29
Project Portfolio (as of 2015)

Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

Embed Size (px)

Citation preview

Page 1: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

Project Portfolio (as of 2015)

Page 2: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 2

Dear Partners!

Thank you for your interest to GCE Group. We are the team of energy consultants and engineers

founded in 1994 to provide professional services for big industries. Today, the geography of our

projects covers Eastern and Western Europe, Middle and Southern Asia, Latin America. This portfolio

of recent projects was prepared to present you briefly GCE resources and capabilities in different

industrial sectors.

For the detailed information, please, visit our website www.groupgce.com

Page 3: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 3

Geography

WORLDWIDE OFFICES OF GCE

GROUP

GEOGRAPHY OF SOME PROJECTS

OF 2015

Page 4: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 4

List of services

ENERGY SURVEYS (ENERGY AUDITS)

IN ACCORDANCE WITH INTERNATIONAL,

NATIONAL AND CORPORATE STANDARDS

comprehensive energy survey of the entire

plant or a subdivision;

analysis of process systems performance

(all types of energy resources);

developing EnCon programs;

developing EnCon options for technological

processes and process equipment;

analysis (control) of results after EnCon

options implementation (e.g.: changes in

energy resource consumption norms per a

unit of product output, or a unit of

processed raw materials); ;

expertise of normative energy losses,

specific fuel consumption during thermal

and electrical energy generation and fuel

reserves in accordance with the national

legislation.

ENERGY CONSERVATION STANDARDS

AND REGULATORY DOCUMENTS

developing energy conservation standards,

guidelines and regulations;

developing and implementing corporate

Energy Management Systems in

accordance with ISO 50001;

preparation of a company for certification in

accordance with ISO 50001.

Page 5: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 5

Several Projects 2014-2015 (by countries, A-Z) Country Client Project Sector Start Completion

Brazil Duratex Investment energy audit Construction materials 02.2015 04.2015

Brazil Procópio Investment energy audit Wood processing 08.2014 01.2015

Brazil Pernod Ricard Investment energy audit Alcoholic beverages 09.2014 04.2015

Brazil Cattalini - Terminais Marítimos

Investment energy audit Transport 09.2015 12.2015

Brazil Volkswagen Investment energy audit Automotive 10.2015 03.2016

Germany Dyckerhoff Cement Energy audit of the heating networks Cement 08.2014 01.2015

Germany Lafarge Comprehensive energy audit Cement 03.2015 06.2015

India Rashtriya Ispat Nigam Limited-Visakhapatnam Steel Plant

Mandatory energy audit and process audit

Steel 01.2015 08.2015

India Meghalaya Power Distribution Company

Network simulation, energy efficiency software implementation and staff trainings

Power grids 05.2015 11.2016

India Hindustan Petroleum Corporation - Vishakh refinery

Cooling towers optimization study Oil refining 08.2015 10.2015

New technology implentation feasibility study and pre-design

in process

Israel Bazan Group Energy Analisys and Energy Management System implementation

Oil refining 08.2015 03.2016

Page 6: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 6

Several Projects 2014-2015 (by countries, A-Z) Country Client Project Sector Start Completion

Kazakhstan Kazakhoil Aktobe Energy Management System development

and implementation

Oil extraction 05.2015 12.2015

Kazakhstan ArcelorMittal Temirtau Mandatory energy audit Steel 11.2014 07.2015

Kazakhstan Central Asia Cement Mandatory energy audit Cement 04.2015 10.2015

Kazakhstan Kazzinc Mandatory energy audit of several plants Non-ferrous

metals

12.2013* 09.2015*

Russia Knauf Petroboard Energy audit of heat supply network Pulp & Paper 08.2014 03.2015

Knauf Gypsum Heat Supply system improvement concept Construction 08.2015 03.2016

Russia Gazprom transgas Yugorsk Energy efficiency improvement Program

development

Gas transmission 04.2014 07.2015

Russia Gazprom dobycha yabmurg Energy efficiency improvement Program

development

Gas extraction 05.2015 09.2016

Poland Ciech Soda Polska Comprehensive energy audit Chemical 06.2014 01.2015

Poland Samsung Electronics Poland

Manufacturing

Comprehensive energy audit Consumer

Electronics

02.2015 09.2015

Spain Energias do Portugal (EDP) Investment Grade Audit of Hewlett Packard -

Sant Cugat

Buildings 08.2015 09.2015

Spain Energias do Portugal (EDP) Investment Grade Audit of Gerdau Azkoitia Steel 08.2015 10.2015

Spain Energias do Portugal (EDP) Investment Grade Audit of Abono cement

factory

Cement 10.2015 11.2015

Page 7: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 7

Duratex

Country: Brazil

Location: Agudos – São Paulo

Facility: MDF wooden boards plant

Capacity: 418.915 m³/year

Project: Investment energy audit

Duration: Feb – Apr 2015

Developed EnCon

options:

33

Annual savings: 1355,2 TOE

1,4 mln. EUR

Energy savings (%): 11,0%

Investments: 1,9 mln. EUR

Simple payback period: 1,4 years

Page 8: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 8

PROCÓPIO (Campo Largo factory)

Country: Brazil

Location: Campo Largo – Paraná

Facility: Raffia and derivatives processing plant

Capacity: 14, 4 ths. tons/year

Project: Investment energy audit

Duration: Aug 2014 – Jan 2015

Developed EnCon

options:

7

Annual savings: 85 TOE

50 ths. EUR

Energy savings (%): 3,0%

Investments: 69 ths. EUR

Simple payback period: 1,4 years

Page 9: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 9

PERNOD RICARD

Country: Brazil

Location: Cabo de St. Agostinho –Pernambuco

Facility: Beverages plant

Capacity: 27 mln. liters/year

Project: Investment energy audit

Duration: Sept 2014 –Apr 2015

Developed EnCon

options:

7

Annual savings: 11,68 TOE

15,5 ths. EUR

Energy savings (%): 11,0%

Investments: 12,3 ths. EUR

Simple payback period: 0,8 years

Page 10: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 10

Cattalini – Terminais Marítimos

Country: Brazil

Location: Paranaguá –Paraná

Facility: Marine terminal

Capacity: 400 000 m³

Project: Investment energy audit

Duration: Sept 2015 –Dec 2015

Developed EnCon

options:

13

Annual savings: 969,5 MWH

273 ths. EUR

Investments: 301 ths. EUR

Simple payback period: 1,0 year

Page 11: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 11

Dyckerhoff Cement

Country: Germany

Location: Lengerich

Facility: Cement Plant

Capacity: 1,8 mln. t/year

Project: Energy audit of the heating network

Duration: Aug 2014 – Jan 2015

Developed EnCon

options:

7

Annual savings: 460 ths.EUR

Energy savings(%): 6,0 %

Investments: 1,1 mln. EUR

Simple payback period: 2,4 years

Page 12: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 12

Lafarge Cement

Country: Germany

Location: Karsdorf

Facility: Cement Plant

Capacity: 2,3 mln. t/year

Project: Improvement of exhaust heater efficiency

Duration: Mar 2015 – Jun 2015

Developed EnCon

options:

3

Annual savings: 11%

Increase of efficiency: 9,7%

Simple payback period: 0,8 years

Page 13: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 13

Rashtriya Ispat Nigam Limited – Visakhapatnam Steel Plant

Country: India

Location: Visakhapatnam

Facility: Integrated steel plant

Capacity: 6,3 MTPA

Project: Mandatory energy audit (including process

survey) as per Energy Conservation Act 2011

Duration: Jan 2015 – Aug 2015

Developed EnCon

options:

38

Annual savings: 268,2 ths. TOE

74,8 mln.USD

Energy savings(%): 6,6 %

Investments: 102,0 mln. USD

Simple payback period: 1,4 years

Page 14: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 14

Meghalaya Power Distribution Company Limited (MePDCL)

Country: India

Location: Meghalaya state

Facility: Power distribution grid

Project: Asset checking, mapping, network simulation,

energy audit, data reading from installed

meters, energy efficiency software

implementation, staff training

Duration: May 2015 – Nov 2016 (in progress)

Targets: • Differential GPS based pole to pole survey for the electrical assets,

mapping and simulation of electrical distribution network • Meters reading (CMRI) • Power distribution grid simulation based on obtained data • Developing energy balances with regard to commercial and technical

losses of electrical energy • Developing and implementing energy efficiency software • Software users training for employees • Etc.

Page 15: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 15

Hindustan Petroleum Corporation Limited (Visakh refinery)

Country: India

Location: Visakhapatnam

Facility: Refinery

Capacity: 8,3 MTPA

Project: Study targeted to operational improvement of

sea water cooling towers and development of

cooling tower modernization schemes to

improve energy efficiency

Duration: Sep 2015 – Oct 2015

Developed EnCon

options:

7

Annual savings: 3,7 ths. TOE

1,5 mln. USD

Energy savings(%): 14,8%

Investments: 518,5 ths. USD

Page 16: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 16

Simple payback period: 0,4 years

Hindustan Petroleum Corporation Limited (Visakh refinery)

Country: India

Location: Visakhapatnam

Facility: Refinery

Capacity: 8.3 MTPA

Project: Feasibility study of Organic Rankine Cycle

technology implementation for waste heat

recovery (pre-design project)

Duration: Sep 2015 – in process

Backgrounds: Heat duty of diesel rundown Air Fin Coolers (AFC) in Diesel Hydrodesulphurization units (DHDS) was one of the highest in the refinery. It was proposed to carry out a study and design ORC based system to recover waste heat from the diesel stream going to Air Fin Coolers to produce electricity.

Project description: Analysis of ORC modules implementation possibility for waste heat recovery; development of optimal flowcharts for ORC modules implementation; economical and technical feasibility study of ORC modules implementation; HAZOP study

Page 17: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 17

Bazan Group

Country: Israel

Location: Haifa

Facility: One of the largest integrated refining and

petrochemical complexes in Israel

Capacity: 9,8 MTPA

Project: Development and implementation of Energy

management system as per

ISO 50001 to obtain certification

Duration: Aug 2015 – Mar 2016

Precertification activities completed during the project:

Diagnostic audit

Energy review

Development of all documents required as per ISO 50001 (EnMS Guideline; Monitoring, measurement and analysis; Energy review report, etc.)

Trainings for employees involved into EnMS development and operation (including training for internal auditors for the EnMS)

Page 18: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 18

KAZZINC

Country: Kazakhstan

Location: Ust-Kamenogorsk, Zyryanovsk

Facility: Several integrated metallurgical complexes

and ore enrichment plants

Capacity: Zinc – 307,7 ths.t/year

Lead – 909 ths.t/year

Copper – 60 ths.t/year

Project: Mandatory Energy Audit (comprehensive

energy audit) as per Energy Conservation

and Energy Efficiency Law as of 2012

Duration: Dec 2013 – Sep 2015

Developed EnCon

options:

96

Annual savings: 27,7 ths. TOE

3,1 mln. USD

Energy savings (%): 3,2%

Investments: 5,3 mln. USD

Simple payback period: 1,7 years

Page 19: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 19

ArcelorMittal Temirtau

Country: Kazakhstan

Location: Temirtau

Facility: Integrated steel plant

Capacity: 9,8 mln. t/year

Project: Compulsory Energy Audit

Duration: Nov 2014 – Jul 2015

Developed EnCon

options:

43

Annual savings: 943 ths. TOE

44 mln. USD

Energy savings(%): 12%

Investments: 67 mln. USD

Simple payback period: 1,5 years

Page 20: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 20

Central Asia Cement

Country: Kazakhstan

Location: Aktau

Facility: Cement plant

Capacity: 1 134 ths. t/year

Project: Mandatory Energy Audit (comprehensive

energy audit) as per Energy Conservation and

Energy Efficiency Law as of 2012

Duration: Apr 2015 – Oct 2015

Developed EnCon

options:

12

Annual savings: 23 ths. TOE

4,3 mln. USD

Energy savings(%): 10%

Investments: 57 mln. USD

Simple payback period: 14 years

Page 21: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 21

Samsung Electronics Poland Manufacturing

Country: Poland

Location: Wronki

Facility: Refrigerator production plant

Capacity: 500 000 ref./year (main refrigerator production

facility of Samsung in Europe)

Project: Comprehensive energy audit

Duration: Feb 2015 – Sep 2015

Developed EnCon

options:

12

Annual savings: 157 000 MW/h

3,4 mln. EUR

Energy savings(%): 8%

Investments: 26 mln. USD

Simple payback period: 7,8 years

Page 22: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 22

Gazprom Dobycha Yamburg

Country: Russia

Location: Yamburg

Facility: Oil and gas extraction facility

Capacity: Gas extraction – 200 bln. m³/year;

Gas condensate extraction – 5 mln. t/year

Project: Intelligent software implementation for energy

efficiency indicators and EnPIs analysis,

trainings for employees (one of the stages)

Duration: May 2015 – September 2016 (in progress)

Annual savings: 10%

Investments: 19 ths. USD

Simple payback period: 10 months

Page 23: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 23

Gazprom Transgas Yugorsk

Country: Russia

Location: Yugorsk

Facility: Main gas pipelines

Gas transmission

capacity:

1.5 bln.m³/day

Project: Development and implementation of the

methodology and intelligent software for

reliability, risk and energy efficiency analysis

(one of the stages)

Duration: April 2014 – July 2015

Annual savings: 5%

Investments: 36 ths. USD

Simple payback period: 8 months

Page 24: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 24

Knauf Petroboard

Country: Russia

Location: Leningrad region

Facility: Pulp & Paper factory

Capacity: 235 ths. t/year

Project: Local energy audit

Duration: Aug 2014 –Mar 2015

Developed EnCon

options:

8

Annual savings: 24,9 ths. TOE

1,7 mln. EUR

Energy savings(%): 13,7%

Investments: 7,9 mln. EUR

Simple payback period: 4,6 years

Page 25: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 25

Knauf Gypsum

Country: Russia

Location: Moscow region

Facility: Construction materials factory

Project: Developing heat supply system improvement

concept

Duration: Aug 2015 – Apr 2016

Developed EnCon

options:

6

Annual savings: 2,3 ths. TOE

0,14 mln. EUR

Energy savings(%): 13,7%

Investments: 1,1 mln. EUR

Simple payback period: 8,1 years

Page 26: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 26

Hewlett Packard Sant Cugat

Country: Spain

Location: Barcelona

Facility: Techno park (complex of buildings with 3000

employees)

Project: Investment Grade Audit

Duration: June 2015 – Sep 2015

Developed EnCon

options:

8

Annual savings: 707,9 TOE

195,2 ths. EUR

Energy savings(%): 14,6%

Investments: 497,0 ths. EUR

Simple payback period: 2,6 years

Page 27: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 27

Energias do Portugal (Gerdau Azkoitia)

Country: Spain

Location: Azkoitia

Facility: Steel rolling plant

Capacity: 6,3 MTPA

Project: Investment Grade Audit

Duration: Jul 2015 – Nov 2015

Developed EnCon

options:

8

Annual savings: 10,1 ths. TOE

1,2 mln. EUR

Energy savings (%): 11,0%

Investments: 2,4 mln. EUR

Simple payback period: 1,9 years

Page 28: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

WWW.GCE.COM 28

Energias do Portugal (Cementos Tudela Veguín – Aboño cement factory)

Country: Spain

Location: Gijón

Facility: Cement plant

Capacity: 2 600 t/day

Project: Investment Grade Audit

Duration: Oct 2015 – Nov 2015

Developed EnCon

options:

9

Annual savings: 9,7 ths. TOE

2,1 mln. EUR

Energy savings (%): 14,8%

Investments: 3,5 mln. EUR

Simple payback period: 1,7 years

Page 29: Project Portfolio (as of 2015) - GCE Group you for your interest to GCE Group. ... India Hindustan Petroleum Corporation ... • Differential GPS based pole to pole survey for the

Contacts GCE Group headquarters locates in one of the beautiful cities

in the world in Saint Petersburg. Our post address is

6 Bukharestskaya street, St. Petersburg, Russia, 192102

Please feel free to contact with us. Contacts of closest to you office

you can find in our corporate website www.groupgce.com

International Department: +7 812 331 96-75 E-mail: [email protected]