    AIM: - TO ANALYZE THE TOTAL PNEUMATIC LEAKAGE OF THE PLANT AND

    ELIMINATION OF LEAKAGE

    THEORY:

    Four screw type air compressors are used, two air dryers, and reservoirs

     Technical Speciica!i"n# " !he Machine# $#e% "& Ai& #'#!e(

    Following air compressors are used

    S)N" COMPRESSOR  

    NAME

    CAPACITY PO*ER  

    1 KPC 1 635 CFM 110 KW

    KPC !50 CFM 135 KW

    3 "#$"% C&PC& '!( CFM )0 KW

    ' %*$$"+ 1000 CFM 150 KW

    -e.ore proceeding to t/e analysis introduction to various components is to e given w/ere t/e

    compressed air is used to per.orm various operations

    Following components are uses compressed air to per.orm operations2

    1 Pneumatic impact wrenc/

    4rinder3 "ir gun

    ' "ctuator

    *se o. components2

    1 Pneumatic impact wrenc/ 2 #/is is used .or t/e olt tig/tening operation

    4rinder2 #/is is used to grind t/e various sur.aces3 "ir gun2 #/is is used mainly on mac/ines to clean t/e c/ip and coolant .rom t/e o

    ' "ctuator2 #/is is used .or t/e s/i.ting o. t/e conveyor .rom one to anot/er

    ITRODUCTION TO FRL

    FRL STANDS FOR FILTER REGULATOR AND LU+RICATOR

    FRL is used .or2

    1 #o .ilter t/e compressed e.ore eing used y component to avoid readown due to dust

    or any .oreign particles #o egulate t/e pressure o. air as per desired woring conditions o. t/e component

    3 #o luricate t/e air eing used w/ic/ will protect t/e rotating, reciprocating and any

    meeting parts .rom wear and tear and also to protect .rom rusting