VPVI-85:Project Reports: Where does the data come from?
Deb Eastberg, SilverEdge
AgendaSummarized Project ReportsOptions that affect valuesWhere data comes from:
Billing Value and Refresh Billing Extensions
Compensation and Contract amounts
Billed, Revenue and Unbilled
ETC, EAC and Budgets
Calculations
Summarized Project Reports
Project Earnings
Office Earnings
Which Report?Office Earnings vs. Project EarningsDo you need to see:
Cost, billable value or both?
Total Billed or Billed by Revenue Type?
Overhead or promotional projects included?
Do you need a drill down to labor, expenses?
Differences: Project Earnings (PE)
Less Rows on the reportColumns (not rows) for Current, YTD, Custom
Period or JTD amountsReport has columns to show Cost and BillingCan include Overhead and Promo ProjectsFields for Budgeted Labor, Expense, ConsultantTotal Billed only (not by Revenue Type)No drill down capability to more detail
Can show Cost and Billing, and different periods on the same line.
No Drill down capability for Labor or Expense amounts.
Single row for each WBS level
JTD Billed, but not Labor Billed, Expense Billed, Consultant Billed, etc.
Budget Amounts can show category values.
Differences: Office Earnings (OE)
Separate row for Current, YTD, Custom Period or JTD amounts
Report will show either Cost or Billing
Will not include Overhead or Promo Projects
Additional Billed values by category fields
Drill down capability for Labor and Expenses
Spent for Labor\Expense Amount is either Cost or
Billing.
Drill down capability for Labor or Expense
amounts.
Row is created for Current, YTD, JTD and/or Custom
periods.
Billed and Revenue by Category
(Labor, Consultant, etc.)
Total Budgeted Amount Only
Showing Project Level Values
Values from the Project are shown.
Sorting to show Phase Values
© Deltek, Inc. All Rights Reserved. 10
Phase values display and are added up for project totals
Activity Options affect amounts on report
Phase 07, which had no activity, was excluded.
Compensation Totals did not include Phase 07
compensation amount.
Questions on PE/OE Options?
12
Where do amounts come from?
Compensation vs. Contract CompensationTotal BilledRevenueUnbilledSpent @ Billing
Where do Fee amounts come from?
Project\Budget & Revenue
Compensation = Direct Labor + Direct Expense
Direct Consultants
Reimbursable Allowance = Reimbursable Expense + Reimbursable Consultant
Total Compensation = Compensation + Direct Consultants + Reimb Allowance
Contract Amounts can be date sensitive on reports.
Contract Management report can show unsigned contracts.
It can also show how much business you won in a particular period.
Contract amounts can be assigned to employees.
Contract Management – A Fee History
Contract Fields and OE/PE Reports
16
You can include all contracts or only those that have a specific Status or Type.
If you assign a period Contract Amounts on Project
Reports will be date sensitive.
Configuration\Accounting\System Settings
Are your fees entered:
At any level?
At the bottom level (and will roll up to higher levels)?
On Contract Management tab and pushed to Budget and Revenue tab?
Configuration Settings
• Configuration/Accounting/System
Project Fee Entering Method
Note: Don’t change to Lowest Level without first talking to a consultant or testing in your sandbox.
Configuration\Accounting\System Settings
Option to update Budget & Revenue amounts from Contract Management
Backfilling Contracts from Compensation
If you enable the Synchronize Fees from Contract to Project Vision tells you about a Utility you can run.
When you create a contract Vision offers to build a historical contract for you if Budget & Revenue amounts already exist.
Amounts can be pushed to Budget & Revenue
If “Include in Fees” is checked the amounts will update the
fields on the Budget & Revenue tab.
If a contract is entered the Budget & Revenue fields are
disabled.
Budget & Revenue fields
Backlog = Total Compensation – JTD Revenue
Project Reports Columns: Budget & Revenue
Budget &
Revenue fields
Contract
Management fields
Contract Backlog = Contract Total Compensation – JTD Revenue
Project Report Columns: Contract Management
Questions on Fee Amounts?
24
Revenue vs. Billed vs. Amount Bill
Invoice Income Accounts are mapped to Project Columns for: Fees Labor Expense Consultant Add-ons Units
Configuration\Accounting\Accounts Receivable
• Billed = Invoiced
• Revenue = “It’s complicated”
JTD Billed and JTD Revenue
© Deltek, Inc. All Rights Reserved. 27
If this box is unchecked Revenue = Billed.
• If Revenue Generation feature is enabled, then you will assign a revenue method at the lowest work breakdown structure level of each regular project.
Configuration\Accounting\User Defined Revenue
© Deltek, Inc. All Rights Reserved. 28
Vision comes with standard methods…
…or you can create your own methods.
Vision comes with standard methods…
OE and PE Unbilled (is not unbilled time and expenses)
Unbilled = Revenue – Billed
Unbilled is not unbilled time and expenses.
The only reports that show unbilled time and
expenses are the Project Detail and the Unbilled
Detail and Aging.
Billing Rates on Project Reports
© Deltek, Inc. All Rights Reserved. 30
JTD Spent @ Billing
Potential Bill value – If I could have billed ever record at its original bill rate
Written off, Deleted, Hold all have Billing Value
Often compare to Total Compensation or Plan – How much more can I work on this job?
Use as Project Reporting Default Terms
The Use as Project Reporting Default Terms Only means the labor will not show on the invoice but will use the rates on PM reports.
If the labor method is NOT “No Labor Billing”then Vision uses that labor method.
No Labor Billing
If the labor method is set to No labor billing (regardless of the checkbox setting) then…
Vision will use the settings in Configuration\Billing\Reporting Default Terms for billing rates.
Labor Billing: Missing or inaccurate billing rates
Billing Rates are stamped on a record when posted.Verify Billing Rates on posting reports or Labor
Detail ReportRates are most often wrong because:Billing terms were not set up at the time of postingBilling Terms have changed since posting
– Billing Report\Missing Billing Terms– Use Refresh Billing Extensions to correct rates
Billing Rates
Corrected Billing Terms = Invoice is
correct, but report is still not correct.
Refresh Billing Extensions
Don’t run this for all
projects and a huge
date range!
Which accounting
periods?
Unbilled Only?
Updates labor
and expense
billing rates on Project Reports.
Refresh uses current billing terms
All time and expenses at the expected bill value (potential bill value)Project ReviewProject ReportsiAccessJTD Bill on PlansJTD Spent on Project Budgets\Labor Billing and
Expense Billing tabs
Labor Billing, Report at Billing, JTD Billing
Questions on Billed, Revenue & Billing Amounts?
Budgets and Budget ValuesTypes of BudgetsEstimate to CompleteEstimate at Complete
ETC and EAC from Budgets
JTD Spent + ETC = EAC
Job to Date Spent + Estimate to Complete = Estimate at Complete
Project Budget Worksheet
Project Budget Worksheet• Created in Accounting\Budgeting\Project Budget
• No option to budget by Employee
• Must budget labor by Labor Code
• No date sensitivity
• ETC and EAC must be updated manually.
Budget WorksheetConsultant LedgerOffice EarningsProject Review\Cost AnalysisProject Review\Billing AnalysisProject EarningsProject ProgressProject Summary
Project Budgets on Project Reports
Vantagepoint Plan\iAccess or Vision
Plan by employee or generic resource.
Plan for specific periods of time.
Consultant LedgerOffice EarningsProject Review\Cost AnalysisProject Review\Billing AnalysisProject EarningsProject ProgressProject Summary
**If you own Planning you can also see these amounts on Resource Planning and Project Planning reports.
iAccess\Planning\Vantagepoint Budgets on Project Reports
Project Report example
JTD Spent + ETC = EAC
Job to Date Spent + Estimate to Complete = Estimate at Complete
ETC and EAC from Planning is date sensitive
ETC and EAC from Project Budget is manually entered amount.
Project Review
If using Planning the Estimate to Complete
is calculated automatically based on future planned
values.
Select the Budget Source of Plan or
Budget.
Questions on ETC and EAC?
Creating Your Own FieldsCalculated Fields
Calculated Fields on Reports
Reporting Calculated Fields will be “personal”, so no one will be able to see them but you.
Configuration\General\Calculated Fields
Fields created within Configuration will be available to anyone with access to the report.
Using a Condition
Use a condition to create more complex calculations.
Also, use this to avoid “division by zero” errors.
Using a ConditionTotal Comp = 0JTD Billed = 12,000
This calculation will be 0 – 12,000 = -12,000
Total Comp = 0JTD Billed = 12,000
This calculation will show a result of zero.
Control Format
How to display zero values, negative amounts
Data Type of Numeric or Percent
Perform Calculation On…
Detail Lines (with option to Sum Up on Total Lines)
Each Row from the Query (same as Detail lines with Sum on Totals)
Last Group Line (with option to Sum Up on Total Lines)
All Detail and Total Lines
Tip: Modifying a Calculated Field
After modifying the field in Configuration open it here, so that the changes are refreshed.
Questions on Calculated Fields?
Thank you for attending!Questions & ContactsPlease visit me during lunch tomorrow in the Expo Hall at the SilverEdge booth.