProject Type Basin Initiatives
AORs Strategic InitiativesFlood Protection Emergency Flood Response
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River
Cooperator(s)
Project Manager NELSON, BRIAN
Task Manager(s)
Status Ongoing
DescriptionAnnual maintenance of aquatic and ditchbank vegetation on the Medard Reservoir Dam, rip-rap areas, the outflow
canal and associated fencelines. This is an ongoing maintenance project.
BenefitsExcessive populations of aquatic and ditchbank vegetation have the potential to negatively impact the flow capacity of
the Medard Reservoir water control structure. Vegetation growing on the dam and rip-rap areas can negatively impact
the integrity of these structures as well as interfere with recreational use and aesthetics. Fence lines are also treated
for aesthetic purposes and to prolong the life of the fence.
Costs
The budget for aquatic plant management operations within the Alafia River Basin includes Salaries/wages, herbicides
and central garage charges. The amount budgeted for FY2009 was $3,178. The current year budget is $2,951 and the
proposed FY2011 budget is $2,525. The future funds identified for the project are contingent upon approval of such
amounts by the District Basin and Governing Boards in the annual budget(s).
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 2,211 0 0 0 2,211 0
011 Alafia River Basin 55,436 0 0 46,766 5,610 3,060
013 Hillsborough River Basin 954,990 0 0 757,283 95,362 102,345
014 Northwest Hillsborough Basin 323,159 0 0 323,159 0 0
015 Coastal Rivers Basin 2,064 0 0 0 2,064 0
016 Pinellas-Anclote River Basin 71,085 0 0 63,118 5,170 2,797
019 Withlacoochee River Basin 427,016 0 0 385,947 20,848 20,221
020 Peace River Basin 197,678 0 0 176,712 7,382 13,584
$2,033,639 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: February 23, 2011
No vegetation work was conducted this period.
011 - Alafia River Basin 127
P259
Education - Youth Water Resources Education Program
Project Type Basin Initiatives
AORs Strategic InitiativesWater Quality Water Quality MonitoringWater Supply ConservationNatural Systems Natural Systems Identification and MonitoringFlood Protection Floodplain Management
Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,
Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager HULL, MARY MARGARET
TORRUSIO, MARY, KUSHMER, KAYLIE, UNSER, SALLYTask Manager(s)
Status Proposed
DescriptionThis Basin Initiative proposes funding for a variety of water resources education programs to county school districts,
private schools, homeschool groups and nonformal educators. Program components will consist of teacher training
workshops, grants for classroom projects, field trips, online curriculum tools and publications for students and
educators. Teacher workshops will be conducted by District staff and/or educators who have been trained by District
staff. Workshops will include information about the District and the basins, as well as basic hydrology and water
management issues. Training sessions will provide teachers with background information, materials, experiences and
opportunities to explore topics of importance in the basin. Participants will evaluate the effectiveness of teacher
workshops, providing another method of improving performance. The Splash! school grant program would provide
funds to teachers for classroom projects on water quality, water conservation, alternative sources, water supply or
watersheds. The proposed program's goal is to provide hands-on water education that teaches students about their
local watersheds and the freshwater resources within them. Classroom projects will be designed to increase
knowledge and understanding of the impacts of human activities on the water resources in their basin and to effect
behavior change in regard to water resources conservation and protection. Outcomes will be assessed
through teacher/student contact hours learning about water resources, pre- and post-assessment scores, sample
student work generated from the project, video or photographic documentation, and final reports by teachers and
representative students. Grant recipients are required to participate in annual sharing days, which provide an
opportunity for school grant participants to showcase their projects and provide model programs for other teachers
who would like to implement water projects in their classrooms. Publications and online curriculum tools will provide
teachers and students with a variety of educational resources including student newsletters and curricula with
accompanying teacher's guides, watershed excursions, coloring activity sheets, posters, bookmarks, the Classroom
Water Conservation Challenge and World Water Monitoring Day activities. The District also provides kits and boxes
specific to water conservation (the grades K-3 Water Conservation Kit) and watersheds (the grades K-3 Watershed
Resource Box and the grades 3-5 Watershed Education Resources Box) that teach students about the importance of
water conservation and healthy watersheds, while meeting Sunshine State Standards and preparing students for the
Florida Comprehensive Assessment Test. Each of these resources includes a big book, several smaller books, a
teacher's guide and other tools and materials used for role-playing and demonstrations. Each county has received kits
and boxes for circulation, and these materials are available through the Splash! school grant program.
BenefitsThe proposed Youth Water Resources Education program continues to help the District meet its mission by providing
students, teachers and families with classroom materials and opportunities for hands-on learning experiences that
equip them to make informed decisions about water resources. Throughout coordination of the District's youth
education program, strong partnerships have been developed throughout public school districts, private schools,
homeschool networks, science centers, museums and organizations, colleges and universities, state departments
(FDOE and FDEP), local governments, girl and boy scout groups, boys and girls clubs, environmental education
providers as well as numerous environmental education centers.
Costs
The proposed FY2012 budget for youth education totals $904,753. Funding is shared among the basins as follows:
Alafia River $58,813; Hillsborough River $189,350; Coastal Rivers $59,088; Pinellas-Anclote River $255,963;
Withlacoochee River $59,113; Peace River $195,363; Manasota $87,063. The General Fund provides an
additional $11,400 in funding support. Based on numbers reached in FY2010 through programs, outreach, teacher
workshops and school grants, this program is projected to reach approximately 502,000 students and teachers, which
is 62 percent of the students and teachers in the District (817,644) at a cost of $1.83 per person in FY2012. Budget
lines below include costs for staff to manage the projects.
011 - Alafia River Basin 128
P259
Education - Youth Water Resources Education Program
Additional Information
The FY2011 budget for youth education totals $906,000. Funding is shared among the basins as follows: Alafia River
$58,900; Hillsborough River $189,650; Coastal Rivers $59,200; Pinellas-Anclote River $256,250; Withlacoochee River
$59,200; Peace River $195,550; Manasota $87,250. The General Fund provides an additional $12,000 in funding
support. Staff reached a total of 355,053 students and educators in FY2010 through programs, school grants and
outreach. A total of 184 school grants were completed, impacting more than 99,218 students. Due to budgetary
constraints, Hillsborough County Water Resource Services cancelled the $50,000 it originally planned to use to
supplement Splash! school grants in Hillsborough County schools due to budgetary constraints. Water resources
education program agreements with 13 separate school boards impacted more than 38,514 students and teachers.
The 25 teacher workshops involved 469 teachers who will reach more than 27,438 students per year. More than
702,619 pieces of youth education materials were distributed to students and teachers throughout the District.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 482,418 0 (6,301) 322,627 77,152 88,940
011 Alafia River Basin 704,502 0 (2,585) 566,689 68,988 71,410
013 Hillsborough River Basin 1,666,066 0 (12,562) 1,263,418 208,012 207,198
014 Northwest Hillsborough Basin 488,873 0 0 488,873 0 0
015 Coastal Rivers Basin 708,965 0 (3,264) 566,134 72,651 73,444
016 Pinellas-Anclote River Basin 3,207,470 0 (4,197) 2,660,136 274,472 277,059
019 Withlacoochee River Basin 694,072 0 (8,804) 558,377 72,685 71,814
020 Peace River Basin 1,913,798 0 (30,385) 1,511,506 213,838 218,839
021 Manasota Basin 973,455 0 (19,765) 775,135 103,851 114,234
District Budgeted - Outside Revenue
Hillsborough - Youth & Water Rstr Edu
(P259)
50,000 0 0 50,000 0 0
$10,889,619 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2009 Budgeted FundsProgram commence for school board agreements 8/1/08 8/1/08
Mini-grants selected 10/15/08 10/10/08
Mini-grant projects complete 5/30/09 5/29/09
School board agreement program complete 7/30/09 7/30/09
Final reports submitted to District 8/30/09 8/30/09
FY2010 Budgeted FundsProgram commence for school board agreements 8/3/09 8/28/09 8/28/09
Splash! school grants selected 10/16/09 10/16/09
Splash! school grant projects complete 5/29/10 5/28/10
School board agreement program complete 7/30/10 7/30/10
Final reports submitted to District 8/31/10 8/26/10
FY2011 Budgeted FundsSchool board education programs commence 9/10/10 9/10/10
Splash! school grants selected 10/15/10 10/15/10
Splash! school grant projects complete 5/31/11
School board education programs complete 8/31/11
011 - Alafia River Basin 129
P259
Education - Youth Water Resources Education Program
Status As Of: February 23, 2011
ACTION TO DATE: On time. Outreach: (1) The youth outreach specialist visited seven schools in January, teaching
approximately 950 students and 385 educators. (2) Staff helped judge the 2011 Sarasota County Regional Science,
Engineering and Technology Fair on Jan. 25. Projects focused on environmental science and botany. Splash! School
Grants: (1) There have been 206 Splash! school grants awarded for the 2010-2011 school year. (2) Fifty Splash! school
grant calendars have been mailed to each of the 12 schools featured in the 2010-11 calendar. Teacher Training: (1) A
Great Water OdysseySM workshop was held on Jan. 3 for 64 Citrus County teachers from Forest Ridge Elementary
School. The six-hour workshop was facilitated by Youth Education staff at the Best Western Citrus Hills Lodge. (2) This
fiscal year, 128 teachers have been trained in two workshops. School Board Coordination: (1) Youth Education staff have
been coordinating with land resources staff and Sumter County School District staff to gain school district participation in
the Florida Fish and Wildlife Conservation Commission (FWC) and the Wildlife Foundation of Florida (WFF) initiative to
develop a youth center at Flying Eagle Preserve in Citrus County. As a result of this coordination, the Land Resources
Department director made a presentation about the FWC/WFF initiative to the Sumter County School Board on Feb. 1.
(2) As part of the continuing "Get Outside!" campaign, youth education and land resources staff are coordinating two field
trips with Sumter County School District personnel, scheduled for Feb. 25 and March 9. The field trips will take place at
the District's Lake Panasoffkee property and will educate 135 seventh- and ninth-grade students about District lands,
watersheds and water resources. Program Evaluation: The youth education program is undergoing a three-year program
evaluation to determine the effectiveness and use of its current offerings and to guide decisions concerning future
efforts. Five schools are being selected for a comprehensive case study to examine the effectiveness of the Splash!
school grants program, to determine the level of awareness about the District's educational resources and how these
resources are currently being used by teachers. The comprehensive evaluation conducted by an outside evaluator will
conclude in FY2011. Publications: Approximately 241,457 youth publications have been distributed during fiscal year
2011. More than 82,843 youth education materials have been distributed during calendar year 2011.
011 - Alafia River Basin 130
P268
Education - Public Water Resource Education Program
Project Type Basin Initiatives
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementFlood Protection Floodplain ManagementWater Supply ConservationNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Withlacoochee River,
Peace River, Manasota
Cooperator(s)
Project Manager PUTNAM, BETH
HARROUN, AMY, ROE, MELISSA, ALTMAN, MELISSA, DURELL, SYLVIA, STERNBERGER,
VIRGINIA
Task Manager(s)
Status Proposed
DescriptionThis Basin Initiative is proposed to provide funding for several projects designed to inform and educate the public
about the importance of managing and protecting the water resources. All programs align directly with one or more of
the District's areas of responsibilities, with the District's Strategic Plan and with Basin Board priorities. The District's
broad range of public education programs and materials reflect the variety of backgrounds and interests of the
District's residents and visitors. Some projects would be implemented Districtwide with support from all Basin Boards,
while some are proposed to be basin-specific and supported only by the Basin Board(s) that will benefit from the
project(s). Districtwide programs include: (1) Community Education Grants, (2) educational material development and
distribution, (3) surveys and other research/evaluation measures, (4) translation services for Spanish materials, and
(4) special events including the "Get Outside!" campaign. Basin-specific programs reflect differing priorities as well as
unique opportunities. Categories of basin-specific projects are (1) watershed/ water quality education programs; (2)
Florida-Friendly LandscapingTM education "start-up" programs; (3) partnerships with local environmental education
centers, nonprofits and others; and (4) the College Conservation program. Funding for a public service advertising
campaign has been removed from the FY2012 budget. Staff's ongoing review during the budget development process
may result in additonal reductions.
BenefitsThe proposed programs benefit the District through an increase in awareness and understanding of water
management and water resource issues, as well as an increase in behaviors that conserve and protect the District's
water resources and watersheds. Partnerships with local groups and organizations allow the District to leverage
resources and extend reach.
Costs
The total proposed cost of the FY2012 education program is $731,380 and is budgeted as follows: Governing Board
($297,003), Alafia River ($27,010), Hillsborough River ($106,976), Coastal Rivers ($29,499), Pinellas-Anclote River
($108,942), Withlacoochee River ($41,939), Peace River ($76,461), Manasota ($43,550). This 55% budget reduction
reflects the removal of $902,100 for a scheduled public service advertising campaign in FY2012. If a drought
messaging campaign is needed, staff will request contingency funds from the Governing Board. Major budget
categories proposed for FY2012 within this basin initiative are (1) Community Education Grants--$236,623, (2)
educational material development and distribution--$180,680, (3) surveys and other research/evaluation measures-
-$132,650, (4) translation services for Spanish materials--$5,000, and (4) special events including the "Get Outside!"
campaign--$87,766. Categories of basin-specific projects are (1) watershed/ water quality education programs-
-$75,751--including Lakes Education Action Drive's Watershed Education to Polk County, Tampa Bay Estuary
Program's pet waste education program and two decision-maker workshops; (2) Florida-Friendly LandscapingTM
education "start-up" programs in Levy ($4,000) and DeSoto ($2,000) counties; (3) partnerships with local
environmental education/science centers--MOSI IMAX messaging $30,000; and (4) the College Conserveration
program $7,000. Based on the total number of people reached through the public education materials and programs in
FY2010 (1.8 million people), the cost/benefit ratio for the remaining amount budgeted for public education in FY2012 is
approximately $0.41 per person. Budget lines below include costs for staff to manage the projects.
Additional Information
Funding for public education is budgeted within the basins for FY2011 as follows: Alafia River -- $52,223; Hillsborough
River -- $195,417; Coastal Rivers -- $62,056; Pinellas-Anclote River -- $184,035; Withlacoochee River -- $66,096;
Peace River -- $129,099; Manasota -- $95,289. In addition, the Governing Board contributes $933,212 to
support public education efforts, $525,000 of which is allocated to public service advertising. Basin Board and General
Fund contributions in FY2011 for public service advertising total $902,010. The cost/benefit of those reached via
011 - Alafia River Basin 131
P268
Education - Public Water Resource Education Program
public service advertising is measured in impressions and is projected to cost the District less than eight hundredths of
a cent per impression. P268 funds support a variety of education and outreach efforts Districtwide. Based on the total
number of people reached through the public education materials and programs in FY2009 (1.8 million people), the
cost/benefit ratio for the remaining amount budgeted for public education in FY2011 is approximately $0.45 per
person. Budget lines below include costs for staff to manage the projects.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 6,389,784 0 583,574 4,471,529 401,056 933,625
011 Alafia River Basin 726,922 0 2,423 618,285 41,168 65,046
013 Hillsborough River Basin 1,977,098 0 10,754 1,614,153 131,327 220,864
014 Northwest Hillsborough Basin 600,036 0 8,400 591,636 0 0
015 Coastal Rivers Basin 752,785 0 (1,792) 638,000 40,736 75,841
016 Pinellas-Anclote River Basin 3,357,541 0 (15,024) 3,020,746 140,718 211,101
019 Withlacoochee River Basin 951,741 0 (22,067) 841,036 54,593 78,179
020 Peace River Basin 1,622,270 0 (12,404) 1,391,753 96,318 146,603
021 Manasota Basin 1,187,315 0 (10,706) 1,020,377 67,205 110,439
$17,565,492 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Barrier and Benefit SurveySurvey instrument one written 5/1/08 6/19/08
Survey one results 5/30/08 7/20/08 7/18/08
Survey instrument two written 6/20/08 9/15/08 10/24/08
Survey two results 7/18/08 11/20/08 12/18/08
Survey instrument three written 8/8/08 1/15/09 1/15/09
Survey three results 8/29/08 4/30/09 4/30/09
CBSM education intervention plans complete 9/26/08 4/30/09 6/16/09
FY2009 Community Education Grant ActivitiesApplication deadline 8/22/08 8/22/08
Basin Board Education Committee input 11/21/08 11/21/08
Announcement of allocations to CE Grant recipients 1/23/09 1/12/09 1/12/09
Basin Boards informed of grant allocations 2/13/09 1/22/09 2/22/09
Grant-recipient required workshops 2/27/09 2/27/09
End of projects' work period 7/31/09 7/31/09
Final reports due 7/31/09 8/31/09 8/31/09
Requests for reimbursements 8/31/09 8/31/09 8/31/09
FY2009 Media MessagingFall media buy 10/14/08 10/14/08
Spring plan developed 11/30/08 11/30/08
Fall media buy final report 12/30/08 12/30/08
Winter media buy 1/5/09 1/5/09
Spring media buy 3/1/09 3/1/09
Summer media buy plan 4/28/09 4/28/09
Summer media buy 5/17/09 5/15/09
Media buy final report 6/1/09 7/31/09 7/31/09
FY2010 Community Education Grant Activities
011 - Alafia River Basin 132
P268
Education - Public Water Resource Education Program
Application deadline 8/21/09 8/21/09
Basin Board Education Committee input 11/20/09 11/20/09
Announcement of allocations to CE Grant recipients 1/22/10 1/11/10 1/11/10
Basin Boards informed of grant allocations 2/12/10 2/12/10
Grant-recipient required workshops 2/23/10 2/25/10 2/25/10
End of projects' work period 7/31/10 7/31/10
Requests for reimbursements 8/31/10 8/31/10
Final reports due 8/31/10 8/31/10
FY2010 Media MessagingWinter media buy plan 10/30/09 11/6/09 11/6/09
Winter media buy 1/4/10 11/30/09 11/30/09
Winter media buy final report 4/30/10 4/30/10
FY2010 Media ResearchPO Opened 10/1/09 10/1/09
Pretest Survey 11/22/09 11/22/09
Post test 4/5/10 4/5/10
Focus Groups 8/30/10 7/1/10 7/1/10
Final Report 9/27/10 9/30/10
FY2011 Community Education Grant ActivitiesApplication deadline 8/20/10 8/20/10
Basin Board Committee input 11/18/10 11/18/10
Announcement of allocations to CEG recipients 1/10/11 1/10/11
Basin Boards informed of grant allocations 2/2/11 2/3/11 2/3/11
Grant recipient required workshops 2/14/11 2/14/11
End of projects' work period 7/31/11
Final reports due 8/31/11
Requests for reimbursement 8/31/11
FY2011 LE/AD Polk County Watershed Education ProjectWater resources conference 10/29/10 10/12/10
Fall newsletter 11/30/10 11/30/10
Winter newsletter 2/28/11 2/28/11
Project EAGLE lake cleanup 4/29/11
Pet waste station bag replacement 4/29/11
Spring newsletter 5/31/11
Lakes Appreciation Celebration and Cleanup 7/31/11
Summer newsletter 8/31/11
Final report and project close 9/30/11
Cardboard Boat Challenge and Lakeshore Festival 9/30/11
Living at the Lake classes 9/30/11
Lakeside display signs 9/30/11
FY2011 Public Service AdvertisingRFP for Media Buyer Sent 8/27/10 8/27/10
Production company PO Opened 9/10/10 9/10/10
How To Videos Completed 10/22/10 10/22/10
Media Buyer PO Opened 11/1/10 11/1/10
TV Ads Produced 11/30/10 12/15/10 12/15/10
Print advertising produced 12/3/10 1/7/11 1/7/11
Spring Media Buy Plan Complete 2/1/11 1/19/11
Spring Media Buy Begins 2/15/11 2/14/11 2/14/11
Spring Media Buy Ends 5/16/11
Spring Media Buy Final Report Complete 7/15/11
FY2011 Public Service Advertising - ResearchResearch consultant PO opened 9/15/10 9/15/10
Pretest survey conducted 1/14/11 1/14/11
Posttest survey conducted 5/31/11
Focus groups 8/5/11
011 - Alafia River Basin 133
P268
Education - Public Water Resource Education Program
Final research report received 9/30/11
Pilot Irrigation ProjectFinish focus group research 9/30/07 9/30/07
Take test meter readings of pilot neighborhoods 9/30/07 10/24/07
Finish survey research 2/28/08 5/1/08 6/9/08
Develop pilot project plans 5/31/08 9/30/08 10/6/08
Begin pilot project in designated neighborhoods 7/1/08 12/1/08 12/1/08
Take meter read #1 7/31/08 12/30/08 12/30/08
Take meter read #2 8/31/08 1/31/09 2/9/09
Take meter read #3 9/30/08 3/20/09 4/10/09
Evaluate pilot program based on meter readings 10/15/08 10/15/10 7/30/10
Begin phase two with needed revisions 1/1/09 7/1/09 7/1/09
Take meter read #1 1/31/09 7/31/09 7/31/09
Take meter read #2 2/28/09 8/31/09 9/15/09
Take meter read #3 3/30/09 9/30/09 12/10/09
Pilot end date 3/31/09 9/30/10 7/30/10
WWIPP Phase IIConduct campaign with pretest 7/31/09 9/30/09 10/1/09
Evaluate program impact with posttest 6/30/10 10/31/10 10/31/10
Final report and fact sheet due 8/31/10 3/31/11
Status As Of: March 04, 2011
Community Education Grants (CEG): The FY2011 CEG program received 46 applications Districtwide, requesting
$203,490. Staff has approved funding for 29 projects, totaling $120,471. In February, Basin Boards were informed of
funded projects and grant implementation meetings were held. The grant implementation period runs from March
through July 2011. Florida-Friendly LandscapingTM Education (FFL): (1) The second annual Landscape Challenge is
planned for March 17, 8:30 a.m.-12:30 p.m., at District Headquarters. The event promotes water conservation and
encourages landscape BMPs in Florida's nursery and landscape industry. Teams compete for the title of Ruling Water
Champions. The four challenge stations at the event will be The Spin on Bugs (manage yard pests responsibly), Happy
Plants (right plant, right place), Fertilizer Course (fertilize appropriately) and Water It Right (efficient irrigation). (2) The
Charlotte Harbor National Estuary Program coordinated a FFL workshop on Jan. 22 at the Turner Center in Arcadia. The
program attracted 80 people. "Get Outside!" Campaign: In the campaign's second year, a series of smaller events will be
held on District properties in conjunction with special environmental holidays. The first event in honor of Florida Arbor
Day was held on Jan. 21 at the District's Lake Panasoffkee property. Approximately 30 people attended the event and
helped to plant more than 300 trees. Two guided hiking events were held during February in conjunction with Florida
Hiking Trails Month. The first event on Feb. 12 attracted more than 30 hikers to the District's Green Swamp West Tract.
The second event, at the Oak Ridge Equestrian Area on Feb. 19, had 20 people in attendance. Advertising: The FY2011
campaign features appropriate fertilizer use. The advertising consists of TV, radio and print ads. Media relations and
public outreach components include news releases and retail and special event outreach. Educational materials
developed for the campaign include a tip card, a fertilizer guide and a webpage housing seven how to videos. The
campaign runs mid-February through mid-May 2011.Research: (1) The advertising pre-campaign survey, which
contained questions on both fertilizer use and water conservation, was conducted through Jan. 21. A final report on the
findings was submitted to the District on Feb 21. A post-campaign draft survey is expected from the vendor for review on
March 18. (2) The Irrigation Literacy Evaluation, Phase II: Water-Wise Irrigation Practices and Perceptions Campaign:
University of Florida reviewed survey data it collected in Pinellas County during Phase I. Survey results indicated that
homeowners had a general misunderstanding of irrigation scheduling and seasonal plant water needs. During the Phase
II campaign, an online newsletter was distributed to homeowners that provided information about watering restrictions,
irrigation scheduling guidelines and water conservation. Post-campaign survey results showed that 93 percent of Phase
II participants plan to use irrigation scheduling as opposed to 69 percent of Phase I survey participants. Post-campaign
survey results also indicated that the greatest increases in knowledge were for understanding of irrigation zone locations
and sprinkler head types. Watershed/Water Quality Education: (1) A Five-Year Water Quality Education Plan has been
approved and will guide future programs. The majority of District watershed education efforts exist through the
Cooperative Funding and Basin Initiative partnerships. These efforts will continue and evolve based on direction provided
by the District to our partners. In addition to results achieved through these projects with partners, the District will
coordinate a comprehensive campaign that promotes the District's priority issues, programs and resources. (2)The
Lakes Education/Action Drive printed and mailed its winter newsletter to a mailing list of 1,200. The newsletter featured
the District's fertilizer campaign and new Do-It-Yourself Guide to Florida-Friendly Fertilizing. Special Events:
Approximately 2,275 people visited the District's educational booths at the Tampa Bay Black Heritage Festival and the
Manatee Viewing Center's 25th Anniversary event, both held Jan. 15-16. In February, staff represented the District at the
011 - Alafia River Basin 134
P268
Education - Public Water Resource Education Program
Florida Pioneer Museum's Farm Festival and Quilt Show in the Withlacoochee River Basin and at the Cortez Commercial
Fishing Festival in the Manasota Basin. District staff interacted with 1,015 people at these two events. Every Drop Counts
College Conservation Program: The District is piloting a new water conservation education program to college students
at University of South Florida (USF). The program is running from January through April 2011. To enhance its outreach
efforts, the District has enlisted the help of a student environmental group and USF's Office of Sustainability. The
program includes the placement of a number of posters and decals throughout the campus, a 111-gallon water jug
sculpture representing the average amount of water used each day per person in the region, special event
representation, a water conservation pledge, a Facebook page and a 30-second water conservation video competition. A
pre-campaign survey was conducted to establish a benchmark for any behavior or attitude change as measured by the
post-campaign survey. The video competition is scheduled to begin March 7 and run through March 28.
011 - Alafia River Basin 135
H008
Restoration - Lake Hancock Design, Permit & Mitigation to Raise
Lake Nearly 1.5'Project Type WS&R Dev.
AORs Strategic InitiativesNatural Systems Minimum Flows and Levels Recovery
Basin(s) General Fund (District), Alafia River, Peace River, Manasota
Cooperator(s)
Project Manager DOWNING, HARRY
BLASCHKA, STEVEN, SMITH, RANDY, LETASI, SCOTT, HILL, CHERYLTask Manager(s)
Status Ongoing
DescriptionThe Lake Hancock Lake Level Modification Project is part of the proposed strategy for achieving minimum flows and
levels recovery for the upper Peace River established by the District. The goal of the Lake Level Modification Project is
to store water by raising the control elevation of the existing outflow structure on Lake Hancock and to slowly release
the water during the dry season to help meet the minimum flow requirements in the upper Peace River between
Bartow and Zolfo Springs. Historically, Lake Hancock fluctuated more than a foot higher than it has during the past
several decades. The project proposes to increase the normal operating level from 98.7 feet to 100.0 feet National
Geodetic Vertical Datum (NGVD) by modifying the P-11 outfall structure. See H009 (Lake Hancock Outfall Structure
P-11 Modification) for a description of that project. This proposed project will further the District's recent efforts to
restore minimum flows in the upper Peace River, which is a major component of the District's SWUCA Recovery Plan.
As such, it is funded as a Water Supply and Resource Development (WSRD) project.
BenefitsRaising the normal operating water level of Lake Hancock to 100.0 feet NGVD will provide the storage to increase the
number of days the upper Peace River will meet minimum flows. This includes providing up to 25 cfs for sink losses
within the river. It was also determined that raising of the operating level along with other District projects will help
restore wetland function for several hundred acres of contiguous lands to Lake Hancock.
Costs
This is a multi-year funded project. Funding for this project is shared by the Governing Board (50 percent), Peace
River Basin Board (25 percent), Alafia River Basin Board (12.5 percent) and Manasota Basin Board (12.5 percent).
Basin Board funding percentages are based on Alafia, Manasota, and Peace Basin impacts to the loss of flows from
the upper Peace River Watershed from ground-water withdrawals. As of 2010, the District has budgeted $8,942,000 of
which $1,600,000 is from State Appropriations, Ecosystem Trust Fund and Water Protection and Sustainability Trust
Fund. For continued funding of future project steps, District staff is requesting $3,000,000 in FY2011 for implementing
the project, broken down as follows: Governing Board $1,500,000, Peace River Basin Board $750,000, Manasota and
Alafia River Boards each $375,000. The funding is for design, permitting, and construction of drainage improvement
projects necessary to raise the operating level of the Lake to 100 feet NGVD. Land costs are not included.
In additional to H008, $2,500,000 was funded in FY2003 and another $2,500,000 in FY2009 through field
operations (Project H009) for the replacement of the P-11 structure.
Additional Information
This project is being conducted in 3 Steps: Step (1) provided the preliminary evaluations and incremental probable
costs for raising the normal high operating levels of Lake Hancock to 99.5, 100.0, and the target 100.5 feet from the
current level of 98.7 feet. Step (1) is complete with a recommended target level up to 100.0 feet. The results of Step 1
were presented to the boards with a staff recommendation for moving forward with Step (2) of the project in October
2004. Step (2) involves the generation of the detailed information necessary to submit a complete Conceptual
Environmental Resource Permit (ERP) Application, and to specifically identify impacts to private lands for acquisition
and other mitigation needs (environmental, facilities, etc). Major components of the Conceptual ERP include: pre and
post condition analysis; private property, dwelling, environmental, and infrastructure mitigation; outfall structure
operation characteristics; and an anticipated fluctuation schedule for the Lake. Step (2) is complete and the
Conceptual ERP was received on June 14, 2007. Step (3) is the implementation of the mitigation components as
specified in the Conceptual ERP. The Project will be coordinated with H014 which will look at improving water quality
released from the lake.
011 - Alafia River Basin 136
H008
Restoration - Lake Hancock Design, Permit & Mitigation to Raise
Lake Nearly 1.5'
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 4,727,454 0 (759,254) 3,909,068 17,448 1,560,192
011 Alafia River Basin 1,192,274 0 (187,500) 983,996 4,555 391,223
020 Peace River Basin 2,529,983 0 (375,000) 2,055,676 69,365 779,942
021 Manasota Basin 1,189,186 0 (187,500) 980,908 4,555 391,223
District Budgeted - Outside Revenue
Ecosystem Trust Fund - Lk Hancock Lk
Level
1,050,000 0 0 1,050,000 0 0
State Approp - WRAP - Prior Year
Funds
1,750,000 0 1,500,000 250,000 0 0
Water Protection & Sust T.F. (Surface
Wtr Rstr)
300,000 0 0 300,000 0 0
$12,738,897 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Step (1) Preliminary Evaluation1. Preliminary Identification of Potentially Affected Parcels 10/30/02 10/30/02
2. Advertise Request for Proposals 12/20/02 12/20/02
3. Select and Approve Consulting Firm 12/30/02 12/30/02
4. Develop Project Scope of Work 12/30/02 2/27/03
5. Begin Contract Negotiations 2/27/03 3/15/03
6. Enter into Contract 5/23/03 5/14/03
7. Provide Preliminary Results 4/28/04 6/15/04
8. Board Action for Step (2) 9/27/04 10/26/04
2. Step(2) Preliminary Design and Conceptual Permitting1. Amend Contract with BCI, Inc. for Conceptual Permitting 11/3/04 11/3/04
2. Permitting of NCLF Phase III Expansion 3/29/05 3/29/05
3. NCLF Evaluation for Project Effects 3/31/05 12/20/05
4. Develop Project Mitigation Strategies 6/30/05 12/30/05
5. Approve Mitigation Strategies 8/30/05 7/25/06
6. Submit CERP Application 10/14/05 8/31/06
7. Obtain CERP 3/31/06 6/14/07
8. Board Authorization of Project 9/25/07 9/25/07
9. USACE Notice of Intent 9/26/07 12/12/07
3. Step (3) P-11 Design and Construction1. Post P-11 Request For Proposals 3/31/08 2/8/08
2. Select P-11 Engineering Firm 6/30/08 6/6/08
3. Execute Agreement - P-11 Engineering Firm 8/31/08 10/8/08
4. Notice to Proceed - P-11 Engineering Firm 9/15/08 10/29/08
5. 30% P-11 Design Completion (Conceptual) 3/8/09 3/20/09 3/20/09
6. 60% P-11 Design Completion 7/8/09 10/1/09 7/20/09
7. Submit P-11 Environmental Resource Permit 8/1/09 10/30/09 1/29/10
8. 90% P-11 Design Completion 10/8/09 11/30/09 11/24/09
9. Final P-11 Design Completion 1/8/10 4/30/10 5/24/10
10. Post P-11 Request For Bids 2/15/10 5/14/10 8/6/10
11. Select P-11 Lowest Responsive Bidder 5/15/10 5/31/11
12. Execute Agreement - P-11 Construction Contractor 6/30/10 7/29/11
13. Notice to Proceed - P-11 Construction Contractor 7/1/10 8/31/11
011 - Alafia River Basin 137
H008
Restoration - Lake Hancock Design, Permit & Mitigation to Raise
Lake Nearly 1.5'14. P-11 Construction Commences 8/1/10 9/30/11
15. P-11 Construction Completion 12/31/12
3. Step (3) Cemetery Drainage Improvements1. Complete Design Alternative Analysis 3/31/10 7/13/10
2. Submit Environmental Resource Permit 10/29/10 1/31/11
3. Complete Design Plans & Specifications 11/30/10 2/28/11
4. Begin Construction 2/28/11 6/1/11
5. Complete Construction 8/31/11 11/30/11
3. Step (3) Jacque Lee Lane & HWY 5401. Complete Design Alternative Analysis 8/2/10 8/31/10 8/12/10
2. Submit Environmental Resource Permit 11/30/10 1/31/11
3. Complete Design Plans & Specifications 12/31/10 3/15/11
4. Begin Construction 4/22/11 6/1/11
5. Complete Construction 12/30/11
3. Step (3) Lake Lena Run1. Complete Design Alternative Analysis 8/31/10 2/15/11
2. Submit Environmental Resource Permit 10/29/10 4/1/11
3. Complete Design Plans & Specifications 12/31/10 5/31/11
4. Begin Construction 5/31/11 8/15/11
5. Complete Construction 12/30/11
3. Step (3) OFP Flow Way1. Complete Design Alternative Analysis 8/31/10 3/31/11
2. Complete Design Plans & Specifications 12/31/10 5/31/11
3. Begin Construction 4/29/11 8/15/11
4. Complete Construction 9/30/11 12/30/11
3. Step (3) Parkway Pond Modification1. Submittal of FDOT Permits 11/19/07 3/31/10 7/16/10
2. Complete Design 5/31/10 7/16/10
3. Submit Environmental Resource Permit Modification to FDEP 6/30/10 5/26/10
4. Post Request for Bids 11/30/10 5/2/11
5. Award Contract & Notice to Proceed 2/15/11 6/1/11
6. Begin Construction 2/21/11 6/30/11
7. Complete Construction 2/25/11 7/31/11
Status As Of: March 15, 2011
Status History: The Preliminary Evaluation Report (Step 1) for Lake Hancock by BCI, Inc., is complete and was
approved by the Governing Board in October 2004 for initiating preliminary design and conceptual permitting to raise the
lake operating level from 98.7 to 100.0 feet (Step 2). With the approval of the Governing Board (October 26, 2004),
District staff amended the contract and entered into a Work Order with BCI Engineers and Scientists, Inc. to begin Step
(2) of the project on November 3, 2004. The Governing Board at their January 24, 2006 meeting authorized staff to
submit a conceptual ERP application to the FDEP and the United States Army Corps of Engineers to raise the control
elevation up to 100 feet NGVD to help meet the low flow requirements of the upper Peace River, upon reaching
agreement through a Memorandum of Agreement (MOA) with Polk County. The Board authorized staff to develop a
MOA with Polk County for the Lake Level Modification Project. With the approval of the MOA by the District at the July
2006 meeting, a Conceptual ERP application was submitted to FDEP on August 31, 2006 for permitting. A Conceptual
ERP was received from FDEP on June 14, 2007. The USACE Public Notice of Intent to permit was completed in
December 2007 and approval was later received in April 2008. District staff have met with affected property owners in
August and September, 2007 to discuss (1) project effects, (2) whether their property would be needed to implement the
project, and (3) Board meetings and schedules. The District has contracted the engineering consulting firm DMK &
Associates to design the new Lake Hancock Outfall Structure (P-11). DMK has completed the P-11 design plans and the
District has received an ERP to construct the new P-11 structure from FDEP which was issued on March 2, 2010.
Current Status: Land Resources is currently negotiating with private land owners and purchasing their properties when
successful negotiations are achieved. District staff is currently working on FDOT permits for Highway 540 and the Polk
Parkway, and has contracted with BCI, Engineers and Scientists, Inc. to implement (Step 3), the design, permitting, and
development of construction documents for mitigation required upstream of the P-11 Structure. Eight (8) bids for the
construction of the P-11 Structure were received in October 2010, however all of the bids were rejected by the District
and the project will be rebid at a later date. ACTION-TO-DATE: On-time, this project already has an accelerated
schedule and District staff will continue to make sure the project tasks are being completed on schedule.
011 - Alafia River Basin 138
H009
Lake Hancock Outfall Structure P-11 Replacement To Raise Lake
Nearly 1.5'Project Type WS&R Dev.
AORs Strategic InitiativesNatural Systems Minimum Flows and Levels Recovery
Basin(s) General Fund (District), Alafia River, Peace River, Manasota
Cooperator(s)
Project Manager LETASI, SCOTT
LETASI, SCOTT, SMITH, RANDY, BARTLETT, MIKE, GANUN, JIMTask Manager(s)
Status Ongoing
DescriptionFunding under Project H009 is provided for the replacement of the Lake Hancock P-11 Water Control Structure. This
project is directly related to Project H008, Lake Hancock Lake Level Modification. Project H009 is contingent on the
successful completion of Project H008 in 3 steps: Step (1) provide the preliminary evaluations and incremental
probable costs for raising the normal high operating levels of Lake Hancock to 99.5, 100.0, and the target 100.5 feet
from the current level of 98.7 feet. Step (1) is complete with a recommended target level up to 100.0 feet. The results
of Step 1 were presented to the boards with a staff recommendation for moving forward with Step (2) of the project in
October 2004. Step (2) involves the generation of the detailed information necessary to submit a complete Conceptual
Environmental Resource Permit (ERP) Application, and to specifically identify impacts to private lands for acquisition
and other mitigation needs (environmental, facilities, etc). Major components of the Conceptual ERP include: pre and
post condition analysis; private property, dwelling, environmental, and infrastructure mitigation; outfall structure
operation characteristics; and an anticipated fluctuation schedule for the Lake. Step (3) is the implementation of the
mitigation components as specified in the Conceptual ERP. Costs for design, ERPs, and construction for
environmental and infrastructure mitigation requirements have not been determined. Once these steps have been
completed, construction documents will be completed for the replacement of Structure P-11 and the District will post a
request for bids. Funding for this project is shared by the Governing Board (50 percent), Peace River Basin Board (25
percent), Alafia River Basin Board (12.5 percent) and Manasota Basin Board (12.5 percent). Basin Board funding
percentages are based on Alafia, Manasota, and Peace Basin impacts to the loss of flows in the Upper Peace River
Watershed from ground-water withdrawals.
BenefitsRaising the normal operating water level of Lake Hancock to 100.0 feet NGVD will provide the storage to increase the
number of days the upper Peace River will meet the minimum flows from 70 percent to 87 percent and provide up to
25 cfs of recharge to the Upper Floridan aquifer through sinks. It was also determined that raising of the operating level
along with other District projects will help restore wetland function for several hundred acres of contiguous lands to
Lake Hancock. Project H009 will involve the actual replacement of the present control structure to achieve these goals.
Costs
The probable cost are projected to be a total of $5,000,000 for this structural replacement project. This cost does not
include any land acquisition costs. Funds encumbered under Project H009 were approved in FY2003 in the amount of
$2,500,000 and an additional $2,500,000 was approved in the FY2009 for implementing the structure replacement
project. The FY2009 funds are from the West Central Florida Water Restoration Action Plan FY2009 State funds. The
FY2003 and FY2009 funds do not include any land acquisition cost.
011 - Alafia River Basin 139
H009
Lake Hancock Outfall Structure P-11 Replacement To Raise Lake
Nearly 1.5'
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 2,016,645 0 750,000 1,252,473 14,172 0
011 Alafia River Basin 379,367 0 62,500 313,325 3,542 0
020 Peace River Basin 1,007,911 0 375,000 625,825 7,086 0
021 Manasota Basin 379,367 0 62,500 313,325 3,542 0
District Budgeted - Outside Revenue
Water Protection & Sust T.F.
(Alternative Wtr)
1,000,000 0 0 0 0 1,000,000
$4,783,290 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: March 15, 2011
Status History: See Project H008 for a detailed history on the project. The milestones and updates will be provided for
this project once an agreement has been executed between the District and the Construction Contractor. As described in
the project description steps 1 and 2 have been completed. The engineering consulting firm DMK & Associates has been
contracted to design the new Lake Hancock Outfall Structure (P-11). The design has been completed and the District
received 8 bids for construction. Current Status: The project is currenlty on hold until the project can be rebid. Project
Milestones will be followed as part of project H008 until an agreement has been executed between the District and a
Construction Contractor.
011 - Alafia River Basin 140
H015
FARMS - Wells With Poor Water Quality in the SWUCA
Back-Plugging ProgramProject Type WS&R Dev.
AORs Strategic InitiativesWater Quality Water Quality Maintenance and Improvement
Basin(s) Alafia River, Peace River, Manasota
Cooperator(s)
Project Manager BRUMBAUGH, DAVID
Task Manager(s)
Status Ongoing
DescriptionPunta Gorda's in-stream drinking water reservoir is sustained by Class I surface water bodies comprised of the Shell
and Prairie Creek watersheds. In 2000, the City of Punta Gorda contacted FDEP and the District with concerns for
declining water quality trends observed in the reservoir. Investigations indicated that irrigation pumping from deep
wells was a primary source adversely impacting the watersheds through degraded agricultural runoff, ultimately
leading to a decline in water quality of the Punta Gorda reservoir downstream. In 2002, the Back-Plug Program was
initiated primarily to improve water quality in the watershed systems of the SWUCA. The back-plug program was
included in the Facilitating Agricultural Resources Management Systems (FARMS) Program in 2005.
BenefitsWell back-plugs may become a procedure recommended for agricultural growers wanting to significantly improve crop
yields by decreasing highly mineralized sources of groundwater used for irrigation, and to mitigate potential impacts to
public surface water supplies.
Costs
Qualifying landowners are reimbursed up to a maximum of $6,500 per well for back-plug procedures, with final
amounts of reimbursement determined by borehole dimensions of the back-plugged interval. The Shell, Prairie, and
Joshua Creek (SPJC) watersheds are considered priority areas for this program.
Additional Information
A brochure and webpage is available from SWFWMD summarizing the FARMS Back-Plug Program.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 755,288 0 (30,000) 742,418 14,671 28,199
011 Alafia River Basin 69,019 0 0 62,389 1,939 4,691
020 Peace River Basin 620,136 0 (133,547) 727,836 8,920 16,927
021 Manasota Basin 54,780 0 0 44,388 3,808 6,584
$1,499,223 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: December 20, 2010
A total of 68 wells have been back-plugged in the SWUCA overall to date, with 50 of these wells located in the SPJC
priority watersheds. Analytical results for samples collected from the 50 back-plugged wells in the SPJC area indicated
conductivity, total dissolved solids (TDS) and chloride were decreased by 47%, 48% and 66%, respectively, with
pumping yields reduced by 23% as a result of back-plugging procedures. For the 18 wells in the SWUCA (outside of the
SPJC area), seven wells were back-plugged in the Peace River watershed, six in the Alafia River watershed, three in the
Manatee River watershed, one in the Myakka River watershed, and one in the Horse Creek watershed. Analytical results
for all back-plugged wells combined in the SWUCA indicated conductivity, TDS and chloride were decreased by 46%,
46% and 62%, respectively. Combined SWUCA pumping yields were reduced by 24% as a result of back-plugging
procedures. Routine monitoring results of select back-plugged wells have indicated sustained improvements to the
quality of groundwater used for irrigation purposes.
011 - Alafia River Basin 141
H017
FARMS - Facilitating Agricultural Resource Management Systems
Project Type WS&R Dev.
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply Alternative Water Supply
Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,
Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota
Cooperator(s)
Project Manager ESTES, CAROLE
Task Manager(s)
Status Ongoing
DescriptionThe Facilitating Agricultural Resource Management Systems (FARMS) Program is an agricultural Best Management
Practice (BMP) cost-share reimbursement program. The program is a public/private partnership developed by the
District and the Florida Department of Agriculture and Consumer Services (FDACS). The purpose of the FARMS
initiative is to provide an incentive to the agricultural community, within the District, to implement agricultural BMPs that
will provide resource benefits that include water quality improvement; reduced Upper Floridan aquifer withdrawals;
and/or conserve, restore, or augment the area's water resources and ecology. FARMS is intended to assist in the
implementation of the District's Regional Water Supply Plan.
BenefitsThe goal for the FARMS Program is to offset 40 mgd of ground water within the District by 2025. Ground water use
reductions not only benefit the Upper Floridan aquifer but also can improve surface water quality in areas where
ground water is highly mineralized. According to the District's Water Management Information System (WMIS), there
are 6,395 permitted agricultural permits in the District, with a combined permitted annual average daily ground water
quantity of 699,485,000 gpd. Since actual use of permitted quantities is dependent on hydrologic conditions, one of the
main goals of the FARMS program is to provide cost-share that helps reduce ground water use, regardless of
hydrologic conditions. Therefore, FARMS projects not only offset ground water use with surface water but also try to
increase the overall efficiency of irrigation water use. Each project's performance is tracked to determine its
effectiveness. To date, total ground water offset accomplished through the FARMS Program by District funding has
cost $1.40 per 1000 gallons.
Costs
From the inception of the FARMS Program through FY2009 a total of $18,299,146 has been spent on FARMS
projects with $7,778,096, or 42.5 percent coming from the farming participants and $10,521,050, or 57.5 percent, from
public funding through the FARMS budget. Public funding sources for total project reimbursement is as follows: Basin
Boards - 10.6 percent, Governing Board - 11.5 percent, State Appropriations - 28.9 percent, and FDACS - 6.5 percent.
Cost-share project expenditures to date and projected through FY2011 is as follows: Fund 010 General Fund -
$4,572,711; Fund 011 Alafia river BAsin - $571,459; Fund 013 Hhillsborough River Basin - $1,024,131; Fund 015
Coastal Rivers BAsin - $2,403; Fund 019 Withlacoochee River Basin - $167,795; Fund 020 Peace River Basin -
$1,803,573; Fund 021 Manasota Basin - $1,482,944; FDACS - $1,198,721; Ecosystem Trust Fund - $1,833,591; State
Approp-WRAP - $14,085; Applicant Contribution - $3,086,014; for a total expenditure of $15,757,427.
Additional Information
FARMS also funds a limited amount of non-project related outreach activities and data collection efforts in support of
the Program. These include: IFAS Flatwood Citrus BMP Implementation. The District will provide $50,000 to this
project for three years for a total of $150,000. This is an outreach effort by IFAS that furthers the goals of FARMS
Program in the SPJC watersheds, in addition to growers within Manatee, Hardee, Sarasota, DeSoto, and Charlotte
Counties IFAS Row Crop BMP Implementation. The District will provide $50,000 to this project for two years, and
$55,000 in the final year for a total of $155,000. This is also an outreach effort by IFAS that furthers the goals of
FARMS Program in Hillsborough, Manatee, Hardee, Sarasota, DeSoto, and Charlotte Counties. Finally for the Upper
Myakka Surface-Water Quality Monitoring Network - funding for the deployment of data sondes at seven USGS gage
sites in the UMRW has been approved. The network will assist in better understanding agricultural impacts on Flatford
Swamp and in determining the effectiveness of FARMS projects.
011 - Alafia River Basin 142
H017
FARMS - Facilitating Agricultural Resource Management Systems
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 6,822,724 0 (3,116,172) 5,240,865 2,877,439 1,820,592
011 Alafia River Basin 1,410,794 0 (342,150) 412,097 1,038,035 302,812
013 Hillsborough River Basin 1,396,091 0 (86,008) 220,115 437,210 824,774
015 Coastal Rivers Basin 5,954 0 0 0 3,551 2,403
019 Withlacoochee River Basin 288,864 0 (20,836) 165,834 121,069 22,797
020 Peace River Basin 2,716,751 0 (1,542,845) 2,639,602 1,096,911 523,083
021 Manasota Basin 1,604,978 0 144,908 1,364,366 42,055 53,649
District Budgeted - Outside Revenue
DACS - FARMS (H017) 1,198,721 0 (218,695) 1,417,416 0 0
Ecosystem Trust Fund - FARMS 1,564,060 0 (3,435,940) 5,000,000 0 0
State Approp - WRAP - Prior Year
Funds
19,735 0 (1,380,265) 1,400,000 0 0
Project Funds Not Budgeted by the
District
Applicant Contribution 3,086,014 0 0 3,086,014 0 0
$20,114,686 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: December 15, 2010
The FARMS Program has 100 ongoing Board Approved projects in six of the District's nine Basins. Projected offset from
the board approved projects is 15,636,268 gallons per day (gpd). Peace River Basin The Peace River Basin has 57
board approved ongoing FARMS projects with a projected offset of 9,723,290 gpd. Of the 57 projects in this Basin, 39
are operational. Six projects are under construction in this basin, and twelve more are in the contracting process. The
Peace River Basin includes the Shell, Prairie, and Joshua Creek (SPJC) watershed, which is one of two priority areas
designated for the FARMS Program. Thirty six of the 57 projects, including twenty six of the operational projects, are
within the SPJC Priority area. Manasota Basin The Manasota Basin has fourteen board approved projects with a
projected offset of 4,358,450 gpd. Of the fourteen projects in the Manasota Basin, nine are now operational, one is under
construction and four are in the contracting process. The Manasota Basin includes the other FARMS priority area, the
Upper Myakka River Watershed. Seven of the fourteen projects are in the Upper Myakka River Watershed priority area,
including six of the operational projects. Hillsborough River Basin The Hilllsborough River Basin has six board
approved FARMS Projects with projected offsets of 496,583 gpd. Three projects are now operational and the other three
projects are in the contracting process. Green Swamp Basin FARMS has three projects in the basin. One project is
operational, one os under construction, and the other project is in the contracting process. Alafia River Basin The Alafia
Basin has sixteen board approved projects with projected offsets of 1,013,240 gpd. Six projects are operational and the
rest are in the contracting phase. Withlacoochee River Basin. The Withlacoochee River Basin has four board approved
projects with projected offsets of 37,135 gpd. Two projects are newly operational and the other two are in the contracting
process. FARMS is also providing partial funding for four regional projects. These projects are being coordinated through
the Florida Department of Agriculture and Consumer Services. Three projects will help implement BMP programs for
citrus growers and row crop farmers and the other is the Mini-FARMS program, which is described in greater detail under
project number H529.
011 - Alafia River Basin 143
H024
Identify Other Surface Water Storage and Release Options to Meet
Peace River MFLsProject Type WS&R Dev.
AORs Strategic InitiativesNatural Systems Minimum Flows and Levels Recovery
Basin(s) Alafia River, Peace River, Manasota
Cooperator(s)
Project Manager TURNER, DAWN
Task Manager(s)
Status Ongoing
DescriptionThis project involves the identification and evaluation of potential water resource development projects in the upper
Peace River watershed above Zolfo Springs. The vehicle to accomplish this is the District's Watershed Management
Program (WMP). The project includes performing the 1) Topographic Information, 2) Watershed Evaluation, and 3)
Watershed Management Plan elements of the WMP. Work on the Topographic Information, Watershed Evaluation,
and Watershed Management Plan tasks for the area contributing flow to the river between the confluence with the
Peace Creek Canal and the Highway 640 bridge crossing in Homeland are nearing completion. A potential surface
water storage area adjacent to the river will also be evaluated. Watershed Evaluation tasks will be performed for the
area contributing flow to the river between the Highway 640 bridge crossing in Homeland and Zolfo Springs. These
tasks include the collection of hydrologic and hydraulic information for both the existing condition and the committed
future condition reflected in approved reclamation plans. Future funding will be needed to complete the Topographic
Information, Watershed Evaluation, and Watershed Management Plan tasks for the area between Homeland and
Zolfo Springs. Preferred Best Management Practices (BMPs) will be further developed through the Implementation of
BMPs process under separate activity codes, and will require additional funding.
BenefitsThe water resource development projects that are ultimately selected for implementation will enhance low flows, water
quality, and natural systems within the upper Peace River.
Costs
The anticipated project cost is $2,760,000. For FY2010, $250,000 of project funding is appropriated in the following
Basin budgets: Governing Board ($125,000), Peace River Basin ($62,500), Alafia River Basin ($31,250), and the
Manasota Basin ($31,250). However, the project will be discontinued after current work order assignments are
completed. All of the FY2010 funds will be returned to the respective Basin budgets. Howeer, this will not be
reflected in the Funding section until after the new fiscal year begins on October 1, 2010. For FY2009, $250,000 was
appropriated in the following budgets: Governing Board ($125,000), Peace River Basin ($62,500), Alafia River Basin
($31,250), and the Manasota Basin ($31,250). $41,142 of the FY2009 funds were used to obtain LiDAR for an area
within the river floodplain that was inundated when the original LiDAR data was obtained. The remaining FY2009
funds were used for the technical evaluation of suitable water storage areas adjacent to the Peace River, and to
optimize design opportunities for MFL recovery. For FY2008, $250,000 was appropriated in the following budgets:
Governing Board ($125,000), Peace River Basin ($62,500), Alafia River Basin ($31,250), and the Manasota Basin
($31,250). $200,000 was used for an evaluation of a potential surface water storage area. The remaining $50,000 of
FY2008 funds were allowed to lapse. For FY2007, $250,000 was appropriated in the following budgets: Governing
Board ($125,000), Peace River Basin ($62,500), Alafia River Basin ($31,250), and the Manasota Basin ($31,250). In
FY2007, $250,000 in revenue will be received from state appropriations and distributed as follows: Governing Board
($125,000), Peace River Basin ($62,500), Alafia River Basin ($31,250), and the Manasota Basin ($31,250).For
FY2006, $250,000 was appropriated in the following budgets: Governing Board ($125,000), Peace River Basin
($62,500), Alafia River Basin ($31,250), and the Manasota Basin ($31,250). In FY2006, $250,000 in revenue will be
received from Water Protection and Sustainability Trust Fund and distributed as follows: Governing Board ($125,000),
Peace River Basin ($62,500), Alafia River Basin ($31,250), and the Manasota Basin ($31,250). For FY2005, $500,000
was appropriated in the following budgets: Governing Board ($250,000), Peace River Basin ($125,000), Alafia River
Basin ($62,500), and the Manasota Basin ($62,500). In 2005, an additional $360,000 was transferred to this project for
design and permitting of an above grade surface water reservoir. However, these funds were liquidated in
FY2010. For FY2004, $150,000 was appropriated in the Governing Board budget. The District funding amounts shown
in the table include staff salaries.
Additional Information
The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed
Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters
and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed
011 - Alafia River Basin 144
H024
Identify Other Surface Water Storage and Release Options to Meet
Peace River MFLsManagement (CWM) initiative strategies and one of the District's Strategic Priorities. In 2002, the District completed
the technical work necessary for establishing minimum flows in the upper Peace River, and the first draft of the Peace
River Cumulative Impacts Analysis Report. The Upper Peace River Watershed has been heavily impacted by mining,
development activities, and groundwater withdrawals. Proposed minimum "low" flows are currently not being met at
the Bartow and Ft. Meade gage sites. The District has developed the Southern Water Use Caution Area (SWUCA)
Recovery Strategy that proposes concepts for development of water resource projects. Two of the concepts are
storage of wet season rainfall in surface water reservoirs for later release during periods of low or no flow; and the
hydraulic optimization of areas impacted by mining, including the reconnection of closed basin areas. Two projects,
the Upper Peace River Minimum Flow Enhancement project (H004), and the Old Lands Phosphate project (H011),
were initiated in FY2003 to accomplish similar goals. The Upper Peace River Minimum Flow Enhancement project
included funding for a feasibility analysis, and design and permitting of a surface water reservoir on reclaimed mine
land. The District evaluated a reservoir site located on the east side of the Peace River just south of County Highway
640, and began the land acquisition process. The property owner rejected the District's offer for purchase, which
terminated the efforts for this site. As part of the Old Lands Phosphate project, District staff identified other potential
reservoir locations, and areas that no longer contribute runoff to the river as a result of mining activities that could be
hydraulically reconnected. Both of these projects are consistent with the Upper Peace River Resource Development
project. Projects H004 and H011 were discontinued as individual projects, and incorporated into the Upper Peace
River Resource Development project. Alternative reservoir sites are being evaluated, and District staff are collecting
available information from property owners, mine companies, FDEP Bureau of Mine Reclamation, and others. FY2004
funds were used to complete elements of a Watershed Evaluation to identify the connectivity of the Upper Peace
River system from the confluence of Saddle Creek and Peace Creek, south to Zolfo Springs. Work Order #1 tasks
focused on the identification of system connectivity through phosphate lands located between the confluence of
Saddle Creek and Peace Creek, and Zolfo Springs. The First Amendment was executed to expand the scope of work
to complete the Watershed Evaluation tasks for the area above County Highway 640 at Homeland, and encumber
FY2005 funds. The Second Amendment was executed to prepare a Watershed Management Plan for the area that
contributes flow to the River between the confluence of Saddle Creek and the Peace Creek Canal, and Homeland;
and encumber FY2006 funds. The Watershed Management Plan element will include a water resource assessment
and an alternative analysis that will include a cost/benefit evaluation of potential water resource development projects.
A Third Amendment was executed to extend the contract expiration date from December 31, 2008 to December 31,
2009. A second Agreement was developed to encumber FY2007 funds to perform Watershed Management Program
elements for the area contributing flow to the river between the Highway 640 bridge crossing at Homeland, and Zolfo
Springs. Future funding will be needed to complete the Watershed Management Plan for the area between Homeland
and Zolfo Springs. When each task is completed the project budget will be refined based on the information
developed. The District is cooperating with FEMA to modernize the flood insurance rate maps (FIRMs) in Polk County.
Information developed with this project will be used to update the FIRMs representing this watershed.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 922,613 0 (424,200) 1,346,813 0 0
011 Alafia River Basin 185,266 0 (105,064) 290,330 0 0
020 Peace River Basin 354,953 0 (210,126) 565,079 0 0
021 Manasota Basin 196,472 0 (105,065) 301,537 0 0
District Budgeted - Outside Revenue
Ecosystem Trust Fund - Upper Peace
Rvr Rstr
250,000 0 0 250,000 0 0
Water Protection & Sust T.F. (Surface
Wtr Rstr)
250,000 0 0 250,000 0 0
$2,159,304 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 145
H024
Identify Other Surface Water Storage and Release Options to Meet
Peace River MFLs
Critical Project Milestones ActualProjected Amended
1. Original AgreementDraft Original Agreement to Management Services 7/26/04 8/24/04
Draft Original Agreement returned from Management Services 8/26/04 8/25/04
Execute Original Agreement (First Agreement) 9/17/04 9/30/04
Notice to Proceed - Work Order #1 9/24/04 10/22/04
Submittal of Final Report related to Work Order #1 4/22/05 4/22/05
Execute Contract Amendment 1 to the First Agreement 9/21/05 9/21/05
Recognition of the SWFWMD, Peace, Alafia & Manasota Basin Bds. will be
provided on all reports
10/31/05 12/31/10
Notice to Proceed - Work Order #2 for geotechnical testing 11/30/05 1/9/06
Notice to Proceed - Work Order #3 (Watershed Evaluation) 11/30/05 11/17/05
Submittal of Final Report related to Work Order #2 2/28/06 4/19/06
Notice to Proceed - Work Order #4 (Feasibility of Alternatives) 5/19/06 5/19/06
Execute Contract Amendment 2 6/2/06 7/24/06
Submittal of Final Report related to Work Order #3 6/17/06 10/3/06
Notice to Proceed - Work Order #5 for geotechnical testing 7/28/06 7/28/06
Contract Expiration - Original Agreement 7/29/06 12/31/10
Submittal of Final Report related to Work Order #5 9/28/06 3/27/07
Notice to Proceed - Work Order #6 Watershed Mgt. Plan 10/31/06 10/25/06
Submittal of Final Report related to Task 2.2.7.1 of Work Order #4 12/22/06 2/21/07
Submittal of Final Report related to Task 2.2.7.3 of Work Order #4 12/22/06 12/31/10
Submittal of Final Report related to Task 2.2.7.2 of Work Order #4 12/22/06 12/31/10
Notice to Proceed - Work Order #7 (Summary Report) 7/20/07 7/20/07
Submittal of Final Report related to Work Order #7 8/31/07 8/31/07
Notice to Proceed - Work Order #8 (Sinkhole Survey) 10/31/07 12/14/07
Submittal of Final Deliverables related to Work Order #8 1/31/08 6/10/08
Notice to Proceed - Work Order #9 (Survey) 5/31/08 5/15/09
Submittal of Final Report related to Work Order #6 11/30/08 12/31/10
1. Original AgreementFinal Deliverables WO#9 (Survey) 8/31/08 10/24/08
Notice to Proceed - Work Order #10 (Additional Field Reconnaissance) 11/10/08 11/10/08
Final Deliverables WO#10 (Additional Field Reconnaissance) 3/10/09 12/31/10 9/2/09
2. Second AgreementDraft Second Agreement to Management Services 12/1/06 5/29/07
Draft Second Agreement returned from Management Services 1/1/07 6/7/07
Execute Second Agreement - Zolfo Springs 1/31/07 7/11/07
Notice to Proceed - Zolfo Springs Work Order #1 2/9/07 7/20/07
Submittal of Final Report - Zolfo Springs WO #1 2/9/08 12/31/10
Contract Expiration - Second Agreement (Zolfo Springs) 1/31/09 12/31/10
Status As Of: January 31, 2011
After current work order assignments are completed, this project will be discontinued. However, the District will continue
to work with cooperators to prepare Watershed Management Plans for areas contributing to the Upper Peace River,
which will include Best Management Practices (BMP) Alternative Analyses. If BMPs are identified that could enhance the
resource, future funding may be requested for Implementation of BMPs. Status of Agreements and Work Orders: An
Agreement was executed with HDR to further evaluate CS-11 as a potential surface water reservoir to enhance low flows
in the upper Peace River. Tasks involved probable design criteria and conceptual cost estimates on rehabilitation of
CS-11 to a reservoir along with assisting staff with negotiations on the possible purchase of the property from the current
owner. The evaluation will build upon the feasibility assessment performed by Ardaman and Associates as part of the
Surface Water Resource Assessment Inventory and Approach Development task. Ardaman and Associates will continue
to develop the Upper Peace River Watershed Management Plan. Hydrologic and hydraulic data collected as part of the
Upper Peace River Resource Development project is also being used in the development of the Peace River Integrated
Model (P687). The Agreement (#04CON00047) with Ardaman was executed on September 30, 2004. Project tasks
focus on the area above Homeland. As part of the Watershed Management Plan, Ardaman conducted geotechnical
testing and surface water modeling to evaluate potential reservoir sites. The Ardaman evaluations indicate CS-11 could
be modified to function as a surface water reservoir. The tasks associated with Work Orders #1, #2, #3, #5, #7, #8, & #9
011 - Alafia River Basin 146
H024
Identify Other Surface Water Storage and Release Options to Meet
Peace River MFLshave been completed, and associated final deliverables have been approved. Tasks related to Work Orders #4, #6, &
#10 are on-going. A draft of the first of 3 reports related to Work Order #4 was received on January 26, 2007. Staff
reviewed the draft, and provided comments to the consultant on January 30, 2007. Data collection for Work Order #6 has
been completed. The final report related to Work Order #6 was due on November 30, 2008. However a time extension
was granted until December 31, 2009. Work Order #7 was issued on July 20, 2007 for the preparation of a summary
report to consolidate recent geotechnical and engineering evaluation information regarding the feasibility of using CS-11
as a water storage area for MFL recovery. The water discharged back into the river will need to be of sufficient quantity to
overcome the influence of sinkholes in and adjacent to the streambed in order to meet MFLs in the upper river. A draft
summary report was received in August 2007. Comments were provided to the consultant. Final version of the WO#7
summary report received May 27, 2009. Work Order #8 was executed on December 14, 2007 to survey sinkhole areas
to determine if low flows can be redirected around the sinkhole features, and to identify the hydraulic control elevation in
the streambed that may be backing water up into these features. An evaluation of the survey data will be conducted as
part of the SWUCA Recovery - Upper Peace Karst Berms (H064) project. Please refer to the PIMS entry for H064 for
further information on that project. Work Order #9 was developed to collect survey data for several cross-sections and
bridge crossings within the upper Peace River and two of its tributaries, Bear Branch and Six Mile Creek. Notice to
Proceed was issued on May 15, 2008. Notice to Proceed for Work Order #10 was issued on November 10, 2008. Work
Order #10 includes the collection of additional survey information within the City of Bartow for areas that discharge to the
Peace River. This work has been completed. The Fourth Amendment to Agreement 04CON00062 was executed to add
$243,500 in FEMA funds for tasks related to the delineation of the 100 year floodplain for the Upper Peace River above
Homeland, and to perform peerand public review of the model results. Notice to Proceed for Work Order #11 was issued
on January 28, 2010 to perform the floodplain analysis and delineation tasks using the FEMA funds. A second consultant
services agreement (#07CC0000062) was developed to focus on the area contributing flow to the river between
Homeland and Zolfo Springs. The Second Agreement was executed on July 11, 2007. Work Order #1 was issued
against the Second Agreement on July 20, 2007; and involves the completion of Watershed Evaluation tasks for the area
between Homeland and Zolfo Springs. Status History: The first contract, (#04CON00047), currently encumbers $150,000
of FY2004 funds, $500,000 of FY2005 funds, and $500,000 of FY2006 funds. The Second Agreement,
(#07CC0000062), encumbers $500,000 of FY2007 funds. $200,000 in FY2008 funding was used to retain HDR to further
evaluation the use of CS-11. The remaining $50,000 in FY2008 funds was liquidated. $250,000 was budgeted in
FY2009. $360,000 of H004 Upper Peace River Minimum Flow Enhancement project funds were transferred to this
project to retain a consultant to perform detailed geotechnical analyses, obtain topographic information, prepare
cost/benefit analyses, prepare preliminary and final design plans, and obtain permits needed to construct a reservoir.
The H004 funds were previously Board encumbered. The amount shown in the Prior Funding column of the funding table
has been revised to reflect the funds transferred from the H004 project. Tasks associated with the Ardaman Work
Orders #1, #2, #3, #5, #7, #8, #9, and #10 have been completed, and associated final deliverables have been approved.
Tasks related to Ardaman Work Orders #4, #6, and #11 are on-going. The draft watershed model and GIS deliverables
were received on July 1, 2010, and are being reviewed by District staff. As of this writing, the following has been
expended: $1,104,404 has been invoiced and paid in accordance with the Original Agreement with Ardaman; $467,767
has been invoiced and paid in accordance with the Second Agreement with Ardaman; and $41,142 has been expended
to obtain additional LiDAR data. Of the $250,000 in FY2009 funding, $15,000 will be used to retain a consultant to
provide technical support in responding to questions on the conceptual design for CS-11; $41,142 will be used to obtain
topographic information for an area that was inundated when the LiDAR data was obtained. An additional $3,350 was
added to the HDR contract to finish technical support for CS-11 land negotiations and $10,000 was added as
contingency in case any new issues arise.
011 - Alafia River Basin 147
H041
Design & Construction - Pasco's Southeast Regional Reclaimed
Water Transmission LoopProject Type WS&R Dev.
AORs Strategic InitiativesWater Supply Alternative Water Supply
Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,
Pinellas-Anclote River, Withlacoochee River
Pasco CountyCooperator(s)
Project Manager WRIGHT, CARL
Task Manager(s)
Status Ongoing
DescriptionThis is an alternative water supply project consisting of design and construction of approximately 18,500 linear feet
24-inch reclaimed water transmission main with associated fittings and valves to complete the transmission system
looped interconnection between Pasco County's Southeast Pasco and Wesley Center Wastewater Treatment
Facilities (WWTF's). This new 24-inch main will connect an existing 16-inch reclaimed water transmission main on
State Road 54 that will serve the New River Development (now under construction) with three existing 16-inch
reclaimed water transmission mains on Handcart Road that deliver reclaimed water from the Southeast Pasco WWTF
to areas to the north, south and east of the Southeast WWTF.
BenefitsThis transmission main interconnect project will ensure an adequate means for the delivery of reclaimed water for the
southeastern portions of the County, indirectly allowing offsets that will be realized within those portions of the Pasco
County Reuse System where development is creating demand, and will allow later transmission/distribution of any wet
weather flows diverted to the series of wet-weather storage reservoirs being constructed in Pasco County.
Costs
The total cost of this project is estimated to be $1,330,000. The Alafia River Basin Board budgeted $27,265 for the
project in FY2006, the Coastal Rivers Basin Board budgeted $21,812 for the project in FY2006, the Hillsborough River
Basin Board budgeted $68,162 for the project in FY2006, the Northwest Hillsborough Basin Board budgeted $35,444
for the project in FY2006, the Pinellas-Anclote River Basin Board budgeted $117,238 for the project in FY2006, the
Withlacoochee River Basin Board budgeted $2,726 for the project in FY2006, and the Governing Board budgeted
$272,650 for the project in FY2006. In addition to the board's FY2006 budget, $239,405 in Water Protection and
Sustainability Trust Funds (WPSTF) were budgeted. The cost benefit cannot be calculated because there is no direct
offset associated with this project; any benefits realized will be associated with future transmission/distribution projects
this interconnect will support.
Additional Information
When complete, this loop will help to transport water from the Southeast and Wesley Center WWTF's to the New
River, Wesley Chapel and Meadow Point developing areas and will also serve to deliver reclaimed water from the
Central Regional Reclaimed Water Interconnect to the most eastern portions of the Pasco County Reuse System.
This project is consistent with the District's goal for the development of regional reuse interconnects. Of the total
estimated project cost of $1,330,000, design represents $133,000 (10%) and construction represents $1,197,000
(90%). Any additional funds budgeted are for District staff time for project management. The County has a water
conserving rate structure making it eligible for Water Protection and Sustainability Trust Funds.
011 - Alafia River Basin 148
H041
Design & Construction - Pasco's Southeast Regional Reclaimed
Water Transmission Loop
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 278,283 0 0 276,483 877 923
011 Alafia River Basin 27,265 0 0 27,265 0 0
013 Hillsborough River Basin 74,683 0 0 71,970 1,813 900
014 Northwest Hillsborough Basin 38,365 0 0 38,365 0 0
015 Coastal Rivers Basin 27,375 0 0 25,620 855 900
016 Pinellas-Anclote River Basin 122,801 0 0 121,046 855 900
019 Withlacoochee River Basin 8,191 0 0 6,484 855 852
District Budgeted - Outside Revenue
Water Protection & Sust T.F.
(Alternative Wtr)
239,405 0 0 239,405 0 0
Project Funds Not Budgeted by the
District
Pasco County 545,298 0 0 545,298 0 0
$1,361,666 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Draft Agreement to Contract Administration 11/15/05 12/16/05
Draft Agreement returned from Contract Administration 12/31/05 7/3/06
Contract Execution 3/15/06 10/26/06
Notice to Proceed 3/16/06 10/30/06
Commence Design 8/1/06 7/25/06
Commence Construction 5/1/07 5/1/10
Signage Erected 7/31/07 5/1/10
Complete Construction 5/1/08 5/1/11
Contract Close Out 12/31/09 8/1/11
Status As Of: February 17, 2011
The Boards approved inclusion of this Water Supply and Resource Development project in their FY2006 budgets. The
County issued notice to proceed to the design consultant (C&D Engineering) on July 25, 2006. The survey work is
complete and the consultant has recommended a final route. Design documents were provided to Pasco County on
August 7, 2007. Easement acquisition issues necessitated a slight change in the proposed routing of the transmission
main, but this change in routing did not alter the interconnection points or the intent of the project. The project was
advertised for bid on February 11, 2011. The County anticipates that construction will commence by May 1, 2011. To
date the District has encumbered $784,702, including $239,405 in Water Protection and Sustainability Trust Funds, of
which $0 has been reimbursed. Per District policy, cooperators may not be reimbursed for design and construction
projects until construction has commenced.
011 - Alafia River Basin 149
H065
Design & Construction - TBW System Configuration II - Plant from
66 to at least 99 MGD; Pipes, Pumps, etc.Project Type WS&R Dev.
AORs Strategic InitiativesWater Supply Alternative Water Supply
Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,
Pinellas-Anclote River, Withlacoochee River
Tampa Bay WaterCooperator(s)
Project Manager RAMOY, ALISON
ARMSTRONG, BRIANTask Manager(s)
Status Ongoing
DescriptionThe System Configuration II project will develop additional capacity in Tampa Bay Water's Enhanced Surface Water
System to withdraw and treat water during periods of higher flow from the Hillsborough River and Tampa Bypass
Canal. A number of regional system components will be expanded as part of this project, including the surface water
treatment plant and the Tampa Bypass Canal Pump Station. These improvements will enable the higher surface water
flows from the Hillsborough River and Tampa Bypass Canal to be captured, and will increase the use of Tampa Bay
Water's C.W. Bill Young Regional Reservoir. Four system interconnect components are also included in the System
Configuration II project. These will provide delivery of alternative water supplies from the regional system to member
governments of Tampa Bay Water. Upon completion, the project will develop a total of 25 mgd of additional alternative
water supply. The anticipated final completion of the project is December 2011.
BenefitsDevelopment of the System Configuration II project will provide the pumpage, transmission, and treatment capacity to
produce an additional 25 mgd to the regional system that will enable future demands to be met using non-groundwater
sources. This will ensure that recovery of natural systems impacted by groundwater withdrawals in the region can be
achieved.
Costs
As of March 2010, the total cost of constructing the System Configuration II project is estimated at $247,694,339. Of
this amount, $232,000,000 has been determined to be eligible for reimbursement through the District's cooperative
funding program. Tampa Bay Water has requested the District fund 50 percent or up to $116,000,000 of total eligible
project costs. The District's and Tampa Bay Water's share of the project was reduced to $105,121,573 each, as a
result of $21,756,854 in state funding that was secured ($15,506,854 from Water Protection and Sustainability
Program trust funds and $6,250,000 from the Community Budget Issue Request). The final year of funding was
budgeted in FY2011 and includes $759,981 from the Governing Board and $90,212 from the Withlacoochee River
Basin, for a total of $850,193.
Additional Information
In 2005, Tampa Bay Water (TBW) determined that the permitted capacity of their regional potable water supply
system would be exceeded in 2011. In order to meet demand beyond 2011, TBW decided to move forward with the
System Configuration II project. Tampa Bay Water originally proposed to meet their water supply needs beyond 2011
through the downstream augmentation component of the TBRRAP project (H300-H310). The downstream
augmentation component was eliminated from the project as a result of permitting difficulties. However, many of the
elements necessary for downstream augmentation, such as expansion of the surface water treatment plant and
Tampa Bypass Canal (TBC) intakes, will also be necessary for the System Configuration II project. As a result of
these developments, the TBW Board voted to move forward with the System Configuration II project at their October
2006 meeting. Two of the system interconnect projects were previously approved by the District for funding. The
South Central Hillsborough Interconnect was partially funded in FY2007 by the Governing Board, Alafia River and
Hillsborough River Basin Boards. The Northwest Hillsborough Interconnect was also partially funded in FY2007 by the
Governing Board and Northwest Hillsborough Basin Board. The amounts previously budgeted by the Board and
Basins for those projects were transferred to this project and the amounts credited towards their respective project
costs. The Governing Board approved the agreement with TBW for the System Configuration II project at its February
2007 meeting. The project, when completed in 2011, is expected to provide up to 25 mg per day of alternative water to
the regional system. The cooperative funding agreement was executed on May 1, 2007, with a contract period
beginning on October 1, 2005 and ending December 31, 2012. Shortly after the contract execution, TBW received
approval of its water use permit (June 2007). The project seeks to increase TBW's overall system capacity by drawing
more water from the Hillsborough River during high flows via the TBC, in combination with increasing the allowable
percentage of withdrawals from the TBC. The project components are primarily associated with the construction of
improvements to the regional system's treatment, transmission, and storage infrastructure.
011 - Alafia River Basin 150
H065
Design & Construction - TBW System Configuration II - Plant from
66 to at least 99 MGD; Pipes, Pumps, etc.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 52,613,320 0 7,248,588 44,599,054 3,830 761,848
011 Alafia River Basin 5,269,241 0 1,343,384 3,922,993 458 2,406
013 Hillsborough River Basin 15,375,057 0 1,674,125 13,693,380 1,000 6,552
014 Northwest Hillsborough Basin 4,625,103 0 975,517 3,649,586 0 0
015 Coastal Rivers Basin 4,217,740 0 501,456 3,713,705 458 2,121
016 Pinellas-Anclote River Basin 22,623,762 0 2,695,328 19,919,438 1,745 7,251
019 Withlacoochee River Basin 537,869 0 62,682 383,012 836 91,339
District Budgeted - Outside Revenue
Ecosystem Trust Fund - Tampa Bay
Rstr
3,250,000 0 3,000,000 250,000 0 0
Ecosystem Trust Fund - TBRRAP
Cooperator
3,000,000 0 3,000,000 0 0 0
Water Protection & Sust T.F.
(Alternative Wtr)
15,506,854 0 15,506,854 0 0 0
Project Funds Not Budgeted by the
District
Tampa Bay Water 120,815,912 0 0 119,965,718 0 850,194
$247,834,858 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Planning and Initial Design 10/31/05 10/31/06
Contract Approved 2/27/07 2/27/07
Notice to Proceed 3/9/07 5/1/07
Design 9/1/08 9/30/09 7/31/09
Construction 9/30/08 12/31/11
Substantial Completion 12/31/10 6/30/11
Final Completion 12/31/11
Contract close out 12/31/12
Status As Of: February 25, 2011
ACTION-TO-DATE : On-time. Overall, the System Configuration II project is running on schedule for its December 2011
completion date. On January 31, 2008, the South-Central Hillsborough Infrastructure Project (SCHIP) Phase IB was
completed. The purpose of Phase IB is to provide potable water from the regional surface water treatment plant to
TBW's Brandon/South Central Hillsborough service area and add yard piping improvements at the Lithia Water
Treatment Plant. The SCHIP Phase II was completed March 17, 2009. The Morris Bridge Booster Station Expansion was
completed on September 24, 2010. This project provides disinfection and increases the discharge pressure of the
treated groundwater from the Morris Bridge Wellfield that is delivered into the regional system. The Surface Water
Treatment Plant Expansion was completed in December 2010. This project increases the plant's capacity from 66 mgd
to a minimum of 99 mgd. The remaining seven project components are in the construction phase. Major activities are
described below.
Tampa Bypass Canal (TBC) Pump Station: The TBC Pump Station pumps water from the lower and middle pools to
the SWTP. The expansion of this pump station will increase the capacity of the station from 138 mgd to 200 mgd.
011 - Alafia River Basin 151
H065
Design & Construction - TBW System Configuration II - Plant from
66 to at least 99 MGD; Pipes, Pumps, etc.Recently completed activities include re-installation of Pumps 1 and 4 after factory retrofitting. Ongoing activities include
instrumentation and controls programming, general site and building cleanup, and preparation of the preliminary punch
list.Regional High Service Pump Station: The purpose of the Regional High Service Pump Station is to pump treated
water into the Regional Transmission System; the expansion will increase the pump station capacity from 120 mgd to
135 mgd. Current activities include punch list items and additional auxiliary power transition controls work.
SWTP Repump Station Expansion: The function of the SWTP Repump Station is to pump raw water from the Regional
Facilities site to the SCHI Booster Pumping Station/C.W. Bill Young Regional Reservoir. The expansion will increase the
capacity from 130 mgd to 180 mgd. Recently completed activities include instrumentation and controls programming.
Current activities include punch list items.Cypress Creek Pump Station Expansion: The Cypress Creek Pump Station
Expansion will add pumping capacity improvements. The expansion will increase the capacity from 150 mgd to 165 mgd.
Recently completed activities include testing of the new auxiliary power system and placing the new 72-inch chemical
feed bypass piping in service. Current activities include installation of Pump #7 and the 42-inch surge control piping.
SCHI Booster Pumping Station: The purpose of the SCHI Booster Pumping Station is to pump water from the Repump
Station to the C.W. Bill Young Regional Reservoir. Current activities include the review of equipment and material
submittals, pressure testing of the 72-inch pipe, and concrete work for the pump building. Recently completed activities
include installation of decking and roof on the electrical building, storage tank testing, installation of the 72-inch Venturi
meter, and offloading of the switch gear.
Off-stream Reservoir Pump Station: The Off-stream Reservoir Pump Station pumps water from the reservoir to the
SWTP. Current activities include the review of equipment and material submittals and backfilling. Recently completed
activities include completion of valve vault walls, installation of the 84-inch pipe, installation of VFDs in the electrical
building, and the Reservoir Transmission Main tie-in.Northwest Hillsborough Pipeline: The Northwest Hillsborough
Pipeline adds infrastructure improvements to the Regional Facilities that provide a regional interconnect with the
Northwest Hillsborough Regional Wellfield. Ongoing activities include preparation for pipeline crossings at Fawn Ridge
Blvd., Sheldon Rd., and Gunn Hwy.; pipeline pressure testing; and installation of an emergency connection at the
Northwest Hillsborough Water Treatment Plant. Completed activities include disconnecting the Northwest Hillsborough
Wellfield piping from the Regional System and separating the raw water wellfield piping from the Regional Transmission
Main connection between the Northwest Hillsborough and Cosme Water Treatment Plants.
011 - Alafia River Basin 152
H076
Design & Construction - TECO's SW Polk Power Station
Interconnects to Lakeland & Polk CountyProject Type WS&R Dev.
AORs Strategic InitiativesWater Supply Reclaimed Water
Basin(s) General Fund (District), Alafia River, Peace River
Tampa Electric Company, Tampa Electric CompanyCooperator(s)
Project Manager RAMOY, ALISON
Task Manager(s)
Status Proposed
DescriptionThis alternative water supply project is proposed to maximize the beneficial use of reclaimed water flows that are not
currently being beneficially used by the City of Lakeland, Polk County, Mulberry, and potentially other utilities such
as Plant City and Hillsborough County. The project is best described as being composed of two elements. The first
element is a traditional reclaimed water supply project consisting of transmission pipelines and storage to provide
reclaimed water to industrial users from one or more domestic wastewater treatment facilities. This element is
proposed to be implemented in at least two phases.
Phase I consists of the design and construction of approximately 15 miles of reclaimed water transmission main from
the City of Lakeland's wastewater effluent wetland treatment system to the Tampa Electric Company's (TECO) Polk
Power Station (WUP# 11747) for power generation expansion (Unit 6). Additional reclaimed water flows will be
obtained from the Polk County Southwest Regional Utility Service Area and the City of Mulberry (see "Additional Info"
below for further details). Phase I also includes the additional treatment necessary, including one deep disposal well,
for TECO to treat the water to an acceptable level for cooling and other potential uses.
Phase II, of the first element, may bring additional reclaimed water to TECO to meet additional power generation
expansion needs at the Polk Power Station (Unit 7). Phase II may also provide reclaimed water to customers in
addition to TECO, such as Mosaic. It is likely that storage will be necessary for this phase, which could involve the
reclamation and conversion of Mosaic's N-5 Reservoir to a reclaimed water storage reservoir. The source(s) of
reclaimed water for this second phase will have to be evaluated. District staff and project participants will ensure the
project infrastructure, including pipe capacities, are sized appropriately in anticipation of future flows that may be used
to serve other users.
Recharge was explored as part of the second element, which is more innovative in concept and seeks to create
opportunities for additional potable groundwater withdrawals in the SWUCA through direct or indirect recharge of
reclaimed water into the Upper Floridan aquifer. MWH Americas, Inc. completed the Feasibility of Using Reclaimed
Water for Direct and Indirect Aquifer Recharge in the Tampa Bay Area Study in March 2009. The scope of work
included assessing regulatory requirements for reclaimed water treatment in order to obtain operational permits (Task
1); quantifying water level improvements following aquifer recharge and subsequent amounts of groundwater
withdrawals using groundwater modeling of conceptual scenarios at various coastal and inland locations and recharge
rates (Task 2); and performing a cost analyses of various recharge options (Task 3). The findings, presented to the
Governing Board on March 31, 2009, indicated that it is possible to develop direct and indirect aquifer recharge
projects to improve Upper Floridan aquifer water levels and provide opportunities for additional groundwater
withdrawals. Further involvement by the District will be in the form of providing technical and financial support
(cooperative funding) to entities who propose to investigate aquifer recharge more thoroughly.
BenefitsThe implementation of Phase I will initially provide TECO with approximately 7 mgd of reclaimed water (combined
flows from Lakeland, Polk County and Mulberry) for power generation expansion at the Polk Power Station. While
flows have not been finalized, Phase II will provide TECO with reclaimed water for a future power generation
expansion. Discussions with potential Phase II project participants have revealed that additional reclaimed water flows
may be utilized by other customers, such as Mosaic. Utilization of reclaimed water will eliminate surface water
discharges, ultimately resulting in a reduction of nitrogen loading to Tampa Bay. The potential project benefit of
recharge to the Upper Floridan aquifer of the SWUCA in the vicinity of southern Hillsborough County or western Polk
County could provide for additional groundwater withdrawals in the SWUCA.
Costs
Phase I is now estimated to cost $68,186,800, due to the inclusion of the Polk County SWRUSA reclaimed water
connection to TECO (formerly Project H091). The District is being asked to fund 50 percent, or $34,093,400. However,
the District's and TECO's share of eligible project costs has been reduced to $32,426,734 each as a result of
$3,333,332 in Water Restoration Action Plan (WRAP) funding that has been secured. The District funding will be
divided as: Governing Board (50%); Alafia River Basin (25%); and Peace River Basin (25%). The funding approved for
011 - Alafia River Basin 153
H076
Design & Construction - TECO's SW Polk Power Station
Interconnects to Lakeland & Polk CountyPhase I from FY2009 through FY2011 is $27,525,360, split as: Governing Board $16,213,368; Alafia River Basin
$5,748,687; Peace River Basin $2,229,973; and WRAP $3,333,332. This includes the $553,024 in ad valorem funding
and $833,332 from the WRAP Fund as a result of the budget transfer from Project H091. The funding being requested
in FY2012 includes: Alafia River Basin $1,178,998 and Peace River Basin $2,938,355 for a total of $4,117,353 in
District funding to be used toward the design and construction of the transmission main from the Lakeland wetlands to
the Polk Power Station. The future funds identified for the project are contingent upon approval of such amounts by
the District Governing Board and Basin Boards in the annual budgets. Though the Manasota Basin Board approved
$31,250 in FY2009, the funding was returned to the Basin due to further project refinement, which does not include a
water resource benefit in this basin. The Governing Board also allocated $50,000 from the FY2008 budget to assist
TECO in the cost analyses of evaluating potential reclaimed water supply routes for Phase I. However, a route was
selected without having to utilize the $50,000 that was set aside, so the funding was returned to the Governing Board's
Water Supply and Resource Development Reserves (H100).
The City of Mulberry submitted a FY2012 cooperative funding application for a project (N360) that would supply the
TECO Polk Power Station with additional reclaimed water. Much like the Polk County SWRUSA connection, TECO
has requested, and staff recommends, that the Mulberry connection be combined with this existing project. The cost of
the Mulberry portion is estimated to be $4,500,000, increasing the total cost of the project to $72,686,800. The FY2012
funding request represents the cash flow demand through FY2012.
Phase II has not yet been initiated. The preliminary cost estimate, which is not reflected in the funding table, is
$70,000,000.
Recharge: The Governing Board also allocated $500,000 (see "Cumulative Transfers") from the FY2008 budget to be
used for a feasibility study to investigate reclaimed water aquifer recharge.
Additional Information
Polk County applied for and received funding for the Polk County SWRUSA Reclaimed Water Connection to TECO
Project (H091) during the FY2010 cooperative funding cycle. When District and county staff entered into discussions
about developing the cooperative funding agreement, it became clear that the best course of action for all parties
would be to combine that project with this overall project. TECO also agreed to this approach. In order to combine the
projects, it was necessary to transfer the funding from the Polk County SWRUSA Reclaimed Water Connection to
TECO Project to this project. A request to transfer the funds and authorization to amend the existing cooperative
funding agreement with TECO was approved by the Alafia River and Peace River Basin Boards and the Governing
Board in June 2010. District staff prepared a draft amendment to incorporate the elements from the Polk County
SWRUSA Reclaimed Water Connection to TECO Project. However, the amendment will be postponed until the
Mulberry portion of the project can also be added.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 17,849,758 1,125,000 757,661 13,367,749 7,678 2,591,670
011 Alafia River Basin 8,693,046 1,741,498 1,638,256 2,667,023 1,183,035 1,463,234
020 Peace River Basin 8,693,046 3,500,855 138,256 1,136,529 2,942,392 975,014
021 Manasota Basin 1,451 0 (31,250) 32,701 0 0
District Budgeted - Outside Revenue
State Approp - WRAP - Prior Year
Funds
3,333,332 0 3,333,332 0 0 0
Project Funds Not Budgeted by the
District
TECO 34,676,734 6,367,353 0 19,181,440 4,117,353 5,010,588
$73,247,367 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 154
H076
Design & Construction - TECO's SW Polk Power Station
Interconnects to Lakeland & Polk County
Critical Project Milestones ActualProjected Amended
Phase IAgreement Effective 10/1/08 10/1/08
Agreement Executed 12/31/08 2/24/09
Begin Infrastructure Design 3/15/09 2/18/10 2/18/10
Begin Disposal Well Design 3/1/10 11/1/08 11/1/08
Begin Water Quality Testing 8/31/10 3/31/10 3/31/10
Complete Disposal Well Design 9/30/10 7/3/09 7/3/09
Begin Disposal Well Construction 1/1/11 2/5/10 2/5/10
Complete Infrastructure Design 3/31/11 12/28/11
Begin Infrastructure Construction 4/30/11 1/6/12
Complete Water Quality Testing 4/30/13
Complete Infrastructure Construction 4/30/13 12/28/12
Complete Disposal Well Construction 4/30/13 4/1/11
Phase I Completion 1/31/14
Phase I Contract Closeout 12/31/14
RechargeBegin Aquifer Recharge Study 10/1/08 10/1/08
Complete Aquifer Recharge Study 3/31/09 3/31/09
Status As Of: February 28, 2011
Phase I: To date, the District has budgeted a total of $24,192,028 in ad valorem funding and an additional $3,333,332
from the WRAP fund. The Project Milestones have been revised to reflect the accelerated well construction. The next
monthly project status meeting is scheduled for March 8 at the Polk Power Station. District staff met with representatives
from TECO, Lakeland, Polk County and Mulberry on December 21 to discuss the timing of reclaimed water flows that will
be used before Unit 6 is operational. TECO staff continue to analyze options for their future power sources and
associated water needs. A tour of the site will be held on March 23. District staff drafted the amendment to incorporate
the elements from the Polk County SWRUSA Reclaimed Water Connection to TECO Project. However, the amendment
will now be postponed in order to also incorporate the Mulberry portion of the overall project. TECO staff are still finalizing
the terms of separate Reclaimed Water Supply Agreements with Polk County and Mulberry. The Mulberry portion of the
pipeline was originally planned to be a separate project. As such, Mulberry submitted a FY2012 request for cooperative
funding (Project N360). However, Mulberry will now be incorporated into this project and their FY2012 cooperative
funding request has been withdrawn. No funding is being requested in FY2012 for the Mulberry pipeline. The FY2012
cooperative funding is being requested for completion of the Lakeland and Polk County portions of the project. ACTION
TO DATE: On time. TECO has entered into agreements with the selected consultants/contractors for preliminary
engineering, oversight of well construction, and well drilling. The Request for Qualifications for the pipeline and pump
station engineering was advertised in December, and the responses are being reviewed. Construction of the disposal
well began in February 2010, ahead of the originally anticipated start date of 1/1/2011. Well drilling commenced on May
3, and the 12.25-inch diameter pilot hole has since been drilled to 6,000 feet below land surface (bls). The pilot hole has
been reamed with a 26.5-inch bit in anticipation of the 18-inch diameter final steel casing to 4,215 feet. Sampling
continues at the monitor wells. The reclaimed water treatment pilot test at the Lakeland Wetland Treatment System will
run through March 2011.
011 - Alafia River Basin 155
H082
Feasibility - Potential for Expanding TBW's C.W. "Bill" Young
Reservoir or AlternativesProject Type WS&R Dev.
AORs Strategic InitiativesWater Supply Alternative Water Supply
Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Withlacoochee River
Tampa Bay WaterCooperator(s)
Project Manager WILL, SANDIE
FERREIRA-LEE, SHELLIE, BARCELO, MARKTask Manager(s)
Status Ongoing
DescriptionThe Surface Water Expansion Project includes a four-year feasibility study that involves detailed planning, modeling,
and preliminary engineering to determine the availability of surface water withdrawals from surface water supply
sources (including the Alafia River and Bullfrog Creek) and expansion of Tampa Bay Water's current reservoir, as well
as a cost analyses. Tampa Bay Water will be conducting public outreach activities independently. This project was
completely funded in FY2010, and the project is scheduled to be completed by December 2014. Results from this
study will aid Tampa Bay Water's Board to determine if this water supply option is viable and whether further analyses
should be performed.
BenefitsThe project will determine the potable water supply yield of surface water alternatives, as well as infrastructure
elements and capital and operating costs, and will provide Tampa Bay Water the information needed to evaluate
various ways to increase their potable water supply by expanding their surface water supply system.
Costs
Total cost is $2,247,669, with Tampa Bay Water contributing $1,496,020 and the District contributing 50 percent of
eligible costs up to an amount not to exceed $751,649. Sources of District funding are as follows: General Fund
($375,825); Alafia River Basin ($37,582) Hillsborough River Basin ($142,813); Coastal River Basin ($30,066);
Pinellas-Anclote River Basin ($161,605) and Withlacoochee River Basin ($3,758). Public outreach will be solely
funded by Tampa Bay Water.
Additional Information
This project will study one of the seven water supply concepts to develop new supply under consideration by Tampa
Bay Water as part of the December 2008 update to the Master Water Plan. Tasks in this project will allow Tampa Bay
Water to evaluate different alternatives for expansion of the surface water system for additional alternative water
supply. The study will be shared with Polk County as per an approved Memorandum of Understanding between Polk
County and Tampa Bay Water, and opportunities will be explored to see if an economy of scale is achievable.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 389,479 0 (249,176) 629,031 4,835 4,789
011 Alafia River Basin 41,158 0 (24,918) 64,466 1,051 559
013 Hillsborough River Basin 148,271 0 (94,687) 239,637 1,276 2,045
015 Coastal Rivers Basin 33,553 0 (19,934) 51,966 1,056 465
016 Pinellas-Anclote River Basin 167,784 0 (107,145) 271,505 1,218 2,206
019 Withlacoochee River Basin 6,908 0 (2,492) 8,216 1,051 133
Project Funds Not Budgeted by the
District
Tampa Bay Water 1,496,020 0 0 1,250,000 246,020 0
$2,283,173 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 156
H082
Feasibility - Potential for Expanding TBW's C.W. "Bill" Young
Reservoir or Alternatives
Critical Project Milestones ActualProjected Amended
Task 1Surface Water System Expansion Evaluation 12/31/13
Task 2Develop Project Configurations 6/30/14
Task 3Public Information and Involvement (TBW funded only) 12/31/14
Task 4Coordination 12/31/14
Task 5Final Project Report 11/28/14
Task 6Project Management 12/31/14
Task 7Contingency 12/31/14
Status As Of: March 10, 2011
District staff met with TBW and their consultants on March 3, 2011 to discuss the project status and modeling results.
The consultants have completed numerous modeling runs and have chosen seven scenarios that appear most viable.
During the next few months, these scenarios will be evaluated and a recommendation will be presented to their Board in
June 2011. It is anticipated that the next status meeting will be held in June/July 2011. ACTION-TO-DATE: On time
011 - Alafia River Basin 157
H092
Pasco County Reclaimed Water for Natural System Restoration &
Aquifer RechargeProject Type WS&R Dev.
AORs Strategic InitiativesWater Supply Reclaimed WaterNatural Systems Minimum Flows and Levels Recovery
Basin(s) General Fund (District), Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River
Pasco CountyCooperator(s)
Project Manager HANCOCK, MIKE
RHINESMITH, PHILIP, WRIGHT, CARLTask Manager(s)
Status Ongoing
DescriptionThe Reclaimed Water Natural Systems Treatment and Restoration Project is a collaborative effort between the District
and Pasco County to investigate using excess reclaimed water to improve the water resources in central Pasco
County. The project will investigate the feasibility of applying reclaimed water to constructed wetland systems and/or
infiltration basins in central Pasco County to help raise groundwater and surface-water levels that have been
historically depressed due to regional ground-water withdrawals. Variations of this approach have been employed
before in natural and constructed wetlands throughout Florida, leading to improved wildlife usage, restored water
levels, and natural treatment of effluent. The first phase (FY2010) of this multi-year project included an initial feasibility
study, while the second year (FY2011) involves more assessment and preliminary design. Funds for 2012 will be used
for advanced levels of feasibility work to continue assessments, including more surface and groundwater modeling,
field data collection, and pre-land acquisition work. Further discussions with regulatory agencies will be included.
Future phases will include land purchase,design, permitting and construction, and will depend on the results of Phase
2 and 3.
BenefitsIf this project is found to be feasible and is constructed, the facility would provide additional water for impacted water
resources in the Upper Hillsborough River and Coastal Rivers watersheds, including the aquifers, wetlands and flow
systems. The facility may also provide additional wetland habitat, recreational facilities, and reclaimed water disposal
opportunities for Pasco County.
Costs
The Hillsborough River Basin Board approved $98,382 for FY2010 to expand Pasco County's ongoing feasibility
study. Funding for FY2011 was budgeted by the Governing Board, and the Hillsborough River, Coastal Rivers,
Pinellas-Anclote River, Withlacoochee River, and Alafia River Basin for a total of $250,000. Proposed funding for
FT2012 is $950,000, which includes $237,500 from the Governing Board, $118,750 each from the Hillsborough River
and Pinellas-Anclote River Basins, and $475,000 from Pasco County. The total cost of future work is estimated to be
$63,256,000 for design, permitting, and construction, and $33,000,000 for land purchases. Future phases and their
sources of funding will be dependent on the results the previous phases.
011 - Alafia River Basin 158
H092
Pasco County Reclaimed Water for Natural System Restoration &
Aquifer Recharge
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 380,446 0 0 0 248,164 132,282
011 Alafia River Basin 15,170 0 0 0 1,791 13,379
013 Hillsborough River Basin 269,738 0 98,382 0 120,671 50,685
015 Coastal Rivers Basin 17,340 0 0 0 6,432 10,908
016 Pinellas-Anclote River Basin 177,638 0 0 0 120,541 57,097
019 Withlacoochee River Basin 3,478 0 0 0 1,791 1,687
Project Funds Not Budgeted by the
District
Pasco County 475,001 0 0 0 475,000 1
$1,338,811 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Feasibility Project Begins 6/1/10 10/11/10 10/11/10
Phase 1 Completed 2/1/11 2/1/11
Phase 2 begins 4/18/11
Phase 2 Complete 9/30/11
Phase 3 begins 10/3/11
Phase 3 complete 9/30/12
Status As Of: February 10, 2011
At their April 8, 2010 Board meeting, the Hillsborough River Basin Board approved $98,382 to be transferred from their
FY 2010 Water Supply and Resource Development Reserves to this project. The final Agreement was signed by the
District in October. Meetings were held throughout late-October and November to discuss the project and results. The
draft final report was reviewed, and the final report was received. Discussions are now taking place to determine the
scope of the next phase of the project.
011 - Alafia River Basin 159
H541
FARMS - Hopewell Business Center, LLC
Project Type WS&R Dev.
AORs Strategic InitiativesWater Supply Alternative Water Supply
Basin(s) Alafia River
Hopewell Enterprises / Business CenterCooperator(s)
Project Manager COOPER, RANDY
Task Manager(s)
Status Ongoing
DescriptionThe FARMS project, as proposed by Hopewell Business Center, is to reduce Upper Floridan aquifer groundwater
withdrawals through the use of a tailwater recovery and surface water irrigation reservoir. The strawberry farm is
located in the Medard Park Run Watershed of the Alafia River, on the South side of State Road 60 in Hillsborough
County, within the SWUCA. The previous Water Use Permit for this grove authorized an annual average groundwater
withdrawal of 24,000 gallons per day (gpd) for the irrigation of 32 acres of citrus from two Upper Floridan aquifer wells.
The citrus grove has been destroyed due to disease and has been converted to strawberries and row crops. The
Water Use Permit is currently in house for a modification due to the crop change; however, the expected annual
average groundwater withdrawal that will be allowed under the permit modification is 225,000 gpd. The previous permit
was a small general permit, which does not require meter readings, therefore no data is available to determine
historical use. The modified permit will require meter readings. The proposed project involves water quantity BMPs.
Therefore, the project qualifies for a 50 percent cost-share reimbursement rate under the FARMS Program.
BenefitsFARMS projects calculate a cost benefit based on the term of the proposed contract (generally five years) and
compare it to model farms listed in the Regional Water Supply plan. Using an estimate of 50 percent savings of
projected permitted quantities, or approximately 112,500 gpd, yields a daily cost of $1.26 per thousand gallons of
groundwater reduced over the proposed five-year contract term, and $0.38 per thousand gallons of groundwater
reduced over a thirty-year term. Both projected values for groundwater savings costs are within the guidelines for the
generally accepted average cost savings per thousand gallons for the implementation of alternative water supplies.
Costs
Total project costs are estimated at $225,000, with FARMS eligible costs up to a not-to-exceed limit of $112,500. Of
this amount, the 2005 State Appropriations will be used for $56,250 of the reimbursement, the Governing Board is
requested to fund $28,125, and the Alafia River Basin Board is requested to fund $28,125.
Construction is complete with final reimbursement of $28,125 from Fund 010 General Fund, $28,125 from Fund 020
Peace River Basin, and $56,250 from Ecosystems Trust Fund appropriation to FARMS.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 28,125 0 28,125 0 0 0
011 Alafia River Basin 28,125 0 28,125 0 0 0
District Budgeted - Outside Revenue
Ecosystem Trust Fund - FARMS 56,250 0 56,250 0 0 0
$112,500 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
01 - Approval
011 - Alafia River Basin 160
H541
FARMS - Hopewell Business Center, LLC
Governing Board Approval 12/18/07 12/18/07
Basin Board Approval 2/7/08 2/7/08
Status As Of: February 21, 2011
This project has offset groundwater pumping by an average of 16,529 gpd or 14.69 percent of the projected offset of
112,500 gpd.
ACTION-TO-DATE: On-time
011 - Alafia River Basin 161
H595
FARMS - Mont-Lest, LLC
Project Type WS&R Dev.
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River
Cooperator(s)
Project Manager STINGHEN, GIO
Task Manager(s)
Status Ongoing
DescriptionThe project as proposed by Mont-Lest, Inc. is to reduce the withdrawal of groundwater through the construction and
operation of a 1.2-acre surface water irrigation reservoir. Surface water will then be used for all crop establishment and
frost/freeze protection, and for in-season irrigation when sufficient quantities are available.The reduction in
groundwater use will benefit the Upper Floridan aquifer system by replacing Upper Floridan withdrawals with recovered
tailwater and surface water. FARMS project components consist of one surface water irrigation pump station, including
pump, power unit, and filtration. Mont-Lest, Inc. is located in eastern Hillsborough County, 3 miles south of State Road
60 and 3 miles west of County Road 39. The property drains into the Alafia RiverThe Water Use Permit currently
authorizes 43,700 gallons per day (gpd) for the irrigation of citrus. However, the permit is in the process of being
modified to accommodate strawberry with drip irrigation and overhead irrigation for freeze protection. It is anticipated
that the revised permitted quantity will be 110,000 gpd. There is no reported pumpage, as the permitted quantity for
citrus irrigation was less than 100,000 gpd, which is the threshold for reporting pumpage in the SWUCA. The proposed
project involves water quantity BMPs, which qualifies for a percent cost-share reimbursement rate under the FARMS
Program.
BenefitsFARMS projects calculate a cost benefit based on the term of the proposed contract (generally five years) and
compare it to model farms listed in the Regional Water Supply plan. Using an estimated percent savings of permitted
quantities, or approximately 44,000 yields a daily cost of $1.27 per thousand gallons of groundwater reduced over the
proposed 8-year contract term, and $0.56 per thousand gallons of groundwater reduced over a 30-year term. Both
values are within the guidelines for the generally accepted average cost savings per thousand gallons for the
implementation of alternative water supplies for strawberry operations.
Costs
Total project costs are estimated at $151,000 with FARMS eligible costs up to a not-to-exceed limit of $65,500 percent
of total project costs. Of this amount, the 2008 State Appropriations will be used for $32,750 of the reimbursement, the
Alafia River Basin is requested to fund $16,375, and the Governing Board is requested to fund $16,375.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 49,125 0 49,125 0 0 0
011 Alafia River Basin 16,375 0 16,375 0 0 0
$65,500 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: February 21, 2011
Project delayed while District investigates cold protection issues. ACTION-TO-DATE: Delayed
011 - Alafia River Basin 162
H598
FARMS - Francis White
Project Type WS&R Dev.
AORs Strategic InitiativesWater Supply Alternative Water Supply
Basin(s) Alafia River
Cooperator(s)
Project Manager ESTES, CAROLE
Task Manager(s)
Status Ongoing
DescriptionThe project as proposed by Francis White is to reduce the withdrawal of groundwater through the construction and
operation of a five-acre tailwater recovery and surface water irrigation reservoir that will collect and reuse water from
the property and surrounding watershed. The reduction in groundwater use will benefit Upper Floridan aquifer system
by replacing Upper Floridan withdrawals with recovered tailwater and surface water. FARMS project components
consist of a surface water irrigation pump station, filtration, and the piping necessary to connect the surface water
reservoir to the existing irrigation system. The United States Department of Agriculture Natural Resource Conservation
Service will be reimbursing the grower for the cost of excavation and water control structures. Francis White
strawberry farm is located approximately five miles south of Plant City, in eastern Hillsborough County, and within the
SWUCA. The property drains into the Alafia River less than a mile above its confluence with Turkey Creek. Currently, t
he Water Use Permit authorizes an annual average groundwater withdrawal of 112,700 mgd for the micro-irrigation of
citrus trees. Since January 2004, an average of 75 percent of the permitted quantities was used to irrigate the citrus
grove. The applicant is in the process of converting the grove to strawberry production using drip and overhead
irrigation for crop establishment and freeze protection. It is estimated that the change in crop type will increase the
permitted annual average withdrawal of groundwater to approximately 244,000 gallons per day (gpd). Mrs. White has
applied for a water use permit modification, however the modification has been delayed pending evaluation of the
impact of cold protection quantities. The existing permit allows for 2,592,000 gpd in cold protection quantities for citrus.
The conversion to strawberries will require an additional 12,528,000 gpd for cold protection. The reservoir designed for
the site has a capacity of nearly 23,000,000 gallons, and it is positioned to receive nearly all the runoff from the
property. Preliminary calculations indicate that the reservoir should provide ample capacity for typical cold protection
events. The proposed project involves water quantity BMPs through the excavation of a five-acre reservoir. The
reservoir will provide sufficient capacity to reduce groundwater withdrawals more than 50 percent and therefore
qualifies for a 75 percent cost-share reimbursement rate under the FARMS Program.
BenefitsFARMS projects calculate a cost benefit based on the term of the proposed contract (generally five years) and
compare it to model farms listed in the Regional Water Supply plan. Using an estimated 60 percent savings of
proposed quantities, or approximately 146,000 gpd yields a daily cost of $1.08 per thousand gallons of groundwater
reduced over the proposed five-year contract term, and $0.32 per thousand gallons of groundwater reduced over a
thirty-year term. Both values are within the guidelines for the generally accepted average cost savings per thousand
gallons for the implementation of alternative supplies and improved irrigation techniques for strawberry operations.
Costs
Total project costs are estimated at $ 240,000, with FARMS eligible costs up to a not-to-exceed limit of $180,000 (75
percent of total project costs). Of this amount, $45,000 will be funded from Fund 010 General fund; $45,000 will be
funded from Fund 011 Alafia River Basin Board; and $90,000 will be funded by WRAP appropriations to FARMS.
011 - Alafia River Basin 163
H598
FARMS - Francis White
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 45,000 0 45,000 0 0 0
011 Alafia River Basin 45,000 0 45,000 0 0 0
District Budgeted - Outside Revenue
State Approp - WRAP - Prior Year
Funds
90,000 0 90,000 0 0 0
$180,000 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: February 21, 2011
This project is under construction.
ACTION-TO-DATE: On-Time
011 - Alafia River Basin 164
H611
FARMS - Alafia Berry Farm
Project Type WS&R Dev.
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River
Cooperator(s)
Project Manager LEWELLING, BILL
Task Manager(s)
Status Completed
DescriptionFARMS Program staff received a project proposal from Alafia Berry Farms, LLC, for their 30-acre row crop farm
located in southeastern Hillsborough County. The purpose of the project is to reduce Upper Floridan aquifer
groundwater withdrawals through the use of ground cover frost/freeze cloth. Proposed project components include:
25-acres of frost/freeze protection cloth, metal support brackets, and weighting to keep the cloth in place. The Alafia
Berry Farms, LLC property is comprised of approximately 30 acres dedicated to strawberry production, with a Water
Use Permit (WUP) authorizing groundwater use of an annual average of 115,200 gallons per day (gpd) for crop
production and 4,320,000 gpd for freeze protection. It has been estimated that the use of frost/freeze cloth on 25
acres will yield a groundwater offset of approximately 1,200,000 gpd, based upon an estimated 6,000 gal/acre rate
over an eight-hour period .
BenefitsThe proposed project involves 100 percent reduction in groundwater quantities thorough the use of row-cover cloth on
25-acres of strawberries for freeze protection in the Dover/Plant City Water Use Caution Area, which qualifies for a 75
percent cost-share reimbursement rate under the FARMS Program.
Costs
Using an estimated 100 percent savings of permitted freeze protection quantities, converted to an annual daily
average, yields a daily cost of $0.47 per thousand gallons of groundwater reduced over the proposed five-year
contract term, and $0.14 per thousand gallons of groundwater reduced over a thirty-year term. Both values are within
the guidelines for the generally accepted average cost savings per thousand gallons for the implementation of
improved irrigation techniques for row crop operations. State Appropriations to the Governing Board will be used
for $30,000 of the reimbursement, with the remainder divided evenly between the Alafia Basin Board ($35,250) and
the District Governing Board ($35,250).
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 65,250 0 65,250 0 0 0
011 Alafia River Basin 35,250 0 35,250 0 0 0
$100,500 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Installation/completion 12/27/10 12/27/10
Status As Of: December 30, 2010
25-acres of row-cover cloth was installed prior to late December 2010 freezes.
011 - Alafia River Basin 165
H612
FARMS - Berry Patches, Inc
Project Type WS&R Dev.
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River
Cooperator(s)
Project Manager BRUMBAUGH, DAVID
Task Manager(s)
Status Ongoing
DescriptionThe purpose of the project is to reduce Upper Floridan aquifer groundwater withdrawals historically used to prevent
strawberry crop freeze damage with a large area of protective row cover that would be deployed ahead of a weather
freeze event. Proposed project components include frost cloth to cover three fields having a combined area of 41
acres, low-tunnel support hoops, and weights to secure the frost cloth during periods of deployment. The Water Use
Permit authorizes annual average withdrawals of 104,700 gallons per day (gpd) for crop production, and 3,942,000
gpd for freeze protection. It has been estimated that use of the frost/freeze cloth on the 41-acres proposed for row
cover will reduce cold protection quantities by approximately 2.5 mgd.
BenefitsUsing an estimated 64 percent savings of permitted freeze protection quantities, converted to an annual daily average,
yields a daily cost of $ 0.75 per thousand gallons of groundwater reduced over the proposed five-year contract term,
and $0.23 per thousand gallons of groundwater reduced over a thirty-year term. Both values are within the guidelines
for the generally accepted average cost savings per thousand gallons for the implementation of improved irrigation
techniques for row crop operations.
Costs
Total project costs are estimated at $118,000 with FARMS eligible costs reimbursed at 75%, not to exceed $88,500.
The project is to be funded equally between the Alafia River Basin Board (Basin Fund 011) and the Governing Board
(General Fund 010).
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 44,250 0 44,250 0 0 0
011 Alafia River Basin 44,250 0 44,250 0 0 0
$88,500 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
01 - ApprovalAlafia River Basin Board 10/7/10 10/7/10
Governing Board 10/26/10 10/26/10
02 - ContractExecution 11/12/10
03 - InstallationDuring Hard Winter Freeze Events 1/1/11
Status As Of: December 20, 2010
The project is contract pending.
011 - Alafia River Basin 166
H619
FARMS - Ennis Strawberry Farm
Project Type WS&R Dev.
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River
Cooperator(s)
Project Manager LEWELLING, BILL
Task Manager(s)
Status Ongoing
DescriptionFARMS Program staff received a project proposal from Ennis Strawberry Farm for their 19-acre row crop farm located
in eastern Hillsborough County. The purpose of the project is to reduce Upper Floridan aquifer groundwater
withdrawals through the use of an existing 0.5-acre surface-water reservoir. Proposed project components include a
surface-water pump station, filters, and mainline pipe and controls connected to the irrigation system. The Ennis
Strawberry Farm property is comprised of approximately 19 acres dedicated to strawberry production, with a Water
Use Permit (WUP) authorizing groundwater use totaling an annual average of 45,000 gallons per day (gpd). It has
been estimated that the use of surface water for the proposed project will yield a groundwater offset of approximately
22,500 gpd, or 50 percent of the estimated irrigation requirements for strawberry operations in the project area. There
is no reported pumpage, as the permitted quantity is less than 100,000 gpd, which is the threshold for reporting
pumpage in the SWUCA. The existing Ennis Strawberry Farm pond has a well developed tailwater recovery dendritic
network of ditching that is capable of capturing much of the surface runoff during a limited or multi-day frost/freeze
event, thus providing for a sustained cold-protection period. This farm is permitted to withdrawal up to 1,764,000 gpd
of groundwater for frost/freeze protection, implemetation of the the pond is estimated to provide at least 50 percent of
the cold protection quantities, or 882,000 gpd.
BenefitsThe proposed project will reduce groundwater withdrawals from the Upper Floridan aquifer over the project area by
approximately 50 percent of permitted quantities, or 22,500 gpd, which allows for a 75 percent cost-share
reimbursement under the FARMS Program.
Costs
Using an estimated 50 percent savings of permitted quantities yields a daily cost of $0.87 per thousand gallons of
groundwater reduced over the proposed five-year contract term, and $0.26 per thousand gallons of groundwater
reduced over a thirty-year term. Both values are within the guidelines for the generally accepted average cost savings
per thousand gallons for the implementation of improved irrigation techniques for row crop operations. The funds will
be divided evenly between the Alafia River Basin Board and the District Governing Board.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 11,625 0 11,625 0 0 0
011 Alafia River Basin 11,625 0 11,625 0 0 0
$23,250 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of:
011 - Alafia River Basin 167
H620
FARMS - Blues Berry Farm, LLC
Project Type WS&R Dev.
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River
Cooperator(s)
Project Manager STINGHEN, GIO
Task Manager(s)
Status Ongoing
DescriptionFARMS Program staff received a project proposal from Blues Berry Farm, LLC, for their 20-acre blueberry farm
located one mile south of Plant City, in the proposed DPCWUCA in eastern Hillsborough County. The purpose of the
project is to reduce Upper Floridan aquifer groundwater withdrawals, historically used to prevent blueberry freeze
damage, through the construction and operation of a wind machine and two cold drains. The Water Use Permit
authorizes an annual average groundwater withdrawal of 34,500 gallons per day (gpd) to irrigate 20 acres of the
blueberry bushes with under bush drip in combination with overhead sprinklers for daily irrigation, and overhead
sprinklers for cold protection. FARMS project components will consist of one wind machine, one galvanized tower, a
fuel tank, one concrete pad, two cold drains, and one weather station. The use of wind machines is cost effective for
cold protection under radiant freeze conditions with wind speed less than five mph. This technology has been used
successfully on more than 31 blueberry farms in Georgia, Mississippi, Texas, and Arkansas to protect bushes from
freeze damage. On calm clear nights, wind machines can raise the temperature of the air around the blueberry bush
by as much as 5-6 degrees, based on research conducted by land grant universities in states that more commonly use
wind machines. Because the farm is located nearby to residential housing, the applicant is concerned about the noise
level from using two wind machines and proposes to replace one wind machine with two cold drains. During a radiation
frost night, the cold, heavy air will flow downhill, due to gravity, and settles in low elevation areas that do not allow for
adequate drainage. The cold drain thrusts the cold air upward to a height of nearly 300ft, mixing with the warmer,
lighter air from above, allowing it to rise higher, until it is dispersed into the upper inversion layer. The cold drain effect
changes the temperature in the lower elevation, frost-prone areas, to be more similar to the temperatures in the higher
elevation, non-frost areas. Analysis of historical District temperature and wind speed data indicates wind machines and
cold drains would be effective for approximately 75 percent of the daily events where groundwater pumping for cold
protection of blueberries would normally be expected. Therefore, the projected frost/freeze offset is 75 percent of the
permitted quantity of 1,636,100 gpd, or 1,227,075 gpd. One wind machine and two cold drains are expected to provide
sufficient cold protection for 75 percent of the frost/freeze events over the 20-acre project. The cold drain technology is
recommended for funding as a demonstration project to better assess the technology. Additional cold drain projects
will not be funded until the technology is proven through District data collection and analysis, to be viable as an
alternative to groundwater use.
BenefitsThe proposed project involves the reduction of groundwater quantities for freeze protection in the DPCWUCA, which
qualifies for a 75 percent cost-share reimbursement rate under the FARMS Program. The FARMS eligible expenses
total $3,695 per acre and are comparable to the range of typical cold protection costs for this technology that have
been compiled by FARMS staff. In addition, these costs are within the same range as other frost/freeze BMPs such as
freeze cloth ($2,300 to $3,800).
Costs
Total project costs are estimated at $78,000. The Alafia River Basin Board is requested to fund $29,250 and the
Governing Board is requested to fund $29,250.
011 - Alafia River Basin 168
H620
FARMS - Blues Berry Farm, LLC
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 29,250 0 29,250 0 0 0
011 Alafia River Basin 29,250 0 29,250 0 0 0
$58,500 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of: January 03, 2011
a contract is being developed for this project at this time
011 - Alafia River Basin 169
H622
FARMS - Mathis Farms
Project Type WS&R Dev.
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River
Cooperator(s)
Project Manager BRUMBAUGH, DAVID
Task Manager(s)
Status Ongoing
DescriptionThe purpose of the project is to reduce Upper Floridan aquifer groundwater withdrawals historically used to prevent
strawberry crop freeze damage with a large area of protective row cover that would be deployed ahead of a weather
freeze event. Proposed project components include frost cloth to cover two fields having a combined area of 40
acres, low-tunnel support hoops, and weights to secure the frost cloth during periods of deployment. The Water Use
Permits for the two fields combined, authorizes annual average withdrawals of 121,900 gallons per day (gpd) for
strawberry crop production, and maximum daily frost/freeze withdrawals of 3,369,600 gpd. It has been estimated that
use of frost cloth on the 40-acres proposed for row cover would reduce cold protection quantities up to the permitted
maximum daily withdrawal quantities.
BenefitsThe proposed project involves the reduction of groundwater quantities for freeze protection in the DPCWUCA, which
qualifies for a 75 percent cost-share reimbursement rate under the FARMS Program. The FARMS eligible expenses
total $3,830 per acre for 1.8 oz. row cover cloth and are comparable to the range of typical cold protection costs for
this technology that have been compiled by FARMS staff (range of $2,300 to $3,800).
Costs
Total project costs are estimated at $165,200 with FARMS eligible costs reimbursed at 75%, not to exceed $123,900.
The project is to be funded equally between the Alafia River Basin Board (Basin Fund 011) and the Governing Board
(General Fund 010).
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 61,950 0 61,950 0 0 0
011 Alafia River Basin 61,950 0 61,950 0 0 0
$123,900 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
01 - ApprovalAlafia River Basin Board 12/2/10 12/2/10
Governing Board 12/14/10 12/14/10
02 - ContractExecution 1/7/11
03 - InstallationDuring Hard Winter Freeze Events 1/7/11
Status As Of: December 20, 2010
The project is contract pending.
011 - Alafia River Basin 170
K652
Education - Water Conservation Theatre in Hillsborough County
(Cancelled)Project Type Cooperative Funding
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River
Arts Council of Hillsborough County, Hillsborough County BOCCCooperator(s)
Project Manager HULL, MARY MARGARET
Task Manager(s)
Status Cancelled
DescriptionThis Cooperative Funding Initiative (CFI) project will deliver water protection and conservation messages to more than
40,000 grades K-6 students and teachers in Hillsborough County through live theatrical presentations. Each
participating classroom receives District-created student/teacher materials, pre- and post-performance assessments
and an evaluation form.
BenefitsThis project enhances the District's water conservation education efforts by fostering individual (student and teacher)
responsibility to protect water resources and conserve water. Students, working with their teachers, gain knowledge
and skills and then use those skills in the classroom. This project promotes the District's mission through the
distribution of District-created student/teacher materials, which in turn, students/teachers take home to share with their
families. Throughout coordination of the program, Hillsborough County Water Resource Services has built a strong
partnership with The Arts Council of Hillsborough County and the School Board of Hillsborough County.
Costs
The total cost of the FY2011 project is $80,000, with the District contributing $40,000 (Alafia River $8,800;
Hillsborough River $31,200). The cost reflects no increase over FY2010 project costs. The dollar amount allocated per
basin is determined by the number of schools projected to participate in the programming from each basin. District
funding is for the development and presentation of performances promoting water conservation at Hillsborough
County schools as well as program evaluation. This project will reach an estimated 40,000 students at a cost to the
District of $0.98 per student well below the average of other comparable education programming. The budget lines
below include costs for staff to manage the project.
Additional Information
The total cost of the FY2010 project was $80,000, with the District contributing $40,000 (Alafia River $8,800;
Hillsborough River $31,200). This project reached approximately 45,436 students and 2,626 teachers at a cost to the
District of $0.83 per person and $0.83 per participant contact hour. Funding was used for the development and
presentation of theatrical performances at Hillsborough County schools. The District has supported this project since
FY1995.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 92,001 0 0 82,348 0 9,653
013 Hillsborough River Basin 227,082 0 0 194,935 0 32,147
014 Northwest Hillsborough Basin 91,525 0 0 91,525 0 0
Project Funds Not Budgeted by the
District
Hillsborough County Board of County
Commissioners
460,000 0 0 420,000 0 40,000
$870,608 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 171
K652
Education - Water Conservation Theatre in Hillsborough County
(Cancelled)
Critical Project Milestones ActualProjected Amended
FY 2009 Budgeted FundsTheatre performances begin 10/27/08 10/27/08
FY2009 Budgeted FundsSelection of new performers/script development 8/30/08 8/30/08
Purchase order opened 10/27/08 10/28/08
2008-2009 theatre performances end 6/5/09 5/27/09
2008-2009 evaluation and final report due to District 8/30/09 9/11/09 9/9/09
FY2010 Budgeted FundsInitiate purchase order 10/1/09 12/4/09
Educational programming ends 6/4/10 6/2/10
Final report and invoice due to District 8/31/10 8/9/10
FY2011 Budgeted FundsInitiate purchase order 10/1/10
Project cancelled 11/24/10 11/24/10
Educational programming ends 6/3/11
Final report and invoice due to the District 8/31/11
Status As Of: December 15, 2010
ACTION TO DATE: Cancelled. District was copied on a letter from Hillsborough County to the Arts Council of
Hillsborough County cancelling the project effective November 24, 2010.
011 - Alafia River Basin 172
L099
WMP - Hillsborough - Watershed Model Update
Project Type Cooperative Funding
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) Alafia River, Hillsborough River
Hillsborough County BOCCCooperator(s)
Project Manager ARNOLD, DAVE
Task Manager(s)
Status Ongoing
DescriptionThis is a continuing multi-year funded project to update the Topographic Information, Watershed Evaluation, and
Watershed Management Plan elements of the District's Watershed Management Program (WMP) in Hillsborough
County. The County's area is approximately 1000 square miles. The project updates 17 watershed plans developed by
Hillsborough County. The Topographic Information, Watershed Evaluation and Management Plan elements were
completed in 1998-2002 by the cooperator before development of the District's Watershed Management Program
Guidance Documents. This project involves the Update of Watershed Parameters and Models to the
District's Guidance Documents where the Topographic Information, Watershed Evaluation and Plan will reflect the
changes in the watershed since the previous work was done. FY2004-2007 funding completed Updates for the
Brooker Creek, East Lake, Duck Pond, Curiosity Creek, and began the Alafia River and Hillsborough River Updates.
FY2008 funding completes the Alafia River and Rocky/Brushy Creek Updates, and continues the Hillsborough River
Update. FY2009 funding is to complete the Hillsborough River, and Sweetwater Creek Updates. Due to higher than
expected costs, additional funding is required to complete the Little Manatee River, and Bullfrog Creek/Wolf Branch
Updates. As a result, Hillsborough County proposed funding in FY2010 and FY2011 to increase the project budget,
and extend the time schedule to finish this work. The Board approved this request and this funding was added through
an amendment to the cooperative funding agreement. Topographic information includes the acquisition of data and
development of the terrain features in the Geodatabase to be used in the Watershed Evaluation. The Watershed
Evaluation includes collection of existing data, GIS processing of the terrain features to establish catchments and
connectivity, field reconnaissance, refinement of the terrain features and development of the hydraulic element point
features. The Watershed Management Plan element includes: development of watershed parameters for a specific
use, GIS processing, computer modeling, floodplain and water quality analysis, surface water resource assessment,
establishment of LOS, BMP alternative analysis.
BenefitsA Watershed Management Plan provides a method to evaluate the capacity of a watershed to protect, enhance, and
restore water quality and natural systems, while achieving flood protection. The information developed provides the
science for the District's Resource Management and Environmental Resource Permitting (ERP). It assists local
governments with their land management responsibilities by identifying the floodplain, establishing a level of service,
evaluating Best Management Practices (BMPs) to address level of service deficiencies, and provides a geodatabase
and projected results from watershed model simulations for floodplain management, and water quality management.
Costs
The original project budget is $3,000,000, funded over FY2004-2009. The District's multi-year share is $1,500,000.
Contributing Basin Boards are Alafia River Basin ($563,000), Hillsborough River Basin ($504,000), and ($433,000)
from the former Northwest Hillsborough Basin which is now a part of the Hillsborough River Basin. Hillsborough
County is contributing $1,500,000. Based on Board Approval and amendment of the cooperative funding agreement,
$800,000 is added to the budget in FY2010-2011, increasing the total budget to $3,800,000. The additional budget is
to cover higher than expected costs. This funding is being used for the Little Manatee River and Bullfrog Creek/Wolf
Branch Updates, thereby completing the project. FY2011 funding totals $400,000, with the Alafia River Basin
contributing $200,000, and the County contributing $200,000. As watershed plan updates are completed, the project
cost and scope may require refinement based on the information gathered and unforeseen circumstances. The
District funding amount shown in the table includes staff salaries.
Additional Information
The WMP includes five major elements: 1) Topographic information, 2) Watershed Evaluation, 3) Watershed
Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters
and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.
Topographic Information is being updated by Hillsborough County. The Watershed Evaluation, and Watershed
Management Plan update process began in FY2002, with project K645 in the NW Hillsborough Basin. In FY2003 the
Basins funded watershed model reviews at the request of the County for each watershed (see B126). This project
011 - Alafia River Basin 173
L099
WMP - Hillsborough - Watershed Model Update
merges watershed plan update efforts within the County by including funding from the three Basins within the County,
the Alafia River, Hillsborough, and NW Hillsborough Basins (after inception of this project, the NW Hillsborough Basin
was dissolved and merged into the Hillsborough River Basin). The project funding is being allocated to update
watershed plans within each Basin based on update requirements/priorities established under the B126 project,
funding availability, and Basin funding priorities. The updates address the review comments, and include new
topographic information funded cooperatively by the County and District (see K524). This is a multi-year funded
project which requires cooperative funding request over multiple fiscal years. The County is managing the project,
with the District project manager approving any agreements to accomplish project tasks. Future cooperative
agreements will be required for the Implementation of BMPs and Maintenance of Watershed Parameters and Models.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 983,212 0 0 779,655 1,233 202,324
013 Hillsborough River Basin 531,587 0 0 527,057 2,797 1,733
014 Northwest Hillsborough Basin 445,689 0 0 445,689 0 0
Project Funds Not Budgeted by the
District
Hillsborough County 1,900,000 0 0 1,700,000 0 200,000
$3,860,488 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Critical Project MilestonesDraft Agreement to Management Services 12/15/02 4/1/04 5/14/04
Draft Agreement Returned from Management Services 1/31/03 6/1/04 5/28/04
Basin Board Approval of Agreement 2/1/03 9/1/03 9/1/03
Governing Board approval of Agreement 2/1/03 9/1/03 9/1/03
Cooperator Contract Executed 4/15/03 8/1/04 9/30/04
Notice to Proceed 5/1/03 2/1/05 2/1/05
Complete Project 9/1/10 1/1/13
Status As Of: February 25, 2011
Results of Hillsborough County Watershed Model Review project (see B126) are being used to determine watershed
plan update requirements. The County has completed updates of the Brooker Creek, Duck Pond, East Lake, Curiosity
Creek, Delaney Creek, Double Branch Creek, Rocky Creek, and Alafia River watershed plans, and the Hillsborough
River and Sweetwater/Lower Sweetwater Creek watershed plan updates are underway. Based on the added
FY2010/FY2011 funding, the County is negotiating for consulting services for the Little Manatee River and is planning
issuance of a request for proposals for Bullfrog Creek/Wolf Branch, which will complete all 17 of the watershed plan
updates. This is an ongoing project that is proceeding as expeditiously as possible within County, Consultant, and District
capabilities. District and County staff are engaged in ongoing coordination to move the project forward. No further action
is needed to expedite this project.
011 - Alafia River Basin 174
L445
Stormwater Improvements - Flood Protection - Hillsborough -
Hillgrove and StearnsProject Type Cooperative Funding
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) Alafia River
Hillsborough CountyCooperator(s)
Project Manager RHINESMITH, PHILIP
Task Manager(s)
Status Ongoing
DescriptionIn response to regional flooding in the area of Stearns Creek and Lithia-Pinecrest Road, Hillsborough County
submitted a cooperative funding request to complete an inventory of culverts in and around the creek and make
modifications to an abandoned fish farm to provide additional storage and treatment. To accomplish this, the County
will complete a surface water modeling effort to determine the proper culvert sizes and how to best route stormwater to
prevent flooding. The County has acquired an abandoned fish farm in Lithia-Pinecrest to serve the additional storage
needs. Stormwater runoff from the contributing watershed will be routed through the facility prior to discharge back to
Stearns Creek, a tributary creek of the Alafia River. The storage volume provided will help attenuate frequent flood
events. A control structure will be used to limit discharge and maintain a defined hydroperiod. As a secondary benefit,
the ponds will be planted with native plants to provide additional water quality treatment/enhanced habitat value.
BenefitsThe improvements described above will address flooding in areas of Stearns Creek and improve water quality entering
the Alafia River via Stearns Creek.
Costs
The total project cost is $2,704,120 with Hillsborough County funding 82% or $2,219,620 of the total project cost. The
District's share is $484,500 (18%) of which $300,000 was budgeted in FY2006 ($150,000 from the Alafia River Basin
Board and $150,000 from the State's Water Protection and Sustainability Program Trust Fund) and an additional
$184,500 was budgeted by the Alafia River Basin Board in FY2008. The FY2012 funding amounts shown in the table
below include staff salary, travel and central garage charges.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 349,857 0 0 344,055 4,759 1,043
District Budgeted - Outside Revenue
Water Protection & Sust T.F. (Surface
Wtr Rstr)
150,000 0 0 150,000 0 0
Project Funds Not Budgeted by the
District
Hillsborough County 2,219,620 0 0 2,219,620 0 0
$2,719,477 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Contract Development & ExecutionCooperator to Submit Completed Scope of Work 9/1/05 10/1/05
Submit Draft Contract to Cooperator for Review 10/1/05 11/1/05
Contract Executed 11/30/05 3/20/07
011 - Alafia River Basin 175
L445
Stormwater Improvements - Flood Protection - Hillsborough -
Hillgrove and Stearns
2. Critical Project MilestonesDesign Commence 12/31/05 1/31/06
Design Complete 12/31/07 12/31/08 12/31/10
3. Critical Project MilestonesConstruction Commence 1/31/09 3/1/11
Construction Complete 12/31/09 2/15/12
4. Agreement Expiration DatesCooperative Agreement with Hillsborough County Expires 12/31/11 12/31/11
Status As Of: March 01, 2011
The project is currently 25 months behind schedule. Hillsborough County had difficulties securing easements necessary
for the expanded the proposed drainage retention area. There were also delays in the design phase and contractor
selection as well. The project was released for bid in December 2010 and the bid opening was January 28, 2011.
Hillsborough County selected QGS Development to complete the construction. The current schedule is for construction
to start in April 2011 with substantial completion in February 2012.
011 - Alafia River Basin 176
L672
WMP - Polk - Polk County Area
Project Type Cooperative Funding
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River
Polk CountyCooperator(s)
Project Manager TURNER, DAWN
Task Manager(s)
Status Ongoing
DescriptionThis is a multi-year funded project to perform tasks related to the Topographic Information, Watershed Evaluation, and
Watershed Management Plan elements of the District's Watershed Management Program (WMP) for watersheds in
Polk County. Polk County encompasses approximately 2009 square miles within central Florida, of which 1,586 square
miles are located within the District. There are 25 watersheds withing the District. Watershed Management Plan
development is on-going for 7 watersheds (Christina, Poley Creek, Itchepackesassa Creek, Peace Creek, Lake Lulu,
Lake Hamilton, and the Upper Peace River at Homeland). Maintenance of Watershed Parameters and models is
planned for 2 watersheds (Saddle Creek and Gator Creek). This project will involve the development of Topographic
Information, including 1-foot topographic contour maps using LiDAR data obtained by the District in 2005; the
development of Watershed Evaluations and Watershed Management Plans for the remaining 18 watersheds; and
updates of previous Watershed Evaluations and Watershed Management Plans to reflect changes in the watersheds.
Polk County watersheds will be prioritized, and work orders will be issued to consultants for individual watersheds.
BenefitsThe WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality
and natural systems, while achieving flood protection. The information developed provides the science for the District's
Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) with their land
management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to
address level of service deficiencies; and 2) provides a Geodatabase and projected results from watershed model
simulations for floodplain management, and water quality.
Costs
The projected cost for this project is $2,856,954 of which the District's share will be $1,428,477. Polk County will
contribute $1,428,477. In prior fiscal years, a total of $2,356,954 was appropriated in the following Basin budgets:
Governing Board acting for the Green Swamp Basin ($762,698), Peace River Basin ($467,360), Alafia River Basin
($416,046), and the Hillsborough River Basin ($710,850). $1,178,477 in revenue will be received from Polk County,
and distributed as follows: Governing Board ($381,349), Peace River Basin ($233,680), Alafia River Basin ($208,023),
and the Hillsborough River Basin ($355,425). Basin funding and revenue distributions are based upon the percent
project area within the Basin. FY2011 funding was included in the following Basin budgets: Governing Board acting for
the Green Swamp Basin ($83,333), Peace River Basin ($83,334), and the Hillsborough River Basin ($83,333).
$250,000 in revenue will be received from Polk County, and distributed as follows: Governing Board ($41,466.50),
Peace River Basin ($41,667), and the Hillsborough River Basin ($41,666.50). In February 2011, County staff notified
the District the County cannot provide their FY2011 matching funds. In addition, the initiation of work in several
watersheds is being postponed. The Cooperative Funding Agreement will be amended to reflect a reduction in the
project budget, and the unused funds will be liquidated. Future funds identified for the project are contingent upon
approval of such amounts by the District Governing Board and the Alafia, Hillsborough and Peace River Basin Boards
in their annual budgets.
Additional Information
Polk County desires to create a county-wide Stormwater Master Plan to include data from previous Watershed
Evaluations, Watershed Management Plans, Stormwater and Basin Master Plans, stormwater land development
regulations, standards and criteria, operation & maintenance plans, and recommended BMPs. The vehicle to develop
this information is the District's Watershed Management Program. Implementing elements of the WMP with local
governments is one of the District's Strategic Priorities. A cooperative funding revenue agreement with the County will
be developed as a multi-year funded project contingent on the approval of future funding to complete Watershed
Evaluations and Watershed Management Plans for all of the watersheds. This will require the submission of a
cooperative funding request and ranking each fiscal year until the project is completed. The District will manage the
project and enter into purchase orders and agreements to accomplish project tasks. Cost estimates will be developed
for Watershed Management Plans upon completion of the associated Watershed Evaluation. The District is
cooperating with FEMA to modernize the flood insurance rate maps (FIRMs) in Polk County. Information developed
011 - Alafia River Basin 177
L672
WMP - Polk - Polk County Area
with this project will be used to update the FIRMs representing this watershed.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 493,826 0 0 397,899 6,310 89,617
011 Alafia River Basin 231,503 0 0 224,920 0 6,583
013 Hillsborough River Basin 462,484 0 2,070 363,904 6,594 89,916
020 Peace River Basin 328,681 0 0 238,889 0 89,792
District Budgeted - Outside Revenue
Polk Co - WMPlan Polk County (L672) 1,428,477 0 0 1,178,477 0 250,000
$2,944,971 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Revenue ContractContract to Polk County for signautre 11/7/06 11/7/06
Contract presented to County Commission 1/24/07 1/24/07
Contract Executed 2/28/07 2/13/07
First Amendment Executed 3/10/08 3/10/08
Contract Expiration 1/31/10 1/31/12
2. Consultant Services AgreementPO issued to Woolpert to process LiDAR 2/28/07 2/22/07
LiDAR processing complete 7/31/07 7/31/07
One-foot contour shapefile complete 10/31/07 10/31/07
3. Consultant Services AgreementAgreement executed with BCI 2/28/07 2/26/07
Notice to Proceed - Polk City Watershed Evaluation 2/28/07 3/12/07
First Amendment to BCI Agreement Executed 10/1/07 9/24/07
Notice to Proceed - Polk City Watershed Management Plan 10/31/07 10/1/07
Polk City Watershed Evaluation complete 2/28/08 11/24/08
Polk City Watershed Management Plan Complete 12/31/08 5/31/11
BCI Contract Expiration 1/31/10 5/31/11
4. Consultant Services AgreementAgreement 07CC50 executed with PBS&J 2/28/07 2/26/07
Notice to Proceed - Christina Watershed Evaluation 2/28/07 3/14/07
First Amendment to PBS&J Agreement Executed 6/19/07 6/19/07
Christina Watershed Evaluation complete 7/31/07 10/31/07 8/8/07
PBS&J Contract Expiration 7/31/07 10/31/08
Notice to Proceed - Poley Creek Watershed Evaluation 9/28/07 9/10/20
Second Amendment to PBS&J Agreement Executed 9/28/07 8/13/07
Poley Creek Watershed Evaluation Complete 10/31/08 10/31/08
Agreement 09CC11 executed with PBS&J for Poley Creek WMPlan 8/10/09 8/10/09
Notice to Proceed - Poley Creek WMPlan 5/26/10 5/26/10
Agreement 09CC11 expiration date 5/31/11
5. Consultant Services AgreementNotice to Proceed - Bowlegs Creek Watershed Evaluation - task cancelled 9/28/07
Agreement with Ardaman Executed - task cancelled 9/28/07 10/12/07
011 - Alafia River Basin 178
L672
WMP - Polk - Polk County Area
Bowlegs Creek Watershed Evaluation Complete - task cancelled 12/31/08
Ardaman Contract Expiration - task cancelled 12/31/09
6. Consultant Services AgreementNotice to Proceed - Reedy Creek Watershed Evaluation - task cancelled 9/28/07
Agreement with Boyle Executed - task cancelled 9/28/07
Reedy Creek Watershed Evaluation Complete - task cancelled 12/31/08
Boyle Contract Expiration - task cancelled 1/31/10
7. Consultant Services AgreementNotice to Proceed - Itchepackesassa Creek Watershed Evaluation 9/28/07 2/14/08
Agreement with CivilSurv Executed 9/28/07 9/3/07
Notice to Proceed - Itchepackesassa DTM 9/28/07 2/14/08
First Amendment Executed 2/4/08 2/4/08
Itchepackesassa DTM Complete 5/14/08 6/12/08
Itchepackesassa Creek Watershed Evaluation Complete 7/31/08 3/5/09
CivilSurv Contract Expiration 1/31/09 5/31/11
Itchepackesassa Creek Computer Model Complete 2/27/09 5/31/11
Itchepackesassa Creek Watershed Management Plan Complete 5/29/09 5/31/11
Status As Of: January 31, 2011
The Cooperative Funding Revenue Agreement with Polk County was executed on February 13, 2007. The First
Amendment to the Agreement was executed on March 10, 2008 to encumber FY2008 funds. The Second Amendment
was executed on December 7, 2009 to encumber FY2010 funds. County staff requested the approved FY2011 funding
be released, that work on new watersheds be postponed indefinitely, and unused Alafia River and Peace River funds be
liquidated. Work on the Itchepackesassa Creek and Polk City Watershed Management Plans will continue. LiDAR:
COMPLETE. LiDAR processing and 1 foot contour coverage deliverables have been reviewed and approved, and the
final invoice for these services has been paid. Christina: COMPLETE. The Peer and Public Review process has been
completed; and the model results were presented to the District's Governing Board on December 14, 2010. Poley Creek:
POSTPONED. A work order was issued for the development of Project Plan documents. This work was completed. The
County has requested that any further work on Poley Creek be postponed, and that the Revenue Agreement be
amended to remove remaining Alafia Basin funds from the contract. Polk City: ON-GOING. A Consultant Service
Agreement for development of Digital Topographic Information and preparation of a Watershed Evaluation for the Polk
City (BCI) watershed was executed, and the associated Work Order and Notices to Proceed were issued on March 12,
2007. The Polk City Watershed Evaluation has been completed. The first amendment to the agreement with BCI was
executed effective October 1, 2007 to encumber FY2008 funds and expand the scope of work to include Watershed
Management Plan tasks. The Second, Third and Fourth Amendments encumbered additional FY2007, 2009 and 2010
funding to the agreement to complete the Watershed Management Plan for Polk City. The draft Watershed Management
Plan deliverables were received on December 13, 2010, and are currently being reviewed by District staff. The Peer
Review process is anticipated to begin in early 2011. Itchepackesassa Creek: ON-GOING. The Agreement with Keith
and Schnars was executed on September 3, 2007. Since that time, Keith and Schnars split into 2 companies, and
assigned this contract to the new company, CivilSurv Design Group, Inc. The watershed assigned to CivilSurv is the
Itchepackesassa Creek watershed. Notice to Proceed for Itchepackesassa Creek DTM generation and the initiation of
Watershed Evaluation tasks was issued on February 14, 2008. The First Amendment to the Agreement was executed on
February 4, 2008 to encumber FY2008 funds and expand the scope of work to include Watershed Management Plan
tasks. Notice to Proceed for completion of the Itchepackesassa Creek Watershed Evaluation and initiation of Watershed
Management Plan tasks was issued July 25, 2008. FY2009 funds are being used to complete the Watershed
Management Plan. Draft deliverables were received on August 12, 2010, and were reviewed by District staff. The
presentation to the Peer Review consultant was conducted on November 18, 2010. Peer review comments were
received and provided to CivilSurv on January 27, 2011. Awaiting further information from CivilSurv regarding projected
cost and schedule to address peer review comments. Bowlegs Creek: POSTPONED. Saddle Creek Update:
POSTPONED. County staff requested the Watershed Management Plan Update be postponed, and that the Revenue
Agreement be amended to remove remaining Peace River Basin funds. Reedy Creek: POSTPONED. Fox Creek:
POSTPONED after aquatic weed control efforts are completed. Status History: The County requested that FY2007
funds approved for the recently withdrawn Stormwater Assessment Study and GIS parcel digitization (L675) project be
transferred to this project. The total project budgetwill remain the same. The revised FY2007 amounts were presented to
the Governing Board, Alafia River Basin Board and Hillsborough River Basin Board at their August 2006 meetings. The
funding amount for the Peace River Basin was not changed for FY2007. The FY2007 and future funding amounts shown
in the table above have been revised accordingly. The County requested out-of-cycle FY2007 funding for the Christina
Watershed Management Plan. At their December 2006 meeting, the Alafia River Basin Board approved funding the
Christina Watershed Management Plan as a separate FY2007 project. Please refer to project number L702 for additional
011 - Alafia River Basin 179
L672
WMP - Polk - Polk County Area
information. FY2008 funding will be used to expand the scope of work to include Watershed Management Plan tasks for
watersheds within the Hillsborough River and Green Swamp Basins, including the Itchepackesassa Creek and Polk City
watersheds. The total project budget is $2,356,954. Of this, the following has been invoiced and paid: $497,540 to
Woolpert for LiDAR processing and the generation of 1 foot contours; $371,226 to PBS&J for the Christina and Poley
Creek Watershed Evaluations, and the peer and public meetings for the Christina Watershed; $354,501 to BCI for the
Polk City Watershed Evaluation; and $394,130 to CivilSurv for the Itchepackesassa Creek Watershed Management
Plan. As consultant invoices are paid, Polk County is being invoiced for its share. On January 9, 2009 District staff
contacted the County to see if the project could be expedited. County staff indicated the is project is limited by available
funding, and additional State or Federal funding would be needed to expedite the completion of Watershed Management
Plans for all of the County watersheds. No further actions are planned to expedite the project at this time.
011 - Alafia River Basin 180
L693
Education - Water Education Exhibits at the Glazer Childrens
Museum in TampaProject Type Cooperative Funding
AORs Strategic InitiativesWater Quality Water Quality MonitoringFlood Protection Floodplain ManagementWater Supply ConservationNatural Systems Natural Systems Identification and Monitoring
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
The Children's Museum of TampaCooperator(s)
Project Manager HULL, MARY MARGARET
Task Manager(s)
Status Ongoing
DescriptionThe Glazer Children's Museum of Tampa has relocated to a new museum site in Riverfront Park in downtown Tampa.
This multi-year project is part of the City of Tampa's efforts to revitalize the downtown business district. This is the third
and final phase of a project to develop and install water exhibits in the museum. In FY2007, the District funded the
planning and development phase for interactive water exhibits. FY2008 funds paid for detailed specifications,
structural engineering, fabrication of support structure, construction of entrances, partial platform construction and
other expenses related to fabrication. In the conceptual phase, District staff and BBEC members were included in
several planning sessions for the design of the interactive water exhibits to ensure they incorporate the District's
message. The Water's Journey exhibit is a multi-story climbing structure where visitors "become" a drop of water and
move through the exhibit, starting deep within the aquifer, eventually penetrating the surface, which would then
become the watershed, climbing through trees to the upland area. The other District exhibit, originally conceptualized
as a bank, is evolving during the planning process to better reflect research on how children learn from exhibits.
Several concepts are being discussed for the interactive water conservation exhibit. Children would be provided
with the opportunity to make decisions and see the consequences of those decisions. The exhibit would convey the
importance of rainfall to the District's water supply by showing rainfall's effect on aquifer levels. Children would then be
presented with a variety of ways water is used in and around the home. They would be able to make decisions about
using water-conserving practices and watch how individual actions combine to impact the District's water supply. The
FY2009 funding is for exhibit construction and installation. The museum is scheduled to open to the public in late
September 2010.
BenefitsThe exhibits are multidisciplinary and designed to engage diverse learning styles. The museum is projected to draw
100,000 people annually. The interactive water exhibits address three elements of the District's AORs -- water supply,
water quality and natural systems -- in simple, easy-to-understand terms. Additionally, this project targets children ages
0-10 years and accompanying adults. This segment of the population was identified in an independent evaluation of
the District's youth education program as one to which the District needed to expand its reach. This project helps
accomplish this goal.
Costs
The total cost of the project (including building construction and all exhibits throughout the museum) is estimated to be
$20 million. The total contribution from the District, including FY2007, FY2008 and FY2009, is $617,442. In FY2007,
the basins shared $112,500 for the planning and development phase for interactive water exhibits. FY2008 funds were
for detailed specifications, structural engineering, fabrication of support structure, construction of entrances, partial
platform construction and other expenses related to fabrication. FY2009 funds are for completion of the exhibit
fabrication, installation and education program development. Phase 3 FY2009 funding request of $252,471 is
allocated as follows:
Alafia River: 12% $29,968;
Hillsborough River: 27% $68,900;
Northwest Hillsborough: 15% $37,340;
Coastal Rivers: 9% $22,249;
Pinellas-Anclote: 14% $35,396;
Withlacoochee River: 5% $12,821;
Peace River: 8% $20,550;
Manasota: 10% $25,247.
The funding splits for this project are based on cooperator-supplied projections of museum attendance. This project
anticipates reaching 100,000 people per year at a cost (for the total project, all phases) to the District of $6.18 per
011 - Alafia River Basin 181
L693
Education - Water Education Exhibits at the Glazer Childrens
Museum in Tampaperson. Typical museum exhibits have a 10-year life span. This project, therefore, has the potential to reach 1 million
visitors over a 10-year period at a cost to the District of $0.62 per person. The budget lines below include costs for
staff to manage the project.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 74,786 0 0 74,786 0 0
013 Hillsborough River Basin 171,265 0 0 171,265 0 0
014 Northwest Hillsborough Basin 94,255 0 0 94,255 0 0
015 Coastal Rivers Basin 49,738 0 0 49,738 0 0
016 Pinellas-Anclote River Basin 98,917 0 0 98,917 0 0
019 Withlacoochee River Basin 30,290 0 0 30,290 0 0
020 Peace River Basin 49,534 0 0 49,534 0 0
021 Manasota Basin 58,115 0 0 58,115 0 0
Project Funds Not Budgeted by the
District
Glazer Children's Museum of Tampa 5,522,920 0 0 5,522,920 0 0
Other Funding Sources 19,091,102 0 0 19,091,102 0 0
$25,240,922 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2007 Budgeted FundsFY2007 purchase order opened 4/30/07 4/26/07
Confirmation and layout of exhibits in building 6/30/07 6/30/07
Schematic design and fabrication documents 12/30/07 12/14/07
FY2008 Budgeted FundsFY2008 contract executed 5/15/08 9/15/08 9/10/08
Project meeting with Museum staff and architect 7/6/09 7/6/09
FY2008 components completed 12/31/09 2/26/10 2/26/10
FY2009 Budgeted FundsFY2009 contract executed 9/1/09 10/30/09 11/4/09
Building construction complete 3/1/10 3/26/10 3/26/10
Exhibits installed 7/1/10 9/1/10 9/1/10
FY2009 components completed 8/1/10 12/31/10 12/31/10
Museum grand opening 9/30/10 9/25/10 9/25/10
Status As Of: February 23, 2011
ACTION TO DATE: Completed. Cooperator requested the performance completion schedules be extended to December
20. The cooperator completed project deliverables by the contract expiration date of December 31, 2010. The final report
and invoice are under review by District staff. The Glazer Children's Museum held its grand opening on September 30.
To date, an estimated 25,000 people have visited the museum.
011 - Alafia River Basin 182
L890
WMP - Hillsborough - Parameters & Models Percolation Rate
AssessmentProject Type Cooperative Funding
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough
Hillsborough CountyCooperator(s)
Project Manager ARNOLD, DAVE
Task Manager(s)
Status Completed
DescriptionThis is a cooperative project with Hillsborough County to conduct elements of the District's Watershed Management
Program. The project includes a Watershed Evaluation and Watershed Assessment to investigate the effect of soil
percolation as an outfall and develop guidelines and specifications for use in watershed modeling. The results will
support development of watershed plans within Hillsborough County, including project L099 to update the Hillsborough
County Watershed Management Plans. Information derived from this project will be used to improve accuracy of
watershed modeling, including the influence of soil percolation on model projected flood elevations. The project will
provide a methodology for determining soil percolation rate based on land use, soil, surface vegetation conditions,
groundwater conditions, antecedent conditions, and topographic information. The FY2008 funding is proposed to
complete the project. However, if the Watershed Evaluation indicates the need for extensive field measurements to
develop and verify percolation rate calculation methods, future funding will be required to complete the project.
BenefitsResults of the study will support watershed management and regulation by providing information and procedures to
improve modeling of percolation as an outfall in closed basin watersheds.
Costs
The total budget for this project is $120,000, of which the District's share is $60,000 ($20,000 each from the Alafia
River, Hillsborough River, and former Northwest Hillsborough Basin which is now a part of the Hillsborough River
Basin). Hillsborough County will contribute $60,000. FY2008 funding is budgeted to complete the project. However, it
is possible that future cooperative funding requests and budget amendments may be required to fully fund and
complete the project. The County is managing the project and entering into purchase orders and agreements to
accomplish project tasks.
Additional Information
A WMP includes five major elements: Topographic Information, Watershed Evaluation, Watershed Management Plan,
Implementation of Best Management Practices, and Maintenance of Watershed Parameters and Models.
Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management
(CWM) initiative strategies. The County will manage the project and enter into purchase orders and agreements to
accomplish project tasks. If the Watershed Evaluation indicates the need for extensive field measurements to
develop and verify percolation rate calculation methods, future funding will be required to complete the project.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 22,436 0 0 22,436 0 0
013 Hillsborough River Basin 25,234 0 0 23,833 0 1,401
014 Northwest Hillsborough Basin 22,436 0 0 22,436 0 0
Project Funds Not Budgeted by the
District
Hillsborough County 60,000 0 0 60,000 0 0
$130,106 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 183
L890
WMP - Hillsborough - Parameters & Models Percolation Rate
Assessment
Critical Project Milestones ActualProjected Amended
Project Completion 11/1/10
Contract Expiration 1/1/11
Status As Of: February 25, 2011
Based on inclusion of the project within the FY2008 budget, a cooperative funding agreement with Hillsborough County
was executed. Following execution of the funding agreement, Hillsborough County contracted with the University of
South Florida for consulting/research services, and work on the project is progressing. This project is complete; a final
report has been submitted and accepted by the County and District, the District has fully reimbursed the County for 50%
of project costs, and project closure documents have been completed.
011 - Alafia River Basin 184
L900
Education - Polk County Watershed Education - LEAD
Project Type Cooperative Funding
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply ConservationNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Peace River
Lakes Education/Action Drive (LE/AD), Lakes Education/Action Drive (LE/AD)Cooperator(s)
Project Manager STERNBERGER, VIRGINIA
Task Manager(s)
Status Ongoing
DescriptionThis Cooperative Funding Initiative project has provided environmental education to Polk County residents for more
than 20 years. With over 500 lakes in Polk County, water resources education helps residents understand how they
impact their watershed. This is a continuation of the (LE/AD) program and is designed to encourage Polk County
residents to protect their watershed through education on water resources and water quality issues, as well as lake
preservation and protection. FY2010 program components include creating and distributing quarterly newsletters,
organizing and hosting annual lake cleanup events and the annual Lakeland Cardboard Boat Challenge and
Lakeshore Festival, installing three lakeside display signs and hosting a water resources conference. Effectiveness will
be measured by number of participants, activites accomplished, surveys and pre- and posttests.
BenefitsThis project enhances the District's watershed education efforts throughout Polk County by educating 22,000 residents
on how their actions affect water resources and encouraging them to adopt behaviors that protect their local
watersheds.
Costs
The total cost of the FY2010 project is $26,841, with the District contributing $11,716 (Alafia River $1,523;
Hillsborough River $1,875; Peace River $8,318). The dollar amount allocated per basin is determined by population.
The program is estimated to reach approximately 22,000 Polk County residents at a cost to the District of $0.53 per
resident. The budget lines below include costs for staff to manage the project.
Additional Information
The LE/AD Polk County Watershed Education project requested $18,084 as part of the FY2011 Cooperative Funding
Initiative, but subsequently withdrew and is being funded instead through the Basin Initiatives for Public Education
(P268). There is no increase in costs.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 7,267 0 0 7,267 0 0
013 Hillsborough River Basin 8,982 0 0 8,982 0 0
020 Peace River Basin 35,286 0 0 35,286 0 0
Project Funds Not Budgeted by the
District
Lakes Education/Action Drive 15,125 0 0 15,125 0 0
Other Funding Sources 19,397 0 0 19,397 0 0
$86,057 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 185
L900
Education - Polk County Watershed Education - LEAD
Critical Project Milestones ActualProjected Amended
FY2008 Budgeted FundsInitiate purchase order 10/1/07 10/31/08 10/31/08
Water, Wings & Wild Things event 5/12/08 11/1/08 11/1/08
Lakes Appreciation Month Celebration 8/1/08 8/1/08
Cardboard Boat Challenge & Lakeshore Festival 8/2/08 9/30/08 8/6/08
Project close 9/16/08 1/15/09 1/15/09
FY2009 Budgeted FundsInitiate purchase order 10/1/08 12/15/08 12/15/08
Water Resouces Conference 5/1/09 10/30/09 10/30/09
Lakes Appreciation Month Celebration 8/3/09 8/3/09
Cardboard Boat Challenge & Lakeshore Festival 9/25/09 9/25/09
Lakside display signs 9/30/09 9/30/09
Pet waste stations 9/30/09 9/30/09
Project close 9/30/09 11/30/09 11/30/09
FY2010 Budgeted FundsInitiate purchase order 10/1/09 11/16/09 11/16/09
Fall newsletter 11/30/09 12/7/09
Winter newsletter 2/28/10 2/10/10
Project EAGLE cleanup event 4/30/10 4/24/10 4/24/10
Spring newsletter 5/30/10 6/30/10 6/30/10
Lakes Appreciation Month cleanup events 7/30/10 7/30/10
Summer newsletter 8/31/10 8/31/10
Cardboard Boat Challenge & Lakeshore Festival 9/30/10 9/30/10
Lakeside display signs 9/30/10 4/29/11
Water resources conference 10/31/10 10/12/10 10/12/10
Close purchase order 11/30/10 4/29/11
Status As Of: February 21, 2011
ACTION TO DATE: All but one component on time. Although the lakeside signage component of the project is delayed
to allow improvements based on research data and evaluations, all other deliverables have been completed. The
FY2011 purchase order is open and will be reported under P268.
011 - Alafia River Basin 186
L914
City of Lakeland Plumbing Retrofit Project
Project Type Cooperative Funding
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River, Peace River
City of LakelandCooperator(s)
Project Manager WHITE, BRENT
Task Manager(s)
Status Completed
DescriptionThis project offers financial incentives to water customers within the City of Lakeland's service area for replacement of
existing high-volume indoor plumbing fixtures including showerheads (replacing those using 4.0 gallons per minute, or
gpm, or greater with those using 2.5 gpm or less), faucet aerators (3.0 gpm or greater with 2.2 gpm in kitchens and 1.5
gpm in bathrooms) and toilets (3.5 gallons per flush (gpf) or greater with 1.6 gpf or lower). Approximately 84 percent of
Lakeland's 46,155 residential accounts were built or improved before 1995 (~38,770 homes), making them eligible for
plumbing retrofit incentives. In FY2008, The City of Lakeland expects to distribute 2,200 retrofit kits (maximum two per
customer) and to retrofit up to 4,390 single family and multi-family toilets through an outside contracted consultant.
Single-family residences will be offered up to two toilet rebates per home while multi-family dwellings, with appropriate
representation, will be encouraged to replace all devices at one time. These quantities are planned each year for a
term of five years.
BenefitsThis project will provide an estimated potable water savings of 113,197 gallons per day, or 41.31 million gallons per
year for toilet savings and 41.86 gallons per day, or 15,278 gallons per year for the plumbing retrofits (showerheads
and aerators). The total savings is estimated to be 128,475 gallons per day or 46.89 million gallons per year.
Costs
The total FY2008 cost for this project is $600,000 with the District 50 percent funding level allocated amongst the
Peace River basin ($210,000), the Hillsborough River basin ($60,000) and the Alafia River basin ($30,000). The City of
Lakeland's 50 percent share is $300,000. The cost benefit for the project using the total cost amortized over 20 years
is $1.33 per thousand gallons of water.
Additional Information
The City of Lakeland will provide actual billing data, ensure 100 percent fixture inspection, conduct a scientifically
significant survey to determine customer satisfaction with low-volume devices and institute an education program
designed to assist customers in long-term maintenance related to water savings. The educational portion will provide
participants with materials on leak detection and replacement of devices at the end of the life cycle. Marketing for the
project will begin February 2008 and the distribution of the kits will begin no later than Oct. 1. Approximately 2,200 kits
will be distributed by Sept. 30, 2008. A draft annual distribution report, describing and relating the number of kits
distributed, and the demographics of participating customers will be provided to the District by March 2009 and a final
distribution report incorporating District comments will be provided on May 2009.
011 - Alafia River Basin 187
L914
City of Lakeland Plumbing Retrofit Project
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 18,605 0 (14,105) 32,710 0 0
013 Hillsborough River Basin 50,535 0 (11,326) 61,861 0 0
020 Peace River Basin 106,132 0 (106,722) 212,854 0 0
Project Funds Not Budgeted by the
District
City of Lakeland 430,000 0 0 430,000 0 0
$605,272 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Develop RFP for Contractor 10/1/07 10/3/07
Agreement with SWFWMD 1/1/08 11/21/07
Begin Advertising Program 2/1/08 2/1/08
Program Implementation 3/1/08 4/1/08
Draft Distribution Report 3/1/09 10/1/09 10/23/09
Final Distribution Report 5/1/09 12/1/09 12/21/09
Draft Final Report 3/1/10 12/1/10
Final Report 4/1/10 12/31/10
Final Invoice to District 6/1/10 12/31/10
Project Closeout 1/31/11 12/31/10
Status As Of: February 23, 2011
The project has shifted to the FY2010 project, N112. The City of Lakeland has completed the project. The final report will
be submitted in December 2010 and all relative milestones have been adjusted to reflect this date. All funds have been
liquidated back to their individual basins. Liquidation total by basin includes $15,764.22 to the Alafia River Basin,
$11,472.77 to the Hillsborough River Basin and $118,480.94 to the Peace River Basin. Within the Alafia River Basin
portion of the City of Lakeland¿s service area, 199 fixtures were rebated for a total potable water savings of 15,671 gpd
or 78.8 gallons per toilet. Within the Hillsborough River Basin portion of the City of Lakeland¿s service area, 727 fixtures
were rebated for a total potable water savings of 29,696 gpd or 40.8 gallons per toilet. Within the Peace River Basin
portion of the City of Lakeland¿s service area, 1,348 fixtures were rebated for a total potable water savings of 26,847
gpd or 19.9 gallons per toilet.
Action-to-date: Completed
011 - Alafia River Basin 188
L967
Stormwater Improvements - Flood Protection - Polk - Christina
WatershedProject Type Cooperative Funding
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) Alafia River
Polk County Natural Resources, Polk CountyCooperator(s)
Project Manager TURNER, DAWN
Task Manager(s)
Status Ongoing
DescriptionThis project involves the Implementation of Best Management Practices (BMPs) element of the District's Watershed
Management Program (WMP) for the Christina Watershed. The Christina watershed includes 13 square miles of the
Mulberry area of Polk County, and is part of the headwaters to the North Prong Alafia River. The area has
experienced severe home, street and yard flooding over the past decade. BMPs to improve flood protection and water
quality treatment were evaluated as part of the Christina Watershed Management Plan (L702) alternative analysis.
Some BMPs will require additional evaluation to determine feasibility. However, final design and permitting of several
of the BMPs can now begin. Implementation of BMPs includes design, development of construction documents,
construction permitting, land acquisition, bidding and contractor selection, construction of the BMPs and construction
engineering and inspection. Funding is included to begin implementation of BMPs. Additional funding may be
needed to complete Implementation of BMPs.
Benefits
The Best Management Practces will provide stormwater improvements to address food protecton issues, and will include
practces to improve water quality.
Costs
The projected cost for implementation of this project is $10,000,000. The District's share is $5,000,000, and the
County's is $5,000,000. With $1,440,000 in prior funding, ($720,000 District's share) the County is performing land
acquisition, construction, construction engineering, and inspection of selected water quality BMPs. The County will
also initiate geotechnical testing, feasibility evaluation, design, and permitting for other recommended BMPs,
including an above grade impoundment, When each task is completed the project budget will be refined based on the
information developed. Future funds identified for the project are contingent upon approval of such amounts by the
Alafia Basin Board in the annual budget.
Additional Information
The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed
Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters
and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed
Management (CWM) initiative strategies and one of the District's Strategic Priorities. The WMP provides a method to
evaluate the capacity of a watershed to protect, enhance, and restore water quality and natural systems, while
achieving flood protection. The Christina Watershed is one of 15 watersheds in the County, out of 25 within our
District, which do not have a Watershed Evaluation or Watershed Management Plan. The Christina Watershed
Evaluation and Watershed Management Plan are currently being prepared as part of the Polk County Watershed
Evaluation (L672) project, and the Christina Watershed Management Plan (L702) project. A cooperative funding
expenditure agreement with Polk County will be developed for Implementation of BMPs. The County will manage the
project, where the District project manager must approve any agreements to accomplish project tasks.
011 - Alafia River Basin 189
L967
Stormwater Improvements - Flood Protection - Polk - Christina
Watershed
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 737,986 0 0 732,643 2,673 2,670
Project Funds Not Budgeted by the
District
Polk County Natural Resources 5,000,000 4,280,000 0 720,000 0 0
$5,737,986 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Cooperative Funding AgreementCFA executed 10/9/07 10/9/07
Notice to Proceed 10/24/07 10/24/07
Amendment 1 executed 1/31/09 2/11/09
Amendment 2 executed 1/31/10
CFA expiration date 12/31/12
2. Design and PermittingConstruction plans, final design report and permitting 6/30/10
3. Land AcquisitionLand Acquisition 12/31/10
4. ConstructionBidding and contractor selection 11/30/10
Commence Construction 12/31/10
Complete Construction 12/31/12
Status As Of: January 31, 2011
The cooperative funding agreement with Polk County was executed on October 9, 2007. Notice to Proceed was provided
to the County on October 24, 2007. The Cooperative Funding Agreement was amended to add $540,000 in FY2009
funding ($270,000 District's share) to the project budget. Implementation will likely begin with the installation of minor
improvements, while the feasibility of constructing the recommended above grade impoundment is being evaluated.
Please refer to the Christina Watershed Management Plan (L702) project for additional information. The County retained
PBS&J to design and permit a Water Quality Improvement Structure (Baffle Box) on the northeast corner of Crescent
Lake. The permit was obtained, and the project was sent out for bids. The bids were received and reviewed, and the
contract was awarded to Evans and Lyles, Inc. in September 2010. Construction is expected to begin by February 4,
2011. ACTION-TO-DATE: On-time for permitted water quality improvements. On January 9, 2009 District staff contacted
the County to see if the project could be expedited. County staff indicated the project is limited by available funding, and
additional State or Federal funding would be needed to expedite this project. In addition, the feasibility of constructing an
above grade impoundment on State owned land located within the County park south of Carter Road has not yet been
determined. To expedite the project, County staff will continue to investigate the feasibility of constructing an
impoundment on the State owned land. District staff will also investigate the possibility of using the excess runoff that is
to be stored in the impoundment to augment reclaimed water supplies within the adjacent City of Lakeland waste water
treatment facility. A coordination meeting was held between the interested parties on March 10, 2009. Information related
to water quality and preliminary supply projections have been provided to TECO.
011 - Alafia River Basin 190
N004
Education - Polk Is Florida-Friendly Education Initiative
Project Type Cooperative Funding
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply Conservation
Basin(s) Alafia River, Hillsborough River, Peace River
Polk County Builders Association, Polk County Builders AssociationCooperator(s)
Project Manager DURELL, SYLVIA
Task Manager(s)
Status Completed
DescriptionThis Polk County Builders Association public education program is a FY2009 Cooperative Funding Initiative (CFI)
project that provides widespread promotion of Florida-Friendly LandscapingTM through educational presentations,
demonstration sites and development and distribution of materials. Components of the program include a brochure
and poster that feature a driving map of FFL demonstration sites throughout Polk County and an illustrated list of
plants most suited to the county. The plant list and demonstration sites will also be included in presentations and a
DVD for use in workshops and community events. Questions soliciting a potential homebuyer's interest in FFL will be
added to an existing homebuilders' customer survey. Additional partners in this project include Polk County Natural
Resources, Polk County Utility Department, the City of Lakeland, the City of Winter Haven, the City of Haines City,
Polk County FFL program and the Friends of the Parks.
BenefitsThis program's goal is to promote widespread adoption of FFL best management practices including reducing water
use and protecting water quality through proper landscape design, installation and maintenance. The program is
projected to reach approximately 87,000 Polk County residents at a cost to the District of approximately $0.27 per
person.
Costs
The total cost of the FY2009 project is $59,480, with the District contributing $23,718 (Alafia River $2,609;
Hillsborough River $3,558; Peace River $17,551). District funds support printing, education materials, travel and
contract services for preparation and implementation of educational programs. The budget lines below include costs
for staff to manage the project.
Additional Information
Because of staff reductions and personnel changes, this project was delayed and the timeline was extended.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 3,388 0 0 3,388 0 0
013 Hillsborough River Basin 4,337 0 0 4,337 0 0
020 Peace River Basin 18,330 0 0 18,330 0 0
Project Funds Not Budgeted by the
District
Polk County Builders Association 35,763 0 0 35,763 0 0
$61,818 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2009
011 - Alafia River Basin 191
N004
Education - Polk Is Florida-Friendly Education Initiative
Purchase order created 10/1/08 10/31/08 12/8/08
Project plan approved 10/31/08 12/1/08
First report and invoice 1/30/09 2/17/09 2/17/09
Second report and invoice 4/30/09 1/29/10 1/26/10
Third report and invoice 7/31/09 7/30/10
Deadline reminder letter sent 8/17/09 8/17/09
Project extended 9/30/09 9/30/10
Cooperator reorganizing meeting 1/22/10 1/22/10
Fourth report and invoice 5/25/10 5/25/10
Fifth report and invoice 8/27/10 11/30/10 11/30/10
Project end date 9/30/10 12/31/10 12/8/10
Status As Of: December 08, 2010
ACTION TO DATE: Completed. (1) Although staff reductions and personnel changes delayed the completion of the
project in FY2009, Polk County Builders Association (PCBA) staff was able to accomplish most of the original
deliverables including a DVD that contains the educational components of the project. The DVD will be used as an
educational tool during community events and workshops. (2) A total of 76,500 brochures that include the locations and
attributes of 15 FFL gardens in Polk County have been distributed through these methods: 61,000 by the Polk County
Ledger as part of the Polk County Builders Association (PCBA) 2010 Parade of Homes event; 7,500 during the Parade of
Homes event; potentially 8,000 locally through the County Extension, Polk County Welcome Center, Polk County
Training Center, PCBA office, the offices of the partnering governments and at community events. (3) A list of plants
suitable for planting in Polk County was developed by the Polk County FFL coordinator and is being distributed through
this project also. (4) A total of $21,938 was paid to the cooperator leaving a balance of $1,780.
011 - Alafia River Basin 192
N029
Education - MOSI Wetland Wonders Environmental Education
InitiativeProject Type Cooperative Funding
AORs Strategic InitiativesWater Quality Water Quality MonitoringWater Supply ConservationNatural Systems Natural Systems Identification and MonitoringFlood Protection Floodplain Management
Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough
Museum of Science and Industry (MOSI), Museum of Science and Industry (MOSI)Cooperator(s)
Project Manager HULL, MARY MARGARET
Task Manager(s)
Status Ongoing
DescriptionThe Museum of Science and Industry (MOSI) conducts Wetland Wonders programs for the general public, teachers
and students. This Cooperative Funding Initiative (CFI) project provides 100 hands-on programs for fourth-grade
students, transportation to and from these programs, teacher training sessions, an educational web page,
environmental appreciation fun day events and promotional materials for these events. The program emphasizes
family participation through the special events, furthering educational outreach to parents and siblings of the
fourth-grade students. Project components will be evaluated using an appropriate method, including
pre/post/tests, participant surveys and observations.
BenefitsApproximately 12,600 residents receive education through hands-on activities, special events, training workshops, the
MOSI web page and promotional materials. The program educates the general public, teachers and youth about
Florida's natural habitats, watersheds and water conservation and how their actions can affect the environment in
which they live. The programming also emphasizes the importance of becoming stewards of Florida's natural
resources by making use of MOSI exhibits like the Bioworks Butterfly Garden and the BackWoods areas (wetland)
that were previously funded by the District.
Costs
The total cost of the FY2009 project is $406,500, with the District contributing $106,500 (Alafia River
$26,625; Hillsborough River $58,575; Northwest Hillsborough $21,300). The dollar amount allocated per basin is
determined by the amount of residents projected to participate in the programming from each basin. The funding is
allocated toward staff time, materials and program expenses. The program is projected to reach 12,600 residents at a
cost to the District at $8 per person. The budget lines below reflect costs for staff to manage the project.
Additional Information
MOSI has a long history of educating the public about water conservation. Educational environmental programming for
students, families, adults, scouts, and homeschoolers in the BackWoods of MOSI occur year-round to illustrate the
natural processes, observe the flora and fauna living in each habitat, and to demonstrate the effects of human
behavior on the health of these natural systems. Programming in the BioWorks Butterfly Garden, an engineered
wetland, illustrates the water purification process that occurs in wetlands. District water conservation and protection
messages are viewed each day by thousands of visitors to the IMAX Dome Theatre at MOSI.
011 - Alafia River Basin 193
N029
Education - MOSI Wetland Wonders Environmental Education
Initiative
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 26,625 0 0 26,625 0 0
013 Hillsborough River Basin 58,575 0 0 58,575 0 0
014 Northwest Hillsborough Basin 21,300 0 0 21,300 0 0
Project Funds Not Budgeted by the
District
Hillsborough County EPA 125,000 0 0 125,000 0 0
Museum of Science and Industry 175,000 0 0 175,000 0 0
$406,500 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2009 Budgeted FundsOpen purchase order 11/3/08 11/24/08
Program components complete 9/15/09 11/19/10 11/19/10
Final report and invoice due to the District 11/20/09 12/20/10 1/18/11
Status As Of: February 23, 2011
ACTION TO DATE: Completed. The cooperator originally requested a no-cost time extension to complete the web site
component of the program. The web site has been created and reviewed by District staff. The cooperator reports that the
web site has received more than 100,000 visits (site is still live and continues to draw visitors). The four teacher
workshops were completed, educating 92 teachers. A total of 91 student programs of the 100 planned were conducted,
reaching more than 1,926 students and teachers from 21 different schools. 62% of the participating schools were Title 1
schools (schools serving significant number of free and reduced lunches). District staff is reviewing the final report and
invoice. Staff is working with cooperator to provide final invoicing documentation requirements.
011 - Alafia River Basin 194
N112
Conservation - Lakeland - Plumbing Retrofit Project
Project Type Cooperative Funding
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River, Hillsborough River, Peace River
City of LakelandCooperator(s)
Project Manager WHITE, BRENT
WHITE, BRENTTask Manager(s)
Status Ongoing
DescriptionThis project offers financial incentives to up to 2,000 residential water customers within the City of Lakeland's service
area for replacement of existing high-volume indoor plumbing fixtures including showerheads (replacing those using
4.0 gallons per minute (gpm) or greater with those using 2.5 gpm or less), faucet aerators (3.0 gpm or greater with 2.2
gpm in kitchens and 1.5 gpm in bathrooms) and toilets (3.5 gallons per flush (gpf) or greater with 1.6 gpf or lower).
Approximately 82 percent of Lakeland's 47,145 residential accounts were built or improved prior to 1995 (~38,770
homes), making them eligible for plumbing retrofit incentives.
BenefitsThis project will provide an estimated potable water savings of 82,656 gallons per day (gpd), or approximately 30.16
million gallons per year. The toilet savings is estimated to be 48,888 gpd, the aerators 20,412 gpd and the
showerheads 13,356 gpd.
Costs
The total cost for this project is $293,260 with the District 50 percent funding level allocated amongst the Peace River
Basin Board ($50,000), the Hillsborough River Basin Board ($64,420) and the Alafia River Basin Board ($32,210). The
City of Lakeland's 50 percent share is $146,630. The cost benefit for the project amortized using a weighted average
due to the varying life expectancies of the retrofit devices is $1.01 per 1,000 gallons saved.
Additional Information
Single family residences are offered up to two toilet rebates per home while multi-family dwellings, with appropriate
representation, will be encouraged to replace all devices at one time. The City of Lakeland is providing actual billing
data, ensuring 100 percent fixture inspection, conducting a scientifically significant survey to determine customer
satisfaction with low-volume devices and instituting an education program designed to assist customers in long-term
maintenance related to water savings. The educational portion will provide participants with materials on leak
detection and replacement of devices at the end of the life cycle. The marketing for the project began February 1,
2009 with the Phase 1 of the Project, and the distribution of the kits will begin no later than October 1, 2009. The water
savings associated with this project should affect public supply water demand, most notably Water Use Permit #4912.
This permit is for 30.2 MGD. This project is located within the Southern Water Use Caution Area and is consistent with
basin Comprehensive Watershed Management (CWM) priorities.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 32,839 0 0 32,210 629 0
013 Hillsborough River Basin 65,049 0 0 64,420 629 0
020 Peace River Basin 54,353 0 0 52,441 629 1,283
Project Funds Not Budgeted by the
District
City of Lakeland 146,630 0 0 146,630 0 0
$298,871 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 195
N112
Conservation - Lakeland - Plumbing Retrofit Project
Critical Project Milestones ActualProjected Amended
Program Implementation / Rebates Begin 10/1/09 10/1/09
Rebates End / Savings Evaluations Begin 10/1/10
Final Report Due 11/1/11
Project Closeout 1/1/12
Status As Of: February 23, 2011
The City of Lakeland has officially closed the toilet rebate portion of the program associated with N112. The combined
total of rebated fixtures for L914 and N112 was 3,508. N112 is currently in the final stage of completion. The City of
Lakeland is recording pre and post usage from all participating customers. The savings analysis for 138 of the 740
locations is completed. The documented savings for these 138 locations is 2,297,000 gallons per year or 6,293 gallons
per day.
011 - Alafia River Basin 196
N150
Mapping - Polk - NAVD88 Vertical Control Densification
Project Type Cooperative Funding
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River
Polk CountyCooperator(s)
Project Manager OWENS, JIM
Task Manager(s)
Status Ongoing
DescriptionThe establishment of an accurate and easily accessible vertical control survey network is an important component in
the development of updated Federal Emergency Management Agency Flood Insurance Rate Maps (FEMA FIRM). The
District, in cooperation with the National Geodetic Survey and the Florida Department of Environmental Protection, has
completed the Distict-wide vertical control densification. This project further enhances the existing vertical control
network to support FEMA FIRM mapping, topographic data collection and modeling activities. The newly-established
vertical control network allows the District and local governments to transition from the older and less accurate vertical
control survey network known as the National Geodetic Vertical Datum of 1929 to the more accurate North American
Vertical Datum of 1988 (NAVD88) system. In Polk County this includes running level loops and establishing bench
marks based on NAVD88 along state and county roadways. This project enables the surveying community to make an
orderly transition to NAVD88 and allows Polk County to be on the same vertical datum as the District and to comply
with the federal surveying and mapping requirements. This project will densify the NAVD88 vertical control in Polk
County within the District's jurisdiction and compliments the District's NAVD88 migration project.
BenefitsDensification of benchmarks supports the development of Watershed Management Plans for Polk County thus
contributing to flood protection, natural systems, water quality and water supply. Polk County participates in the
National Flood Insurance Program administered by FEMA and requires that all finished floor elevations be above the
100 year floodplain. This project is a key component in meeting this requirement. Also, the establishment and
implementation of the NAVD 1988 enables more accurate elevations and mapping throughout the District, and the
conversion to the modern vertical datum allows the ability to establish accurate and reliable elevations using Global
Positioning System (GPS) technology. Polk County is a participant in FEMA's Community Rating System and has a
Class 8 rating.
Costs
The FY2010 approved budget is $200,000 in contractual services. The total cost for contractual services in the
FY2010 Cooperative Funding Agreement is $200,000 where the costs are being split (50%/50%) evenly between the
District and the County. The District's cost is split between the Alafia River Basin ($15,000), the General Fund
($15,000), the Hillsborough River Basin ($10,000), and the Peace River Basin ($60,000) based on approximate area.
The District is the lead for this project, and the County will reimburse the District 50 percent of the project costs not
exceeding $100,000. Additional costs are associated with staff time required to manage the project. The future funds
for the project are contingent upon approval of such amounts by the District Basin and Governing Boards in the annual
budgets.
Additional Information
This project will be administered by the District. The vertical control network survey work will be completed by FDEP
and NGS. All control network data produced by this project will be made available through Internet access via LABINS
web site and the NGS web site.
011 - Alafia River Basin 197
N150
Mapping - Polk - NAVD88 Vertical Control Densification
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 15,000 0 0 15,000 0 0
011 Alafia River Basin 16,949 0 0 16,949 0 0
013 Hillsborough River Basin 11,949 0 0 11,949 0 0
020 Peace River Basin 61,949 0 0 61,949 0 0
District Budgeted - Outside Revenue
Polk Co - Vertical Control Densification
(N150)
100,000 0 0 100,000 0 0
$205,847 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
150 daysExecute Cooperative Agreement between the County and the District 12/31/09 3/26/10 4/15/10
180 daysExecute Contract with FDEP 2/1/10 4/30/10 4/21/10
30 daysInitial Project Planning and Develop Scope of Work 9/1/09 10/22/09
60 daysSubmit Cooperative Agreement for Approval 10/1/09 10/16/09 10/26/09
720 daysFinal Deliverables 12/30/11 12/3/10
Status As Of: March 22, 2011
The District executed the Cooperative Funding Agreement with Polk County on April 15, 2010. The District executed a
contract with Florida Department of Environmental Protection (FDEP) on April 21, 2010. The field surveying work is 100
percent complete. The FDEP has submitted the survey data to the National Geodetic Survey for final adjustment and
publishing. Florida Initiative ACTION-TO-DATE comment: the FY2010 Cooperative Funding Project is complete.
011 - Alafia River Basin 198
N156
Design & Construction - Polk's SWRUSA Carter Road Transmission
MainProject Type Cooperative Funding
AORs Strategic InitiativesWater Supply Reclaimed Water
Basin(s) Alafia River, Peace River
Polk County UtilitiesCooperator(s)
Project Manager ANDRADE, ANTHONY
Task Manager(s)
Status Ongoing
DescriptionThis amended alternative water supply project consists of the design, permitting and construction of 8,150 feet of
12-inch reclaimed water transmission main along Carter Road from an existing pipeline on Carter Road, north to
connect to the county's reclaimed water transmission main on County Road 540A.
BenefitsThere are 561 dry-lined customers that will receive 224,400 gpd of reclaimed water to offset 134,640 gpd of potable
water. In conjunction with a booster station that the county is planning to install in 2009, this new pipeline will also
improve pressures and reliability within the eastern portion of the Southwest Regional Utility Service Area (SWRUSA)
reclaimed water system.
Costs
The total project cost is $784,130 (decreased from $900,000). The District's 50 percent share is $392,065 (decreased
from $450,000). The Alafia River Basin Board budgeted $240,000 in FY2010, and the remaining $152,065 was
budgeted in FY2011. The cost, amortized at 8 percent over 30 years, is $1.40 per thousand gallons offset.
Additional Information
As implementation of the project went forward, the County determined that due to design optimization the original
project's transmission main diameter could be reduced with no decrease to overall project benefit. As a consequence,
in December 2010, the Basin Board approved a cost-reduction scope modification amendment to decrease the
transmission main diameter from 16 to 12 inches; to decrease the total project cost from $900,000 to $784,130; and
proportionately decrease the District's contribution by $57,935 from $450,000 to $392,065.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 457,728 0 0 243,787 0 213,941
020 Peace River Basin 2,641 0 0 2,641 0 0
Project Funds Not Budgeted by the
District
Polk County Utilities 450,000 0 0 240,000 0 210,000
$910,369 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Contract Execution 12/1/09 2/15/10 2/24/10
Commence Design 2/24/10 2/24/10
Complete Design 6/30/10 6/1/10
Commence Construction 9/30/10 6/30/10
Complete Construction 9/30/11
011 - Alafia River Basin 199
N156
Design & Construction - Polk's SWRUSA Carter Road Transmission
MainContract Closeout 1/31/13
Offset Report 12/31/13
Status As Of: February 21, 2011
Construction started in June 2010 (Killebrew, Inc.), and is progressing ahead of schedule (90% complete). To date,
$240,000 has been budgeted, of which $0 has been reimbursed. In December 2010 the Basin Board approved a cost
reduction amendment related to the downsizing of main. ACTION TO DATE: On Schedule.
011 - Alafia River Basin 200
N161
Conservation - Polk Utilities - Rain Sensor Rebate Program
Project Type Cooperative Funding
AORs Strategic InitiativesWater Supply Conservation
Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River
Polk County UtilitiesCooperator(s)
Project Manager ANDRADE, ANTHONY
Task Manager(s)
Status Ongoing
DescriptionThis project provides financial incentives to encourage Polk County Utilities (PCU) customers to install rain sensors on
automatic irrigation systems installed prior to 1991. Eligible customers will receive up to a $50 rebate per sensor. It is
estimated that in this first phase 1,295 rain sensors will be installed, which is based on approximately five percent of
the eligible accounts throughout PCU's service area. The rebates will be offered to single-family, multi-family, and
commercial customers throughout PCU's service area. Customers will contact PCU's Customer Service Department
for the rebate request. The Permitting Section will verify that the property is eligible (built prior to 1991). Eligible
customers will then receive a rebate application and instructions for purchasing and installing the rain sensor. One
year of pre- and post-rain sensor installation water use data will be collected in order to analyze the water savings. An
inspection company contracted by PCU will verify correct installation of the rain sensors and issue the rebate checks.
Multi-family and commercial customers may receive up to two rebates per account. Addressing outdoor water use will
assist PCU in meeting future demands by using conservation as an alternative water supply measure.
BenefitsBased on a savings rate of 100 gallons per day (gpd) per sensor, the project is estimated to save 129,500 gpd.
Costs
The total cost of this project is estimated to be $116,550 and the District is requested to fund $58,275. Funding
budgeted in FY2010 includes $7,470 from the Green Swamp Basin (General Fund), $12,825 from the Hillsborough
River Basin Board, $20,565 from the Alafia River Basin Board, and $17,415 from the Peace River Basin Board, for a
total of $58,275. Additional funding may be requested in future fiscal years for subsequent phases. The cost benefit
amortized at 8 percent over 5 years is $0.60 per thousand gallons saved.
Additional Information
This is PCU's first rain sensor rebate program with the District. Project participants will also receive a packet of
information on water conservation, covering topics such as indoor and outdoor conservation, retrofitting,
Florida-friendly landscaping, irrigation system tips and detecting water leaks. Additionally, participants will be asked if
they would like an irrigation system evaluation for an additional charge, since this is outside the scope of the rain
sensor rebate program. PCU staff understands that if a customer elects to have an evaluation performed, those
savings will have to be reported separately.
011 - Alafia River Basin 201
N161
Conservation - Polk Utilities - Rain Sensor Rebate Program
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 7,470 0 0 7,470 0 0
011 Alafia River Basin 20,565 0 0 20,565 0 0
013 Hillsborough River Basin 12,825 0 0 12,825 0 0
020 Peace River Basin 26,349 0 0 23,182 3,167 0
Project Funds Not Budgeted by the
District
Polk County Utilities 58,275 0 0 58,275 0 0
$125,484 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Begin Rebates 1/31/10 6/30/10
Contract Execution 3/1/10 1/7/10
Begin Project Evaluation 8/31/11
Final Report 10/31/12
Contract Expiration 12/31/12
Status As Of: February 21, 2011
This FY2010 project is progressing according to the Agreement schedule. The program is in place, advertising has
begun, and inquiries are arriving daily. To date, only three (3) rebates have been issued. The project has not experienced
delays, however the rebate issuance rate has been much lower than anticipated. The District's entire project share of
$58,275 has been budgeted, of which $139 has been reimbursed. ACTION TO DATE: On-Time.
011 - Alafia River Basin 202
N223
WMP - Polk - Mulberry Area
Project Type Cooperative Funding
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) Alafia River
MulberryCooperator(s)
Project Manager TURNER, DAWN
Task Manager(s)
Status Ongoing
DescriptionThis is a multi-year funded project to perform tasks related to the Topographic Information, Watershed Evaluation, and
Watershed Management Plan elements of the District's Watershed Management Program (WMP) for the City of
Mulberry. Mulberry encompasses approximately 7 square miles of central Polk County. Approximately half of the City
was included in the Christina Watershed Management Program (L702). This project will build upon the information
developed through the Christina Watershed Management Plan, and will include the development of Topographic
Information, a Watershed Evaluation including a detailed system inventory, and a Watershed Management Plan for
the area outside of the Christina Watershed.
BenefitsThe WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality
and natural systems, while achieving flood protection. The information developed provides the science for the District's
Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) with their land
management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to
address level of service deficiencies; and 2) provides a Geodatabase and projected results from watershed model
simulations for floodplain management, and water quality management. The total cost for this project is $140,000.
Costs
The total funding amount for this project is $140,000. Due to their REDI status, the City was granted relief from the
normal 50/50 funding match. $105,000 is being provided by the District, and the City will contribute $35,000. This
represents a 75% to 25% funding split between the District and the City. With FY2010 funding, work on the Digital
Topographic Information and Watershed Evaluation tasks will be completed. Future funding will be needed to
complete Watershed Management Plan tasks.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 166,482 0 5,000 148,549 6,475 6,458
Project Funds Not Budgeted by the
District
City of Mulberry 35,000 0 0 35,000 0 0
$201,482 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
01 - October 200901 Award project funding 10/1/09
02 - December 200902 Submit draft Revenue Agreement to Contracts for Review 12/15/09 1/26/10
03 - January 201003 Execute Revenue Agreement 1/29/10 4/14/10
011 - Alafia River Basin 203
N223
WMP - Polk - Mulberry Area
04 - December 2009Submit draft Consultant Agreement to Contracts for review 12/15/09 5/26/10
05 - January 201005 Execute Consultant Service Agreement 1/29/10 7/1/10
06 - May 201006 Complete Topographic Information Element 5/31/10 5/31/11
07 - August 201007 Issue draft Watershed Eval Report for City and District review 8/31/10 8/31/11
08 - September 201008 Revise WE report per comments received, issue final report 9/30/10 9/30/11
09 - December 201009 Complete watershed model and validation of model results 12/31/10 12/31/11
10 - May 201110 Complete peer and public review process 5/31/11 5/31/12
11 - August 201111 Issue draft WMPlan report for review by City and SWFWMD 8/31/11 8/31/12
12 - September 201112 Revise WMPlan report per comments received, issue final report 9/30/11 9/30/12
Status As Of: January 31, 2011
The FY2010 Revenue Agreement and the associated consulting services agreement have been executed. Project
development meetings conducted with City and PBS&J staff on October 1, 2009 and October 27, 2009. Cost estimate
received from PBS&J on November 12, 2009 indicates the Watershed Evaluation and Watershed Management Plan can
be completed with FY2010 funding. The City would like to develop implementation projects for all of their problem areas,
including those identified in the Christina Watershed Management Plan. An evaluation of BMP alternatives will be
included in the Mulberry Watershed Management Plan; and a comprehensive implementation plan will be developed that
will include both immediate maintenance projects that do not require ERP permits, and the implementation of larger
BMPs that will require ERPs. Initiation of this project has been delayed. The consultant is working on several watershed
management plans that are behind schedule, and need to be completed for use in FEMA Map Modernization projects.
As the FEMA related projects are completed, work on this project will be authorized. It is anticipated the notice to
proceed will be given to the consultant in February 2011.
011 - Alafia River Basin 204
N321
Conservation - Harbor Bay CDD - Mira Bay Weather-Based
Controller ProjectProject Type Cooperative Funding
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River
Harbor Bay CDDCooperator(s)
Project Manager MUSICARO, MELISSA
Task Manager(s)
Status Ongoing
DescriptionThis project will replace traditional irrigation controllers with evapotranspiration (ET) weather-based irrigation
controllers to reduce irrigation water use. The 31 acres of common areas are currently irrigated by seven irrigation
contollers operating off of three onsite wells. The wells range in depth from 380 feet to 440 feet and recent tests
showed sodium chloride levels of 160 ppm or less, which is an indication of high quality water. Each of the wells is
metered and several years of water use data is available. A total of seven ET contollers will be installed and
maintained as recommended by the manufacturer. In addition, a weather station will be installed and maintained.
Water use data will be collected on a monthly basis and annual reports will be submitted to the District documenting
water usage and controller program modications made to the programming of the controllers over the next five years,
through December 2015. The appearance of the turf and landscape and replacement frequencies will be monitored by
the CDD and the landscape maintenance company.
BenefitsThe project is anticipated to save an estimated 14,431 gpd.
Costs
The total project cost is $50,000, and the Alafia River Basin Board approved FY2011 funding in the amount of
$25,000. The cost amortized at 8 percent over 5 years, is $2.31 per thousand gallons saved.
Additional Information
This project will install evapotranspiration (ET) controllers that are equipped to interface with rain sensor devices, and
rain sensor devices will be installed on each ET controller. Available research on ET controllers show that these
devices can save more than 30% in irrigation use. A total of seven ET controllers will be installed and maintained by
the irrigation contractor. The irrigation system is currently managed and maintained on a monthly basis by the
irrigation design and consulting firm that designed the original system. Monthly maintenance inspections include
obtaining meter readings, checking irrigation controllers for proper operation and scheduling, visually inspecting every
zone for broken pipes and sprinklers, misaligned heads, vegetative interference, etc. These maintenance practices
are expected to continue for the life of the property and every effort will be made to ensure that the system continues
to operate as efficiently as possible. Any modifications to the controller programs will be documented through the
duration of the project.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 27,024 0 0 0 2,024 25,000
Project Funds Not Budgeted by the
District
Other 25,000 0 0 0 0 25,000
$52,024 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
011 - Alafia River Basin 205
N321
Conservation - Harbor Bay CDD - Mira Bay Weather-Based
Controller Project
Draft Agreement to Contracts Administration 1/14/11
Draft Agreement Returned from Contracts Administration 1/31/11
Contract Executed 2/28/11
Notice to Proceed 2/28/11
Controllers Installed 4/1/11
Basin Board Notification 4/7/11
Final Report 12/1/15
Project Closeout 12/31/15
Status As Of: December 14, 2010
The agreement is being processed and is anticipated to be executed in February 2011.
011 - Alafia River Basin 206
N287
Feasibility and Pilot Testing - Hillsborough's Aquifer Recharge With
Reclaimed Water in South County Coastal AreaProject Type Cooperative Funding
AORs Strategic InitiativesWater Supply Reclaimed Water
Basin(s) Alafia River
Hillsborough County BOCC, Hillsborough County BOCCCooperator(s)
Project Manager WILL, SANDIE
SCOTT, KATHYTask Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as 1A priority. The FY2012 funding request is for public outreach activities which were not included in the
FY2011 funding request. The overall project would allow the County to optimize its reclaimed water use, improve
water levels in the Most Impacted Area of the Southern Water Use Caution Area (SWUCA) and provide a salinity
barrier to mitigate effects (i.e. provide net benefit) from potential additional groundwater withdrawals. The
public outreach activities will be an important addition to the project to provide education on the benefits of aquifer
recharge as well as to increase communication on project tasks. Funding for this project is being recommended
consistent with recent modifications to the Governing Board's Cooperative Funding Initiative Policy (130-4). There is
sufficient data to evaluate the project; it is in within the Basin Board's statutory authority to fund; and it is not the result
of a permit requirement or other enforcement action.
DescriptionThis is an aquifer recharge pilot testing project that will assess the effects of using up to 2 million gallons per day
(mgd) of treated excess reclaimed water from the South-Central Hillsborough County reclaimed water system to
directly recharge a non-potable zone of the Upper Floridan aquifer at the County's Big Bend ASR test well site. The
project consists of the design, permitting and construction of a reclaimed water recharge well system with associated
wellhead and appurtenances, interconnects, and monitor wells; performing a one-year aquifer recharge pilot study;
conducting groundwater modeling to evaluate water level improvements and water quality (including metals
mobilization); and assessing the potential for a salinity barrier and mitigation offsets for potential future groundwater
withdrawals. The County is also requesting additional funding to include public outreach activities.
BenefitsThe project would allow the County to utilize excess reclaimed water flows, improve water levels within the Most
Impacted Area (MIA) of the Southern Water Use Caution Area (SWUCA), and potentially provide a salinity barrier, as
well as additional mitigation offsets for future groundwater supplies.
Costs
The total cost of the project as presented in FY2011 was $2,640,000, with the District funding 50% or $1,320,000 for
the installation of a recharge well and monitor wells, engineering, legal and construction services, well construction
permitting, groundwater modeling, sampling, water quality modeling, and a dissolved oxygen reduction system (to
ameliorate arsenic leaching). In FY2011, the Alafia River Basin Board approved $1,168,073 in funding. In FY2012, the
County requested $428,854 ($214,427 each) for the remaining project activities ($303,854) and an additional
$125,000 ($62,500 each) for public outreach, increasing the project cost from $2,640,000 ($1,320,000 each) to
$2,765,000 (1,382,500 each). After further discussions with the County, however, it was determined that $25,000
($12,500 each) for public outreach would be spent in FY2012. Therefore, District staff recommends that the Board
approve $25,000 in the FY2012 budget (plus District staff salaries, travel and central garage) and that the County
request the remaining funds in subsequent future funding requests. The future funds identified for the project are
contingent upon approval of such amounts by the Pinellas-anclote Basin Board in the annual budget.
Additional Information
Hillsborough County completed an aquifer recharge feasibility study in the Big Bend area in 2009. This study identified
the initial steps to construct and evaluate the first direct reclaimed water aquifer recharge pilot project in the County.
The County has an existing Big Bend ASR test well that will be used as a monitoring well for the aquifer recharge pilot
test program. The feasibility study also includes cost estimates for well modifications and installations, as well as a
planning level cost estimate for expanding the pilot system to a full scale aquifer recharge system to recharge up to 1
billion gallons (BG) per year. Estimated water conversation benefit at build-out is 1.80 MGD based on 90% potable
quality offset. Estimated cost/benefit ratio at 8% annual interest rate amortized over 30 years is $0.36/1,000 gallons for
the total project.
011 - Alafia River Basin 207
N287
Feasibility and Pilot Testing - Hillsborough's Aquifer Recharge With
Reclaimed Water in South County Coastal Area
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 1,401,692 201,927 0 0 22,240 1,177,525
Project Funds Not Budgeted by the
District
Hillsborough County 1,382,500 0 0 0 214,427 1,168,073
$2,784,192 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Task 1Well Construction Permit Obtained 12/31/11
Task 2Recharge Well Engineering Design & Bid Docs Completed 10/31/12
Task 3Well Construction Completed 6/28/13
Task 4Recharge Operations Testing/Monitoring Completed 3/31/17
Task 5Groundwater Modeling and Data Analysis Completed 11/30/15
Task 6Operation Permit Application Completed 2/28/15
Operation Permit Obtained 2/28/17
Task 7Public Involvement Website Completed 1/1/12
Public Relations Website Update 1 & Brochure 1/1/13
Public Relations Website Update 2 1/1/14
Public Relations Website Update 3 1/1/15
Tasks CompleteProject Completed 4/1/17
Status As Of: March 15, 2011
District staff is currently working with the County on the scope of work and agreement documents. The County is
undergoing contract negotiations with their consultant. ACTION-TO-DATE: Pending contract completion.
011 - Alafia River Basin 208
K057
Education - Hillsborough County Lake & Stream Management
Outreach ProgramProject Type Cooperative Funding
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Quality Water Quality Monitoring
Basin(s) Alafia River, Hillsborough River
Hillsborough County BOCC, Hillsborough County BOCCCooperator(s)
Project Manager BURKE, MAYA
BURKE, MAYA, KOLASA, KEITH, STERNBERGER, VIRGINIA, MICKEL, JASONTask Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as High priority. Staff recommends continuing funding at requested levels the for the Hillsborough County Lake
and Stream Management Program. Funded continuously since 1997 the program has continued to monitor a group of
up to 120 lakes and 20 stream, educate and assist lake and stream property owners, and maintain the Water Atlas as
a source of data for citizens.
DescriptionThis is a continuation of the 1997-2009 Lake and Stream Monitoring Program. The objectives of this project are to: (1)
update and maintain water quality, habitat and hydrologic conditions data for 120 county lakes and 20 stream sites in
the University of Florida LAKEWATCH and Hillsborough County's Stream WATERWATCH programs that monitor lake
and stream conditions throughout the County; (2) provide training to citizen volunteers to collect field data and water
quality samples; (3) educate and assist lake and stream property owners on lake/stream management techniques and
water resources protection; (4) ensure that all data are entered into the Hillsborough County Watershed Atlas web site
(http://www.hillsborough.wateratlas.org) and that the site is kept current through data updates and new developmental
tasks; and (5) employ the Atlas for watershed, lake habitat and hydrologic conditions education and as a central
source for State, County and Volunteer data for citizens and water resource professionals.
BenefitsThe objectives of this project are to: 1) maintain 120 county lakes and 20 stream sites in the University of Florida
LAKEWATCH program that monitors lake water quality throughout the state; 2) provide training to citizen volunteers to
collect field data and water quality samples; 3) educate lake and stream property owners on lake/stream management
techniques and water resource protection; and 4) insure that all data are entered into the Hillsborough County
Watershed Atlas web site http://www.hillsborough.wateratlas.usf.edu/, and the site is properly maintained.
Costs
The total project cost for FY2011 was $401,186. The District's share of $200,593 was funded by the Alafia River
($40,118) and Hillsborough River ($160,475) Basin Boards. Hillsborough County's share of the total project cost was
$200,593. Hillsborough County is requesting reduced total project funding, $350,000, for FY2012. It is proposed the
District's share and Hillsborough County's share of the total project cost will each be $175,000.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 461,157 0 (52,536) 433,207 37,878 42,608
013 Hillsborough River Basin 992,984 0 (108,001) 799,482 138,538 162,965
014 Northwest Hillsborough Basin 783,440 0 (122,185) 905,625 0 0
Project Funds Not Budgeted by the
District
Hillsborough County 1,956,887 0 0 1,956,887 0 0
$4,194,468 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
011 - Alafia River Basin 209
K057
Education - Hillsborough County Lake & Stream Management
Outreach Program
Critical Project Milestones ActualProjected Amended
FY2004 Contractual FundingFY2004 Annual Report 6/30/05 6/30/04
FY2004 Contract Close Out 6/30/05 6/30/05
FY2005 Contractual FundingFY2005 Draft Agreement to management services 1/15/05 11/1/04
FY2005 Draft Agreement returned from management services 2/28/05 11/15/04
FY2005 Draft Agreement Mailed to Hillsborough Co. 3/1/05 12/1/04
FY2005 Draft Agreement returned from Hillsborough Co. 3/21/05 12/15/05
FY2005 Contract Executed 4/1/05 12/29/05
FY2005 Recognition of SWFWMD in project signage 4/1/05 4/1/05
FY2005 Begin Annual Sampling Program 4/1/05 4/1/05
FY2005 Annual Report 6/30/06 6/30/06
FY2005 Contract Close Out 6/30/06 6/30/06
FY2006 Contractual FundingFY2006 Draft Agreement to management services 1/15/06 1/20/06
FY2006 Draft Agreement returned from management services 2/28/06 2/15/06
FY2006 Draft Agreement Mailed to Hillsborough Co. 3/1/06 3/3/06
FY2006 Draft Agreement returned from Hillsborough Co. 3/21/06 5/3/06
FY2006 Contract Executed 4/1/06 5/31/06
FY2006 Recognition of SWFWMD in project signage 4/1/06 4/1/06
FY2006 Begin Annual Sampling Program 4/1/06 4/1/06
FY2006 Contract Close Out 6/30/07 6/25/07
FY2007 Contractual FundingFY2007 Draft Agreement to management services 1/15/07 10/15/06
FY2007 Draft Agreement returned from Hillsborough Co. 3/21/07 2/20/07
FY2007Contract Executed 4/1/07 2/22/07
FY2007 Recognition of SWFWMD in project signage 4/1/07 4/1/07
FY2007 Begin Annual Sampling Program 4/1/07 4/1/07
FY2007 Annual Report 6/30/08 6/24/08
FY2007 Contract Close Out 6/30/08 6/24/08
FY2008 Contractual FundingFY2007 Draft Agreement to management services 12/31/07 12/17/07
FY2008 Agreement returned from Hillsborough Co. 1/31/08 4/1/08
FY2008 Contract Executed 4/1/08 4/1/08
FY2009 Contractual FundingFY2008 Draft Agreement to management services 2/1/09 2/1/09
FY2008 Agreement returned from Hillsborough Co. 3/15/09 2/12/09
FY2008 Contract Executed 3/31/09 4/17/09
FY2010 Contract SummaryFY2010 Draft contract agreement sent to Hillsborough County for review and
edit
11/13/09 11/13/09
FY2010 Draft contract agreement received from Hillsborough County 1/5/10 1/5/10
FY2010 Contract agreement began District routing process 1/6/10 1/6/10
FY2010 Contract agreement sent to Hillsborough County for approval 2/24/10 2/24/10
FY2010 Signed contract agreement received from Hillsborough County 3/26/10 4/9/10
FY2010 Executed contract agreeement sent to Hillsborough County 4/19/10 4/19/10
Status As Of: February 28, 2011
A draft scope of work for FY2011 has been finalized.
011 - Alafia River Basin 210
L816
Design & Construction - Plant City's Sydney Road to Walden Lake
GC Transmission Main and PumpProject Type Cooperative Funding
AORs Strategic InitiativesWater Supply Reclaimed Water
Basin(s) Alafia River
Plant CityCooperator(s)
Project Manager MUSICARO, MELISSA
Task Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as a high priority. This is a multi-year project, and the District cost share in the agreement has been approved
and budgeted in previous fiscal years. This funding request is for additional funding that would increase the total
project cost for upgrading the reclaimed water line size from 18" to 20 or 24". The larger line will allow the city to serve
more residential customers in the future. The project addresses water supply priorities of the Basin Board by delivering
reclaimed water to offset the uses of potable quality water resources. The cooperator is working on confirming that it
will include the necessary matching funds in its capital budget in FY2012. There was sufficient data submitted to
evaluate the project, it is within the basin board's statutory authority to fund, it is not the result of a permit requirement
or enforcement action.
DescriptionThis alternative water supply project consists of the design, permitting and construction of approximately 16,000 feet of
18" diameter transmission main and an estimated 5,000 feet of 2" to 12" pipe. A booster pump station and minor
appurtenances will also be designed and constructed in order to complete the project. The planned line extends from
the city's Water Reclamation Facility at Alexander Street, through local roads and extending along Sydney Road to
Walden Lake Golf Course. The existing facilities to be served include Walden Lake Golf Course
(WUP#003685), South Florida Baptist Hospital, Tomlin Middle and Byran Elementary Schools. The customers will
have a combined demand of 0.4 mgd. The golf course and schools will use the reclaimed water for irrigation and the
hospital for irrigation and a cooling tower. The city is evaluating increasing the size of the transmission main from 18"
to either 20" or 24" in order to be able to serve additional residential customers in the future. The city will
receive construction bids for all 3 line sizes, at which time the city will be able to determine the FY2012 funding
amount to be requested from the Alafia River Basin Board.
BenefitsThe project will deliver approximately 0.4 mgd, and offset 0.3 mgd of potable quality water.
Costs
The anticipated total project cost is $3,568,200. The District share is $1,638,500 and the city share is $1,929,700. The
The Alafia River Basin Board approved $716,935 in its FY2008 budget. An additional $353,630 was allocated in
FY2008 from the Water Protection and Sustainability Program Trust Fund. The total project allocation for FY2008 is
$1,070,565. An additional $250,000 was allocated in FY2009 from the Water Protection and Sustainability Program
Trust Fund. The city is receiving an additional $200,000 through a legislative grant to be used for this project. The
Alafia River Basin Board approved $332,675 for the project from its FY2010 budget. The Alafia River Basin
Board approved its remaining contribution of $332,675 in FY2011. The city is evaluating increasing the size of the
transmission main from 18" to either 20" or 24" in order to serve additional residential customers in the future. The
city's preliminary FY2012 funding amount being requested from the Alafia River Basin Board is $338,362. The city will
receive construction bids for all 3 line sizes, at which time the city may adjust the requested FY2012 funding amount.
The cost amortized at 8 percent over 30 years, is $2.87 per thousand gallons offset, and this will be revised if the total
project cost is modified.
Additional Information
The City is in the process of evaluating Tomlin Middle School and Byran Elementary School for inclusion in the project.
The schools have a combined use of 20,000 gallons per day for irrigation. The scope of work will be revised once the
customers have agreed to particpate in the project.
011 - Alafia River Basin 211
L816
Design & Construction - Plant City's Sydney Road to Walden Lake
GC Transmission Main and Pump
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 1,731,501 0 0 1,055,554 340,488 335,459
District Budgeted - Outside Revenue
Water Protection & Sust T.F.
(Alternative Wtr)
603,630 0 0 603,630 0 0
Project Funds Not Budgeted by the
District
Plant City 1,720,647 0 0 1,049,610 338,362 332,675
$4,055,778 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Notice to Proceed 1/15/08 3/10/09
Basin Board Notification 2/1/08 6/4/09
Draft Agreement to Contract Administration 9/30/08 11/19/08
Draft Agreement returned from Contracts Administration 10/31/08 12/9/08
Contract Executed 1/1/09 3/9/08
Design Commence 3/31/09 4/7/09
Construction Commence 10/31/10 4/30/11
Construction Complete 7/31/11 1/30/12
Contract Termination 12/31/12
Status As Of: March 22, 2011
In December 2008, the service agreement with the Walden Lake golf course was signed, and the cooperative funding
agreement was sent to the City for appropriate signatures. The agreement was executed on March 9, 2009. The City
began working on project design with the consultant on April 7, 2009. The City continues to work with the consultant on
project design. The design consultant is proceeding with 90% design plans and specifications. The City met with the
Florida Strawberry Festival Management regarding potential reclaimed water connection points and there appear to be
little or no opportunities to use reclaimed water in the existing system. The City is pursuing additional irrigation
opportunities at the Tomlin Middle and Byran Elementary School. ACTION TO DATE: The City has requested a 6 month
time extension for the commence and completion dates for construction. The August 2010 request is due to the
additional time needed to obtain railroad crossing agreements and additional easements for construction. The time
extension does not affect the contract termination date, and a response letter was sent to the City on September 7, 2010,
approving this request. The milestones have been updated with the revised dates. The utility easements have been
obtained. The project was advertised for bid on November 5, 2010, and 11 bids were received. The city rejected a bid
and later decided to rebid the project construction. In March 2011, the city informed the District that the Walden Lake
Golf Course is under foreclosure. District and city staff will meet to discuss the future of this project.
011 - Alafia River Basin 212
N014
Education - Florida Aquarium's Watershed Education Initiative
Project Type Cooperative Funding
AORs Strategic InitiativesWater Quality Water Quality Maintenance and ImprovementWater Supply ConservationNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Withlacoochee River,
Peace River, Manasota
The Florida Aquarium, Inc., The Florida Aquarium, Inc.Cooperator(s)
Project Manager UNSER, SALLY
Task Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as High priority. The Florida Aquarium's focus on Florida's fresh water makes this science-based attraction's
goals closely aligned with the District's mission. The Florida Aquarium Watershed Education Initiative proposes to
continue programming that enhances the District's watershed education efforts by providing participants with a better
understanding of Florida's ecology through summer camps, advanced training for students and teachers in
environmental issues, and indepth teacher training. This project has several strengths: (1) its alignment to the District's
mission; (2) its summer camp program for minority and at-risk students, which is an audience the District has
identified for additional outreach; and (3) its incorporation of multiple learning approaches that encourage learning new
behaviors and environmental leadership skills. The program costs are within acceptable ranges for similar types of
youth education projects with the exception of the weeklong SEAS teacher training component, which is nearly twice
the cost per contact hour of other proposed teacher trainings. The indepth nature of this training justifies the addtional
costs for that component. The proposed program is aligned with Basin Board priorities for education.
DescriptionThis Cooperative Funding Initiative (CFI) project proposes to educate teachers and students in Hillsborough, Pinellas,
Pasco and Manatee counties about Florida's water resources and natural environment. The Florida Aquarium, which is
a major area attraction that drew 670,564 visitors in FY2010, proposes to implement a water resources education
initiative that focuses on three distinct programs for elementary, middle and high school students and teachers. What's
in Your Watershed? is a summer camp program designed to teach the importance of the Tampa Bay watershed to
low-income, at-risk upper elementary and middle school students from organizations such as Metropolitan Ministries,
United Way, Kids Inc. and the school district of Hillsborough County. The proposed camp will provide an opportunity
for youth to engage in interactive role-playing to learn about watersheds, water quality, water conservation and habitat
protection. Throughout the ongoing program, each student takes part in three field explorations within the Tampa Bay
watershed. This component will be evaluated through a portfolio of student work, student and parent evaluation of the
program using a written survey, instructor evaluation of the program and student pre/post assessments. Science
Education at Sea (SEAS) is a teacher education program that proposes to provide workshops for elementary, middle
and high school teachers, focusing on estuaries and incorporating the learning objectives of the Florida
Comprehensive Assessment Test. It allows teachers to explore current and future environmental issues and
challenges. The SEAS evaluation will include a combination of pre/post assessments, workshop surveys and teacher
journals. The proposed Regional Ocean Conference for Students (ROCS) will give 60 middle and high school students
and 15 teachers the opportunity to study several major water quality issues associated with local watersheds. Students
will identify the issues and create action plans that are achievable and beneficial for the environment. SWIM staff
participate in this conference.The ROCS workshop will be evaluated through pre/post assessments.
BenefitsThe cooperator estimates that the FY2012 program will reach 211 students and teachers directly and 9,240 students
indirectly. ROCS will provide an intensive workshop experience for high school students, providing
opportunities to explore current environmental issues in the Tampa Bay watershed, use critical thinking to develop
strategies for solutions and create action plans to be used within their communities. "What's in Your Watershed?"
summer camp addresses the important priority of getting traditionally underserved, inner-city youth outside to
explore the Tampa Bay watershed. Students learn important but simple actions that they can take back to their families
to increase water conservation at home. SEAS increases teachers' understanding of science through water resources
education and is relevant to issues in the Tampa Bay area. In addition, teachers acquire materials that will help
students meet the educational standards and FCAT preparation.
Costs
The total cost of the proposed FY2012 project is $43,346 with the District contributing $21,401 (Alafia River $5,136;
Hillsborough River $10,700; Coastal Rivers $1,070; Pinellas-Anclote River $1,285; Withlacoochee River
011 - Alafia River Basin 213
N014
Education - Florida Aquarium's Watershed Education Initiative
$1,070; Peace $1,070; Manasota $1,070). The dollar amount allocated per basin is determined by the number of
participants that will participate in the programming from each basin. District funding is requested for a summer camp,
teacher training programs and a conference for teachers and students. The program will reach 211 students and
teachers directly and 9,240 students and teachers indirectly at a cost to the District of $2.32 per person and $.73 per
contact hour. Budget lines below includes costs to manage projects.
Additional Information
The District has supported this project since FY2009.
The total FY2011 project cost was $43,346, with the District contributing $20,331 (Alafia River $5,136; Hillsborough
River $10,700; Coastal Rivers $1,070; Pinellas-Anclote River $1,285; Withlacoochee River $1,070; Manasota $1,070).
The dollar amount allocated per basin was determined by the number of participants projected to participate in the
programming from each basin. In FY2010, District funding supported a summer camp, teacher training programs and
a workshop for teachers and students. This program is projected to reach 127 students and 84 teachers directly
and 2,815 students indirectly at a cost to the District of $100.15 per person. The budget line includes costs for staff to
manage the project.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 22,653 0 (1,128) 11,976 5,851 5,954
013 Hillsborough River Basin 38,180 0 (2,257) 17,489 11,430 11,518
014 Northwest Hillsborough Basin 6,025 0 0 6,025 0 0
015 Coastal Rivers Basin 7,100 0 (226) 3,691 1,747 1,888
016 Pinellas-Anclote River Basin 7,566 0 (226) 3,694 1,995 2,103
019 Withlacoochee River Basin 7,213 0 (247) 3,792 1,780 1,888
020 Peace River Basin 5,246 0 (226) 3,692 1,780 0
021 Manasota Basin 7,101 0 (226) 3,692 1,747 1,888
Project Funds Not Budgeted by the
District
Florida Aquarium 43,890 0 0 0 21,945 21,945
The Florida Aquarium, Inc. 57,020 0 0 57,020 0 0
$201,994 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2009 Budgeted FundsOpen purchase order 11/3/08 1/5/09
Program components completed 9/15/09 9/30/09 9/30/09
Final report received by the District 9/30/09 10/15/09 12/23/09
FY2010 Budgeted FundsInititate purchase order 10/1/09 12/1/09
Program components completed 12/17/10 12/17/10
Final report and invoice received by the District 1/14/11
FY2011 Budgeted FundsInitiate purchase order 12/1/10 1/4/11
Program components completed 12/9/11
Final report and invoice received by the District 1/13/12
011 - Alafia River Basin 214
N014
Education - Florida Aquarium's Watershed Education Initiative
Status As Of: February 17, 2011
Project manager has written scope of work for FY2011 and it is in approval process.
011 - Alafia River Basin 215
N363
Conservation - Polk County - Landscape and Irrigation Evaluation
Project Type Cooperative Funding
AORs Strategic InitiativesWater Supply Conservation
Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River
Polk County UtilitiesCooperator(s)
Project Manager MUSICARO, MELISSA
Task Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as a high priority. This conservation project is consistent with basin board priorities of water conservation. This
project will result in a reduction of customers' outdoor water use through irrigation evaluations and indoor water use
through conservation kits. Since the project is offered to potable and reclaimed water users, a large portion of
the estimated water savings resulting from this project will extend the existing potable supply of water associated
with the Polk County Utilities service area and other participating utility service areas. Polk County Utilities has
received letters of intent from four interested municipalites. There was sufficient data submitted to evaluate the project,
it is within the basin board's statutory authority to fund, and it is not the result of a permit requirement or enforcement
action.
DescriptionThe project with Polk County Utilities (PCU) and Polk County municipalities (municipalities) will provide 1,093
landscape evaluations for customers using potable and reclaimed irrigation water to become knowledgeable about
how their individual irrigation system and landscaping can be modified to maximize water savings through
efficiency. PCU has letters of intent for cities of Auburndale, Winter Haven, Lakeland and Polk City. PCU is prepared
to offer the 1,093 landscape evaluations to their utility customers if for some reason the municipalities do
not participate in the project. Each participating customer will receive a water conservation kit including a low-flow hose
nozzle, kitchen faucet aerator, low-flow shower head (exchange program), and conservation information. PCU will
designate a staff member as project manager. The project manager will coordinate between the municipalities,
the hired contractor, and the District. The contractor will schedule evaluations, ensure that all reports and invoices are
distributed properly and timely, and compile conservation kit items for customers. Municipalities will be responsible for
forwarding contact information for eligible participants to the county project manager. Municipalities will individually set
their participation limits according to their available budgets, will reimburse PCU for their half of the costs directly
related to evaluations and conservation kits, and will provide water consumption information for each participant to the
county project manager. Reimbursement will be made in accordance with executed Interlocal Agreements with the
municipalities. The contractor will schedule appointments, send confirmation notices, and make reminder phone calls
prior to performing irrigation evaluations for single family, multi-family and commercial accounts. The contractor will be
limited to two appointments per day to ensure sufficient time for explaining the program and its benefits to each
customer. The contractor will provide each customer with a detailed report recommending modifications for improving
the efficiency of their irrigation system and landscaping, and distribute water conservation kits. A copy of each report
will be made available to the county project manager. Ten percent of the participants, randomly selected by the county
project manager, will receive a follow-up evaluation/inspection within six months to determine if modifications have
been implemented and to evaluate water use changes.
BenefitsThe project is anticipated to save an estimated 166,136 gallons per day.
Costs
The total project cost is $250,840, with the District 50 percent funding ($125,420) being requested in FY2012 from the
Peace River ($74,906), Alafia River ($17,905), Hillsborough River ($24,726) and Green Swamp Basins ($7,883). The
Polk County 50 percent share is $125,420. The cost amortized at 8 percent over 5 years is $1.01 per thousand
gallons saved.
011 - Alafia River Basin 216
N363
Conservation - Polk County - Landscape and Irrigation Evaluation
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 7,883 0 0 0 7,883 0
011 Alafia River Basin 17,905 0 0 0 17,905 0
013 Hillsborough River Basin 24,726 0 0 0 24,726 0
020 Peace River Basin 75,683 0 0 0 75,683 0
Project Funds Not Budgeted by the
District
Polk County Utilities 125,420 0 0 0 125,420 0
$251,617 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Develop Advertising Program 11/1/11
Execute Agreements with Municipalites 12/31/11
Begin Advertising 1/3/12
Begin Evaluations 1/31/12
Complete Evaluations 9/30/13
Final report 12/31/13
Status As Of:
011 - Alafia River Basin 217
N394
WMP - Delaney/Archie Creek Watershed Update
Project Type Cooperative Funding
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) Alafia River, Hillsborough River
Hillsborough County BOCCCooperator(s)
Project Manager ARNOLD, DAVE
Task Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as a high priority. A senior administrator has provided confirmation that the County will budget the project for
FY2012. Completing elements of the District's Watershed Management Program is one of the District's Strategic
Priorities for managing the water resource, and provides information to local governments to address land use
changes and stormwater management within a specific watershed.
DescriptionThis is a multi-year funded project to update the Watershed Evaluation and Watershed Management Plan elements of
the District's Watershed Management Program (WMP) for the Delaney/Archie Creek Watershed. The project is a
second update to a study completed in 2000 and updated in 2007, covering an area of 34.3 square miles within
Hillsborough County. A Watershed Management Plan provides a method to evaluate the capacity of a watershed to
protect, enhance, and restore water quality and natural systems, while achieving flood protection. The Watershed
Evaluation tasks include the collection of existing data, development of the geodatabase, Geographical Information
System (GIS) processing, field reconnaissance, and development of preliminary model features. The information is
organized as a geodatabase in the GIS. The Watershed Evaluation establishes the complexity of the watershed and
provides a geodatabase that defines the watershed's natural conveyance and storage features, and stormwater
infrastructure. The Watershed Management Plan tasks include watershed model parameterization, computer
modeling, floodplain analysis, peer review of floodplain results, public notification, public meeting, Governing Board
approval of floodplain results, surface water resource assessment (water quality analysis), establishment of level of
service (LOS), and Best Management Practices (BMP) alternative analysis. The update scope-of-work includes: (1)
update the geodatabase using newly available digital data (see project B813); (2) update the geodatabase and model
based on land use changes and associated information including Environmental Resource Permit data; (3) convert the
model from the Hillsborough County version of the Stormwater Management Model (SWMM) to Environmental
Protection Agency version SWMM 5.0; (4) develop a long term simulation model for assessing water quality/quantity;
(5) re-evaluate BMPs and provide final flood protection recommendations. With FY2012 funding, the Watershed
Evaluation will be completed. Future funding will be required to complete the Watershed Management Plan.
BenefitsThe Watershed Evaluation element is the collection and organization of detailed information such as land elevation,
ditches, culverts and other stormwater management features that affect how water moves within a watershed. The
Watershed Evaluation is the foundation for the Watershed Management Plan, the next element in the Watershed
Management Program. The information developed provides the science for the District's resource management and
Environmental Resource Permitting (ERP) responsibilities. It assists local governments with their land management
responsibilities by identifying the floodplain, establishing a level of service, evaluating BMPs to address level of service
deficiencies, and providing a geodatabase and projected results from watershed model simulations for floodplain
management, and water quality management.
Costs
The projected cost for this project is $1,600,000 of which the District's share is $800,000 and the County's share is
$800,000. The District's funding, on a watershed area basis, is split 91% - 9% between the Alafia River and
Hillsborough River Basins. For FY2012, $200,000 is included in the Basins' budget ($182,000 from the Alafia River
Basin and $18,000 from the Hillsborough River Basin) and Hillsborough County will contribute $200,000 for a total of
$400,000. With FY2012 funding, the Watershed Evaluation will be completed. Future funding will be required to
complete the Watershed Management Plan. Future funds identified for the project are contingent upon approval of
such amounts by the Governing Board and Basin Board in their annual budget. When each element is completed, the
project cost and scope may require refinement based on the information gathered and unforeseen circumstances. The
District funding amount shown in the table includes staff salaries.
Additional Information
The WMP includes five major elements: 1) Topographic information, 2) Watershed Evaluation, 3) Watershed
Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters
011 - Alafia River Basin 218
N394
WMP - Delaney/Archie Creek Watershed Update
and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.
The District has worked with the County to develop an implementation schedule by watershed based on their
projected funding levels. Hillsborough County will manage this project. A cooperative funding agreement will be
developed as a multi-year funded project contingent on the approval of future funding to complete the project. This
project will require a cooperative funding request each fiscal year until completed. If approved, this project will be
ranked as a 1A project in future fiscal years. The District and Hillsborough County are cooperating technical partners
CTP) with FEMA, the floodplain results will be submitted to FEMA. The flood insurance rate map (FIRM) panels will be
updated by FEMA based on their schedule and budget.
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 729,274 546,000 0 0 183,274 0
013 Hillsborough River Basin 73,274 54,000 0 0 19,274 0
Project Funds Not Budgeted by the
District
Hillsborough County 800,000 600,000 0 0 200,000 0
$1,602,548 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
April 30, 2012Update the model with new ERPs 4/30/12
December 31, 2011Kick off 12/31/11
February 28, 2012Convert the event based model from HCSWMM into EPA SWMM 5 2/28/12
March 31, 2013Final Report 3/31/13
September 30, 2012Long term simulation model development 9/30/12
Alternative analysis / final recommendation 12/30/12
Status As Of:
011 - Alafia River Basin 219
N397
Conservation - Rainwater Harvesting and Commercial Reuse
Project Type Cooperative Funding
AORs Strategic InitiativesWater Supply ConservationWater Supply Alternative Water Supply
Basin(s) General Fund (District), Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River,
Withlacoochee River, Peace River, Manasota
The Home Depot USA IncorporatedCooperator(s)
Project Manager SCOTT, KATHY
ROE, MELISSATask Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as a high priority. The project makes use of on-site, alternative water supplies to save water and educate
consumers about water conservation. This addresses District strategies of promoting water conservation through
education and and effective conservation practices. There was adequate information available to evaluate the project
and the cooperator provided a letter confirming it has included the necessary matching funds. The project is within the
District's statutory authority to fund and is not the result of a permit requirement or enforcement action.
DescriptionThis project consists of the installation of a rainwater collection system to collect water from the garden center
catchment area, along with the condensate from the HVAC units on the roof top, in each of The Home Depot stores in
the District to irrigate the plants within the Garden Centers, in lieu of potable water. These systems will include
corrugated steel tank (6' x 20') for a total storage capacity of 4150 gallons each. The complete conveyance system
includes a pump, floating extractor, pump control, motorized municipal backflow valve, flow meter and pre-filtration.
The Home Depot and the District will also work together to provide educational messages to store customers about
the innovative reuse technology being used at the stores as well as general water conservation messages for homes
and businesses.
BenefitsThe project is expected to reduce potable water use at each store by 500,000 gallons per store per year (1,370 gpd)
with a total reduction in the District in 35 stores of 17,500,000 gallons per year (48,000 gpd). In addition to the savings
realized, the project provides the community an example of how to make beneficial use of all available water. It also
affords the District an opportunity to expand its outreach efforts by working with The Home Depot to
communicate the need for and benefits of water conservation to numerous store customers.
Costs
The total project cost is anticipated to be $910,000 and the District is requested to fund $455,000 (50%). It is
anticipated that the cost to install the technology in each store will be $26,000 The stores are located throughout the
District in the following basins, and each basin's funding share is allocated accordingly: three stores in the Alafia River
Basin ($39,000); five stores in the Coastal Rivers Basin ($65,000); seven stores in the Hillsborough River Basin
($91,000); five stores in the Manasota River Basin ($65,000); seven stores in the Peace River Basin ($91,000); and
eight stores in the Pinellas-Anclote River Basin ($104,000). The estimated cost, amortized at 8 percent over and
estimated 20-year life of the savings, is $5.12 per 1,000 gallons saved. The installation portion of the project will be
completed in FY2012.
Additional Information
A similar project has been successfully implemented between the St. Johns River Water Management District
(SJRWMD) and The Home Depot for ten stores within the SJRWMD. The systems were recently brought on-line
(January 2011) and savings data will be forthcoming.
011 - Alafia River Basin 220
N397
Conservation - Rainwater Harvesting and Commercial Reuse
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 800 0 0 0 800 0
011 Alafia River Basin 40,020 0 0 0 40,020 0
013 Hillsborough River Basin 92,020 0 0 0 92,020 0
015 Coastal Rivers Basin 66,020 0 0 0 66,020 0
016 Pinellas-Anclote River Basin 105,020 0 0 0 105,020 0
019 Withlacoochee River Basin 13,102 0 0 0 13,102 0
020 Peace River Basin 92,020 0 0 0 92,020 0
021 Manasota Basin 66,122 0 0 0 66,122 0
Project Funds Not Budgeted by the
District
The Home Depot 455,000 0 0 0 0 455,000
$930,124 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Complete Equipment Installation 6/30/11
Begin Installing Equipment 10/31/11
Begin Focused Education 2/1/12
Complete Focused Education 12/31/12
Final Report 3/1/13
Status As Of:
011 - Alafia River Basin 221
N415
Wildlands Watershed Training Program
Project Type Cooperative Funding
AORs Strategic InitiativesNatural Systems Natural Systems Identification and MonitoringNatural Systems Natural Systems Conservation and Restoration
Basin(s) Alafia River, Hillsborough River, Coastal Rivers, Pinellas-Anclote River, Peace River, Manasota
Wildlands Conservation, Inc.Cooperator(s)
Project Manager BURKE, MAYA
Task Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as a High Priority. The proposed project is consistent with the basin budget priorities of "Public and Youth
Education" and "Education Through Citizen Science". The proposed project calls for a series of seminars on the
relationship between biological indicators and habitat types that are specific to each watershed. These seminars will
train citizens (using flash cards, CDs and other media) to collect data on these biological indicators. The project will
also provide an online forum (through the Watershed Atlas) to report these data along with data collected by trained
ecologists and an annual assessment of watershed health derived from the data collected. Finally, the project
proposed to employ community-based social marketing techniques, including pre- and post- testing, targeting specific
behavior change (getting outside on District lands and proper fertilizer use, for example) and contact over a sustained
period of time. This project provides an education opportunity for members of the public to engage in citizen science
and may also be of use to the Land Resources Department.
DescriptionThe goal of the Wildlands Watershed Training Program is to train citizens to identify representative wildlife species that
occur in the natural plant communities which comprise the District's watersheds in an effort to encourage citizen
science and assist with stewardship on public recreational lands. Wildlands Conservation, Inc. will develop and
implement a curriculum that informs interested members of the public on wildlife that is common in each of our most
prevalent natural plant communities by using readily evident indicators (sight, sound or sign). Courses will be taught
with the purpose of increasing an understanding of these lands and their associated natural habitats. This class will be
conducted at a minimum of four preservation areas in basins throughout the District. It will provide a two-pronged
approach. Part one is in the classroom; part two in the field. This will enable us to apply the classroom training in the
field. Participants will be encouraged to independently monitor their local watersheds and are provided with sample
data sheets and field guides of local watershed health indicator species and habitats. Data will be uploaded to the
existing Water Atlas website network. This new data layer will use information collected by professional, peer-reviewed
ecologists and citizen "trainees" and will reflect the habitats and selected species element occurrences taught in the
course.
BenefitsWildlands Conservation is a core group of conservation professionals with a common goal to conserve our natural
environment. Wildlands and its expertise are a critical component in the challenge to save our remaining wild places.
From an organizational perspective, Wildlands has been involved in the review of the land acquisition program for the
District and assisted in fine tuning acquisition priorities. This has direct bearing on water conservation and the
Wildlands Watershed Training Program is another avenue to achieving this goal. Furthermore, our staff has taken a
lead role in the Hillsborough River Greenways Task Force since its inception and has implemented a similar program,
the Frog Listening Network.
011 - Alafia River Basin 222
N415
Wildlands Watershed Training Program
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 2,127 0 0 0 2,127 0
011 Alafia River Basin 3,849 0 0 0 3,849 0
013 Hillsborough River Basin 13,195 0 0 0 13,195 0
015 Coastal Rivers Basin 4,948 0 0 0 4,948 0
016 Pinellas-Anclote River Basin 12,645 0 0 0 12,645 0
019 Withlacoochee River Basin 3,849 0 0 0 3,849 0
020 Peace River Basin 8,247 0 0 0 8,247 0
021 Manasota Basin 8,247 0 0 0 8,247 0
$57,107 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
01/2012-04/2012Schedule seminars 4/20/12
04/2012-10/2012Perform seminars, seminar editing, post-seminar surveys and specimen
maintenance
10/12/12
10/2012 - 12/2012Perform all seminar follow-up surveys 12/7/12
Status As Of:
011 - Alafia River Basin 223
L111
Education - Suncoast Earth Force Teacher Training
Project Type Cooperative Funding
AORs Strategic InitiativesWater Quality Water Quality MonitoringWater Supply ConservationNatural Systems Natural Systems Identification and Monitoring
Basin(s) Alafia River, Hillsborough River, Pinellas-Anclote River
Suncoast Earth ForceCooperator(s)
Project Manager UNSER, SALLY
Task Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as medium priority. There are several strengths of this proposed project.The cooperator's proposal to
help teachers foster student-directed learning incorporates the concept of inquiry-based science education, which is
more effective than a passive learning environment. The curriculum focuses on hands-on learning and on conducting
service learning projects in the community. Another strength of the proposal is the partnership with the Hillsborough
County School District to implement the program.The four proposed workshops are two days in length and will reach
100 teachers with indepth instruction. These teachers will in turn reach 13,300 students. The medium ranking reflects
concerns with program stability. Although Earth Force has undergone many staff changes in the past, District staff is
optimistic that the current leadership has the ability to implement this project. The proposed program is aligned with
Basin Board priorities.
DescriptionThis Cooperative Funding Initiative project proposes to deliver four two-day workshops for teachers primarily from
Hillsborough County with a smaller number expected from Pinellas county. Earth Force will be partnering with the
Hillsborough County school district to deliver professional development on service learning for its teachers. The
purpose of the teacher training is to provide teachers with the knowledge and skills needed to foster student-directed
learning about watersheds and water resources. Earth Force intends to use their GREEN (Global Rivers
Environmental Education Network) curriculum, which features a "Protecting Our Watersheds" activity booklet. This
curriculum provides a six-step process to help teachers integrate STEM (Science, Technology, Engineering, and
Mathematics) directives and service learning projects. The proposed project intends to reach 100 teachers with an
indirect reach of 13,300 students. Twenty-five teachers will be selected to act as mentors for the other teachers. The
students will be 5th-12th graders and 70% of the students will qualify for free and reduced lunch. District funding is
requested for four workshops and the purchase of water quality testing kits for each teacher to use with their students.
Evaluation will come from pre- and posttests as well as on-site observations of teachers with their classes.
BenefitsThis project enhances the District's watershed education efforts by enabling middle and secondary teachers to learn
about watersheds and water resources as well as acquire the skills to guide students through hands-on experiences
and apply critical thinking skills to solve water issues. Service learning projects will reinforce intended behavior change
and stewardship of water resources. The intended population of 70% students qualifying for free and reduced lunch
aligns with District objectives to reach underserved populations. Partnering with the Hillsborough County School
District optimizes the likelihood that the participation of teachers will be high.
Costs
The total cost of the FY2012 proposed project is $47,843, with the District contributing $23,360 (Hillsborough River
$11,360; Alafia River $11,000; Pinellas-Anclote River $1,000). District funds will be used to provide four two-day
workshops for teachers and a water quality testing kit for each teacher. The proposed project is intended to reach 100
teachers and through them reach 13,300 students. The direct cost is $233.60 per person and $14.60 per contact
hour. This amount is on the lower end of other teacher training proposals both in cost per person and cost per contact
hour. Budget lines below include costs to manage the project.
011 - Alafia River Basin 224
L111
Education - Suncoast Earth Force Teacher Training
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 74,234 0 (2,990) 65,509 11,715 0
013 Hillsborough River Basin 127,163 0 (11,416) 126,489 12,090 0
014 Northwest Hillsborough Basin 34,400 0 0 34,400 0 0
015 Coastal Rivers Basin 2,000 0 0 2,000 0 0
016 Pinellas-Anclote River Basin 120,364 0 (12,775) 131,429 1,710 0
Project Funds Not Budgeted by the
District
Hillsborough County Schools 100,652 0 0 100,652 0 0
Suncoast Earth Force 797,923 0 0 773,440 24,483 0
TECO Foundation 5,000 0 0 5,000 0 0
University of South Florida/Hillsborough
Cty Schls
45,000 0 0 45,000 0 0
$1,306,736 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
FY2009 Budgeted FundsOpen purchase order 11/3/08 1/5/08
Youth summit held 4/22/09 4/22/09
Program components complete 10/30/09 10/30/09
Final report received by the District 12/18/09 1/4/10
FY2010 Budgeted FundsInitiate purchase order 10/1/09 12/4/09
Youth summit held 4/1/10 4/1/10
Program components complete 9/30/10 11/30/10 11/30/10
Final report received by the District 10/29/10 12/20/10 12/22/10
Status As Of: February 18, 2011
Proposed CFI for FY2012.
011 - Alafia River Basin 225
N299
Stormwater Improvements - Flood Protection - Mulberry - Mulberry
WatershedProject Type Cooperative Funding
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) Alafia River
Mulberry, MulberryCooperator(s)
Project Manager TURNER, DAWN
Task Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as a Medium priority. A senior administrator has provided confirmation that the City will budget the project for
FY2012. The Best Management Practices will provide stormwater improvements to address flood protection issues.
DescriptionThis is a multi-year funded project for preliminary engineering and design, and development of an implementation plan
for immediate maintenance and Best Management Practices (BMPs) within Mulberry. The City of Mulberry
encompasses approximately 6.5 square miles in west Polk County, in the Alafia River Basin. Approximately half of the
City is located within the Christina Watershed. The Christina Watershed Management Plan was completed in 2008
through an agreement between the District and Polk County. In 2010, the District entered into an Agreement with the
City to develop a Watershed Management Plan for the remainder of the incorporated area. The Mulberry Watershed
Management Plan is anticipated to be complete in 2011, and will include an Immediate Maintenance Evaluation and
BMP Alternative Analysis. The City anticipates performing immediate maintenance and implementing BMPs identified
in both plans. Project funds may be used for development of construction documents, construction permitting, land
acquisition, bidding and contractor selection, construction, construction engineering, and inspection.
BenefitsThe performance of immediate maintenance and implementation of Best Management Practices will provide
stormwater improvements to address flood protection issues.
Costs
The projected cost for this project is $375,000. Due to their REDI status, the City was granted relief from the normal
50/50 funding match. The City will be the lead party for implementation of BMPs, and the District will reimburse the
City 75% of the project costs. For FY2011, $56,250 District is included in the Basin's budget, and the City will
contribute $18,750 for a total of $75,000. With FY2011 funding, the City will initiate immediate maintenance and obtain
land rights needed to perform immediate maintenance and implement BMPs recommended in the Christina or
Mulberry Watershed Management Plan. For FY2012, $56,250 is included in the Basin's budget, and the City will
contribute $18,750 for a total of $75,000. With FY2012 funding, additional land rights will be obtained and design,
permitting, and construction of immediate maintenance activities and recommended BMPs will continue. Future
funding will be needed to complete design, permitting, and construction of BMPs.
Additional Information
The WMP includes five major elements: 1) Topographic information, 2) Watershed Evaluation, 3) Watershed
Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters
and Models. Implementing elements of the WMP with local governments is one of the District's Strategic Priorities.
The Mulberry watershed has experienced repeated flooding during large storm events. As a result of the hurricanes in
2004, homes were damaged, roads were overtopped, and stormwater infrastructure was damaged due to erosion.
The Christina Watershed Management Plan identified a need for immediate maintenance and infrastructure
improvements in the city. The City was granted cooperative funding in FY2010 to complete Digital Topographic
Information, Watershed Evaluation and Watershed Management Plan tasks in order to identify immediate
maintenance needs and evaluate BMP alternatives for the remainder of the Mulberry watershed. The City will manage
this project, and the District has worked with the City to develop an implementation schedule based on their projected
funding levels. This project requires a cooperative funding request each fiscal year until completed. If approved, this
project will be ranked as a 1A in future fiscal years. The District is a cooperating technical partner (CTP) with FEMA.
Floodplain results will be submitted to FEMA, and flood insurance rate map (FIRM) panels will be updated by FEMA
based on their schedule and budget.
011 - Alafia River Basin 226
N299
Stormwater Improvements - Flood Protection - Mulberry - Mulberry
Watershed
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 342,894 225,000 0 0 58,948 58,946
Project Funds Not Budgeted by the
District
City of Mulberry 93,750 56,250 0 0 18,750 18,750
$436,644 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
Land/Easement Acquisition 7/20/11
Design and Permitting 7/20/11
Contractor Selection 8/20/11
Initiate Construction of BMPs 9/20/11
Initiate Immediate Maintenance 9/20/11
Complete Immediate Maintenance 12/20/11
Complete Construction of BMPs 12/20/13
Status As Of: March 15, 2011
District and City staff met on December 8, 2010 to discuss the FY2011 Scope of Work. The draft Agreement is currently
routing for approval..
011 - Alafia River Basin 227
N396
Conservation - Rivercrest Irrigation Water Conservation Pilot
Project Type Cooperative Funding
AORs Strategic InitiativesWater Supply Conservation
Basin(s) Alafia River
Raymow Enterprises IncCooperator(s)
Project Manager SCOTT, KATHY
Task Manager(s)
Status Proposed Coop. Funding Application
Recommendation
Fund as a low priority. While the concept is directly in line with agency and basin priorities, the application does not
contain sufficient information to evaluate it,and phone calls to the cooperator were not returned. In addition, the
project's cost savings are approximately six times higher than other conservation projects of this nature. There was
not sufficient information to evaluate the application, but the cooperator has confirmed it has the necessary matching
funds in its FY2012 budget. The project is within the District's statutory authority to fund, and is not the result of a
permit requirement or enforcement action.
DescriptionThe proposed pilot project consists of the replacement of two conventional irrigation controllers to Baseline control
systems that will utilize soil moisture sensors to monitor the available water in the soil. Installed, maintained and
monitored appropriately, this control system will have the ability to self regulate the water delivered from the water
source based on the soil moisture readings. The site will have off site monitoring capabilities and will include flow
sensing to track water usage. This system may qualify for variance based on Senate Bill 494, passed into legislation in
2010, that allows a monitoring entity (in this case,the Rivercrest Homeowners' Association) to monitor irrigation using
Smart Irrigation Controllers rather than irrigating according to the standard days/times per week allowed by District
rules. The approval of a variance would be subject to the application process established by the District. The applicant
believes the proposed control system meets all requirements and standards of the Florida Irrigation Society and the
Irrigation Association best management practices (BMPs).
BenefitsBy irrigating according to moisture levels within the soil, determined by the Smart Irrigation Controller technology, the
applicant estimates the savings to be 7,109 gallons per day (gpd). Rivercrest HOA is currently permitted to use
115,200 gpd for irrigation (WUP #10398).
Costs
The project is estimated to cost $201,820, and requests the Alafia River Basin Board to fund $101,910, or 50% of the
project costs. The estimated cost, amortized at 8 percent over an estimated five-year life is $18.54 per 1000 gallons
offset. A five-year life is assumed because savings is contingent upon monitoring by the HOA and a variance
approved by the District; in addition, the technology is too new to confidently assign a longer life of the equipment.
Additional Information
For the first phase, the applicant and District staff discussed a potential pilot project during the summer of 2010. It
was suggested a pilot project might be considered since, at the time, no one else had applied for a 494 variance and
the District would like to get information on both the processes and the savings that could be achieved. In January
2011, a community has applied for the 494 variance without financial assistance, and will provide the information the
District is seeking. The applicant has also proposed a second phase of the project to be considered in the future. This
is to convert the shrub area application to point source irrigation. Point source irrigation utilizing emitters that are
applying plant water requirements at the root base only will reduce water requirements for this site by eliminating the
application of water to areas of the beds that have no need for irrigation. The emitters required for each plant will be
calculated based on plant water requirements, plant size, environment and soil type. Conversion of the spray heads
application to multi-trajectory multi-stream rotary nozzles. The applicant believes this would allow for lower gallons
required for each head and reduce application rate and thus allow for the addition of heads. Coverage issues would
then be addressed to have a minimum of head to head coverage as suggested by all major manufactures' as well as
the Florida Irrigation Society and the Irrigation Association BMP'
011 - Alafia River Basin 228
N396
Conservation - Rivercrest Irrigation Water Conservation Pilot
District Budgeted - Ad Valorem Based
Revenue
011 Alafia River Basin 104,763 0 0 0 104,763 0
$104,763 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Status As Of:
011 - Alafia River Basin 229
M114
FIRM Maps - Polk - Development and Outreach of Flood Insurance
Rate MapsProject Type FEMA/Map Mod.
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River
Federal Emergency Management AgencyCooperator(s)
Project Manager TURNER, DAWN
Task Manager(s)
Status Ongoing
DescriptionThe project involves performing tasks included in the Topographic Information, Watershed Evaluation, and Watershed
Management Plan elements of the District's Watershed Management Program for priority watersheds in Polk County;
and the development of countywide digital Flood Insurnace Rate Maps (FIRMs). Public education and outreach will
also be performed to faciliate successful adoption of the FIRMs. The District obtained LiDAR topographic information
and digital orthophotos for most of Polk county as part of the Peace River Topographic Mapping project (P692).
Through the District's cooperative funding program, the District and County have prepared or are in the process of
preparing Watershed Management Plans for all or portions of 11 of the 25 identified watersheds. With Federal
Emergency Management Agency (FEMA) funding, these plans will be updated to include recent alterations within the
watersheds, and to meet the standards described in the District's Guidelines and Specifications. The remaining
watersheds will be prioritized based on the needs of local governments and the District. Appropriate Watershed
Evaluation and Watershed Management Plan tasks will be accomplished for priority watersheds. However, some of
the lower priority watersheds will not be studied in detail because of funding constraints. In these watersheds the risk
information from the current FIRMs will be transferred to the modernized, digital maps. Future cooperative funding
request(s) will be required to complete Watershed Evaluation and Watershed Management Plan tasks for lower
priority watersheds, and for those tasks that are not associated with the FIRM map updates (e.g. LOS determination,
surface water resource assessment, and BMP alternative analysis). The District will manage the project, coordinate
with local government(s), and enter into purchase orders and agreements to accomplish project tasks. A portion of
Polk county is located within the South Florida Water Management District (SFWMD). The SFWMD will pursue FEMA
funding to update the Polk county FIRMS in their area. The District executed a joint Mapping Activity Statement with
FEMA and the SFWMD that identifies costs, responsibilities, and specific activities to complete the FEMA Map
Modernization effort for watersheds within Polk county.
BenefitsIdentification of floodprone areas is critical for the effective implementation of local, state and federal programs
including the regulation of land use changes and site development, emergency preparedness, and emergency
response. The information is also used by public and private entities to assess risk, and make development decisions.
Costs
The Federal Emergency Management Agency provided $1,200,000 for this project.
Additional Information
FEMA is a federal agency with flood protection responsibilties that include the preparation of FIRMs to identify flood
hazards zones. Staff has been working to improve and formalize the District¿s relationship with FEMA. On September
14, 2001, FEMA and the District executed a Cooperating Technical Partners (CTP) Memorandum of Agreement. As a
CTP, the District is eligible for federal grants and matching funds to further efforts to modernize the FIRMs. In FY2004,
FEMA provided over $6 million in grant funds to the District to modernize the FIRMs in Hernando, Marion, Pasco, and
Sarasota counties. In FY2005, FEMA provided an additional $2.7 million in grant funds to the District to modernize the
FIRMS in Polk, Hadee and DeSoto counties. $1.2 million of the FY2005 funding was allocated to the area of Polk
county located within the District. These funds will be used to update previous studies to meet District Guidelines and
Specifications, perform elements of the District's Watershed Management Program (WMP) for priority watersheds,
and develop countywide digital FIRM maps. A WMP includes five major elements: Topographic information,
Watershed Evaluation, Watershed Management Plan, Implementation of Best Management Practices, and
Maintenance of Watershed Parameters and Models. The Topographic Information element provides the foundational
information used to define the watershed's boundaries, storage and conveyance. The Watershed Evaluation element
tasks includes field evaluation of the watershed and its intermediate conveyance system, inventory of water resources
and stormwater management infrastructure, data development and GIS processing of watershed parameters, and an
immediate maintenance evaluation. The Water Management Plan tasks include survey, data management and
development of watershed parameters, GIS processing, computer modeling, floodplain analysis, surface water
resource assessment (water quality), establishment of level of services (LOS), and a best management practices
011 - Alafia River Basin 230
M114
FIRM Maps - Polk - Development and Outreach of Flood Insurance
Rate Maps(BMP) alternative analysis, which includes prioritized recommendations and probable costs. Implementation includes
design, construction permitting, development of construction documents, land acquisition, and construction of the
BMPs. Maintenance of Watershed Parameters and Models are required in order to maintain the watershed
parameters and model based on land alteration occurring within the watershed. When each element is completed, the
project budget is refined based on the information gathered. The District's FY2006 funding shown in the table below
will be used for staff time.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 101,324 0 0 73,035 14,804 13,485
District Budgeted - Outside Revenue
FEMA Coop Tech Partner Agreement 1,200,000 0 0 1,200,000 0 0
$1,301,324 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Cooperating Technical Partners AgreementCooperating Tech. Partners Memorandum of Agreement 9/14/01 9/14/01
Cooperating Technical Partners Agreement Executed 8/12/02 8/12/02
2. Mapping Activity StatementMapping Activity Statement Executed 9/30/05 2/6/06
3. Consultant Agreement - ScopingDevelop Scoping Consultant Agreement 11/7/05 11/7/05
Draft Consultant Agreement to Management Services 11/7/05 11/7/05
Draft Agreement returned from Management Services 12/1/05 11/30/05
Scoping Consultant Contract Execution 12/30/05 1/12/06
Scoping Consultant Notice to Proceed 12/30/05 2/1/06
Scoping Consultant Contract Termination 7/31/06 7/31/06
Polk County Scoping Report complete 1/23/07 1/23/07
4. Consultant Agreement - DFIRM generationConsultant Agreement to Contracts for approval 4/1/07 6/12/07
Consultant Agreement back from Contracts 4/30/07 6/15/07
Agreement mailed to Consultant for signature 5/14/07 6/21/07
Consultant Agreement executed 6/14/07 7/30/07
Notice to Proceed to Consultant 6/14/07 8/2/07
Status As Of: January 31, 2011
The Consultant Services Agreement with Watershed Concepts has been executed, and Notice to Proceed was given on
August 2, 2007. The Agreement includes DFIRM map generation and related tasks for the area of Polk County that is
within the District. The SFWMD will contract with a consultant separately for the generation of DFIRM maps for the
portion of Polk County that is located within the SFWMD. Status History: The Mapping Activity Statement (MAS) was
executed by both Water Management Districts and FEMA as of February 6, 2006. Project funds have been placed in the
District's Smartlink account. The Governing Board approved encumbering the funds without a contract, because the
funds were included in District's FY2005 budget. The consultant services agreement with Tampa Bay Engineering (TBE)
was executed, and the first work order for scoping services was issued in January 2006. District and TBE staff conducted
a pre-scoping meeting on April 19, 2006. Representatives of the District, Polk County, the City of Winter Haven, and the
SFWMD attended the pre-scoping meeting. The project scope and schedule, and data needs were discussed. The
scoping meeting was conducted on June 22, 2006 in the Bartow Service Office. Representatives of the District, the
SFWMD, Polk County, Mosaic, the cities of Winter Haven, Lake Wales, Lakeland, Frostproof, Lake Alfred, and
Auburndale attended the scoping meeting. Participants were asked to identify areas of particular concern for their
011 - Alafia River Basin 231
M114
FIRM Maps - Polk - Development and Outreach of Flood Insurance
Rate Mapscommunity; and to provide information such as current city limits that will be used in the preparation of the digital FIRM
maps. Each local government was also asked to execute a Community Partner Memorandum of Agreement to confirm
their commitment to work with the District, the SFWMD and the FEMA to produce updated, digital FIRM maps for their
community. The Scoping Report was provided to local governments for review and comment on January 23, 2007. One
comment was received, and the scoping map was revised accordingly, and the Scoping Report was submitted to FEMA.
After the original Scoping Report was submitted to FEMA, District staff were notified that the SFWMD would receive
$250,000 from FEMA, and that the SFWMD would obtain LiDAR data for the SFWMD portion of Polk County. In addition,
it has been determined that the Post Preliminary Processing task will take at least 11 months to complete. The Scoping
Report was revised to reflect the funding provided to the SFWMD and the addition of the LiDAR data for the SFWMD
portion of Polk County; and to revise the project schedule to reflect a longer period for the completion of the Post
Preliminary Processing task, and an associated reduction in the amount of time provided for the completion of model
development and mapping related tasks. The revised Scoping Report was submitted to FEMA on June 12, 2008.
SFWMD prepared an amendment to the Mapping Activity Statement (MAS) agreement with the District and FEMA to
reflect the additional FEMA funding and LiDAR data. The MAS amendment has been fully executed. Staff is continuing to
work with each local government to execute a Community Partner Memorandum of Agreement to confirm their
commitment to work with the District, and the FEMA to produce updated, digital FIRM maps for their community. To date,
MOAs have been received from 6 local governments (Eagle Lake, Lake Wales, Winter Haven, Lake Alfred, Polk City and
the City of Auburndale), and from Polk County. Draft models have been received for the Polk City, Peace Creek, and
Christina watersheds. Of these, the Peace Creek and Christina models have been reviewed by a peer consultant, and
the Christina model results have been presented during a Public Meeting held on January 12, 2010. Staff anticipates
receipt of the Itchepackesassa Creek and Upper Peace River watershed models during summer 2010. (Please refer to
project L672 for additional information regarding the Polk City, Christina, Itchepackesassa Creek Watershed
management Plans, H024 for the Upper Peace River watershed Management Plan, and H034 for the Peace Creek
Watershed Management Plan. The total budget for this project is $1,200,000. Of this, $39,800 was paid to TBE for
consulting services related to project scoping and the development of the original Scoping Report. $69,134 has been
encumbered to a contract with Bender Consulting for the preparation of a public outreach plan for Polk County, and
$747,010 has been encumbered to the agreement with Watershed Concepts for DFIRM generation. $243,500 was
encumbered to an agreement with Ardaman for floodplain analysis and delineation, and peer and public review tasks for
the Upper Peace River - Homeland watershed. (Refer to H024 for more information.) Invoices totaling $43,980 have
been received from Bender Consulting, and have been paid. Invoices totaling $68,090 have been received from
Watershed Concepts, and have been paid.
011 - Alafia River Basin 232
M118
FIRM Maps - Map Modernization Management Support - Districtwide
FEMA FundingProject Type FEMA/Map Mod.
AORs Strategic InitiativesFlood Protection Floodplain Management
Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,
Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota
Federal Emergency Management AgencyCooperator(s)
Project Manager TURNER, DAWN
Task Manager(s)
Status Proposed
DescriptionThis project is to provide management support for Federal Emergency Management Agency (FEMA) flood insurance
rate map (FIRM) modernization projects throughout the District (please reference projects M101-M116). Under these
Map Modernization projects the FIRMs will reflect updated flood hazard risk areas and be modernized to a digital
product. The updated flood hazard risk areas are being developed by the District through the 1) Topographic
Information, 2) Watershed Evaluation, and 3) Watershed Management Plan elements of the District's Watershed
Management Program (WMP). Map Modernization management support (MMMS) funds supplement the ongoing
activities already being performed by staff including, but not limited to coordination and effort in building partnerships,
information technology systems, program management planning, hydrologic and hydraulic review, outreach, and the
development of a Coordinated Needs Management Strategy.
BenefitsThe WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality
and natural systems, while achieving flood protection. The information developed provides the science for the District's
Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) With their land
management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to
address level of service deficiencies. 2) Provides a Geodatabase and projected results from watershed model
simulations for floodplain management and water quality management. The FIRMs are used by local governments for
land management and building permitting to satisfy the minimum requirements of the National Flood Insurance
Program.
Costs
The total amount for MMMS is $1,013,240 to be funded by FEMA. The District has received a total of $953,860 in
FEMA MMMS to date that has been included in the Governing Board's FY2005, FY2006, FY2007, FY2008, FY2009,
and FY2010 budgets as revenue. District Staff anticipate an additional $150,000 to be funded by FEMA for ongoing
MMMS activities in FEMA's FY2011. Each year FEMA notifies the District how much funding is available for MMMS.
The District funding amounts shown in the table represents staff salaries.
Additional Information
The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed
Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters
and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed
Management (CWM) initiative strategies and one of the District's Strategic Priorities. The District is cooperating with
FEMA to modernize the FIRMs throughout the District. Staff has worked with the FEMA to improve and formalize the
District's relationship with a federal agency that shares flood protection responsibilities. FEMA and the District
executed a Cooperating Technical Partners (CTP) Memorandum of Agreement on September 14, 2001. As a CTP,
the District is eligible for federal grants and matching funds to further efforts to modernize the FIRMs. Each year the
District enters into a cooperative agreement with FEMA for MMMS funding that defines the activities that will be
performed. $250,000 in funding (grant EMA-2004-CA-5038) for FY2005 is being used to provide a meeting facilitator
for ongoing coordination meetings between the water management districts, FEMA Region 4, and the Florida
Department of Community Affairs; develop a District-wide FIRM paneling scheme; determine the feasibility of
expanding the District's role in distributing digital FIRMs to the public; maintaining the digital FIRMs; and revising the
FIRMs simultaneously with the ERP application review. For FY2005, a total of $300,000 was actually budgeted in the
General Fund with associated revenue. The $50,000 difference between expected funding and actual was rolled into
the FY2006 budget. For FY2006 FEMA has granted (EMA-2005-CA-5244) the five water management districts
$120,000 in MMMS to hire an outreach facilitator and develop design storm rainfall depth criteria for the entire State.
The District will manage the project and contract with consultants on behalf of the other water management districts.
In addition, the District received additional MMMS ($144,000) in FY2006 to support outreach efforts, allow the District
to develop quality control/quality assurance tools, and support staff travel to meetings and conferences related to this
effort. For FY2007, the District has received $129,620 from FEMA (grants EMA-2006-CA-5631 and
011 - Alafia River Basin 233
M118
FIRM Maps - Map Modernization Management Support - Districtwide
FEMA FundingEMA-2006-CA-5624) for continued travel support, outreach efforts, management assistance, and an XML-based
export to for the District's Geographic Watershed Information System to populate FEMA's database. The District has
recently received an additional $69,620 under EMA-2007-CA-5723 for continued travel and programmatic assistance.
For FY2008, the District is proposing to budget $150,000 in revenue for continued MMMS. The District will coordinate
with the local government(s), will manage the project, and will enter into purchase orders and agreements to
accomplish project tasks.
District Budgeted - Ad Valorem Based
Revenue
010 General Fund (Districtwide) 278,431 0 40,600 65,750 163,882 8,199
District Budgeted - Outside Revenue
FEMA Coop Tech Partner Agreement 1,320,000 0 0 1,170,000 0 150,000
$1,598,431 Total:
Prior
Funding
Cumulative
Transfer or
Lapsed Funding Funding Funding
2011 FY 2012 FY Future
Funding
Total
Funding
Critical Project Milestones ActualProjected Amended
1. Critical Project MilestonesFEMA & District Recognition on Reports 3/31/10 9/30/10 9/30/10
2. FY2005Develop Mutually Agreeable Scope of Work for MMMS 9/30/04 9/30/04
Execute FEMA Agreement Articles and Related Forms 11/30/04 11/24/04
Develop Consultant Agreement 11/30/04 11/19/04
Draft Agreement to Management Services 1/7/05 1/7/05
Draft Agreement returned from Management Services 1/21/05 2/4/05
Contract Execution 3/4/05 3/1/05
Notice to Proceed 3/4/05 3/1/05
Develop First Amendment to Consultant Service Agmt 7/7/06 8/2/06
Draft Amendment to Management Services 7/12/06 8/2/06
Contract Termination 7/21/06 9/30/10 9/30/10
Amendment Execution 9/18/06 9/18/06
3. FY2006 - DistrictDevelop Cooperative Agreement for MMMS (District) 6/7/05 6/1/07
Execute FEMA Agreement Articles and Related Forms 10/31/05 12/2/05
District Outreach Facilitator Purchase Order Execution 2/28/06 3/2/06
District Outreach Facilitator Purchase Order Termination 12/31/06 12/31/06
3. FY2006 - FL WMDDevelop Application for competitive MMMS (FL WMD) 6/1/05 5/18/05
Execute FEMA Agreement Articles and Related Forms 10/31/05 12/2/05
Develop State Outreach Facilitator Purchase Order 1/30/06 2/21/06
State Outreach Facilitator Purchase Order Execution 2/28/06 3/2/06
Develop Rainfall Frequency Analysis Purchase Order 6/1/06 6/1/06
Rainfall Frequency Analysis Purchase Order Execution 6/30/06 7/20/06
State Outreach Facilitator Purchase Order Termination 12/31/06 12/31/06
Rainfall Frequency Analysis Purchase Order Termination 6/30/07 9/30/07
4. FY2007Develop Application for competitive MMMS 3/27/06 3/27/06
Develop Cooperative Agreement for MMMS 5/26/06 5/26/06
Execute FEMA Agreement Articles and Related Forms 9/22/06 9/28/06
011 - Alafia River Basin 234
M118
FIRM Maps - Map Modernization Management Support - Districtwide
FEMA FundingExecute FEMA Agreement Articles and Related Forms 9/22/06 9/29/06
Develop XML-base Export System Purchase Order 11/30/06 5/20/10
XML-base Export System Purchase Order Execution 11/30/06 8/9/10
Develop Map Modernization Program Assistance Agreement 7/31/07 5/30/07
Map Modernization Program Assistance Agreement Execution 9/30/07 9/7/07
5. FY2008Develop Scope of Work for MMMS 6/25/08 6/25/08
Execute FEMA Agreement Articles 6/25/08 8/15/08
Execute 76-10A Form 7/3/08 8/15/08
6. FY2009Execute FEMA Agreement Articles 9/30/09 6/1/10
Execute 76-10A form 9/30/09 6/1/10
Develop Scope of Work for MMMS 9/30/09 6/1/10
7. FY2010Execute Agreement Articles 9/30/10 10/20/10
Execute 76-10A form for FY2010 funding 9/30/10 10/20/10
Develop Scope of Work for Coordinated Need Management Strategy (CNMS) 9/30/10 8/10/10
Develop Scope of Work for Program Management 9/30/10 8/10/10
Status As Of: January 31, 2011
FY2005: COMPLETEFY2006: ON-GOING. The District was awarded $69,200 in MMMS from FEMA to continue travel
associated with Map Modernization, coordination meeting facilitation, and programmatic assistance. Of the $69,200
provided for programmatic assistance and travel, $65,651 has been expended. The remaining $3,969 is for travel. The
remaining funds have been Board encumbered..FY2007: ON-GOING. The District was awarded $69,200 in MMMS from
FEMA to continue travel associated with Map Modernization, coordination meeting facilitation, and programmatic
assistance. Of the $69,200 provided for programmatic assistance and travel, $65,635 has been expended. The
remaining $4,985 is for travel. The remaining funds have been Board encumbered. FY2008: COMPLETEFY2009:
COMPLETE. $69,000 in FY2009 FEMA funding was awarded to the District, of which $69,000 has been expended to
date. The FY2009 funds are being used to retain a consultant to perform programmatic assistance, including meeting
facilitation. FY2010: ON-GOING. $102,000 of FY2010 FEMA funding was awarded to the District, of which $68,920 has
been expended to date. The funds are being used to retain a consultant to perform programmatic assistance and
develop information for FEMA's Coordinated Needs Management Strategy. To date, a total of $953,860 has been
provided by FEMA for Map Modernization Management Support, of which $908,825 has been expended.
011 - Alafia River Basin 235
The Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This nondiscrimination policy involves every aspect of the District's functions, including access to and participation in the District's programs and activities. Anyone requiring reasonable accommodation as provided for in the Americans with Disabilities Act should contact the District's Human Resources Director, 2379 Broad Street, Brooksville, Florida, 34604-6899; (352) 796-721 or 1-800-423-1476 (FL only), ext. 4702; TDD (FL only)1-800-231-6103; or email [email protected].