Mitsubishi IGCC Project Updates
MITSUBISHI HEAVY INDUSTRIES, LTD.
Oct. 5, 2009Koichi Sakamoto, Deputy GM, IGCC & Gasification
Note: This document is the property of and contains confidential proprietary information of MITSUBISHI HEAVY INDUSTRIES, LTD. This document shall not be reproduced, used, disclosed or transmitted in whole or in part unless authorized in writing by MITSUBISHI HEAVY INDUSTRIES, LTD.
11
MHIMHI’’ss Diversified Products are Contributing to Every Area of Society;Diversified Products are Contributing to Every Area of Society;
Power Systems,Pollution Control Equipment
INFRASTRUCTURE :INFRASTRUCTURE : Bridges, Gates, Desalination Plants
Aircraft, Ships, Land Transportation Systems
ENERGY & ENVIRONMENT:ENERGY & ENVIRONMENT:
TRANSPORTATION :TRANSPORTATION :
INDUSTRIAL &CHEMICAL :INDUSTRIAL &CHEMICAL :
Pulp & Paper Machinery, Chemical PlantsIndustrial Robots, Machine Tools
LIFE STYLE AND LEISURE:LIFE STYLE AND LEISURE:Air-Conditioners, Refrigeration Units, District Heating, Pleasure Boats, Leisure Facilities
OCEAN AND SPACE :DEVELOPMENTOCEAN AND SPACE :DEVELOPMENT
Ocean Research Ships, Deep Submergence Research Vehicles, Rockets, Space Planes
DEFENSE :DEFENSE :Submarines, Naval Vessels, Jet Fighters, Missiles, Tanks
MHIMHI’’ss Diversified Products Focusing Diversified Products Focusing on Gasificationon Gasification
22
Gas Turbine Steam Turbine
Developed to Gasifier Optimized for IGCC
Boiler
Origin of MHI IGCC & Gasification Origin of MHI IGCC & Gasification TechnologTechnologies ies
Gas Purification System Developed to Gas C/Ufor IGCC
Boiler625,778t/h
(2,976 units)
Gas Turbine62,478MW (486 units)
Steam Turbine182,939MW(1,987 units)
33
IGCC: Integrated Gasification Combined Cycle
2025
Gro
ss T
herm
al E
ffici
ency
(LH
V%)
Gro
ss T
herm
al E
ffici
ency
(LH
V%)
40
45
50
55
60
65
70
1990 1995 2000 2005 2010 2015
USC(coal)USC(coal)USC(coal)
2020
NGCC(Natural Gas)
NGCCNGCC(Natural Gas)(Natural Gas)
② IGCC②② IGCCIGCC
① Ultra High temp. GT(1,700oC)
①① Ultra High temp. GTUltra High temp. GT(1,700(1,700ooCC))
J type GTJJ type type GTGT
1,700oC GT1,7001,700ooC C GTGTHot gas
Clean-upSystem
Scenario of Scenario of MitsubishiMitsubishi’’s Clean Coal Technologys Clean Coal Technology
FuelFuel
Low COLow CO2 2
GenerationGeneration
COCO2 2 CaptureCapture
COCO22TransportationTransportation
COCO22StorageStorageOcean &
Underground
MHI High EfficiencyMHI High EfficiencyIGCC Power PlantIGCC Power Plant
MHIMHICOCO22Capture Capture technologytechnology----Low Energy Low Energy CaptureCapture
MHI High Pressure MHI High Pressure COCO22Compressor Compressor for CCS Plantfor CCS Plant
2. CO2 Capture and Storage2. CO2 Capture and Storage1. Improvement of Thermal Efficiency1. Improvement of Thermal Efficiency
44
Contribute to Both of the Power Generation and the Chemical Industries
Business Portfolio Business Portfolio
• Oxygen-Blown Gasifier for Chemical Products (i.e. SNG, CTL, NH3, etc.) at the Minimum Utility Consumption Including Aux. Power
• Air-Blown Gasifier with High Temp. GT for IGCC(i.e. for the Power) at the Highest Plant Efficiency and Economical Merits
55
1980 1990 2000 20101985 1995 20051
10
100
1,000
5
50
500
5,000
Fuel
Cap
acity
(ton
/day
)
2t/d PDU (CRIEPI)
200t/d Pilot Plant(Nakoso)
Pilot Test Plant(MHI Nagasaki)
3,600t/d Commercial Plant
20202015
10,000
2025
AirAir--Blown GasifierBlown Gasifierfor IGCCfor IGCC
OxygenOxygen--Blown GasifierBlown Gasifierfor Chemical Productsfor Chemical Products
Mitsubishi IGCC / GasificationMitsubishi IGCC / GasificationTechnology DevelopmentTechnology Development
1,700t/d / 250MWDemo. Plant
Clean Coal PowerR&D, Ltd.
500MW or MoreCommercial Plant
PDU : Process Development UnitCRIEPI : Central Research Institute of Electric Power Industry
66Recent IGCC and Gasification ProjectsRecent IGCC and Gasification ProjectsMHI has been undertakingMHI has been undertaking
• Air blown IGCC– Australian ZeroGen Project– CCS Demonstration in Nakoso
• Oxygen blown gasification– A project (SNG)– B project (CTL)– C project (Polygeneration-Combined
Air blown / Oxygen blown)
77
7
HRSGHRSG GASIFIERGASIFIER
GAS CLEAN UPGAS CLEAN UP
GT/STGT/ST
SelexolSelexolGas CleanGas Clean--upup
22--3 3 Mil.tonMil.ton/yr/yrCO2 StorageCO2 Storage6565--90%90%Carbon CaptureCarbon Capture
Dual PressureDual PressureReheat CycleReheat CycleBottomingBottoming CCycleycle
M701G2 GT (1 on 1)M701G2 GT (1 on 1)Gas TurbineGas TurbineAir Blown Dry FeedAir Blown Dry FeedGasifierGasifier530 MW gross530 MW grossOutputOutputAustralian Hard CoalAustralian Hard CoalCoalCoal
Principal Specification
Australian ZeroGen ProjectAustralian ZeroGen Project-- Principal SpecificationPrincipal Specification
88
CO Shift
Air
ASU-N2G
Coal
N2
GT Comp
HRSG
Air
Air for Gasifier
O2
Air-BlownGasifier
Air Booster
ST
SRU
Combustor
Sulfur
AGR
CO2Comp
Steam CO2
MHI’s Scope of Supply
CO2Underground
StorageCO2 Pipe Line
Other Company’s Scope
Australian ZeroGen ProjectAustralian ZeroGen Project-- MHIMHI’’ss Scope of SupplyScope of Supply
99
PJ SchedulePJ Schedule
Key Mile StonesKey Mile Stones
201620152014201320122011201020092008
AwardPre-Study
Comm.FS Feed EPC
ScopingStudy
AwardFS
CommencingFEED
ContractEPC
Start Commissioning COD
Pre-Study
2008/10~12 Scoping Study2009/ 1~ 3 Pre-Study2009/ 6 Feasibility Study Awarded2010/ 9 FEED Study Contract (Scheduled)2012/ 1 EPC Contract (Scheduled)2015/ 9 Operation Start (Scheduled)
Project Shcdule
Australian Australian ZeroGenZeroGen ProjectProject-- Project ScheduleProject Schedule
1010
CCS Demonstration in CCS Demonstration in NakosoNakoso
Source: http://www.nedo.go.jp/activities/portal/gaiyou/p08020/h21jisshi.pdf
Japan CCS Co., Ltd., founded in May 2008 with investment from 29 companies, including electric utility companies and oil companies.NEDO (New Energy and industrial technology Development Organization)TEPCO (Tokyo Electric Power Company)
Gas Clean-Up
Gasifier
HRSG
GT / ST
Tokyo
NAKOSO
Fukushima Prefecture
IWAKI City
•• Japan CCSJapan CCS started “Feasibility Study on a Total System from Electric Power Generation to CO2 Storage,” as a part of the “Innovative Zero Emission Coal Gasification Electric Power Project”funded by Japanese Government, NEDO from 2008.
•• TEPCOTEPCO has been charged to perform a study for CCS demonstration system at NakosoIGCC site.
1111
CCS Demonstration in CCS Demonstration in NakosoNakoso
Source: Japan CCS CO., Ltd. RITE CCS Workshop 2008Source: http://www.nedo.go.jp/activities/portal/gaiyou/p08020/h21jisshi.pdf
Major activities of the FS in 2008;• Study on methods for CO2 capture and separation• Study on the amount of the CO2 captured for both 100% of syngas and 10%
of syngas treatment cases • Preliminary specification of the CCS system
1212
• Same “MHI 2-Stage Entrained Flow Gasifier” asAir-Blown Demo. Project Applied- Important factors duly considered
(ex. increased heat flux, change in burner, change of carrier gas, impact to SGC)
• Minimized Oxygen Consumption by 2-Stage Gasification• SGC, as Monolithic Structure with Gasifier, Producing
Steam and Supplying Aux. Power Needed in Plants
N2 or CO2
N2 or CO2Water
Coal
HighHighPress.Press.SteamSteam
Syngas
CoalCombustor
Reductor
SGCSGCGasifierGasifier
MHI Can Design and Supply Gasifiers Both for Air-Blown and Oxygen-Blown
Standard Design ParametersStandard Design Parametersof MHI Oxygenof MHI Oxygen--Blown Gasifier Blown Gasifier
2,500kcal/Nm3-dryHHV of Syngas270 ton/h~ 330 ton/hSyngas Flow Rate
Typically 160~190t/h13MPa x 430deg-C
OxygenStandard Size within Experience
2.8MPa ~4.0MPa(Subject to process requirement)
3,500t/d~4,000t/d
MHI Oxygen-Blown Gasifierfor Chemical Process
HP Steam Conditionsfrom the Gasifier SGC
Gasification AgentGasifier Dimension
Operation Press.
Coal Capacity
Type
1313
O2-blownGasifier System
O2
Slag
Steam for Process
and Power
N2(Purge*)
Acid Gas RemovalSystem
Syngas
Water
Bit. Coal
Air SeparationUnit
*Nitrogen is used to purge or inert equipment for safety
Methanation
OO22--blown Gasification blown Gasification ““AA”” Project Project for SNG Plantfor SNG Plant
O2-blownGasifier System
O2-blownGasifier System
MHIMHI’’s scopes scope
SNG
1414
O2-blownGasifier System
O2
Slag
N2(Purge*)
Acid Gas Removal System
Syngas
Water
Bit. Coal
Air SeparationUnit
*Nitrogen is used to purge or inert equipment for safety
Liquid FuelSynthesis
OO22--blown Gasificationblown Gasification ““BB”” ProjectProjectfor CTL Plantfor CTL Plant
O2-blownGasifier System
CTL
MHIMHI’’s scopes scope
Steam for Process
and Power
1515
Air-blownGasifier System
O2
Slag
N2
Acid Gas Removal System
Water
Bit. Coal
Air SeparationUnit
*Nitrogen is used to purge or inert equipment for safety
ChemicalSynthesis
PolyPoly--Generation Plant Generation Plant ““CC”” ProjectProjectusing Airusing Air--blown & Oblown & O22--blown Combinationblown Combination
O2-blownGasifier System
MHIMHI’’s scopes scope
Syngas
Combined Cycle Power
PlantSteam for Process
and Power
Air
1616
“Mitsubishi’s Contribution for
Energy and Environment Solutions”