24
TTY/TDD Dial 711 www.VirginiaDOT.org 703-259-2377 703-259-1768 703-259-2986 703-259-1779 © 2017 Commonwealth of Virginia 4975 Alliance Drive Fairfax, VA 22030 4975 Alliance Drive Fairfax, VA 22030 4975 Alliance Drive Fairfax, VA 22030 4975 Alliance Drive Fairfax, VA 22030 Primary Contact: Angel Tao, P.E. [email protected] Claudia Llana, P.E. [email protected] Brian Costello [email protected] Jennifer McCord [email protected] Communications Location and Design Preliminary Engineering Right of Way & Utilities Get Involved Public Information Meeting Blackburn Road and Rippon Boulevard Prince William County Wednesday, Dec. 6, 2017 6:30 p.m. to 8 p.m. Freedom High School 15201 Neabsco Mills Road, Woodbridge, VA 22191 Welcome to the Virginia Department of Transportation’s (VDOT) public information meeting on proposed improvements to install a new traffic signal at the intersection of Blackburn Road and Rippon Boulevard. We look forward to your active participation. This meeting is being held to provide an opportunity for citizens and organizations to give VDOT comments and/or suggestions on the proposed project. VDOT strives to ensure that all members of the community have the opportunity to participate in public decisions on transportation projects and programs affecting them. VDOT representatives are present to discuss the project and answer your questions. A comment sheet is included in this brochure and your input is encouraged. All written comments received on this project will be reviewed by the design team. A summary of comments and responses will be posted on the project website after the meeting. Public Information Meeting Project Overview Purpose: Improve safety and operations for all users Project: Intersection of Blackburn Road and Rippon Boulevard Improvements: Install a new traffic signal at the intersection of Blackburn Road and Rippon Boulevard, including pedestrian improvements State Project: 0638-076-203, P101, R201, C501 / UPC: 107405 VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions. You may leave the sheet or any other written comments in the comment box, or mail/email your comments. Comments must be postmarked, emailed or delivered to VDOT by Dec. 16, 2017. Mail comments to Ms. Angel Tao at the address below or email [email protected]. Please include “Blackburn Road and Rippon Boulevard” in the subject line. Project information shared at this meeting will be available online at www.virginiadot.org/projects and at VDOT’s Northern Virginia Office. Contact Information

Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

TTY/TDD Dial 711

www.VirginiaDOT.org

703-259-2377

703-259-1768

703-259-2986

703-259-1779

© 2017 Commonwealth of Virginia

4975 Alliance Drive Fairfax, VA 22030

4975 Alliance Drive Fairfax, VA 22030

4975 Alliance Drive Fairfax, VA 22030

4975 Alliance Drive Fairfax, VA 22030

Primary Contact:

Angel Tao, P.E.

[email protected]

Claudia Llana, P.E.

[email protected]

Brian Costello

[email protected]

Jennifer McCord

[email protected]

Location and Design

Preliminary Engineering

Right of Way & Utilities

Get InvolvedPublic Information Meeting

Blackburn Road and Rippon BoulevardPrince William County

Wednesday, Dec. 6, 2017 6:30 p.m. to 8 p.m.Freedom High School 15201 Neabsco Mills Road, Woodbridge, VA 22191

Welcome to the Virginia Department of Transportation’s (VDOT) public information meeting on proposed improvements to install a new traffic signal at the intersection of Blackburn Road and Rippon Boulevard. We look forward to your active participation.

This meeting is being held to provide an opportunity for citizens and organizations to give VDOT comments and/or suggestions on the proposed project. VDOT strives to ensure that all members of the community have the

opportunity to participate in public decisions on transportation projects and programs affecting them.

VDOT representatives are present to discuss the project and answer your questions. A comment sheet is included in this brochure and your input is encouraged. All written comments received on this project will be reviewed by the design team. A summary of comments and responses will be posted on the project website after the meeting.

Public Information Meeting

Project Overview

Purpose: Improve safety and operations for all users

Project:Intersection of Blackburn Road and Rippon Boulevard

Improvements: Install a new traffic signal at the intersection of Blackburn Road and Rippon Boulevard, including pedestrian improvements

State Project: 0638-076-203, P101, R201, C501 / UPC: 107405

VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions. You may leave the sheet or any other written comments in the comment box, or mail/email your comments.

Comments must be postmarked, emailed or delivered to VDOT by Dec. 16, 2017.

Mail comments to Ms. Angel Tao at the address below or email [email protected]. Please include “Blackburn Road and Rippon Boulevard” in the subject line. Project information shared at this meeting will be available online at www.virginiadot.org/projects and at VDOT’s Northern Virginia Office.

Contact Information

Page 2: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

VDOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964. if you need more information or special assistance for persons with disabilities or limited English proficiency, contact VDOT’s Civil Rights Division at 703-259-1775 or TTY/TDD 711.

Preliminary right of way impacts presented on the displays are conceptual in nature and may change as the design is refined. The property owners will be informed of the exact location of the easements during the right of way acquisition process and prior to construction.

Information about right of way purchase is discussed in VDOT’s brochure, “Right of Way and Utilities: Guide for Property Owners and Tenants.” Copies of this brochure are available here from VDOT personnel. After this meeting, information regarding right of way may be obtained from the right of way contact listed on the back of this brochure.

Right of Way

Anticipated Schedule

Public Information Meeting Dec. 6, 2017 Comment period endsDec. 16, 2017

Approve Design Summer 2018 Begin ConstructionSpring 2019

End ConstructionFall 2019

Project Description Engineering Design: $270,000

Right of Way Acquisition/Utility Relocation: $100,000

Construction:$850,000

Total Cost:$1.2 million

The project is being financed with federal funds.

Estimated Project Cost

Civil Rights

Aerial Overview of the Blackburn Road and Rippon Boulevard Proposed Improvements

This project aims to improve safety and operations at the intersection of Blackburn Road and Rippon Boulevard. It will also provide additional sidewalk connections from Blackburn Road to the shared-use path along Rippon Boulevard.

Based on VDOT’s recent traffic study, existing congestion and crash history at this location warrants installing a traffic signal.

The project will install a new traffic signal at the intersection of Blackburn Road and Rippon Boulevard. In addition, the turn lanes on Rippon Boulevard that have not been in use since the intersection became a four-way stop will be restored as part of pavement resurfacing and restriping.

Environmental Review

Pursuant to the National Environmental Policy Act (NEPA) and 23 CFR 771, a NEPA document in the form of a Programmatic Categorical Exclusion (PCE) will be prepared for this project under a Programmatic Agreement between VDOT and the Federal Highway Administration (FHWA). The PCE will include information about potential impacts to environmental resources within the project’s vicinity. In accordance with 23 CFR 774.5, a Section 4(f) de minimis impact finding will also be requested from FHWA for minor use of Rippon Landing Neighborhood Park.

Page 3: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

COMMENT SHEETState Project: 0638-076-203, P101, R201, C501 / UPC: 107405

Please leave this comment sheet at the designated location, mail your comments to the addressee on the reverse side, or email them to [email protected].

Please include “Blackburn Road and Rippon Boulevard” in the email subject line.

Name (optional):

Address (optional):

Email (optional):

1. Do you have comments or concerns about the proposed signal located at Blackburn Road and Rippon Boulevard?

2. Do you support the proposed signal located at Blackburn Road and Rippon Boulevard?

Yes No Yes with modifications, please explain:

3. Do you have any comments about a potential signal located at Forest Grove Drive and Rippon Boulevard?

4. Do you have any comments about the proposed alternatives presented?

5. How did you hear about this meeting?

Newspaper Social Media Website Other

All comments are subject to public disclosure.

Public Information Meeting

Blackburn Road and Rippon Boulevard Prince William County

Wednesday, Dec. 6, 2017

6:30 p.m. to 8 p.m.

Freedom High School

15201 Neabsco Mills Road, Woodbridge, VA 22191www.VirginiaDOT.org

Page 4: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Postal Servicewill notdeliver withouta stamp

Fold Line

Fold Line

Angel Tao, P.E.

Virginia Department Of Transportation

Northern Virginia District

4975 Alliance Drive

Fairfax, VA 22030

Page 5: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Blackburn Rd at Rippon Blvd

Public Information Meeting

Project Manager

Angel Tao, P.E.

Project Sponsor

Claudia Llana, P.E.

December 6, 2017

Page 6: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Blackburn Rd at Rippon Blvd Location Map

Project Location

Page 7: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Purpose and Need The purpose of this project is to improve vehicular and pedestrian

safety and operations at the Blackburn Rd and Rippon Blvd

intersection.

3

Page 8: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Project History • Received citizens’ requests for a new signal for Blackburn Rd and

Rippon Blvd starting in 2003

• Traffic study shows that signal warrants have been met for a new

signal installation

• Project received federal funding (RSTP) in 2015

4

Page 9: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Signal Warrants

Total of 9 signal warrants in the Manual on

Uniform Traffic Control Devices (MUTCD) to

justify the installation of a signal

Signal warrants met for the Blackburn/Rippon

intersection:

Warrant 2 – Four Hour Volumes

Warrant 3A – Peak Hour Delay

Warrant 7 – Crash Experience

10 crashes in the last 3 years.

7 out of 10 were angle crashes.

5 out of 10 were injury crashes.

5

A new signal will decrease the number of angle crashes which cause

the most severe injuries.

Page 10: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

6

Proposed Scope of Work

• New traffic signal

• Pedestrian improvements

Pedestrian signals

Crosswalks

ADA ramps

Connect sidewalk to an adjacent project

• Minor geometric improvements

Slip lane island with refuge

Milling and resurfacing

• Existing striped out turn lanes will be restored and

utilized if possible.

Page 11: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

7

Right of Way Impacts

3 Properties impacted, including the Rippon Landing Park

Rippon

Landing Park

Page 12: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

8

Proposed Schedule (Pending public meeting comments)

Public Information Meeting: December 6, 2017

Comment Period Ends: December 16, 2017

Approve Design: Summer 2018

Construction Begins: Spring 2019

Construction Completed: Fall 2019

Page 13: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

9

• Concerns with the proposed traffic signal at Blackburn

Road and Rippon Boulevard

• Request to evaluate a roundabout at Blackburn Road

and Rippon Boulevard

• Request to evaluate the adjacent Forest Grove Drive and

Ripon Boulevard Intersection

• Request for Public Hearing / Meeting

Public Input Received

Page 14: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Forest Grove Dr at Rippon Blvd

10

• Recent modifications to the neighborhood access point at Rte 1 and Vantage Dr induced

more traffic at Forest Grove Dr and Rippon Blvd.

• Forest Grove Dr and Rippon Blvd intersection is found to meet the same signal warrants

as Blackburn Rd and Rippon Blvd (volume, peak hour delay, and crash history).

• 13 crashes in the last 3 years

• 12 out of 13 were angle crashes

• 5 out of 13 were injury crashes

Page 15: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Alternatives 1 – 3

• Alternative 1 – No Build

• Do not implement any signal installation

• Existing safety and operational problems remain unresolved

• Alternative 2 – Build new signal at Blackburn Rd and Rippon

Blvd

• Implement proposed project

• Project fully funded and would improve operations and safety at

Blackburn Rd and Rippon Blvd

• Alternative 3 – Build new signal at Forest Grove Dr and Rippon

Blvd

• Project not yet funded but would improve operations and safety at

Forest Grove Dr and Rippon Blvd

11

Page 16: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Alternative 4 – Both Signals at

Forest Grove/Rippon & Blackburn/Rippon

12

• Signals would be coordinated to favor Rippon Blvd through traffic.

• Would improve operations and safety for both intersections.

• Funding not currently available for both improvements.

Page 17: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Alternative 5 – Roundabout at Blackburn/Rippon &

Intersection Modifications at Forest Grove/Rippon

13

• Using a single lane roundabout to reduce right of way impacts and construction cost

• Narrows approaches to 1 lane & prohibits left turns out at Forest Grove Dr in both directions

• Reduce the number and severity of crashes compared to signal installation

• Traffic modeling shows moderate delays on Rippon Blvd

• Funding not identified; higher upfront cost

Page 18: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Traffic Simulation Videos

14

Page 19: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Alternative Comparison

15

Safety Operations Cost

ALT 1 – No Build

- - $0

ALT 2 – New Signal at

Blackburn/Rippon (Current Funded Project)

+ + $1.2M

ALT 3 – New Signal at

Forest Grove/Rippon + + $1.1M

ALT 4 – New Signal at

both Blackburn/Rippon

and Forest Grove/Rippon ++ ++ $2.3M

ALT 5 – Single Lane

Roundabout at

Blackburn/Rippon with

access modifications at Forest Grove/Rippon

+++ + $3M

Page 20: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Nearby Projects

16

• Neabsco Mills Rd Widening

from Route 1 to Smoke Ct

(VDOT/PWC)

Under Design

• Rippon Landing Park

Parking Lot (PWC)

Under Design

• Route 1 Widening from

Featherstone Road to

Mary’s Way (PWC)

Under Right of Way

acquisition

• Route 1 Widening from

Mary’s Way to Annapolis

Way (VDOT)

Under Construction

Page 21: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

Please Submit Your Comments

17

Your written comments are welcome:

• By Email

[email protected]

Please include “Blackburn Road and Rippon Boulevard” in the

subject line

• By Mail

Ms. Angel Tao

Virginia Department of Transportation

4975 Alliance Drive

Fairfax, VA 22030

• Leave in COMMENT BOX

Page 22: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

VDOT CONTACT INFO

18

1-800-FOR-ROAD

1-800-367-7623

VDOT website: http://www.virginiadot.org/

Resources: http://virginiaroads.org/

Report a problem: https://my.vdot.virginia.gov/

Page 23: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational
Page 24: Project Overview - Virginia Department of …...Alternatives 1 – 3 • Alternative 1 – No Build • Do not implement any signal installation • Existing safety and operational

UPC 107405

Roundabout at Rippon Blvd and Blackburn Road

REVIEWED BY:

RIGHT LANE

MUST

TURN RIGHT

Sign

Install R3-7R

RIGHT LANE

MUST

TURN RIGHT

Sign

Install R3-7R

Sign

Install R3-2

U. S. ROUTE 1

RIPPON BOULEVARD EAST OF

CONCEPT DESIGN FOR RTE. 1362

(BLACKBURN ROAD)

ROUNDABOUT AT ROUTE 638

ALTERNATIVE WITH ONE-LANE

Richard West, P. E.DESIGN BY: Angel Tao, P. E.

50'R=

60'

R=55'

R=

50'R=

December, 2017One Inch = 25 Feet

ROUTE 1392 (R

IPPON BOULEVARD)

(FO

REST G

RO

VE

DR)

RO

UTE 13

96

(BLAC

KB

UR

N

RD)

RO

UTE 638

Sign

Install R3-2

PROPOSED CURB

PROPOSED CURB & GUTTER

SCALE: DATE: Roll Plan

UPC 107405

Roundabout at Rippon Blvd and Blackburn Road

REVIEWED BY:

RIGHT LANE

MUST

TURN RIGHT

Sign

Install R3-7R

RIGHT LANE

MUST

TURN RIGHT

Sign

Install R3-7R

Sign

Install R3-2

U. S. ROUTE 1

RIPPON BOULEVARD EAST OF

CONCEPT DESIGN FOR RTE. 1362

(BLACKBURN ROAD)

ROUNDABOUT AT ROUTE 638

ALTERNATIVE WITH ONE-LANE

Richard West, P. E.DESIGN BY: Angel Tao, P. E.

50'R=

60'

R=55'

R=

50'R=

December, 2017One Inch = 25 Feet

ROUTE 1392 (R

IPPON BOULEVARD)

(FO

REST G

RO

VE

DR)

RO

UTE 13

96

(BLAC

KB

UR

N

RD)

RO

UTE 638

Sign

Install R3-2

PROPOSED CURB

PROPOSED CURB & GUTTER

SCALE: DATE: Roll Plan

Metal Sign

Metal Sign

Metal Sig

n

Metal Sign

Wooden Sig

n

Wooden Sig

n

Metal Sig

n

D

Metal Sig

n

D

Metal Sig

n

Metal Sign

Metal Sign

Metal Sign

Metal Sig

n

Metal Sig

n

D

Metal Sig

n

Metal Sig

n

D

Metal Sig

n

Metal Sig

n

D

Metal Sig

n

Metal Sig

n

0.5' C

onc. Curb

Conc. Sidewalk

0.5' Conc. Curb

0.5' C

onc. C

urb

Conc. Slab

2.5' Conc. C

urb

Conc. Sidewalk

Asphalt E

nt.

2 - Styl Fr Bldg Conc. Slab

Metal Guardrail

0.5' Conc. Curb

Metal Gua

rdrail

Gravel Ent.

Wooden Sign

2.5' Conc. C

urb

0.5' Conc. Curb

2.5' Conc. Curb

Inv. = 2

4.62'

In Pl. 18" Concrete Pipe

Inv.

Out = 34.3

8'

Top = 36.9

2'

In Pl. M

etal

Grate

A

B

In Pl. 3

6" Concrete Pipe

Inv.

Out = 29.6

7'

Inv. In = 29.9

0' (B)

Inv. In = 30.9

2' (A)

Top = 37.2

9'

In Pl. S

SM

H

In Pl. 3

6" Concrete Pipe

Inv.

Out = 39.8

4'

Top = 46.8

5'

In Pl. S

SM

H

In Pl. 2

7" Concrete Pipe

Location

Approx.

Only

Sructure Not Found

Inv. Out = 18.94'

In Pl. Conc. Endwall

In Pl. 15" Concrete Pipe

Inv. In = 20.06'

In Pl. Conc. Headwall

In Pl. 48" Concrete Pipe

Inv. In = 19.31'

In Pl. Conc. HeadwallWCR

WCR

(Asphalt)

(64' Rig

ht of

Way)

Blackburn Rd -

Rte. 638

(Asphalt)

(64' Rig

ht of

Way)

Blackburn Rd -

Rte. 638

(Asphalt) (110' Right of Way)

Rippon Blvd. - Rte. 1392 - WBL

(Asphalt) (110' Right of Way)

Rippon Blvd. - Rte. 1392 - EBL

(Asphalt)

(110' Right of Way)

Rippon Blvd. - Rte. 1392 -

WBL

(Asphalt)

(110' Right of Way)

Rippon Blvd. - Rte. 1392 -

EBL

Asphalt Path

In Pl. 15" Concrete Pipe

Inv.

Out = 33.6

0'

Top = 40.14'

In Pl. S

SM

HIn Pl. C

onc. DI

In Pl. 12

" Concrete Pipe

Inv. In = 2

4.2

8' (12

")

Inv. In = 2

4.95' (15

")

Top = 2

6.79'

In Pl. S

SM

H

In Pl. C

onc. DI

Asphalt Path

Asphalt Path

In Pl. 12

" Concrete Pip

e

Inv. O

ut = 19

.27'

Top = 2

2.7

7'

In Pl. S

SM

H

In Pl. C

onc. DI

In Pl. 18

" Concrete Pip

e

Inv. O

ut = 17

.44'

Inv. In = 17

.55'

Top = 2

3.0

4'

In Pl. S

SM

H

In Pl. C

onc. DI

Inv. O

ut = 16

.15'

Gravel Should

er

Metal Sig

n (M

edia

n)

Metal Sig

n (M

edia

n)

Metal Sig

n (M

edia

n)

Gravel Parking Area

Generator

Gravel Shoulder

Conc. Median

Conc. Median

Grass Median

0.5' Conc. Curb

0.5' Conc. Cur

b

Metal Sig

n (M

edia

n)

Metal Sig

n (C

onc. Isla

nd)

Island

Con

c.

Woods

Inv. Out = 19.74'

In Pl. Conc. Endwall

Curb

2.5' C

onc.

2.5' Conc. Curb