Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice President Clean Coal Power R&D Co.,Ltd

Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

  • Upload
    others

  • View
    3

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Project Statusof

250MW Air-blown IGCCDemonstration Plant

October, 2002by

Shozo KanekoExecutive Vice President

Clean Coal Power R&D Co.,Ltd

Page 2: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Clean Coal PowerR&D Co.,LTD

Established : June 15, 2001

Purpose : Design, Construction and Operationof Japanese IGCC Demonstration Plant

Shareholders : 10 Japanese Electric Power Companies

Officers : President & CEO Mr.H.OnishiExecutive Vice President Mr.S.KanekoManaging Director Mr.S.Honda

Page 3: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Project SchemeMETI

Joint Project Agreement

Clean Coal PowerR&D Co., Ltd.

30% subsidy

Hokkaido EPCo.Tohoku EPCo.Tokyo EPCo.Chubu EPCo.Hokuriku EPCo.Kansai EPCo.Chugoku EPCo.Shikoku EPCo.Kyushu EPCo.Electric Power

Development Co.CRIEPI

70%contribution

Personnel

METI : Ministry of Economy, Trade and Industry EPCo. : Electric Power CompanyCRIEPI : Central Research Institute of Electric Power Industry

Page 4: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Demonstration Plant―Final Stage to Commercial Plant

High Efficiency

Economy

ReliabilityEnvironmental Performance

Page 5: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Energy Sources for Power Generation in Japan (2000)

TotalTotal229GW229GW

CapacityCapacity

LNGLNG25%25%

OilOil21%21%

CoalCoal13%13%

NuclearNuclear20%20%

HydroHydro19%19%

OthersOthers2%2%

TotalTotal941941××101033

GWhGWh

Power GenerationPower Generation

LNGLNG26%26%

OilOil10%10%

CoalCoal18%18%

NuclearNuclear34%34%

HydroHydro10%10%

OthersOthers2%2%

Page 6: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Conventional Coal Fired Power Plant

- 1000MW class- USC steam condition

- 24.1MPa (3495 psi)- 600/610 deg-C (1112/1130deg-F)- Net Efficiency : 42%LHV

- High Environmental Performance- SOx : 50ppm vol. - NOx : 45ppm vol. 6%O2

- PM : 10mg/m3N 6%O2

Page 7: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Trend on Coal FiredPower Plant Efficiency

40

45

50

1985 1990 1995 2000 2005 2010 2015(year)

600/600566/56624.1MPa

538/566 deg-C

Net

Pow

er P

lant

Effi

cien

cy(L

HV

%)

Conventional600/610

Demonstration Plant(1200 deg-C G/T)

Commercial Plant(1500 deg-C G/T)

Page 8: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

CO2 Emission by Fuel and Cycle

Conventional (538/566 C)

CO2 Emission Rate0 0.2 0.4 0.6 0.8 1

Conventional (600/610 C)

IGCC (1500 C G/T)

Conventional (538/566C)

Conventional (538/566C)

Combined (1500 C G/T)

Coal

Oil

Nat. Gas

Page 9: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Plant Site

Tokyo

Nakoso

FukushimaPrefecture

NakosoIwaki City

Page 10: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Nakoso Power Station

IGCC site

Page 11: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Conceptual Drawing of IGCC Demonstration Plant

Air Separation Unit

Turbine Train

Gasifier

Gas Cleanup

Page 12: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Schematic Diagram of IGCC

CoalFeed

PorousFilter

HRSG

Air Compressor

S/TG/T

O2

M

ASUChar

Syngas

N2

Air

GypsumRecovery

Gas clean up(cold)Air-blown Gasifier

Combined Cycle SystemAir Separation Unit

GasifierDry

Combuster

Page 13: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Fuel Capacity 1700 tons/day

G/T 701DA TIT:1200 C(2190 F)class

Gross Output 250 MW (GT:130 MW )

Net Plant Efficiency 42 % (LHV)

Emission Level SOx / NOx / PMs: 8ppm / 5ppm / 4mg/m3N

Design of IGCC Demonstration Plant

Page 14: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Air-blown Entrained Flow Gasifier

Air-Blown- Lower auxiliary power consumption than oxygen-blown

Two Stage- Best balance of syngas caloriefor GT combustion and hightemperature for melting ash

- Effective gas/slag quenching at the 2nd stage with coal gasification endothermic reaction

Dry-Coal-Fed- Higher thermally efficient than Slurry-Coal-fed

Char

Air

Molten Slag

Air

Coal

Coal Gas + Char

CyclonePorous Filter

Coal

Reductor(2nd Stage)

Combustor(1st Stage)

150010005000

20001000 1500500

Syng

asC

alor

ie

Gas

Tem

pera

ture

Gas Temperature(deg-C)

Syngas Calorie(kcal/Nm3-dry)

Page 15: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Oxygen-blown v.s. Air-blown IGCC in Plant Efficiency

(based on 1300 deg-C G/T)

Oxygen-blownIGCC

Air-blownIGCC

50%

NET

GROSS

40%

45%

Higher net power plantefficiency

Best system forpower generation

Plan

t Ef

ficie

ncy(

LHV%

)

Page 16: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

History of Development of Air-blown IGCC

PDU and Pilot Plant

Demonstration Plant

86

2 t/d PDU 200 t/d Pilot Plant 24 t/d Confirmation Plant

90 2000 0995 05

Basic Researchfor Demo. Plant

Demo. Plant

Design Construction Operation

Page 17: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

200t/d Pilot Plant -1986~1996-Total Operating Hours : 4770hrs

Gas cleanup(hot)

G/T

Gasifier

ControlRoom

Page 18: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

200t/d Pilot PlantNational R&D Project(MITI/NEDO/IGC/MHI etc)

SiteNakoso Power Station at Iwaki City, Fukushima Pref.

Key Dates of the Project- Start of Erection : Jan.27 ’88- Start of Gasification : Jul.23 ’91- Completion of Test : Mar. ’96

Accumulative TotalOperating Hours

- Gasifier : 4770hrs- Gas clean up : 2981hrs- PowerGeneration : 1643hrs(as of Mar.1996)

Maximum ContinuousOperating Hours- 789hrs

(Mar.3 ’95 - Apr.5 ’95)

Page 19: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Pressurized 24t/dIGCC Confirmation Test Plant

Page 20: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Schedule of IGCC Demonstration Plant Project

Fiscal year

DemonstrationPlant Tests

EnvironmentalImpact

Assessment

2001 2002 20042003 2005 2006 2007 2008 2009

Design of plant Construction of plant Operation tests

Page 21: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Environmental Impact Assessment (EIA)

- Takes 3 years or more due to Japanese Regulation- Includes variety of viewpoints :

Air Pollution, Sea Water Pollution/Warming,Biology, Disposals, Global Warming and Landscape

Page 22: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

EIA (Ambient Air Measurement)

Page 23: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

EIA (Underwater Environment Survey)

Page 24: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice

Clean Coal Power

Conclusion

1. Clean Coal Power R&D Co., was establishedby 10 Japanese Utilities.

2. CCP to construct 250MW Air-blown IGCC Demonstration Plant

3. Nakoso, northern Japan, was chosen for Demo plant Site.

4. Environmental Impact Assessment underway

Page 25: Project Status of 250MW Air-blown IGCC Demonstration Plant · Clean Coal Power Project Status of 250MW Air-blown IGCC Demonstration Plant October, 2002 by Shozo Kaneko Executive Vice